You are on page 1of 77

NCO

NTRO
J-13D
EDSD REV

-Ap r
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

-
LLED
DATE:
DATE:
DATE:
DATE:
DATE:
0F1
THIS INDICATES THAT REV. NO.__________

2
10-08643-
SEPT-27-22

0
00A NM

M
OF THIS DRAWING IS COVERED, FOR ALL 0005 ISSUED FOR REVIEW KO

WHEN
CONTROL NUMBER

23
APPROVAL/CERTIFICATION REQUIREMENTS, 10-08643-

S
DEC-22-22 ISSUED FOR CONSTRUCTION NM KO
0005

AGENCY
BY: 00

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER

PRINT
K. OGAWA
DISCIPLINE

CERTIFIED

MAR-14-23
10-08643-

N. ALSAHBIB

OPERATIONS
MAR-14-23

CONSTRUCTION

ED
MAR-14-23

MAR-14-23
(DCC) NO. _____________________ 0F1 0005 ISSUED FOR CONSTRUCTION NM

N. MINAMIBORI
DATE: KO

SAFANIYA
Saudi Aramco 2616-ENG (03/99)

ZULUF AH UTILITIES
13-Apr-2023

Project Specifications
Construction Specs for Bldg. HVAC
SAUDI ARABIAN OIL COMPANY

DOC
DWG.TYPE

SAUDI ARABIA
MP
PREP’D
PCWBS

JO / EWO:
A80
FOR

JGC JOB NO.


JGC DOC NO.

PLANT NO.
ISSUE PURPOSE

K
INDEX
For Construction

JM
BUILDING HVAC WORKS

CHK’D

10-08643-0005
JGC CORPORATION
CONSTRUCTION SPECIFICATION

DRAWING NO.
0000

CE-181305-001
0-8887-20-0000

NM
SS-0000-13405-0001

1
of
APP’D

77
FOR CONSTRUCTION

SHT.NO.

0F1
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

1 / 77
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

TABLE OF CONTENTS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 PURPOSE ............................................................................................................ 3
ENGG CERT

KO
KO
KO
2.0 DEFINITIONS AND SUBCONTRACTOR RESPONSIBILITIES ......................... 3
NM
NM

NM
2.1 Definitions ........................................................................................................... 3
2.2 Subcontractor Responsibilities ........................................................................ 3
3.0 APPLICABLE CODES, STANDARDS AND DOCUMENTS .............................. 4
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

3.1 Saudi Aramco Codes and Standards ............................................................... 4


ISSUED FOR REVIEW

3.2 Project Specifications........................................................................................ 5


3.3 HVAC Standard Drawings ................................................................................. 5
DESCRIPTION

3.4 Industry Codes and Standards ......................................................................... 5


4.0 PRODUCT DELIVERY, STORAGE AND HANDLING........................................ 6
5.0 MATERIAL APPROVAL REQUEST (MAR) ....................................................... 6
6.0 VENDOR MANUFACTURER SELECTION ........................................................ 6
7.0 PROJECT PRESERVATION REQUIREMENTS................................................. 6
8.0 ACTIVITY ON SITE ............................................................................................. 6
9.0 DUCTING AND PIPING SUPPORTS .................................................................. 6
JO/EWO

10-08643-
10-08643-

10-08643-

10.0 MECHANICAL IDENTIFICATION ....................................................................... 9


0005
0005

0005

11.0 VIBRATION AND SOUND ISOLATION ............................................................ 11


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

12.0 PIPE AND DUCT INSULATION ........................................................................ 15


13.0 REFRIGERANT PIPING AND ACCESSORIES ................................................ 18
00A

0F1
NO.
REV

00

DISCIPLINE
14.0 AIR COOLED CONDENSING UNITS ............................................................... 29
ENGINEER
N. MINAMIBORI 15.0 PACKAGED Air Conditioning Unit ................................................................. 31
DATE:
MAR-14-23 16.0 HUMIDIFIERS .................................................................................................... 32
PROJECT
ENGINEER 17.0 ELECTRIC DUCT HEATER .............................................................................. 35
N. ALSAHBIB
MAR-14-23
18.0 AIR HANDLING UNITS ..................................................................................... 37
DATE:
CERTIFIED 19.0 FANS.................................................................................................................. 39
K. OGAWA
MAR-14-23
20.0 CHEMICAL FILTER UNITS ............................................................................... 41
DATE:
CONSTRUCTION 21.0 DUCTWORK & ACCESSORIES ....................................................................... 43
AGENCY
22.0 DAMPERS ......................................................................................................... 49
DATE: 23.0 AIR DEVICES, REGISTERS, GRILLES AND DIFFUSERS ............................. 53
OPERATIONS
24.0 DUCTED-SPLIT AND MINI-SPLIT AIR CONDITIONER .................................. 56

DATE:
25.0 VAV/CAV BOX (AIR TERMINAL UNITS) ......................................................... 58
CONTROL NUMBER

26.0 PRECISION AIR CONDITIONER ...................................................................... 61


VERIFICATION

27.0 HVAC CONTROLS ............................................................................................ 63


EDSD

28.0 TESTING, ADJUSTING AND BALANCING ..................................................... 70


DATE:
BY:

29.0 DOCUMENTATION AND SUBMITTAL REQUIREMENTS .............................. 74


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 2


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 2 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 PURPOSE
ENGG CERT

KO
KO
KO
This document, along with other relevant project documents referenced in this document,
NM
NM

NM
presents the minimum requirements for the design, fabrication, supply and installation of
HVAC System to be used in the Zuluf Central Plant Facilities (Zuluf CPF) Project.

The specification shall be applied to the following buildings:


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

a. Substations (SS-100, SS-200, SS-300, SS-400 & SS-600)


ISSUED FOR REVIEW

b. Central Control Building (CCB)


c. Emergency Generator Building (EGB)
DESCRIPTION

d. Process Interface Buildings (PIB-01, PIB-02, PIB-03 & PIB-04)


e. Line Maintenance Buildings (LMB-01, LMB-02 & LMB-03)
f. Operator Shelters (OS-01, OS-02, OS-03 & OS-04)
g. Chemical Storage Shelters (CS-01 & CS-02)

2.0 DEFINITIONS AND SUBCONTRACTOR RESPONSIBILITIES

2.1 Definitions
Whenever in this specification below words are used, it shall be understood as follows:
JO/EWO

10-08643-
10-08643-

10-08643-

Company : Saudi Aramco


0005
0005

0005

Contractor : JGC
SEPT-27-22

MAR-14-23

Subcontractor : The party supplying all materials and/or labor including shop
DEC-22-22
DATE

drawing preparation, execution at site, commissioning and handing over etc., unless
otherwise noted in this specification or construction drawings.
00A

0F1
NO.
REV

00

Vendor : The party supplying equipment or materials including system


DISCIPLINE drawings, supervision, specialist personnel, support the inspection and shop/site testing,
ENGINEER training etc., unless otherwise noted in this specification or construction drawings. For
N. MINAMIBORI
MAR-14-23
usage of term “vendor” in the document, vendor can be a manufacturer or a supplier.
DATE:
PROJECT
ENGINEER Subcontractor Responsibilities
N. ALSAHBIB Subcontractor shall be responsible for the following requirements but not limited to the
DATE: MAR-14-23 following as the list is not comprehensive.
CERTIFIED
K. OGAWA 1) Any conflict between the requirements of this specification and related codes,
DATE:
MAR-14-23 standards, data sheet, drawings, requisition, etc., shall be referred to Contractor for
CONSTRUCTION clarification/ resolution.
AGENCY

2) Subcontractor shall not make assumptions to replace the information not furnished
DATE:
OPERATIONS
by Contractor. Subcontractor is required to obtain necessary information from
Contractor. All claims arising from lack of knowledge of required information will be
rejected by Contractor.
DATE:
CONTROL NUMBER

3) Subcontractor shall list and fully describe all deviations from this specification and
VERIFICATION

related codes.
EDSD

4) Subcontractor shall verify all (existing) dimensions and conditions shown on


DATE:
BY:

Contractor’s drawings at the field.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

5) In the case where contradiction and/or inadequacy are found, shall be claimed.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

Contractor’s will issue instruction for further work, which shall be in written
(DCC) NO. _____________________

confirmation, if necessary.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 3


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 3 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.0 APPLICABLE CODES, STANDARDS AND DOCUMENTS
ENGG CERT

KO
KO
KO
The following specifications, standards, drawings and regulations shall be applied to the
selection of material and workmanship. The effective standards cut-off date shall be
NM
NM

NM January 01, 2019, unless specified otherwise.

In the event that there is a conflict among following documents, it must be brought to the
attention of Contractor at the earliest opportunity and prior to the commencement of any
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

construction activity. Otherwise, the most stringent requirement shall be adopted at


Subcontractor’s own cost.
ISSUED FOR REVIEW

The subcontractor may be allowed to relax the above requirements in certain situations
DESCRIPTION

(e.g., if SAES requirement is relaxed), but only by prior instruction from Contractor
3.1 Saudi Aramco Codes and Standards
• SAES P-103 - Metric Units of Weights and Measures
• SAES-A-004 - General Requirements for Pressure Testing
• SAES-A-112- Meteorological and Seismic Design Data
• SAES-A-105 - Noise ControlSAES-B-014 Safety Requirements for Plant
and Operations Support Buildings
• SAES-B-069 - Emergency Eyewashes and Showers
• SAES-H-001 - Coating Selection and Application Requirements for
JO/EWO

10-08643-
10-08643-

10-08643-

Industrial Plants and Equipment


0005
0005

0005

• SAES-J-003 - Instrumentation - Basic Design Criteria



SEPT-27-22

MAR-14-23

SAES-J-505 - Combustible Gas and Hydrogen Sulfide in Air Detection


DEC-22-22
DATE

System
• SAES-J-600 - Pressure Relief Devices
00A

0F1


NO.
REV

00

SAES-J-700 - Control Valves


DISCIPLINE • SAES-K-001 - Heating, Ventilation and Air Conditioning (HVAC)

ENGINEER
N. MINAMIBORI SAES-K-002- Air Conditioning Systems for Essential Operating Facilities
DATE:
MAR-14-23 • SAES-K-003 - Air Conditioning Systems for Communications Buildings
PROJECT • SAES-K-100 - Saudi Aramco Mechanical (HVAC) Code

ENGINEER
SAES-L-100 - Applicable Codes and Standards for Pressure Piping
N. ALSAHBIB
Systems
MAR-14-23
DATE:
CERTIFIED
• SAES-L-105 - Piping Material Specifications
K. OGAWA • SAES-M-009 - Design Criteria for Blast Resistant Buildings
MAR-14-23 • SAES-M-100 - Saudi Aramco Building Code
DATE:
CONSTRUCTION
• SAES-N-001 - Basic Criteria, Industrial Insulation
AGENCY • SAES-N-004 - Design and Installation of Building Thermal Insulation
• SAES-P-100 - Basic Power System Design Criteria
DATE:
• SAES-P-113 - Motors and Generators
OPERATIONS
• SAES-P-119 - Onshore Substations
• SAES-S-060 – Saudi Aramco Plumbing Code
DATE: • SAES-T-151 - D.C. Power System

CONTROL NUMBER

TES-P-119.19 – Substation Building and Site Development


VERIFICATION

• 16-SAMSS-503 - Indoor Control Gear - Low Voltage


EDSD

• 16-SAMSS-513 - Power System Automation Components


• 16-SAMSS-518 - Low Voltage Panel Boards
DATE:
BY:

• 34-SAMSS-820 - Instrument Control Cabinets



REVISIONCERTIFICATION

34-SAMSS-830 – Programmable Logic Controller


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

34-SAMSS-831 - Instrumentation for Packaged Units


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 4


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

M S
J-13D
13-Apr-2023
r - 2 0 23
-Ap ED 4 / 77
PRINT
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

3.2 Project Specifications

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG CERT

PE-300002 – HVAC Design Criteria


KO
KO
KO
• PE-300017 –Specification for Building Heating and Air Conditioning
NM
(HVAC) and Plumbing
NM

NM

3.3 HVAC Standard Drawings


• CB-181851 – HVAC General Notes and Abbreviations
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

• CB-181852 – HVAC Standard Details – 1


• CB-181853 – HVAC Standard Details – 2
ISSUED FOR REVIEW

• CB-181854 – HVAC Standard Details – 3


• CB-181855 – HVAC Standard Details – 4
DESCRIPTION

• CB-181856 – HVAC Standard Details – 5


• CB-181857 – HVAC Standard Details – 6
• CB-181858 – HVAC Standard Details – 7
3.4 Industry Codes and Standards
• AABC Associated Air Balance Council - System Balancing
• ACGIH American Conference of Governmental Industrial Hygienists
• AMCA 99 Air Movement & Control Association Standards Handbook
• ANSI B31.5 Refrigeration Piping
• ANSI B31.9 Building Services Piping
JO/EWO

10-08643-
10-08643-

10-08643-

• ANSI Z9.2 Operation of Local Exhaust Systems


0005
0005

0005

• ANSI Z9.5 American National Standard for Laboratory Ventilation


SEPT-27-22

MAR-14-23


DEC-22-22
DATE

API 505 Recommended Practice for Classification of Location installations


of Petroleum Facilities Classifications Class I, Zone 0, Zone1, and Zone2,
1st Edition
00A

0F1
NO.
REV

00

• ASHRAE Std. 62.1 Ventilation for Acceptable Indoor Air Quality


DISCIPLINE
ENGINEER
• ASHRAE Std. 52.2 Method of Testing General Ventilation Air-Cleaning
N. MINAMIBORI Devices for Removal Efficiency by Particle Size
DATE:
MAR-14-23 • IBC International Building Code ICC
PROJECT
ENGINEER
• A117.1 Accessible and Usable Buildings and Facilities
N. ALSAHBIB
• IEC International Electrotechnical Commission
MAR-14-23 • IFC International Fire Code
DATE:
CERTIFIED • ISA S71.04 Environmental Conditions for Process Measurement and
K. OGAWA Control Systems: Airborne Contaminants
DATE:
MAR-14-23 • ICC International Mechanical Code 2015
CONSTRUCTION • NFPA 70 National Electrical Code
AGENCY
• NFPA 75 Standard for the Protection of Information Technology
Equipment
DATE:
OPERATIONS
• NFPA 76 Standard for Fire Protection in Telecommunication Facilities
• NFPA 90A Installation of Air Conditioning and Ventilating Systems
• NFPA 101 Life Safety Code
DATE: • OSHA Occupational Safety and Health Administration
CONTROL NUMBER

• SATIP Saudi Aramco Typical Inspection Plan


VERIFICATION

• SAIC Saudi Aramco Inspection Checklist


EDSD

• SMACNA Standards and Guidelines



DATE:

UL Underwriters Laboratories
BY:

• UMC Uniform Mechanical Code


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 5


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 5 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.0 PRODUCT DELIVERY, STORAGE AND HANDLING
ENGG CERT

KO
KO
KO
A. Deliver materials to the site in their original containers or unopened packages,
clearly label with the manufacturer’s name, product identification and lot number
NM
NM

NM where appropriate.

B. Protect all materials from damage during transit, handling, storage and installation
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

C. All materials shall be stored and handled in accordance with the Manufacturer’s
and Supplier’s Recommendation. All damaged materials shall be placed in
ISSUED FOR REVIEW

quarantine and removed from site.


DESCRIPTION

5.0 MATERIAL APPROVAL REQUEST (MAR)

Sub-contractor shall prepare and submit Material Approval Request (MAR) to Contractor
Representative, before starting the procurement of materials. MAR shall include Brochures,
Vendor’s/ manufacturer’s information, Technical Specifications, Check sheet for compliance
of specification requirements, Installation manual, Maintenance Procedure etc., Samples shall
be submitted upon request by Contractor Representative

6.0 VENDOR MANUFACTURER SELECTION


JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

Vendor/ Manufacturer for materials shall be selected from approved vendor list/ 9COM list.
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

7.0 PROJECT PRESERVATION REQUIREMENTS


00A

0F1
NO.
REV

00

DISCIPLINE All requirements for the Project Preservation shall be based on Manufacturer’s and Supplier’s
ENGINEER
N. MINAMIBORI recommendation.
MAR-14-23
DATE:
PROJECT
ENGINEER
8.0 ACTIVITY ON SITE
N. ALSAHBIB
MAR-14-23
DATE: Inspection of the work area shall be carried out by Contractor and Sub Contractor jointly with
CERTIFIED
Company before commencing the works to confirm requirements of WMS, JSA, or RA are in
K. OGAWA
place and identify any safety hazards.
MAR-14-23
DATE:
CONSTRUCTION
AGENCY 9.0 DUCTING AND PIPING SUPPORTS

DATE:
OPERATIONS
9.1 GENERAL

DATE:
9.1.1 Description
CONTROL NUMBER
VERIFICATION

A. This Section covers providing all material, and equipment for complete ducting
EDSD

and piping support systems including all accessories required to complete the
DATE:

Work acceptable to Saudi Aramco Representative. All ducting and pipes shall be
BY:

adequately and permanently supported to prevent failure or excessive


REVISIONCERTIFICATION

deformation of ducts, pipes or supporting structure, and to minimize noise and


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

vibration.
0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 6


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

M S
J-13D
13-Apr-2023
r - 2 0 23
-Ap ED 6 / 77
PRINT
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

9.1.2 Quality Assurance

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
A. Sub-contractor shall be responsible for the quality of all Work and material to
be used in the Work and shall propose a program for inspection and testing so
NM
NM

NM
as to achieve the specified quality.

B. Sub-contractor shall maintain a qualified representative “on-Site” during all


operations to ensure that all ducting and piping support systems are installed
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

according to Saudi Aramco Standard and equipment.


ISSUED FOR REVIEW

9.1.3 Product Delivery, Storage and Handling


DESCRIPTION

A. Deliver materials to the site in their original containers or unopened packages,


clearly label with the manufacturer’s name, product identification and lot number
where appropriate.

B. Protect all materials from damage during transit, handling, storage and installation

C. Protect duct opening from dirt, dust, sand and other foreign materials with
materials appropriate to system.

9.1.4 Submittals
JO/EWO

10-08643-
10-08643-

10-08643-

A. Certificate of compliance stating that the material used in the construction of


0005
0005

0005

ducts and pipes supports and hangers conform to these Specifications.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

B. Complete manufacturer’s descriptive literature, including manufacturer’s name,


model number, design load, and intended service, for all propriety items shall be
00A

0F1
NO.
REV

00

provided.
DISCIPLINE
ENGINEER
N. MINAMIBORI C. Trapeze Hangers and Wall Support: fabrication shop drawings and
DATE:
MAR-14-23 manufacturer’s literature and proposed location of trapeze hangers.
PROJECT
ENGINEER
N. ALSAHBIB
D. Special installation or fabrication conditions, shop drawings, and other descriptive
MAR-14-23
data detailing proposed methods of welding and installation of hangers, supports,
DATE:
CERTIFIED
and anchors.
K. OGAWA
MAR-14-23
E. Support schedule with support details for all duct and pipe sizes.
DATE:
CONSTRUCTION
AGENCY
9.2 PRODUCTS
DATE:
OPERATIONS 9.2.1 General

DATE:
A. All hangers shall be adjustable while under load. Where lateral or axial duct
movement is anticipated, suitable linkages are to be provided so that hanger
CONTROL NUMBER
VERIFICATION

rods will be subjected to tensile loads only. Hanger rods shall be continuously
EDSD

threaded, and of material furnished by one of the approved hanger


manufacturers and complying to the Saudi Aramco Standard requirements, but
DATE:

must be no less than the size shown in standard sheets for given conditions.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

B. Locate all supports with due regard for maximum loads (such as operating
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

loads, test loads, wind loads, etc.), allowable forces and moments on
0F1

(DCC) NO. _____________________

equipment connections, and effects of loads on structure beyond immediately


supporting system. It is intended that support systems be designed for

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 7


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

M S
J-13D
13-Apr-2023
r - 2 0 23
-Ap ED 7 / 77
PRINT
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

controlled flexibility. Systems design to include provision for anticipated

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
settlement at Site.
ENGG CERT

KO
KO
KO
C. Sub-contractor shall coordinate the support system and comply with the
NM
NM

NM
structural Sections of these Specifications, as to type and locations of pipe
supports from concrete roof and/or metal steel decking.

D. Provide supports at changes of direction, but at locations that will not limit
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

system flexibility.
ISSUED FOR REVIEW

9.2.2 Supports for Ducting


DESCRIPTION

A. All duct hangers and spacing shall conform to the latest SMACNA standards.

B. Cutting edges of any HDG/Steel Coated supports shall be touch-up with


approved paint coating materials.

C. Upper attachment to steel members shall be by means of a beam clamp on


narrow flange beams (Grinnel Figure 218 or approved equal) and a beam C-
clamp with a retaining clamp (Grinnel Figures 88/89 or approved equal) on wide
flange beams.
JO/EWO

D. Alternatively precast concrete inserts similar to C-475 Saudi Supper Strut or


10-08643-
10-08643-

10-08643-

approved equal may be used. Concentrate load per insert shall not exceed 34
0005
0005

0005

kg in case of inserts in second floor slab and shall not exceed 22 kg in case of
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

roof slab. Hanger spacing may be reduced to less than specified in SMACNA in
order not to exceed the loading. Wire hangers shall not be used.
00A

0F1
NO.
REV

00

E. All ducts shall be braced and stiffened so as not to breathe, rattle, vibrate or sag.
DISCIPLINE
ENGINEER The bracing shall be applied to the outside of all ducts and may consist of standing
N. MINAMIBORI seams, modified “S” slips or angles, and cross-breaking supplemented by angle
DATE:
MAR-14-23 stiffener. All ducts shall have adequate supports as shown in the typical details
PROJECT
ENGINEER
drawings.
N. ALSAHBIB
MAR-14-23
F. Welding to structural beams for duct hangers may be done only with prior
DATE:
CERTIFIED
approval by Saudi Aramco Representative.
K. OGAWA
MAR-14-23
G. Strap Hangers shall be made of the same material as duct. The maximum size
DATE:
CONSTRUCTION
duct supported by strap hanger shall be 20” (500 mm).
AGENCY
H. Hanger shall be configured as per ASHRAE and SMACNA.
DATE:
OPERATIONS I. The hangers constructed of galvanized steel angles with Hot dip galvanized steel
rods shall be in accordance with SMACNA and based on the following table
DATE:
shown on PE-300017 Section 11.2.16.
CONTROL NUMBER
VERIFICATION

J. Restore to new condition any finishes which have been damaged too extensively
EDSD

to be merely primed and touched up.


DATE:

K. Supports in corrosive environment such as battery room shall be as the material


BY:

of duct or shall be suitable coated for corrosive environment.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

L. Painting requirements shall be done as required by applicable Saudi Aramco


0F1

standard.
(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 8


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 8 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

9.3 EXECUTION

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

9.3.1 Hangers Installation:


KO
KO
KO A. Strap Hangers: install in accordance with SMACNA.
NM
NM

NM
B. Angle Hanger: complete with locking nuts and washers.
C. Hanger spacing: in accordance with SMACNA.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

9.3.2 Completed Works


ISSUED FOR REVIEW

A. Replace or repair damage materials, equipment and defective Work as directed


by Saudi Aramco Representative at no additional cost to Saudi Aramco. Repair
DESCRIPTION

procedure shall be prepared by Sub-contractor and approved before proceeding


the works.

10.0 MECHANICAL IDENTIFICATION

10.1 GENERAL
10.1.1 Description

This Section covers providing nameplates, tags, stencils and pipe markers as
specified herein, including all accessories required to complete the Work in
JO/EWO

10-08643-
10-08643-

10-08643-

accordance with SAES-K-001 and PE-300017.


0005
0005

0005
SEPT-27-22

MAR-14-23

10.1.2 Section Includes


DEC-22-22
DATE

A. Nameplates.
00A

0F1
NO.
REV

00

DISCIPLINE B. Tags.
ENGINEER 13-Apr-2023
N. MINAMIBORI
MAR-14-23
C. Stencils.
DATE:
PROJECT
ENGINEER D. Pipe Markers.
N. ALSAHBIB
DATE: MAR-14-23 10.1.3 Submittals (three (3) copies each):
CERTIFIED
K. OGAWA
A. Submit lists of working, symbols, letter sizes, and color coding for mechanical
MAR-14-23
DATE: identification.
CONSTRUCTION
AGENCY
B. Submit valve chart and schedule, including valve tag number, location, function
DATE:
and valve manufacturer’s name and model number.
OPERATIONS
C. Product Data: Provide manufacturers catalog literature for each product required

DATE: D. Samples: Submit two labels and tags.


CONTROL NUMBER
VERIFICATION

E. Manufacturer’s Installation Instructions: Indicate special procedures and


EDSD

installation.
DATE:
BY:

10.1.4 Project Record Documents


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

A. Record actual locations of tagged valves.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 9


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

M S
J-13D
-Ap r - 2 0 23
PRINT
ED 9 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

10.2 PRODUCTS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

10.2.1 Manufacturers
KO
KO
KO A. AEMED Co., 330 Green Street, Box 369, Buffalo, NY 14240.
NM
NM

NM

B. Seton Name Plate Corporation, New Haven, CT 06505.


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

C. R.K. Industries, Inc. P.O. Box 280, Lagrange, TX 78945.


ISSUED FOR REVIEW

D. Or approved equal.
13-Apr-2023
DESCRIPTION

10.3 EXECUTION

10.3.1 Installation

A. Nameplate shall be made of 316 stainless steel with Monel fasteners and install
in accordance with SAES-K-001.

B. Install tags with corrosion resistant chain. Chain shall be installed for all
instrument devices, valves, and any HVAC equipment where application of
Mechanical fastener or adhesive are not feasible.
JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

C. Apply stencil painting to all duct identification in accordance to PE-300017.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

D. Install plastic tape pipe markers complete around pipe as required. Use of plastic
tape markers is only acceptable for indoor location. Outdoor equipment, ducting
00A

0F1
NO.
REV

00

and piping shall be stencil paint marked.


DISCIPLINE
ENGINEER
N. MINAMIBORI
E. Install underground plastic pipe markers (6” to 8”) 150mm to 200mm below finish
MAR-14-23 grade, directly above buried pipe.
DATE:
PROJECT
ENGINEER F. All HVAC equipment, devices and accessories including Air handling units,
N. ALSAHBIB Condensing units and Split AC’s shall be identified with a tag or name plate made
DATE: MAR-14-23 from 316 stainless steel, to conform to Saudi Aramco Engineering Standard
CERTIFIED SAES-K-001, Chapter 4.8.1.2. Anything tagged on the drawing shall be physically
K. OGAWA
tagged on the site.
MAR-14-23
DATE:
CONSTRUCTION
AGENCY
G. Identify indoor control panels with laminated plastic nameplates as per SAMSS-
820 Section 6.5.5.
DATE:
OPERATIONS H. Identify thermostats relating to fan coil units or valves with nameplates.

I. Identify valves in main and branch piping with tags.


DATE:
CONTROL NUMBER

J. Identify piping, concealed or exposed, with plastic pipe markers. Use tags on
VERIFICATION

piping (3/4”) 20 mm diameter and smaller. Identify services, flow direction and
EDSD

pressure. Install in clear view and align with axis of piping. Locate identification
not to exceed (6 ft.) 2 m on straight runs including risers and drops, adjacent to
DATE:
BY:

each valve and tee, at each side of penetration of structure or enclosure and at
each obstruction. Markers shall comply with ANSI A13.1 Color Standards. All
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

pipes located outdoor shall be stenciled outdoor.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 10


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

M S
J-13D
-Ap r - 2 0 23
PRINT
ED 10 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

Below table shall be followed for size of letter and direction marks.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
Outside diameter of Pipe or Minimum Length of Directional
Minimum Size of Letters
Covering Arrow
NM
NM

NM
inches mm inches mm inches mm

1/2 to 1-1/4 15 to 32 8 203 1/2 12.7


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

1-1/2 to 2 40 to 50 8 203 3/4 19.1


ISSUED FOR REVIEW

2-1/2 and above 65 and above 12 305 1-1/4 32


DESCRIPTION

K. Duct identification shall be as per section 12.6 of PE-300017 HVAC


specifications. Outdoor ducting shall be stencil marked.

L. Provide color coded ceiling task locating valves, dampers (fire, fire and smoke,
manual motorized) above drop ceilings. Locate in corner of panel closest to
equipment. All equipment, valves, dampers and fan coil units shall be tagged
sequentially and keyed to the Drawings.

11.0 VIBRATION AND SOUND ISOLATION


JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

11.1 GENERAL
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

11.1.1 Description
00A

0F1
NO.
REV

00

A. This Section covers providing Neoprene isolators, steel springs, floor mounts,
DISCIPLINE etc., required for isolation of equipment and piping as shown on the approved
ENGINEER
N. MINAMIBORI for construction Drawings or as required and specified herein, including all
MAR-14-23 accessories, to complete Work acceptable to Saudi Aramco Representative.
DATE:
PROJECT
ENGINEER
11.1.2 Quality Assurance
N. ALSAHBIB
MAR-14-23
DATE: A. Conform to Saudi Aramco Engineering Standards.
CERTIFIED
K. OGAWA
B. Static deflection of vibration isolators shall generally be not less than
MAR-14-23
DATE: recommended in the ASHRAE guide and data book for the actual floor spans
CONSTRUCTION
AGENCY
involved. Replace at no additional cost to Saudi Aramco, any isolator failing to
conform to these Specifications as applied to the actual systems involved.
DATE:
C. A single, vibration isolation manufacturer, or his qualified representative, shall
OPERATIONS supply vibration isolation devices, including auxiliary steel bases and pouring
forms, and be responsible for coordination of his Work.
DATE:
D. Sub-contractor shall provide such supervision as necessary to assure correct
CONTROL NUMBER

installation and adjustment of the isolation equipment, inspect the installation in


VERIFICATION

operation, and submit a report in writing certifying the correctness of installation


EDSD

and compliance with approved submittal data. Report shall indicate the actual
measured isolator deflection compared with that predicted and that specified.
DATE:
BY:

E. The vibration isolation manufacturer and his representative shall have been
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

engaged in the business of vibration isolation for no less than 5 years. Products
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

shall be standard cataloged items with factory certified ratings.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 11


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 11 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

F. Vibration isolation manufacturer shall be kinetics Co., Mason Industries,

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Amber/Booth, Vibration Eliminators, Inc., or approved equal.
ENGG CERT

KO
KO
KO
11.1.3 Submittals
NM
NM

NM
A. Submit the following data to Saudi Aramco Representative for review and
approval prior to purchase or installation of equipment. Data shall clearly identify
each item of equipment supported and the isolation to be installed at each point
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

of support.
ISSUED FOR REVIEW

1. Floor span if the equipment is to be supported by structure above


grade.
DESCRIPTION

2. Horsepower of each motor, and RPM of both driven and driver, in


each supported unit.

3. Calculated static load of each isolator.

4. Deflection recommended by the ASHRAE systems guide, in inches.

5. Scheduled deflection of each isolator. Identification of each isolator


selected by model number and spring color.
JO/EWO

10-08643-
10-08643-

10-08643-

6. Performance data including loading, static deflection, and isolation


0005
0005

0005

efficiency.
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

7. Deflection of each isolator under the calculated load.


00A

0F1
NO.
REV

00

8. The load at which each isolator would be fully compressed to solid.


DISCIPLINE
ENGINEER
N. MINAMIBORI 9. The load at which each isolator would operate the deflection
DATE:
MAR-14-23 recommended by the ASHERAE guide, and at schedule deflection.
PROJECT
ENGINEER
N. ALSAHBIB
10. Shear stress at solid calculated stress as applied, and maximum
MAR-14-23
allowable stress for infinite cycle life classification.
DATE:
CERTIFIED
K. OGAWA 11. Horizontal stiffness KX, vertical stiffness KY, at calculated load at
MAR-14-23
each isolator.
DATE:
CONSTRUCTION
AGENCY 12. Factory, certified data to allow submitted conditions of selection to
be easily verified, without calculations.
DATE: 13. Complete base details.
OPERATIONS
14. Complete flexible connection detail.
DATE:
15. Material of Construction.
CONTROL NUMBER
VERIFICATION
EDSD

16. Physical dimensions and weights.


DATE:

B. If an increase or decrease in calculated load of 20 percent will cause the amount


BY:

of deflection to be more than 50 percent less than the one called for be the guide,
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

submit an alternate selection.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 12


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 12 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

11.2 PRODUCTS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM
11.2.1 Materials
NM

NM
Refer to PE-300017 section 9.0
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

11.2.2 Corrosion Protection


ISSUED FOR REVIEW

A. Vibration isolators shall be designed for resistance to corrosion.


DESCRIPTION

B. Steel components shall be PVC coated, or phosphate and painted with industrial
grade enamel; nuts, bolts and washers shall be zinc-electroplated. Structural
steel bases shall be thoroughly cleaned of welding slag and primed with zinc-
chromate or metal etching primer. A finish coat of industrial enamel shall be
applied over the primer.

C. Isolators exposed to the weather shall have steel parts PVC coated, hot-dip
galvanized or zinc-electroplated plus coating of neoprene of bitumastic paint.
Aluminum components for outdoor installation shall be etched and painted with
industrial grade enamel; nuts, bolts, and washers shall be zinc electroplated.
JO/EWO

10-08643-
10-08643-

10-08643-

11.2.3 Design Requirements


0005
0005

0005
SEPT-27-22

MAR-14-23

A. Where height-saving brackets for side mounting of isolators are specified, the
DEC-22-22
DATE

height-saving brackets shall be designed to provide for an operating clearance of


1-inch under the inertial base, and, designed so that the isolators can be installed
00A

0F1
NO.
REV

00

and removed when the operating clearance is 1 inch or less. When used with
DISCIPLINE spring isolators having a deflection of 2½ inches or more, the height-saving
ENGINEER
N. MINAMIBORI
brackets shall be of the pre-compression type to limit exposed bolt length
MAR-14-23
between the top of the isolator and the underneath side of the bracket.
DATE:
PROJECT
ENGINEER B. Isolators supporting a given piece of equipment shall be selected for
N. ALSAHBIB approximately equal spring deflection.
DATE: MAR-14-23
CERTIFIED C. Horizontal deflection of isolators under operating conditions shall not exceed two
K. OGAWA (2) percent of the height of the loaded elastic element. Provide stabilizers it
MAR-14-23
DATE: necessary to limit such horizontal movement to two (2) percent or ¼ inch,
CONSTRUCTION
AGENCY
whichever is less.

D. Air handling units and chemical filter units shall be installed on neoprene isolators.
DATE:
OPERATIONS Air cooled condensing units, packaged air conditioning units, and exhaust fans
shall be installed on spring isolators.

DATE: E. Air handling unit and duct mounted fans shall be isolated from their duct by flexible
CONTROL NUMBER

Connections. The use of vibration isolators between equipment & foundations


VERIFICATION

and or building structures is required to minimize transmitted vibration.


EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 13


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

M S 13-Apr-2023
J-13D
-Ap r - 2 0 23
PRINT
ED 13 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

11.3 EXECUTION

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM
11.3.1 Concrete Work
NM

NM
A. Provide housekeeping pads for equipment indicated to be pad mounted.
Housekeeping pads shall be constructed at least 4 inch high for indoor equipment
and at least 6” high for outdoor equipment. Construct in full accordance with
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

Construction Specifications for Structural Works - Concrete. Finish tops of


housekeeping pads smooth and level within one (1) percent of span. All exposed
ISSUED FOR REVIEW

corners of housekeeping pads shall be chamfered.


DESCRIPTION

11.3.2 Equipment Isolator Installation

A. The installation or use of vibration isolators must not cause any change of position
of equipment or piping which would result in stresses in piping connection or
misalignment of shafts or bearings. In order to meet this objective, maintain
equipment and piping in a rigid position during installation. The load shall not be
transferred to the isolator until the installation is complete and under full
operational load. Refer to HVAC Standard Details CB-181854 and CB-181855.

B. All vibration isolation equipment and materials specified in this Section shall be
installed in accordance with the approved shop drawings and as recommended
JO/EWO

10-08643-
10-08643-

10-08643-

by the manufacturer.
0005
0005

0005
SEPT-27-22

MAR-14-23

C. Upon completion of installation of all vibration isolation equipment and prior to the
DEC-22-22
DATE

start up of isolated equipment, all debris shall be removed from areas surrounding
and from beneath all isolated equipment.
00A

0F1
NO.
REV

00

DISCIPLINE D. All connections to isolate equipment shall be made so as to allow free motion of
ENGINEER
N. MINAMIBORI
the isolation equipment.
MAR-14-23
DATE:
PROJECT
E. Set isolators per manufacturer’s recommendation to insure unit is supported only
ENGINEER by the isolators, any isolators that are “Bottomed” out must be re-adjusted to
N. ALSAHBIB support the unit.
DATE: MAR-14-23
CERTIFIED F. Each vibration isolator shall be sized, and adjusted so that the dead load will
K. OGAWA cause a 2.5cm (1 inch) deflection in the spring. The vibration isolator shall also
MAR-14-23
DATE: be required to have a remaining travel of 50% after the initial loading and
CONSTRUCTION
AGENCY
adjustment.

G. Support the machine to be isolated by a structural steel frame or by brackets


DATE:
OPERATIONS attached directly to the machine where no frame is required.

H. Provide brackets to accommodate the isolator and provide a mechanical stop.


DATE: The vertical position and size of the bracket shall be specified by the isolator
CONTROL NUMBER

manufacturer.
VERIFICATION
EDSD

I. The operating clearance between the bracket and the housekeeping pad or floor
shall be 3/8 inch plus or minus 1/16 inch. The minimum operating clearance
DATE:
BY:

between the frame and the pad or floor shall be 1 inch.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

J. Place the frame in position and support the brackets temporarily by 3/8 inch shims
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

prior to the installations of the machine or isolators.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 14


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 14 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

K. Install the isolators with raising the machine and frame assembly.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
L. After the entire system installation is completed and is under full operational load,
adjust the isolator so that the load is transferred from the shims to the isolator.
NM
NM

NM
When isolators are properly adjusted, the shims shall be barely free. The shims
shall be used as a gauge to check that the 3/8 inch clearance is maintained so
that system will remain free of stress. Remove the shims.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

M. Replace or repair damaged item or defective work as directed by Saudi Aramco


ISSUED FOR REVIEW

Representative at no additional cost to Saudi Aramco.

12.0.A PIPE INSULATION


DESCRIPTION

12.1.A GENERAL

12.1.1.A Description

A. This Section covers providing pipe insulation as specified and as shown on the
Drawings and specified herein including accessories required to complete the
Work acceptable to Saudi Aramco Representative.
JO/EWO

10-08643-
10-08643-

10-08643-

0005

12.1.2.A Submittals
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

A. Submit for approval, Manufacturer’s literature in accordance with the


requirements of these Specifications. The submittal data shall include, but not be
limited to the following:
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER B. Manufacture’s Literature:
N. MINAMIBORI
DATE:
MAR-14-23 1. Thickness of Insulation
PROJECT
ENGINEER
N. ALSAHBIB
2. Density
DATE: MAR-14-23
CERTIFIED
3. Maximum Temperature Limit
K. OGAWA
MAR-14-23 4. Fire and Smoke Hazard Rating
DATE:
CONSTRUCTION
AGENCY 5. Thermal Conductivity

DATE: 6. Permeability of Insulation and Finishes


OPERATIONS
7. Moisture Absorption Data
DATE:
8. External Facing or Covering
CONTROL NUMBER
VERIFICATION
EDSD

9. Description Facing or Covering


DATE:

a. Adhesives
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

b. Mechanical Fasteners
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

c. Application, finishing and flashing materials and methods.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 15


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 15 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

10. U.L Rating

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM 12.1.3.A Limitation
NM

NM
A. Materials specified shall be applied subject to their temperature limits. Any
methods of application of insulating materials or finishes not specified in detail
herein shall be in accordance with the particular manufacturer’s published
recommendations.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

B. Fire Resistance: Insulation, adhesive, sealer and vapor-barrier materials shall be


non-combustible as defined in Section 719 of International Building Code; shall
have a flame-spread rating of not more than 25 and smoke developed rating shall
DESCRIPTION

be determined by Method of Test of Surface Burning Characteristics of Building


materials, NFPA No. 255, ASTM E84; UL Standard No. 723. Such materials are
listed in U.L. Building Materials List under heading “hazard Classification (Fire)”.

12.1.4.A Quality Assurance

A. Pipe insulation shall be inspected in accordance with SATIP and SAIC


requirements.

12.2.A PRODUCTS
JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

12.2.1.A Materials
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

Refer to PE-300017 section 10


00A

0F1
NO.
REV

00

DISCIPLINE 12.3.A EXECUTION


ENGINEER
N. MINAMIBORI
MAR-14-23
DATE: 12.3.1.A General
PROJECT
ENGINEER
N. ALSAHBIB A. Refer to PE-300017 section 10.5 and 10.6
DATE: MAR-14-23
CERTIFIED B. All insulation and finishes shall be installed according to the manufacturer’s
K. OGAWA recommendations.
MAR-14-23
DATE:
CONSTRUCTION C. Adhesives, sealers, vapor barrier coating, etc. shall be compatible with the
AGENCY materials to which they are applied, and shall not corrode, soften or otherwise
attached such material in either wet or dry state.
DATE:
OPERATIONS
D. Condensate pipes shall be insulated as per section 10.3.6, 10.3.10 and 10.6.14
of specification PE-300017. All piping shall have canvas with foster 30/80 or
DATE: equivalent. However, outdoor piping shall be provided with aluminum cladding
additionally.
CONTROL NUMBER
VERIFICATION
EDSD

E. Refrigerant pipes (hot and cold) shall be insulated as per section 10.3.6,
10.3.10 and 10.6.14 of specification PE-300017. All piping shall have canvas
DATE:

with foster 30/80 or equivalent. However, outdoor piping and indoor pipes at 2
BY:

meters or below shall be provided with aluminum cladding additionally.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 16


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 16 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

12.3.2.A Application

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
A. Replace or repair damage materials and defective Work as directed by Saudi
Aramco Representative at no additional cost to Saudi Aramco.
NM
NM

NM
B. Repair procedure shall be prepared by Sub-contractor and approved before
proceeding the works.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

12.0.B DUCT INSULATION


DESCRIPTION

12.1.B GENERAL

12.1.1.B Description

A. This Section covers providing duct insulation as specified and as shown on the
Drawings and specified herein including accessories required to complete the
Work acceptable to Saudi Aramco Representative.

12.1.2.B Submittals
JO/EWO

10-08643-
10-08643-

10-08643-

0005

A. Submit for approval, Manufacturer’s literature in accordance with the


0005

0005

requirements of these Specifications. The submittal data shall include, but not be
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

limited to the following:

B. Manufacture’s Literature:
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER 11. Thickness of Insulation
N. MINAMIBORI
DATE:
MAR-14-23 12. Density
PROJECT
ENGINEER
N. ALSAHBIB
13. Maximum Temperature Limit
DATE: MAR-14-23
CERTIFIED
14. Fire and Smoke Hazard Rating
K. OGAWA
MAR-14-23 15. Thermal Conductivity
DATE:
CONSTRUCTION
AGENCY 16. Permeability of Insulation and Finishes

DATE: 17. Moisture Absorption Data


OPERATIONS
18. External Facing or Covering
DATE:
19. Description Facing or Covering
CONTROL NUMBER
VERIFICATION
EDSD

d. Adhesives
DATE:

e. Mechanical Fasteners
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

f. Application, finishing and flashing materials and methods.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

20. U.L Rating


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 17


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 17 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

C. Submit to Saudi Aramco Representative one sample of insulated duct with a 10

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cm overlap between different components (duct, adhesive etc.) to show the
ENGG CERT

KO
KO
KO
quality of the duct and workmanship of the duct installer. Duct installation shall
start only after Saudi Aramco Representative has approved the duct sample.
NM
NM

NM
12.1.3.B Limitation

A. Materials specified shall be applied subject to their temperature limits. Any


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

methods of application of insulating materials or finishes not specified in detail


ISSUED FOR REVIEW

herein shall be in accordance with the particular manufacturer’s published


recommendations.
DESCRIPTION

B. Fire Resistance: Insulation, adhesive, sealer and vapor-barrier materials shall be


non-combustible as defined in Section 719 of International Building Code; shall
have a flame-spread rating of not more than 25 and smoke developed rating shall
be determined by Method of Test of Surface Burning Characteristics of Building
materials, NFPA No. 255, ASTM E84; UL Standard No. 723. Such materials are
listed in U.L. Building Materials List under heading “hazard Classification (Fire)”.
Duct insulation shall be labeled in accordance with Section 604 of the
International Mechanical Code.

12.1.4.B Quality Assurance


JO/EWO

10-08643-
10-08643-

10-08643-

A. Duct insulation shall be inspected in accordance with SATIP and SAIC


0005
0005

0005

requirements.
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

B. Notify Saudi Aramco Representative of the insulation schedule so that he may


observe all duct insulation before it is concealed from view.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER
12.2.B PRODUCTS
N. MINAMIBORI
MAR-14-23
DATE:
PROJECT
ENGINEER
12.2.1.B Materials
N. ALSAHBIB
MAR-14-23
Refer to PE-300017 section 10
DATE:
CERTIFIED
K. OGAWA
12.3.B EXECUTION
MAR-14-23
DATE:
CONSTRUCTION
AGENCY 12.3.1.B General

DATE: A. Refer to PE-300017 section 10.4


OPERATIONS

B. All insulation and finishes shall be installed according to the manufacturer’s


DATE: recommendations. Joints shall be tightly butted and the insulation materials
securely attached to the duct.
CONTROL NUMBER
VERIFICATION
EDSD

C. Duct joints insulation shall be install after duct leakage test is completed and
the work is acceptable to Saudi Aramco Representative.
DATE:
BY:

D. Adhesives, sealers, vapor barrier coating, etc. shall be compatible with the
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

materials to which they are applied, and shall not corrode, soften or otherwise
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

attached such material in either wet or dry state.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 18


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 18 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

E. Insulation shall be applied as per Section 4.8.13 of SAES-K-001 & Table 6.4

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
of UMC.
ENGG CERT

KO
KO
KO
F. All ductwork exposed to outdoors shall be insulated and aluminum cladded.
NM
NM

NM
G. All ductworks exposed to indoors up to 2M. high from the finish floor level shall
be aluminum cladded.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

12.3.2.B Application
ISSUED FOR REVIEW

A. For rectangular ducts wider than 60 cm. apply stick clips to the bottom of the
duct on 45 cm centers.
DESCRIPTION

B. Apply adhesive to the ductwork in 10.2 cm. strip on 20-cm. centers and allow
drying time as necessary.

C. Tightly wrap insulation around duct with all circumferential joints butted and
with facing overlapped at least 5 cm.

D. Longitudinal joints shall overlap at least 5 cm.

E. Secure all joints with 0.02” WD Steel strapping at 300mm on center with ¾”
JO/EWO

closed double notch joint seal.


10-08643-
10-08643-

10-08643-

0005
0005

0005

F. On rectangular ductwork in excess of 60 cm wide, apply washers to the stick


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

clips and clip the pins flush with the washers.

G. All joints as well as all penetrations in the facing of the insulation shall be taped
00A

0F1
NO.
REV

00

with 7.6 cm wide foil flush reinforced Kraft tape.


DISCIPLINE
ENGINEER
N. MINAMIBORI H. Exterior stick clip pins shall be on 46 cm centers. Clips shall be spot welded
DATE:
MAR-14-23 with a Duro Dyne Model LF, or approved equal.
PROJECT
ENGINEER
N. ALSAHBIB
I. Replace or repair damage materials and defective Work as directed by Saudi
MAR-14-23
Aramco Representative at no additional cost to Saudi Aramco.
DATE:
CERTIFIED
K. OGAWA J. Repair procedure shall be prepared by Sub-contractor and approved before
MAR-14-23
proceeding the works.
DATE:
CONSTRUCTION
AGENCY

13.0 REFRIGERANT PIPING AND ACCESSORIES


DATE:
OPERATIONS
13.1 GENERAL

DATE:
13.1.1 Description
CONTROL NUMBER
VERIFICATION
EDSD

A. This section covers providing field refrigerant piping for direct expansion HVAC
systems as shown on the Drawings and specified herein including all
DATE:

accessories required to complete the work acceptable to Saudi Aramco


BY:

Representative.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 19


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

M S
J-13D
13-Apr-2023
r - 2 0 23
-Ap ED 19 / 77
PRINT
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

B. Definitions:

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
1. Refrigerating system: Combination of interconnected
refrigerant-containing parts constituting one closed refrigeration
NM
NM

NM
circuit in which a refrigerant is circulated for the purpose of
extracting heat.

a. Low side means the parts of a refrigerating system


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

subjected to evaporator pressure.


ISSUED FOR REVIEW

b. High side means the parts of a refrigerating system


subjected to condenser pressure.
DESCRIPTION

2. Brazed joint: A gas-tight joint obtained by the joining of metal parts


with alloys which melt at temperatures higher than 427 degrees C
(800 degrees F) but less than the melting temperatures of the
joined parts.

13.1.2 Quality Assurance

A. Reference Codes and Standards: Comply with applicable Saudi Aramco


Standard as specified herein.
JO/EWO

10-08643-
10-08643-

10-08643-

B. Comply with ASHRAE Standard 15, Safety Code for Mechanical Refrigeration.
0005
0005

0005

The application of this Code is intended to assure the safe design,


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

construction, installation, operation, and inspection of every refrigerating


system employing a fluid which normally is vaporized and liquefied in its
refrigerating cycle.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER C. Comply with ASME Boiler and Pressure Vessel Code: Section IX: Welding and
N. MINAMIBORI Brazing Qualifications.
MAR-14-23
DATE:
PROJECT
ENGINEER
D. Products shall comply with UL 207 "Refrigerant–Containing Components and
N. ALSAHBIB
Accessories, "Nonelectrical"; or UL 429 "Electrical Operated Valves."
DATE: MAR-14-23
CERTIFIED
13.1.3 Submittals
K. OGAWA
MAR-14-23
A. Submit samples of the refrigerant pipes and shop drawings.
DATE:
CONSTRUCTION
AGENCY B. Comprehensive set of refrigerant piping size calculations performed by the
condenser units vendor to confirm adequacy of selected pipe sizes for actual
DATE: installed equipment and actual distances to AHU coils. Vendor shall confirm
OPERATIONS that with the proposed pipe sizes, the condenser units shall be able to deliver
the required cooling capacity as specified in the equipment schedules.
DATE:
C. Shop Drawings: Sufficient information for components noted, including valves
CONTROL NUMBER
VERIFICATION

and refrigerant piping accessories, clearly presented, shall be included to


EDSD

determine compliance with drawings and specifications for components noted


below:
DATE:
BY:

1. Tubing and fittings


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

2. Valves (TX valves, Solenoid valves, Isolation valves, etc.)


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

3. Strainers
0F1

4. Moisture-liquid indicators
(DCC) NO. _____________________

5. Filter-driers

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 20


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 20 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

6. Flexible metal hose

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7. Liquid-suction interchanges
ENGG CERT

KO
KO
KO
8. Oil separators (when specified)
9. Gauges
NM
NM

NM
10. Pipe and equipment supports
11. Flexible elastomeric pipe insulation
12. Refrigerant and oil
13. Pipe/conduit roof penetration cover
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

14. Soldering and brazing materials


ISSUED FOR REVIEW

D. Layout and Isometrics of refrigerant piping and accessories, including flow


capacities, valves locations, and oil traps slopes of horizontal runs, floor/wall
DESCRIPTION

penetrations, and equipment connection details.

E. Certification: Copies of certificates for welders, approved welding procedure,


performance qualification record and list of welders' names and symbols.

F. Manufacturer’s standard catalog data prior to the purchase or installation of a


particular component, highlighted to show material, size, options, performance
charts and curves, etc., in adequate detail to demonstrate compliance with
contract requirements. Data shall include manufacturer’s recommended
installation instructions and procedures. Data shall be provided for the
JO/EWO

following components as a minimum:


10-08643-
10-08643-

10-08643-

0005
0005

0005

1. Piping and Fittings.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

2. Valves.
3. Piping Accessories.
4. Pipe Hangers, Inserts, and Supports
00A

0F1
NO.
REV

00

5. Pipe Insulation
DISCIPLINE
ENGINEER
N. MINAMIBORI
MAR-14-23
13.2 PRODUCTS
DATE:
PROJECT
ENGINEER
N. ALSAHBIB
13.2.1 Standard Commercial Products
DATE: MAR-14-23
CERTIFIED A. Materials and equipment shall be standard products of a manufacturer regularly
K. OGAWA engaged in the manufacturing of such products, which are a similar material,
MAR-14-23 design, and workmanship. The standard products shall have been in satisfactory
DATE:
CONSTRUCTION
commercial or industrial use for 2 years prior to bid opening. The 2-year use shall
AGENCY include applications of equipment and materials under similar circumstances and
of similar size. The 2 years’ experience shall be satisfactorily completed by a
DATE: product which has been sold or is offered for sale on the commercial market
OPERATIONS through advertisements, manufacturer’s catalogs, or brochures. Products having
less than a 2-year field service record shell be acceptable if a certified record of
DATE:
satisfactory field operation, for not less than 6000 hours exclusive of the
manufacturer’s factory tests, can be shown. Products shall be supported by a
CONTROL NUMBER
VERIFICATION

service organization. System components shall be environmentally suitable for


EDSD

the indicated locations.


DATE:

B. All items shall be in compliance to Specification PE-300017.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

13.2.2 General
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

A. Refrigerant piping, valves, fittings, and accessories shall be in accordance with


ASHRAE 15 and ASME B31.5, except as specified herein. Refrigerant piping,

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 21


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 21 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

valves, fittings, and accessories shall be compatible with the fluids used and

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
capable of withstanding the pressures and temperatures of the service.
ENGG CERT

KO
KO
KO
Refrigerant piping, valves, and accessories used for refrigerant service shall be
cleaned, dehydrated, and sealed (capped or plugged) prior to shipment from the
NM
NM

NM
manufacturer’s plant.

13.2.3 Refrigerant Piping and Fittings


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

A. Refrigerant piping shall be copper tubing conforming to SAES-L-105 and


ANSI B31.5 requirements.
DESCRIPTION

B. Copper tubing shall be soft annealed where bending is required and hard
drawn where no bending is required. Soft annealed copper tubing shall
not be used in sizes larger than 35 mm (1-3/8 inches).

C. Joints shall be brazed except that joints on lines 22 mm (7/8 inch) and
smaller may be flared. Cast copper fittings for flared copper tube shall
conform to ASME B16.26 and ASTM B 62. Wrought copper and bronze
solder-joint pressure fittings shall conform to ASME B16.22 and ASTM B
75M. Joints and fittings for brazed joint shall be wrought-copper or
forged-brass sweat fittings. Cast sweat-type joints and fittings shall not
JO/EWO

be allowed for brazed joints. Brass or bronze adapters for brazed tubing
10-08643-
10-08643-

10-08643-

may be used for connecting tubing to flanges and to threaded ends of


0005
0005

0005

valves and equipment.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

D. Suction lines shall be insulated with at least ¾” thick plastic foam


insulation conforming to ASTM C 534.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER 13.2.4 Solder
N. MINAMIBORI
DATE:
MAR-14-23 A. Solder shall conform to ASTM B 32, grade Sb5, tin-antimony alloy for
PROJECT
ENGINEER
service pressures up to 1034 kPa 150 psig. Solder flux shall be liquid or
N. ALSAHBIB
paste form, non-corrosive and conform to ASTM B 813.
DATE: MAR-14-23
CERTIFIED
13.2.5 Brazing Filler Metal
K. OGAWA
MAR-14-23
A. Filler metal shall conform to AWS A5.8, Type Bag-5 with AWS Type 3
DATE:
CONSTRUCTION
flux, except Type BcuP-6 may be used for brazing copper-to-copper
AGENCY joints.

DATE:
OPERATIONS 13.2.6 Valves

DATE:
Valves shall be designed, manufactured, and tested specifically for refrigerant
service. Valve bodies shall be of brass, bronze, steel, or ductile iron construction.
CONTROL NUMBER
VERIFICATION

Valves 25mm inch and smaller shall have brazed or socket welded connections.
EDSD

Valves larger than 25 mm 1 inch shall have tongue-and-groove flanged or butt-


welded end connections. Threaded end connections shall not be used, except in
DATE:

pilot pressure or gauge lines where maintenance disassembly is required, and


BY:

welded flanges cannot be used. Internal parts shall be removable for inspection
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

of replacement without applying heat or breaking pipe connections. Valve stems


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

exposed to the atmosphere shall be stainless steel or corrosion resistant metal


0F1

plated carbon steel. Direction of flow shall be legibly and permanently indicated
(DCC) NO. _____________________

on the valve body. Control valve inlets shall be fitted with integral or adapted

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 22


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 22 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

strainer or filter where recommended or required by the manufacturer. Purge,

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
charge, and receiver valves shall be of manufacturer’s standard configuration
ENGG CERT

KO
KO
KO
A. Refrigerant Stop Valves: Valve shall be the globe or full-port ball type
NM
NM

NM
with a back-seating stem especially packed for refrigerant service. Valve
packing shall be replaceable under line pressure. Valve shall be
provided with a hand wheel or wrench operator and a seal cap. Valve
shall be the straight or angle pattern design as required.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

B. Check Valves: Valve shall be the swing or lift type as required to provide
positive shutoff at the differential pressure indicated. Valve shall be
provided with resilient seat.
DESCRIPTION

C. Liquid Solenoid Valves: Valves shall comply with ARI 760 and be suitable
for continuous duty with applied voltage 15 percent under and 5 percent
over nominal rated voltage at maximum and minimum encountered
pressure and temperature service conditions. Valves shall be direct-acting
or pilot-operating type, pack less, except that packed stem, seal capped,
manual lifting provisions shall be furnished. Solenoid coils shall be
moisture-proof, UL approved, totally encapsulated, or encapsulated and
metal jacketed as required. Valves shall have safe working pressure of
2760 kPa 400 psi and a maximum operating pressure differential of at least
JO/EWO

1375 kPa 200 psi at 85 percent rated voltage. Valves shall have an
10-08643-
10-08643-

10-08643-

operating pressure differential suitable for the refrigerant used.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

D. Expansion Valves: Valve shall conform to ARI 750 and ASHRAE 17. Valve
shall be the diaphragm and spring-loaded type with internal or external
equalizers, and bulb and capillary tubing. Valve shall be provided with an
00A

0F1
NO.
REV

00

external superheat adjustment along with a seal cap. Internal equalizers


DISCIPLINE
ENGINEER may be utilized where flowing refrigerant pressure drop between outlet of
N. MINAMIBORI the valve and inlet to the evaporator coil is negligible and pressure drop
DATE:
MAR-14-23 across the evaporator is less than the pressure difference corresponding
PROJECT
ENGINEER
to 1 degrees C (2 degrees F) of saturated suction temperature at
N. ALSAHBIB
evaporator conditions. Bulb charge shall be determined by the
MAR-14-23
manufacturer for the application and such that liquid will remain in the bulb
DATE:
CERTIFIED
at all operating conditions. Gas limited liquid charged valves and other
K. OGAWA valve devices for limiting evaporator pressure shall not be used without a
MAR-14-23
distributor or discharge tube or effective means to prevent loss of control
DATE:
CONSTRUCTION
when bulb becomes warmer than valve body. Pilot-operated valves shall
AGENCY have a characterized plug to provide required modulating control. A de-
energized solenoid valve may be used in the pilot line to close the main
DATE: valve in lieu of a solenoid valve in the main liquid line. An isolatable
OPERATIONS pressure gauge shall be provided in the pilot line, at the main valve.
Automatic pressure reducing or constant pressure regulating expansion
DATE:
valves may be used only where indicted or for constant evaporator loads.
CONTROL NUMBER
VERIFICATION

E. Safety Relief Valves: Valve shall be the two-way type, unless indicated
EDSD

otherwise. Valve shall bear the ASME code symbol. Valve capacity shall
be certified by the National Board of Boiler and Pressure Vessel
DATE:

Inspectors. Valve shall be of an automatically reseating design after


BY:

activation.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

F. Evaporator Pressure Regulators, Direct Acting: Valve shall include a


0F1

diaphragm/spring assembly, external pressure adjustment with seal cap,


(DCC) NO. _____________________

and pressure gauge port. Valve shall maintain a constant inlet pressure

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 23


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 23 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

by balancing inlet pressure on diaphragm against an adjustable spring

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
load. Pressure drop at system design load shall not exceed the pressure
ENGG CERT

KO
KO
KO
difference corresponding to a 1 degrees C (2 degrees F) change in
saturated refrigerant temperature at evaporator operating suction
NM
NM

NM
temperature. Spring shall be selected for indicated maximum allowable
suction pressure range.

G. Refrigerant Access Valves: Refrigerant access valves and hose


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

connections shall be in accordance with ARI 720.


ISSUED FOR REVIEW

13.2.7 Piping Accessories


DESCRIPTION

A. Filter Driers: Driers shall conform to ARI 710. Sizes 15 mm (5/8 inch) 5/8
inch and larger shall be the full flow, replaceable core type. Sizes 15 mm
(½ inch) and smaller shall be the sealed type. Cores shall be of suitable
desiccant that will not plug, cake, dust, channel, or break down, and shall
remove water, acid, and foreign material from the refrigerant. Filter drillers
shall be constructed so that none of the desiccant will pass into the
refrigerant lines. Minimum bursting pressure shall be 10.3 Mpa (1500 psi)
.
JO/EWO

B. Sight and Glass Liquid level Indicator Assembly and Components:


10-08643-
10-08643-

10-08643-

Assembly shall be pressure and temperature-rated and constructed of


0005
0005

0005

materials suitable for the service. Glass shall be borosilicate type. Ferrous
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

components subject to condensation shall be electro-galvanized.

C. Gauge Glass: Gauge glass shall include top and bottom isolation valves
00A

0F1
NO.
REV

00

fitted with automatic checks and packing followers; red-line or green-line


DISCIPLINE
ENGINEER gauge glass; elastomer or polymer packing to suit the service; and gauge
N. MINAMIBORI glass guard.
MAR-14-23
DATE:
PROJECT
ENGINEER
D. Moisture Indicator: Indicator shall be a self-reversible action, moisture
N. ALSAHBIB
reactive, color changing media. Indicator shall be furnished with full-color-
MAR-14-23
printing tag containing color, moisture, and temperature criteria. Unless
DATE:
CERTIFIED
otherwise indicated, the moisture indicator shall be an integral part of each
K. OGAWA corresponding sight glass.
MAR-14-23
DATE:
CONSTRUCTION
E. Vibration Dampeners: Dampers shall be of the all-metallic bellows and
AGENCY woven-wire type.

DATE: F. Flexible Pipe Connectors: Connectors shall be a composite of interior


OPERATIONS corrugated phosphor bronze or Type 300 Series stainless steel, as
required for fluid service, with exterior reinforcement of bronze, stainless
DATE:
steel or monel wire braid. Assembly shall be constructed with a safety
factor of not less than 4 at 150 degrees C (300 degrees F). Unless
CONTROL NUMBER
VERIFICATION

otherwise indicated, the length of a flexible connector shall be as


EDSD

recommended by the manufacturer for the service intended.


DATE:

G. Strainers: Strainers used in refrigerant service shall have brass or cast iron
BY:

body, Y-or angle-pattern, cleanable, not less then 60-mesh non corroding
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

screen of an area to provide net free area not less than ten times the pipe
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

diameter with pressure rating compatible with the refrigerant service.


0F1

Screens shall be stainless steel or monel and reinforced spring-loaded


(DCC) NO. _____________________

where necessary for bypass-proof construction.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 24


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 24 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
I. Pressure and Vacuum Gauges: Gauges shall conform to ASME B40.100
ENGG CERT

KO
KO
KO
and shall be provided with throttling type needle valve or a pulsation
dampener and shut-off valve. Gauge shall be a minimum of 85 mm 3-1/2
NM
NM

NM
inches in diameter with a range from 0 kPa (0 psig) 0 psig to approximately
1.5 times the maximum system working pressure. Each gauge range shall
be selected so that at normal operating pressure, the needle is within the
middle-third of the range.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

J. Temperature Gauge: Temperature gauges shall be the industrial duty type


and be provided for the required temperature range. Gauges shall have
Celsius scale in 1 degree (Fahrenheit scale in 2 degree) graduations scale
DESCRIPTION

(black numbers) on a white face. The pointer shall be adjustable. Right


stem type temperature gauges shall be provided in thermal wells located
within 1.5 m 5 feet of the finished floor. Universal adjustable angle type or
remote element type temperature gauges shall be provided in thermal
wells located 1.5 to 2.1 m above the finished floor. Remote element type
temperature gauges shall be provided in thermal wells located 2.1 m above
the finished floor.

13.3 EXECUTION
JO/EWO

10-08643-
10-08643-

10-08643-

13.3.1 General
0005
0005

0005

A. Install refrigerant piping and refrigerant containing parts in accordance with


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

ASHRAE Standard 15 and ANSI B31.5.

1. Install piping as short as possible, with a minimum number of


00A

0F1
NO.
REV

00

joints, elbow and fittings.


DISCIPLINE
ENGINEER
N. MINAMIBORI 2. Install piping with adequate clearance between pipe and adjacent
DATE:
MAR-14-23 walls and hangers to allow for service and inspection. Space
PROJECT
ENGINEER
piping, including insulation, to provide 25 mm (one inch) minimum
N. ALSAHBIB
clearance between adjacent piping or other surface. Use pipe
MAR-14-23
sleeves through walls, floors, and ceilings, sized to permit
DATE:
CERTIFIED installation of pipes with full thickness insulation.
K. OGAWA
MAR-14-23 3. Locate and orient valves to permit proper operation and access for
DATE:
CONSTRUCTION
maintenance of packing, seat and disc. Generally, locate valve
AGENCY stems in overhead piping in horizontal position. Provide a union
adjacent to one end of all threaded end valves. Control valves
DATE: usually require reducers to connect to pipe sizes shown on the
OPERATIONS drawing.

DATE:
4. Use protective conduit when installed below ground outside
trench.
CONTROL NUMBER
VERIFICATION
EDSD

5. Swab fittings and valves with manufacturer's recommended


cleaning fluid to remove oil and other compounds prior to
DATE:

installation.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

6. Install hangers and supports per ANSI B31.5 and the refrigerant
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

piping manufacturer's recommendations.


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 25


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 25 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

B. Protect refrigerant system during construction against entrance of foreign

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
matter, dirt, and moisture; have open ends of piping and connections to
ENGG CERT

KO
KO
KO
compressors, condensers, evaporators and other equipment tightly
capped until assembly.
NM
NM

NM
C. After installation, purge all refrigerant lines with 7 kPa gage (1.0 psig) dry
nitrogen while soldering, brazing or welding connections as per SAES-K-
001 section 5.3.2.1. Cap the system with reusable plug after each brazing
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

operation to retain the nitrogen and prevent entrance of air and moisture.
ISSUED FOR REVIEW

D. Pipe relief valve discharge to outdoors for systems containing more than
45 kg (100 pounds) of refrigerant.
DESCRIPTION

E. Pipe shall be cut accurately to measurements established at the jobsite, and


worked into place without springing or forcing, completely clearing all
windows, doors, and other openings. Cutting or other weakening of the
building structure to facilitate piping installation will not be permitted without
written approval. Pipe or tubing shall be cut square, shall have burrs removed
by reaming, and shall permit free expansion and contraction without causing
damage to the building structure, pipe, joints, or hangers.

F. Changes in direction shall be made with fittings, except that bending of pipe
JO/EWO

100 mm (4 inches) and smaller will be permitted, provided a pipe bender is


10-08643-
10-08643-

10-08643-

used and wide weep bends are formed. Mitering or notching pipe or other
0005
0005

0005

similar construction to form elbows or tees will not be permitted. The


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

centerline radius of bends shall not be less than 6 diameters of the pipe. Bent
pipe showing kinks, wrinkles, flattening, or other malformations will not be
accepted.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER G. Brazing procedure and brazing operators shall be in accordance with the
N. MINAMIBORI requirements of Part QB, articles XII and XIII, section, ASME BPV code of
DATE:
MAR-14-23 ASME B31.5 section 528.2.
PROJECT
ENGINEER
N. ALSAHBIB
13.3.2 Piping Installation
DATE: MAR-14-23
CERTIFIED
A. Brazed/Soldered Connections: Brazing shall be performed in accordance
K. OGAWA with AWS Brazing Handbook, except as modified herein. During brazing, the
MAR-14-23
pipe and fittings shall be filled with a pressure regulated inert gas, such as
DATE:
CONSTRUCTION
nitrogen, to prevent the formation of scale. Before brazing copper joints, both
AGENCY the outside of the tube and the inside of the fitting shall be cleaned with a wire
fitting brush until the entire joint surface is bright and clean. Brazing flux shall
DATE: not be used. Surplus brazing material shall be removed at all joints. Tubing
OPERATIONS shall be protected against oxidation during brazing by continuous purging of
the inside of the piping using nitrogen. Piping shall be supported prior to
DATE:
brazing and not be sprung or forced.
CONTROL NUMBER
VERIFICATION

B. Flared Connections: When flared connections are used, a suitable lubricant


EDSD

shall be used between the back of the flare and the nut in order to avoid
tearing flare while tightening the nut.
DATE:
BY:

13.3.3 Valve and Accessories Installation


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A. General: Refrigerant stop valves shall be installed on each side of each piece
0F1

of equipment such as compressors condensers, evaporators, receivers, and


(DCC) NO. _____________________

other similar items in multiple-unit installation, to provide partial system

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 26


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 26 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

isolation as required for maintenance or repair. Stop valves shall be installed

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
with stems horizontal unless otherwise indicated. Ball valves shall be
ENGG CERT

KO
KO
KO
installed with stems positioned to facilitate operation and maintenance.
Isolating valves for pressure gauges and switches shall be external to thermal
NM
NM

NM
insulation. Safety switches shall not be fitted with isolation valves. Filter
dryers having access ports may be considered a point of isolation. Purge
valves shall be provided at all points of systems where accumulated non-
condensable gases would prevent proper system operation. Valves shall be
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

furnished to match line size, unless otherwise indicated or approved.


ISSUED FOR REVIEW

B. Expansion Valves: Expansion valves shall be installed with the thermostatic


expansion valve bulb located on top of the suction line when the suction line
DESCRIPTION

is less than 54 mm (2-1/8 inches) 2-1/8 inches in diameter and at the 4 o’clock
or 8 o’ clock position on lines larger than 54 mm (2-1/8 inches) 2-1/8 inches.
The bulb shall be securely fastened with two clamps. The bulb shall be
insulated. The bulb shall be installed in a horizontal portion of the suction
line, if possible, with the pigtail on the bottom. If the bulb must be installed in
a vertical line, the bulb tubing shall be facing up.

C. Valve Identification: Each system valve, including those which are part of a
factory assembly, shall be tagged. Tags shall be in alphanumeric sequence,
progressing in direction of fluid flow. Tags shall be embossed, engraved, or
JO/EWO

stamped plastic or nonferrous metal of various shapes, sized approximately


10-08643-
10-08643-

10-08643-

34 mm (1-3/8 inch) 1-3/8 inch diameter, or equivalent dimension,


0005
0005

0005

substantially attached to a component or immediately adjacent thereto. Tags


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

shall be attached with nonferrous, heavy duty, bead or link chain, 14 gauge
annealed wire, nylon cable bands or as approved. Tag numbers shall be
referenced on Operation and Maintenance Manuals and system diagrams.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER D. Strainers: Strainers shall be provided immediately ahead of solenoid valves
N. MINAMIBORI and expansion devices. Strainer may be an integral part of an expansion
DATE:
MAR-14-23 valve.
PROJECT
ENGINEER
N. ALSAHBIB
E. Filter Dryer: A liquid line filter dryer shall be provided on each refrigerant
MAR-14-23
circuit located such that all liquid refrigerant passes through a filter dryer.
DATE:
CERTIFIED
Dryers shall be sized in accordance with the manufacturer’s
K. OGAWA recommendations for the system in which it is installed. Dryers shall be
MAR-14-23
installed such that it can be isolated from the system, the isolated portion of
DATE:
CONSTRUCTION
the system evacuated, and the filter dryer replaced. Dryers shall be installed
AGENCY in the horizontal position except replaceable core filter dryers may be installed
in the vertical position with the access flange on the bottom.
DATE:
OPERATIONS F. Sight Glass: A moisture indicating sight glass shall be installed in all
refrigerant circuits down stream of all filter dryers and where indicated. Site
DATE:
glasses shall be full line size.
CONTROL NUMBER
VERIFICATION

G. Flexible Pipe Connectors: Connectors shall be installed perpendicular to line


EDSD

of motion being isolated. Piping for equipment with bi-directional motion shall
be fitted with two flexible connectors, in perpendicular planes. Reinforced
DATE:

elastomer flexible connectors shall be installed in accordance with


BY:

manufacturer’s instructions. Piping guides and restraints related to flexible


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

connectors shall be provided as required.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

H. Temperature Gauges: Temperature gauges shall be located specifically on,


(DCC) NO. _____________________

but not limited to the following: the sensing element of each automatic

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 27


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023

M S
J-13D
-Ap r - 2 0 23
PRINT
ED 27 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

temperature control device where a thermometer is not an integral part

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
thereof, the liquid line leaving a receiver and [the suction line at each
ENGG CERT

KO
KO
KO
evaporator or liquid cooler. Thermal wells for insertion thermometers and
thermostats shall extend beyond thermal insulation surface not less than 25
NM
NM

NM
mm 1 inch.

I. Building Surface Penetrations: Sleeves shall not be installed in structural


members except where indicated or approved. Sleeves shall be PVC.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

J. General Service Areas: Each sleeve shall extend through its respective wall,
floor, or roof, and shall be cut flush with each surface. Pipes passing through
concrete or masonry wall or concrete floors or roofs shall be provided with
DESCRIPTION

pipe sleeves fitted into place at the time of construction. Sleeves shall be of
such size as to provide a minimum of 6.35 mm ¼ inch all-around clearance
between bare pipe and sleeves or between jacketed-insulation and sleeves.

K. Field Applied Insulation:

1. Refrigerant pipe shall be insulated with fiber-free flexible


elastomeric closed cell type PVC nitrile rubber insulation.
Insulation installed or exposed outdoor shall be metal cladded or
protected by an approved and acceptable method from moisture
JO/EWO

and sunlight degradation.


10-08643-
10-08643-

10-08643-

0005
0005

0005

2. Use proper size material. Do not stretch or strain insulation.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

3. To avoid undue compression of insulation, provide cork stoppers


or wood inserts at supports as recommended by the insulation
00A

0F1
NO.
REV

00

manufacturer. Insulation protection shields shall be provided to all


DISCIPLINE
ENGINEER insulated pipe between the pipe insulation and pipe support.
N. MINAMIBORI Insulation shield shall be galvanized carbon steel ribbed shields
DATE:
MAR-14-23 gauge 18 designed to prevent damage to insulation by support.
PROJECT
ENGINEER
The shield shall contain 2 ribs each 1 inch from center in order to
N. ALSAHBIB
keep the shield centered on hanger. Shield shall be Grinnel Figure
MAR-14-23
168 or approved equal.
DATE:
CERTIFIED
K. OGAWA 4. Where possible, slip insulation over the pipe or tubing prior to
MAR-14-23
connection, and seal the butt joints with adhesive. Where the
DATE:
CONSTRUCTION
slip-on technique is not possible, slit the insulation and apply it to
AGENCY the pipe sealing the seam and joints with contact adhesive.
Optional tape sealing, as recommended by the manufacturer, may
DATE: be employed.
OPERATIONS
5. Insulation installed or exposed outdoor shall be metal cladded or
DATE:
protected by an approved and acceptable method from moisture
and sunlight degradation.
CONTROL NUMBER
VERIFICATION
EDSD

L. Field Painting: Painting required for surface not otherwise specified, and
finish painting of items only primed at the factory.
DATE:
BY:

13.3.4 Cleaning and Adjusting


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A. Clean uncontaminated system by evacuation and purging procedures


0F1

currently recommended by refrigerant and refrigerant equipment


(DCC) NO. _____________________

manufacturers, and as specified herein, to remove small amounts of air

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 28


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 28 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

and moisture. Systems containing moderate amounts of air moisture,

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
contaminated refrigerant, or any foreign matter shall be considered
ENGG CERT

KO
KO
KO
contaminated systems. Restoring contaminated systems to clean
condition including disassembly, component replacement, evacuation,
NM
NM

NM
flushing, purging, and re-charging, shall be performed using currently
approved refrigerant and refrigeration manufacturer’s procedures.
Restoring contaminated systems shall be at no additional cost to Saudi
Aramco. Water shall not be used in any procedure or test.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

B. After installation, dehydrate system by placing a vacuum of 1.7 kPa (0.5


in. Hg) absolute pressure. Hold vacuum for 24 hours or cycle vacuum and
dry nitrogen purge according to manufacturer’s recommendations.
DESCRIPTION

13.3.5 Refrigerant Piping Tests

After all components of the refrigerant system have been installed and connected,
the entire refrigeration system shall be subjected to pneumatic, evacuation, and
startup tests as described herein. Tests shall be conducted in the presence of
Saudi Aramco Representative. Any material, equipment, instruments, and
personnel required for the test shall be provided by the Sub-contractor. The
services of a qualified technician shall be provided as required to perform all tests
and procedures indicated herein.
JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

A. Preliminary Procedures: Prior to pneumatic testing, equipment which has


SEPT-27-22

MAR-14-23

been factory tested and refrigerant charged as well as equipment which could
DEC-22-22
DATE

be damaged or cause personnel injury by imposed test pressure, positive or


negative, shall be isolated from the test pressure or removed from the
00A

0F1
NO.
REV

00

system. Safety relief valves and rupture discs, where not part of factory
DISCIPLINE sealed systems, shall be removed and openings capped or plugged.
ENGINEER
N. MINAMIBORI
MAR-14-23
B. Pneumatic Test: Pressure control and excess pressure protection shall be
DATE:
PROJECT
provided at the source of test pressure. Valves shall be wide open, except
ENGINEER those leading to the atmosphere. Test gas shall be dry nitrogen, with minus
N. ALSAHBIB 55 degree C (minus 70 degree F) dewpoint and less than 5 ppm oil. Test
DATE: MAR-14-23 pressure shall be applied in two stages before any refrigerant pipe is
CERTIFIED insulated or covered. First stage test shall be at 69 kPa (10 psi) with every
K. OGAWA joint being tested with a thick soap or color indicating solution. Second stage
DATE:
MAR-14-23 tests shall raise the system to the minimum refrigerant leakage test pressure
CONSTRUCTION specified in ASHRAE 15 with a maximum test pressure 25 percent greater
AGENCY
than first stage. Pressure above 690 Kpa (100 psig) shall be raised in 10
percent increments with a pressure acclimatizing period between increments.
DATE:
OPERATIONS
The initial test pressure shall be recorded along with the ambient temperature
to which the system is exposed. Final test pressures of the second stage
shall be maintained on the system for a minimum of 24 hours. At the end of
DATE: the 24 hour period, the system pressure will be recorded along with the
CONTROL NUMBER

ambient temperature to which the system is exposed. A correction factor of


VERIFICATION

2 Kpa (0.3 psi) will be allowed for each degree C (F) F change between test
EDSD

space initial and final ambient temperature, plus for increase and minus for a
decreases. If the corrected system pressure is not exactly equal to the initial
DATE:
BY:

system test pressure, then the system shall be investigated for leaking joints.
To repair leaks, the joint shall be taken apart, thoroughly cleaned, and
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

reconstructed as a new joint. Joints repaired by caulking, remelting, or back-


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

welding/brazing shall not be acceptable. Following repair, the entire system


(DCC) NO. _____________________

shall be retested using the pneumatic tests described above. The entire

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 29


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 29 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

system shall be reassembled once the pneumatic tests are satisfactorily

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
completed.
ENGG CERT

KO
KO
KO
C. Evacuation Test: Following satisfactory completion of the pneumatic tests,
NM
NM

NM
the pressure shall be relieved and the entire system shall be evacuated to an
absolute pressure of 300 micrometers. During evacuation of the systems,
the ambient temperature shall be higher than 2 degrees C 35 degrees F. No
more than one system shall be evacuated at one time by one vacuum pump.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

Once the desired vacuum has been reached, the vacuum line shall be closed
ISSUED FOR REVIEW

and the system shall stand for 1 hour. If the pressure rises over 500
micrometers after the 1 hour period, then the system shall be evacuated
again down to 300 micrometers and let set for another 1 hour period. The
DESCRIPTION

system shall not be charged until a vacuum of at least 500 micrometers is


maintained for a period of 1 hour without the assistance of a vacuum line. If
during the testing the pressure continues to rise, check the system for leaks,
repair as required, and repeat the evacuation procedure. During evacuation,
pressures shall be recorded by the thermocouple-type, electronic-type, or a
calibrated-micrometer type gauge.

D. System Charging and Startup Test: Following satisfactory completion of the


evacuation tests, the system shall be charge with the required amount of
refrigerant by raising pressure to normal operating pressure and in
JO/EWO

accordance with manufacturer’s procedures. Following charging, the system


10-08643-
10-08643-

10-08643-

shall operate with high-side and low-side pressures and corresponding


0005
0005

0005

refrigerant temperatures, at design or improved valves. The entire system


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

shall be tested for leaks. Fluorocarbon systems shall be tested with halide
torch or electronic leak detectors.
00A

0F1
NO.
REV

00

E. Refrigerant Leakage: If a refrigerant leak is discovered after the system has


DISCIPLINE
ENGINEER been charge, the leaking portion of the system shall immediately be isolated
N. MINAMIBORI from the remainder of the system and the refrigerant pumped into the
DATE:
MAR-14-23 system receiver or other suitable container. Under no circumstances shall
PROJECT
ENGINEER
the refrigerant be discharged into the atmosphere.
N. ALSAHBIB
MAR-14-23
F. Sub-contractor’s Responsibility: The Sub-contractor shall, at all times during
DATE:
CERTIFIED
the installation and testing of the refrigeration system, take steps to prevent
K. OGAWA the release of refrigerants into the atmosphere. The steps shall include, but
MAR-14-23
not be limited to, procedures which will minimize the release of refrigerants
DATE:
CONSTRUCTION
to the atmosphere and the use of refrigerant recovery devices to remove
AGENCY refrigerant from the system and store

DATE: the refrigerant for reuse of reclaim. At no time shall more than 85 g (3
OPERATIONS ounces) 3 ounces of refrigerant be released to the atmosphere in any one
occurrence.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 30


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 30 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
14.0 AIR COOLED CONDENSING UNITS
ENGG CERT

KO
KO
KO 14.1 GENERAL
NM
NM

NM

14.1.1 Description:
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

A. This Section covers providing Air Cooled Condensing Units (ACCUs),


ISSUED FOR REVIEW

complete and functional acceptable to Saudi Aramco Representative and


in strict accordance with this Section and the applicable Drawings.
DESCRIPTION

B. Refer to PE-300017 section 5.11

C. No deviation from the applicable Drawings, approved shop drawings or the


Specifications shall be performed. If such a deviation is deemed necessary
by Sub-contractor, Sub-contractor shall submit details of such deviation to
Saudi Aramco Representative prior to commencing Work.

14.1.2 Quality Control


JO/EWO

10-08643-
10-08643-

10-08643-

A. The material to be furnished under this section shall be the standard product
0005
0005

0005

of a manufacturer regularly engaged in the production of air-cooled


SEPT-27-22

MAR-14-23

condensing units and shall be the manufacturer’s latest approved design as


DEC-22-22
DATE

published in the catalogues.


00A

0F1
NO.
REV

00

B. Unit construction shall comply with latest edition of ANSI/ASHRAE and with
DISCIPLINE NEC.
ENGINEER
N. MINAMIBORI
MAR-14-23
14.1.3 Submittals
DATE:
PROJECT
ENGINEER A. Submit to Saudi Aramco Representative for approval a certificate of
N. ALSAHBIB compliance stating that the material used and construction of air-cooled
DATE: MAR-14-23 condensing units conforms to all requirements of these Specifications.
CERTIFIED
K. OGAWA B. Catalogue Data Including the Following Information’s:
MAR-14-23
DATE:
CONSTRUCTION 1. Unit type number.
AGENCY

2. Installation and functional dimensions.


DATE:
OPERATIONS
3. Locations and size of piping connections.

DATE: 4. Weight of units.


CONTROL NUMBER
VERIFICATION

5. Capacity of the units


EDSD

6. Motor, type, speed, horsepower, voltage, and full load current of


DATE:
BY:

all components
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

7. Complete electrical schematic and connection diagram for each


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

electrically controlled component having more than one


(DCC) NO. _____________________

automatic or manual controlled device including provisions for

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 31


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 31 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

field connections to the HVAC Control Panel, shall be submitted

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to Saudi Aramco Representative for approval. Wiring diagrams
ENGG CERT

KO
KO
KO
shall identify each component, and one diagram shall show all
interconnected for interlock components and HVAC Control
NM
NM

NM
Panel field connections.

8. Operation and Maintenance Manuals, including parts list.


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

9. Applicable Codes and Standards under which the product is


ISSUED FOR REVIEW

manufactured and tested.

10. Unit generated sound power data.


DESCRIPTION

C. Submit recommending spare part list for two years. List shall include parts
numbers, description of each part and the price of each.

14.2 PRODUCTS

Refer to PE-300017 Section 5.11

14.3 EXECUTION
JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

14.3.1 Inspection
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

A. Inspection shall be in accordance with SATIP and SAIC requirements.


00A

0F1
NO.
REV

00

B. Sub-contractor shall inspect all products for damage immediately before


DISCIPLINE installation. Any products that are damaged or not in accordance with
ENGINEER
N. MINAMIBORI Specifications shall immediately be repaired or remove from the Site and
MAR-14-23 be replaced at no additional cost to Saudi Aramco.
DATE:
PROJECT
ENGINEER C. Repair procedure shall be prepared by Sub-contractor and approved
N. ALSAHBIB before proceeding the works.
DATE: MAR-14-23
CERTIFIED 14.3.2 Installation
K. OGAWA

DATE:
MAR-14-23 A. All ACCUs shall be installed in strict accordance with the manufacturer’s
CONSTRUCTION recommendations and in accordance with the applicable Codes and
AGENCY Standards.

DATE: B. Install ACCUs on the location shown on the Drawings. D/X refrigerant lines
OPERATIONS
with all accessories such as filter/dryer, expansion valve…etc shall be
connected. Refrigerant filters, control valves and all other required
DATE: accessories shall be completely installed as an operational system. Units
shall be installed on vibration isolators. Interconnecting refrigerant piping
CONTROL NUMBER
VERIFICATION

between AHU and ACCU shall run in cable trays with cover.
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 32


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023

M S
J-13D
-Ap r - 2 0 23
PRINT
ED 32 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
15.0 PACKAGED Air Conditioning Unit
ENGG CERT

KO
KO
KO 15.1 GENERAL
NM
NM

NM

15.1.1 Description of Work


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

A. Work Included: The work under this section includes, but is not limited
ISSUED FOR REVIEW

to, the furnishing and installation of packaged air conditioning units as


specified herein and indicated on design drawings.
DESCRIPTION

B. The packaged air conditioner is a factory assembled cooling unit,


designed for refrigerant R-410a and housed in an insulated weather
proof cabinet for outdoor installation.

15.1.2 Quality Assurance

A. Certification: The air conditioning units shall be designed, constructed,


assembled, rated and tested in accordance with applicable codes and
standards.
JO/EWO

15.1.3 Submittals
10-08643-
10-08643-

10-08643-

0005
0005

0005

A. Unit specifications including weights and dimensions.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

B. Electrical data, including wiring diagrams.


C. Description of materials and methods of construction including finishes for
00A

0F1
NO.
REV

00

units and all components.


DISCIPLINE
ENGINEER
N. MINAMIBORI D. Description of cooling sequence of operation.
MAR-14-23
DATE:
PROJECT
ENGINEER
E. Complete air data including fan motor electric characteristics and air volumes
N. ALSAHBIB
at design, external static pressure and sound rating. Fan curve shall be
MAR-14-23
provided with specified operating point clearly plotted to verify performance.
DATE:
CERTIFIED
K. OGAWA F. Description of heat exchangers including the cooling coil and condenser coil.
MAR-14-23
DATE:
CONSTRUCTION
G. Description of air filter media, size and quantities.
AGENCY
H. Description of all auxiliary equipment.
DATE:
OPERATIONS I. Cooling capacities at design conditions and flow rates.

DATE:
J. Installation recommendations including support arrangement, etc.
CONTROL NUMBER
VERIFICATION

K. Submit recommended spare parts list for each unit under this section. List
EDSD

shall include part numbers, and description of each part, and the price of each
part.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

.
0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 33


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 33 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

15.2 PRODUCTS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM
15.2.1 Single Packaged Air Conditioning Unit
NM

NM
Refer to PE-300017 Section 17.0

15.3 EXECUTION
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

15.3.1 Inspection
DESCRIPTION

A. Inspection shall be in accordance with SATIP and SAIC requirements.

B. The unit shall have factory installed internal piping and wiring; refrigerant
circuit tested, dehydrated, seated and shipped with holding charge of
refrigerant.

C. At the worksite, the Sub-contractor shall remove any shipment fixtures of


corrosion protection if so required in accordance with manufacturer's
instructions.

D. The Sub-contractor shall check the air conditioning unit for damage and/or
JO/EWO

10-08643-
10-08643-

10-08643-

warpage which may have occurred during transit.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22

E. Equipment and materials supplied primed or painted shall be scrutinized by


DATE

the Sub-contractor to establish what further work will be necessary to fully


protect and finish the surfaces in accordance with the paint specification. A
00A

0F1
NO.
REV

00

guide to compatibility between coatings supplied by other and those which


DISCIPLINE shall be applied by the Sub-contractor is given in SAES-H-001 para. 5.3.10.
ENGINEER
N. MINAMIBORI
MAR-14-23 F. Should the equipment or materials be delivered with unsuitable primer or
DATE:
PROJECT
paint the unsuitable primer or paint shall be removed and the proper
ENGINEER surface preparation re-established by the Sub-contractor.
N. ALSAHBIB
DATE: MAR-14-23 15.3.2 Installation
CERTIFIED
K. OGAWA
A. Equipment shall be installed, tested and commissioned in accordance with
MAR-14-23
DATE: the relevant drawings, project scope of work, construction specifications and
CONSTRUCTION
AGENCY
manufacturer's instructions to insure proper sequential operation of the unit
and its control.
DATE:
OPERATIONS 16.0 HUMIDIFIERS

DATE:
16.1 GENERAL
CONTROL NUMBER
VERIFICATION
EDSD

16.1.1 System Description


DATE:
BY:

A. Self contained electric steam humidifier complete with steam distribution


system, connecting hose and all associated controls and accessories.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 34


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 34 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

16.1.2 Quality Assurance

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
A. The material to be furnished under this section shall be the standard
product of a manufacturer regularly engaged in the production of
NM
NM

NM
humidifiers and shall be the manufacturer’s latest approved design as
published in the catalogues.

B. All equipment wiring shall comply with NEC requirements.


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

16.1.3 Submittals

A. Submit complete installation details to Company Representative for


DESCRIPTION

approval prior to installation.

B. Sub-contractor shall submit to Company Representative for approval lists of


material and equipment supported by sufficient descriptive material, such as
catalog cuts, diagrams and other data, published by the manufacturer, to
demonstrate conformance to the Construction Specification requirements;
model number alone will not be accepted.

C. Maintenance and operating manuals for each piece of equipment.


JO/EWO

10-08643-
10-08643-

10-08643-

16.2 PRODUCTS
0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

16.2.1 Equipment

A. General: Self contained electrode steam humidifier having a capacity as


00A

0F1
NO.
REV

00

shown on the drawings complete with steam distribution system, connecting


DISCIPLINE
ENGINEER hose and all associated controls and accessories.
N. MINAMIBORI
DATE:
MAR-14-23 B. Cabinet : A painted steel cabinet with lockable cylinder access door shall be
PROJECT
ENGINEER
provided. The cylinder shall be of polypropylene construction. Electrode
N. ALSAHBIB
wiring shall be connected with a nut to prevent loosening of the connection.
DATE: MAR-14-23
CERTIFIED C. Controls:
K. OGAWA
MAR-14-23 1. A modulating type humidity control system shall be provided for
DATE:
CONSTRUCTION
remote control (from DDC) and shall be solid state control system
AGENCY that boils water based on conductivity. The control is to have field
adjustable low drain threshold, cycle time and capacity.
DATE:
OPERATIONS 2. Unit shall be able of drain tempering.

DATE:
3. Unit Control system to shutdown the unit on any of the following
faults : over current, excessive fill time and end of cylinder life.
CONTROL NUMBER
VERIFICATION
EDSD

4. The humidifier shall have the provision to relay its malfunctioning to


the HVAC control panel (DDC).
DATE:
BY:

5. Provide duct humidistat with high limit setting to disable the steam
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

production in case of high humidity within the duct.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 35


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 35 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

6. The below interface signals shall be available in the unit:

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
a. Enable/Disable Command
(Relay output from DDC Panel to Humidifier Panel)
NM
NM

NM
b. Humidifier Capacity Control
(0-10 VDC from DDC Panel to Humidifier Panel)
c. Humidifier Healthy Status
(VFC from Humidifier Panel to DDC Panel)
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

d. Humidifier Fault
ISSUED FOR REVIEW

(VFC from Humidifier Panel to DDC Panel)


e. Humidistat Input
(Input from Duct Humidistat to Humidifier)
DESCRIPTION

D. Steam distribution System: Stainless steel distribution pipe for horizontal in-
duct installation with integral pitch.

E. Connecting Pipe: Provide appropriate length of insulated copper pipe for


connection between the unit and the stream distribution system as shown on
the drawings.

F. Terminal connection points for all line and low voltage (control) connections.
A system on/off switch shall be externally available. A door interlock switch
JO/EWO

shall prevent operation when door is open.


10-08643-
10-08643-

10-08643-

0005
0005

0005

G. Drain solenoid shall be of the shielded core dry operator design to prevent
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

minerals from impeding proper operation of the solenoid plunger.

H. All manufacturer recommended accessories, such as water filters, isolation


00A

0F1
NO.
REV

00

valves, etc shall be included.


DISCIPLINE
ENGINEER
N. MINAMIBORI
MAR-14-23
16.3 EXECUTION
DATE:
PROJECT
ENGINEER
N. ALSAHBIB 16.3.1 Inspection
DATE: MAR-14-23
CERTIFIED A. Sub-contractor shall inspect all products for damage immediately before
K. OGAWA installation. Any products that are damaged or not in accordance with
MAR-14-23 Specifications shall immediately be repaired or remove from the Site and
DATE:
CONSTRUCTION
be replaced at no additional cost to the company.
AGENCY

B. Repair procedure shall be prepared by Sub-contractor and approved


DATE: before proceeding the works.
OPERATIONS

16.3.2 Installation
DATE:
A. Work shall be installed as shown and according to the manufacturer’s
CONTROL NUMBER
VERIFICATION

diagrams and recommendations.


EDSD

B. Handle and install units in accordance with manufacturer's written


DATE:

instructions.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

C. Provide water supply in accordance with pressure and conductivity criteria.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 36


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 36 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
17.0 ELECTRIC DUCT HEATER
ENGG CERT

KO
KO
KO 17.1 GENERAL
NM
NM

NM

17.1.1 System Description


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

A. Duct mounted electric heating units ,flanged or slip-in design, with built-in
ISSUED FOR REVIEW

terminal and control boxes completely factory wired to terminals.

17.1.2 Reference Codes and Standards


DESCRIPTION

A. Reference Codes and Standards: Comply with applicable Saudi Aramco


Standards, Codes and Standards.

17.1.3 Quality Assurance

A. The material to be furnished under this section shall be the standard


product of a manufacturer regularly engaged in the production of electric
duct heater and shall be the manufacturer’s latest approved design as
published in the catalogues.
JO/EWO

10-08643-
10-08643-

10-08643-

B. All equipment wiring shall comply with NEC requirements.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

17.1.4 Submittals

A. Submit complete shop drawings and wiring diagrams, installation details


00A

0F1
NO.
REV

00

to Saudi Aramco Representative for approval prior to installation.


DISCIPLINE
ENGINEER
N. MINAMIBORI B. Submit schedules listing the duct heaters air flow, heating capacities,
DATE:
MAR-14-23 accessories, etc. including all unit tag numbers.
PROJECT
ENGINEER
N. ALSAHBIB
C. Sub-contractor shall submit to Saudi Aramco Representative for approval
MAR-14-23
lists of material and equipment supported by sufficient descriptive material,
DATE:
CERTIFIED
such as catalog cuts, diagrams and other data, published by the
K. OGAWA manufacturer, to demonstrate conformance to the Construction Specification
MAR-14-23
requirements; model number alone will not be accepted.
DATE:
CONSTRUCTION
AGENCY D. Maintenance and operating manuals for each piece of equipment

DATE:
OPERATIONS
17.2 PRODUCTS

DATE:
17.2.1 Equipment
CONTROL NUMBER
VERIFICATION

A. General: Aluminized steel frame, spot welded. Duct mounted units, flanged or
EDSD

slip-in design, with built-in terminal and control boxes completely factory wired
to terminals. Control panels shall be built-in (NEMA l).
DATE:
BY:

B. Coils: Open type, 80 percent nickel, 20 percent chromium resistance wire,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

insulated by floating ceramic bushings and supported in aluminized steel


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

brackets spaced on 100 mm (4-inch) maximum centers. Coils shall be


0F1

(DCC) NO. _____________________

mechanically crimped in stainless steel terminals which are insulated from the

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 37


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 37 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

frame with high temperature molded phenolic bushings. Heaters shall be

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
supplied with metal protective screens on inlet and outlet sides.
ENGG CERT

KO
KO
KO
C. Over Temperature Protection:
NM
NM

NM
l. Primary system: Automatic reset thermal cutout.

2. Secondary system: Load-carrying manual reset thermal cutout


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

factory wired in series with each heater stage.


ISSUED FOR REVIEW

D. Over current Protection: UL and NEC.


DESCRIPTION

E. Contactors: Disconnecting mercury type.

F. Shall be supplied with metal protective screens on inlet and outlet sides of the
heating coil.

G. Provide Airflow sensing device to disable the unit in case of low or no flow.

H. For staged controlled heaters the maximum stage capacity shall be 3 kW.

I. Electric heaters above 6 kW shall be SCR controlled.


JO/EWO

10-08643-
10-08643-

10-08643-

J. Provide Room thermostats compatible with the heater control signal


0005
0005

0005

requirements.
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

K. Thermostats installed in Battery Rooms and corrosive areas shall be corrosion


resistant.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER L. The below interface signals shall be available in the unit:
N. MINAMIBORI
DATE:
MAR-14-23 i. Heater Enable/Disable Command
PROJECT
ENGINEER
(Relay output from DDC Panel to Heater Panel)
N. ALSAHBIB
ii. Heater ON Status
MAR-14-23
(VFC from Heater Panel to DDC Panel)
DATE:
CERTIFIED
iii. Heater Trip Alarm
K. OGAWA (VFC from Heater Panel to DDC Panel)
MAR-14-23
iv. Heater Capacity Input Signal (Only for SCR Controlled Heaters)
DATE:
CONSTRUCTION
(0-10 VDC from DDC Panel to Heater Panel)
AGENCY

17.3 EXECUTION
DATE:
OPERATIONS

17.3.1 Inspection
DATE:
A. Sub-contractor shall inspect all products for damage immediately before
CONTROL NUMBER
VERIFICATION

installation. Any products that are damaged or not in accordance with


EDSD

Specifications shall immediately be repaired or remove from the Site and be


replaced at no additional cost to Saudi Aramco.
DATE:
BY:

B. Repair procedure shall be prepared by Sub-contractor and approved


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

before proceeding the works.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 38


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 38 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

17.3.2 Installation

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
A. Work shall be installed as shown and according to the manufacturer’s
diagrams and recommendations.
NM
NM

NM
B. Handle and install units in accordance with manufacturer's written
instructions.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

C. Support units rigidly so they remain stationary at all times. Cross-bracing or


ISSUED FOR REVIEW

other means of stiffening shall be provided as necessary. Method of support


shall be such that distortion and malfunction of units cannot occur.
DESCRIPTION

18.0 AIR HANDLING UNITS

18.1 GENERAL

18.1.1 Description

A. This Section covers providing Air Handling Units, complete and functional
acceptable to Saudi Aramco Representative and in strict accordance with
JO/EWO

10-08643-

this Section and the applicable Drawings.


10-08643-

10-08643-

0005
0005

0005

B. No deviation from the applicable Drawings, approved shop drawings or the


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

Specifications shall be performed. If such a deviation is deemed necessary


by Sub-contractor, Sub-contractor shall submit details of such deviation to
Saudi Aramco Representative prior to commencing Work.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER 18.1.2 Quality Control
N. MINAMIBORI
DATE:
MAR-14-23 A. The material to be furnished under this section shall be the standard
PROJECT
ENGINEER
product of a manufacturer regularly engaged in the production of air
N. ALSAHBIB
handling units and shall be the manufacturer’s latest approved design as
MAR-14-23
published in the catalogues.
DATE:
CERTIFIED
K. OGAWA 18.1.3 Submittals
MAR-14-23
DATE:
CONSTRUCTION
A. Submit to Saudi Aramco Representative for approval a certificate of
AGENCY compliance stating that the material used and construction of air handling
units conforms to all requirements of these Specifications.
DATE:
OPERATIONS B. Catalogue Data Including the Following Information’s:

DATE:
1. Unit type (horizontal or vertical) and model number.
CONTROL NUMBER
VERIFICATION

2. Unit capacities including but not limited to sensible, latent, total,


EDSD

water flow rates, pressure drop for each component, face


velocities.
DATE:
BY:

3. Installation and functional dimensions.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4. Locations and size of piping connections.


0F1

(DCC) NO. _____________________

5. Description of insulation.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 39


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 39 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6. Weight of units.
ENGG CERT

KO
KO
KO
7. Fan Air flow rate and coil capacity. The ratings and test conditions
NM
NM

NM
shall be per ARI industry Standard 430 for central station Air
Handling Units (AHU’s).

8. Fan curve showing the operating point at full air flow rate for all
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

AHUs.
ISSUED FOR REVIEW

9. Motor, type, speed, horsepower, voltage and full load current.


DESCRIPTION

10. Complete description of heating (if any) and cooling coils.

11. Complete description and data on heating step controller (if any).

12. Complete electrical schematic and connection diagram for each


electrically controlled component having more than one automatic
or manual controlled device including provisions for field
connections to the HVAC Control panel (DDC), shall be submitted
to Saudi Aramco Representative for approval. Wiring diagrams
shall identify each component, and one diagram shall show all
JO/EWO

interconnected for interlock components and HVAC Control Panel


10-08643-
10-08643-

10-08643-

(DDC) field connections.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

13. Complete description of heating and cooling parts list.

14. Operation and Maintenance Manuals, including parts list.


00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER 15. Applicable Codes and Standards under which the product is
N. MINAMIBORI manufactured and tested.
MAR-14-23
DATE:
PROJECT
ENGINEER
16. Unit generated sound power data.
N. ALSAHBIB
DATE: MAR-14-23 18.2 PRODUCTS
CERTIFIED
K. OGAWA
MAR-14-23 18.2.1 General
DATE:
CONSTRUCTION
AGENCY A. Sub-contractor shall ensure that the manufacture or supplier have the
capability to provide In-Kingdom repair, maintenance, spare parts and
DATE: supply service for all equipment
OPERATIONS

18.2.2 Air Handling Units (AHUs)


DATE:
Refer to PE-300017 Section 5.0
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 40


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 40 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

18.3 EXECUTION

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM
18.3.1 Inspection
NM

NM
A. Sub-contractor shall inspect all products for damage immediately before
installation. Any products that are damaged or not in accordance with
Specifications shall immediately be repaired or remove from the Site and
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

be replaced at no additional cost to Saudi Aramco.


ISSUED FOR REVIEW

B. Repair procedure shall be prepared by Sub-contractor and approved


before proceeding the works.
DESCRIPTION

18.3.2 Installation

A. All Air Handling Units (AHU’s) shall be installed in strict accordance with
the manufacturer’s recommendations and in accordance with the
applicable Codes and Standards.

B. Install Air Handling Units (AHU’s) on the location shown on the Drawing.
Refrigerant lines shall be connected including condensate drain line. Air
filters, control valves and all other required accessories shall be completely
JO/EWO

10-08643-
10-08643-

10-08643-

installed as an operational system.


0005
0005

0005
SEPT-27-22

MAR-14-23

C. Ductwork shall be connected to the AHU with a flexible duct connector.


DEC-22-22
DATE

Braided wire jumper shall be used for continuous grounding between


AHU’s and its ductwork.
00A

0F1
NO.
REV

00

DISCIPLINE D. Provide vibration isolators for all Air Handling Units (AHU’s).
ENGINEER
N. MINAMIBORI
MAR-14-23
E. Furnish one set of the following:
DATE:
PROJECT
ENGINEER 1. Replacement filters for each air handling unit.
N. ALSAHBIB
DATE: MAR-14-23 2. Replacement belts for each air handling unit.
CERTIFIED
K. OGAWA
MAR-14-23
19.0 FANS
DATE:
CONSTRUCTION
AGENCY

19.1 GENERAL
DATE:
OPERATIONS
19.1.1 Description

DATE: A. This Section covers supply and exhaust fans as shown on the Drawings
CONTROL NUMBER

and specified herein, including accessories required to complete the Work


VERIFICATION

for functional operation, acceptable to Saudi Aramco Representative of the


EDSD

following.
DATE:
BY:

19.1.2 Quality Assurance


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

A. Reference Codes and Standards: Comply with applicable Saudi Aramco


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

Standards, Codes and Standards.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 41


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 41 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

19.1.3 Submittals

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM Submit following to Saudi Aramco Representative for approval:
NM

NM
A. Test Report: Data showing test reading and calculated results of factory
tests of fans. The data shall include:

1. Description of fan and drive-(Make-size-type-arrangement).


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

2. Motor nameplate data- (Volts-phase, Hertz-FLA-LRA-


synchronous and full load speeds-hp).
DESCRIPTION

3. Characteristics: - l/s. vs. static pressure, BHP and efficiency,


indicating clearly the operating point.

B. Provide with the following data:

1. Fan tip speed.

2. Sound rating information.

3. Method and material of construction.


JO/EWO

10-08643-
10-08643-

10-08643-

4. Arrangement of unit.
0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

5. Installation recommendation.

6. Description of drive components.


00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER 7. Performance curves.
N. MINAMIBORI
DATE:
MAR-14-23 8. Static efficiency.
PROJECT
ENGINEER
N. ALSAHBIB
9. Control wiring diagram.
DATE: MAR-14-23
CERTIFIED
K. OGAWA C. Recommended Spare Parts Lists: List of recommended spare showing
MAR-14-23
name, part number, and price for each part.
DATE:
CONSTRUCTION
AGENCY D. Operation and Maintenance Manuals.

DATE:
OPERATIONS
19.2 PRODUCTS

DATE:
19.2.1 Equipment
CONTROL NUMBER
VERIFICATION

Refer to PE-300017 Section 7.0


EDSD

A. Speed controllers shall be provided for all direct driven fans to achieve
DATE:

the design operating point.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

B. Fans in corrosive areas shall be epoxy coated.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

C. Fans in Battery Rooms shall be spark resistant and epoxy coated.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 42


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 42 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

D. Fans in hazardous explosive areas shall be explosion proof with explosion

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
proof rating suitable for the explosive hazard.
ENGG CERT

KO
KO
KO
19.2.2 Identification
NM
NM

NM
A. Equipment Number: Stamp equipment number on Manufacturer’s
standard nameplate and attach it permanently to fan.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

B. Seals: All fans must bear the AMCA certified rating seal.
ISSUED FOR REVIEW

19.3 EXECUTION
DESCRIPTION

19.3.1 Installation

A. General:
1. Equipment shall be installed shown on the Drawings and in
accordance with the manufacturer’s recommendations.

2. Exhaust duct openings extending above roof shall not face


windward side.
JO/EWO

10-08643-
10-08643-

10-08643-

20.0 CHEMICAL FILTER UNITS


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

20.1 GENERAL
00A

0F1
NO.
REV

00

DISCIPLINE 20.1.1 Description


ENGINEER
N. MINAMIBORI
MAR-14-23 A. This Section covers the manufacturing and supply of materials and
DATE:
PROJECT
equipment for Chemical Filter units , complete and functional acceptable
ENGINEER to Company Representative and in strict accordance with this Section and
N. ALSAHBIB the applicable Drawings.
DATE: MAR-14-23
CERTIFIED B. The purpose of the filtration shall be for the protection of electronic
K. OGAWA
equipment against corrosive gases in the outside air. The system shall be
MAR-14-23
DATE: designed and installed to remove the corrosive gases and maintain an
CONSTRUCTION
AGENCY
indoor air quality below the G1 severity level in accordance with ISA
Standard S71.04.
DATE:
OPERATIONS C. No deviation from the applicable Drawings, approved shop drawings or the
Specifications shall be performed. If such a deviation is deemed necessary
by Sub-contractor, Sub-contractor shall submit details of such deviation to
DATE: company representative prior to commencing Work.
CONTROL NUMBER
VERIFICATION

20.1.2 Quality Control


EDSD

A. The material to be furnished under this section shall be the standard


DATE:
BY:

product of a manufacturer regularly engaged in the production of chemical


filter units and shall be the manufacturer’s latest approved design as
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

published in the catalogues.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

B. Unit performance shall be certified in accordance with ISA standard S 71.04

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 43


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 43 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Sub-contractor shall ensure that the manufacture or supplier have the
ENGG CERT

KO
KO
KO
capability to provide In-Kingdom repair, maintenance, spare parts and
supply service for all equipment
NM
NM

NM
D. Repair procedure shall be prepared by Sub-contractor and approved
before proceeding the works.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

20.1.3 Submittals

E. Submit to Company Representative for approval a certificate of compliance


DESCRIPTION

stating that the material used and construction conforms to all requirements
of these Specifications.

F. Catalogue Data Including the Following Information’s:

1. Unit type and model number.

2. Installation and functional dimensions.

3. Weight of units.
JO/EWO

10-08643-
10-08643-

10-08643-

4. Fan curve showing the operating point at full air flow rate for all fans.
0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

5. Motor, type, speed, horsepower, voltage and full load current.

6. Chemical media selection indicating the required gas concentration are


00A

0F1
NO.
REV

00

met.
DISCIPLINE
ENGINEER
N. MINAMIBORI 7. Complete electrical schematic and connection diagram for each
DATE:
MAR-14-23 electrically controlled component having more than one automatic or
PROJECT
ENGINEER
manual controlled device including provisions for field connections to
N. ALSAHBIB
the HVAC Control panel, shall be submitted to company
MAR-14-23
Representative for approval. Wiring diagrams shall identify each
DATE:
CERTIFIED
component, and one diagram shall show all interconnected for interlock
K. OGAWA components and HVAC Control Panel field connections.
MAR-14-23
DATE:
CONSTRUCTION
8. Operation and Maintenance Manuals, including parts list.
AGENCY
9. Applicable Codes and Standards under which the product is
DATE: manufactured and tested.
OPERATIONS
10. Unit generated sound power data.
DATE:
CONTROL NUMBER

20.2 PRODUCTS
VERIFICATION
EDSD

20.2.1 Equipment
DATE:
BY:

Refer to PE-300017 section 6.0


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 44


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 44 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

20.3 EXECUTION

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM
20.3.1 Inspection
NM

NM
A. Sub-contractor shall inspect all products for damage immediately before
installation. Any products that are damaged or not in accordance with
Specifications shall immediately be repaired or remove from the Site and
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

be replaced at no additional cost to Company.


ISSUED FOR REVIEW

B. Repair procedure shall be prepared by Sub-contractor and approved


before proceeding the works.
DESCRIPTION

C. Fans shall be tested against the specified performance ratings.

D. All above tests and inspection shall be subject to acceptance of company


engineer.

20.3.2 Installation

A. All chemical filter units shall be installed in strict accordance with the
manufacturer’s recommendations and in accordance with the applicable
JO/EWO

10-08643-
10-08643-

10-08643-

Codes and Standards.


0005
0005

0005
SEPT-27-22

MAR-14-23

B. Ductwork shall be connected to the chemical filter unit with a flexible duct
DEC-22-22
DATE

connector. Braided wire jumper shall be used for continuous grounding


between the unit and its ductwork.
00A

0F1
NO.
REV

00

DISCIPLINE C. Provide neoprene pad vibration isolators for all chemical filter units.
ENGINEER
N. MINAMIBORI
MAR-14-23
DATE:
PROJECT 21.0 DUCTWORK & ACCESSORIES
ENGINEER
N. ALSAHBIB
DATE: MAR-14-23
CERTIFIED
21.1 GENERAL
K. OGAWA
MAR-14-23
DATE: 21.1.1 Description
CONSTRUCTION
AGENCY
A. This Section covers providing metal and non-metal ductwork as shown
DATE:
on the Drawings and specified herein, including, all accessories and
OPERATIONS testing required to complete the Work acceptable to Saudi Aramco
Representative.

DATE:
21.1.2 Duct Work
CONTROL NUMBER
VERIFICATION
EDSD

A. The ductwork to be provided under this Section shall include but not limited
to the supply, return, outside fresh air ductwork and air exhaust for the
DATE:

following systems and as shown on the Drawings.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Ductwork and all plenums with pressure class ratings shall be constructed
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

to Seal Class A. Openings for rotating shafts shall be sealed with bushings
(DCC) NO. _____________________

or other devices that seal off air leakage. Pressure-sensitive tape shall not
be used as the primary sealant unless it has been certified to comply with

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 45


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 45 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

UL-181A or UL-181B by an independent testing laboratory, and the tape is

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
used in accordance with that certification. All connections shall be sealed,
ENGG CERT

KO
KO
KO
including but not limited to spin-ins, taps, other branch connections, access
doors, access panels, and duct connections to equipment. Sealing that
NM
NM

NM
would void product listings is not required. Spiral lock seams need not be
sealed. All duct pressure class ratings shall be designated in the design
documents.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

21.1.3 Materials Furnished but Installed Under Other Sections


ISSUED FOR REVIEW

A. Provide the following materials for installation under other Sections of the
Specifications:
DESCRIPTION

a. Frames and anchors for fire dampers to be installed on or in walls, partitions,


or floors.

b. Sleeves for ductwork penetrating walls and floors.

c. Supports for HVAC equipment.

21.1.4 Quality Assurance


JO/EWO

A. The manufacturer shall, upon request, furnish a certificate of inspection


10-08643-
10-08643-

10-08643-

stating that the material has been manufactured, sampled, tested, and
0005
0005

0005

inspected in accordance with this specification, and has been found to


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

meet the requirements.

B. Inspection: Inform Saudi Aramco Representative of approved duct


00A

0F1
NO.
REV

00

erection schedule so that he may observe ductwork during fabrication,


DISCIPLINE
ENGINEER and inspect all ductwork installation. Ductwork shall not be concealed in
N. MINAMIBORI any manner prior to inspection by Saudi Aramco Representative.
MAR-14-23
DATE:
PROJECT
ENGINEER
C. All ductwork shall be clear from visual imperfections, including pitting, oil
N. ALSAHBIB
canning, stains and discoloration.
DATE: MAR-14-23
CERTIFIED
D. Ductwork which shows visual imperfections, including pitting, oil canning,
K. OGAWA stains and discoloration, shall be returned to the manufacturer for free
MAR-14-23
replacement as long as the consignment/delivery note has not been
DATE:
CONSTRUCTION
signed by the Sub-contractor’s representative.
AGENCY
E. Sub-contractor will be responsible for the quality of ductwork after the
DATE: consignment delivery note is signed, and that includes damaged ducts
OPERATIONS due to mishandling, improper storing, etc. All ductwork shall be clear
from visual imperfections, including pitting, oil canning, stains and
DATE:
discoloration. All ductwork shall be clear from visual imperfections,
including pitting, oil canning, stains and discoloration.
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 46


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 46 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

21.1.5 Submittals

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM Submit the following to Saudi Aramco Representative for approval:
NM

NM
A. Shop Drawings:

1. Complete with details, Section, Elevations, Connections, etc,. Photo


copies of the duct layout from the Drawings are not acceptable as a
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

submittal.
ISSUED FOR REVIEW

2. Data shall include, but not limited to:


DESCRIPTION

a. Overall two-line layout, dimensioned with respect to the


building and connections to equipment.

b. Equipment and duct elevations and sections as required to


show clearances, methods of support, and details of
installation.

c. Distance from bottom of ducts or equipment to finished floor.

d. Dimensions of each duct section.


JO/EWO

10-08643-
10-08643-

10-08643-

e. Location of duct supports and sway bracing.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

f. Details of duct supports, including hanger locations, hanger


types, connections to duct and to building, auxiliary steel,
etc., manufacturer’s name and model number for hangers.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER g. Location and details of auxiliary equipment including: grills,
N. MINAMIBORI registers, diffusers, extractors, volume dampers, fire
DATE:
MAR-14-23 dampers, access doors, turning vanes, thermometer and
PROJECT
ENGINEER
pressure sensing connections, smoke detectors, test
N. ALSAHBIB
openings for pilot readings, control instruments, duct drains,
MAR-14-23
flexible connections, fume and exhaust hoods, etc.
DATE:
CERTIFIED
K. OGAWA B. Coordination Drawings:
MAR-14-23
DATE:
CONSTRUCTION
1. Sub-contractor Shall submit reflected ceiling plans, drawn to
AGENCY scale, on which the following items are shown and coordinated
with each other, based on input from installers of the items
DATE: involved:
OPERATIONS
a. Ceiling suspension assembly members.
DATE:
b. Other systems installed in same space as ducts
CONTROL NUMBER
VERIFICATION

c. Ceiling and wall-mounting access doors and panels


EDSD

required to provide access to dampers and other


operating devices.
DATE:
BY:

d. Ceiling-mounting items, including lighting fixtures,


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

diffusers, grilles, speakers, sprinklers, access panels, and


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

special moldings.
0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 47


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 47 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Fabrication Details:
ENGG CERT

KO
KO
KO
a. Provide fabrication schedules for each duct pressure
NM
NM

NM
rating. The schedule shall at minimum show the followed
SMACNA table/section, reinforcement details, and
connection method.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

D. Calculation verification
ISSUED FOR REVIEW

a. Ducts Pressure Drop Calculations


DESCRIPTION

Sub-contractor shall check and verify the pressure drop


calculations as per the procured equipment and
approved shop drawings.
Sub-contractor shall ensure that all procured
equipment, the duct sizing, and routes at site will be
within the free issued equipment selected external static
pressure.
JO/EWO

10-08643-
10-08643-

10-08643-

b. Sound Attenuator and Noise Calculations


0005
0005

0005

Sub-contractor shall validate the sound attenuator


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

calculations based on
• selected equipment data,
00A

0F1
NO.
REV

00

• approved shop drawings and


DISCIPLINE


ENGINEER
N. MINAMIBORI sound attenuator vendor selections.
MAR-14-23
DATE:
PROJECT
ENGINEER
21.2 PRODUCTS
N. ALSAHBIB
DATE: MAR-14-23
CERTIFIED 21.2.1 Equipment
K. OGAWA

DATE:
MAR-14-23 A. Rectangular Ductwork:
CONSTRUCTION
AGENCY
1. Ductwork shall be constructed in the sizes and configuration as
shown on the Drawings. Sheet metal gauges corresponding to duct
DATE:
OPERATIONS
sizes and details of construction shall conform to the latest edition of
SMACNA, “HVAC Duct Construction Standards.”

DATE: 2. Duct Fittings: Rectangular Duct: all changes in duct size or elevation,
CONTROL NUMBER

tee connections, connections for grilles, registers or diffusers,


VERIFICATION

transition for elbows, casings, etc. shall be fabricated in accordance


EDSD

with Section 2 of SMACNA “HVAC Duct Construction Standards”.


Unless otherwise noted on the Drawing, no mitered fittings will be
DATE:
BY:

allowed.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

B. Access Doors:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Refer to PE-300017 Section 12.3

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 48


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 48 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Flexible Connections:
ENGG CERT

KO
KO
KO
Reefer to PE-300017 Section12.2
NM
NM

NM
D. Sound Attenuators:

1. Attenuator Case: Attenuators shall be framed with galvanized steel


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

1 gauge heavier than the main duct wall and shall be constructed at
ISSUED FOR REVIEW

a minimum of 20 gauges.

2. Splitter shall be radiused at both ends to minimize air pressure loss


DESCRIPTION

and regenerated noise.

3. Attenuator Cells: Cells and terminations shall be continuous for the


vertical height, shall be of the wedge design and shall match the
configuration of the duct walls. Cells shall be protected by perforated
steel and shall be in the frame with continuous beads of inert silicon
sealant.

4. Acoustic Fill: Acoustic fill shall be moisture-proof, odor-proof, vermin-


proof, fungus-proof, fire-proof and erosion-proof faced with glass
JO/EWO

tissue or equivalent.
10-08643-
10-08643-

10-08643-

0005
0005

0005

5. Installation: Shall be installed in the duct at a sufficient distance


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

downstream of the fans an fittings as per manufacturer


recommendations.
00A

0F1
NO.
REV

00

6. Supports for the sound attenuators shall be independent from the


DISCIPLINE
ENGINEER duct supports.
N. MINAMIBORI
DATE:
MAR-14-23 7. Sound Attenuator and Noise Calculations
PROJECT
ENGINEER
N. ALSAHBIB
a. Sub-contractor shall validate the sound attenuator calculations
MAR-14-23
based on
DATE:
CERTIFIED
1. selected equipment data,
K. OGAWA 2. approved shop drawings and
MAR-14-23
3. sound attenuator vendor selections.
DATE:
CONSTRUCTION
b. The sound attenuator selection shall ensure achieving the specified
AGENCY noise levels in all spaces.

DATE: 21.2.2 Materials


OPERATIONS
A. Sheet Metal:
DATE:
1. Galvanized Steel Sheet:
CONTROL NUMBER
VERIFICATION

Refer to PE-300017 Section 11


EDSD

2. Duct material for Battery Room and Corrosive Environment


DATE:

Refer to PE-300017 Section 11


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

B. Fasteners:
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

1. Steel Ductwork: Unless otherwise noted, all screwed fasteners used


(DCC) NO. _____________________

in galvanized ductwork shall be constructed or cadmium plated or

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 49


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 49 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

galvanized steel. All riveted connections in galvanized ductwork

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
must be made with 5mm. dia. Steel pop rivets or flat-head, tinned
ENGG CERT

KO
KO
KO
iron rivets. Rivets and fasteners used in stainless steel ductwork
shall be stainless steel.
NM
NM

NM
C. Reinforcing: Reinforcing bars and angles shall be of the same material as the
ducts or casing on which they are used.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

D. Galvanized surfaces damaged by welding shall be repaired with


ISSUED FOR REVIEW

GALVANOX, or approved equal, in accordance with manufacturer’s written


instructions.
DESCRIPTION

E. Flexible Ducting:

1. General: Provide only to join duct collar to round necks of outlets


and inlets. Bends greater than 90 degree are not allowed. Length
longer than 1.0m shall not be allowed. Factory fabricated assembly
consisting of corrosion resistant spring steel helix, non-perforated
inner liner, wrapped with nominal 25mm thick fiberglass insulation
with thermal conductivity of 0.0331 W/m²-ºK.(0.23 Btu/hr.-sq. ft. -
ºF). Assembly sheathed in vapor barrier jacket, factory sealed at
both ends of each section, where horizontal support is required,
JO/EWO

flexible duct shall be suspended with minimum 19mm side flat


10-08643-
10-08643-

10-08643-

banding material. All connections to be sheet metal secured with


0005
0005

0005

13mm wide positive locking steel straps. Flexible ducts shall be


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

installed with minimum of R/D (Radius/Diameter) of 1.5. Flexible


ductwork shall have a flame spread rating of not more than 25 and
a smoke developed rating of not more than 50 in accordance with
00A

0F1
NO.
REV

00

NFPA 90A
DISCIPLINE
ENGINEER
N. MINAMIBORI F. Sealants:
MAR-14-23
DATE:
PROJECT
ENGINEER
Duct joint sealer shall be fast-setting, thixotropic paste that remains flexible
N. ALSAHBIB
after drying. Product is to be Foster’s 32-14 DUCT SEALANT; United Sheet
MAR-14-23
Metal’s DUCT-SEAL, or approved equal.
DATE:
CERTIFIED
K. OGAWA G. Flexible Duct Connections to Equipment:
MAR-14-23
Refer to PE-300017 Section 12.2
DATE:
CONSTRUCTION
AGENCY H. Instrument test ports:

DATE: Refer PE-300017 to Section 12.5


OPERATIONS Sub-contractor shall consult with NEBB certified professional for verification
of the installation locations of the instrument test port inline with
DATE:
specification requirement during shop drawing preparation.
CONTROL NUMBER
VERIFICATION

I. Duct Leakage Tests:


EDSD

Ductwork that is designed to operate at static pressure in excess of 750 Pa


DATE:

and all ductwork located outdoor shall be leak-tested according to industry-


BY:

accepted test procedures (as stated in ASHRAE 90.1). Representative


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

sections totaling no less than 25% of the total installed duct area for the
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

designated pressure class shall be tested. All sections shall be selected by


0F1

the EPC Contractor or the designated representative of the Company.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 50


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 50 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

Positive pressure leakage testing is acceptable for negative pressure

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ductwork.
ENGG CERT

KO
KO
KO 21.3 EXECUTION
NM
NM

NM

21.3.1 Installation
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

A. Install ducts in a neat and workmanlike manner at locations shown on the


ISSUED FOR REVIEW

Drawings and approved shop drawings. If interferences occur which require


changes in locations, size, or design of the ductwork, such changes are to be
made only after approval by Saudi Aramco.
DESCRIPTION

B. Ducts are to be independently supported from building structure only, and not
from other equipment or other equipment supports unless specifically shown
on the Drawings or approved by Saudi Aramco Representative at no
additional cost to Saudi Aramco.

C. Any deviations from the Drawings and Specifications concerning duct


construction, duct routing or duct support systems committed by the Sub-
contractor, without Saudi Aramco Representative’s prior approval, shall be
removed and replaced with approved material or methods at Sub-
JO/EWO

10-08643-
10-08643-

10-08643-

contractor’s expense, if so directed by Saudi Aramco Representative.


0005
0005

0005

D. Damage materials and defective WORK, or non-compliance with these


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

Specifications shall be repaired, removed and replaced as directed by


Saudi Aramco Representative at no additional cost to Saudi Aramco.
00A

0F1
NO.
REV

00

E. Repair procedure shall be prepared by Sub-contractor and approved


DISCIPLINE
ENGINEER before proceeding the works.
N. MINAMIBORI
MAR-14-23
DATE:
22.0 DAMPERS
PROJECT
ENGINEER
N. ALSAHBIB
DATE: MAR-14-23 22.1 GENERAL
CERTIFIED
K. OGAWA
MAR-14-23 22.1.1 Description
DATE:
CONSTRUCTION
AGENCY This Section covers all type dampers required for the HVAC systems, including all
accessories required to complete the Work for functional operation acceptable to
DATE: Saudi Aramco Representative.
OPERATIONS

22.1.2 Quality Assurance


DATE:
A. General: All devices, unless otherwise noted on the Drawings, shall be
CONTROL NUMBER
VERIFICATION

new and of best quality.


EDSD

B. Reference Codes and Standards: Comply with applicable Saudi Aramco


DATE:

Standards, Codes and Standards.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

C. The material provided under this Section shall be the standard product of
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

a manufacturer’s latest approved design, bear UL label and be UL listed


(DCC) NO. _____________________

as required

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 51


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 51 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

22.1.3 Submittals

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
A. Shop Drawings: submit following to Saudi Aramco Representative for
approval:
NM
NM

NM
1. Shop drawings and manufacturer’s literature.

2. Required data shall include but not be limited to:


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

a. Damper locations, required opening sizes and mounting


details.
DESCRIPTION

b. Dimensions of dampers, mounting attachment and all


accessories.

c. Complete description of materials and methods of


construction.

d. Complete description of damper operators, linkage,


bearings.

e. Performance curves showing air volume delivery at various


JO/EWO

pressure drops.
10-08643-
10-08643-

10-08643-

0005
0005

0005

f. Complete wiring diagram for fire/smoke, shut-off,


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

modulating, gas tight dampers with actuator, including


provision for field connection to the HVAC Control Panel.
00A

0F1
NO.
REV

00

g. All motorized dampers shall be factory fitted with their


DISCIPLINE
ENGINEER selected actuators, quantity of actuators per damper and
N. MINAMIBORI power consumption shall be listed for each damper.
MAR-14-23
DATE:
PROJECT
ENGINEER
h. All actuators shall be 24VAC powered with failed safe spring
N. ALSAHBIB
return type, fail-safe position (open/closed) shall be listed for
MAR-14-23
each damper.
DATE:
CERTIFIED
K. OGAWA i. All on/off actuators shall be 2-point with open/closed
MAR-14-23
feedback.
DATE:
CONSTRUCTION
AGENCY j. All modulating actuators input control signals and feedback
outputs shall be 0 – 10 DC.
DATE:
OPERATIONS k. Fire dampers shall be equipped with blade closed limit
switches for the confirmation of damper blade closure as per
DATE:
specified on design drawings.
CONTROL NUMBER
VERIFICATION

3. Sub-contractor shall include damper manufacturer's Installation


EDSD

Instructions as part of the fire damper submittal. These


instructions shall describe the applicable requirements for
DATE:

damper sleeve thickness, retaining angles, methods of


BY:

attachment, duct-to-sleeve connections, preparation of wall or


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

floor openings, and all other requirements to provide an


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

installation equivalent to that tested by the damper


0F1

manufacturer during the UL Standard 555 qualification


(DCC) NO. _____________________

procedures. Sub-contractor shall detail any proposed

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 52


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 52 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

installations that deviate from these manufacturer's instructions

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and explain the needed deviations. All fire damper installations
ENGG CERT

KO
KO
KO
shall comply with the manufacturer's installation instructions or
any submitted deviations and must be acceptable to Saudi
NM
NM

NM
Aramco.

22.2 PRODUCTS
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

22.2.1 Fire Dampers

Refer to PE-300017 Section 16.3


DESCRIPTION

22.2.2 Balancing Dampers

Refer to PE-300017 Section 16.1

22.2.3 Back draft Dampers

Refer to PE-300017 section 16.2.2

22.2.4 Pressure Relief Damper


JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

A. Horizontal operable shutter which operates to equalize the pressure across


complete with counterweight.
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

B. The frame and the blades shall be extruded aluminum alloy and polyester
powder coated with a white finish.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER C. The frame shall have a typical wall thickness of 1/16” and shall be separated
N. MINAMIBORI from the movable blades by an extruded rigid PVC track.
MAR-14-23
DATE:
PROJECT
ENGINEER
D. Foam tape shall be installed on the blades where they overlap to insure a good
N. ALSAHBIB
seal and to reduce noise.
DATE: MAR-14-23
CERTIFIED E. Damper shall be provided with a counterweight in order to adjust the pressure
K. OGAWA at which the blades open. Leakage class 1 that shall conform to the Saudi
MAR-14-23 Aramco requirements.
DATE:
CONSTRUCTION
AGENCY 22.2.5 Blast Suppression Dampers

DATE: Refer to PE-300017 section 16.4


OPERATIONS

22.2.6 Motorized Shut-off Dampers


DATE:
A. Dampers shall be UL 555S classified and labelled as a leakage class 1
CONTROL NUMBER
VERIFICATION
EDSD

B. Shall be constructed with galvanized steel frame and parallel-blade type


complete with linkage, steel spring, auxiliary switches and electric spring
DATE:

return actuator.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

C. Damper shall close on loss of power


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

D. Dampers shall be suitable for ductwork mounting and shall be sealed air tight
in the ductwork with suitable mastic. The seals on the damper blades shall

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 53


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 53 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

be silicon or vinyl. Dampers shall have nylon, PVC or bronze self-lubricating

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
bushings.
ENGG CERT

KO
KO
KO
E. For Dampers located on in Battery Room or corrosive environment, shall be
NM
NM

NM
stainless steel

22.2.7 Modulating Dampers


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

A. Dampers shall be UL 555S classified and labelled as a leakage class 1


ISSUED FOR REVIEW

B. Shall be constructed with galvanized steel frame and parallel-blade type


complete with linkage, steel spring, auxiliary switches, and electric spring
DESCRIPTION

return actuator.

C. Damper shall close on loss of power

D. Dampers shall be suitable for ductwork mounting and shall be sealed airtight
in the ductwork with suitable mastic. The seals on the damper blades shall
be silicon or vinyl. Dampers shall have nylon, PVC or borze self-lubricating
bushings.

22.2.8 Gas Tight Dampers


JO/EWO

10-08643-
10-08643-

10-08643-

A. Construction: Casing galvanized sheet steel


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

B. Blades: Muti-blades, opposed action, galvanized steel

C. Bearing: Self-lubricating stainless-steel sleeve, turning in extruded hole in


00A

0F1
NO.
REV

00

frame
DISCIPLINE
ENGINEER
N. MINAMIBORI D. Seals: Neoprene foam rubber material, heat resistant to 80°C
MAR-14-23
DATE:
PROJECT
ENGINEER
E. Jamb: Stainless steel, flexible metal compression type.
N. ALSAHBIB
MAR-14-23
F. Linkage: Concealed in frame
DATE:
CERTIFIED
K. OGAWA G. Controlled closing and locking of damper in 3 seconds.
MAR-14-23
DATE:
CONSTRUCTION
H. Dampers shall be UL 555S classified and labelled as a leakage class 1
AGENCY

22.2.9 Fire and Smoke Dampers


DATE:
OPERATIONS A. Dampers shall be UL 555 and UL 555S classified and labelled as a leakage
class 1 and NFPA90
DATE:
B. Construction: Casing galvanized sheet steel
CONTROL NUMBER
VERIFICATION
EDSD

C. Blades: Airfoil-shape, single or multi-blades, opposed action, galvanized steel


DATE:

D. Bearing: Self-lubricating stainless-steel sleeve, turning in extruded hole in


BY:

frame.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

E. Jamb: Stainless steel, flexible metal compression type.


0F1

(DCC) NO. _____________________

F. Linkage: Concealed in frame

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 54


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 54 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G. Factory Sleeve: Minimum 1.0 mm (20 gauge) thickness, minimum 432 mm
ENGG CERT

KO
KO
KO
(1 inches ) long. Silicon caulk factory applied to sleeve at damper frame to
comply with leakage rating requirements.
NM
NM

NM
H. Heat actuated, quick detect, temperature release device.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

22.3 EXECUTION
ISSUED FOR REVIEW

22.3.1 Installation
DESCRIPTION

A. Dampers are to be provided where shown on the Drawings and required


by IBC and applicable Codes and Standards. Installation to be neat,
workmanlike and in accordance with the instructions of the damper
manufacturer.

B. Sub-contractor shall provide suitable access at each fire damper to allow


inspection, cycling or testing of the fire damper and replacement of the
fusible link. This includes furnishing and installing duct access doors and
wall or ceiling access panels as may be required. Sub-contractor
installing fire dampers shall be responsible for these access doors and
JO/EWO

10-08643-
10-08643-

10-08643-

panels unless they are specifically shown to be supplied by other trades.


0005
0005

0005

22.3.2 Completed Work


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

A. Position each manual operator so that it clearly and accurately indicates


the position of the damper blade.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER B. Furnish 4(four) Nos. spare fusible links for fire dampers per building.
N. MINAMIBORI
MAR-14-23
DATE:
23.0 AIR DEVICES, REGISTERS, GRILLES AND DIFFUSERS
PROJECT
ENGINEER
N. ALSAHBIB
DATE: MAR-14-23 23.1 GENERAL
CERTIFIED
K. OGAWA
MAR-14-23 23.1.1 Description
DATE:
CONSTRUCTION
AGENCY A. This Section covers air providing air devices, registers, grilles, and diffusers
as shown on the Drawings and specified herein, including accessories
DATE: required to complete the Work acceptable to Saudi Aramco Representative.
OPERATIONS

23.1.2 Submittals
DATE:
Submit the following to Saudi Aramco Representative for approval
CONTROL NUMBER
VERIFICATION
EDSD

A. Manufacturer’s Literature: Performance data, physical dimensions, etc.


DATE:

B. Samples: One (1) sample of each type of air outlet and inlet with accessories and
BY:

manufacturer’s technical data’s.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 55


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 55 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

23.2 PRODUCTS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM
23.2.1 General
NM

NM
A. Diffusers, registers and grilles of sizes and types indicated on the Drawings
and specified herein, shall be manufactured by Saudi Aramco’s approved
vendor. Equipment shall be suitable for handling supply/return/exhaust air
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

from locations in acoustical ceiling, gypsum board ceiling, in exposed


ductwork or flush on wall.
ISSUED FOR REVIEW

B. The diffusers, grilles, and registers shall be rated to deliver its rated air
DESCRIPTION

capacity in the indicated style without exceeding the specified noise level of
35 NC. Ratings shall be certified by ADC or ADC approved laboratory.

C. Finish: Provide diffusers and grilles with factory applied baked enamel color
finish as specified on Drawings. Backside of all diffusers, registers and grilles
including visible portion of duct shall be painted flat back.

23.2.2 Supply Air Grilles

Refer to PE-300017 Section 13.9


JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

23.2.3 Return/Exhaust Air Grilles


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

Refer to PE-300017 Section 13.9


00A

0F1
NO.
REV

00

23.2.4 Supply Air Diffuser


DISCIPLINE
ENGINEER
N. MINAMIBORI
Refer to PE-300017 Section 13.9
MAR-14-23
DATE:
PROJECT
23.2.5 Return/Exhaust Air Diffuser
ENGINEER
N. ALSAHBIB Refer to PE-300017 Section 13.9
DATE: MAR-14-23
CERTIFIED 23.2.6 Supply Jet Diffuser
K. OGAWA
MAR-14-23
DATE: A. Aluminum alloy turbo nozzle and rings
CONSTRUCTION
AGENCY
B. Adjustable (horizontal and vertical ways) inner concentric rings of jet
DATE:
OPERATIONS C. Electrostatic polyester powder coated finished.

23.2.7 Door and Transfer Grilles


DATE:
CONTROL NUMBER

A. The frame and blades shall be extruded aluminium alloy and polyester
VERIFICATION

powder coated with a white finish.


EDSD

B. The frame shall have a typical wall thickness of 1/16” and shall be
DATE:
BY:

separated from the blades by an extruded rigid PVC track which becomes
an integral part of the frame.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

C. The frame mounting holes shall be dimpled.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 56


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 56 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

D. The chevron style blades shall be mounted in the PVC track and shall be

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
spaced ½” on center.
ENGG CERT

KO
KO
KO
23.2.8 Sand Trap Louvers
NM
NM

NM
Refer to PE-300017 Section 15.1

23.2.9 Inertial Filters


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

A. Inertial Filters shall be factory fabricated and assembled. Each filter shall
consist of housing, bleed air manifold, cell bodies, blade packs, bullnoses,
and inlet screen.
DESCRIPTION

B. All finished components shall be phosphatized and given a coat at zinc


chromate primer and finished with a coat of gray enamel.

C. The filter shall consist of one or more cells depending on airflow and
resistance requirements. Individual cells shall include two removable blade
packs and have a maximum center-to-center (width) dimension of 5” (127
mm) and shall be 24” (610 mm) in length.

D. Housing shall be constructed of not less than 11-gauge steel. The housing
JO/EWO

shall be of all welded construction and equipped with continuous standing


10-08643-
10-08643-

10-08643-

flanges around the periphery of both air entering and air exiting sides.
0005
0005

0005

Flanges shall have pre-drilled bolt holes to facilitate field installation.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

E. Housings shall be equipped with a bleed air manifold constructed of not less
than 11-gauge steel, all welded construction. Manifold outlets shall have a
00A

0F1
NO.
REV

00

continuous standing flange with pre-drilled both holes to facilitate field


DISCIPLINE
ENGINEER connection. Manifolds shall be seized to provide uniform airflow through
N. MINAMIBORI each cell’s dust bin for proper balance and dust removal.
MAR-14-23
DATE:
PROJECT
ENGINEER
F. Blade packs shall be constructed of not less than 20-gauge steel with
N. ALSAHBIB
welded construction. Blade pack vanes are to be individually formed and
MAR-14-23
welded. Vanes shall be arranged to provide a circuitous path to the airflow
DATE:
CERTIFIED
and redirect the air toward the clean air outlet. The air passageway
K. OGAWA between adjacent blades shall have a minimum width of 19” (4.83 mm).
MAR-14-23
Blade packs shall be removable to provide for inspection or service.
DATE:
CONSTRUCTION
AGENCY G. The bullnose shall be aerodynamically formed of 16-gauge steel to provide
proper air entry. One bullnose will be required for each two blade packs to
DATE: properly direct air to each tapered cell. Bullnose clamps shall be
OPERATIONS constructed of 19” (4.83 mm) steel and shall be retained by 5/16 threaded
stock welded to the center divider. Center divider shall be constructed of
DATE:
16-gauge steel.
CONTROL NUMBER
VERIFICATION

H. Bleed slots shall be an integral part of each dust bin. The bleed slot/dust bin
EDSD

shall be constructed of not less than 16-gauge steel. The bleed slot shall
have a rounded entry configuration to minimize obstruction or plugging
DATE:

under heavy dust concentrations.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

I. Inlet screens shall consist of a 26-gauge, four-mesh, galvanized hardware


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

cloth integrally supported by a double layered 16-gauge galvanized steel


0F1

frame. Inlet screens shall be bolted to the housing.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 57


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 57 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

J. When tested in accordance with the general requirements outlined in SAE

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
J726, the filter efficiency shall not be less than 93% on Standardized Coarse
ENGG CERT

KO
KO
KO
Air Cleaner Test Dust at a clean airflow rate of 1000 CFM (1700 m2/h) per
single cell using a bleed rate equaling 10% of inlet flow. Inlet to clean air
NM
NM

NM
outlet resistance shall not exceed 1.2” w.g. (.30 kPa) at 1000 CFM (1700
m2/h) clean airflow.

K. Filter shall be Model DynaVane as Manufactured by Farr Company or


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

approved equal.
ISSUED FOR REVIEW

23.3 EXECUTION
DESCRIPTION

23.3.1 Installation

A. Installation registers, grilles and diffusers in accordance with manufacturer’s


instructions and recommendations.

B. Any damaged item be removed and replaced as directed by Saudi Aramco


Representative at no additional cost to Saudi Aramco.

24.0 DUCTED-SPLIT AND MINI-SPLIT AIR CONDITIONER


JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005
SEPT-27-22

MAR-14-23

24.1 GENERAL
DEC-22-22
DATE

24.1.1 Description
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER This Section covers split system A/C units as shown on the Drawings and
N. MINAMIBORI specified herein, including controls and all accessories required to complete the
DATE:
MAR-14-23 Work for operation acceptable to Saudi Aramco Representative
PROJECT
ENGINEER
N. ALSAHBIB 24.1.2 Quality Assurance
DATE: MAR-14-23
CERTIFIED A. Reference Codes and Standards: Comply with applicable Saudi Aramco
K. OGAWA Standards, Codes and Standards.
MAR-14-23
DATE:
CONSTRUCTION
24.1.3 Submittals
AGENCY

Submit to following Saudi Aramco Representative for approval:


DATE:
OPERATIONS A. Manufacturer’s Literature:

DATE:
1. Manufacturer’s original copy of maintenance and operating
manuals.
CONTROL NUMBER
VERIFICATION
EDSD

2. Required data shall include, but not limited to:


DATE:

i. Unit designations.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

ii. Unit dimensions and weight.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

iii. Complete Electrical data including wiring diagrams.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 58


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 58 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

iv. Description of materials and methods of construction including

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
finishes for unit and all components.
ENGG CERT

KO
KO
KO
v. Description of cooling/or heating operation.
NM
NM

NM
vi. Data including fan motor KW and air flow capacity at design external
static pressure and sound rating.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

vii. Description of heat exchangers including the cooling coil, condenser


ISSUED FOR REVIEW

coil and heating coil.

viii. Description of air filter


DESCRIPTION

ix. Cooling capacities at design conditions and flow rates.

x. Installation recommendations.

B. Recommended Spare Parts Lists: Recommended spare parts list for each
unit. List shall include part numbers, a description of each part, including
price of each part.

24.2 PRODUCTS
JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

24.2.1 Split units


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

A. Direct - expansion type with remote condensing unit, capacity ratings


certified to comply with ARI standard 210.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER B. Outdoor Unit: Factory-assembled, single-piece, air-cooled air conditioner
N. MINAMIBORI unit. Contained within the unit enclosure is all factory wiring, piping,
DATE:
MAR-14-23 controls, compressor, refrigerant charge (R-410a), and special features
PROJECT
ENGINEER
required prior to field start-up.
N. ALSAHBIB
MAR-14-23
C. Unit Cabinet: Unit cabinet will be constructed of galvanized steel or
DATE:
CERTIFIED aluminum, bonderized, and coated with a powder coat paint.
K. OGAWA
MAR-14-23 D. Fans: Condenser fan will be direct-drive propeller type, discharging air
DATE:
CONSTRUCTION
upward.
AGENCY E. Condenser fan motors will be totally enclosed, 1-phase type with class F
insulation and permanently lubricated bearings. Shafts will be corrosion
DATE: resistant.
OPERATIONS

F. Fan blades will be statically and dynamically balanced. Condenser fan


DATE:
openings will be equipped with PVC-coated steel wire safety guards.
CONTROL NUMBER
VERIFICATION

G. Compressor: Compressor will be hermetically sealed. Compressor will be


EDSD

mounted on rubber vibration isolator.


DATE:

H. Condenser Coil: Condenser coil will be air-cooled. Coil will be constructed


BY:

of aluminum fins mechanically bonded to copper tubes which are then


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

cleaned, dehydrated, and sealed.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

I. Refrigeration Components: Refrigeration circuit components will include


liquid line shutoff valve with seat connections, suction line shutoff valves

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 59


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 59 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

with sweat connections, system charge of R-410a refrigerant, and

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
compressor oil.
ENGG CERT

KO
KO
KO
J. Indoor Unit:
NM
NM

NM
1. Wall Type: complete with wireless controller, washable filter, fan
speed adjustment, quiet operation, complete with thermostat.
2. Ducted Type: complete with wireless controller, washable filter, fan
speed adjustment, quiet operation, complete with thermostat.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

24.2.2 Identification

A. Equipment Number: Provide a nameplate tally at conspicuous location on


DESCRIPTION

the equipment, bearing the equipment number and the area it serves.

24.3 EXECUTION

24.3.1 Installation

A. Provide galvanized metal collar frame (weather tight seal) for thru the wall
packaged air conditioners.
JO/EWO

10-08643-
10-08643-

10-08643-

B. Install the A/C units as high as possible. Pipe works shall be kept
0005
0005

0005

concealed in the wall. Refer to manufacturer recommendation for the


manner in which the condenser is to be mounted on the roof.
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

C. Replace or repair damage materials, equipment and defective Work as


directed by Saudi Aramco Representative at no additional cost to Saudi
00A

0F1
NO.
REV

00

Aramco.
DISCIPLINE
ENGINEER
N. MINAMIBORI D. Repair procedure shall be prepared by Sub-contractor and approved
DATE:
MAR-14-23 before proceeding the works.
PROJECT
ENGINEER
N. ALSAHBIB 25.0 VAV/CAV BOX (AIR TERMINAL UNITS)
DATE: MAR-14-23
CERTIFIED 25.1 GENERAL
K. OGAWA
MAR-14-23
DATE:
CONSTRUCTION
25.1.1 System Description
AGENCY

A. Air Terminal Units (VAV/CAV), with built-in terminal and control boxes
DATE: completely factory wired to terminals.
OPERATIONS

25.1.2 Reference Codes and Standards


DATE:
A. Reference Codes and Standards: Comply with applicable Saudi Aramco
CONTROL NUMBER
VERIFICATION

Standards, Codes and Standards.


EDSD

25.1.3 Quality Assurance


DATE:
BY:

A. The material to be furnished under this section shall be the standard


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

product of a manufacturer regularly engaged in the production of VAV/CAV


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

with integral electric heater and shall be the manufacturer’s latest approved
(DCC) NO. _____________________

design as published in the catalogues.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 60


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 60 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

B. All equipment wiring shall comply with NEC requirements.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM 25.1.4 Submittals
NM

NM
A. Submit complete shop drawings and wiring diagrams, installation details
to Saudi Aramco Representative for approval prior to installation.

B. Submit schedules listing the VAV/CAV air flow, heating capacities,


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

accessories, etc. including all unit tag numbers.


ISSUED FOR REVIEW

C. Sub-contractor shall submit to Saudi Aramco Representative for approval


lists of material and equipment supported by sufficient descriptive material,
DESCRIPTION

such as catalog cuts, diagrams and other data, published by the


manufacturer, to demonstrate conformance to the Construction Specification
requirements; model number alone will not be accepted.

D. Maintenance and operating manuals for each piece of equipment

25.2 PRODUCTS

25.2.1 Equipment
JO/EWO

10-08643-
10-08643-

10-08643-

0005
0005

0005

A. General: Refer to PE-300017 section 13.0


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

B. Technical Requirements

1. Damper spindle shall have clear indication /marking for the


00A

0F1
NO.
REV

00

damper position.
DISCIPLINE
ENGINEER 2. Minimum required straight runs for up and down streams of the
N. MINAMIBORI VAV, and its inline Electric heater shall be defined for each type
DATE:
MAR-14-23 in the material submittal for approval.
PROJECT
ENGINEER
3. All VAVs/CAVs shall be controlled by BACnet MS/TP DDC
N. ALSAHBIB
controllers.
MAR-14-23
4. For VAV/CAV Electric Duct Heater (EDH) shall not be integral
DATE:
CERTIFIED assembly of the VAV/CAV box but shall be a separate UL listed
K. OGAWA component.
MAR-14-23 5. The VAV/CAV electric duct heater shall include a dedicated
DATE:
CONSTRUCTION
mounted control panel and shall follow the electric duct heater
AGENCY specification requirements listed in section 17 of this
specifications.
DATE: 6. The VAV/CAV electric duct heater shall not include a separate
OPERATIONS thermostat, it shall be controlled by the VAV/CAV DDC controller
through the VAV/CAV thermostat.
DATE:
7. For VAVs/CAVs with electric heaters:
a. Wiring between the VAV/CAV control panel and the
CONTROL NUMBER
VERIFICATION

electric duct heater panel shall be performed after


EDSD

installation and shall run through conduits.


b. In addition to its internal safeties, the electric heater shall
DATE:

not be enabled by the VAV DDC controller unless the


BY:

minimum heating air flow is achieved.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

c. The VAV/CAV control panel shall include external


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

terminals for connection to the Heater Panel, and the


0F1

(DCC) NO. _____________________

same shall be available in the heater panel side.


8. All VAV/CAV units shall be factory wired.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 61


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 61 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

9. All units shall be factory calibrated and tested.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10. Each VAV shall be factory labeled with tags showing the model
ENGG CERT

KO
KO
KO
number, configured minimum and maximum flow setpoints, and
unit tag number as minimum.
NM
NM

NM
11. Wiring diagrams showing all internal and external wiring and
connection details for each unit type shall be submitted in the
material submittal for approval.
12. The below points shall be communicated from the VAV/CAV
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

DDC Controller as minimum:


ISSUED FOR REVIEW

a. Room Temperature
b. Room Temperature Setpoint
c. Damper Position
DESCRIPTION

d. Supply Air Flow


e. Requested Air Flow
f. Minimum Air Flow Setpoint
g. Maximum Air Flow Setpoint
h. Low Air Flow Alarm
i. Electric Heater Enable/Disable Command
j. Electric Heater ON Status
k. Electric Heater Capacity
l. Electric Heater Alarm
m. Operating Mode
JO/EWO

n. Heating and cooling setpoints and parameters.


10-08643-
10-08643-

10-08643-

0005
0005

0005
SEPT-27-22

MAR-14-23

25.3 EXECUTION
DEC-22-22
DATE

25.3.1 Inspection
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER A. Sub-contractor shall inspect all products for damage immediately before
N. MINAMIBORI installation. Any products that are damaged or not in accordance with
DATE:
MAR-14-23 Specifications shall immediately be repaired or remove from the Site and be
PROJECT
ENGINEER
replaced at no additional cost to Saudi Aramco.
N. ALSAHBIB
MAR-14-23
B. Repair procedure shall be prepared by Sub-contractor and approved before
DATE:
CERTIFIED proceeding the works.
K. OGAWA
MAR-14-23 25.3.2 Installation
DATE:
CONSTRUCTION
AGENCY A. Work shall be installed as shown and according to the manufacturer’s diagrams
and recommendations.
DATE:
OPERATIONS B. Handle and install units in accordance with manufacturer's written instructions.

DATE:
C. Support units rigidly so they remain stationary at all times. Cross-bracing or
other means of stiffening shall be provided as necessary. Method of support
CONTROL NUMBER
VERIFICATION

shall be such that distortion and malfunction of units cannot occur.


EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 62


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 62 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
26.0 PRECISION AIR CONDITIONER
ENGG CERT

KO
KO
KO 26.1 GENERAL
NM
NM

NM

26.1.1 Description
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

This Section covers precision air conditioner as shown on the Drawings and
ISSUED FOR REVIEW

specified herein, including controls and all accessories required to complete the
Work for operation acceptable to Saudi Aramco Representative
DESCRIPTION

26.1.2 Quality Assurance

A. Reference Codes and Standards: Comply with applicable Saudi Aramco


Standards, Codes and Standards.

26.1.3 Submittals

Submit to following Saudi Aramco Representative for approval:

A. Manufacturer’s Literature:
JO/EWO

10-08643-
10-08643-

10-08643-

1. Manufacturer’s original copy of maintenance and operating manuals.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

2. Required data shall include, but not limited to:

i. Unit designations.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER ii. Unit dimensions and weight.
N. MINAMIBORI
DATE:
MAR-14-23 iii. Complete Electrical data including wiring diagrams.
PROJECT
ENGINEER
N. ALSAHBIB
iv. Description of materials and methods of construction
MAR-14-23
including finishes for unit and all components.
DATE:
CERTIFIED
K. OGAWA v. Description of cooling/or heating operation.
MAR-14-23
DATE:
CONSTRUCTION
vi. Data including fan motor KW and air flow capacity at design
AGENCY external static pressure and sound rating.

DATE: vii. Description of heat exchangers including the cooling coil,


OPERATIONS condenser coil and heating coil.

DATE:
viii. Description of air filter
CONTROL NUMBER
VERIFICATION

ix. Cooling capacities at design conditions and flow rates.


EDSD

x. Installation recommendations.
DATE:
BY:

C. Recommended Spare Parts Lists: Recommended spare parts list for each
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

unit. List shall include part numbers, a description of each part, including
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

price of each part.


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 63


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 63 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

26.2 PRODUCTS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM
26.2.1 General
NM

NM
A. Direct - expansion type with remote condensing unit, capacity ratings
certified to comply with ARI standard 210.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

B. Outdoor Unit: Air-cooled condenser shall be with low profile, direct propeller
fan type.
ISSUED FOR REVIEW

Unit Cabinet: Unit cabinet will be constructed of galvanized steel or


DESCRIPTION

aluminum, bonderized, and coated with a powder coat paint.

Fans: Condenser fan will be direct-drive propeller type, discharging air


upward.

Fan blades will be statically and dynamically balanced. Condenser fan


openings will be equipped with PVC-coated steel wire safety guards.

Compressor: Compressor will be hermetically sealed. Compressor will be


mounted on rubber vibration isolator.
JO/EWO

10-08643-
10-08643-

10-08643-

Condenser Coil: Condenser coil will be air-cooled. Coil will be constructed


0005
0005

0005

of aluminum fins mechanically bonded to copper tubes which are then


SEPT-27-22

MAR-14-23

cleaned, dehydrated, and sealed.


DEC-22-22
DATE

Refrigeration Components: Refrigeration circuit components will include


00A

0F1
NO.
REV

00

liquid line shutoff valve with seat connections, suction line shutoff valves
DISCIPLINE with sweat connections, system charge of R-410a refrigerant, and
ENGINEER
N. MINAMIBORI
compressor oil.
MAR-14-23
DATE:
PROJECT
Indoor Unit : Floor mounted, wireless controller, washable filter, fan speed
ENGINEER adjustment, quiet operation, complete with thermostat.
N. ALSAHBIB
DATE: MAR-14-23 Controls: with interface control with DDC to control operation and monitor
CERTIFIED status of the unit.
K. OGAWA
MAR-14-23
DATE: 26.2.2 Identification
CONSTRUCTION
AGENCY
A. Equipment Number: Provide a nameplate tally at conspicuous location on
the equipment, bearing the equipment number and the area it serves.
DATE:
OPERATIONS

26.3 EXECUTION
DATE:
CONTROL NUMBER

26.3.1 Installation
VERIFICATION
EDSD

A. Provide galvanized metal collar frame (weather tight seal) for thru the wall
packaged air conditioners.
DATE:
BY:

B. Install the A/C units as high as possible. Pipe works shall be kept
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

concealed in the wall. Refer to manufacturer recommendation for the


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

manner in which the condenser is to be mounted on the roof.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 64


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 64 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

C. Replace or repair damage materials, equipment and defective Work as

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
directed by Saudi Aramco Representative at no additional cost to Saudi
ENGG CERT

KO
KO
KO
NM Aramco.
NM

NM
D. Repair procedure shall be prepared by Sub-contractor and approved before
proceeding the works.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

27.0 HVAC CONTROLS


ISSUED FOR REVIEW
DESCRIPTION

27.1 GENERAL

27.1.1 Description

A. This Section covers all labors, materials, tools and equipment, design,
fabrication ,installation, complete and in place, and all control systems as
specified herein and required for a complete and operable HVAC Control
system acceptable to Saudi Aramco Representative. The Systems shall be
designed for continuous automatic electric operation with a minimum
maintenance of equipment.
JO/EWO

10-08643-
10-08643-

10-08643-

0005

B. The HVAC Control System shall be a standalone electronic Direct Digit


0005

0005

Control (DDC) type consisting but not limited to air duct and wall mounted
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

sensors, damper actuators, switches, thermostats, terminal panel, boxes and


all other accessory equipment required, including a complete system of
control wiring, controllers, controlled devices and other accessory equipment.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER C. All Work performed under this Section shall be done by an independent sub-
N. MINAMIBORI contractor who specializes in the installation and servicing of automatic
DATE:
MAR-14-23 electric control systems.
PROJECT
ENGINEER
N. ALSAHBIB
1. Sub-contractor shall provide all materials, labor, conduits, wiring,
MAR-14-23
and equipment required for the control systems hereinafter specified
DATE:
CERTIFIED
and approved unless provided by others but installed under this
K. OGAWA Section of Work.
MAR-14-23
DATE:
CONSTRUCTION
2. Sub-contractor or its approved sub-contractor shall provide all
AGENCY materials, labor, equipment necessary to check, calibrate, and adjust
all components, etc. of the control system to insure that each system
DATE: functions in accordance with the requirements of these
OPERATIONS Specifications.

DATE:
3. Sub-contractor shall ensure that the manufacturer or supplier have
the capability to provide In-Kingdom repair, maintenance, spare
CONTROL NUMBER
VERIFICATION

parts and supply service for all equipment specified in this Section.
EDSD

D. All control shall be “BACnet” compatible for future connection to a Building


DATE:

Management System (BMS).


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 65


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 65 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

27.1.2 Submittals

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
NM A. General:
NM

NM
1. Sub-contractor shall submit to Saudi Aramco Representative, for
approval, list of manufacturers and equipment proposed to be
provided for the HVAC control system. Sub-contractor shall submit
a list of shop drawings, technical data, bulletins etc., with submittals
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

dates, in coordination with construction schedules dates when


ISSUED FOR REVIEW

equipment and materials is required on site. A delay of construction,


due to lack of equipment, materials, etc., not being on Site on time
is unacceptable.
DESCRIPTION

2. Submit to Saudi Aramco Representative following items for


approval, but not limited to:

a. Complete materials list of all items proposed to be provided


under this Section.

b. Manufacturers specification and other data required to


demonstrate compliance with the specified requirements.
JO/EWO

c. Catalogs showing Part number, physical dimensions and


10-08643-
10-08643-

10-08643-

weight of each component.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

d. Input/Output Summaries.

e. Electrical power consumption ratings and calculation.


00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER f. Data of Actuators and Control Devices.
N. MINAMIBORI
DATE:
MAR-14-23 g. Data of Power Supplies and Power Conditioners.
PROJECT
ENGINEER
N. ALSAHBIB
h. Data of all instrumentation, gauges and meters.
DATE: MAR-14-23
CERTIFIED
i. Data of Field Cabinets and Panels.
K. OGAWA
MAR-14-23
j. Data of Conduit, Raceway and Wiring
DATE:
CONSTRUCTION
AGENCY k. Manufacturer’s recommended installation procedures
which, when approve by Saudi Aramco Representative, will
DATE: become the basis for inspection and acceptance or rejection
OPERATIONS of the actual installation procedures used on the Work.

DATE:
3. Shop Drawings:
CONTROL NUMBER
VERIFICATION

a. Floor plans showing all HVAC Control panel locations.


EDSD

b. Control diagrams with all points identified, sequence of


DATE:

operation, control logic and control algorithms, motor control


BY:

diagrams, and electrical interface diagrams, including all


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

switches, relays and transducers noting the function of each


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

device.
0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 66


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 66 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

Control terminology and identification shown on the

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
diagrams shall be consistent throughout for all components
ENGG CERT

KO
KO
KO
and follow the standard symbols, nomenclature and
markings set forth by the latest edition of NEC & ASHRAE
NM
NM

NM
Electrical Standards. System drawings shall be full size
diagrams.

c. Wiring diagrams: shall show the complete interconnected


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

control system with all external and internal connections and


ISSUED FOR REVIEW

field devices,motor starters, control panel, external pilot and


safety devices and such other equipment terminal points
with correct identification.
DESCRIPTION

d. Electrical Installation Drawings, including all wire routing


and conduit routing, and all panel, and junction box
locations. Provide wire termination drawings for all panels
and details for all wall and ceiling mounted devices.

B. As-Built: Prior to final completion, furnish Saudi Aramco Representative


complete as-built documents covering the complete control systems for
each system, complete with revised drawings, maintenance and repair
instruction sheets, special tool, and a description of operation of all
JO/EWO

system installed in the buildings. Work will not be accepted as


10-08643-
10-08643-

10-08643-

“complete” until “as-built” has been submitted to Saudi Aramco


0005
0005

0005

Representative for his approval.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

C. Operation and Maintenance Instructions: submit operation and


maintenance manuals for the complete system including, but not limited
00A

0F1
NO.
REV

00

to, system as-built wiring diagrams, input/output summaries, full system


DISCIPLINE
ENGINEER sequence of operation, startup, and troubleshooting.
N. MINAMIBORI
DATE:
MAR-14-23 27.1.3 Conditions
PROJECT
ENGINEER
N. ALSAHBIB
A. Environmental Requirements: Maintain temperature and humidity within
MAR-14-23
specified range during and after installation of controls and instruments.
DATE:
CERTIFIED
Maintain area free of dirt and dust during and after installation.
K. OGAWA
MAR-14-23
B. Condition: Locations of all equipment shall be coordinated with all other
DATE:
CONSTRUCTION
trades and elements of the buildings and exterior. Arrange piping, conduits,
AGENCY wire ways, etc., to maintain headroom and conceal all piping conduits, wire
ways, etc., in finished spaces where possible.
DATE:
OPERATIONS
27.2 PRODUCTS

DATE:
27.2.1 Manufacturers
CONTROL NUMBER
VERIFICATION
EDSD

A. Acceptable manufacturers are the following:


DATE:

1. Honeywell.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

2. Johnson Controls.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

3. Schneider Electric.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 67


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 67 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

4. Siemens.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
B. Other manufacturers may be considered subject to Saudi Aramco
Representative is satisfaction with recent history of manufacturer’s
NM
NM

NM
engineering, installation, service, and maintenance capabilities.

27.2.2 General
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

A. Sub-contractor or his approved control sub-contractor shall provide all control


ISSUED FOR REVIEW

devices, sensors, controller, recorders, actuators, thermostats, interlock


wiring and conduit, remote and panel mounted push buttons, selector
switches, etc., that are required for a complete and functional system of
DESCRIPTION

automatic control.

B. Unless otherwise approved by Saudi Aramco Representative, all control


wiring and conduit, including interlock wiring of the devices covered under
this Control Section shall be detailed, furnished and installed by Sub-
contractor or its approved control sub-contractor. All wiring shall be in strict
accordance with Construction Specifications for Electrical Works, the
National Electric code and all other applicable local codes.

C. Sub-contractor shall ensure and provide evidence that the manufacturer or


JO/EWO

supplier have the capability to provide In-Kingdom repair, maintenance,


10-08643-
10-08643-

10-08643-

spare parts and supply service for all equipment specified in this Section.
0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

27.2.3 HVAC Control System


00A

0F1
NO.
REV

00

A. System Requirements:
DISCIPLINE
ENGINEER
N. MINAMIBORI 1. The HVAC Control System shall be standalone electronic Direct
DATE:
MAR-14-23 Digit Control (DDC). The system shall monitor and/or control all
PROJECT
ENGINEER
items related to the HVAC system as identified in the control
N. ALSAHBIB
drawings and documents.
DATE: MAR-14-23
CERTIFIED
2. The system shall be of modular design consisting of field equipment
K. OGAWA (sensors and control devices) and panel mounted controllers. Each
MAR-14-23
controller shall be of the standalone type. It is preferable to have one
DATE:
CONSTRUCTION
controller per panel unless limited by the system capacity and
AGENCY number of Input/Output points.

DATE: 3. Each component and subsystem shall be installed as specified


OPERATIONS herein and as shown on the Drawings, with all equipment and
software provided as required to satisfy the performance
DATE:
requirements specified herein.
CONTROL NUMBER
VERIFICATION

4. UV resistant coverings shall be provided to airflow switch plastic


EDSD

tubes for all outdoor installations.


DATE:

5. All controls shall be “BACnet” compatible for future connection to a


BY:

BMS system.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 68


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 68 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

B. Controller:

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
1. Each controller shall be microprocessor based with memory,
input/output interface, programs and power supplies. The
NM
NM

NM
controller shall perform calculations and logical operations, accept
and process system commands, and shall be programmed for
stand-alone operation. Each controller shall be able to gather
information from field sensors, provide signal conditioning,
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

transmit commands to field equipment.


ISSUED FOR REVIEW

2. Controllers used for “DDC” control shall include software to


perform “DDC” control loop processing. Loop processing shall be
DESCRIPTION

local at the panel. Control algorithms shall be combined


proportional, integral, and/or derivative control to meet the needs
of the application or otherwise as specified. Other control modes
such as incremental, floating, or two position shall be included to
adapt to control requirements.

3. Controller shall be field programmable/ Software shall be provided


for arithmetic, logic and utility functions, control loop and custom
programming of control algorithms. Control function shall include
control rest and optimized start/stop. All parameters including
JO/EWO

proportional, integral and derivative sensitivity factors and energy


10-08643-
10-08643-

10-08643-

management data shall be programmable through the keypad.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

4. Each controller shall include but not limited to the following


features:
00A

0F1
NO.
REV

00

a. Fused circuit protection, power conditioning, and high


DISCIPLINE
ENGINEER voltage surge protection.
N. MINAMIBORI
DATE:
MAR-14-23 b. Terminals for field checking of incoming data.
PROJECT
ENGINEER
N. ALSAHBIB
c. Automatic restart upon power resumption after power
MAR-14-23
failure.
DATE:
CERTIFIED
K. OGAWA d. Non-Volatile Memory: Capacity shall be sufficient to
MAR-14-23
contain all controller programs (plus 20% spare capacity
DATE:
CONSTRUCTION
and 15% spare I/O’s).
AGENCY
e. Energy management application programs, including
DATE: timed start/stop, optimized start/stop, duty cycling, trend
OPERATIONS logging, night setback, run time totalization and supply air
temperature reset.
DATE:
f. Battery back-up for program memory sufficient for 24
hours.
CONTROL NUMBER
VERIFICATION
EDSD

5. Provide a portable operator terminal for system monitoring, and


equipment control. Operator terminal may be a controller
DATE:

connected keypad or a portable notebook style terminal with


BY:

communication compatibility to the controller.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

6. Through portable display, a trained operator shall be able to:


0F1

(DCC) NO. _____________________

a. Display the value of an analog point, e.g. temperature.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 69


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 69 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
b. Start or stop equipment and control equipment operation.
ENGG CERT

KO
KO
KO
c. Monitor the status of equipment being controlled.
NM
NM

NM
d. Display the set point of a control loop.

e. Display the control signal to an actuator.


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

f. Set or change alarm units.

g. Adjust control units.


DESCRIPTION

7. The controller shall be programmed with an energy management


program incorporating the following programs:

a. “Start/Stop” Schedules: Scheduling of the Air Handling


Units to start only during occupied periods.

b. Optimum “Start” Program: To start the Air Handling Units


at an optimum time before occupancy begins. This shall
be early enough to bring space temperature to comfort
JO/EWO

levels and late enough to save energy.


10-08643-
10-08643-

10-08643-

0005
0005

0005

c. Optimum “Stop” Program: To stop the Air handling Units


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

at an optimum time before occupancy ends. This shall be


late enough to maintain comfort levels and early enough
to save energy.
00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER d. Supply air temperature reset during unoccupied periods.
N. MINAMIBORI
MAR-14-23
DATE:
PROJECT
ENGINEER
C. Control Panel Graphic Display:
N. ALSAHBIB
MAR-14-23
1. Each DDC building control panel shall be provided with a panel
DATE:
CERTIFIED
fascia mounted 15” touch display panel for system graphical
K. OGAWA display and operation.
MAR-14-23
DATE:
CONSTRUCTION
2. The touch panel shall be of 1024x768 resolution and 265,000 color
AGENCY as minimum.

DATE: 3. All connected equipment, instruments and data points connected


OPERATIONS to the HVAC Control Panel shall be graphically displayed on this
display.
DATE:
4. Through the touch display panel, a trained operator shall be able
CONTROL NUMBER
VERIFICATION

to:
EDSD

a. Navigate through the system graphical display pages.


DATE:
BY:

b. Display the values of analog points (Input and output).


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

c. Monitor the status of equipment being controlled.


0F1

(DCC) NO. _____________________

d. Start or stop equipment and control equipment operation.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 70


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 70 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
e. Display and change all control loops set points and limits.
ENGG CERT

KO
KO
KO
f. Display and change all timer setpoints.
NM
NM

NM
g. View Alarm logs and acknowledge/reset alarms

h. Display trend logs, charts, etc.


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

i. Display and change time schedules.


j. View controllers date and time.
DESCRIPTION

D. Portable Operator Terminal:

1. Provide one portable operator terminal for system monitoring, and


equipment control. Operator terminal may be a controller
connected keypad or a portable notebook style terminal with
communication compatibility to the controller.

2. Through the portable terminal, a trained operator shall be able to:

a. Adjust parameters, ranges, and limits for all inputs and


JO/EWO

output points.
10-08643-
10-08643-

10-08643-

0005
0005

0005

b. Display and Force input/output values.


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

c. Adjust parameters and limits for all PIDs.


00A

0F1
NO.
REV

00

E. HVAC Control Panel Manual Operation Facility:


DISCIPLINE
ENGINEER
N. MINAMIBORI 1. Each DDC control panel shall be equipped manual operation
DATE:
MAR-14-23 functionality to operate the system manually in case of DDC
PROJECT
ENGINEER
unavailability situation. The Manual Operation shall include
N. ALSAHBIB
System “MAN-OFF-AUTO” selector switch for the Panel, Manual
MAR-14-23
Operation “Start/Stop” selector Switch for each Fan, and
DATE:
CERTIFIED
“Enable/Disable” selector switches for each ACCU and duct
K. OGAWA heater.
MAR-14-23
DATE:
CONSTRUCTION
2. All feedback statuses and alarms of the Fans, ACCU
AGENCY Compressors trips, and motorized dampers open/closed statuses,
shall be displayed by indication lamps on the panel Fascia.
DATE:
OPERATIONS
27.3 EXECUTION

DATE:
27.3.1 General
CONTROL NUMBER
VERIFICATION
EDSD

A. The system shall be installed by competent mechanics, regularly employed by


the HVAC control manufacturer or an approved authorized agent with full
DATE:

responsibility for proper operation of the control system including debugging and
BY:

proper calibration of each component in the entire system.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

B. Install all components of the control system in strict accordance with the
0F1

(DCC) NO. _____________________

manufacturer’s recommendations and these Specifications.

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 71


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 71 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

C. All components of the control system shall be installed to allow ample space on

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
all sides for maintenance of components and to permit installations of wiring.
ENGG CERT

KO
KO
KO
27.3.2 Control Panel Installation
NM
NM

NM
A. Refer to manufacturing and installation Specifications, and approved shop
drawings.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

27.3.3 Control System Adjusting


ISSUED FOR REVIEW

A. The control system manufacturer shall install and check all control
components for all systems.
DESCRIPTION

B. The final precise adjustment of dampers and other controls to maintain


design conditions shall be the sole responsibility of the Sub-contractor and
HVAC Control vendor.

28.0 TESTING, ADJUSTING AND BALANCING

28.1 GENERAL
JO/EWO

10-08643-
10-08643-

10-08643-

0005

28.1.1 Description
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

A. Using the proper and standard equipment, operated by experienced and


qualified personnel, of an Independent Testing and Balancing Organization,
the Sub-contractor shall perform the air conditioning balancing in
00A

0F1
NO.
REV

00

accordance with applicable codes and Standards.


DISCIPLINE
ENGINEER
N. MINAMIBORI
DATE:
MAR-14-23 28.1.2 Quality Assurance
PROJECT
ENGINEER
N. ALSAHBIB
A. Reference Codes and Standards: Comply with applicable Saudi Aramco
MAR-14-23
Standards, Codes and Standards.
DATE:
CERTIFIED
K. OGAWA 1. AABC National Standards for Field Measurements and
MAR-14-23 Instrumentation Total system Balance Vol.1.
DATE:
CONSTRUCTION
AGENCY 2. NEBB National Environmental Balancing Bureau “Procedural
Standards for Testing, Adjusting, Balancing of Environmental
DATE: Systems”.
OPERATIONS
3. ASHRAE Systems handbook.
DATE:
4. SMACNA Manual for the Balancing and Adjusting of Air Distribution
CONTROL NUMBER
VERIFICATION

Systems.
EDSD

5. AMCA Standard 803-87 criteria for acceptance of duct traverse


DATE:

velocity readings.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

6. NFPA 72E, 90A and B.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

B. Testing: Sub-contractor shall submit his proposed Testing Balancing and


(DCC) NO. _____________________

Adjusting (TBA) program for air balancing to Saudi Aramco Representative

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 72


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 72 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

at least two weeks prior to the scheduled test. Saudi Aramco will issue its

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
non-objection to the personnel and instrumentation required, and the scope
ENGG CERT

KO
KO
KO
of the TBA program. All tests shall be conducted in the presence of Saudi
Aramco Representative unless he find it acceptable not to do so. Saudi
NM
NM

NM
Aramco Representative shall be given two (2) days notice before any test is
to be conducted.

Any material, equipment, instruments, and personnel required for the tests
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

shall be provided by the Sub-contractor.


ISSUED FOR REVIEW

C. Qualification of TAB Organization:


DESCRIPTION

The Testing and Balancing (TAB) work for HVAC installation shall be
accomplished by an independent organization who is:

1. An organization whose regular activities include testing, adjusting


and balancing environmental systems.
2. An organization which utilizes only regular employees
experienced and trained specifically in the total balancing of
environmental systems; and
3. An organization which has satisfactorily balanced at least five
systems of comparable type and size.
JO/EWO

4. An organization which is approved by Saudi Aramco to perform


10-08643-
10-08643-

10-08643-

TAB of HVAC systems.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

D. Qualification of the Balancing Personnel: The Balancing Personnel shall be:


00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER 1. Qualified personnel regularly employed by an Independent Testing
N. MINAMIBORI and Balancing Organization who are experienced and trained
DATE:
MAR-14-23 specifically in the total balancing of Environmental systems; and
PROJECT
ENGINEER
have certificate of qualification from an acceptable professional
N. ALSAHBIB
organization such as NEBB.
DATE: MAR-14-23
CERTIFIED
2. Qualified personnel who have satisfactory balanced at least five (5)
K. OGAWA systems of comparable type and shape.
MAR-14-23
DATE:
CONSTRUCTION
3. In the event the Sub-contractor fails to comply with the above
AGENCY provision, Saudi Aramco Representative reserves the right to
designate another professional testing agency at no additional cost
DATE: to Saudi Aramco.
OPERATIONS
E. Certification: Upon completion of the Work, the Sub-contractor shall submit
DATE:
to Saudi Aramco Representative a written certification stating that the
environmental systems have been tested, adjusted and balanced to: (a)
CONTROL NUMBER
VERIFICATION

within +10% of the values reported; (b) within plus or minus 2 deg. F db in
EDSD

the areas being served by the distribution systems; (c) the lowest sound and
vibration levels possible. Environmental systems found to be operating
DATE:

outside these limits on the final inspection, will be rebalanced at no additional


BY:

cost to Saudi Aramco.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 73


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 73 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

28.1.3 Submittals

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

KO
KO
KO
A. Reports: Upon completion of the work, or prior final acceptance by Saudi
Aramco Representative, Sub-contractor shall submit to Saudi Aramco
NM
NM

NM
Representative six (6) copies of a bund report of the balancing Work
containing, but no limited to the following items:

1. Drawings: Sepias of all HVAC system drawings made from the latest
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

available revised of drawings with original design and field balancing


ISSUED FOR REVIEW

data clearly recorded for each system. The drawings shall be known
as the “Corrected Testing, Adjusting and Balancing Drawings”.
DESCRIPTION

2. Equipment Data Sheets: Typewritten data sheets, equivalent to


those available from SMACNA, covering all phases of the specified
Work containing at least the following item:

a. Original Design Data.

b. Field Test Data, see Paragraph 3.01, “ Balancing Method”.

c. Installed Equipment Data.


JO/EWO

3. Testing and Balancing report shall be submitted in accordance with


10-08643-
10-08643-

10-08643-

SAES-K-001 section 6.4.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

B. Test Equipment: A complete list of all test equipment used in performing the
Work with serial numbers and verification of latest calibration data.
00A

0F1
NO.
REV

00

DISCIPLINE 28.2 PRODUCTS


ENGINEER
N. MINAMIBORI
DATE:
MAR-14-23 28.2.1 Instrumentation
PROJECT
ENGINEER
N. ALSAHBIB
A. Test Equipment: Sub-contractor shall provide all the test equipment
MAR-14-23
required to perform the Work.
DATE:
CERTIFIED
K. OGAWA B. Testing and balancing instrument shall be of types described in NEBB or
MAR-14-23 AABC manuals. Instruments shall be calibrated every six months.
DATE:
CONSTRUCTION
Calibration shall be in accordance with NEBB and AABC procedures.
AGENCY

DATE:
28.3 EXECUTION
OPERATIONS

28.3.1 Pre-Start Up and Commissioning


DATE:
A. Refer to SAES-K-001 Section 5.5.
CONTROL NUMBER
VERIFICATION
EDSD

B. All equipment shall be commissioned as per manufacturer


recommendations. Including Commissioning of Electrical and Controls for
DATE:

HVAC system.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

28.3.2 Testing and Balancing Method


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

A. Perform all testing, adjusting and balancing work in accordance with the
practices, methods, or standards prepared by the technical societies and

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 74


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

DM02S3
13-Apr-2023

J-13-Apr-2 PRINT
ED 74 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

associations listed in Paragraph. 1.02, of this Section. The balancing Sub-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
contractor shall perform the following tasks as a minimum. It is the Sub-
ENGG CERT

KO
KO
KO
contractor responsibility to conduct all necessary tests to prove to Saudi
Aramco that the system is functional as per the requirement of these
NM
NM

NM
specifications.

B. Duct traverses are required on all main supply and return air ducts. The
initial location for the traverses shall be calculated per formulas (36) and
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

(37) from ASHRAE-1993 Fundamentals Chapter 32. Velocity readings


ISSUED FOR REVIEW

shall be recorded on a gird sheet similar to SMACNA’s Rectangular Duct


Travers Report or the Round Duct Traverse Report, whichever is
applicable. Final computed duct velocity and air flow shall be calculated
DESCRIPTION

and shown on the same sheet.

C. General Requirements:

1. Record and report dry bulb and wet bulb temperatures for the air
entering the coil and leaving the coil shall be shown for each unit.
The ambient dry bulb and wet bulb readings for the day the testing
is done shall also be reported.

2. Static pressure readings shall be taken ahead of the filter for each
JO/EWO

unit, prior to the evaporate coil and in the main supply air duct at
10-08643-
10-08643-

10-08643-

a distance no greater than 2 meters from the unit in a straight run


0005
0005

0005

of ductwork. These reading shall be logged on the same sheet as


SEPT-27-22

MAR-14-23
DEC-22-22
DATE

the temperature readings.

3. Amperage and voltage readings shall be taken on each air


00A

0F1
NO.
REV

00

handling unit or fan coil unit main blower motor and electric heater.
DISCIPLINE
ENGINEER These readings shall be logged on a separate data sheet.
N. MINAMIBORI
DATE:
MAR-14-23 4. The RPM of each motor and blower shall be taken and logged in
PROJECT
ENGINEER
the report separately.
N. ALSAHBIB
MAR-14-23
5. The size (diameter and pitch) of the motor and blower drive
DATE:
CERTIFIED
sheaves and drive belt shall be logged onto the same data sheets
K. OGAWA the RPM and motor amperage data.
MAR-14-23
DATE:
CONSTRUCTION
28.3.3 Corrective Work
AGENCY
A. Any system changes that are required prior to the final balance, as
DATE: determined by the initial system check, will be performed by Sub-
OPERATIONS contractor responsible for providing the system. Such changes may
encompass, but not necessarily be restricted to, changing of pulleys,
DATE:
belts, dampers or addition of dampers or access doors.
CONTROL NUMBER
VERIFICATION

B. Seal all test holes with metal snap-in plugs by Brownman Products Division
EDSD

of Associated Spring Crop. Of Atlanta, Georgia or approved agent. Use of


duct tape to seal the holes will not be permitted or accepted.
DATE:
BY:

C. If the testing balancing is performed when the ambient temperature is


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

100ºF (37.8ºC) or less, the balancing Sub-contractor shall return and take
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

a second set of temperature readings when the ambient temperature is


0F1

100ºF (37.8ºC) or greater.


(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 75


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 75 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

D. If the air balancing portion of the test and balancing report has been

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
accepted, only the additional temperature readings are required. The
ENGG CERT

KO
KO
KO
required temperature readings shall be: a) dry bulb and wet bulb
temperatures entering the coil, and b) dry bulb and wet bulb temperatures
NM
NM

NM
leaving the coil. These readings are required for each air handling unit and
packaged unit.

28.3.4 Criteria For Acceptance of Duct Traverse Readings


ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW

A. Distortion Factors:

1. For an acceptable duct traverse the AMCA (Air Movement and Control
DESCRIPTION

Association) Standard 80-87 for the tolerance in transverse and axial


distortion factors must be met. These factors are:

a. The transverse distortion factor must be <=10 (i.e. 10%).

b. The axial distortion factor must be <=10 (i.e. 10%).

Where the transverse distortion factor = The square root of the sum of
the square differences between the average velocity of each transverse
set of readings and the total average velocity of all transverse readings
JO/EWO

divided by the number of transverse readings. This is then multiplied by


10-08643-
10-08643-

10-08643-

100 and divided by the average velocity of all readings.


0005
0005

0005
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

Where the axial distortion factor = the square root of the sums of the
square differences between the average velocity of each axial set of
readings and the total average velocity of all traverse readings divided by
00A

0F1
NO.
REV

00

the number of axial readings. This is then multiplied by 100 and divided
DISCIPLINE
ENGINEER by the average velocity of all readings.
N. MINAMIBORI
DATE:
MAR-14-23 2. If either the transverse or axial distortion is greater than 10 (i.e. 10%), the
PROJECT
ENGINEER
traverse will be considered invalid.
N. ALSAHBIB
MAR-14-23
3. Contractor will be required to take a new duct traverse in another
DATE:
CERTIFIED
location, as directed by Saudi Aramco Representative, at no additional
K. OGAWA cost to Saudi Aramco where the transverse and axial distortions are less
MAR-14-23
than 10%.
DATE:
CONSTRUCTION
AGENCY
29.0 DOCUMENTATION AND SUBMITTAL REQUIREMENTS
DATE: In the course of performing the works, Sub-contractor shall submit for review the
OPERATIONS documents listed below.

The minimum content of these documents is briefly described.


DATE:
CONTROL NUMBER
VERIFICATION

1. Execution Plan Including:


• Sub-contractor Plan to execute the works
EDSD

• Organization structure of Sub-contractor and Vendor.


DATE:

• Roles and responsibility of key personnel


BY:

• Description of scope of work


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

• Overall sequence of execution of works


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

• Schedule of scope of works


0F1

(DCC) NO. _____________________

• Details of key suppliers of main components and materials for the works

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 76


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77

13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 76 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

• Overview of HSE Commitments for the project

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Overview of Quality Commitments for the project
ENGG CERT

KO
KO
KO
2. HSE Plan including:
NM
NM

NM
• Organization structure of personnel
• Roles and responsibilities of key personnel
• Proposed processes to identify key areas of risk and establish measures
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION

to manage the same


ISSUED FOR REVIEW

3. Quality Plan Including:


• Strategy of managing quality of all parties such as Vendor,
Sub-contractor and third parties, including the interface between them
DESCRIPTION

• Roles and responsibilities of key personnel


• Overview of audit and review plans and schedules

4. Work Method Statement (WMS) including:


• Description of main activities
• Details of main equipment and materials
• Details of transportation, handling, and storage on mainland and on site
• Job Safety Analysis (JSA) for the main activities
• Risk Assessments (RA) for each JSA
JO/EWO

10-08643-
10-08643-

10-08643-

Work shall not commence until such documents defining elements of work are
0005
0005

0005

available on site.
SEPT-27-22

MAR-14-23
DEC-22-22
DATE

00A

0F1
NO.
REV

00

DISCIPLINE
ENGINEER
N. MINAMIBORI
MAR-14-23
DATE:
PROJECT
ENGINEER
N. ALSAHBIB
DATE: MAR-14-23
CERTIFIED
K. OGAWA
MAR-14-23
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


0F1

(DCC) NO. _____________________

Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specs for Bldg. HVAC DOC 77


A80 K CE-181305-001
ZULUF AH UTILITIES of 0F1
SAFANIYA SAUDI ARABIA JO / EWO: 10-08643-0005 77