You are on page 1of 1

12 11 10 9 8 7 6 5 4 3 2 1

2
ENKA VEN DOR VEN DOR ENKA
CO

M6-EN-00006
00END00BR029-C1E1-200mm 11END00BR008-C1E1-25mm GENERAL NOTES :
(E-3) 11END00BR002-C1E1-100mm
AA - FOR SYMBOLS AND LEGENDS SEE DRAWING:M6J-YA-00001 THROUGH M6J-YA-00007.
TREATED CO STORAGE TANK
H 00ENB10BB003 900
11END00BR114-C1E1-40mm - WHERE REQUIRED, VENTS & DRAINS SHALL BE ARRANGED AT HIGH AND LOW POINTS OF

HOT WATER
HOT WATER
AA009
00ENB20BB003

RETURN
SUPPLY
ENKA MOE MOE ENKA SET @ 13 barg
00ENB30BB003 11END00BB001 LINES. THEY WILL BE ARRANGED ACCORDING TO "ENGINEERING DESIGN STANDARD FOR DRAIN/
SURGE

11END00BR113-C1E1-20mm
100 x 80 ACCUMULATOR
VENT CONNECTIONS". IQ360-000-3DS-P72G-00007. THEY WILL BE SHOWN ON ISOMETRIC

11END00BR017-C1E1-100mm
VOLUME:750Lt.
(V) DRAWINGS AND WILL NOT BE SHOWN ON P&IDs. SPECIAL CASES WHERE VENTS/DRAINS NEED
CG CG CG CG M6-QL-00003
H,L 001B 001A 003A 003B TO BE SEAL WELDED, DRAIN/VENT VALVES NEED TO BE REMOVED, WILL BE SPECIFICALLY
CT (G-9 , H-5)
TP XG02 ZI XG01 ZI
ENKA VEN DOR VEN DOR ENKA
XG01 ZI XG02 ZI INDICATED ON P&IDs.
001

00END00BR029-C1E1-200mm
413-1 (V) H,L

AA700
XQ01 TI CT
00END00BB003
002
- FOR INSTRUMENT AIR CONNECTION OF SKIDS PLEASE REFER TO IA DISTRIBUTION P&ID.

AA752
SURGE

AA004
XQ01 TI
ACCUMULATOR CG CG CG CG
VOLUME:750Lt. CT
001B 001A 003A 003B
- ALL DRAINS ON THE LINES SHALL BE ROUTED TO THE CLOSEST FUEL DRAIN CHANNEL AS MUCH
001
ZSC ZSO TP TP TP ZSO ZSC CT
AS APPLICABLE.
TIT

AA751
05 03 04 002
- ALL THE REQUIREMENT FOR PROVIDING THERMAL INSULATION AND TRACE HEATING SHALL BE
TIT
ENKA VEN DOR VEN DOR ENKA CO FORWARDING PUMP SKID 11ENT00AC001 CO FILTERING SKID BASED ON DOCUMENT “DQR/00/K/K-----EK26/DM/001”
150 x 100 150x100 11END00BR010-C1E1-150mm (GT UNIT-11)
TP TP TP
(SEE VENDOR DRAWING: 01 CO HEATING UNIT-11 02
M6-EN-00010 1 CO FORWARDING PUMP SKIDS WILL BE INSIDE THE CO PUMPS PIT.
2 412-1
E0872-2C2-I20-FD-001) 11END00BR004-C1E1-150mm 11END00BR005-C1E1-100mm 11END00BR009-C1E1-100mm AA003 150x100 (G-12)
(SEE VENDOR DRAWING:

00END00BR190-C1E1-100mm
AA855
LATER) 2 SURGE ACCUMULATOR, PRESSURE GAUGE AND RELIEF VALVE WILL BE IN VENDOR SCOPE.
11END00BR001-C1E1-200mm 200 x 150 TP
TP
G 411-1 1 06
AA852

AA800
TP
11END00BR006-C1E1-100mm AA002
TP 414-1
415-1

CG CG
002A 002B
ZSO ZSC
00END00BR026-C1E1-250mm

CG CG
002A 002B
11END00BR003-C1E1-25mm XG01 ZI XG02 ZI
M6-GM-00002/1

12END00BR002-C1E1-100mm ENKA VEN DOR


2
VEN DOR ENKA
12END00BR008-C1E1-25mm
(G-12)
REFERENCES :
AA DQR/00/K/K-----EK26/DM/001

HOT WATER
HOT WATER
900

RETURN
SUPPLY
ENKA MOE MOE ENKA 12END00BR114-C1E1-40mm
F 100 x 80 12END00BB001 SET @ 13 barg

12END00BR017-C1E1-100mm
SURGE

12END00BR113-C1E1-20mm
H,L
CT ACCUMULATOR CG CG CG CG M6-QL-00003
VOLUME:750Lt. (V)
001 001B 001A 003A 003B
XQ01 XG02 XG01 XG01 ZI XG02 ZI (E-9 , F-5)
TP TI ZI ZI
(V) ENKA VEN DOR VEN DOR ENKA
413-2 H,L

AA700
CT
CT 002
001 XQ01 TI
CG CG CG CG

AA754
TIT

AA004
001B 001A 003A 003B
TP TP TP

AA753
ZSC ZSO ZSO ZSC CT
05 03 04 002
TIT
CO FILTERING SKID
200 x 150
CO FORWARDING PUMP SKID 150 x 100 150x100 12ENT00AC001 12END00BR010-C1E1-150mm (GT UNIT-12)
12END00BR001-C1E1-200mm TP TP TP TP
(SEE VENDOR DRAWING: 01 CO HEATING UNIT-12 02
M6-EN-00010
411-2 412-2
12END00BR004-C1E1-150mm 12END00BR005-C1E1-100mm 12END00BR009-C1E1-100mm 150x100 (E-12)
E0872-2C2-I20-FD-001) AA003
(SEE VENDOR DRAWING:
AA852

AA855

LATER) TP
06
1
00END00BR029-C1E1-200mm

AA800 12END00BR007-C1E1-25mm
E TP 12END00BR006-C1E1-100mm AA002
TP 414-2
415-2

CG CG
002A 002B
ZSO ZSC

CG CG
002A 002B
12END00BR003-C1E1-25mm XG01 ZI XG02 ZI

M6-GM-00002/1
13END00BR002-C1E1-100mm (H-12)
2 13END00BR008-C1E1-25mm
ENKA VEN DOR VEN DOR ENKA

AA

HOT WATER
HOT WATER

RETURN
ENKA MOE MOE ENKA 900

SUPPLY
13END00BR114-C1E1-40mm
SET @ 13 barg
100 x 80
13END00BB001
13END00BR017-C1E1-100mm

13END00BR113-C1E1-20mm
SURGE CG CG CG CG M6-QL-00003
D CT
H,L ACCUMULATOR 001B 001A
(V) 003A 003B
(D-9 , E-5)
VOLUME:750Lt. XG02 ZI XG01 ZI XG01 ZI XG02 ZI
TP 001
(V) ENKA VEN DOR VEN DOR ENKA
XQ01 TI H,L

AA700
413-3 CT
002
CT XQ01 TI

AA756
CG CG CG CG
001 001B 001A 003A 003B
TP TP TP
AA004

TIT
AA755

ZSC ZSO ZSO ZSC CT


05 03 04 002
TIT
CO FILTERING SKID
200 x 150
CO FORWARDING PUMP SKID 150 x 100 150x100 13ENT00AC001 13END00BR010-C1E1-150mm (GT UNIT-13) Revision History
13END00BR001-C1E1-200mm TP TP TP TP
411-3
(SEE VENDOR DRAWING: 01 CO HEATING UNIT-13 02
M6-EN-00010
412-3
E0872-2C2-I20-FD-001) 13END00BR004-C1E1-150mm AA001
13END00BR005-C1E1-100mm 13END00BR009-C1E1-100mm AA003 150x100 (C-12)
02 10.09.2019 NY CYO AA YT ISSUED FOR USE
(SEE VENDOR DRAWING:
AA856

00END00BR190-C1E1-100mm
AA853

LATER) 01 21.06.2019 NY CYO AA YT ISSUED FOR USE


TP
00 25.12.2017 NY CYO AA HS ISSUED FOR USE
06
1 Rev. Revision Date BY CHK EGS PEM Brief Description
00END00BR029-C1E1-200mm

AA800 13END00BR007-C1E1-25mm Description Current Version


TP
13END00BR006-C1E1-100mm AA002
TP 414-3
PROJECT
C 415-3
DHI QAR COMBINED CYCLE
CG CG
002A 002B POWER PLANT PROJECT
00END00BR026-C1E1-250mm

ZSO ZSC
NASIRIYAH, IRAQ
CG CG
002A 002B OWNER
13END00BR003-C1E1-25mm XG01 ZI XG02 ZI
M6-GM-00002/1
14END00BR002-C1E1-100mm
(H-12)
2 14END00BR008-C1E1-25mm
ENKA VEN DOR VEN DOR ENKA
M
E
AA
HOT WATER
HOT WATER

ENKA MOE MOE ENKA


RETURN
SUPPLY

900
SET @ 13 barg 14END00BR114-C1E1-40mm
100 x 80 CONTRACTOR NOMINATED SUB CONTRACTOR
14END00BR017-C1E1-100mm

14END00BB001
GE POWER
14END00BR113-C1E1-20mm

SURGE CG CG CG CG
H,L M6-QL-00003
CT ACCUMULATOR 001B 001A 003A 003B
TP 001 VOLUME:750Lt. XG02 ZI XG01 ZI XG01 ZI XG02 ZI
(B-9 , C-5)
(V)
413-4 XQ01 TI ENKA VEN DOR VEN DOR ENKA
(V) H,L
AA700

B CT
002
CT XQ01 TI
001 CG CG CG CG
001B 001A 003A 003B
AA756

TIT TP TP TP
AA004

ZSC ZSO ZSO ZSC CT


AA755

05 03 04 002
MOE Contract Number :
TIT

200 x 150
CO FORWARDING PUMP SKID 150 x 100 150x100 14ENT00AC001 14END00BR010-C1E1-150mm
CO FILTERING SKID
(GT UNIT-14) CONTRACT NO: 1
14END00BR001-C1E1-200mm TP TP TP TP
(SEE VENDOR DRAWING: 01 CO HEATING UNIT-14 02
M6-EN-00010
411-4 412-4
14END00BR009-C1E1-100mm AA003 150x100 (B-12) Cross Checked
E0872-2C2-I20-FD-001) 14END00BR005-C1E1-100mm
(SEE VENDOR DRAWING:
00END00BR026-C1E1-250mm

Department Name Date Signature


AA854

AA857

LATER) TP
06
1
Replaces Responsible Dept. Document Type Project Document Code
AA800 14END00BR007-C1E1-25mm PROCESS P&ID DQR/00/K/EG-EN/FD/019
TP AA002
TP 414-4 14END00BR006-C1E1-100mm
BY CHK EGS PEM Format

SIZE A3 (420x297 mm)


415-4
NY CYO AA YT A3
CG CG
CO
002A 002B Nominated Sub Contractor Document Title Document Status Scale :
A M6-EN-00008 ZSO ZSC
PIPING & INSTRUMENT DIAGRAM ISSUED FOR USE -
M6-GM-00002/1
(G-3)
Identification Number
TREATED CO STORAGE TANK
CG CG
(F-12) CRUDE OIL SYSTEM
00ENB10BB003
00ENB20BB003 002A 002B CO FORWARDING PUMP SKID IQ360-000-M6-EN-00009
00ENB30BB003 14END00BR003-C1E1-25mm XG01 ZI XG02 ZI
M6-GM-00002/1 Rev. Date Lang. Sheet
(H-12)
02 10.09.2019 EN 1/1

You might also like