Professional Documents
Culture Documents
NOTES
1. ALL DIMENSIONS ARE IN mm & LEVELS ARE IN m.
2.DIMENSION MENTIONED IN THE DRAWINGS SHALL ONLY BE USED.(ONLY
WRITTEN DIMENSIONS SHALL BE FOLLOWED). DO NOT SCALE DRAWINGS.
3.CLEARANCE FOR THE BOLT HOLES SHALL CONFIRM TO IS800-2007
BOLT HOLE SIZE SHALL BE 2mm LARGER THAN THE BOLT DIAMETER UPTO
24mm AND 3mm LARGER THAN THE BOLT DIAMETER FOR GREATER
THAN 24mm.
A 4.ALL PRIMARY BOLTS SHALL BE OF GRADE 8.8 ELECTRO GALVANIZ.ED A
5.ALL SECONDARY BOLTS SHALL BE OF GRADE 4.6 ELECTRO GALVANIZED.
6.FOR WELD DETAILS REFER DRAWING O20350-C-FB-01-GA-0124
7.PAINTING SPECIFICATION: SHALL BE FOLLOWED AS PER
DOCUMENT NO.O20350-C-FB-00-DB-0001
LEGEND
TYP. - TYPICAL
WTS - WIRE TO SHIP
DET. - DETAIL
2x wh_03-p-9 A
wh_03-p-8 MINIMUM WELD SIZE UNO IN THIS DWG.
EL19.604
wh_03-p-19 B
(T.O.S)
wh_03-p-19 720
wh_03-p-8 BS wh_03-p-8 THICKNESS OF THICKER MINIMUM SIZES
wh_03-p-8 wh_03-p-8 wh_03-p-25 wh_03-p-19 wh_03-p-8 wh_03-p-25
wh_03-p-8 wh_03-p-5 PLATE (SINGLE PASS)
E E wh_03-p-9 2x wh_03-p-9 FS
B wh_03-p-9 wh_03-p-9 wh_03-p-9
B
20
50 100 420 100 50
wh_03-p-29 UP TO 6 MM 3 MM
TYP wh_03-p-29
100
100
46
100
100
100
100
wh_03-p-8
wh_03-p-8 6 TO 12 MM 5 MM
50
wh_03-p-25 12 TO 20 MM 6 MM
3*100=300
wh_03-p-8
400
97
50
REFERENCE DRAWINGS
wh_03-p-8 wh_03-p-8
wh_03-p-8 96 260 268 96 16 - Ø 26 HOLES
FOR M 24 BOLTS
C wh_03-p-19
2x wh_03-p-9 FS wh_03-p-25
C
wh_03-p-29
SECTION E - E
wh_03-p-29
wh_03-p-5 SCALE 1:10
2 O20350-C-FB-02-GA-0101 TO 0108 R1
1 O20350-C-FB-02-GA-0109 TO 0123 R0
wh_03-p-29 SL NO DRAWING NUMBER REV NO INT / EXT
wh_03-p-29
11754 (PL6*500 x 11714)
170
170
REVISIONS
wh_03-p-5
340
D D
6
11714
D D
170
170
wh_03-p-29
14 500 14
0 ISSUED FOR FABRICATION 03.09.2021
wh_03-p-29
CLIENT
SECTION D - D LARSEN AND TOUBRO,LIMITED, CONSTRUCTION,
SCALE 1:10 BUILDINGS AND FACTORIES
wh_03-p-5
CONCEPT ARCHITECT
wh_03-p-5
55
wh_03-p-21 BS 232 232
65 65 wh_03-p-26 BS wh_03-p-21
119
wh_03-p-27 TYP wh_03-p-27 2x wh_03-p-26 NS
wh_03-p-27
120
wh_03-p-5
120
230
230
(B.O.BP)
75 75
wh_03-p-29
230
230
230
230
EL7.850
470
120
F F
120
C C DRAWING TITLE
120
wh_03-p-21 wh_03-p-27
20
111
wh_03-p-20 wh_03-p-21 wh_03-p-26 BS wh_03-p-20 wh_03-p-27 BS
wh_03-p-20 wh_03-p-26
wh_03-p-27 BS A
SECTION A - A
55
B
2x wh_03-p-26 NS
SCALE 1:10 SECTION B - B wh_03-p-20 136 154 212 162 136
G. A ASSEMBLY SUB ASSLY ELEMENTS
MATERIAL LIST FOR ASSEMBLY MK'D WH_03-JC-101 18 No. Required FILE NAME: S-21- WH_03-JC-101
Weight DRAWING NUMBER:
Mark Profile Material Qty Length Area (Kg) REV
wh_03-p-5 PL6*500 E350BR 1 11714 11.86 275.85 S-21-WH_03-JC-101
0
wh_03-p-8 PL6*96 E350BR 6 100 0.02 2.71
These drawings are under copyright and are the property of Steel Infra Solutions Pvt.Ltd
wh_03-p-9 PL6*30 E350BR 4 100 0.01 0.57 None of the drawings and related documents can be reproduced, copied in whole or in
wh_03-p-19 PL20*400 E350BR 1 720 0.62 45.22 part whithout prior expressed written consent of Steel Infra Solutions Pvt. Ltd.
These drawings cannot be handed over to a third party or used for any purpose, other
wh_03-p-20 PL20*470 E350BR 1 800 0.80 59.03 than that for which it has been loaned.
wh_03-p-21 PL8*230 E350BR 4 232 0.10 13.40
H STEEL INFRA SOLUTIONS PVT. LTD.
‘ CITY CENTRE ’ 79/2,
6TH FLOOR,
H
wh_03-p-25 PL8*100 E350BR 2 197 0.04 2.47 HENNUR BELLARY OUTER RING ROAD,
wh_03-p-26 PL8*136 E350BR 6 230 0.06 11.79 HEBBAL, BANGALORE 560024.
18 - JACK COLUMNS - REQ'D. AS DRAWN MK'D.WH_03-JC-101 wh_03-p-27 PL8*65 E350BR 4 230 0.03 3.76
WWW.SISCOL.IN
1 2 3 4 5 6 7 10 11 12 13 14 15 16