You are on page 1of 1

KEY:

MEKKAH
MEKKAH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

NOTES:
68600 1. FOR GENERAL NOTES & DETAILS REFER TO DRAWING Nos. ST002 &
ST003.
2. UNLESS OTHERWISE INDICATED, ALL DIMENSIONS ARE IN
3600 3100 6050 4800 6400 5500 5500 5500 5500 5500 5500 5500 6030 120 MILLIMETERS AND ALL LEVELS ARE IN METERS.
3. UNLESS OTHERWISE INDICATED, ALL LEVELS SHOWN ON THE PLAN
OR SECTION INDICATES THE TOP OF STRUCTURAL CONCRETE LEVEL.
4. FOR EXACT LOCATION OF OPENINGS AND SLEEVES REFER TO
ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS. ANY
DISCREPANCY MUST BE BROUGHT TO THE NOTICE OF THE ENGINEER
FOR CLARIFICATION.
5. ALL SLEEVES MUST BE FIXED IN SLABS BEFORE CASTING
CONCRETE.
6. CONCRETE SLAB LIMIT TO BE VERIFIED FROM ARCHITECTURAL
DRAWINGS PRIOR TO CONSTRUCTION.
C 7. ALL COUPLING BEAM DEPTHS TO BE VERIFIED WITH
ARCHITECTURAL/ELECTRICAL DRAWINGS AND/OR ELEVATOR
2200

MANUFACTURER PRIOR TO CONSTRUCTION.


8. FOR MEZZANINE FLOOR DETAILS REFER TO SHEET NO. ST506 TO
ST506A.
D 9. CONSTRUCTION LOADS DO NOT EXCEED DESIGN LOAD.
10. TOP REINFORCEMENT SHALL BE SPLICED AT MIDSPAN AND
2000

BOTTOM REINFORCEMENT SHALL BE SPLICED AT SUPPORT IF


NECCESSARY.
11. FOR STAIRCASE DETAILS REFER TO ST560 TO ST562.
E 12. UNLESS INDICATED, MESH REINFORCEMENT SHALL BE PLACED

MATCH LINE FOR CONTINUTY REFER DWG: ST115b


TO HAVE THE SAME DIRECTION OF ADDITIONAL REINFORCEMENT AS
1950

SHOWN IN BOTH DIRECTIONS.


13. LENGTH OF REBARS SHOWN ON THE PLAN IS EXCLUDING THE
HOOK LENGTH.
F 14. ALL DISCONTINUOS ENDS OF TOP AND BOTTOM
REINFORCEMENT SHALL BE PROVIDED BY 900 STANDARD HOOKS.

1700

1200
15. ALL COUPLING BEAM DEPTHS TO BE VERIFIED WITH
3000

2350
10T12@200 ARCHITECTURAL/ELECTRICAL DRAWINGS. AND/OR ELEVATOR

30T32@200
15T25@200 L= 2500 MANUFACTURE PRIOR TO CONSTRUCTION.
3000

L= 4000

15T16@200
L= 6500 16. STEEL BARS WITH LENGTH MORE THAN 12M ARE SHOWN ON
PLAN AS A ONE SINGLE STRAIGHT LINE FOR CLARITY PURPOSE ONLY.

L= 3000
THE CONTRACTOR SHALL PROVIDE FULL TENSION DEVELOPED
6350

15T12@200

STAGGERED SPLICE OR MECHANICAL COUPLERS AS NECESSARY AND


L= 4000

APPROVED BY ENGINEER. ALL SPLICES AND/OR MECHANICAL


COUPLERS SHALL SATISFY THE REQUIREMENTS OF ACI318-14. IN THE

T12@200
CASE OF THE NECESSITY TO ONLY HAVING MECHANICAL COUPLERS

L= 6500
TO AVOID STEEL BARS CONGESTION, SO THIS SHALL BE TOTALLY ON
T12@200 CONTRACTOR EXPENSIVE AS HE SHOULD BID ACCORDINGLY
L= 6500
15T12@200 WITHOUT ANY FURTHER CLAIM TO THE CLIENT OR ANY OTHER
5500 L= 2500 PARTIES.
17. IN CASE OF INVERTED BEAMS AT LAST FLOOR,THE TOP LEVEL OF
G THE COLUMNS SHOULD MATCH THE TOP LEVEL OF THE BEAM.

20T20@200
L= 2500 35T25@200
35T20@200 LEGENDS:
L= 4000
3500 L= 5500
6400

4200

T20@200
T25@200

L= 7000
L= 7000

20T25@200
L= 2500

9750

H
DD1
3300

PS - 1
20T25@200

15T12@200
L= 6000

L= 2500
J 25T20@200
L= 4000
1600

2550 1550

+3.925
T12@200
4600

S.C.L.
L= 5500

T16@200
L= 3000 MESH REINF.
2900

T16@200 T&B
BOTH DIRECTIONS
T16@200
L= 2000 PS - 2

K
40T32@200

T12@200
55000

L= 6000
35T25@200

L= 6000
1900

PS - 1
L= 4000

25T20@200 40T25@200
L= 4000
5800

T16@200 4800 L= 6500


L= 3000
30T20@200

15T16@200
T12@200
L= 4500

L= 8000

L= 2500
L
30T25@200
L= 5000
2400

T12@200 T12@200
L= 4000 5000 L= 4000
4600

DD1
T25@200
L= 3000

20T16@200
2300

L= 6000
10T16@200
L= 4000

PS - 3
M
DD2
+3.925
S.C.L.
5400

MESH REINF.
T16@200 T&B
BOTH DIRECTIONS

T12@200
L= 4500
5800

DETAILED DESIGN
120 mm
EXPANSION JOINT SUBMISSION
JULY 2021
P

DD2 FLOOR PLAN CHANGES FOR PART-B MM 08/04/22


4200

DD1 REVISED AS CLOUDED MM 15/11/21


DD0 DETAILED DESIGN SUBMISSION MM 08/07/21
Q No. REVISION APP'D DATE

CLIENT

R
2400

S
CONSULTANT

PROJECT TITLE

KALBA VEGETABLES, MEAT & FISH


MARKET
LOCATION AL BAHAIS AT KALBA, SHARJAH,UAE PLOT No. 94
DRAWING TITLE

MEZZANINE FLOOR REINFORCEMENT

FILE NAME: NE1919_KA_XX_M3_XX_ST_MAIN_19


PLAN - PART A
DESIGNED M.M.S PROJECT No.
VERIFIED M.S. NE1919
APPROVED M.M.K SHEET SIZE A0
DATE JULY 2021 SCALE 1:100
DETAILED DESIGN SUBMISSION
PROJECT ZONE BLDG. STAGE SERIAL NUMBER REVISION

NE1919 00 BA DD ST116a 01

You might also like