Professional Documents
Culture Documents
PROJECT NO :VEC4051
01 02.03.24 MIR YMU ADD ISSUED FOR REVIEW - -
SUPPLIER:
ARABIAN INDUSTRIES MANUFACTURING LLC
GCO000CO1418
Manufacturing
MP/HP SKID 99
Petroleum Development Oman
2. GRADE ELEVATION 100.000 W.R.T PHDXX DATUM SHALL BE VERIFIED AND CONFIRMED BY TOPO SURVEY DURING DETAIL DESIGN.
STEEL STRUCTURE
1. ALL CO-ORDINATES AND ELEVATIONS ARE IN METRES AND DIMENSIONS ARE IN mm.
GENERAL NOTES, LEGEND
MASTER DRAWING REVISION
NOTES REFERENCE DRAWINGS
AND ABBREVATIONS STD 99 104071 CS 7880 00001 0002 01
IN CASE OF DEVIATIONS A MARKED UP PRINT SHALL BE SENT TO COASTAL DESIGN OFFICE
LAST SAVED BY SHAHBAZ.MIRKAR ON 02/03/2024 5:47 PM PLOTTED BY SHAHBAZ AHMED MIRKAR ON 3/2/2024 5:48 PM FILENAME: X:\NAS - VEC PROJECTS\NAS - VEC PROJECTS 2022\VEC4051 - RESIDUAL ENGINEERING OF MODULAR HOOK UP SKIDS- AIM\DRAWINGS\21-CIVIL\GENERAL DRAWINGS\HUG-99-104071-CS-7880-00001-0002-01.DWG