Professional Documents
Culture Documents
NTRO
J-13D
EDSD REV
-Ap r
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
-
LLED
DATE:
DATE:
DATE:
DATE:
DATE:
0F1
THIS INDICATES THAT REV. NO.__________
2
10-08643-
SEPT-27-22
0
00A NM
M
OF THIS DRAWING IS COVERED, FOR ALL 0005 ISSUED FOR REVIEW KO
WHEN
CONTROL NUMBER
23
APPROVAL/CERTIFICATION REQUIREMENTS, 10-08643-
S
DEC-22-22 ISSUED FOR CONSTRUCTION NM KO
0005
AGENCY
BY: 00
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
PRINT
K. OGAWA
DISCIPLINE
CERTIFIED
MAR-14-23
10-08643-
N. ALSAHBIB
OPERATIONS
MAR-14-23
CONSTRUCTION
ED
MAR-14-23
MAR-14-23
(DCC) NO. _____________________ 0F1 0005 ISSUED FOR CONSTRUCTION NM
N. MINAMIBORI
DATE: KO
SAFANIYA
Saudi Aramco 2616-ENG (03/99)
ZULUF AH UTILITIES
13-Apr-2023
Project Specifications
Construction Specs for Bldg. HVAC
SAUDI ARABIAN OIL COMPANY
DOC
DWG.TYPE
SAUDI ARABIA
MP
PREP’D
PCWBS
JO / EWO:
A80
FOR
PLANT NO.
ISSUE PURPOSE
K
INDEX
For Construction
JM
BUILDING HVAC WORKS
CHK’D
10-08643-0005
JGC CORPORATION
CONSTRUCTION SPECIFICATION
DRAWING NO.
0000
CE-181305-001
0-8887-20-0000
NM
SS-0000-13405-0001
1
of
APP’D
77
FOR CONSTRUCTION
SHT.NO.
0F1
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1 / 77
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
TABLE OF CONTENTS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 PURPOSE ............................................................................................................ 3
ENGG CERT
KO
KO
KO
2.0 DEFINITIONS AND SUBCONTRACTOR RESPONSIBILITIES ......................... 3
NM
NM
NM
2.1 Definitions ........................................................................................................... 3
2.2 Subcontractor Responsibilities ........................................................................ 3
3.0 APPLICABLE CODES, STANDARDS AND DOCUMENTS .............................. 4
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
14.0 AIR COOLED CONDENSING UNITS ............................................................... 29
ENGINEER
N. MINAMIBORI 15.0 PACKAGED Air Conditioning Unit ................................................................. 31
DATE:
MAR-14-23 16.0 HUMIDIFIERS .................................................................................................... 32
PROJECT
ENGINEER 17.0 ELECTRIC DUCT HEATER .............................................................................. 35
N. ALSAHBIB
MAR-14-23
18.0 AIR HANDLING UNITS ..................................................................................... 37
DATE:
CERTIFIED 19.0 FANS.................................................................................................................. 39
K. OGAWA
MAR-14-23
20.0 CHEMICAL FILTER UNITS ............................................................................... 41
DATE:
CONSTRUCTION 21.0 DUCTWORK & ACCESSORIES ....................................................................... 43
AGENCY
22.0 DAMPERS ......................................................................................................... 49
DATE: 23.0 AIR DEVICES, REGISTERS, GRILLES AND DIFFUSERS ............................. 53
OPERATIONS
24.0 DUCTED-SPLIT AND MINI-SPLIT AIR CONDITIONER .................................. 56
DATE:
25.0 VAV/CAV BOX (AIR TERMINAL UNITS) ......................................................... 58
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 2 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 PURPOSE
ENGG CERT
KO
KO
KO
This document, along with other relevant project documents referenced in this document,
NM
NM
NM
presents the minimum requirements for the design, fabrication, supply and installation of
HVAC System to be used in the Zuluf Central Plant Facilities (Zuluf CPF) Project.
2.1 Definitions
Whenever in this specification below words are used, it shall be understood as follows:
JO/EWO
10-08643-
10-08643-
10-08643-
0005
Contractor : JGC
SEPT-27-22
MAR-14-23
Subcontractor : The party supplying all materials and/or labor including shop
DEC-22-22
DATE
drawing preparation, execution at site, commissioning and handing over etc., unless
otherwise noted in this specification or construction drawings.
00A
0F1
NO.
REV
00
2) Subcontractor shall not make assumptions to replace the information not furnished
DATE:
OPERATIONS
by Contractor. Subcontractor is required to obtain necessary information from
Contractor. All claims arising from lack of knowledge of required information will be
rejected by Contractor.
DATE:
CONTROL NUMBER
3) Subcontractor shall list and fully describe all deviations from this specification and
VERIFICATION
related codes.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
5) In the case where contradiction and/or inadequacy are found, shall be claimed.
OF THIS DRAWING IS COVERED, FOR ALL
Contractor’s will issue instruction for further work, which shall be in written
(DCC) NO. _____________________
confirmation, if necessary.
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 3 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.0 APPLICABLE CODES, STANDARDS AND DOCUMENTS
ENGG CERT
KO
KO
KO
The following specifications, standards, drawings and regulations shall be applied to the
selection of material and workmanship. The effective standards cut-off date shall be
NM
NM
In the event that there is a conflict among following documents, it must be brought to the
attention of Contractor at the earliest opportunity and prior to the commencement of any
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
The subcontractor may be allowed to relax the above requirements in certain situations
DESCRIPTION
(e.g., if SAES requirement is relaxed), but only by prior instruction from Contractor
3.1 Saudi Aramco Codes and Standards
• SAES P-103 - Metric Units of Weights and Measures
• SAES-A-004 - General Requirements for Pressure Testing
• SAES-A-112- Meteorological and Seismic Design Data
• SAES-A-105 - Noise ControlSAES-B-014 Safety Requirements for Plant
and Operations Support Buildings
• SAES-B-069 - Emergency Eyewashes and Showers
• SAES-H-001 - Coating Selection and Application Requirements for
JO/EWO
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
System
• SAES-J-600 - Pressure Relief Devices
00A
0F1
•
NO.
REV
00
•
OF THIS DRAWING IS COVERED, FOR ALL
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S
J-13D
13-Apr-2023
r - 2 0 23
-Ap ED 4 / 77
PRINT
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
•
ENGG CERT
NM
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
•
DEC-22-22
DATE
0F1
NO.
REV
00
UL Underwriters Laboratories
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 5 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.0 PRODUCT DELIVERY, STORAGE AND HANDLING
ENGG CERT
KO
KO
KO
A. Deliver materials to the site in their original containers or unopened packages,
clearly label with the manufacturer’s name, product identification and lot number
NM
NM
NM where appropriate.
B. Protect all materials from damage during transit, handling, storage and installation
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
C. All materials shall be stored and handled in accordance with the Manufacturer’s
and Supplier’s Recommendation. All damaged materials shall be placed in
ISSUED FOR REVIEW
Sub-contractor shall prepare and submit Material Approval Request (MAR) to Contractor
Representative, before starting the procurement of materials. MAR shall include Brochures,
Vendor’s/ manufacturer’s information, Technical Specifications, Check sheet for compliance
of specification requirements, Installation manual, Maintenance Procedure etc., Samples shall
be submitted upon request by Contractor Representative
10-08643-
10-08643-
10-08643-
0005
0005
0005
Vendor/ Manufacturer for materials shall be selected from approved vendor list/ 9COM list.
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE All requirements for the Project Preservation shall be based on Manufacturer’s and Supplier’s
ENGINEER
N. MINAMIBORI recommendation.
MAR-14-23
DATE:
PROJECT
ENGINEER
8.0 ACTIVITY ON SITE
N. ALSAHBIB
MAR-14-23
DATE: Inspection of the work area shall be carried out by Contractor and Sub Contractor jointly with
CERTIFIED
Company before commencing the works to confirm requirements of WMS, JSA, or RA are in
K. OGAWA
place and identify any safety hazards.
MAR-14-23
DATE:
CONSTRUCTION
AGENCY 9.0 DUCTING AND PIPING SUPPORTS
DATE:
OPERATIONS
9.1 GENERAL
DATE:
9.1.1 Description
CONTROL NUMBER
VERIFICATION
A. This Section covers providing all material, and equipment for complete ducting
EDSD
and piping support systems including all accessories required to complete the
DATE:
Work acceptable to Saudi Aramco Representative. All ducting and pipes shall be
BY:
vibration.
0F1
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S
J-13D
13-Apr-2023
r - 2 0 23
-Ap ED 6 / 77
PRINT
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
A. Sub-contractor shall be responsible for the quality of all Work and material to
be used in the Work and shall propose a program for inspection and testing so
NM
NM
NM
as to achieve the specified quality.
B. Protect all materials from damage during transit, handling, storage and installation
C. Protect duct opening from dirt, dust, sand and other foreign materials with
materials appropriate to system.
9.1.4 Submittals
JO/EWO
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
provided.
DISCIPLINE
ENGINEER
N. MINAMIBORI C. Trapeze Hangers and Wall Support: fabrication shop drawings and
DATE:
MAR-14-23 manufacturer’s literature and proposed location of trapeze hangers.
PROJECT
ENGINEER
N. ALSAHBIB
D. Special installation or fabrication conditions, shop drawings, and other descriptive
MAR-14-23
data detailing proposed methods of welding and installation of hangers, supports,
DATE:
CERTIFIED
and anchors.
K. OGAWA
MAR-14-23
E. Support schedule with support details for all duct and pipe sizes.
DATE:
CONSTRUCTION
AGENCY
9.2 PRODUCTS
DATE:
OPERATIONS 9.2.1 General
DATE:
A. All hangers shall be adjustable while under load. Where lateral or axial duct
movement is anticipated, suitable linkages are to be provided so that hanger
CONTROL NUMBER
VERIFICATION
rods will be subjected to tensile loads only. Hanger rods shall be continuously
EDSD
must be no less than the size shown in standard sheets for given conditions.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
B. Locate all supports with due regard for maximum loads (such as operating
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
loads, test loads, wind loads, etc.), allowable forces and moments on
0F1
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S
J-13D
13-Apr-2023
r - 2 0 23
-Ap ED 7 / 77
PRINT
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
settlement at Site.
ENGG CERT
KO
KO
KO
C. Sub-contractor shall coordinate the support system and comply with the
NM
NM
NM
structural Sections of these Specifications, as to type and locations of pipe
supports from concrete roof and/or metal steel decking.
D. Provide supports at changes of direction, but at locations that will not limit
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
system flexibility.
ISSUED FOR REVIEW
A. All duct hangers and spacing shall conform to the latest SMACNA standards.
10-08643-
approved equal may be used. Concentrate load per insert shall not exceed 34
0005
0005
0005
kg in case of inserts in second floor slab and shall not exceed 22 kg in case of
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
roof slab. Hanger spacing may be reduced to less than specified in SMACNA in
order not to exceed the loading. Wire hangers shall not be used.
00A
0F1
NO.
REV
00
E. All ducts shall be braced and stiffened so as not to breathe, rattle, vibrate or sag.
DISCIPLINE
ENGINEER The bracing shall be applied to the outside of all ducts and may consist of standing
N. MINAMIBORI seams, modified “S” slips or angles, and cross-breaking supplemented by angle
DATE:
MAR-14-23 stiffener. All ducts shall have adequate supports as shown in the typical details
PROJECT
ENGINEER
drawings.
N. ALSAHBIB
MAR-14-23
F. Welding to structural beams for duct hangers may be done only with prior
DATE:
CERTIFIED
approval by Saudi Aramco Representative.
K. OGAWA
MAR-14-23
G. Strap Hangers shall be made of the same material as duct. The maximum size
DATE:
CONSTRUCTION
duct supported by strap hanger shall be 20” (500 mm).
AGENCY
H. Hanger shall be configured as per ASHRAE and SMACNA.
DATE:
OPERATIONS I. The hangers constructed of galvanized steel angles with Hot dip galvanized steel
rods shall be in accordance with SMACNA and based on the following table
DATE:
shown on PE-300017 Section 11.2.16.
CONTROL NUMBER
VERIFICATION
J. Restore to new condition any finishes which have been damaged too extensively
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
standard.
(DCC) NO. _____________________
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 8 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
9.3 EXECUTION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
NM
B. Angle Hanger: complete with locking nuts and washers.
C. Hanger spacing: in accordance with SMACNA.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
10.1 GENERAL
10.1.1 Description
This Section covers providing nameplates, tags, stencils and pipe markers as
specified herein, including all accessories required to complete the Work in
JO/EWO
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
A. Nameplates.
00A
0F1
NO.
REV
00
DISCIPLINE B. Tags.
ENGINEER 13-Apr-2023
N. MINAMIBORI
MAR-14-23
C. Stencils.
DATE:
PROJECT
ENGINEER D. Pipe Markers.
N. ALSAHBIB
DATE: MAR-14-23 10.1.3 Submittals (three (3) copies each):
CERTIFIED
K. OGAWA
A. Submit lists of working, symbols, letter sizes, and color coding for mechanical
MAR-14-23
DATE: identification.
CONSTRUCTION
AGENCY
B. Submit valve chart and schedule, including valve tag number, location, function
DATE:
and valve manufacturer’s name and model number.
OPERATIONS
C. Product Data: Provide manufacturers catalog literature for each product required
installation.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 9 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
10.2 PRODUCTS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
10.2.1 Manufacturers
KO
KO
KO A. AEMED Co., 330 Green Street, Box 369, Buffalo, NY 14240.
NM
NM
NM
D. Or approved equal.
13-Apr-2023
DESCRIPTION
10.3 EXECUTION
10.3.1 Installation
A. Nameplate shall be made of 316 stainless steel with Monel fasteners and install
in accordance with SAES-K-001.
B. Install tags with corrosion resistant chain. Chain shall be installed for all
instrument devices, valves, and any HVAC equipment where application of
Mechanical fastener or adhesive are not feasible.
JO/EWO
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
D. Install plastic tape pipe markers complete around pipe as required. Use of plastic
tape markers is only acceptable for indoor location. Outdoor equipment, ducting
00A
0F1
NO.
REV
00
J. Identify piping, concealed or exposed, with plastic pipe markers. Use tags on
VERIFICATION
piping (3/4”) 20 mm diameter and smaller. Identify services, flow direction and
EDSD
pressure. Install in clear view and align with axis of piping. Locate identification
not to exceed (6 ft.) 2 m on straight runs including risers and drops, adjacent to
DATE:
BY:
each valve and tee, at each side of penetration of structure or enclosure and at
each obstruction. Markers shall comply with ANSI A13.1 Color Standards. All
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 10 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Below table shall be followed for size of letter and direction marks.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
Outside diameter of Pipe or Minimum Length of Directional
Minimum Size of Letters
Covering Arrow
NM
NM
NM
inches mm inches mm inches mm
L. Provide color coded ceiling task locating valves, dampers (fire, fire and smoke,
manual motorized) above drop ceilings. Locate in corner of panel closest to
equipment. All equipment, valves, dampers and fan coil units shall be tagged
sequentially and keyed to the Drawings.
10-08643-
10-08643-
10-08643-
0005
0005
0005
11.1 GENERAL
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
11.1.1 Description
00A
0F1
NO.
REV
00
A. This Section covers providing Neoprene isolators, steel springs, floor mounts,
DISCIPLINE etc., required for isolation of equipment and piping as shown on the approved
ENGINEER
N. MINAMIBORI for construction Drawings or as required and specified herein, including all
MAR-14-23 accessories, to complete Work acceptable to Saudi Aramco Representative.
DATE:
PROJECT
ENGINEER
11.1.2 Quality Assurance
N. ALSAHBIB
MAR-14-23
DATE: A. Conform to Saudi Aramco Engineering Standards.
CERTIFIED
K. OGAWA
B. Static deflection of vibration isolators shall generally be not less than
MAR-14-23
DATE: recommended in the ASHRAE guide and data book for the actual floor spans
CONSTRUCTION
AGENCY
involved. Replace at no additional cost to Saudi Aramco, any isolator failing to
conform to these Specifications as applied to the actual systems involved.
DATE:
C. A single, vibration isolation manufacturer, or his qualified representative, shall
OPERATIONS supply vibration isolation devices, including auxiliary steel bases and pouring
forms, and be responsible for coordination of his Work.
DATE:
D. Sub-contractor shall provide such supervision as necessary to assure correct
CONTROL NUMBER
and compliance with approved submittal data. Report shall indicate the actual
measured isolator deflection compared with that predicted and that specified.
DATE:
BY:
E. The vibration isolation manufacturer and his representative shall have been
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
engaged in the business of vibration isolation for no less than 5 years. Products
OF THIS DRAWING IS COVERED, FOR ALL
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 11 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Amber/Booth, Vibration Eliminators, Inc., or approved equal.
ENGG CERT
KO
KO
KO
11.1.3 Submittals
NM
NM
NM
A. Submit the following data to Saudi Aramco Representative for review and
approval prior to purchase or installation of equipment. Data shall clearly identify
each item of equipment supported and the isolation to be installed at each point
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
of support.
ISSUED FOR REVIEW
10-08643-
10-08643-
10-08643-
0005
efficiency.
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
of deflection to be more than 50 percent less than the one called for be the guide,
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 12 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
11.2 PRODUCTS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM
11.2.1 Materials
NM
NM
Refer to PE-300017 section 9.0
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
B. Steel components shall be PVC coated, or phosphate and painted with industrial
grade enamel; nuts, bolts and washers shall be zinc-electroplated. Structural
steel bases shall be thoroughly cleaned of welding slag and primed with zinc-
chromate or metal etching primer. A finish coat of industrial enamel shall be
applied over the primer.
C. Isolators exposed to the weather shall have steel parts PVC coated, hot-dip
galvanized or zinc-electroplated plus coating of neoprene of bitumastic paint.
Aluminum components for outdoor installation shall be etched and painted with
industrial grade enamel; nuts, bolts, and washers shall be zinc electroplated.
JO/EWO
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
A. Where height-saving brackets for side mounting of isolators are specified, the
DEC-22-22
DATE
0F1
NO.
REV
00
and removed when the operating clearance is 1 inch or less. When used with
DISCIPLINE spring isolators having a deflection of 2½ inches or more, the height-saving
ENGINEER
N. MINAMIBORI
brackets shall be of the pre-compression type to limit exposed bolt length
MAR-14-23
between the top of the isolator and the underneath side of the bracket.
DATE:
PROJECT
ENGINEER B. Isolators supporting a given piece of equipment shall be selected for
N. ALSAHBIB approximately equal spring deflection.
DATE: MAR-14-23
CERTIFIED C. Horizontal deflection of isolators under operating conditions shall not exceed two
K. OGAWA (2) percent of the height of the loaded elastic element. Provide stabilizers it
MAR-14-23
DATE: necessary to limit such horizontal movement to two (2) percent or ¼ inch,
CONSTRUCTION
AGENCY
whichever is less.
D. Air handling units and chemical filter units shall be installed on neoprene isolators.
DATE:
OPERATIONS Air cooled condensing units, packaged air conditioning units, and exhaust fans
shall be installed on spring isolators.
DATE: E. Air handling unit and duct mounted fans shall be isolated from their duct by flexible
CONTROL NUMBER
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S 13-Apr-2023
J-13D
-Ap r - 2 0 23
PRINT
ED 13 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
11.3 EXECUTION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM
11.3.1 Concrete Work
NM
NM
A. Provide housekeeping pads for equipment indicated to be pad mounted.
Housekeeping pads shall be constructed at least 4 inch high for indoor equipment
and at least 6” high for outdoor equipment. Construct in full accordance with
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
A. The installation or use of vibration isolators must not cause any change of position
of equipment or piping which would result in stresses in piping connection or
misalignment of shafts or bearings. In order to meet this objective, maintain
equipment and piping in a rigid position during installation. The load shall not be
transferred to the isolator until the installation is complete and under full
operational load. Refer to HVAC Standard Details CB-181854 and CB-181855.
B. All vibration isolation equipment and materials specified in this Section shall be
installed in accordance with the approved shop drawings and as recommended
JO/EWO
10-08643-
10-08643-
10-08643-
by the manufacturer.
0005
0005
0005
SEPT-27-22
MAR-14-23
C. Upon completion of installation of all vibration isolation equipment and prior to the
DEC-22-22
DATE
start up of isolated equipment, all debris shall be removed from areas surrounding
and from beneath all isolated equipment.
00A
0F1
NO.
REV
00
DISCIPLINE D. All connections to isolate equipment shall be made so as to allow free motion of
ENGINEER
N. MINAMIBORI
the isolation equipment.
MAR-14-23
DATE:
PROJECT
E. Set isolators per manufacturer’s recommendation to insure unit is supported only
ENGINEER by the isolators, any isolators that are “Bottomed” out must be re-adjusted to
N. ALSAHBIB support the unit.
DATE: MAR-14-23
CERTIFIED F. Each vibration isolator shall be sized, and adjusted so that the dead load will
K. OGAWA cause a 2.5cm (1 inch) deflection in the spring. The vibration isolator shall also
MAR-14-23
DATE: be required to have a remaining travel of 50% after the initial loading and
CONSTRUCTION
AGENCY
adjustment.
manufacturer.
VERIFICATION
EDSD
I. The operating clearance between the bracket and the housekeeping pad or floor
shall be 3/8 inch plus or minus 1/16 inch. The minimum operating clearance
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
J. Place the frame in position and support the brackets temporarily by 3/8 inch shims
OF THIS DRAWING IS COVERED, FOR ALL
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 14 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
K. Install the isolators with raising the machine and frame assembly.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
L. After the entire system installation is completed and is under full operational load,
adjust the isolator so that the load is transferred from the shims to the isolator.
NM
NM
NM
When isolators are properly adjusted, the shims shall be barely free. The shims
shall be used as a gauge to check that the 3/8 inch clearance is maintained so
that system will remain free of stress. Remove the shims.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
12.1.A GENERAL
12.1.1.A Description
A. This Section covers providing pipe insulation as specified and as shown on the
Drawings and specified herein including accessories required to complete the
Work acceptable to Saudi Aramco Representative.
JO/EWO
10-08643-
10-08643-
10-08643-
0005
12.1.2.A Submittals
0005
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER B. Manufacture’s Literature:
N. MINAMIBORI
DATE:
MAR-14-23 1. Thickness of Insulation
PROJECT
ENGINEER
N. ALSAHBIB
2. Density
DATE: MAR-14-23
CERTIFIED
3. Maximum Temperature Limit
K. OGAWA
MAR-14-23 4. Fire and Smoke Hazard Rating
DATE:
CONSTRUCTION
AGENCY 5. Thermal Conductivity
a. Adhesives
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
b. Mechanical Fasteners
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 15 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM 12.1.3.A Limitation
NM
NM
A. Materials specified shall be applied subject to their temperature limits. Any
methods of application of insulating materials or finishes not specified in detail
herein shall be in accordance with the particular manufacturer’s published
recommendations.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
12.2.A PRODUCTS
JO/EWO
10-08643-
10-08643-
10-08643-
0005
0005
0005
12.2.1.A Materials
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
E. Refrigerant pipes (hot and cold) shall be insulated as per section 10.3.6,
10.3.10 and 10.6.14 of specification PE-300017. All piping shall have canvas
DATE:
with foster 30/80 or equivalent. However, outdoor piping and indoor pipes at 2
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 16 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
12.3.2.A Application
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
A. Replace or repair damage materials and defective Work as directed by Saudi
Aramco Representative at no additional cost to Saudi Aramco.
NM
NM
NM
B. Repair procedure shall be prepared by Sub-contractor and approved before
proceeding the works.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
12.1.B GENERAL
12.1.1.B Description
A. This Section covers providing duct insulation as specified and as shown on the
Drawings and specified herein including accessories required to complete the
Work acceptable to Saudi Aramco Representative.
12.1.2.B Submittals
JO/EWO
10-08643-
10-08643-
10-08643-
0005
0005
requirements of these Specifications. The submittal data shall include, but not be
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
B. Manufacture’s Literature:
00A
0F1
NO.
REV
00
DISCIPLINE
ENGINEER 11. Thickness of Insulation
N. MINAMIBORI
DATE:
MAR-14-23 12. Density
PROJECT
ENGINEER
N. ALSAHBIB
13. Maximum Temperature Limit
DATE: MAR-14-23
CERTIFIED
14. Fire and Smoke Hazard Rating
K. OGAWA
MAR-14-23 15. Thermal Conductivity
DATE:
CONSTRUCTION
AGENCY 16. Permeability of Insulation and Finishes
d. Adhesives
DATE:
e. Mechanical Fasteners
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 17 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
cm overlap between different components (duct, adhesive etc.) to show the
ENGG CERT
KO
KO
KO
quality of the duct and workmanship of the duct installer. Duct installation shall
start only after Saudi Aramco Representative has approved the duct sample.
NM
NM
NM
12.1.3.B Limitation
10-08643-
10-08643-
10-08643-
0005
requirements.
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER
12.2.B PRODUCTS
N. MINAMIBORI
MAR-14-23
DATE:
PROJECT
ENGINEER
12.2.1.B Materials
N. ALSAHBIB
MAR-14-23
Refer to PE-300017 section 10
DATE:
CERTIFIED
K. OGAWA
12.3.B EXECUTION
MAR-14-23
DATE:
CONSTRUCTION
AGENCY 12.3.1.B General
C. Duct joints insulation shall be install after duct leakage test is completed and
the work is acceptable to Saudi Aramco Representative.
DATE:
BY:
D. Adhesives, sealers, vapor barrier coating, etc. shall be compatible with the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
materials to which they are applied, and shall not corrode, soften or otherwise
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 18 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
E. Insulation shall be applied as per Section 4.8.13 of SAES-K-001 & Table 6.4
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
of UMC.
ENGG CERT
KO
KO
KO
F. All ductwork exposed to outdoors shall be insulated and aluminum cladded.
NM
NM
NM
G. All ductworks exposed to indoors up to 2M. high from the finish floor level shall
be aluminum cladded.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
12.3.2.B Application
ISSUED FOR REVIEW
A. For rectangular ducts wider than 60 cm. apply stick clips to the bottom of the
duct on 45 cm centers.
DESCRIPTION
B. Apply adhesive to the ductwork in 10.2 cm. strip on 20-cm. centers and allow
drying time as necessary.
C. Tightly wrap insulation around duct with all circumferential joints butted and
with facing overlapped at least 5 cm.
E. Secure all joints with 0.02” WD Steel strapping at 300mm on center with ¾”
JO/EWO
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
G. All joints as well as all penetrations in the facing of the insulation shall be taped
00A
0F1
NO.
REV
00
DATE:
13.1.1 Description
CONTROL NUMBER
VERIFICATION
EDSD
A. This section covers providing field refrigerant piping for direct expansion HVAC
systems as shown on the Drawings and specified herein including all
DATE:
Representative.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S
J-13D
13-Apr-2023
r - 2 0 23
-Ap ED 19 / 77
PRINT
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
B. Definitions:
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
1. Refrigerating system: Combination of interconnected
refrigerant-containing parts constituting one closed refrigeration
NM
NM
NM
circuit in which a refrigerant is circulated for the purpose of
extracting heat.
10-08643-
10-08643-
10-08643-
B. Comply with ASHRAE Standard 15, Safety Code for Mechanical Refrigeration.
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER C. Comply with ASME Boiler and Pressure Vessel Code: Section IX: Welding and
N. MINAMIBORI Brazing Qualifications.
MAR-14-23
DATE:
PROJECT
ENGINEER
D. Products shall comply with UL 207 "Refrigerant–Containing Components and
N. ALSAHBIB
Accessories, "Nonelectrical"; or UL 429 "Electrical Operated Valves."
DATE: MAR-14-23
CERTIFIED
13.1.3 Submittals
K. OGAWA
MAR-14-23
A. Submit samples of the refrigerant pipes and shop drawings.
DATE:
CONSTRUCTION
AGENCY B. Comprehensive set of refrigerant piping size calculations performed by the
condenser units vendor to confirm adequacy of selected pipe sizes for actual
DATE: installed equipment and actual distances to AHU coils. Vendor shall confirm
OPERATIONS that with the proposed pipe sizes, the condenser units shall be able to deliver
the required cooling capacity as specified in the equipment schedules.
DATE:
C. Shop Drawings: Sufficient information for components noted, including valves
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
3. Strainers
0F1
4. Moisture-liquid indicators
(DCC) NO. _____________________
5. Filter-driers
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 20 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7. Liquid-suction interchanges
ENGG CERT
KO
KO
KO
8. Oil separators (when specified)
9. Gauges
NM
NM
NM
10. Pipe and equipment supports
11. Flexible elastomeric pipe insulation
12. Refrigerant and oil
13. Pipe/conduit roof penetration cover
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
2. Valves.
3. Piping Accessories.
4. Pipe Hangers, Inserts, and Supports
00A
0F1
NO.
REV
00
5. Pipe Insulation
DISCIPLINE
ENGINEER
N. MINAMIBORI
MAR-14-23
13.2 PRODUCTS
DATE:
PROJECT
ENGINEER
N. ALSAHBIB
13.2.1 Standard Commercial Products
DATE: MAR-14-23
CERTIFIED A. Materials and equipment shall be standard products of a manufacturer regularly
K. OGAWA engaged in the manufacturing of such products, which are a similar material,
MAR-14-23 design, and workmanship. The standard products shall have been in satisfactory
DATE:
CONSTRUCTION
commercial or industrial use for 2 years prior to bid opening. The 2-year use shall
AGENCY include applications of equipment and materials under similar circumstances and
of similar size. The 2 years’ experience shall be satisfactorily completed by a
DATE: product which has been sold or is offered for sale on the commercial market
OPERATIONS through advertisements, manufacturer’s catalogs, or brochures. Products having
less than a 2-year field service record shell be acceptable if a certified record of
DATE:
satisfactory field operation, for not less than 6000 hours exclusive of the
manufacturer’s factory tests, can be shown. Products shall be supported by a
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
13.2.2 General
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
valves, fittings, and accessories shall be compatible with the fluids used and
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
capable of withstanding the pressures and temperatures of the service.
ENGG CERT
KO
KO
KO
Refrigerant piping, valves, and accessories used for refrigerant service shall be
cleaned, dehydrated, and sealed (capped or plugged) prior to shipment from the
NM
NM
NM
manufacturer’s plant.
B. Copper tubing shall be soft annealed where bending is required and hard
drawn where no bending is required. Soft annealed copper tubing shall
not be used in sizes larger than 35 mm (1-3/8 inches).
C. Joints shall be brazed except that joints on lines 22 mm (7/8 inch) and
smaller may be flared. Cast copper fittings for flared copper tube shall
conform to ASME B16.26 and ASTM B 62. Wrought copper and bronze
solder-joint pressure fittings shall conform to ASME B16.22 and ASTM B
75M. Joints and fittings for brazed joint shall be wrought-copper or
forged-brass sweat fittings. Cast sweat-type joints and fittings shall not
JO/EWO
be allowed for brazed joints. Brass or bronze adapters for brazed tubing
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER 13.2.4 Solder
N. MINAMIBORI
DATE:
MAR-14-23 A. Solder shall conform to ASTM B 32, grade Sb5, tin-antimony alloy for
PROJECT
ENGINEER
service pressures up to 1034 kPa 150 psig. Solder flux shall be liquid or
N. ALSAHBIB
paste form, non-corrosive and conform to ASTM B 813.
DATE: MAR-14-23
CERTIFIED
13.2.5 Brazing Filler Metal
K. OGAWA
MAR-14-23
A. Filler metal shall conform to AWS A5.8, Type Bag-5 with AWS Type 3
DATE:
CONSTRUCTION
flux, except Type BcuP-6 may be used for brazing copper-to-copper
AGENCY joints.
DATE:
OPERATIONS 13.2.6 Valves
DATE:
Valves shall be designed, manufactured, and tested specifically for refrigerant
service. Valve bodies shall be of brass, bronze, steel, or ductile iron construction.
CONTROL NUMBER
VERIFICATION
Valves 25mm inch and smaller shall have brazed or socket welded connections.
EDSD
welded flanges cannot be used. Internal parts shall be removable for inspection
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
plated carbon steel. Direction of flow shall be legibly and permanently indicated
(DCC) NO. _____________________
on the valve body. Control valve inlets shall be fitted with integral or adapted
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 22 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
charge, and receiver valves shall be of manufacturer’s standard configuration
ENGG CERT
KO
KO
KO
A. Refrigerant Stop Valves: Valve shall be the globe or full-port ball type
NM
NM
NM
with a back-seating stem especially packed for refrigerant service. Valve
packing shall be replaceable under line pressure. Valve shall be
provided with a hand wheel or wrench operator and a seal cap. Valve
shall be the straight or angle pattern design as required.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
B. Check Valves: Valve shall be the swing or lift type as required to provide
positive shutoff at the differential pressure indicated. Valve shall be
provided with resilient seat.
DESCRIPTION
C. Liquid Solenoid Valves: Valves shall comply with ARI 760 and be suitable
for continuous duty with applied voltage 15 percent under and 5 percent
over nominal rated voltage at maximum and minimum encountered
pressure and temperature service conditions. Valves shall be direct-acting
or pilot-operating type, pack less, except that packed stem, seal capped,
manual lifting provisions shall be furnished. Solenoid coils shall be
moisture-proof, UL approved, totally encapsulated, or encapsulated and
metal jacketed as required. Valves shall have safe working pressure of
2760 kPa 400 psi and a maximum operating pressure differential of at least
JO/EWO
1375 kPa 200 psi at 85 percent rated voltage. Valves shall have an
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
D. Expansion Valves: Valve shall conform to ARI 750 and ASHRAE 17. Valve
shall be the diaphragm and spring-loaded type with internal or external
equalizers, and bulb and capillary tubing. Valve shall be provided with an
00A
0F1
NO.
REV
00
E. Safety Relief Valves: Valve shall be the two-way type, unless indicated
EDSD
otherwise. Valve shall bear the ASME code symbol. Valve capacity shall
be certified by the National Board of Boiler and Pressure Vessel
DATE:
activation.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
and pressure gauge port. Valve shall maintain a constant inlet pressure
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 23 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
load. Pressure drop at system design load shall not exceed the pressure
ENGG CERT
KO
KO
KO
difference corresponding to a 1 degrees C (2 degrees F) change in
saturated refrigerant temperature at evaporator operating suction
NM
NM
NM
temperature. Spring shall be selected for indicated maximum allowable
suction pressure range.
A. Filter Driers: Driers shall conform to ARI 710. Sizes 15 mm (5/8 inch) 5/8
inch and larger shall be the full flow, replaceable core type. Sizes 15 mm
(½ inch) and smaller shall be the sealed type. Cores shall be of suitable
desiccant that will not plug, cake, dust, channel, or break down, and shall
remove water, acid, and foreign material from the refrigerant. Filter drillers
shall be constructed so that none of the desiccant will pass into the
refrigerant lines. Minimum bursting pressure shall be 10.3 Mpa (1500 psi)
.
JO/EWO
10-08643-
0005
materials suitable for the service. Glass shall be borosilicate type. Ferrous
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
C. Gauge Glass: Gauge glass shall include top and bottom isolation valves
00A
0F1
NO.
REV
00
G. Strainers: Strainers used in refrigerant service shall have brass or cast iron
BY:
body, Y-or angle-pattern, cleanable, not less then 60-mesh non corroding
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
screen of an area to provide net free area not less than ten times the pipe
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 24 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
I. Pressure and Vacuum Gauges: Gauges shall conform to ASME B40.100
ENGG CERT
KO
KO
KO
and shall be provided with throttling type needle valve or a pulsation
dampener and shut-off valve. Gauge shall be a minimum of 85 mm 3-1/2
NM
NM
NM
inches in diameter with a range from 0 kPa (0 psig) 0 psig to approximately
1.5 times the maximum system working pressure. Each gauge range shall
be selected so that at normal operating pressure, the needle is within the
middle-third of the range.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
13.3 EXECUTION
JO/EWO
10-08643-
10-08643-
10-08643-
13.3.1 General
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DATE:
4. Use protective conduit when installed below ground outside
trench.
CONTROL NUMBER
VERIFICATION
EDSD
installation.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
6. Install hangers and supports per ANSI B31.5 and the refrigerant
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
matter, dirt, and moisture; have open ends of piping and connections to
ENGG CERT
KO
KO
KO
compressors, condensers, evaporators and other equipment tightly
capped until assembly.
NM
NM
NM
C. After installation, purge all refrigerant lines with 7 kPa gage (1.0 psig) dry
nitrogen while soldering, brazing or welding connections as per SAES-K-
001 section 5.3.2.1. Cap the system with reusable plug after each brazing
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
operation to retain the nitrogen and prevent entrance of air and moisture.
ISSUED FOR REVIEW
D. Pipe relief valve discharge to outdoors for systems containing more than
45 kg (100 pounds) of refrigerant.
DESCRIPTION
F. Changes in direction shall be made with fittings, except that bending of pipe
JO/EWO
10-08643-
used and wide weep bends are formed. Mitering or notching pipe or other
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
centerline radius of bends shall not be less than 6 diameters of the pipe. Bent
pipe showing kinks, wrinkles, flattening, or other malformations will not be
accepted.
00A
0F1
NO.
REV
00
DISCIPLINE
ENGINEER G. Brazing procedure and brazing operators shall be in accordance with the
N. MINAMIBORI requirements of Part QB, articles XII and XIII, section, ASME BPV code of
DATE:
MAR-14-23 ASME B31.5 section 528.2.
PROJECT
ENGINEER
N. ALSAHBIB
13.3.2 Piping Installation
DATE: MAR-14-23
CERTIFIED
A. Brazed/Soldered Connections: Brazing shall be performed in accordance
K. OGAWA with AWS Brazing Handbook, except as modified herein. During brazing, the
MAR-14-23
pipe and fittings shall be filled with a pressure regulated inert gas, such as
DATE:
CONSTRUCTION
nitrogen, to prevent the formation of scale. Before brazing copper joints, both
AGENCY the outside of the tube and the inside of the fitting shall be cleaned with a wire
fitting brush until the entire joint surface is bright and clean. Brazing flux shall
DATE: not be used. Surplus brazing material shall be removed at all joints. Tubing
OPERATIONS shall be protected against oxidation during brazing by continuous purging of
the inside of the piping using nitrogen. Piping shall be supported prior to
DATE:
brazing and not be sprung or forced.
CONTROL NUMBER
VERIFICATION
shall be used between the back of the flare and the nut in order to avoid
tearing flare while tightening the nut.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
A. General: Refrigerant stop valves shall be installed on each side of each piece
0F1
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
with stems horizontal unless otherwise indicated. Ball valves shall be
ENGG CERT
KO
KO
KO
installed with stems positioned to facilitate operation and maintenance.
Isolating valves for pressure gauges and switches shall be external to thermal
NM
NM
NM
insulation. Safety switches shall not be fitted with isolation valves. Filter
dryers having access ports may be considered a point of isolation. Purge
valves shall be provided at all points of systems where accumulated non-
condensable gases would prevent proper system operation. Valves shall be
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
is less than 54 mm (2-1/8 inches) 2-1/8 inches in diameter and at the 4 o’clock
or 8 o’ clock position on lines larger than 54 mm (2-1/8 inches) 2-1/8 inches.
The bulb shall be securely fastened with two clamps. The bulb shall be
insulated. The bulb shall be installed in a horizontal portion of the suction
line, if possible, with the pigtail on the bottom. If the bulb must be installed in
a vertical line, the bulb tubing shall be facing up.
C. Valve Identification: Each system valve, including those which are part of a
factory assembly, shall be tagged. Tags shall be in alphanumeric sequence,
progressing in direction of fluid flow. Tags shall be embossed, engraved, or
JO/EWO
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
shall be attached with nonferrous, heavy duty, bead or link chain, 14 gauge
annealed wire, nylon cable bands or as approved. Tag numbers shall be
referenced on Operation and Maintenance Manuals and system diagrams.
00A
0F1
NO.
REV
00
DISCIPLINE
ENGINEER D. Strainers: Strainers shall be provided immediately ahead of solenoid valves
N. MINAMIBORI and expansion devices. Strainer may be an integral part of an expansion
DATE:
MAR-14-23 valve.
PROJECT
ENGINEER
N. ALSAHBIB
E. Filter Dryer: A liquid line filter dryer shall be provided on each refrigerant
MAR-14-23
circuit located such that all liquid refrigerant passes through a filter dryer.
DATE:
CERTIFIED
Dryers shall be sized in accordance with the manufacturer’s
K. OGAWA recommendations for the system in which it is installed. Dryers shall be
MAR-14-23
installed such that it can be isolated from the system, the isolated portion of
DATE:
CONSTRUCTION
the system evacuated, and the filter dryer replaced. Dryers shall be installed
AGENCY in the horizontal position except replaceable core filter dryers may be installed
in the vertical position with the access flange on the bottom.
DATE:
OPERATIONS F. Sight Glass: A moisture indicating sight glass shall be installed in all
refrigerant circuits down stream of all filter dryers and where indicated. Site
DATE:
glasses shall be full line size.
CONTROL NUMBER
VERIFICATION
of motion being isolated. Piping for equipment with bi-directional motion shall
be fitted with two flexible connectors, in perpendicular planes. Reinforced
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
but not limited to the following: the sensing element of each automatic
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 27 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
thereof, the liquid line leaving a receiver and [the suction line at each
ENGG CERT
KO
KO
KO
evaporator or liquid cooler. Thermal wells for insertion thermometers and
thermostats shall extend beyond thermal insulation surface not less than 25
NM
NM
NM
mm 1 inch.
J. General Service Areas: Each sleeve shall extend through its respective wall,
floor, or roof, and shall be cut flush with each surface. Pipes passing through
concrete or masonry wall or concrete floors or roofs shall be provided with
DESCRIPTION
pipe sleeves fitted into place at the time of construction. Sleeves shall be of
such size as to provide a minimum of 6.35 mm ¼ inch all-around clearance
between bare pipe and sleeves or between jacketed-insulation and sleeves.
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
L. Field Painting: Painting required for surface not otherwise specified, and
finish painting of items only primed at the factory.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
contaminated refrigerant, or any foreign matter shall be considered
ENGG CERT
KO
KO
KO
contaminated systems. Restoring contaminated systems to clean
condition including disassembly, component replacement, evacuation,
NM
NM
NM
flushing, purging, and re-charging, shall be performed using currently
approved refrigerant and refrigeration manufacturer’s procedures.
Restoring contaminated systems shall be at no additional cost to Saudi
Aramco. Water shall not be used in any procedure or test.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
After all components of the refrigerant system have been installed and connected,
the entire refrigeration system shall be subjected to pneumatic, evacuation, and
startup tests as described herein. Tests shall be conducted in the presence of
Saudi Aramco Representative. Any material, equipment, instruments, and
personnel required for the test shall be provided by the Sub-contractor. The
services of a qualified technician shall be provided as required to perform all tests
and procedures indicated herein.
JO/EWO
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
been factory tested and refrigerant charged as well as equipment which could
DEC-22-22
DATE
0F1
NO.
REV
00
system. Safety relief valves and rupture discs, where not part of factory
DISCIPLINE sealed systems, shall be removed and openings capped or plugged.
ENGINEER
N. MINAMIBORI
MAR-14-23
B. Pneumatic Test: Pressure control and excess pressure protection shall be
DATE:
PROJECT
provided at the source of test pressure. Valves shall be wide open, except
ENGINEER those leading to the atmosphere. Test gas shall be dry nitrogen, with minus
N. ALSAHBIB 55 degree C (minus 70 degree F) dewpoint and less than 5 ppm oil. Test
DATE: MAR-14-23 pressure shall be applied in two stages before any refrigerant pipe is
CERTIFIED insulated or covered. First stage test shall be at 69 kPa (10 psi) with every
K. OGAWA joint being tested with a thick soap or color indicating solution. Second stage
DATE:
MAR-14-23 tests shall raise the system to the minimum refrigerant leakage test pressure
CONSTRUCTION specified in ASHRAE 15 with a maximum test pressure 25 percent greater
AGENCY
than first stage. Pressure above 690 Kpa (100 psig) shall be raised in 10
percent increments with a pressure acclimatizing period between increments.
DATE:
OPERATIONS
The initial test pressure shall be recorded along with the ambient temperature
to which the system is exposed. Final test pressures of the second stage
shall be maintained on the system for a minimum of 24 hours. At the end of
DATE: the 24 hour period, the system pressure will be recorded along with the
CONTROL NUMBER
2 Kpa (0.3 psi) will be allowed for each degree C (F) F change between test
EDSD
space initial and final ambient temperature, plus for increase and minus for a
decreases. If the corrected system pressure is not exactly equal to the initial
DATE:
BY:
system test pressure, then the system shall be investigated for leaking joints.
To repair leaks, the joint shall be taken apart, thoroughly cleaned, and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
shall be retested using the pneumatic tests described above. The entire
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 29 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
completed.
ENGG CERT
KO
KO
KO
C. Evacuation Test: Following satisfactory completion of the pneumatic tests,
NM
NM
NM
the pressure shall be relieved and the entire system shall be evacuated to an
absolute pressure of 300 micrometers. During evacuation of the systems,
the ambient temperature shall be higher than 2 degrees C 35 degrees F. No
more than one system shall be evacuated at one time by one vacuum pump.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
Once the desired vacuum has been reached, the vacuum line shall be closed
ISSUED FOR REVIEW
and the system shall stand for 1 hour. If the pressure rises over 500
micrometers after the 1 hour period, then the system shall be evacuated
again down to 300 micrometers and let set for another 1 hour period. The
DESCRIPTION
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
shall be tested for leaks. Fluorocarbon systems shall be tested with halide
torch or electronic leak detectors.
00A
0F1
NO.
REV
00
DATE: the refrigerant for reuse of reclaim. At no time shall more than 85 g (3
OPERATIONS ounces) 3 ounces of refrigerant be released to the atmosphere in any one
occurrence.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
14.0 AIR COOLED CONDENSING UNITS
ENGG CERT
KO
KO
KO 14.1 GENERAL
NM
NM
NM
14.1.1 Description:
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
10-08643-
10-08643-
10-08643-
A. The material to be furnished under this section shall be the standard product
0005
0005
0005
MAR-14-23
0F1
NO.
REV
00
B. Unit construction shall comply with latest edition of ANSI/ASHRAE and with
DISCIPLINE NEC.
ENGINEER
N. MINAMIBORI
MAR-14-23
14.1.3 Submittals
DATE:
PROJECT
ENGINEER A. Submit to Saudi Aramco Representative for approval a certificate of
N. ALSAHBIB compliance stating that the material used and construction of air-cooled
DATE: MAR-14-23 condensing units conforms to all requirements of these Specifications.
CERTIFIED
K. OGAWA B. Catalogue Data Including the Following Information’s:
MAR-14-23
DATE:
CONSTRUCTION 1. Unit type number.
AGENCY
all components
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 31 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
to Saudi Aramco Representative for approval. Wiring diagrams
ENGG CERT
KO
KO
KO
shall identify each component, and one diagram shall show all
interconnected for interlock components and HVAC Control
NM
NM
NM
Panel field connections.
C. Submit recommending spare part list for two years. List shall include parts
numbers, description of each part and the price of each.
14.2 PRODUCTS
14.3 EXECUTION
JO/EWO
10-08643-
10-08643-
10-08643-
0005
0005
0005
14.3.1 Inspection
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DATE:
MAR-14-23 A. All ACCUs shall be installed in strict accordance with the manufacturer’s
CONSTRUCTION recommendations and in accordance with the applicable Codes and
AGENCY Standards.
DATE: B. Install ACCUs on the location shown on the Drawings. D/X refrigerant lines
OPERATIONS
with all accessories such as filter/dryer, expansion valve…etc shall be
connected. Refrigerant filters, control valves and all other required
DATE: accessories shall be completely installed as an operational system. Units
shall be installed on vibration isolators. Interconnecting refrigerant piping
CONTROL NUMBER
VERIFICATION
between AHU and ACCU shall run in cable trays with cover.
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 32 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
15.0 PACKAGED Air Conditioning Unit
ENGG CERT
KO
KO
KO 15.1 GENERAL
NM
NM
NM
A. Work Included: The work under this section includes, but is not limited
ISSUED FOR REVIEW
15.1.3 Submittals
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DATE:
J. Installation recommendations including support arrangement, etc.
CONTROL NUMBER
VERIFICATION
K. Submit recommended spare parts list for each unit under this section. List
EDSD
shall include part numbers, and description of each part, and the price of each
part.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
.
0F1
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 33 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
15.2 PRODUCTS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM
15.2.1 Single Packaged Air Conditioning Unit
NM
NM
Refer to PE-300017 Section 17.0
15.3 EXECUTION
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
15.3.1 Inspection
DESCRIPTION
B. The unit shall have factory installed internal piping and wiring; refrigerant
circuit tested, dehydrated, seated and shipped with holding charge of
refrigerant.
D. The Sub-contractor shall check the air conditioning unit for damage and/or
JO/EWO
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
0F1
NO.
REV
00
DATE:
16.1 GENERAL
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
A. The material to be furnished under this section shall be the standard
product of a manufacturer regularly engaged in the production of
NM
NM
NM
humidifiers and shall be the manufacturer’s latest approved design as
published in the catalogues.
16.1.3 Submittals
10-08643-
10-08643-
10-08643-
16.2 PRODUCTS
0005
0005
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
16.2.1 Equipment
0F1
NO.
REV
00
DATE:
3. Unit Control system to shutdown the unit on any of the following
faults : over current, excessive fill time and end of cylinder life.
CONTROL NUMBER
VERIFICATION
EDSD
5. Provide duct humidistat with high limit setting to disable the steam
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
a. Enable/Disable Command
(Relay output from DDC Panel to Humidifier Panel)
NM
NM
NM
b. Humidifier Capacity Control
(0-10 VDC from DDC Panel to Humidifier Panel)
c. Humidifier Healthy Status
(VFC from Humidifier Panel to DDC Panel)
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
d. Humidifier Fault
ISSUED FOR REVIEW
D. Steam distribution System: Stainless steel distribution pipe for horizontal in-
duct installation with integral pitch.
F. Terminal connection points for all line and low voltage (control) connections.
A system on/off switch shall be externally available. A door interlock switch
JO/EWO
10-08643-
0005
0005
0005
G. Drain solenoid shall be of the shielded core dry operator design to prevent
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
16.3.2 Installation
DATE:
A. Work shall be installed as shown and according to the manufacturer’s
CONTROL NUMBER
VERIFICATION
instructions.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 36 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
17.0 ELECTRIC DUCT HEATER
ENGG CERT
KO
KO
KO 17.1 GENERAL
NM
NM
NM
A. Duct mounted electric heating units ,flanged or slip-in design, with built-in
ISSUED FOR REVIEW
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
17.1.4 Submittals
0F1
NO.
REV
00
DATE:
OPERATIONS
17.2 PRODUCTS
DATE:
17.2.1 Equipment
CONTROL NUMBER
VERIFICATION
A. General: Aluminized steel frame, spot welded. Duct mounted units, flanged or
EDSD
slip-in design, with built-in terminal and control boxes completely factory wired
to terminals. Control panels shall be built-in (NEMA l).
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
mechanically crimped in stainless steel terminals which are insulated from the
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3
J-DApM
13-Apr-2023
r-202
13- PRINT
ED 37 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
supplied with metal protective screens on inlet and outlet sides.
ENGG CERT
KO
KO
KO
C. Over Temperature Protection:
NM
NM
NM
l. Primary system: Automatic reset thermal cutout.
F. Shall be supplied with metal protective screens on inlet and outlet sides of the
heating coil.
G. Provide Airflow sensing device to disable the unit in case of low or no flow.
H. For staged controlled heaters the maximum stage capacity shall be 3 kW.
10-08643-
10-08643-
10-08643-
0005
requirements.
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER L. The below interface signals shall be available in the unit:
N. MINAMIBORI
DATE:
MAR-14-23 i. Heater Enable/Disable Command
PROJECT
ENGINEER
(Relay output from DDC Panel to Heater Panel)
N. ALSAHBIB
ii. Heater ON Status
MAR-14-23
(VFC from Heater Panel to DDC Panel)
DATE:
CERTIFIED
iii. Heater Trip Alarm
K. OGAWA (VFC from Heater Panel to DDC Panel)
MAR-14-23
iv. Heater Capacity Input Signal (Only for SCR Controlled Heaters)
DATE:
CONSTRUCTION
(0-10 VDC from DDC Panel to Heater Panel)
AGENCY
17.3 EXECUTION
DATE:
OPERATIONS
17.3.1 Inspection
DATE:
A. Sub-contractor shall inspect all products for damage immediately before
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
17.3.2 Installation
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
A. Work shall be installed as shown and according to the manufacturer’s
diagrams and recommendations.
NM
NM
NM
B. Handle and install units in accordance with manufacturer's written
instructions.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
18.1 GENERAL
18.1.1 Description
A. This Section covers providing Air Handling Units, complete and functional
acceptable to Saudi Aramco Representative and in strict accordance with
JO/EWO
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER 18.1.2 Quality Control
N. MINAMIBORI
DATE:
MAR-14-23 A. The material to be furnished under this section shall be the standard
PROJECT
ENGINEER
product of a manufacturer regularly engaged in the production of air
N. ALSAHBIB
handling units and shall be the manufacturer’s latest approved design as
MAR-14-23
published in the catalogues.
DATE:
CERTIFIED
K. OGAWA 18.1.3 Submittals
MAR-14-23
DATE:
CONSTRUCTION
A. Submit to Saudi Aramco Representative for approval a certificate of
AGENCY compliance stating that the material used and construction of air handling
units conforms to all requirements of these Specifications.
DATE:
OPERATIONS B. Catalogue Data Including the Following Information’s:
DATE:
1. Unit type (horizontal or vertical) and model number.
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
5. Description of insulation.
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 39 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6. Weight of units.
ENGG CERT
KO
KO
KO
7. Fan Air flow rate and coil capacity. The ratings and test conditions
NM
NM
NM
shall be per ARI industry Standard 430 for central station Air
Handling Units (AHU’s).
8. Fan curve showing the operating point at full air flow rate for all
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
AHUs.
ISSUED FOR REVIEW
11. Complete description and data on heating step controller (if any).
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER 15. Applicable Codes and Standards under which the product is
N. MINAMIBORI manufactured and tested.
MAR-14-23
DATE:
PROJECT
ENGINEER
16. Unit generated sound power data.
N. ALSAHBIB
DATE: MAR-14-23 18.2 PRODUCTS
CERTIFIED
K. OGAWA
MAR-14-23 18.2.1 General
DATE:
CONSTRUCTION
AGENCY A. Sub-contractor shall ensure that the manufacture or supplier have the
capability to provide In-Kingdom repair, maintenance, spare parts and
DATE: supply service for all equipment
OPERATIONS
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 40 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
18.3 EXECUTION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM
18.3.1 Inspection
NM
NM
A. Sub-contractor shall inspect all products for damage immediately before
installation. Any products that are damaged or not in accordance with
Specifications shall immediately be repaired or remove from the Site and
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
18.3.2 Installation
A. All Air Handling Units (AHU’s) shall be installed in strict accordance with
the manufacturer’s recommendations and in accordance with the
applicable Codes and Standards.
B. Install Air Handling Units (AHU’s) on the location shown on the Drawing.
Refrigerant lines shall be connected including condensate drain line. Air
filters, control valves and all other required accessories shall be completely
JO/EWO
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
0F1
NO.
REV
00
DISCIPLINE D. Provide vibration isolators for all Air Handling Units (AHU’s).
ENGINEER
N. MINAMIBORI
MAR-14-23
E. Furnish one set of the following:
DATE:
PROJECT
ENGINEER 1. Replacement filters for each air handling unit.
N. ALSAHBIB
DATE: MAR-14-23 2. Replacement belts for each air handling unit.
CERTIFIED
K. OGAWA
MAR-14-23
19.0 FANS
DATE:
CONSTRUCTION
AGENCY
19.1 GENERAL
DATE:
OPERATIONS
19.1.1 Description
DATE: A. This Section covers supply and exhaust fans as shown on the Drawings
CONTROL NUMBER
following.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 41 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
19.1.3 Submittals
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM Submit following to Saudi Aramco Representative for approval:
NM
NM
A. Test Report: Data showing test reading and calculated results of factory
tests of fans. The data shall include:
10-08643-
10-08643-
10-08643-
4. Arrangement of unit.
0005
0005
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
5. Installation recommendation.
0F1
NO.
REV
00
DISCIPLINE
ENGINEER 7. Performance curves.
N. MINAMIBORI
DATE:
MAR-14-23 8. Static efficiency.
PROJECT
ENGINEER
N. ALSAHBIB
9. Control wiring diagram.
DATE: MAR-14-23
CERTIFIED
K. OGAWA C. Recommended Spare Parts Lists: List of recommended spare showing
MAR-14-23
name, part number, and price for each part.
DATE:
CONSTRUCTION
AGENCY D. Operation and Maintenance Manuals.
DATE:
OPERATIONS
19.2 PRODUCTS
DATE:
19.2.1 Equipment
CONTROL NUMBER
VERIFICATION
A. Speed controllers shall be provided for all direct driven fans to achieve
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 42 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
proof rating suitable for the explosive hazard.
ENGG CERT
KO
KO
KO
19.2.2 Identification
NM
NM
NM
A. Equipment Number: Stamp equipment number on Manufacturer’s
standard nameplate and attach it permanently to fan.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
B. Seals: All fans must bear the AMCA certified rating seal.
ISSUED FOR REVIEW
19.3 EXECUTION
DESCRIPTION
19.3.1 Installation
A. General:
1. Equipment shall be installed shown on the Drawings and in
accordance with the manufacturer’s recommendations.
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
20.1 GENERAL
00A
0F1
NO.
REV
00
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 43 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Sub-contractor shall ensure that the manufacture or supplier have the
ENGG CERT
KO
KO
KO
capability to provide In-Kingdom repair, maintenance, spare parts and
supply service for all equipment
NM
NM
NM
D. Repair procedure shall be prepared by Sub-contractor and approved
before proceeding the works.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
20.1.3 Submittals
stating that the material used and construction conforms to all requirements
of these Specifications.
3. Weight of units.
JO/EWO
10-08643-
10-08643-
10-08643-
4. Fan curve showing the operating point at full air flow rate for all fans.
0005
0005
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
met.
DISCIPLINE
ENGINEER
N. MINAMIBORI 7. Complete electrical schematic and connection diagram for each
DATE:
MAR-14-23 electrically controlled component having more than one automatic or
PROJECT
ENGINEER
manual controlled device including provisions for field connections to
N. ALSAHBIB
the HVAC Control panel, shall be submitted to company
MAR-14-23
Representative for approval. Wiring diagrams shall identify each
DATE:
CERTIFIED
component, and one diagram shall show all interconnected for interlock
K. OGAWA components and HVAC Control Panel field connections.
MAR-14-23
DATE:
CONSTRUCTION
8. Operation and Maintenance Manuals, including parts list.
AGENCY
9. Applicable Codes and Standards under which the product is
DATE: manufactured and tested.
OPERATIONS
10. Unit generated sound power data.
DATE:
CONTROL NUMBER
20.2 PRODUCTS
VERIFICATION
EDSD
20.2.1 Equipment
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 44 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
20.3 EXECUTION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM
20.3.1 Inspection
NM
NM
A. Sub-contractor shall inspect all products for damage immediately before
installation. Any products that are damaged or not in accordance with
Specifications shall immediately be repaired or remove from the Site and
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
20.3.2 Installation
A. All chemical filter units shall be installed in strict accordance with the
manufacturer’s recommendations and in accordance with the applicable
JO/EWO
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
B. Ductwork shall be connected to the chemical filter unit with a flexible duct
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE C. Provide neoprene pad vibration isolators for all chemical filter units.
ENGINEER
N. MINAMIBORI
MAR-14-23
DATE:
PROJECT 21.0 DUCTWORK & ACCESSORIES
ENGINEER
N. ALSAHBIB
DATE: MAR-14-23
CERTIFIED
21.1 GENERAL
K. OGAWA
MAR-14-23
DATE: 21.1.1 Description
CONSTRUCTION
AGENCY
A. This Section covers providing metal and non-metal ductwork as shown
DATE:
on the Drawings and specified herein, including, all accessories and
OPERATIONS testing required to complete the Work acceptable to Saudi Aramco
Representative.
DATE:
21.1.2 Duct Work
CONTROL NUMBER
VERIFICATION
EDSD
A. The ductwork to be provided under this Section shall include but not limited
to the supply, return, outside fresh air ductwork and air exhaust for the
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
Ductwork and all plenums with pressure class ratings shall be constructed
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
to Seal Class A. Openings for rotating shafts shall be sealed with bushings
(DCC) NO. _____________________
or other devices that seal off air leakage. Pressure-sensitive tape shall not
be used as the primary sealant unless it has been certified to comply with
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 45 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
used in accordance with that certification. All connections shall be sealed,
ENGG CERT
KO
KO
KO
including but not limited to spin-ins, taps, other branch connections, access
doors, access panels, and duct connections to equipment. Sealing that
NM
NM
NM
would void product listings is not required. Spiral lock seams need not be
sealed. All duct pressure class ratings shall be designated in the design
documents.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
A. Provide the following materials for installation under other Sections of the
Specifications:
DESCRIPTION
10-08643-
stating that the material has been manufactured, sampled, tested, and
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
21.1.5 Submittals
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM Submit the following to Saudi Aramco Representative for approval:
NM
NM
A. Shop Drawings:
submittal.
ISSUED FOR REVIEW
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER g. Location and details of auxiliary equipment including: grills,
N. MINAMIBORI registers, diffusers, extractors, volume dampers, fire
DATE:
MAR-14-23 dampers, access doors, turning vanes, thermometer and
PROJECT
ENGINEER
pressure sensing connections, smoke detectors, test
N. ALSAHBIB
openings for pilot readings, control instruments, duct drains,
MAR-14-23
flexible connections, fume and exhaust hoods, etc.
DATE:
CERTIFIED
K. OGAWA B. Coordination Drawings:
MAR-14-23
DATE:
CONSTRUCTION
1. Sub-contractor Shall submit reflected ceiling plans, drawn to
AGENCY scale, on which the following items are shown and coordinated
with each other, based on input from installers of the items
DATE: involved:
OPERATIONS
a. Ceiling suspension assembly members.
DATE:
b. Other systems installed in same space as ducts
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
special moldings.
0F1
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 47 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Fabrication Details:
ENGG CERT
KO
KO
KO
a. Provide fabrication schedules for each duct pressure
NM
NM
NM
rating. The schedule shall at minimum show the followed
SMACNA table/section, reinforcement details, and
connection method.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
D. Calculation verification
ISSUED FOR REVIEW
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
calculations based on
• selected equipment data,
00A
0F1
NO.
REV
00
•
ENGINEER
N. MINAMIBORI sound attenuator vendor selections.
MAR-14-23
DATE:
PROJECT
ENGINEER
21.2 PRODUCTS
N. ALSAHBIB
DATE: MAR-14-23
CERTIFIED 21.2.1 Equipment
K. OGAWA
DATE:
MAR-14-23 A. Rectangular Ductwork:
CONSTRUCTION
AGENCY
1. Ductwork shall be constructed in the sizes and configuration as
shown on the Drawings. Sheet metal gauges corresponding to duct
DATE:
OPERATIONS
sizes and details of construction shall conform to the latest edition of
SMACNA, “HVAC Duct Construction Standards.”
DATE: 2. Duct Fittings: Rectangular Duct: all changes in duct size or elevation,
CONTROL NUMBER
allowed.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
B. Access Doors:
OF THIS DRAWING IS COVERED, FOR ALL
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 48 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Flexible Connections:
ENGG CERT
KO
KO
KO
Reefer to PE-300017 Section12.2
NM
NM
NM
D. Sound Attenuators:
1 gauge heavier than the main duct wall and shall be constructed at
ISSUED FOR REVIEW
a minimum of 20 gauges.
tissue or equivalent.
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
APPROVAL/CERTIFICATION REQUIREMENTS,
B. Fasteners:
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 49 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
must be made with 5mm. dia. Steel pop rivets or flat-head, tinned
ENGG CERT
KO
KO
KO
iron rivets. Rivets and fasteners used in stainless steel ductwork
shall be stainless steel.
NM
NM
NM
C. Reinforcing: Reinforcing bars and angles shall be of the same material as the
ducts or casing on which they are used.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
E. Flexible Ducting:
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
NFPA 90A
DISCIPLINE
ENGINEER
N. MINAMIBORI F. Sealants:
MAR-14-23
DATE:
PROJECT
ENGINEER
Duct joint sealer shall be fast-setting, thixotropic paste that remains flexible
N. ALSAHBIB
after drying. Product is to be Foster’s 32-14 DUCT SEALANT; United Sheet
MAR-14-23
Metal’s DUCT-SEAL, or approved equal.
DATE:
CERTIFIED
K. OGAWA G. Flexible Duct Connections to Equipment:
MAR-14-23
Refer to PE-300017 Section 12.2
DATE:
CONSTRUCTION
AGENCY H. Instrument test ports:
APPROVAL/CERTIFICATION REQUIREMENTS,
sections totaling no less than 25% of the total installed duct area for the
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 50 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ductwork.
ENGG CERT
KO
KO
KO 21.3 EXECUTION
NM
NM
NM
21.3.1 Installation
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
B. Ducts are to be independently supported from building structure only, and not
from other equipment or other equipment supports unless specifically shown
on the Drawings or approved by Saudi Aramco Representative at no
additional cost to Saudi Aramco.
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
APPROVAL/CERTIFICATION REQUIREMENTS,
C. The material provided under this Section shall be the standard product of
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
as required
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 51 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
22.1.3 Submittals
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
A. Shop Drawings: submit following to Saudi Aramco Representative for
approval:
NM
NM
NM
1. Shop drawings and manufacturer’s literature.
pressure drops.
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and explain the needed deviations. All fire damper installations
ENGG CERT
KO
KO
KO
shall comply with the manufacturer's installation instructions or
any submitted deviations and must be acceptable to Saudi
NM
NM
NM
Aramco.
22.2 PRODUCTS
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
B. The frame and the blades shall be extruded aluminum alloy and polyester
powder coated with a white finish.
00A
0F1
NO.
REV
00
DISCIPLINE
ENGINEER C. The frame shall have a typical wall thickness of 1/16” and shall be separated
N. MINAMIBORI from the movable blades by an extruded rigid PVC track.
MAR-14-23
DATE:
PROJECT
ENGINEER
D. Foam tape shall be installed on the blades where they overlap to insure a good
N. ALSAHBIB
seal and to reduce noise.
DATE: MAR-14-23
CERTIFIED E. Damper shall be provided with a counterweight in order to adjust the pressure
K. OGAWA at which the blades open. Leakage class 1 that shall conform to the Saudi
MAR-14-23 Aramco requirements.
DATE:
CONSTRUCTION
AGENCY 22.2.5 Blast Suppression Dampers
return actuator.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
D. Dampers shall be suitable for ductwork mounting and shall be sealed air tight
in the ductwork with suitable mastic. The seals on the damper blades shall
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 53 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
bushings.
ENGG CERT
KO
KO
KO
E. For Dampers located on in Battery Room or corrosive environment, shall be
NM
NM
NM
stainless steel
return actuator.
D. Dampers shall be suitable for ductwork mounting and shall be sealed airtight
in the ductwork with suitable mastic. The seals on the damper blades shall
be silicon or vinyl. Dampers shall have nylon, PVC or borze self-lubricating
bushings.
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
frame
DISCIPLINE
ENGINEER
N. MINAMIBORI D. Seals: Neoprene foam rubber material, heat resistant to 80°C
MAR-14-23
DATE:
PROJECT
ENGINEER
E. Jamb: Stainless steel, flexible metal compression type.
N. ALSAHBIB
MAR-14-23
F. Linkage: Concealed in frame
DATE:
CERTIFIED
K. OGAWA G. Controlled closing and locking of damper in 3 seconds.
MAR-14-23
DATE:
CONSTRUCTION
H. Dampers shall be UL 555S classified and labelled as a leakage class 1
AGENCY
frame.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 54 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G. Factory Sleeve: Minimum 1.0 mm (20 gauge) thickness, minimum 432 mm
ENGG CERT
KO
KO
KO
(1 inches ) long. Silicon caulk factory applied to sleeve at damper frame to
comply with leakage rating requirements.
NM
NM
NM
H. Heat actuated, quick detect, temperature release device.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
22.3 EXECUTION
ISSUED FOR REVIEW
22.3.1 Installation
DESCRIPTION
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER B. Furnish 4(four) Nos. spare fusible links for fire dampers per building.
N. MINAMIBORI
MAR-14-23
DATE:
23.0 AIR DEVICES, REGISTERS, GRILLES AND DIFFUSERS
PROJECT
ENGINEER
N. ALSAHBIB
DATE: MAR-14-23 23.1 GENERAL
CERTIFIED
K. OGAWA
MAR-14-23 23.1.1 Description
DATE:
CONSTRUCTION
AGENCY A. This Section covers air providing air devices, registers, grilles, and diffusers
as shown on the Drawings and specified herein, including accessories
DATE: required to complete the Work acceptable to Saudi Aramco Representative.
OPERATIONS
23.1.2 Submittals
DATE:
Submit the following to Saudi Aramco Representative for approval
CONTROL NUMBER
VERIFICATION
EDSD
B. Samples: One (1) sample of each type of air outlet and inlet with accessories and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 55 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
23.2 PRODUCTS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM
23.2.1 General
NM
NM
A. Diffusers, registers and grilles of sizes and types indicated on the Drawings
and specified herein, shall be manufactured by Saudi Aramco’s approved
vendor. Equipment shall be suitable for handling supply/return/exhaust air
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
B. The diffusers, grilles, and registers shall be rated to deliver its rated air
DESCRIPTION
capacity in the indicated style without exceeding the specified noise level of
35 NC. Ratings shall be certified by ADC or ADC approved laboratory.
C. Finish: Provide diffusers and grilles with factory applied baked enamel color
finish as specified on Drawings. Backside of all diffusers, registers and grilles
including visible portion of duct shall be painted flat back.
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
A. The frame and blades shall be extruded aluminium alloy and polyester
VERIFICATION
B. The frame shall have a typical wall thickness of 1/16” and shall be
DATE:
BY:
separated from the blades by an extruded rigid PVC track which becomes
an integral part of the frame.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 56 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
D. The chevron style blades shall be mounted in the PVC track and shall be
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
spaced ½” on center.
ENGG CERT
KO
KO
KO
23.2.8 Sand Trap Louvers
NM
NM
NM
Refer to PE-300017 Section 15.1
A. Inertial Filters shall be factory fabricated and assembled. Each filter shall
consist of housing, bleed air manifold, cell bodies, blade packs, bullnoses,
and inlet screen.
DESCRIPTION
C. The filter shall consist of one or more cells depending on airflow and
resistance requirements. Individual cells shall include two removable blade
packs and have a maximum center-to-center (width) dimension of 5” (127
mm) and shall be 24” (610 mm) in length.
D. Housing shall be constructed of not less than 11-gauge steel. The housing
JO/EWO
10-08643-
flanges around the periphery of both air entering and air exiting sides.
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
E. Housings shall be equipped with a bleed air manifold constructed of not less
than 11-gauge steel, all welded construction. Manifold outlets shall have a
00A
0F1
NO.
REV
00
H. Bleed slots shall be an integral part of each dust bin. The bleed slot/dust bin
EDSD
shall be constructed of not less than 16-gauge steel. The bleed slot shall
have a rounded entry configuration to minimize obstruction or plugging
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 57 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
J726, the filter efficiency shall not be less than 93% on Standardized Coarse
ENGG CERT
KO
KO
KO
Air Cleaner Test Dust at a clean airflow rate of 1000 CFM (1700 m2/h) per
single cell using a bleed rate equaling 10% of inlet flow. Inlet to clean air
NM
NM
NM
outlet resistance shall not exceed 1.2” w.g. (.30 kPa) at 1000 CFM (1700
m2/h) clean airflow.
approved equal.
ISSUED FOR REVIEW
23.3 EXECUTION
DESCRIPTION
23.3.1 Installation
10-08643-
10-08643-
10-08643-
0005
0005
0005
SEPT-27-22
MAR-14-23
24.1 GENERAL
DEC-22-22
DATE
24.1.1 Description
00A
0F1
NO.
REV
00
DISCIPLINE
ENGINEER This Section covers split system A/C units as shown on the Drawings and
N. MINAMIBORI specified herein, including controls and all accessories required to complete the
DATE:
MAR-14-23 Work for operation acceptable to Saudi Aramco Representative
PROJECT
ENGINEER
N. ALSAHBIB 24.1.2 Quality Assurance
DATE: MAR-14-23
CERTIFIED A. Reference Codes and Standards: Comply with applicable Saudi Aramco
K. OGAWA Standards, Codes and Standards.
MAR-14-23
DATE:
CONSTRUCTION
24.1.3 Submittals
AGENCY
DATE:
1. Manufacturer’s original copy of maintenance and operating
manuals.
CONTROL NUMBER
VERIFICATION
EDSD
i. Unit designations.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 58 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
finishes for unit and all components.
ENGG CERT
KO
KO
KO
v. Description of cooling/or heating operation.
NM
NM
NM
vi. Data including fan motor KW and air flow capacity at design external
static pressure and sound rating.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
x. Installation recommendations.
B. Recommended Spare Parts Lists: Recommended spare parts list for each
unit. List shall include part numbers, a description of each part, including
price of each part.
24.2 PRODUCTS
JO/EWO
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER B. Outdoor Unit: Factory-assembled, single-piece, air-cooled air conditioner
N. MINAMIBORI unit. Contained within the unit enclosure is all factory wiring, piping,
DATE:
MAR-14-23 controls, compressor, refrigerant charge (R-410a), and special features
PROJECT
ENGINEER
required prior to field start-up.
N. ALSAHBIB
MAR-14-23
C. Unit Cabinet: Unit cabinet will be constructed of galvanized steel or
DATE:
CERTIFIED aluminum, bonderized, and coated with a powder coat paint.
K. OGAWA
MAR-14-23 D. Fans: Condenser fan will be direct-drive propeller type, discharging air
DATE:
CONSTRUCTION
upward.
AGENCY E. Condenser fan motors will be totally enclosed, 1-phase type with class F
insulation and permanently lubricated bearings. Shafts will be corrosion
DATE: resistant.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 59 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
compressor oil.
ENGG CERT
KO
KO
KO
J. Indoor Unit:
NM
NM
NM
1. Wall Type: complete with wireless controller, washable filter, fan
speed adjustment, quiet operation, complete with thermostat.
2. Ducted Type: complete with wireless controller, washable filter, fan
speed adjustment, quiet operation, complete with thermostat.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR REVIEW
24.2.2 Identification
the equipment, bearing the equipment number and the area it serves.
24.3 EXECUTION
24.3.1 Installation
A. Provide galvanized metal collar frame (weather tight seal) for thru the wall
packaged air conditioners.
JO/EWO
10-08643-
10-08643-
10-08643-
B. Install the A/C units as high as possible. Pipe works shall be kept
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
Aramco.
DISCIPLINE
ENGINEER
N. MINAMIBORI D. Repair procedure shall be prepared by Sub-contractor and approved
DATE:
MAR-14-23 before proceeding the works.
PROJECT
ENGINEER
N. ALSAHBIB 25.0 VAV/CAV BOX (AIR TERMINAL UNITS)
DATE: MAR-14-23
CERTIFIED 25.1 GENERAL
K. OGAWA
MAR-14-23
DATE:
CONSTRUCTION
25.1.1 System Description
AGENCY
A. Air Terminal Units (VAV/CAV), with built-in terminal and control boxes
DATE: completely factory wired to terminals.
OPERATIONS
APPROVAL/CERTIFICATION REQUIREMENTS,
with integral electric heater and shall be the manufacturer’s latest approved
(DCC) NO. _____________________
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM 25.1.4 Submittals
NM
NM
A. Submit complete shop drawings and wiring diagrams, installation details
to Saudi Aramco Representative for approval prior to installation.
25.2 PRODUCTS
25.2.1 Equipment
JO/EWO
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
B. Technical Requirements
0F1
NO.
REV
00
damper position.
DISCIPLINE
ENGINEER 2. Minimum required straight runs for up and down streams of the
N. MINAMIBORI VAV, and its inline Electric heater shall be defined for each type
DATE:
MAR-14-23 in the material submittal for approval.
PROJECT
ENGINEER
3. All VAVs/CAVs shall be controlled by BACnet MS/TP DDC
N. ALSAHBIB
controllers.
MAR-14-23
4. For VAV/CAV Electric Duct Heater (EDH) shall not be integral
DATE:
CERTIFIED assembly of the VAV/CAV box but shall be a separate UL listed
K. OGAWA component.
MAR-14-23 5. The VAV/CAV electric duct heater shall include a dedicated
DATE:
CONSTRUCTION
mounted control panel and shall follow the electric duct heater
AGENCY specification requirements listed in section 17 of this
specifications.
DATE: 6. The VAV/CAV electric duct heater shall not include a separate
OPERATIONS thermostat, it shall be controlled by the VAV/CAV DDC controller
through the VAV/CAV thermostat.
DATE:
7. For VAVs/CAVs with electric heaters:
a. Wiring between the VAV/CAV control panel and the
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 61 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10. Each VAV shall be factory labeled with tags showing the model
ENGG CERT
KO
KO
KO
number, configured minimum and maximum flow setpoints, and
unit tag number as minimum.
NM
NM
NM
11. Wiring diagrams showing all internal and external wiring and
connection details for each unit type shall be submitted in the
material submittal for approval.
12. The below points shall be communicated from the VAV/CAV
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
a. Room Temperature
b. Room Temperature Setpoint
c. Damper Position
DESCRIPTION
10-08643-
0005
0005
0005
SEPT-27-22
MAR-14-23
25.3 EXECUTION
DEC-22-22
DATE
25.3.1 Inspection
00A
0F1
NO.
REV
00
DISCIPLINE
ENGINEER A. Sub-contractor shall inspect all products for damage immediately before
N. MINAMIBORI installation. Any products that are damaged or not in accordance with
DATE:
MAR-14-23 Specifications shall immediately be repaired or remove from the Site and be
PROJECT
ENGINEER
replaced at no additional cost to Saudi Aramco.
N. ALSAHBIB
MAR-14-23
B. Repair procedure shall be prepared by Sub-contractor and approved before
DATE:
CERTIFIED proceeding the works.
K. OGAWA
MAR-14-23 25.3.2 Installation
DATE:
CONSTRUCTION
AGENCY A. Work shall be installed as shown and according to the manufacturer’s diagrams
and recommendations.
DATE:
OPERATIONS B. Handle and install units in accordance with manufacturer's written instructions.
DATE:
C. Support units rigidly so they remain stationary at all times. Cross-bracing or
other means of stiffening shall be provided as necessary. Method of support
CONTROL NUMBER
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 62 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
26.0 PRECISION AIR CONDITIONER
ENGG CERT
KO
KO
KO 26.1 GENERAL
NM
NM
NM
26.1.1 Description
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
This Section covers precision air conditioner as shown on the Drawings and
ISSUED FOR REVIEW
specified herein, including controls and all accessories required to complete the
Work for operation acceptable to Saudi Aramco Representative
DESCRIPTION
26.1.3 Submittals
A. Manufacturer’s Literature:
JO/EWO
10-08643-
10-08643-
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
i. Unit designations.
00A
0F1
NO.
REV
00
DISCIPLINE
ENGINEER ii. Unit dimensions and weight.
N. MINAMIBORI
DATE:
MAR-14-23 iii. Complete Electrical data including wiring diagrams.
PROJECT
ENGINEER
N. ALSAHBIB
iv. Description of materials and methods of construction
MAR-14-23
including finishes for unit and all components.
DATE:
CERTIFIED
K. OGAWA v. Description of cooling/or heating operation.
MAR-14-23
DATE:
CONSTRUCTION
vi. Data including fan motor KW and air flow capacity at design
AGENCY external static pressure and sound rating.
DATE:
viii. Description of air filter
CONTROL NUMBER
VERIFICATION
x. Installation recommendations.
DATE:
BY:
C. Recommended Spare Parts Lists: Recommended spare parts list for each
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
unit. List shall include part numbers, a description of each part, including
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 63 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
26.2 PRODUCTS
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM
26.2.1 General
NM
NM
A. Direct - expansion type with remote condensing unit, capacity ratings
certified to comply with ARI standard 210.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
B. Outdoor Unit: Air-cooled condenser shall be with low profile, direct propeller
fan type.
ISSUED FOR REVIEW
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
0F1
NO.
REV
00
liquid line shutoff valve with seat connections, suction line shutoff valves
DISCIPLINE with sweat connections, system charge of R-410a refrigerant, and
ENGINEER
N. MINAMIBORI
compressor oil.
MAR-14-23
DATE:
PROJECT
Indoor Unit : Floor mounted, wireless controller, washable filter, fan speed
ENGINEER adjustment, quiet operation, complete with thermostat.
N. ALSAHBIB
DATE: MAR-14-23 Controls: with interface control with DDC to control operation and monitor
CERTIFIED status of the unit.
K. OGAWA
MAR-14-23
DATE: 26.2.2 Identification
CONSTRUCTION
AGENCY
A. Equipment Number: Provide a nameplate tally at conspicuous location on
the equipment, bearing the equipment number and the area it serves.
DATE:
OPERATIONS
26.3 EXECUTION
DATE:
CONTROL NUMBER
26.3.1 Installation
VERIFICATION
EDSD
A. Provide galvanized metal collar frame (weather tight seal) for thru the wall
packaged air conditioners.
DATE:
BY:
B. Install the A/C units as high as possible. Pipe works shall be kept
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 64 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
directed by Saudi Aramco Representative at no additional cost to Saudi
ENGG CERT
KO
KO
KO
NM Aramco.
NM
NM
D. Repair procedure shall be prepared by Sub-contractor and approved before
proceeding the works.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
27.1 GENERAL
27.1.1 Description
A. This Section covers all labors, materials, tools and equipment, design,
fabrication ,installation, complete and in place, and all control systems as
specified herein and required for a complete and operable HVAC Control
system acceptable to Saudi Aramco Representative. The Systems shall be
designed for continuous automatic electric operation with a minimum
maintenance of equipment.
JO/EWO
10-08643-
10-08643-
10-08643-
0005
0005
Control (DDC) type consisting but not limited to air duct and wall mounted
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER C. All Work performed under this Section shall be done by an independent sub-
N. MINAMIBORI contractor who specializes in the installation and servicing of automatic
DATE:
MAR-14-23 electric control systems.
PROJECT
ENGINEER
N. ALSAHBIB
1. Sub-contractor shall provide all materials, labor, conduits, wiring,
MAR-14-23
and equipment required for the control systems hereinafter specified
DATE:
CERTIFIED
and approved unless provided by others but installed under this
K. OGAWA Section of Work.
MAR-14-23
DATE:
CONSTRUCTION
2. Sub-contractor or its approved sub-contractor shall provide all
AGENCY materials, labor, equipment necessary to check, calibrate, and adjust
all components, etc. of the control system to insure that each system
DATE: functions in accordance with the requirements of these
OPERATIONS Specifications.
DATE:
3. Sub-contractor shall ensure that the manufacturer or supplier have
the capability to provide In-Kingdom repair, maintenance, spare
CONTROL NUMBER
VERIFICATION
parts and supply service for all equipment specified in this Section.
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 65 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
27.1.2 Submittals
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
NM A. General:
NM
NM
1. Sub-contractor shall submit to Saudi Aramco Representative, for
approval, list of manufacturers and equipment proposed to be
provided for the HVAC control system. Sub-contractor shall submit
a list of shop drawings, technical data, bulletins etc., with submittals
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
d. Input/Output Summaries.
0F1
NO.
REV
00
DISCIPLINE
ENGINEER f. Data of Actuators and Control Devices.
N. MINAMIBORI
DATE:
MAR-14-23 g. Data of Power Supplies and Power Conditioners.
PROJECT
ENGINEER
N. ALSAHBIB
h. Data of all instrumentation, gauges and meters.
DATE: MAR-14-23
CERTIFIED
i. Data of Field Cabinets and Panels.
K. OGAWA
MAR-14-23
j. Data of Conduit, Raceway and Wiring
DATE:
CONSTRUCTION
AGENCY k. Manufacturer’s recommended installation procedures
which, when approve by Saudi Aramco Representative, will
DATE: become the basis for inspection and acceptance or rejection
OPERATIONS of the actual installation procedures used on the Work.
DATE:
3. Shop Drawings:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
device.
0F1
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 66 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
diagrams shall be consistent throughout for all components
ENGG CERT
KO
KO
KO
and follow the standard symbols, nomenclature and
markings set forth by the latest edition of NEC & ASHRAE
NM
NM
NM
Electrical Standards. System drawings shall be full size
diagrams.
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DATE:
27.2.1 Manufacturers
CONTROL NUMBER
VERIFICATION
EDSD
1. Honeywell.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
2. Johnson Controls.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
3. Schneider Electric.
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 67 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
4. Siemens.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
B. Other manufacturers may be considered subject to Saudi Aramco
Representative is satisfaction with recent history of manufacturer’s
NM
NM
NM
engineering, installation, service, and maintenance capabilities.
27.2.2 General
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
automatic control.
10-08643-
spare parts and supply service for all equipment specified in this Section.
0005
0005
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
A. System Requirements:
DISCIPLINE
ENGINEER
N. MINAMIBORI 1. The HVAC Control System shall be standalone electronic Direct
DATE:
MAR-14-23 Digit Control (DDC). The system shall monitor and/or control all
PROJECT
ENGINEER
items related to the HVAC system as identified in the control
N. ALSAHBIB
drawings and documents.
DATE: MAR-14-23
CERTIFIED
2. The system shall be of modular design consisting of field equipment
K. OGAWA (sensors and control devices) and panel mounted controllers. Each
MAR-14-23
controller shall be of the standalone type. It is preferable to have one
DATE:
CONSTRUCTION
controller per panel unless limited by the system capacity and
AGENCY number of Input/Output points.
BMS system.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 68 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
B. Controller:
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
1. Each controller shall be microprocessor based with memory,
input/output interface, programs and power supplies. The
NM
NM
NM
controller shall perform calculations and logical operations, accept
and process system commands, and shall be programmed for
stand-alone operation. Each controller shall be able to gather
information from field sensors, provide signal conditioning,
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 69 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
b. Start or stop equipment and control equipment operation.
ENGG CERT
KO
KO
KO
c. Monitor the status of equipment being controlled.
NM
NM
NM
d. Display the set point of a control loop.
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER d. Supply air temperature reset during unoccupied periods.
N. MINAMIBORI
MAR-14-23
DATE:
PROJECT
ENGINEER
C. Control Panel Graphic Display:
N. ALSAHBIB
MAR-14-23
1. Each DDC building control panel shall be provided with a panel
DATE:
CERTIFIED
fascia mounted 15” touch display panel for system graphical
K. OGAWA display and operation.
MAR-14-23
DATE:
CONSTRUCTION
2. The touch panel shall be of 1024x768 resolution and 265,000 color
AGENCY as minimum.
to:
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 70 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
e. Display and change all control loops set points and limits.
ENGG CERT
KO
KO
KO
f. Display and change all timer setpoints.
NM
NM
NM
g. View Alarm logs and acknowledge/reset alarms
output points.
10-08643-
10-08643-
10-08643-
0005
0005
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DATE:
27.3.1 General
CONTROL NUMBER
VERIFICATION
EDSD
responsibility for proper operation of the control system including debugging and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
B. Install all components of the control system in strict accordance with the
0F1
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 71 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
C. All components of the control system shall be installed to allow ample space on
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
all sides for maintenance of components and to permit installations of wiring.
ENGG CERT
KO
KO
KO
27.3.2 Control Panel Installation
NM
NM
NM
A. Refer to manufacturing and installation Specifications, and approved shop
drawings.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
A. The control system manufacturer shall install and check all control
components for all systems.
DESCRIPTION
28.1 GENERAL
JO/EWO
10-08643-
10-08643-
10-08643-
0005
28.1.1 Description
0005
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
Systems.
EDSD
velocity readings.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 72 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
at least two weeks prior to the scheduled test. Saudi Aramco will issue its
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
non-objection to the personnel and instrumentation required, and the scope
ENGG CERT
KO
KO
KO
of the TBA program. All tests shall be conducted in the presence of Saudi
Aramco Representative unless he find it acceptable not to do so. Saudi
NM
NM
NM
Aramco Representative shall be given two (2) days notice before any test is
to be conducted.
Any material, equipment, instruments, and personnel required for the tests
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
The Testing and Balancing (TAB) work for HVAC installation shall be
accomplished by an independent organization who is:
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
DISCIPLINE
ENGINEER 1. Qualified personnel regularly employed by an Independent Testing
N. MINAMIBORI and Balancing Organization who are experienced and trained
DATE:
MAR-14-23 specifically in the total balancing of Environmental systems; and
PROJECT
ENGINEER
have certificate of qualification from an acceptable professional
N. ALSAHBIB
organization such as NEBB.
DATE: MAR-14-23
CERTIFIED
2. Qualified personnel who have satisfactory balanced at least five (5)
K. OGAWA systems of comparable type and shape.
MAR-14-23
DATE:
CONSTRUCTION
3. In the event the Sub-contractor fails to comply with the above
AGENCY provision, Saudi Aramco Representative reserves the right to
designate another professional testing agency at no additional cost
DATE: to Saudi Aramco.
OPERATIONS
E. Certification: Upon completion of the Work, the Sub-contractor shall submit
DATE:
to Saudi Aramco Representative a written certification stating that the
environmental systems have been tested, adjusted and balanced to: (a)
CONTROL NUMBER
VERIFICATION
within +10% of the values reported; (b) within plus or minus 2 deg. F db in
EDSD
the areas being served by the distribution systems; (c) the lowest sound and
vibration levels possible. Environmental systems found to be operating
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 73 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
28.1.3 Submittals
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
KO
KO
KO
A. Reports: Upon completion of the work, or prior final acceptance by Saudi
Aramco Representative, Sub-contractor shall submit to Saudi Aramco
NM
NM
NM
Representative six (6) copies of a bund report of the balancing Work
containing, but no limited to the following items:
1. Drawings: Sepias of all HVAC system drawings made from the latest
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
data clearly recorded for each system. The drawings shall be known
as the “Corrected Testing, Adjusting and Balancing Drawings”.
DESCRIPTION
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
B. Test Equipment: A complete list of all test equipment used in performing the
Work with serial numbers and verification of latest calibration data.
00A
0F1
NO.
REV
00
DATE:
28.3 EXECUTION
OPERATIONS
HVAC system.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
A. Perform all testing, adjusting and balancing work in accordance with the
practices, methods, or standards prepared by the technical societies and
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DM02S3
13-Apr-2023
J-13-Apr-2 PRINT
ED 74 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
contractor shall perform the following tasks as a minimum. It is the Sub-
ENGG CERT
KO
KO
KO
contractor responsibility to conduct all necessary tests to prove to Saudi
Aramco that the system is functional as per the requirement of these
NM
NM
NM
specifications.
B. Duct traverses are required on all main supply and return air ducts. The
initial location for the traverses shall be calculated per formulas (36) and
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
C. General Requirements:
1. Record and report dry bulb and wet bulb temperatures for the air
entering the coil and leaving the coil shall be shown for each unit.
The ambient dry bulb and wet bulb readings for the day the testing
is done shall also be reported.
2. Static pressure readings shall be taken ahead of the filter for each
JO/EWO
unit, prior to the evaporate coil and in the main supply air duct at
10-08643-
10-08643-
10-08643-
0005
MAR-14-23
DEC-22-22
DATE
0F1
NO.
REV
00
handling unit or fan coil unit main blower motor and electric heater.
DISCIPLINE
ENGINEER These readings shall be logged on a separate data sheet.
N. MINAMIBORI
DATE:
MAR-14-23 4. The RPM of each motor and blower shall be taken and logged in
PROJECT
ENGINEER
the report separately.
N. ALSAHBIB
MAR-14-23
5. The size (diameter and pitch) of the motor and blower drive
DATE:
CERTIFIED
sheaves and drive belt shall be logged onto the same data sheets
K. OGAWA the RPM and motor amperage data.
MAR-14-23
DATE:
CONSTRUCTION
28.3.3 Corrective Work
AGENCY
A. Any system changes that are required prior to the final balance, as
DATE: determined by the initial system check, will be performed by Sub-
OPERATIONS contractor responsible for providing the system. Such changes may
encompass, but not necessarily be restricted to, changing of pulleys,
DATE:
belts, dampers or addition of dampers or access doors.
CONTROL NUMBER
VERIFICATION
B. Seal all test holes with metal snap-in plugs by Brownman Products Division
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
100ºF (37.8ºC) or less, the balancing Sub-contractor shall return and take
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 75 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
D. If the air balancing portion of the test and balancing report has been
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
accepted, only the additional temperature readings are required. The
ENGG CERT
KO
KO
KO
required temperature readings shall be: a) dry bulb and wet bulb
temperatures entering the coil, and b) dry bulb and wet bulb temperatures
NM
NM
NM
leaving the coil. These readings are required for each air handling unit and
packaged unit.
A. Distortion Factors:
1. For an acceptable duct traverse the AMCA (Air Movement and Control
DESCRIPTION
Where the transverse distortion factor = The square root of the sum of
the square differences between the average velocity of each transverse
set of readings and the total average velocity of all transverse readings
JO/EWO
10-08643-
0005
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
Where the axial distortion factor = the square root of the sums of the
square differences between the average velocity of each axial set of
readings and the total average velocity of all traverse readings divided by
00A
0F1
NO.
REV
00
the number of axial readings. This is then multiplied by 100 and divided
DISCIPLINE
ENGINEER by the average velocity of all readings.
N. MINAMIBORI
DATE:
MAR-14-23 2. If either the transverse or axial distortion is greater than 10 (i.e. 10%), the
PROJECT
ENGINEER
traverse will be considered invalid.
N. ALSAHBIB
MAR-14-23
3. Contractor will be required to take a new duct traverse in another
DATE:
CERTIFIED
location, as directed by Saudi Aramco Representative, at no additional
K. OGAWA cost to Saudi Aramco where the transverse and axial distortions are less
MAR-14-23
than 10%.
DATE:
CONSTRUCTION
AGENCY
29.0 DOCUMENTATION AND SUBMITTAL REQUIREMENTS
DATE: In the course of performing the works, Sub-contractor shall submit for review the
OPERATIONS documents listed below.
APPROVAL/CERTIFICATION REQUIREMENTS,
• Details of key suppliers of main components and materials for the works
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
13-Apr-2023
M S
J-13D
-Ap r - 2 0 23
PRINT
ED 76 / 77
WHEN
LLED
NCONTRO
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Overview of Quality Commitments for the project
ENGG CERT
KO
KO
KO
2. HSE Plan including:
NM
NM
NM
• Organization structure of personnel
• Roles and responsibilities of key personnel
• Proposed processes to identify key areas of risk and establish measures
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
10-08643-
10-08643-
10-08643-
Work shall not commence until such documents defining elements of work are
0005
0005
0005
available on site.
SEPT-27-22
MAR-14-23
DEC-22-22
DATE
00A
0F1
NO.
REV
00
DISCIPLINE
ENGINEER
N. MINAMIBORI
MAR-14-23
DATE:
PROJECT
ENGINEER
N. ALSAHBIB
DATE: MAR-14-23
CERTIFIED
K. OGAWA
MAR-14-23
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Project Specifications DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
S3 13-Apr-2023
J-DApM
13-
r-202
PRINT
ED 77 / 77
WHEN
LLED
NCONTRO