You are on page 1of 1

NOTES:

1. These drawings are to be read in conjunction with all


relevant Architects and Engineers drawings and
Specifications.
1 2 3 4 5 6 7 8 9 10 11 12 13
2. The structural plans shall be treated as general
arrangements, refer to Architects drawings for levels

N
and setout.

3. Refer to engineer for any dimensions not given or


obtainable from the structural details. Do not scale
from drawings.
1 1 2
S2-11 S2-11 1
S2-12
S2-13

1 2 3 2 4
S6-03 S6-03 S6-04 S5-02 S6-04

B3 # B3 # B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B3 # B3 #
A 5329
5346
5332 5336 5341 5343 Typ. 5348
5330 5331 5335 5338 5339 5345 5347
5334 5337 5342 5344

B7 #
CF80
5 CF80
1
B7 #
S6-05
S5-02
B2
B 5328
B2

B3 #
B3 #
B3 #
B3 #

B3

B3
CF80
Typ. U.N.O.

B7 #
B3
B3

B4 #
Level 3A
B7 #

B4
B4 #
B4
B4 #
B4
B4
B4 #
B4
B4 #
B4
B4 #

B4 #
B3 # 5321 5301 S5-01 5372 B3 #
B2 5364
C to 5316 to 5349
5373
5327 to 8 5379
#

CF80 5328 S5-01

B5 #

B11 #
A 14/06/13 CONSTRUCTION
B11 #

B5 #
B2 B2 Ramp 9 24/04/13 Peer Review
5300 5401 7 8 5391 5389 5384 5381 CF80 8 19/04/13 Peer Review
Refer S5-11 7 19/03/13 BUILDING CONSENT

B11 #
4 5403 5402 5400 5399 5398 S6-06
5397 5396 S6-06
5395 5394 5393 5392 5387 5386 5385 5383 5382 7 5380 5264
BEAMS VARY ALONG GRID D5388 6 07/03/13 Progress Issue
5390 DEPENDING ON BRB LOCATIONS
S5-01 S5-01

B11 #
Seismic gap Seismic gap 5350 5 20/02/13 Progress Issue

B11 #
CF80 5404 Refer Grid Elevation - S2-10 CF80
5360 4 29/01/13 Progress Issue
D 1 5351 3 23/11/12 Progress Issue
5263 5363
S2-10 5352 2 16/11/12 Preliminary
#

6 5266 1 26/10/12 Preliminary


B11 #

S5-01 5288 5286


5 5285 5284 5282 2580 2579 5278 5277 5276 5275 5274 5273 5271 5270 5269 REV DATE BY REASON

S5-01
5267 B2
B2 5289 5287 5283 5281 B2
5268 5262
2 15290 CF80

#
B5 #

B2#
CF80 S5-01 S5-01 THE COPYRIGHT OF THIS DRAWING
B11 #
B11 #

B2#

B11 #
B5 #
5257 5255
AND THE DESIGNS SHOWN ON IT
E B2# B2 # 5258 5256
2 REMAIN WITH STRUCTURE DESIGN LTD
S2-10 3 5259 # 5355
B3 #
S5-01 CF80 5260B3 5354
5312 5302 5291 1 5356
Typ. U.N.O. 5261 5353
5313 to to S5-02 5357
Typ.

B3

B7#
ARCHITECT:
B3

5311 5296 5359


CF80 5297 CF80
B7 #

B4 #
B4 #
B4
B4 #
B4
B4 #
B4
B4 #
B4
B4 #
B4
B4 #

to

B3#
5314 B2 B2
F 5299 5254
5315
Level 3B

B3
B3

B3 #
B3 #
B3 #

B7#
B3 #
B7 #

3
S5-02 ENGINEER:
Typ.

G
B3 # B3 # B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B5 B3 # B3 # TELEPHONE 09 302 0205
FACSIMILE 09 302 2073

B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10
B10

5240 5242
5235 5236 5238 5239 5244 5249 5251 5252 5253 prb@structuredesign.co.nz
5231 5241 5243 5246 SUITE 2.4 8A CLEVELAND ROAD
to 5237 CANOPY STEEL @ LEVEL 1 ONLY 3 5245 5247 5250 PARNELL, AUCKLAND

5234 S6-02 5248


PROJECT TITLE:

NOTES: HAZELDEAN CARPARK


SHEAR STUDS General comments. CHRISTCHURCH
Typically, all steel beams supporting the concrete floor shall have 2-19mm dia. studs NB - No access to the exterior side of the steel frame could be made North elevation general paint failures at column / beam junctions..
(125mm long) at 300mm cts, U.N.O. in details. FRAMING SCHEDULE FLOORING:
due to mesh fences being
STEELinstalled to the perimeter Column / beam connections on the ramps show significant failures in
PRECAMBERED STEEL BEAMS Mark Description
No beams are to be precambered unless on steel framing schedule. paintCF80coatings generally.
B1 380PFC55.2 = 150 thick 0.9mm Comflor 80 SHEET TITLE:
Precambered beams shall, as a minimum, have 0.7 of the precamber at 1/4 points, and L3A & 3B
full precamber at the midpoint. South elevation SE92 Grade 500E Mesh
general paint failures
B2 250UB25.7
HD10 in each trough U.N.O.
FLOOR STARTERS & SADDLE BARS
B3 530UB82.0 w 15mm Precamber East elevation general
Refer S1-14 failures
- Slab Diaphragm Plan for addtional column beam junctions & some
atreinforcing TYPICAL
carpark PLAN
FLOORsteel &
Refer S1-14 for typical slab reinforcement. B4 600WB203 w 30mm Precamber - Refer det. 1/S6-02 sections part way along beams.
B5 250UC72.9 COMFLOR
West DESIGN LOADING:
elevation general paint failures at beam / column connections.
BRB BRACING perimeter
B6 310UC118.0 Super-Imposed Dead Load SDL = 0.5kPa
BRB Bracing location varies floor to floor.
Live Load Q
Central building
= 2.5kPa or 13KNGrid D general rust to steel from failed galvanised
Refer Elevations and sections. B7 310UC137.0
B8 150x9.0SHS edge plate
COMFLOR above steel in places, rust spots and some paint failures
DURABILITY
columns
FIRE PROTECTION DRAWN BY: TP SCALE: As indicated
COMFLOR shall provide Structure Design Ltd corrosion protection
Fire Rated Beams are identified (B?#) on S1-04 - Typical Plan B9 150PFC17.7 around bolt connections for the mesh fence supports. General rust on
and maintenance requirements to achieve 50 year life assessed in
Fire Rated Columns are identified (C?#) on S1-03 - Ground Floor Plan
B10 200UB18.2 theaccordance
beams NZS 2312, for approval.
with General paint failures on the beam flanges APPROVED: JJH FILENAME:
30min. FRR Typically
Except 60min. FRR to First Floor Beams over fire egress routes & storage areas. B11 310UC158.0
B12 150x6.0SHS JOB No: SHEET No: REV:
WEB PENTRATIONS
125 dia. electrical web penetrations typically at third points along length of beam. B13 150x5.0SHS
Refer detail 2/S6-02
N Construction 1337 S1-04 A

C:\Users\tracy\Documents\1337 - Model Central_tracey p.rvt

You might also like