Professional Documents
Culture Documents
N
and setout.
1 2 3 2 4
S6-03 S6-03 S6-04 S5-02 S6-04
B3 # B3 # B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B3 # B3 #
A 5329
5346
5332 5336 5341 5343 Typ. 5348
5330 5331 5335 5338 5339 5345 5347
5334 5337 5342 5344
B7 #
CF80
5 CF80
1
B7 #
S6-05
S5-02
B2
B 5328
B2
B3 #
B3 #
B3 #
B3 #
B3
B3
CF80
Typ. U.N.O.
B7 #
B3
B3
B4 #
Level 3A
B7 #
B4
B4 #
B4
B4 #
B4
B4
B4 #
B4
B4 #
B4
B4 #
B4 #
B3 # 5321 5301 S5-01 5372 B3 #
B2 5364
C to 5316 to 5349
5373
5327 to 8 5379
#
B5 #
B11 #
A 14/06/13 CONSTRUCTION
B11 #
B5 #
B2 B2 Ramp 9 24/04/13 Peer Review
5300 5401 7 8 5391 5389 5384 5381 CF80 8 19/04/13 Peer Review
Refer S5-11 7 19/03/13 BUILDING CONSENT
B11 #
4 5403 5402 5400 5399 5398 S6-06
5397 5396 S6-06
5395 5394 5393 5392 5387 5386 5385 5383 5382 7 5380 5264
BEAMS VARY ALONG GRID D5388 6 07/03/13 Progress Issue
5390 DEPENDING ON BRB LOCATIONS
S5-01 S5-01
B11 #
Seismic gap Seismic gap 5350 5 20/02/13 Progress Issue
B11 #
CF80 5404 Refer Grid Elevation - S2-10 CF80
5360 4 29/01/13 Progress Issue
D 1 5351 3 23/11/12 Progress Issue
5263 5363
S2-10 5352 2 16/11/12 Preliminary
#
S5-01
5267 B2
B2 5289 5287 5283 5281 B2
5268 5262
2 15290 CF80
#
B5 #
B2#
CF80 S5-01 S5-01 THE COPYRIGHT OF THIS DRAWING
B11 #
B11 #
B2#
B11 #
B5 #
5257 5255
AND THE DESIGNS SHOWN ON IT
E B2# B2 # 5258 5256
2 REMAIN WITH STRUCTURE DESIGN LTD
S2-10 3 5259 # 5355
B3 #
S5-01 CF80 5260B3 5354
5312 5302 5291 1 5356
Typ. U.N.O. 5261 5353
5313 to to S5-02 5357
Typ.
B3
B7#
ARCHITECT:
B3
B4 #
B4 #
B4
B4 #
B4
B4 #
B4
B4 #
B4
B4 #
B4
B4 #
to
B3#
5314 B2 B2
F 5299 5254
5315
Level 3B
B3
B3
B3 #
B3 #
B3 #
B7#
B3 #
B7 #
3
S5-02 ENGINEER:
Typ.
G
B3 # B3 # B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B3 # B3 # TELEPHONE 09 302 0205
FACSIMILE 09 302 2073
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
5240 5242
5235 5236 5238 5239 5244 5249 5251 5252 5253 prb@structuredesign.co.nz
5231 5241 5243 5246 SUITE 2.4 8A CLEVELAND ROAD
to 5237 CANOPY STEEL @ LEVEL 1 ONLY 3 5245 5247 5250 PARNELL, AUCKLAND