You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

GENERAL NOTES

C-315-01 1. FOR GENERAL NOTE, SYMBOLS, AND PIPING DETAIL


E-315-03 FUEL GAS KO DRUM
SEE P&ID NUMBERS 26071-100-M6-000-00001 THROUGH 26071-100-M6-000-00065.
FUEL GAS SUPERHEATER 000
A SIZE, ID x HEIGHT (mm) 2500 x 3300 A
M6-315-00006
TEMA TYPE NEN DESIGN PRESSURE (kg/cm²g) 9.00
VF
DESIGN DUTY (MMkcal/hr) 1.359 DESIGN TEMPERATURE (°C) 148 / 0.5 000
22966
AREA (m2) 23.63 INSULATION / TRACING N/A
SHELL TUBE MOC C.S NOTES

315-VF-023-3/4"-1CB1S01-NI
DESIGN PRESSURE (kg/cm2g) 9.00 / FV 9.00 / FV TRIM 1CB1S01
DESIGN TEMPERATURE ( C) 230 / 30.5 230 / 0.5
3 315
FIC 1. DELETED.
SHELL / CHANNEL INSULATION / TRACING HC -80 HC-80 0050 000 000000
L
NOTE 11 000 2. SPLIT RANGE CONTROL FOR 315-PV-0037A AND 315-PV-0037B.
000 000
H
315-PICH-0037

000 H OPEN
315-TICH-0039

315 315
B TIC PIC 100% 000 000 B
315
0039 0037 PV
L L
+

0037B 000 PV-0037A PV-0037B


000 000
3/4"

VALVE
315-FG-007-8"-1CB1S01-PS-40 8" 16"x8" 000 16" 16"
500 m
FUEL GAS
SLOP
E 1m 315-VF-003-16"-1CB1S01-NI
315 14938 M6-315-00006
000 FI 8"
315 TO FLARE
TT 0038 000 FO
0039 TYP 4 PIC
TYPE A CLOSED OP(%)
0% 49% 51% 100%
315 315 315 RTD 000 DEAD BAND
AI AT AE 315 315 315 315 315 8" 000
0001 0001 0001 TW TE PT FE FT 000
C 3. DELETED. C
+

NOTE 13 0039 0039 0037 0038 0038 PS-40 NI


4. LOCAL INDICATOR LOCATED NEAR GLOBE VALVE DOWNSTREAM
20" FUEL GAS OF KO DRUM C-315-01.
315-FG-009-20"-1CB1S01-PS-40
14944 M6-315-00006 5. STEAMING OUT IS AIMED TO REMOVE
TO FUEL GAS HEADER TOXIC HYDROCARBON TRAPPED IN THE VESSEL DURING MAINTENANCE OR
315 000 INSPECTIONS.
AP
0001 6. STEAMING OUT DETAIL CONFIGURATION REFER TO P&ID SYMBOL AND LEGEND
(DOC. NO. 26071-100-M6-000-00031).

315 315 315 315 7. NORMALLY NO LIQUID. JUST IN CASE LIQUID IS PRESENT, THE LIQUID IS
TG PG FV +

000 FT NORMALLY DRAINED USING 2" CSC TO THE FUEL GAS OILY WATER SUMP
0050 000
D 000 0051 0052 0050 (Z-315-02). AFTER THAT, TO FLASH FLUID CAN BE ROUTED TO THE FLARE LINE D
IF NECESSSARY.
000
V 3/4" V 3/4" 8. THE CONTROL VALVE NOT TO BE CLOSED DURING GENERAL POWER FAILURE
6" 6" LLP STEAM
M6-315-00014 315-LLS-004-6"-1CB2S07-HC-65 (GPF) TO SUPPLY CONTINUOUS FUEL GAS PURGE ON FLARE HEADER SINCE
M6-315-00006 14934
MS 6" FROM HEADER DURING GPF, CONTINUOUS OFF GAS TO UNIT 315 MAY BE NOT SUPPLIED.
39739 FC 9. FOR SAMPLE STATION DETAILS SEE P&ID NO. 26071-100-M6-000-00021-01
V 2" TYP 4 315
000 000 TO 26071-100-M6-000-00021-06.
6" TYPE A FE +

3/4" HC80 6" 0050 10. SHALL BE LOCATED AT LOWEST POINT.


315-MS-004-2"-3CB2S07-HC-80

6" 2"
V CONTROL VALVE FAILURE 11. THE INSULATION WILL BE APPLIED ON TUBE CHANNEL.
315 315 20" N3 V1 315 SET @ 9.00 kg/cm^2g
N2 N1
TI TT
RS N5
E-315-03 N4 RS
AOV
0002
+

315 SIZE 8T10


12. 315-PY-0037 IS HIGH SELECTOR BETWEEN PRESSURE TRANSMITTER ON
KO-DRUM (315-PT-0043) AND FUEL GAS HEADER (315-PT-0037). THE HIGHEST
315-FG-008-20"-1CB1S01-PS-40

E 0038 0038 24"x20" 24" 24" PSV


+

000 E
LO 0068A V 3/4" 500 m VALUE WILL BE USED FOR CONTROLLING PRESSURE VALVE (315-PV-0037A
2" M 16" 000 SLOP 1m
315-VF-004-16"-1CB1S01-NI TO FLARE AND 315-PV-0037B).
000 3" TYP 9 24" E

000 14941 M6-315-00006


3"x2" 315 000 16"x10" LO 13. ANALYZER FOR H2S.
315 315 RTD 315-D-122-2"-1CB1S01-NI D TI FP
PSV RELIEF
TW TE 315 16"x8"
PG 3/4" 0041 000
0038 0038 CONTROL VALVE FAILURE

315-FG-005-24"-1CB1S01-NI
000 STT 0053 V
2" 2" SET @ 9.00 kg/cm^2g
315-HOC-002-3"-3CB2S07-PP-40 004
000 3/4" 315 SIZE 8T10 315-VF-010-16"-1CB1S01-NI
315-SP
000 315 000
HOT CONDENSATE TT LO PSV
000 16"
+

315-LLC-008-2"-1CB2S07-PP-40 315-LLC-010-2"-1CB2S07-PP-40 FP 0068B V 3/4" 500 m 000


M6-315-00006 39740 PT
ST ST 0041 16"

315-FG-015-4"-1CB1S01-NI
SLOP
E 1m
TO HOT CONDENSATE HEADER 4"x2" 4"x2" FREE DRAINING
F 000 RTD 16"x10" LO F

315-FG-006-16"-1CB1S01-NI
PPT
315 315 FP
002 15355 000 16"x8"

FREE DRAINING
315-SP 315 TE TW 000
PS-40 NI OWS PG 0041 0041 V
V 3/4" 0040
M6-315-00010
000 3/4"
20" 20" 16" LC
FP
000
000 315 HOLDS
36746
315 AOV
+

315-FG-012-16"-1CB1S01-NI
CWR 0001 1. DELETED.
PY FREE DRAINING
0037 M6-315-00011 ON GROUND 2. DELETED. 000
NOTE 2, 12 TYP 9 LO M
SC NOTE 9 24" 3. DELETED.
36748 2" 4"x2" 4"
G 001 315-FG-014-2"-1CB1S01-NI 4. DELETED. G
VFL G TO SAFE LOCATION 26"x24" NNF FREE DRAINING
M6-315-00006 LC 5. DELETED.
HYDROGEN RICH FUEL GAS 3" 6. DELETED.
315-FG-018-12"-1CB2B80-PP-40 000 NNF 12"
17713 M6-315-00006 N2
FROM DHT H2 V1 26"
1CB2B80 1CB1S01 3"
COMPRESSOR #085

315 315 315 315 9290 36747


PI TI FY FI OWS CWS
N3 000
0062 0062 0062 0062A M6-315-00009 M6-315-00011
H C-315-01 16" 000 H REFERENCE DRAWINGS H
315 315 315 315 000
P1 PT PIC PY PDI 26070-203-M6-315-J0006, REV.B02 P&ID FUEL GAS KO DRUM
315 315 315 2" 0043 0043 0043 0043
L
315-PICL-0043

TT FI FQI
0062 0062 0062
HHLL= 675 mm L1A
RTD HLL= 525 mm 000 05 Feb 21 ISSUED FOR CONSTRUCTION MMD/RNS/NN/THH HH/IP/J.H KIM C.J LEE/Y.D KIM
2"
315 315 315 315 315 LLL= 325 mm MAG D/P
PT TE TW FE FT 315-FG-011-20"-1CB1S01-NI 315 H 00D 03 Jun 20 ISSUED FOR DESIGN MMD/RNS/NN/THH HH/IP/J.H KIM C.J LEE/Y.D KIM
+

LLLL= 225 mm 315 315


0062 0062 0062 0062 0062 TO SAFE LOCATION LG LT LI 00C 03 Jan 20 ISSUED FOR HAZOP MMD/RNS/THH HH/IP/J.H KIM C.J LEE/K.H YANG
0044 0045 0045 L
315-LIL-0045

00B 18 Oct 19 RE-ISSUED FOR REVIEW MMD/RNS/THH HH/IP/J.H KIM C.J LEE/Y.D KIM
V 3/4"
FUEL GAS TWO PHASE 16" 20"x16" 20" 26"x20" TYPE C
315-FG-011-16"-1CB1S01-NI N1 00A 13 Aug 19 ISSUED FOR REVIEW MMD/RNS/THH HH/IP/J.H KIM Y.D KIM
14947 M6-315-00006 L1B
I FREE DRAINING 26" 2" 315 REV DATE DESCRIPTION DRAWN CHK'D APP'D I
FROM RFCC UNIT #052, LO
NOTE 5 000 LI
PRU #063 M6-315-00006 M6-315-00006 THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
MH1 STEAM OUT 0045L 000 DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
AND ISOM. UNIT #082 VF VF 000 24" (UTILITY CONNECTION) OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
N5 NOTE 4
27883 22965 D 3/4" 3" FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
000 RS BY PT PERTAMINA (PERSERO).
NOTE 6
2"
315 315 315 315 N4 PROJECT :
PI TI FY FI CT D 3/4" 3/4" 000
0042 0042 0042 0042A
CTT
001
RDMP RU V BALIKPAPAN
315-VF-024-3/4"-1CB1S01-NI

315-VF-022-3/4"-1CB1S01-NI

315-SP 2"
D 3/4" 000
CONTRACTOR :
315 315 315 315-LLS-020-3"-1CB2S07-HC-50
315-D-119-2"-1CB1S01-NI

31576
FI FQI
J TT
0042 0042 0042 LLS RDMP BALIKPAPAN JO J

M6-315-00014
000 RTD
315-D-127-3/4"-1CB1S01-NI

IN VIEW
315 315 315 315 315 000 OWNER :
1CB1S01
315
PV 1CB1S01 PT TE TW FE +
FT PT PERTAMINA
2" 2" 2"
+

0042 0042 0042 0042 0042 315-VFL-005-2"-1CB1S01-NI NOTE 7


3CB1S02 3/4"
0037A
3/4" 3CB1S02 000 000
TWO PHASE FREE DRAINING
14943 M6-315-00006 BALIKPAPAN, INDONESIA
NATURAL GAS 12" 12" NOTE 4 TO FLARE
315-NG-001-12"-3CB1S02-NI 12"
000 TITLE :
14936 M6-315-00006
FROM ONSHORE PIPELINE 12"x8" 8" 12"x8"
NOTE 7 CSC 2" D 3/4" 000
PIPING & INSTRUMENTATION DIAGRAM
000
FC
TYP 4 3CB1S02 1CB1S01
FUEL OIL AND FUEL GAS SYSTEM (UNIT 315)
000 315-D-121-3/4"-1CB1S01-NI
K TYPE A FUEL GAS KO DRUM K

NOTE 8 NOTE 10 39055 15450 27632


FILE NAME :

12"x8" 8" 12"x8" 000 OWS OWS OWS PERTAMINA DRAWING NO. REV.
M6-315-00010 M6-315-00010 M6-315-00010 NONE 26071 26071-203-M6-315-00005 /
LC 000
SCALE JOB NO. DOCUMENT NO. SHT NO.
A1 (841x594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like