Professional Documents
Culture Documents
R 1-THS-8BV-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- VB8 - NO. 1 BILL OF MATERIALS ASSEMBLY MK'D : VB8 ASSY QTY : 1
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
VB8 A-./2 EL. +29.476 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
MARK ASSEMBLY METER QTY. WEIGHT M
M15 1 SHS150.0X150.0X5.022.26 5582.85 127.09 1 127.09 0.00 YST310
F F
P32 2 PL10*150 78.50 155.00 1.83 2 3.65 0.11 E250BR
P33 2 PL10*180 78.50 180.00 2.54 2 5.09 0.14 E250BR
P34 4 PL8*150 62.80 155.00 1.05 4 4.21 0.09 E250BR
TOTAL 140.03 0.34
P32
P33 VB8 P33
75
75
M15
75
75
P34 BS P32
P34
E E
5913
P34 60 65 P33
CTR'D P33 P32 P34
CTR'D
TYP
VB8 6
15
45
44
M15
P32
60
60
TYP
15
P34 P34
6 6 65 60
6
D D
155
55 60 40 5583
180 50 50 50
P32
4 - 22 Ø HOLES
45
M15
155
180
P34
P33
150
60
25
25
150
45
C C
REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.
EMPLOYER
NTPC Limited
(A Government of India Enterprise)
B B
PROJECT
ANDRITZ AG
GRAZ - AUSTRIA
DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
V_BRACE - VB8
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:
NTPC
---
Tekla Structures
PRELIMINARY
---
RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER
FOR
ONE NO. V_BRACE REQD. AS DRAWN MKD. VB8 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-VB8-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1