REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
A 193201DPFM03653 EQUIPMENT SYMBOLS (3/3) A
03 193201DPFM03654 NOMENCLATURE
MOV V MOV 193201DPFM03655 PIPING SYMBOLS
3301CQ001B
+
193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
+
M 009 FB M 013
1" 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
8 5 80 FEED GAS 193201DPFM03658 VALVES TYPICAL (1/2)
330-18"-RG-1-006-62CS-V TYP 5A TYP 5A -4
SOUR GAS FILTER COALESCER (2x100%) NOTE 9 NO POCKET TOXIC 25 330-18"-RG-1-006-62CS-V 193201DPFM03659 VALVES TYPICAL (2/2)
03 15584 193201DPFM03692_02 193201DPFM03660 ELECTRICAL MOTORS DETAIL
92
INTERNAL DIAMETER mm 1450.0 18"-600# 18"-600# TO SOUR GAS/SWEET GAS 193201DPFM03661 SAMPLE CONNECTION (1/2)
EXCHANGER 193201DPFM03662 SAMPLE CONNECTION (2/2)
HEIGHT (TL/TL) mm 6600 193201DPFM03663 API PLAN
330-1-HA-001
DESIGN PRESSURE barg 92.0 193201DPFQ03960 UNIT 330 SOUR GAS ABSORBTION PROCESS FLOW DIAGRAM
03 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
193201DPEQ03560
DESIGN TEMPERATURE (MIN/MAX) °C -45/80 62CS 50AS 1 CAUSE AND EFFECT DIAGRAM - UNIT 330
IN : 1-1/2"-900# 193201DPEQ03592
B STEAM OUT CONDITIONS HV @ 175°C OUT: 2"-300# B
3"-600# PSV 1" V
OPERATING PRESSURE barg 76.0 1½D2 6"x3" 28 15546
H
+
1 0
0
PT PI SET@ 92 barg 001 3"x2" 230-6"-FH-1-050-50AS-V
-8
OPERATING TEMPERATURE °C 25 28 HP FLARE
7
GENERAL NOTES:
INSULATION YES/NO NO DBB 001 001 NOTE 5 LO
193201DTFM64108_01
03 3 A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS ON
TRIM LINE 330-TL-1-019-62CS-V (UPPER SIDE VENT ONLY) 03 03
7 2"x1½" THIS P&ID SHALL BE PREFIXED BY 01-330-1, UNLESS OTHERWISE NOTED.
TRIM LINE 330-TL-1-024-65DS-V
V B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
330-2"-RG-1-008-62CS-V C. DELETED.
1"
FREE DRAINING
TOXIC FB D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
8 28 15544
03 7 4 0 OTHERWISE SPECIFIED.
0
230-2"-FH-1-051-50AS-V
-8
330-2"-RG-1-010-62CS-V 28 HP FLARE
E. DELETED.
FREE DRAINING 7 193201DTFM64108_01
CSC 600mm 53
C MIN C
03
03
ESD
NOTES:
I
1. REMOTE INDICATION LI-001 TO BE CLOSE TO LV-002 BYPASS GLOBE VALVE,ON
I2-0024
80
H 03 P&ID 193201DPFM03692_02.
PDI
25
92
2. HIGH SELECTOR SIGNAL FROM ABSORBER OVHD OVERRIDES THE SIGNAL FROM FEED GAS
004
5
FO MASTER PRESSURE CONTROLLER IN CASE OF HIGH PRESSURE IN THE COLUMN.
-4
PG BDV 3. PRESSURIZATION BY-PASS.
+
001
005
+
005 03 4. THE USE OF BENDS WITHIN 10 PIPE DIAMETER OF THE INLET NOZZLE SHOULD BE AVOIDED.
03 8 28 15548 IF BENDS CANNOT BE AVOIDED, THEY ARE PERMITTED ONLY UN THE VERTICAL SECTIONING
V TYP 6 0
0
3"-900# 10"x6" 12"x10"
-8
03 03 330-6"-RG-1-012-62CS-V 230-12"-FH-1-052-50AS-V 28 HP FLARE PLANE OF THE VESSEL WHICH CONTAINS THE VESSEL NOZZLE AXIS.
RS
PDT 7 2" FREE DRAINING TOXIC 7 193201DTFM64108_01 5. SIZING CASE : FIRE.
D FO LO D
004 TSO 53 6. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN.
DBB FB
3"-900# 3"-900# N5 N2 6"-600# 600 MM 7. REMOTE INDICATION LI-015 TO BE CLOSE TO LV-016 BY-PASS GLOBE VALVE, ON
03 P&ID 193201DPFM03692_02.
CN6 MIN. MIN.
80 8. MECHANICAL STOP FOR EACH FV-001 TO LIMIT THE OPENING TO 110% OF NORMAL FLOW RATE.
DBB DBB 03 9. CARTIDGE & RELEVANT TUBE SHEET OF COALESCER ARE DESIGNED FOR DEPRESSURIZATION SCENARIO.
25
92
CN3A M1B1 10. ONE COMMON SPARE FLOW CONTROL VALVE IN WARE HOUSE FOR FOUR TRAIN
5
-4
N6 8" NOTE 7 11. MINIMUM DISTANCE FROM FILTER COALESCER (330-1-CQ-001B) OUTLET NOZZLE TO ESDV-004 IN 193201DPFM0369202
03
12. FOR SOUR GAS FILTER COALESCER REFER TO SUPPLIER GENERAL DRAWING NUMBER HVO-102223
DBB DBB 3"-900# LI 13. ESDV-003 TO BE MINIMUM DISTANCE FROM BATTERY LIMIT VALVES.
LALL CN5A
03 015 14. VALVE IS PART OF CHEMICAL INJECTION FITTING SCOPE OF SUPPLY. 03
3"-900# 2" DBB
005 CN4A CN7A ON/OFF
H ESD HHLL: 4300.0 mm SIGNAL
E LI I LT HLL: 4200.0 mm 03 LG LT LIC E
LLL: 4000.0 mm 15592 193201DPFM03692_02
005 I4-1001 005 003 015 015 GENERAL HOLDS INDEX:
03 03 LLLL: 3900.0 mm TO LY-016
DP MAG DP
CN4B CN7B a) Solved.
3"-900# 2" DBB
CN5B
b) Solved.
DBB DBB 3"-900# c) Solved.
03 CONDENSATE d) Solved.
N8 7 7 330-3"-CO-1-009-65DS-V
330-18"-RG-1-004-62CS-V 15589 193201DPFM03692_02 e) Solved.
MOV f) Solved.
MOV +
TO CONDENSATE TRAIN 1
+ M 011 M g) Solved.
007 FB 1" 8 INLET MANIFOLD
80 CN3B h) Solved.
TYP 5A 5 NOTE 12
VERY TOXIC TYP 5A -4 D i) Solved. 03
F
25 F
NO POCKET 92 03 j) Solved.
03 18"-600# 18"-600#
1" N1 k) Solved.
FEED GAS 80 V
8
DBB FB 8 NOTE 4 3301CQ001B l) Solved.
5
-4
COALESCER 193201DTFM64108_01 N7
PG 03 RS p) Solved. 03
330-1-CQ-001A 8 FB 4
q) Solved.
CSC NOTE 3 003 4 r) Solved.
8 HHLL: 2000.0 mm
1" s) Solved.
V HLL: 1750.0 mm
1" LLL: 500.0 mm t) Solved.
FB 1" FB u) Solved.
8 LLLL: 250.0 mm 03 03
G 03 v) Solved. G
NOTE 8,10 03
03
2"x1"
FV
18"x12"
M1A
FO
LIC LT LG 03
92 03
18"x12"
32. Solved.
5°
LPT
17
NOTE 11
HV
03
330-18"-RG-1-002-62CS-V - 25
92
MIN.
73 THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
45
6
FB STAGE UNDER NUMBER 330-GD-B-03692_01 EQUIPMENT LIST
540-1"-OD-1-054-03A-V
PRESSURE SIGNAL
15538 193201DPFM03694 8 2" UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
ESD 3301CQ001B
PDAHH I PDI 73
FROM SOUR GAS ABSORBER 4
OVHD LINE (PIC-056) 003 I3-1001 003 1" 6
03 73
03
VERY TOXIC
550-1"-CD-1-180-63AS-V
540-4"-OD-1-627-81A-N
VERY TOXIC
PDT 03 4
540-2"-OD-1-055-03A-V
M
3"-600# 003 3"-600# 03
M
EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
540-4"-OD-1-628-81A-N
550-2"-CD-1-179-63AS-V
DBB I ESD DBB EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
03
NO POCKET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name:193201DPFM03692_EXDE01_02.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
03 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
A V 193201DPFM03653 EQUIPMENT SYMBOLS (3/3) A
MOV MOV 193201DPFM03654 NOMENCLATURE
M FB M
193201DPFM03655 PIPING SYMBOLS
1"
+ +
25
92
7 193201DTFM64108_01 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
03 LO
5
03 OTHERWISE SPECIFIED.
-4
3
73 03 E. DELETED.
2"x1½" 03
H V
C PDI 330-2"-RG-1-015-62CS-V C
8
FREE DRAINING
005 TOXIC FB
1" 0 28 15586
03 7 4 -8 0
330-2"-RG-1-009-62CS-V 230-2"-FH-1-048-50AS-V 28 HP FLARE NOTES:
PG FREE DRAINING 7 193201DTFM64108_01 1. REMOTE INDICATIONS LI-002 AND LI-001, ON P&ID 193201DPFM03692_01, TO BE CLOSE
CSC 600mm
PDT V 006 53 TO LV-002 BYPASS GLOBE VALVE.
03 MIN 03
005 2. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
RS
03 03 ESD
7 2" I 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
3"-900#
I2-0024 FO 3. PRESSURIZATION BY-PASS.
3"-900# 3"-900# N2 DBB +
N5 03 BDV 002 4. THE USE OF BENDS WITHIN 10 PIPE DIAMETER OF THE INLET NOZZLE SHOULD BE AVOIDED.
03
+
CN6 03 006 03 8 28 15587 IF BENDS CANNOT BE AVOIDED, THEY ARE PERMITTED ONLY UN THE VERTICAL SECTIONING
TYP 6 0 0
DBB DBB
330-6"-RG-1-011-62CS-V
12"x10" 230-12"-FH-1-049-50AS-V -8 PLANE OF THE VESSEL WHICH CONTAINS THE VESSEL NOZZLE AXIS.
28 HP FLARE
D
CN3A FREE DRAINING TOXIC 7 193201DTFM64108_01 5. SIZING CASE : FIRE. D
M1B FO LO 6. REMOTE INDICATION LI-016 AND LI-015 ON P&ID 193201DPFM03692_01, TO BE CLOSE
TSO 10"x6" 03
DBB N6 FB 53 TO LV-016 BY-PASS GLOBE VALVE.
8" 03 6"-600# 03
3"-900# DBB 3"-900# 7. SOFT HAND SWITCH HS-001 AND LOCAL HAND SWITCH HS-001A SHALL SWITCH BETWEEN THE OPERATING
CN4A CN5A 600mm FILTERS (A OR B) WITH ITS INSTRUMENTS.
H 2" DBB MIN. MIN. SIGNAL 8. CARTIDGE & RELEVANT TUBE SHEET OF COALESCER ARE DESIGNED FOR DEPRESSUREIZATION SCENARIO.
LALL LI I ESD LT CN7A LT LIC LY
HHLL: 4300.0 mm 193201DPFM03692_01 15592 9. FOR SOUR GAS FILTER COALESCER REFER TO SUPPLIER GENERAL DRAWING NUMBER HVO-102223
006 006 I4-1001 006 03 LG 016 016 V 016
HLL: 4200.0 mm 8 FROM LIC-015 10. HAND SWITCH HS-001 SHALL ACTIVATE ALL INTERLOCK SIGNALS CONNECTED TO THE COALESCER (A OR B)
03 DP LLL: 4000.0 mm 004 DP 03 1" ON DUTY AND OVERRIDE ALL INTERLOCK SIGNALS CONNECTED TO THE STAND BY COALESCER (A OR B).
CN4B 03 MAG ON/OFF 15468 FB 330-1"-CO-1-011-65DS-V
LLLL: 3900.0 mm 016 73 03
3"-900# CN7B HP FLARE
DBB 2" DBB
CN5B LI 193201DTFM64108_01 MIN.
DBB 3"-900# 4 600MM
NOTE 6 230-1"-FH-1-032-50AS-V
E
FB LV GENERAL HOLDS INDEX: E
PG 8 +
03 80 CSC 03 016
004 N8 7 7 7 a) Solved.
5
330-3"-CO-1-010-65DS-V
-4
25 FC b) Solved.
DBB 3"-600# MOV VERY TOXIC 92 3"x1½" 1½"-1500# c) Solved.
MOV 7
+ 03
+ M M
012 FB 1" FB 1" 03
d) Solved.
008 CN3B
5 80 TYP 5A TYP 5A 5 80 NOTE 9 3"x1½" e) Solved.
FEED GAS -4 -4 N1
25 330-18"-RG-1-003-62CS-V VERY TOXIC 25 NO POCKET 8 8 f) Solved.
15582 193201DPFM03692_01 92 03 g) Solved.
92 VERY TOXIC 18"-600#
FROM GAS MANIFOLD FB 1" 18"-600# 18774 NOTE 4 8 8 h) Solved.
V 1" 1" 7
1" V 8 HP FLARE FB FB i) Solved.
FB 8 j) Solved. 03
F
FB
1½"
8
1½"
193201DTFM64108_01
03 3301CQ001A 2"x1" k) Solved. F
03 03 1" l) Solved.
4
MIN.
4 8 HHLL: 2000.0 mm 1" 8 m) Solved.
8 FB 1" 330-2"-CO-1-017-65DS-V 7 03
HLL: 1750.0 mm n) Solved.
CSC NOTE 3 V
80
FB LLL: 500.0 mm
25
o) Solved.
92
1" FB 1½" FB
LLLL: 250.0 mm 03 p) Solved.
1" 8
5
-4
03
RS 6 q) Solved.
2"x1" 03 N7
r) Solved.
330-3"-CO-1-009-65DS-V
CN1A CSC
3"x2" 3"-900# 8 FB s) Solved.
CN2A t) Solved.
3"-900# DBB
VERY TOXIC
DBB 2" 3" 7 3" 7 73 u) Solved.
DBB 03
DP 03 v) Solved.
LG M1A
VERY TOXIC
LT 03
03 MAG 550-2"-CD-1-187-63AS-V
G
002 002 G
L SO 03 03 +
5
004 004 LC
-4
3"-900# 25 16. Solved.
8 03 193201DPFM03692_01 15589
SIGNAL 1" 92 17. Solved.
LY FB D DBB FROM SOUR GAS FILTER 28. Solved.
H 15583 193201DPFM03692_01 COALESCER
002 330-1"-CO-1-006-65DS-V 15494 29. Solved. 03
H
FROM LIC-001 03 330-1-CQ-001B 31. Solved.
HP FLARE 230-1"-FH-1-031-50AS-V 73
MIN.
5°
17
600MM
5
V 330-1"-CO-1-015-65DS-V
MIN.
-4
SEL ESD 73 V@
HS HS I 73 H FB
03 6 MIN.
001 A 001 I4-1001 03
CSC 8 LV
LPT FB 1" 03
+
4 002
540-1"-OD-1-057-03A-V
8 FB 7 5 80 3"x1½"
L 7 -4 330-3"-CO-1-001-65DS-V
7 7 1½"-1500# L
25
FC
540-4"-OD-1-629-81A-N
92 VERY TOXIC
550-1"-CD-1-182-63AS-V
N3 1"
1" FB 1" 03 8 03
330-2"-CO-1-004-65DS-V FB D 03
03 03 8 8 D
FB
2"x1"
THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
D 1"
D 03 330-2"-CO-1-008-65DS-V 03
I
ESD STAGE UNDER NUMBER 330-GD-B-03692_02 EQUIPMENT LIST
03
VERY TOXIC
03
MIN.
03 7
2"
8 FB ESDV
73 +
03 4 92 193201DTFM62014
FB 2" FC EX-DE 03 27-10-2013 ISSUED FOR CONSTRUCTION
540-2"-OD-1-058-03A-V
D FB D 330-3"-CO-1-012-65DS-V EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
540-4"-OD-1-630-81A-N
NNF - 34
92
1" 03 03 18"-600# C. DELETED.
8
45
V NOTE 13 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
TT D
03 03 OTHERWISE SPECIFIED.
NOTE 3
3"-600# 8
024 03 1" FB E. DELETED.
RTD
03 2 80
SWEET GAS 5 80 330-18"-NG-1-007-53CS-V 2 SWEET GAS
5
-4 NO POCKET 330-18"-NG-1-017-53C-V
-4
C 330-18"-NG-1-004-53CS-I 41 34 C
8847 193201DPFM03694 12177 193201DPFM03714
92 TYPE E 92
330-12"-NG-1-008-53CS-V
NO POCKET NOTE 9 TO HYDROCARBON AND WATER
FROM SOUR GAS ABSORBER NO POCKET SC NOTES:
TI HIC DEW POINT PACKAGE
330-1-VJ-001 021 340-1-XX-001
024 HV 1. REMOTE INDICATION LI-021 TO BE CLOSE TO LV-021 BY-PASS GLOBE VALVE.
022 NOTE 2 2. VALVE USED DURING START-UP.
+
024 S
NOTE 8 3. LINE USED FOR GAS EXPORT TO EL GAMIL PLANT FOR FURTHER TREATMENT.
V HV V
AI CO2 AT HPT +
03 FB
4. SIZING CASE : FIRE.
FB 024
021 A 021 DBB 1" 24"x16" 1" 5. SPARE PSV IS STORED IN WAREHOUSE BECAUSE PSV IS PROVIDED FOR FIRE CASE.
TT TG 8 8 28
L 16"x12" 0 0
11821 6. THE USE OF BENDS WITHIN 10 PIPE DIAMETER OF THE INLET NOZZLE SHOULD BE AVOIDED.
022 021 7 7 2 230-24"-FH-1-045-50AS-V -8 IF BENDS CANNOT BE AVOIDED, THEY ARE PERMITTED ONLY IN THE VERTICAL SECTIONING
RTD 28 FREE DRAINING HP FLARE
H AI H2S
FC 7 193201DTFM64108_01 PLANE OF THE VESSEL WHICH CONTAINS THE VESSEL NOZZLE AXIS.
FEED GAS 5 80 CSO CSO NOTE 11 CSO 53
D -4 NO POCKET TOXIC 330-18"-RG-1-005-62CS-V 021 B FB 03 TSO NOTE 10 7. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455, D
25 1"
11810 193201DPFM03692_02 8 12"-600# 330-24"-NG-1-018-53CS-E 03 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
92 03
FROM SOUR GAS FILTER 8. ANALYZER SHALL BE INSTALLED IN LOCAL CABINET 01-330-1-ALC-001.
D 03
COALESCER FI FT DBB 03 9. THIS VALVE USED TO ISOLATE DPC SYSTEM IN CASE OF GAS EXPORT TO ELGAMIL PLANT.
330-1-CQ-001A/B 10. ELECTRICAL TRACING RECEIVED ON VALVE BODY AND PART OF THE OUT LINE TO FLARE.
RS 20"x18" RS 20"x18" 021 021 11. 24" WAFER TYPE MEGASTREAM PLATE SUPPLIED LOOSE WITH CONTROL VALVE.
12. NO POCKET TO BE CONSIDERED UP TO MAIN HEADER ONLY.
2" 2" 03 2" 2" FE 13. ESDV-025 TO BE MINIMUM DISTANCE FROM BATTERY LIMIT VALVES.
+
03
021
S1 20" T1 20"
330-18"-NG-1-007-53CS-V
F 1" m) Solved. 03
F
PT TT 023 023
RTD V 330-4"-NG-1-011-53CS-V n) Solved.
021 025
8 FB o) Solved.
RTD
LO p) Solved.
3"-600# FB 8 8
FB q) Solved. 03
D
FEED GAS 5 80 1" r) Solved.
NO POCKET -4 330-18"-RG-1-001-62CS-I DBB 1" 03 s) Solved.
30 V 03
193201DPFM036945128 H
92 TOXIC PI t) Solved.
TO SOUR GAS ABSORBER 03 03 FB 8 u) Solved. 03
FB 023 LO
330-18"-NG-1-010-55DS-V
34
92
D
5
V
FREE DRAINING
-4
G G
PT FB
03 1"
8 28 11812 HOLDS:
023 7 4 80 0
3"-900# CN4A 330-2"-NG-1-012-53CS-V FREE DRAINING 230-2"-FH-1-046-50AS-V - 28 HP FLARE
2. Solved.
DBB CSC 7.0 193201DTFM64108_01
6. Solved.
7 24"x18" 53
80
3"-900# 7. Solved.
2" V 8" DBB 03 13. Solved.
80
34
92
34
92
5
MIN.
-4
5
-4
03 28. Solved.
H 4" RS NOTE 1 29. Solved. 03
PDI PDT
N8 LI 31. Solved.
H 024 024 DBB 3"-900# H
CN1A 021
FREE DRAINING
34 NOTE 6 CN5B
03 92 2" DBB
UC CN1B
8 DBB 3"-900#
03 2" 3"-900#
03 FB CN2A
DBB
H ESD HHLL : 1250.0 mm
L LI I LT HLL : 950.0 mm L
022 I4-1004 022 DP LLL : 450.0 mm 2" FB
LLLL : 300.0 mm N7
03 ESD DBB
LAHH I CN2B 8 SO THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED EQUIPMENT LIST
3"-900#
022 I3-1001 STAGE UNDER NUMBER 330-GD-B-03693 3301HA001
LALL 80
UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440 3301VA007
03
5
MIN.
-4
022 34 330-2"-ZW-1-023-55DS-V N3
92 °C 3"x2" 03
5 N5
17
@
HV
8 FB
M M
MIN.
EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
I ESD EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
M. DI
73 03
EX-DE 00 10-02-2016 ISSUED FOR COMMENT E. SBALCHIERO A. LO BIANCO
2"
FRANCESCO
8 6
34
92
LV Validity Revision
Contractor Contractor Contractor Company Company
SDV
5
021 +
Revision Index
Prepared Verified Approved Checked Approved
73 023
540-2"-OD-1-060-03A-V
03 03 Company Logo and Business Name Project Name Company Document ID:
4 03 03
3" 8 3" 8 3" 8 3" 8 TYP 2 0 80 SOUR WATER ZOHR
330-3"-ZW-1-007-55DS-V 330-3"-ZW-1-009-55BS-V 31 193201DPFM03693
540-4"-OD-1-632-81A-N
DEVELOPMENT
8836 193201DPFM03697
330-2"-AD-1-017-64AST-V
FO 03
Contract N. 4613-440
03
+
6 1" 03 Facility and Sub Facility Name Scale Sheet of Sheets
03 021
8 3" 4 3" 330-1"-ZW-1-027-55BS-V N.A. 1/1
11823 11818 3" ZOHR ONSHORE PHASE 01
OPEN DRAIN AMINE DRAIN
1" Document Title Superseedes N.
FB LC NOTE 1 8 FB 03 15404
NOTE 7 193201DTFM62003_01 03 UNIT 330 - GAS SWEETENING/ACID GAS REMOVAL (AGR) Superseeded by N.
P 03 330-1"-AD-1-045-64AST-V AMINE DRAIN P
SOUR GAS / SWEET GAS EXCHANGER (TRAIN 1) Plant Area Plant Unit
TOXIC 193201DTFM62003_01
03 03 03 PIPING & INSTRUMENTATION DIAGRAM P10 330
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03693_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
IN : 1-1/2"-1500# 193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
1 OUT: 2"-300# 03 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
PSV
A
8009 28 V 1" NOTE 8 +
1½D2 3301VJ001 193201DPFM03653
193201DPFM03654
EQUIPMENT SYMBOLS (3/3)
NOMENCLATURE
A
0
230-4"-FH-1-038-50AS-V 80 193201DPFM03655 PIPING SYMBOLS
-8
HP FLARE 28 SWEET GAS
5
SOUR GAS ABSORBER (1x100%) 330-18"-NG-1-004-53CS-I NO POCKETS 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
-4
193201DTFM64108_01 7 SET@ 92 barg 41
LO 8847 193201DPFM03693 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
4"x2" 03 92
FB TOP BOTTOM TO SOUR GAS / SWEET GAS 193201DPFM03658 VALVES TYPICAL (1/2)
03 1" 8 193201DPFM03659 VALVES TYPICAL (2/2)
02 2"x1½" INTERNAL DIAMETER mm 2600 2600 EXCHANGER 330-1-HA-001
230-4"-FH-1-068-50AS-E 193201DPFM03660 ELECTRICAL MOTORS DETAIL
V
HEIGHT (TL/TL) mm 25290 193201DPFM03661 SAMPLE CONNECTION (1/2)
LO FB 193201DPFM03662 SAMPLE CONNECTION (2/2)
8 DESIGN PRESSURE barg 92.0
FB 1" 8 03 193201DPFM03663 API PLAN
DESIGN TEMPERATURE (MIN/MAX) °C -45/80 -45/80 193201DPFQ03694 UNIT 330 SOUR GAS ABSORPITION PROCESS FLOW DIAGRAM
FB 8 V 03
STEAM OUT CONDITIONS HV @ 175°C HV @ 175°C 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
LO FB 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
8010 28 03 V 1" 8 OPERATING PRESSURE barg 75.2 80.0 PRESSURE SIGNAL
B 0 CSC 330-2"-NG-1-006-53CS-V FB PT PIC B
0
230-2"-FH-1-037-50AS-V 15538 193201DPFM03692_01
-8
HP FLARE 28 OPERATING TEMPERATURE °C 48 25 DBB 056 056 GENERAL NOTES:
NO POCKETS
193201DTFM64108_01 7 INSULATION YES/NO NO NO L TO HIGH SIGNAL SELECTOR
53 4 600mm 7 3"-600#
TRIM LINE 330-TL-1-003-67DS-V A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS ON
03
330-2"-NG-1-005-53CS-V
MIN. THIS P&ID SHALL BE PREFIXED BY 01-330-1, UNLESS OTHERWISE NOTED.
TRIM LINE 330-TL-1-027-53CS-V
SC B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
TYPE E C. DELETED.
DBB 052 03
D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
OTHERWISE SPECIFIED.
80
E. DELETED.
41
92
ESD H
5
I PY PDI
-4
I2-0024 057 057
C 03 2" NOTES: C
V NOTE 17 03
1. PDALL TO CLOSE SDV-052 WHEN REVERSE FLOW IS DETECTED (WHEN NEGATIVE DP IS
FREE DRAINING
50AS 53CS FO 7
+
BDV MEASURED) INTERLOCK TO BE FURTHER DEVELOPED LATER.
051 V 2. VALVE AT GROUND LEVEL AT MINIMUM FROM FLASH DRUM.
+
03
051 20"x18"
RS
8011 28 8 TYP 6 7 3. DIFFERENT TYPE.
0 53 3"
4. REMOTE INDICATION LI-057 TO BE CLOSE TO LV-057 BYPASS GLOBE VALVE.
0
330-8"-NG-1-003-53CS-V
-8
5
N6
-4
330-2"-ZW-1-005-55DS-V 40
15517 193201DPFM03696 DBB OPERATING MODES. THE LOWEST FEED LINE OFFERING THE LEAST LEVEL OF
95
FROM WASH WATER PUMPS M7 ABSORPTION, NORMAL AMINE FEED IS ABOVE SECOND PARCKING BED.
03 11. SPARE PSV IS STORED IN WAREHOUSE BECAUSE PSV IS PROVIDED FOR FIRE ONLY.
330-1-PA-001A/B #4
12. THE USE OF BENDS WITHIN 10 PIPE DIAMETER OF THE INLET NOZZLE SHOULD BE AVOIDED
10353 28
LI
3301VJ001 #3 NOTE 4 IF BENDS CANNOT BE AVOIDED. THEY ARE PERMITTION ONLY IN VERTICAL SECTING PLANE
0 055 03
0
HP FLARE 28 #2
ESD LI 13. SIZING CASE : FIRE.
193201DTFM64108_01 7 LAHH I DBB
NOTE 9 CN11B 057 14. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
DCS 055 I4-1003 2"-1500# DBB #1 2"-1500#
03 I FIC MIN FLOW 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
80 80 CN12B CN10B M7 330-2"-ZW-1-039-55DS-V
TI ESD 15. SPARE INSTRUMENTATION NOZZLE.
5
H 193201DPFM03696 17605
HHLL: 600.0 mm DBB MAG
0
-4
5
+
5
8
-4
-4
055 1" 052 056 51 51 330-3"-ZW-1-001-55DS-V GRAVITY FLOW
-4
40
+ +
80
1" FB 1" 8 4"-900# 1" FB TSO DBB e) Solved.
330-1-PA-002 A/B 8 BED#3
40
95
8 FB FB 6"-900# 8 FB f) Solved.
2"x1" TI TT 2"-1500# ESD
5
F
03 D D 03 I g) Solved.
F
-4
DBB DBB CN26
H
330-1"-LA-1-069-54DST-V
330-2"-ZW-1-010-55DS-V
FB 4" 4" 4" PDT 7 M5 k) Solved.
MIN.
D 330-6"-LA-1-019-54DST-V 330-6"-LA-1-059-54CST-V N7
054 CN14A LV l) Solved.
7 4 FB 2"-1500# 80
NOTE 10 63 CN13B
+
03 DBB 057 m) Solved.
0
330-2"-ZW-1-011-55BS-V 40 03
6 DBB n) Solved.
TI 03 TT CN25 BED#2
2"-1500# 8 V 03 SDV
TYP 2 42
330-2"-LA-1-014-54DST-V 054
+
o) Solved.
053 053 03 1" FB p) Solved.
6 03
8 2" ESD RTD M4 8 2"x1" 2"x1" 80 WASH WATER q) Solved.
NOTE 1 8 8
5
PDI I H
-4
PDI PDT 40 r) Solved.
1913 193201DPFM03697
95 s) Solved.
330-2"-AD-1-039-64AST-V
G G
054 I4-1010 051 051 CN13A FB FB FC FB FC
73 03 03 1"-1500# 73 TO RICH AMINE FLASH DRUM t) Solved.
8 FB 7 DBB TSO
PDALL 330-6"-LA-1-020-54DST-V 63 2"-1500# 1" D 1" D 1" D 2"-1500# 330-1-VH-001 u) Solved.
73 N8 M3 03
8 8 FO 8 03 RJ v) Solved.
054 330-6"-LA-1-058-54CST-V DBB 2"-1500# FB FB + FB 03
330-1"-AD-1-046-64AST-V NOTE 10 053
TOXIC 03 CN1B
BED#1
TOXIC
8 4
H 1"
15442 TI TT M2 PDT PDI HOLDS:
80 CN24 LC NOTE 4
10358 1. Solved.
5
30 03 03 FB
92
AMINE DRAIN 193201DTFM62003_01
RTD 6. Solved.
193201DTFM62003_01 03 7. Solved.
FEED GAS 24"x18" CN1A 9. Solved.
H NO POCKET TOXIC NOTE 12 13. Solved. H
5128 193201DPFM03693 N1 DBB 2"-1500# 2"-1500#
LPT N11 CN4B 14. Solved.
FROM SOUR GAS / SWEET GAS TOXIC CN9B DBB
DBB NOTE 5 CN3B 15. Solved.
EXCHANGER 330-1-HA-001 16. Solved.
LG DBB
7 17. Solved.
2"-1500# DBB CN5B 051 M1 28. Solved.
80
DBB
-4
0
-8
DP DP DP 230-1"-FH-1-036-50AS-V 28 HP FLARE 32. Solved.
LT LT LT HHLL: 2750.0 mm
HLL: 2500.0 mm CN3A DBB 7 193201DTFM64108_01
056A 056 B 056 C 03
LLL: 1200.0 mm CN4A 73
DBB
330-2"-SY-1-021-67DS-V
330-1"-RA-1-011-67DS-V
NOTE 15 STAGE UNDER NUMBER 330-GD-B-03694
540-2"-OD-1-061-03A-V
8
MIN.
5 80 03 N13 1"
-4 V UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
4 31 330-3"-RA-1-003-67DS-V N4 3301VJ001
92 03 FB
°C TOXIC
600MM
MIN.
5
ESD 17
540-4"-OD-1-631-81A-N
I @ ESD
330-6"-RA-1-023-67DS-V
HV
550-2"-CD-1-188-63AS-V
I4-1004 7 I
NNF
SKIM OIL
2oo3 03 FB I4-1004 03
03
M SDV M
VERY TOXIC
03 1" 8 FB 8 LV
MIN.
H 8 1" 053 03 +
EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION
SP LV-001 LI LALL CSC 058 W. ATEF H.H N.O M.F M.L K.E
MIN.
TYP 2 7 7 6"x3" EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
056 A 056 FB D 330-6"-RA-1-001-67DS-V
NOTE 5, 6 TOXIC 3"-900# EX-DE 01 23-05-2016 ISSUED FOR DESIGN E. SBALCHIERO A. SPOLETO A. LO BIANCO
03 LI H FC E.R.
11819 11820
1" 1" 03 EX-DE 00 10-02-2016 ISSUED FOR COMMENTS E. SBALCHIERO A. SPOLETO A. LO BIANCO
TSO FB 8
CLOSED DRAIN OPEN DRAIN FB 1" 056 B 6"-900# TT 8 FB E.R. 6"x3" Validity Revision
63 Status Number Date Description
Contractor Contractor Contractor Company Company
193201DTFM62023_01 NOTE 7 D H 6 055 MIN. D 03 Prepared Verified Approved Checked Approved
LI 80 80 Revision Index
CSC FB
5
8 8 1" 2"x1"
0
03 330-2"-RA-1-028-67DS-V
-4
6 31 31 RTD TOXIC 80 Company Logo and Business Name Project Name Company Document ID:
056 C
92 92
0
8 31 ZOHR
4 D FB MIN. 92 DEVELOPMENT 193201DPFM03694
540-1"-OD-1-063-03A-V
7
N TI Petrobel eni SpA PROJECT
N
4 NOTE 5 80
055
330-3"-AD-1-051-64AST-V
0
6 31 Contractor Logo and business name Contractor Document ID:
63
540-4"-OD-1-633-81A-N
42
RICH AMINE
FO 03 CSC TOXIC Engineering for the Petroleum and Process Industries
+
03 8 FB 1912 193201DPFM03697
052 SLUG FLOW Contract N. 4613-440
TO RICH AMINE FLASH Facility and Sub Facility Name Scale Sheet of Sheets
13 73 330-2"-AD-1-002-64AST-V DRUM 330-1-VH-001
TOXIC
A
3301PB001A / B 193201DPFM03652
193201DPFM03653
EQUIPMENT SYMBOLS (2/3)
EQUIPMENT SYMBOLS (3/3) A
193201DPFM03654 NOMENCLATURE
WASH WATER MAKE-UP PUMPS (2x100%) 193201DPFM03655 PIPING SYMBOLS
193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
DESIGN FLOWRATE act. m3/h 0.2 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
193201DPFM03658 VALVES TYPICAL (1/2)
SUCTION PRESSURE barg 4.0 193201DPFM03659 VALVES TYPICAL (2/2)
DIFFERENTIAL PRESSURE bar 78.2 PAHH PI 193201DPFM03660 ELECTRICAL MOTORS DETAIL
193201DPFM03661 SAMPLE CONNECTION (1/2)
DESIGN PRESSURE barg 95.0 066 066 SAMPLE CONNECTION (2/2)
193201DPFM03662
DESIGN TEMPERATURE (MIN/MAX) °C 0/80 193201DPFM03663 API PLAN
IN : 1-1/2"-600# 193201DPFQ03960 UNIT 330 SOUR GAS ABSORBTION PROCESS FLOW DIAGRAM
03 RATED POWER kW 1.55 03
OUT: 2"-150# 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
V TRIM LINE 330-TL-1-001-38D-V (PB - 001A) 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
1½F2 PSV
B +
1 1" TRIM LINE 330-TL-1-002-38D-V (PB - 001B) B
061 A 17 15505
H
NOTE 6,7 1 230-3"-AL-1-019-37AS-V 0 PI I ESD FI
0
-1
28 LP FLARE
SET@ 10.0 barg 3.5 193201DTFM64108_01 065 I4-1003 061 A GENERAL NOTES:
3"x2" LO 03
NOTE 2
A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS ON
03
THIS P&ID SHALL BE PREFIXED BY 01-330-1.
3"x1½" IN : 1-1/2"-1500# FI
B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
1" OUT: 2"-300# 03 061 B C. DELETED.
V
1 PSV 1½D2 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
+ NOTE 8 OTHERWISE SPECIFIED.
FB 80 062 PT PT FT NOTE 9
1 3"x2" E. DELETED.
0
ILO 03 40 330-3"-NW-1-010-38A-V
SET=95.0 barg 065 066 061 FE
C SP LK-001 0 FREE DRAINING
+ C
IN : 1-1/2"-600# 061
03 DBB DBB DBB
OUT: 2"-150#
V AT GRADE 80 WASH WATER MAKE-UP NOTES:
5
2"x1½"
PSV 330-2"-NW-1-008-38D-V
-4
1½F2 40
+
0
230-3"-AL-1-020-37AS-V
-1
SET@ 10.0 barg 28 LP FLARE
330-1-VJ-001 3. STRAINER SCREEN MESH IS 50.
3.5 193201DTFM64108_01 1 03
LO 4. NON SLAM TYPE CHECK VALVE.
330-2"-NW-1-009-38D-V
3"x2" 5. PULSATION DUMPER AND CALIBRATION POT SUPPLIED BY PUMP VENDOR. 03
03 03
6. INSTRUMENTS ARE PREFIXED BY 01-522-0.
3"x1½" 1" 7. PSV SIZING CASE : REVERSE FLOW.
D 8. PSV SIZING CASE : BLOCKED OUTLET.
D 1 9. METER RUN FLOW ELEMENT. D
522-3"-NW-1-004-38A-V
522-3"-NW-1-005-38A-V
1 10. PRESSURE TRANSMITTER PROVIDED BY PUMP SUPPLIER TO PROTECT PUMP IN CASE OF DIAPHRAGM FAILURE.
MDMT=0 °C MDMT=-45 °C
11. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE-1 DOC.N. 193201DTDVE0455,
193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458 03
64 NOTE 4
330-2"-NW-1-008-38D-V
FREE DRAINING
ATMOSPHERE
a) Solved.
b) Solved.
330-2"-NW-1-014-38D-V
PI PALL
1" 03 c) Solved.
064 064 1"
E V d) Solved. E
1 e) Solved.
FREE DRAINING
1
FREE DRAINING
03 f) Solved. 03
g) Solved.
H ESD
3301LR001A3 H 03 DBB PG h) Solved.
PI I NOTE 5 PDI 063 i) Solved.
3301LR001A2
03 063 L I4-1003 061 j) Solved.
SP LK-001 03 03 k) Solved.
03
FB 3301LR001A1 NOTE 5 l) Solved.
1 m) Solved. 03
2"x3/4"
ILC 03
NOTE 6 03 DBB n) Solved.
1" DBB
NOTE 5
PT PT PDT o) Solved.
1/2" p) Solved.
PG 03
RS
F
063 064 38A 38D 061 03 03 F
D q) Solved.
03 1 061 3/4"-1500#
MIN 03 NOTE 1,2 r) Solved.
15506 80 03 03
1 1
1"
80
03
NOTE 3
3301PB001A s) Solved.
3/4"-1500# t) Solved.
330-3"-NW-1-002-38D-V 3301EPB001A
0
0
540-2"-OD-1-188-03A-V
03
540-4"-OD-1-725-81A-N
G G
HOLDS:
4. Solved. 03
03 13. Solved.
03 14. Solved.
15. Solved.
IN : 1-1/2"-1500# 28. Solved.
OUT: 2"-300# 18794
31. Solved.
1½D2 OPEN DRAIN
PSV
80 + NOTE 11
3"x2" 063 1 1
0
40 330-3"-NW-1-012-38A-V NOTE 8
H 0 FREE DRAINING
SET=95.0 barg H
MDMT=0 °C MDMT=-45 °C
1 1"
D
2"x1½"
AT GRADE
NOTE 4
64
330-2"-NW-1-011-38D-V
330-2"-NW-1-015-38D-V
1"
L V L
VENT TO 1
03
ATMOSPHERE
THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
80
FREE DRAINING
03
DBB PG
3301LR001B3 064
NOTE 5
H 3301LR001B2 03
M PDI M
2"x3/4"
062 03 03 EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
3301LR001B1 NOTE 5
EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
PDT PG NOTE 5 03 EX-DE 00 05-02-2016 ISSUED FOR COMMENTS E. SBALCHIERO A. SPOLETO A. LO BIANCO
D 03 Validity Revision
38A 38D 062 062 03 3/4"-1500# Contractor Contractor Contractor Company Company
03 1 DBB NOTE 1,2 Status Number Date Description
1" 03 Prepared Verified Approved Checked Approved
DBB
3301PB001B
03 Revision Index
80 03
1 1 NOTE 3 3/4"-1500# Company Logo and Business Name Project Name Company Document ID:
3301EPB001B
0
330-3"-NW-1-017-38D-V 40
3" 3" 95 RS
A M ZOHR
DEVELOPMENT 193201DPFM03695
3"x2" TYP 7A PROJECT
eni SpA
N 1 1/2" 2" 1 2"x3/4" Petrobel N
63 03
03 1 1" ESD Contractor Logo and business name Contractor Document ID:
D 03 UC I
2"-150# MCC
MIN. D I4-1003
NOTE 10 03 Engineering for the Petroleum and Process Industries
03
540-2"-OD-1-189-03A-V Contract N. 4613-440
Facility and Sub Facility Name Scale Sheet of Sheets
03 N.A. 1/1
540-4"-OD-1-726-81A-N ZOHR ONSHORE PHASE 01
Document Title Superseedes N.
18795
P OPEN DRAIN UNIT 330 - GAS SWEETENING/ACID GAS REMOVAL (AGR) Superseeded by N. P
NOTE 11
WASH WATER MAKE-UP PUMPS (TRAIN 1) Plant Area Plant Unit
PIPING & INSTRUMENTATION DIAGRAM P10 330
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03695_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
3301PA001A / B 193201DPFM03651
193201DPFM03652
EQUIPMENT SYMBOLS (1/3)
EQUIPMENT SYMBOLS (2/3)
A 193201DPFM03653 EQUIPMENT SYMBOLS (3/3) A
WASH WATER PUMPS (2X100%) 193201DPFM03654 NOMENCLATURE
193201DPFM03655 PIPING SYMBOLS
DESIGN FLOWRATE m3/h 5.06 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
SUCTION PRESSURE barg 81.00 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
193201DPFM03658 VALVES TYPICAL (1/2)
DIFFERENTIAL HEAD m 21 193201DPFM03659 VALVES TYPICAL (2/2)
SHUT OFF PRESSURE barg 97.0 193201DPFM03660 ELECTRICAL MOTORS DETAIL
193201DPFM03661 SAMPLE CONNECTION (1/2)
DESIGN TEMPERATURE (MIN/MAX) °C -45/80 193201DPFM03662 SAMPLE CONNECTION (2/2)
RATED POWER kW 1.47 193201DPFM03663 API PLAN
193201DPFQ03960 UNIT 330 SOUR GAS ABSORPTION PROCESS FLOW DIAGRAM
WASH WATER MAKE-UP 80 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
5
330-2"-NW-1-008-38D-V
-4
40 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
NW
15510 193201DPFM03695
B 95 NOTE 4 B
FROM WASH WATER MAKE-UP
03 6
ZW
PUMPS 330-1-PB-001A\B NOTE 1 FIC GENERAL NOTES:
071
80
L A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS ON
330-2"-ZW-1-005-55DS-V -4 40
95
FI THIS P&ID SHALL BE PREFIXED BY 01-330-1-, UNLESS OTHERWISE NOTED.
5
B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY O1 UNLESS OTHERWISE NOTED.
071 C. DELETED.
FT NOTE 2 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
MIN.
OTHERWISE SPECIFIED.
071 E. DELETED.
FV
03
+
5
1" 8 1" 4
-4
03 03 330-2"-ZW-1-005-55DS-V 40
03 1" 03 1" 03 FT 1"
95
PUMPS DISCHARGE LINES.
5. STRAINER SCREEN MESH IS 50. 03
D D 072 FB NOTE 2 03 6. 5D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE UPSTREAM PUMP SUCTION NOZZLE.
FB 8 FB 8
FB FB 2D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE DOWNSTREAM PUMP DISCHARGE NOZZLE.
8 CSO 8 CSO 7. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
D D
193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
1" 03 1" 03 8. REFER TO MECHANICAL SEAL SYMBOLS AND LEGEND FOR PLAN 53B. 03
ESD
D D I FI FALL
PDG PG
3301PA001B PG FB 8 FB 8 I4-1002 072 072
075 071 NOTE 8 073 64 64 03
03 NOTE 3 NOTE 3 GENERAL HOLDS INDEX:
3"-900# 3"-900#
NOTE 6 80 a) Solved.
3"-900# 3"-900# DBB
5
MIN. b) Solved.
80
-4
RS 40
03 DBB
40
97
80 DBB 03 DBB NOTE 6 97 c) Solved.
FB FB 330-3"-ZW-1-003-55DS-V NOTE 5
5
d) Solved.
5
-4
40 RS
-4
E 97 M TYP 7B e) Solved. E
8 8 B8 MAIN/ f) Solved.
FB RS 3/4"-1500# F 3301EPA001B FO 03
CSO FB CSO 2" 03 " STAND-BY g) Solved.
1" 8 3/4
+
330-1"-ZW-1-030-55DS-V
5
03
-4
NOTE 1 40 k) Solved.
17605 193201DPFM03694
ESD 97 l) Solved.
I TO SOUR GAS ABSORBER m) Solved.
330-3/4"-ZW-1-031-55DS-V
I4-1002 330-1-VJ-001 03
03 n) Solved.
03 o) Solved.
p) Solved. 03
540-2"-OD-1-004-03A-V q) Solved.
F F
r) Solved.
8
s) Solved.
FB 03
t) Solved.
u) Solved. 03
v) Solved.
330-2"-ZW-1-006-55DS-V 2"
8 FB
540-2"-OD-1-064-03A-V
73
6
HOLDS:
G 1. Solved. G
540-4"-OD-1-635-81A-N
330-2"-ZW-1-001-55DS-V
330-2"-ZW-1-004-55DS-V
4. Solved. 03
4
9. Solved.
03
330-2"-AD-1-014-64AST-V
TOXIC
03
15516
15515
AMINE DRAIN
OPEN DRAIN
193201DTFM62003_01
03 NOTE 7
H 03 H
80
40
95
5
-4
PDG PG PG
076 072
3301PA001A 074
NOTE 8
03 03
3"-900# 3"-900#
330-2"-ZW-1-001-55DS-V NOTE 6 80
3"-900# 3"-900#
DBB EQUIPMENT LIST MOTORs LIST INSTRUMENT LOOP N°
5
MIN.
-4
RS 40
03 DBB 03 DBB DBB
WASH WATER 80 NOTE 6 97 3301PA001A / B 3301EPA001A / B 013301M001
FB GRAVITY FLOW FB NOTE 5
5
330-2"-ZW-1-002-55DS-V
-4
40 RS
L 15518 193201DPFM03694
GRAVITY FLOW 97 8
M TYP 7B L
FROM SOUR GAS ABSORBER 8 8 3/4"-1500# FB
CSO FB CSO FB RS
330-1-VJ-001
8
1"
8
2"
03
3/4
"
3301EPA001A THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
D UC MCC STAGE UNDER NUMBER 330-GD-B-03696
330-1"-ZW-1-028-55DS-V
03 03
UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
330-3/4"-ZW-1-029-55DS-V
I ESD
03 I4-1002
03
M 540-2"-OD-1-003-03A-V M
03
8 EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H M.O M.F M.L K.E
FB EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H M.O M.F M.L K.E
EX-DE 01 23-05-2016 ISSUED FOR DESIGN D. DANIELE E. SBALCHIERO A. LO BIANCO
73 ZOHR
6 193201DPFM03696
540-4"-OD-1-634-81A-N
DEVELOPMENT
Petrobel eni SpA PROJECT
N N
Contractor Logo and business name Contractor Document ID:
03
4
03 Engineering for the Petroleum and Process Industries
TOXIC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03696_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
3301VH001 IN : 6"-300# 193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
EQUIPMENT SYMBOLS (1/3)
193201DPFM03651
OUT: 8"-150# V 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
RICH AMINE FLASH DRUM (1x100%) 6Q8 193201DPFM03653 EQUIPMENT SYMBOLS (3/3)
A PSV 1"
A
1 28 8074 193201DPFM03654 NOMENCLATURE
0
+
FREE DRAINING
80
330-10"-LF-1-006-55AS-V
SOUR WATER
330-3"-ZW-1-009-55BS-V
0
31
6 FB SP LK-002 GENERAL NOTES:
8836 193201DPFM03693
42 FB A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS ON
FROM SWEET GAS KO 8 03
ILC THIS P&ID SHALL BE PREFIXED BY 01-330-1-, UNLESS OTHERWISE NOTED.
DRUM 330-1-VA-007 03
V B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
FREE DRAINING
80 FB C. DELETED.
WASH WATER 0 6 1" D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
330-2"-ZW-1-011-55BS-V 40 8
1913 193201DPFM03694 80 28 11135
OTHERWISE SPECIFIED.
42 03 0 7 4 0
0
230-2"-FH-1-064-50AS-V
-8
FROM SOUR GAS ABSORBER 30 330-2"-LF-1-007-55AS-V 28 HP FLARE E. DELETED.
330-1-VJ-001 12 7 193201DTFM64108_01
TOXIC
C 330-10"-LF-1-005-55AS-V FREE DRAINING CSC MIN. C
600MM 03
03
RICH AMINE 80
SLUG FLOW 03 NOTES:
0
330-6"-RA-1-002-67BS-V 31
1912 193201DPFM03694 H
TOXIC 42 PI PIC 1. LG-082 TO BE READABLE FROM GLOBE VALVE AND DEAD-MAN VALVE ON SKIM OIL LINE.
FROM SOUR GAS ABSORBER 2. REMOTE INDICATION PI-085 TO BE CLOSE TO PV-085 HANDWHEEL.
330-1-VJ-001 085 085 L 3. DELETED.
TOXIC
PT
NOTE 2 4. DEAD-MAN VALVE (SPRING RETURN).
ESD 3"-300# 085
5. DELETED.
PAHH PI I PT 8 FB PV PV
3"-300# + +
FB 6. DELETED.
V 1" 085 085 S 8
081 081 I4-1004 081 03 03 7. REMOTE INDICATION PI-082 TO BE CLOSE TO PV-082 BY-PASS GLOBE VALVE.
V 1" 28 1899 8. SIZING CASE : GAS BREAKTHROUGH.
D
03 3"x2" 3"x2" 2"x1" 03 2"x1" 7 0 0
D
03 230-2"-FH-1-041-50AS-V -8 9. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
FREE DRAINING
28 HP FLARE
7 193201DTFM64108_01 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
7 FC NOTE 13 CSO 10. ANALYZER SHALL BE INSTALLED IN LOCAL CABINET 01-330-1-ALC-002.
330-2"-LF-1-004-55AS-V
80 80 CSO
TSO
1"-600# 11. (NO POCKET) WILL BE APPLICABLE DOWN STREAM THE GLOBE VALVE.
FO 03 PG I ESD 03
31
42
03 V 12. LINE USED FOR INITIAL / POST-MAINTENANCE FILLING.
51
12
+
03
FREE DRAINING
15526 081 081 I4-1004 13 2" WAFER STREAM PLATE SUPPLIED LOOSE WITH THE CONTROL VALVE SUPPLIER. 03
0
HP FUEL GAS
8 1" TYPE E
6 FB TG 3"-300# 03
FOR START-UP 330-0"-FG-1-001-55B-V PV
NNF SC V ESDV FB 8
8 FB FB 8 081
+
80
7 2"x1" 2"x1" 7 4"x2" 03 4"x2" TYP 1 6 7 420-2"-LF-0-024-55A-V GENERAL HOLDS INDEX:
0
330-2"-LF-1-003-55AS-V 51 FLASH GAS
30
42
E 12 193201DTFM62008_02 E
9
FC 2"-150# a) Solved.
-2
03 1"-600# FE 3/4"-600# FC TO LP FUEL GAS K.O. b) Solved.
03
330-6"-RA-1-002-67BS-V
RS
PIC 2" FI 03
j) Solved.
082 082
L k) Solved.
N2 N14 3"x2" 80 l) Solved.
F N3 6 0 LEAN AMINE F
03 51 330-2"-LA-1-070-54AST-V m) Solved. 03
193201DPFM03702 8793 n) Solved.
3"-300# 12
NOTE 7 FROM LEAN AMINE PUMPS o) Solved.
CN8A p) Solved.
PI 330-1-PA-002A/B 03
H q) Solved.
082 PDT PDI
r) Solved.
083 083 s) Solved.
M3
PT t) Solved.
082 CN8B u) Solved. 03
8"x6" V 3"-300# v) Solved.
03 3"-300#
7
RS
7 2"
G N6 G
N8 CN3A 3"-300#
CN1A N1 N7 N13 CN7 V 1"
2" 300# FB 8
03 3301VH001 CN5A 3"-300#
HOLDS:
2" CN2A H
3"-300# 2"x1" 03 LIC 1. Solved.
03 3"x2" 2" CN4A CN6A 3"-300#
081 L 7. Solved.
LG LG LT LT LT 9. Solved.
03 M1 DP 7
M4 LT LG M2 2oo3 13. Solved.
083 082 082 A 082 B 082 C
3"
@
HV
MIN.
7 CSO 7
3" 6 FB 8 FLOW SIGNAL THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
SDV
+ 7828 193201DPFM03707 STAGE UNDER NUMBER 330-GD-B-03697 EQUIPMENT LIST
084 540-2"-OD-1-067-03A-V
7
TO FFIC-191 UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440 3301VH001
CSC 6
ESD 540-1"-OD-1-066-03A-V ON REGENERATOR REBOILER
TSO I 540-4"-OD-1-637-81A-N
4 540-4"-OD-1-638-81A-N STEAM LINE
FC I4-1005 15437
6"-150# TYP 2 03 8831
330-2"-AD-1-008-64AST-V
03 OPEN DRAIN 4 03
RF OPEN DRAIN
03 NOTE 9
15435 NOTE 9
330-1"-AD-1-047-64AST-V
M
AMINE DRAIN TOXIC 330-3"-AD-1-048-64AST-V 4 6 7 M
193201DTFM62003_01 EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
03 EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
TOXIC
15424 03 7 3" EX-DE 01 23-05-2016 ISSUED FOR DESIGN M. VALSECCHI E. SBALCHIERO A. LO BIANCO
03
LEAN AMINE FROM 80 80 EX-DE 00 10-02-2016 ISSUED FOR COMMENTS G. GARITO A. SPOLETO A. LO BIANCO
0 0 6
TOXIC
330-0-CL-001 15436
330-4"-LA-1-082-54AST-P 70 NNF 330-4"-LA-1-032-54AST-V 31 Validity Revision
AMINE DRAIN Contractor Contractor Contractor Company Company
193201DTFM62013
NOTE 12 17 LPT 12 MIN.
Status Number Date Description
Prepared Verified Approved Checked Approved
7 03 193201DTFM62003_01
8072
Revision Index
Company Logo and Business Name Project Name Company Document ID:
03 8 FB AMINE DRAIN
540-3"-OD-1-169-03A-V
6
MIN.
540-4"-OD-1-636-81A-N
+
Contractor Logo and business name Contractor Document ID:
081
3/4"-600#
330-1"-LA-1-072-54AST-V 80 RICH AMINE
330-6"-RA-1-007-67AS-V 0 Engineering for the Petroleum and Process Industries
03 31
03 8899 193201DPFM03698
8 FB TOXIC 12 Contract N. 4613-440
03 TO LEAN/RICH AMINE Facility and Sub Facility Name Scale Sheet of Sheets
EXCHANGER
TOXIC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03697_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
3301HB001A / B 193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
LEAN/RICH AMINE EXCHANGER(2x100%) 193201DPFM03653 EQUIPMENT SYMBOLS (3/3)
A A
193201DPFM03654 NOMENCLATURE
DESIGN DUTY kW 5757.4 03 193201DPFM03655 PIPING SYMBOLS
COLD SIDE HOT SIDE 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
DESIGN PRESSURE barg 12.0 / FV 12.0 / FV 193201DPFM03658 VALVES TYPICAL (1/2)
DESIGN TEMPERATURE (MIN/MAX) °C 0/175 0/175 193201DPFM03659 VALVES TYPICAL (2/2)
STEAM OUT CONDITIONS HV @ 175°C HV @ 175°C 193201DPFM03660 ELECTRICAL MOTORS DETAIL
193201DPFM03661 SAMPLE CONNECTION (1/2)
IN OUT IN OUT 193201DPFM03662 SAMPLE CONNECTION (2/2)
OPERATING PRESSURE barg 7.3 6.6 1.9 1.2 193201DPFM03663 API PLAN
193201DPFQ03962 UNIT 330 SOUR GAS ABSORPTION PROCESS FLOW DIAGRAM
OPERATING TEMPERATURE °C 31 99 130 63 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
03
17 INSULATION YES/NO YES YES 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
PSV DISCHARGE 5 03 PSV DISCHARGE
330-8"-RA-1-004-64AST-V
0
B FREE DRAINING
130 TOXIC FREE DRAINING B
8898 193201DPFM03701 5097 193201DPFM03704
5
FROM LEAN AMINE FILTRATION TO AMINE REGENERATOR
FV
PACKAGE 330-1-XX-002 FB IN : 1-1/2"-600# 330-1-VJ-002 GENERAL NOTES:
03 OUT: 2"-150#
1" V 1½F2 03 A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGIC TAG NUMBERS ON
03 PSV
8 THIS PID SHALL BE PREFIXED BY 01-330-1-, UNLESS OTHERWISE SPECIFIED.
330-3"-RA-1-018-64AST-V
+
TOXIC FREE DRAINING
093
NOTE 3 B. ALL EQUIPMENT AND PIPING OH THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
FB SET@ 12 barg C. DELETED.
330-4"-RA-1-020-64AST-V 3"x2"
LO D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
OTHERWISE SPECIFIED.
FREE DRAINING
FB IN : 2"-150#
FREE DRAINING
8 3"x1½"
03 E. DELETED.
OUT: 3"-150#
C 8 1" V C
PSV 2J3
330-3"-RA-1-016-67AS-P
LO +
PDI H
091
NOTE 3 091 NOTES:
FB 4"x3" SET@ 5 barg 1. EQUIPMENT SHALL BE POSITIONED WITH MAXIMUM TOP ELEVATION LOWER THAN AMINE
03 REGENERATOR 330-1-VJ-002 LLL LEVEL. THIS IN ORDER TO KEEP LEAN SIDE OF THE
EXCHANGER ALWAYS FLOODED BY SOLVENT.
4"x2"
2. LPT DRAIN FOR EACH SIDE OF EXCHANGER TO BE PROVIDED.
PDT
3. PSV SIZING CASE : FIRE.
091 4. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
330-4"-LA-1-049-54AST-P
PDI H PDI H
193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
092 093 5. TAHH-94 WILL TRIP THE BOOSTER AND MAIN PUMPS AND CLOSE SDV-052 IN THE AMINE
FREE DRAINING
INLET LINE TO ABSORBER.
FREE DRAINING
D D
6. FOR MAINTENANCE PURPOSE, SUITABLE SPACE SHALL BE PROVIDED FOR ACCESSIBILITY.
TOXIC
7. VALVE IS PART OF CHEMICAL INJECTION FITTING SCOPE OF SUPPLY.
PDT PDT 03
03
7 092 3301HB001A 093
3"-300#
7
3"-300# 3"-300# 3"-300# 3"-300# 3"-300#
2" SO 330-8"-LA-1-060-56AST-I
17 NOTE 1, 6 2" SO 17 GENERAL HOLDS INDEX:
7 5 A2 B2 RS 8"x6" 5 7
330-6"-RA-1-012-67AS-V TOXIC
0
0
31 RS 130 a) Solved.
12 12 b) Solved.
13 17 FB FB 17 03
0 7 5 8 8"x6" 8 5 7 c) Solved
GRAVITY FLOW
GRAVITY FLOW 1"
0
330-8"-LA-1-028-54AST-P
0
330-6"-RA-1-014-67AS-P
0
63 63 RS RS TOXIC 1" 99 d) Solved
5 LPT 12 12 LPT e) Solved.
E B1 A1 E
NOTE 2 NOTE 2 f) Solved.
3"-300# 3"-300# 03 g) Solved
03
03 03 PG h) Solved
330-8"-LA-1-029-54AST-P
330-6"-RA-1-007-67AS-V
330-4"-RA-1-021-64AST-V
D i) Solved.
PG 7 03 03 D 7 091
j) Solved.
5
2"
13
17
092 8 1" 540-1"-OD-1-068-03A-V 03 k) Solved.
130
99
12
5
540-1"-OD-1-170-03A-V 17 l) Solved
8 1" 5
MIN.
0
330-8"-LA-1-034- 56AST-I
0
130 m) Solved.
MIN.
TOXIC
TOXIC
D 03 03
5 n) Solved
540-4"-OD-1-639-81A-N D
03 o) Solved.
8911
LEAN AMINE p) Solved. 03
540-4"-OD-1-640-81A-N q) Solved.
OPEN DRAIN 03 GRAVITY FLOW
F 6 193201DPFM03704 5195 r) Solved. F
NOTE 4
330-8"-LA-1-034- 56AST-I
8913
6 OPEN DRAIN FROM AMINE REGENERATOR s) Solved.
NOTE 4 330-1-VJ-002 t) Solved.
TI u) Solved. 03
4 093 v) Solved.
TI 03 4
03
091 330-2"-AD-1-025-64AST-V 330-2"-AD-1-029-64AST-P
TOXIC TOXIC
8887 8886
TT TG 13
AMINE DRAIN AMINE DRAIN IN : 1-1/2"-600# 0
093 092
0
TG TT 193201DTFM62003_01 193201DTFM62003_01 OUT: 2"-150# 330-6"-RA-1-009-67AS-P 99
FB 8 03
03 1½F2 RTD 12 HOLDS:
G 093 091 PSV G
03 RTD 03 1" V +
1. Solved.
330-3"-RA-1-019-64AST-V FREE DRAINING
1 094 NOTE 3 03
17 SP LI-003 RICH AMINE 7. Solved.
RICH AMINE 5 SET@ 12 barg
TOXIC 9. Solved.
0
31 330-6"-RA-1-007-67AS-V TOXIC 03 FB
8899 193201DPFM03697 3"x2" 8897 193201DPFM03704 12. Solved.
12 IN : 2"-150# LO TYPE A
FROM RICH AMINE FLASH 03 TO AMINE REGENERATOR 13. Solved.
FREE DRAINING
330-6"-RA-1-009-67AS-P
1" V
NOTE 7
+
8 092
330-8"-LA-1-029-54AST-P
330-6"-RA-1-007-67AS-V
NOTE 3 1 03
SET@ 5 barg
FB 4"x3"
LO 03 1"
MIN.
H H
D
RS
TOXIC
4"x2"
FB
330-3"-RA-1-017-67AS-P
GRAVITY FLOW
ESD
FREE DRAINING
TI I TI H
330-4"-LA-1-050-54AST-P
PDI H PDI H 6
094 I4-1009 091
03 094 095
NOTE 5 TAHH 1
094
FREE DRAINING
TYP B
5
0
17
13
130
99
12
5
SC TT TT TG PDT PDT
0
0
7
L
330-8"-LA-1-029-54AST-P
091 094
RTD
092
RTD
091
7 094 3301HB001B 3"-300#
095
3"-300#
03 03 L
TOXIC
13 2" SO 17 17 THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
LEAN AMINE 0 7 5 A2 NOTE 1, 6 B2 8"x6" 5 7
330-6"-RA-1-007-67AS-V TOXIC EQUIPMENT LIST
0
0
0
193201DPFM03699 5095
63 31 130 STAGE UNDER NUMBER 330-GD-B-03698
5 GRAVITY FLOW 12 RS RS 12 UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
TO LEAN AMINE BOOSTER FB FB 03 3301HB001A / B
13 17 8 8"x6" 17
PUMP 330-1-PA-003 A/B 0 7 5 8 5 7
GRAVITY FLOW 330-8"-LA-1-030-54AST-P 1"
0
1"
0
63 63 TOXIC 99 330-6"-RA-1-015-67AS-P
5 LPT NOTE 2 12 12 LPT
RS B1 A1 RS
3"-300# 3"-300# NOTE 2 3"-300# 3"-300#
03
0
13
49
12
M PG 03 2" 7 PG M
7 D 03
0
2" 03
094 D 093 EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
8 D 8 D EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
MIN.
540-1"-OD-1-069-03A-V 540-1"-OD-1-070-03A-V
MIN.
0
51 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
1851 193201DPFM03702
B 5 B
CSO
FROM LEAN AMINE PUMPS
GENERAL NOTES:
0
330-1-PA-002A/B FV
13
58
+
5
111 330-4"-LA-1-039-54AST-V A. ALL INSTRUMENT, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS
0
ON THIS P&ID SHALL BE PREFIXED BY 01-330-1, UNLESS OTHERWISE NOTED.
03 B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
03 03 13 13 PUMP MINIMUM FLOW C. DELETED.
7 7 0 0 6 7 0 0
58 58 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
5227 193201DPFM03704
5 4"x3" 5 OTHERWISE SPECIFIED.
CSO FO CSO CSO TO AMINE REGENERATOR
3"-150# E. DELETED.
8 330-1-VJ-002
1" 03
FI FB
C 111 D C
330-3"-LA-1-038-54AST-P
03 03 NOTES:
NOTE 5
3" 3" 7 3" 4 1. AUTOSTART OF STAND-BY PUMP ON LOW PRESSURE.
2. NON SLAM CHECK VALVE.
NOTE 5 3. STRAINER SCREEN MESH IS 50. 03
4. 5D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE UPSTREAM PUMP SUCTION NOZZLE.2D
(PIPE DIAMETER) MINIMUM STRAIGHT PIPE DOWSTREAM PUMP DISCHARGE NOZZLE.
FIC
5. REMOTE INDICATION FI-111 TO BE CLOSE TO FV-111 BY-PASS GLOBE VALVE.
111 L 6. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
3"-300# 7. REFER TO MECHANICAL SEAL SYMBOLS AND LEGEND FOR PLAN 11/53B.
DCS 03
D PT PI I D
FT 113 113
L
111 NOTE 1
0
13
GENERAL HOLDS INDEX:
64
16
0
a) Solved.
FE 3/4"-600# b) Solved.
+
c) Solved.
13 111 13 d) Solved.
0 0 0 0 LEAN AMINE
64 330-6"-LA-1-037-54AST-P 64 e) Solved.
1917 193201DPFM03700 f) Solved.
16 16
E TO LEAN AMINE AIR COOLER g) Solved. E
330-1-HC-001 h) Solved.
3/4"-600#
i) Solved.
j) Solved. 03
k) Solved.
FT l) Solved.
112 m) Solved. 03
n) Solved.
o) Solved.
p) Solved. 03
I ESD q) Solved.
r) Solved.
I4-1009 s) Solved.
F
13 03 F
LEAN AMINE 0 0 t) Solved.
330-8"-LA-1-029-54AST-P 63 GRAVITY FLOW u) Solved.
5095 193201DPFM03698 03
5 v) Solved.
FROM LEAN/RICH AMINE
FI FALL
EXCHANGER 330-1-HB-001A/B
112 112
LO 7
8
8 LO
FB
FB LO LPT
8 FB
MIN.
MIN.
2" LO 7
G 2" 64 UC G
UC 3"-300# NOTE 2 7
7 PG 8 FB
HOLDS:
330-8"-LA-1-035-54AST-P
113 8 FB
1. Solved.
64 4. Solved.
3"-300# 1" 03
NOTE 2 7. Solved.
330-8"-LA-1-036-54AST-P
330-1"-LA-1-044-54AST-P
330-6"-LA-1-037-54AST-P
PG
9. Solved.
114 FB 8
10. Solved.
330-1"-LA-1-027-54AST-P
330-6"-LA-1-037-54AST-P
MIN.
H H
330-1"-LA-1-045-54AST-P
H H
PDI PDI
111 03 03 112 03
0 330-1/2"-LA-1-067-54AST-P 0 330-1/2"-LA-1-066-54AST-P
13 13 EQUIPMENT LIST MOTORs LIST INSTRUMENT LOOP N°
0
13
0
3301PA003A 3301PA003B 13
64
16
6
64
64
16
16
03 03
PDT PG PDT 3301PA003A / B 3301EPA003A / B 013301M003
64
16
0
PG
3301EPA003B
0
03 03 03
L L
3"-300# 3"-300# 3"-300# 8 NOTE 4 3"-300# 3"-300# 3"-300# 8 NOTE 4 8 FB
FB 3"-300# 6"x3" FB 3"-300# 6"x3"
03 RS 03 RS
NOTE 3 NOTE 3 THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
03 NOTE 4 4"-300# NOTE 4 4"-300#
RS 03 RS STAGE UNDER NUMBER 330-GD-B-03699
M TYP 7B M TYP 7B UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
330-1"-AD-1-033-64AST-V
8"x4" 8 8"x4" 8
330-3/4"-LA-1-086-54AST-P
RS 03 RS 03
# #
600 FB 600 FB
4"- ESD 4"- ESD
330-3/4"-LA-1-084-54AST-P
3/ I 03 3/ I
03 MCC 03 MCC
330-1"-LA-1-083-54AST-P I4-1009 330-1"-LA-1-085-54AST-P 03 I4-1009
540-2"-OD-1-151-03A-V
03 03 03
03
540-2"-OD-1-150-03A-V
TOXIC
M 03 M
8 EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
FB EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
03 03 10259
MIN. 03 EX-DE 01 23-05-2016 ISSUED FOR DESIGN D. DANIELE E. SBALCHIERO A. LO BIANCO
8 AMINE DRAIN
03 EX-DE 00 10-02-2016 ISSUED FOR COMMENTS E. SBALCHIERO A. SPOLETO A. LO BIANCO
FB 03 330-2"-LA-1-045-54AST-P 193201DTFM62003_01
Validity Revision
MIN. 03 Status Number Date Description
Contractor Contractor Contractor Company Company
MIN. 4 6 Prepared Verified Approved Checked Approved
2"x1" Revision Index
330-2"-AD-1-011-64AST-V
330-2"-LA-1-044-54AST-P Company Logo and Business Name Project Name Company Document ID:
03
2"
4 6 MIN. 2"x1"
ZOHR
193201DPFM03699
330-2"-AD-1-010-64AST-V
2"x1" DEVELOPMENT
DCS DCS
NOTE 1 I 03 8 2" I Petrobel eni SpA PROJECT
N 03 N
2"x1" FB 03
03 8 2" NOTE 1
Contractor Logo and business name Contractor Document ID:
03
FB 03 03
TOXIC
8050
540-2"-OD-1-071-03A-V 8790
03
Facility and Sub Facility Name Scale Sheet of Sheets
AMINE DRAIN N.A.
540-4"-OD-1-643-81A-N OPEN DRAIN 1/1
193201DTFM62003_01
NOTE 6
ZOHR ONSHORE PHASE 01
03 MAIN/STAND-BY Document Title Superseedes N.
8049 8795 03
AMINE DRAIN OPEN DRAIN MHSM UNIT 330 - GAS SWEETENING/ACID GAS REMOVAL (AGR) Superseeded by N.
P P
193201DTFM62003_01 NOTE 6 003 LEAN AMINE BOOSTER PUMPS (TRAIN 1) Plant Area Plant Unit
03 PIPING & INSTRUMENTATION DIAGRAM P10 330
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03699_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
A 193201DPFM03653 EQUIPMENT SYMBOLS (3/3) A
TV 3301HC001 193201DPFM03654 NOMENCLATURE
V +
193201DPFM03655 PIPING SYMBOLS
121 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
FB LEAN AMINE AIR COOLER (1X100%)
1" 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
13 7 8 7 193201DPFM03658 VALVES TYPICAL (1/2)
330-6"-LA-1-047-54AST-P 0 330-6"-LA-1-048-54AST-P DESIGN DUTY MW 1.250
0
64 193201DPFM03659 VALVES TYPICAL (2/2)
16 DESIGN PRESSURE barg 15.8 193201DPFM03660 ELECTRICAL MOTORS DETAIL
6"x3"
FO 6"x3" 193201DPFM03661 SAMPLE CONNECTION (1/2)
3"-150# DESIGN TEMPERATURE (MIN/MAX) °C 0/130 193201DPFM03662 SAMPLE CONNECTION (2/2)
8 FB 03 03 IN OUT 193201DPFM03663 API PLAN
03 193201DPFQ03961 UNIT 330 AMINE PROCESS FLOW DIAGRAM
3" 7 3" 4 OPERATING PRESSURE barg 7.6 5.6 193201DPEQ03560
3" CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
OPERATING TEMPERATURE °C 64 49 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
330-1"-LA-1-025-54AST-P
B 1" NOTE 1 RATED POWER (each fan motor) kW 18.5 B
TRIM LINE
FB 8
MIN.
GENERAL NOTES:
A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS ON
THIS P&ID SHALL BE PREFIXED BY 01-330-1, UNLESS OTHERWISE SPECIFIED.
B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01-UNLESS OTHERWISE NOTED.
C. DELETED.
D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
6 OTHERWISE SPECIFIED.
E. DELETED.
C C
8 FB
NOTES:
0
13
330-1"-AD-1-034-64AST-V
1. REMOTE INDICATION TI-121 TO BE CLOSE TO TV-121 BY PASS GLOBE VALVE.
64
16
2. NUMBER OF BAY IS 1, NUMBER OF PASS IS 6. FOR EACH BAY 2 BUNDLES AND 2 FANS SHALL
0
BE PROVIDED.
3. INSTRUMENT TO BE SUPPLIED BY AIR COOLER VENDOR.
4. TEMPERATURE SET POINT WILL BE FIXED 10°C ABOVE INLET GAS TEMPERATURE TO
ABSORBER.
TOXIC
NOTE 4, 6
5. DELETED.
TIC H 6. TEMPERATURE CONTROLLER TO FIRST ACT ON THE FAN MOTORS AND THEN ON THE
10261 BYPASS CONTROL VALVE.
121
D
AMINE DRAIN L 7. 50% OF THE FANS TO BE OPERATED BY VARIABLE SPEED MOTORS. D
193201DTFM62003_01 8. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
03 9. AIR COOLER IS ASSUMED TO BE LOCATED HIGHERTHAN 7.6 m ABOVE GRADE.
0
1917 193201DPFM03699 6" 6" 49
16 03 03 1876 193201DPFM03701
HPT 16
FROM LEAN AMINE BOOSTER 6"x4" 3 3 TO LEAN AMINE PUMPS
G
PUMPS 330-1-PA-003A/B 3" 3" 6"x4" 330-1-PA-002A/B G
4"
BUNDLE 2 4" TG
3" 03 121
3"
3 3
03 HOLDS:
03
1. Solved.
7. Solved.
9. Solved.
H H
L L
M M
EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
EX-DE 01 23-05-2016 ISSUED FOR DESIGN F. ADORISIO E. SBALCHIERO A. LO BIANCO
EX-DE 00 05-02-2016 ISSUED FOR COMMENTS E. SBALCHIERO A. SPOLETO A. LO BIANCO
Validity Revision
Status Number Contractor Contractor Contractor Company Company
Date Description
Prepared Verified Approved Checked Approved
Revision Index
Company Logo and Business Name Project Name Company Document ID:
ZOHR
DEVELOPMENT 193201DPFM03700
Petrobel eni SpA PROJECT
N N
Contractor Logo and business name Contractor Document ID:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03700_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
3301XX002 193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
LEAN AMINE FILTRATION PACKAGE (1x100%) 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
A
03 193201DPFM03653 EQUIPMENT SYMBOLS (3/3) A
193201DPFM03654 NOMENCLATURE
DESIGN FLOWRATE act. m³/h 18 03 03 17 193201DPFM03655
03 5 PSV DISCHARGE PIPING SYMBOLS
V
0
FREE DRAINING
330-8"-RA-1-004-64AST-V 130 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
8898 193201DPFM03698
PSV 8 TOXIC 5 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
1" 03 TO AMINE REGENERATOR 193201DPFM03658
FB VALVES TYPICAL (1/2)
FV
+
FREE DRAINING
03 03 A. ALL INSTRUMENT,SPECIAL PIPE COMPONENTS ACTUATED VALVES AND INTERLOCK LOGIC TAG NUMBERS
FREE DRAINING
FREE DRAINING
330-4"-LA-1-074-54AST-V 330-2"-LA-1-075-54AST-V ON THIS P&ID SHALL BE PREFIXED BY 01-330-1, UNLESS OTHERWISE NOTED.
03 B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01, UNLESS OTHERWISE NOTED.
330-2"-LA-1-073-54AST-V C. DELETED.
D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
OTHERWISE SPECIFIED.
E. DELETED.
TP-02 TP-04 TP-05
C C
NOTES:
1.THE LEAN AMINE FILTRATION PACKAGE CONSISTS OF A PRE FILTER, AN ACTIVETED CARBON
FILTER AND A POST FILTER.
2. GLOBE VALVE TO PERMIT 10% TO 20% OF THE TOTAL SOLVENT CIRCULATION RATE
THROUGH THE FILTERS. VALVE POSITION TO BE SET AT START-UP.
3. REMOTE INDICATION FI-131B TO BE CLOSE TO MANUAL GLOBE VALVE.
15361 NOTE 4 4. DEMI WATER FOR CARBON FILTER BACKWASHING.
80
5. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
0
330-3"-LA-1-015-54AST-V
m) Solved.
n) Solved.
o) Solved.
p) Solved.
03
q) Solved.
r) Solved.
330-2"-AD-1-022-64AST-V
540-2"-OD-1-171-03A-V
F
s) Solved. F
t) Solved.
u) Solved.
NOTE 3 03
v) Solved.
80
FI
540-4"-OD-1-646-81A-N
48
16
TOXIC
131 B
0
03
3/4"-600#
FI FT
131 A 131
FE 8040
G 8778 G
AMINE DRAIN
+
SP LI-001
80 80
HOLDS:
LEAN AMINE NOTE 2, 3 LEAN AMINE
330-6"-LA-1-001-54AST-V GRAVITY FLOW
0
0
48 48 330-6"-LA-1-001-54AST-V 1. Solved.
1876 193201DPFM03700 1837 193201DPFM03702 03
16 TYPE A 16 7. Solved.
FROM LEAN AMINE AIR COOLER 4 TO LEAN AMINE PUMPS 9. Solved.
330-1-HC-001 330-1-PA-002A/B 10. Solved.
80
31. Solved.
48
16
03
NOTE 7
H 32. Solved. H
0
1 03
330-4"-LA-1-026-54AST-V
1"
MIN.
D
RS
FB
1
L L
03
MIN.
THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
03
03 03 STAGE UNDER NUMBER 330-GD-B-03701 EQUIPMENT LIST
03
NNF
80 03 80 10254 UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440 330-1-XX-002
ANTIFOAM INJECTION 6 NNF
330-2"-CH-1-004-38A-V 330-4"-LA-1-028-54AST-V
0
0
49 48 AMINE TO AGR STORAGE
15358 193201DPFM03711
16 LPT 17 193201DTFM62013
FROM ANTIFOAM INJECTION 03 7
PACKAGE 330-1-XX-001
FB 8
03
M 330-1"-LA-1-087-54AST-V M
EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
1"
MIN.
EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
D
EX-DE 01 23-05-2016 ISSUED FOR DESIGN M. VALSECCHI R. FERRARO A. LO BIANCO
FB 8 M. DI
EX-DE 00 05-02-2016 ISSUED FOR COMMENTS FRANCESCO
E. SBALCHIERO A. LO BIANCO
Validity Revision
Status Number Contractor Contractor Contractor Company Company
Date Description
6 03 Revision Index
Prepared Verified Approved Checked Approved
Company Logo and Business Name Project Name Company Document ID:
FB 8
ZOHR
DEVELOPMENT 193201DPFM03701
Petrobel eni SpA PROJECT
N N
330-1"-AD-1-036-64AST-V
TOXIC
N.A. 1/1
ZOHR ONSHORE PHASE 01
Document Title Superseedes N.
10252
P AMINE DRAIN UNIT 330 - GAS SWEETENING/ACID GAS REMOVAL (AGR) Superseeded by N. P
193201DTFM62003_01
LEAN AMINE FILTRATION (TRAIN 1) Plant Area Plant Unit
03 PIPING & INSTRUMENTATION DIAGRAM P10 330
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03701_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
V FV 193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
3301PA002A / B FB
141
+
03
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
1" 8 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
03 03 63 0 80 PUMP MINIMUM FLOW 193201DPFM03653 EQUIPMENT SYMBOLS (3/3)
A LEAN AMINE PUMP (2x100%) CSO CSO CSO A
51 193201DPFM03654 NOMENCLATURE
1851 193201DPFM03699 193201DPFM03655 PIPING SYMBOLS
DESIGN FLOWRATE m3/h 90 FO 5
7 7 7 TO AMINE REGENERATOR 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
SUCTION PRESSURE barg 5.80 FB 3"-900# 63 FB INSTRUMENTATION SYMBOLS (2/2)
FB 330-1-VJ-002 193201DPFM03657
1" 8 1" 8 193201DPFM03658 VALVES TYPICAL (1/2)
DIFFERENTIAL HEAD m 820 1" 03
8 193201DPFM03659 VALVES TYPICAL (2/2)
330-3"-LA-1-008-54DST-V
SHUT OFF PRESSURE barg 115.0 D 2"x1" 193201DPFM03660 ELECTRICAL MOTORS DETAIL
330-3"-LA-1-065-54AST-V 193201DPFM03661 SAMPLE CONNECTION (1/2)
DESIGN TEMPERATURE (MIN/MAX) °C 0/80 03
3" 193201DPFM03662 SAMPLE CONNECTION (2/2)
RATED POWER kW 324.0 03 3"
193201DPFM03663 API PLAN
1" 193201DPFQ03961 UNIT 330 LEAN AMINE FILTRATION PROCESS FLOW DIAGRAM
8 4
MIN.
D 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
8 FB 03 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
B B
6 GENERAL NOTES:
330-2"-LA-1-071-54DST-V
A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS
FIC
8 FB ON THIS P&ID SHALL BE PREFIXED BY 01-330-1, UNLESS OTHERWISE NOTED.
141 B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
L 330-2"-AD-1-049-64AST-V C. DELETED.
73 TOXIC
ESD 15397 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
I PI PALL OTHERWISE SPECIFIED.
AMINE DRAIN
I4-1010 143 143 E. DELETED.
80
193201DTFM62003_01
C 03 03 C
115
51
0
PI I ESD
FT FIC NOTES:
144 L 143 143 I4-1004 03
L 1. AUTOSTART OF STAND-BY PUMP ON LOW FLOW DETECTED BY FT-055
PT PT 03 SDV (SHOWN ON P&ID 193201DPFM03694).
V FV
FB
+
2. BY PASS LINE FOR CLEANING OF CIRCUIT DURING COMMISSIONING.
143 144 142
+
80
16 115 1" 8 8
115
7. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
51
03 03 7 7 8 2"x1"
63 FB DBB D 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
0
1" 80
8 3"-900# 8. REFER TO MECHANICAL SEAL SYMBOLS AND LEGEND FOR PLAN.
0
1½" 1½" 330-2"-LA-1-070-54AST-V 51 9. REFER TO INSTRUMENTATION SUMBOL AND LEGEND FOR BEARING. 03
03
12
330-2"-LA-1-031-54DST-V
1" 8 4 80
330-6"-LA-1-006-54AST-V
03 D
0
330-2"-LA-1-031-54DST-V 51
MIN.
PT 8 FB 03
115 GENERAL HOLDS INDEX:
145
a) Solved.
6 b) Solved.
E FT c) Solved. E
330-2"-LA-1-062-54DST-V d) Solved.
PI 03
141 e) Solved.
145 8 FB
f) Solved.
03 330-2"-AD-1-035-64AST-V g) Solved.
73 TOXIC h) Solved.
3/4"-1500# 15398
AMINE DRAIN
i) Solved.
FE j) Solved. 03
193201DTFM62003_01
03
+
0
0
51 330-6"-LA-1-004-54DST-V 51
7838 193201DPFM03694 m) Solved. 03
115 115
03 TO SOUR GAS ABSORBER n) Solved.
DBB FT 330-1-VJ-001 o) Solved.
NOTE 2
F F
7 LO 142 p) Solved. 03
3/4"-1500# q) Solved.
7 LO
1" 03 r) Solved.
1" s) Solved.
ESD t) Solved.
FB 8 I
FB 8 u) Solved. 03
I4-1010
7 LO 7 LO 03 v) Solved.
FB 8 FI FALL 03
NOTE 3 FB 8 NOTE 3
64 142 142
G 03 64
G
LEAN AMINE 80
GRAVITY FLOW 330-6"-LA-1-001-54AST-V 03 HOLDS:
0
49 03
1837 193201DPFM03701 3"-900#
LPT 16 3"-900# 1. Solved.
FROM LEAN AMINE COOLER 63 PG DBB 63 PG DBB
330-1-HC-001 54AST 54AST 4. Solved. 03
7 8 144
8 143 7. Solved.
LO 54DST LO 54DST MAIN/STAND-BY
330-1"-LA-1-010-54DST-V
FB FB 9. Solved.
330-6"-LA-1-081-54DST-V
330-6"-LA-1-004-54DST-V
330-1"-LA-1-009-54DST-V
330-2"-LA-1-056-54AST-V
MIN.
7
2"
UC 2" 2"
UC
MIN.
H H
FB 8 FB 8 DCS
I
540-2"-OD-1-073-03A-V
PDI H PDI H
NOTE 1
330-6"-LA-1-002-54DST-V
141 142
80
115
51
6 330-1"-LA-1-090-54DST-V
80
540-4"-OD-1-645-81A-V
GRAVITY FLOW
330-1"-LA-1-076-54DST-V
115
51
330-6"-LA-1-003-54DST-V
0
8783
3301PA002A 3301PA002B
GRAVITY FLOW
03
0
OPEN DRAIN PDT PG 03 PDT PG
NOTE 8 4 141 141
NOTE 8, 9
1"-1500# 142 142
NOTE 8, 9
1"-1500#
EQUIPMENT LIST MOTORs LIST INSTRUMENT LOOP N°
03 03
FB 8 NOTE 5 03
FB 8 NOTE 5 03 3301PA002A / B 3301EPA002A / B 013301M002
330-2"-AD-1-012-64AST-V
3"-900# 3"-900# 3"-900# 3"-1500# 6"x3" 3"-900# 3"-900# 3"-900# 3"-1500# 6"x3"
L 03 03 L
RS RS
NOTE 5 4"-1500# NOTE 4 NOTE 5 4"-1500#
TOXIC
80 NOTE 4 80
03 03
0
49 RS
49 RS
THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
03 115 M TYP 7C
115
8
M TYP 7C
STAGE UNDER NUMBER 330-GD-B-03702
RS 6"x4" 03 8 RS 6"x4"
UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
-V FB -V FB
330-1"-LA-1-089-54DST-V
ST ST
330-1"-LA-1-077-54DST-V
03 4D # 4D #
8788
92-5 1500 MCC 78-5 1500 MCC
0 - 0 03
AMINE DRAIN -1- 1" -1- 1"-
" - LA "- LA
193201DTFM62003_01 03 0-1 0-1 03
540-2"-OD-1-173-03A-V
33 33
540-2"-OD-1-172-03A-V
I ESD I ESD
M M
03 I4-1010 I4-1010 EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
03 03
8 8 EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
03
FB 3301EPA002A FB 03 3301EPA002B EX-DE 01 23-05-2016 ISSUED FOR DESIGN D. DANIELE R. FERRARO A. LO BIANCO
M. DI
MIN. MIN. EX-DE 00 05-02-2016 ISSUED FOR COMMENTS E. SBALCHIERO A. LO BIANCO
73 73 FRANCESCO
2"x1" 2"x1" Validity Revision
330-2"-AD-1-006-64AST-V 330-2"-LA-1-009-54DST-V 330-2"-LA-1-010-54DST-V Status Number Date Description
Contractor Contractor Contractor Company Company
Prepared Verified Approved Checked Approved
MIN. Revision Index
4 6 4 6 MIN. Company Logo and Business Name Project Name Company Document ID:
ZOHR
DEVELOPMENT 193201DPFM03702
03
8 03 8 eni SpA PROJECT
N 2" 2" Petrobel N
FB 330-2"-AD-1-007-64AST-V FB
03 Contractor Logo and business name Contractor Document ID:
03 TOXIC
73
TOXIC
73
03 Engineering for the Petroleum and Process Industries
540-2"-OD-1-074-03A-V 03 540-2"-OD-1-075-03A-V Contract N. 4613-440
Facility and Sub Facility Name Scale Sheet of Sheets
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03702_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
IN : 1"-600# 03 V 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
FB 193201DPFM03653 EQUIPMENT SYMBOLS (3/3)
A OUT: 2"-150# A
1" 193201DPFM03654 NOMENCLATURE
1D2 PSV 8 1 13 193201DPFM03655
0 PSV DISCHARGE PIPING SYMBOLS
3300PA003A / B 3300CL001
+
0
NOTE 4, 5 151 330-3"-RA-0-001-64AST-V 40 TOXIC 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
15413 193201DPFM03708
SET=17.0 barg FREE DRAINING 3.5 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
3"x2" LO 193201DPFM03658 VALVES TYPICAL (1/2)
AMINE DRAIN PUMPS (2X100%) AMINE CHARGE FILTER (1x100%) 03 FB TO AMINE DRAIN DRUM
330-0-VA-001 193201DPFM03659 VALVES TYPICAL (2/2)
H 193201DPFM03660 ELECTRICAL MOTORS DETAIL
DESIGN FLOWRATE m3/h 9.20 DESIGN FLOWRATE m3/h 55.0 PDI 193201DPFM03661 SAMPLE CONNECTION (1/2)
03 2"x1"
SUCTION PRESSURE barg 4.04 DESIGN PRESSURE barg 17.0 193201DPFM03662 SAMPLE CONNECTION (2/2)
151 API PLAN
DESIGN TEMPERATURE (MIN/MAX) °C 0/80 1" 193201DPFM03663
DIFFERENTIAL HEAD m 94 193201DPFQ03965 UNIT 330 AGR AMINE STORAGE PROCESS FLOW DIAGRAM
SHUT OFF PRESSURE barg 17.0 STEAM OUT CONDITIONS HV @ 175°C V 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
DESIGN TEMPERATURE (MIN/MAX) °C 0/130 OPERATING PRESSURE barg 8.8 FB 8 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
B B
RATED POWER kW 16.16 OPERATING TEMPERATURE °C 70 FB
PDT LO
INSULATION YES/NO YES 8
151
03 3"-300# 3"-300# GENERAL NOTES:
FREE DRAINING
330-2"-LA-0-047-54AST-P PG
540-2"-OD-0-174-03A-P 158 A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENTS, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS
ON THIS P&ID SHALL BE PREFIXED BY 01-330-0-,UNLESS OTHERWISE NOTED.
3300CL001 B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
RS
C. DELETED.
80
D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
70
17
PG TG
2" 3"-300# OTHERWISE SPECIFIED.
0
151 03 151 E. DELETED.
V
C 80 7 330-4"-LA-0-048-54AST-P 15441 C
0
RS 70 LEAN AMINE
3"-300#
17 NOTES:
S LPT 193201DTFM62013
03 1. LINE USED FOR INITIAL / POST - MAINTENANCE FILLING.
03 TO LEAN / RICH AMINE
80 2" EXCHANGERS 2. 5D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE UPSTREAM PUMP SUCTION NOZZLE.
7 E 2D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE DOWNSTREAM PUMP DISCHARGE PUMP
330-2"-LA-0-094-54AST-P
0
70 D1 MIN. TRAIN 1,2,3,4
80 17 03 NOZZLE.
AMINE
C
330-4"-LA-0-015-54AST-P 3. CHECK VALVE NON-SLAM TYPE.
5°
0
70
17
15412 193201DPFM03709 4. SIZING CASE: FIRE.
@
17 7 2"
HV
FROM AMINE TRANSFER PUMPS 5. SPARE PSV IS STORED IN WARE HOUSE BECAUSE PSV IS PROVIDED FOR FIRE CASE ONLY.
MIN.
330-0-PA-001 MIN. S.O. D2 6. STRAINER SCREEN MESH IS 50. 03
330-0-PA-002 7. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
D FO 03 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458. D
03
8. PUMP ON MANUAL START, AUTOSTOP ON LOW LIQUID LEVEL.
+
151
MIN. FLOW 13 6 9. REFERS TO MECHANICAL SEAL SYMBOLS AND LEGEND 11/53B.
0 330-4"-LA-0-045-54AST-P 03
330-2"-LA-0-051-64AST-P 0 70
193201DPFM03708 15459
TOXIC 3.5 7
TO AMINE DRAIN DRUM 3 FB 8
330-0-VA-001 03 7
GENERAL HOLDS INDEX:
7
330-1"-LA-0-046-54AST-P
a) Solved.
b) Solved.
PG 2" c) Solved.
03
154 d) Solved.
80
03 e) Solved.
70
17
E 03 3"-300# E
13 NOTE 3 f) Solved.
0 03
0
330-1/2"-LA-0-070-64BST-P 03
0
330-2"-LA-0-043-54AST-P
64 1"
MIN. FLOW
7
3300PA003A 8 i) Solved.
MIN.
FB j) Solved.
3"x1"
NOTE 9 03
03 ESD k) Solved.
330-3"-LA-0-036-64BST-P I 03
RS
PDG PG 03 l) Solved.
I4-0001
NOTE 2
m) Solved. 03
152 153 FB
RS
03 n) Solved.
MIN.
8 1"
330-3"-LA-0-038-64BST-P
o) Solved.
3"-300# 03 3"-300# 3"-300# D
7 D p) Solved.
13 NOTE 2 03
FB 0 NOTE 6 FB 8 q) Solved.
03
0
105 RS
540-2"-OD-0-076-03A-V
F r) Solved. F
LO
17
8
M MCC
6 s) Solved.
03 2" RS FB t) Solved.
0
7 u) Solved.
3300EPA003A
13
3 03
105
3.5
UC 03 03 4 v) Solved.
TYP 7A
0
8 FB
80
540-2"-OD-0-175-03A-V 330-1/2"-LA-0-079-64BST-P
70
17
330-1"-AD-0-016-64AST-P
TOXIC
0
03 03
03
G 330-2"-LA-0-039-64BST-P G
6
HOLDS:
1. Solved.
TOXIC
2"x1" 03
03 4. Solved. 03
7 2" 7. Solved.
4
540-4"-OD-0-911-81A-N 9. Solved.
3 540-2"-OD-0-077-03A-V 3 13. Solved.
10250
TOXIC
6 8761
03 14. Solved.
03 OPEN DRAIN AMINE DRAIN
03 15. Solved.
NOTE 7 193201DTFM62003_01 28. Solved.
540-4"-OD-0-913-81A-N
330-2"-AD-0-003-64AST-V
15457
4 31. Solved.
LEVEL SIGNAL DCS OPEN DRAIN 03
I
15411 193201DPFM03708 03
TOXIC
H NOTE 7 H
3"x2"
TOXIC
PG
330-3"-LA-0-035-64AST-P
AMINE DRAIN
330-4"-LA-0-050-54AST-P
157 03 193201DTFM62003_01
03 03
3"-300# 13
0 NOTE 3 1667
330-1/2"-LA-0-071-64BST-P
0
105 TOXIC
AMINE DRAIN
3300PA003B 17
64 7 193201DTFM62003_01 EQUIPMENT LIST MOTORs LIST INSTRUMENT LOOP N°
03
3"x1"
03 03 I
PDG PG 3300PA003A / B 3300EPA003A / B
NOTE 2
013300M203A/B
FB I4-0001 FB
RS
L L
155 156 03
8 8
3"-300# 3"-300# 3"-300#
NNF
0
13
FB NOTE 6
0
105
RS
105 STAGE UNDER NUMBER 330-GD-B-03703
17
15410 193201DPFM03708
17 TOXIC 8
M MCC
UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
0
330-0-VA-001 03 RS
330-3"-LA-0-035-64AST-P
7
03 03
3300EPA003B
UC 03 TYP 7A
80
70
17
8 FB
0
03
M M
03
TOXIC
EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
3
NOTE 1
6 DEVELOPMENT
Petrobel eni SpA PROJECT
N N
Contractor Logo and business name Contractor Document ID:
03 4
03
TOXIC
N.A. 1/1
NOTE 7 03 193201DTFM62003_01
3 ZOHR ONSHORE PHASE 01
13
NNF
70
193201DPFM03709 15414 UNIT 330 - GAS SWEETENING/ACID GAS REMOVAL (AGR) Superseeded by N.
P 17 P
TO AGR AMINE STORAGE AMINE CHARGE PUMP & FILTER Plant Area Plant Unit
TANK 330-0-TA-001 PIPING & INSTRUMENTATION DIAGRAM P01 330
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name:
193201DPFM03703_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
10359 REFERENCE DOCUMENT
IN : 8"-150# 3301VJ002 V
4
230-1"-AL-1-004-37AS-V LP FLARE 193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
03 FB 193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
OUT: 10"-150# 330-1"-GA-1-006-67AS-P ESD
193201DTFM64108_01
1" 8 I 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
V AMINE REGENERATOR (1x100%) 193201DPFM03653
PSV EQUIPMENT SYMBOLS (3/3)
A 8T10 I4-1005 03 03 193201DPFM03654
A
+
NOMENCLATURE
5211 16 1 1" 161 A TOP BOTTOM 193201DPFM03655 PIPING SYMBOLS
0 0 1 PV
230-18"-AL-1-007-37AS-V -1 INTERNAL DIAMETER mm 1500 2500 SDV 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
28
+
LP FLARE SET@ 3.5 barg 161 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
HEIGHT (TL/TL) mm 25770
+
193201DTFM64108_01 3.5 NOTE 11 162
LO 18"x10" 1" 8 53 8 1" 80 12353 193201DPFM03658 VALVES TYPICAL (1/2)
03 DESIGN PRESSURE barg 3.5 / FV 5.0 / FV FB FB 0 193201DPFM03659 VALVES TYPICAL (2/2)
IN : 8"-150# 10"x8" 50 NITROGEN
193201DPFM03660
03 DESIGN TEMPERATURE (MIN/MAX) °C 0/175 0/175 ELECTRICAL MOTORS DETAIL
330-2"-GA-1-002-67AS-P
03 18"x10" FC 12 193201DTFM64104 193201DPFM03661 SAMPLE CONNECTION (1/2)
V OUT: 10"-150# STEAM OUT CONDITIONS HV @ 175°C HV @ 175°C 6 7 7 2"x1" 2"x1" 7 FC
V 1" FB 1" 1"-600# FB TSO 193201DPFM03662 SAMPLE CONNECTION (2/2)
D 1"
PSV SP LK-003 OPERATING PRESSURE barg 1.2 1.7 03 03
8824 17 1 1" 8T10 1" FB 8 8 D 8 FB 03 8 2"-150# 193201DPFM03663 API PLAN
193201DPFQ03960 UNIT 330 SOUR GAS ABSORBTION PROCESS FLOW DIAGRAM
+
0 0 161 B ILO OPERATING TEMPERATURE °C 112 130 1" 4 1" 8 D 600-2"-UN-1-003-06A-V
-1 230-18"-AL-1-002-37AS-V 1 03 8 1" 1" 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
LP FLARE 28 FB 1"
3.5 INSULATION YES/NO YES YES 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
193201DTFM64108_01 LO SET@ 3.5 barg V
18"x10" 03 TRIM LINE 330-TL-1-007-67AS-I 03 NOTE 5 FB LC GENERAL NOTES:
NOTE 11 SP LK-003
B B
03 FB 8
03 10"x8" TRIM LINE 330-TL-1-020-67BS-I 03
8827
03 8 ILO FO A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT ACTUATED VALVES AND INTERLOCK LOGIC TAG NUMBERS ON THIS
18"x10" 1" FB 03 03
H
+
LP FLARE 161
V 03 PIC PID SHALL BE PREFIXED BY 01-330-1-, UNLESS OTHERWISE NOTED.
193201DTFM64108_01 SP LK-003 3"x2" B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
FB 8 03 161
03 ILC L NOTE 5 C. DELETED.
03 8
FREE DRAINING
VERY TOXIC
FB ESD D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
PAHH PI I 03
230-2"-AL-1-005-37AS-V
330-18"-GA-1-004-67AS-P
3"-300# 3"-300# 03 COLUMN HHLL.
1" 8 13 03
0 17 DBB DBB 0 0 ACID GAS 2. DELETED.
-1 0 4 7 VERY TOXIC NO POCKET 330-12"-GA-1-001-67AS-P 112
28 330-2"-GA-1-008-67AS-P FREE DRAINING
5214 193201DPFM03705 3. MINIMIZE LENGTH AND NUMBER OF DIRECTION CHANGES DUE TO SLUG FLOW.
3.5
VERY TOXIC
3.5 MIN. 10336 VERY TOXIC 4. DELETED.
NOTE 9
CSC FV TO REGENERATOR CONDENSER 5. REMOTE INDICATION PI-161 TO BE CLOSE TO PV-161 BY-PHASE GLOBE VALVE.
600MM LP FLARE
330-1-HC-002 6. VALVE AT MINIMUM DISTANCE FROM EQUIPMENT AT SAME ELEVATION OF EQUIPMENT
03 193201DTFM64108_01 V
VERY TOXIC
NOZZLE.
RS
03 03 7. DELETED.
0
7
17
8" 3"
8. COLUMN BOTTOM LOW LOW LIQUID LEVEL ELEVATION TO BE ABOVE EXCHANGER HB-001A/B
3.5
230-2"-AL-1-003-37AS-P - 28
03
FREE DRAINING
N3 TOP INLET NOZZLE ELEVATION.
10
N14 N12 9. PERSONNEL PROTECTION TO BE EXTENDED DOWNSTREAM LAST VALVE FOR THE SECTION
D 03 OF PIPING ACCESIBLE BY OPERATORS.
D
FV
03 NOTE 6 03 CN6 d) Solved.
EXCHANGER #20 164 164
03 6"-150#
330-1-HB-001 A/B 7 2" 7 2" 03 RTD e) Solved.
f) Solved.
g) Solved.
h) Solved.
03 03 i) Solved.
03 PDT PDI H 03
03 6" 7 6" 4 j) Solved.
6" 6" 163 163 k) Solved.
LC l) Solved.
F F
03 03 m) Solved. 03
MIN.
FO n) Solved.
330-2"-RA-1-032-67AS-V +
o) Solved.
1" 162
8 03 CN7 TT TI p) Solved. 03
FB q) Solved.
163 163
M3 #12 r) Solved.
6 RTD s) Solved.
t) Solved.
u) Solved. 03
7 2" v) Solved.
#1 3"-300#
H DBB
TI TT
330-2"-AD-1-037-64AST-V CN8
G
161 A 161 CN1A 17 VAPOUR RETURN
G
TOXIC L 03 0 5
10323
RTD M2 03 N7 130 NO POCKETS 330-14"-LA-1-042-56AST-I
AMINE DRAIN 1889
193201DPFM03707
5 HOLDS:
FV
RS
193201DTFM62003_01 TI FROM REGENERATOR REBOILER
161 B 17 03 AMINE 330-1-HA-002 1. Solved. 03
03 0 5
130 FREE DRAINING 330-10"-LA-1-041-57AS-I 7. Solved.
N5 1955 193201DPFM03707 9. Solved.
5
FV TO REGENERATOR REBOILER 11. Solved.
330-1-HA-002 13. Solved.
14. Solved.
15. Solved.
28. Solved.
H 03 17 29. Solved. H
PSV DISCHARGE 0 5 03
330-8"-RA-1-004-64AST-V FREE DRAINING TOXIC 130 RS 30. Solved.
5097 193201DPFM03698 N13
5
FROM LEAN AMINE FILTRATION PACKAGE & FV 10"x8"
LEAN/RICH AMINE EXCHANGERS 03
M1 17
HHLL=3970.0 mm NOTE 1 0 5 AMINE
130 FREE DRAINING
NOTE 10 330-10"-LA-1-043-56AST-I
HLL=3670.0 mm N6 193201DPFM03707 1954
5 V
L LLL=610.0 mm FV FROM REGENERATOR REBOILER L
LLLL=300.0 mm NOTE 8 03 03
1" 8 17 03 15478 330-1-HA-002
0 0
7 4 -1
28 230-1"-AL-1-036-37AS-V LP FLARE
17 THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
PUMP MIN FLOW 3.5 EQUIPMENT LIST
2"x1"
5227 193201DPFM03699 N8 03
5 7 7 3"-300# 03 UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440 3301VJ002
FROM LEAN AMINE BOOSTER FV CN3B DBB
PUMP AND LEAN AMINE PUMP 3"-300# 2" 2" DBB
330-1-PA-003 A/B DBB 8 1" 03
330-1-PA-002 A/B NOTE 13 CN4B
FB D H
3"
LG LT LI
ESD DP
LAHH LALL LI I LT 161 161 161
DETAIL "A" MAG DBB 3"-300# L
M
162 162 162 I4-1005 162 3"-300# DP M
7 7 DBB
03 ESD DBB EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
I CN4A CN3A
CHIMNEY
2" EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
3"x2"
TRAY 2"
I4-1009 2" 1"
2"x1"
8 FB Validity Revision
Contractor Contractor Contractor Company Company
17 1" 8 Status Number Date Description
Prepared Verified Approved Checked Approved
0 5 FB
Revision Index
01-330-1-HA-002 130 330-2"-LA-1-033-56AST-P Company Logo and Business Name Project Name Company Document ID:
N10
MIN.
REGENERATOR REBOILER 5 N2
FV
ZOHR
6
7 H DEVELOPMENT 193201DPFM03704
TI Petrobel eni SpA PROJECT
N 540-2"-OD-1-079-03A-V D N
NOTE 1
162
MIN.
GENERAL NOTES:
A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENTS ACTUATED VALVES AND INTERLOCK LOGIC
TAG NUMBERS ON THIS P&ID SHALL BE PREFIXED BY 01-330-1 UNLESS OTHERWISE NOTED.
B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
C. DELETED.
D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
OTHERWISE SPECIFIED.
E. THE PRESENT DOCUMENT IS PART OF THE HANDOVER PACKAGE. FOR DETAILS REFER TO HANDOVER
MEMORANDUM - PROCESS SECTION.
C C
NOTES:
1. INSTRUMENT TO BE SUPPLIED BY AIRCOOLER VENDOR.
2. NUMBER OF BAY IS 1, NUMBER OF PASSES IS 2. FOR THE BAY, 1 BUNDLE AND 2 FANS SHALL
BE PROVIDED.
3. TEMPERATURE CONTROL BY VARIABLE SPEED.
4. 50% OF THE FANS TO BE OPERATED BY VARIABLE SPEED MOTORS.
5. AIR COOLER IS ASSUMED TO BE LOCATED HIGHERTHAN 7.6m ABOVE GRADE.
03
17
03
3.5
q) Solved.
28
03
r) Solved.
0
-1
s) Solved.
H t) Solved.
230-2"-AL-1-030-37AS-V
TIC
ESD ESD NOTE 3 u) Solved. 03
I I 172
MCC
VSDS MCC L v) Solved.
TI I4-1006 I4-1006
171 03 3301EKF002A 03 3301EKF002B 03
TYP 7E TYP 7A
F
V 03
NOTE 1 M M NOTE 1
F
VT VT
1" 8
171 172
4 7
2"
MIN.
CSC TT TG
600MM
172 172
TG TT
RTD
171 171
RTD
HPT 6" 4" 11
ACID GAS 13 0 2 ACID GAS
0 0 330-12"-GA-1-001-67AS-V FREE DRAINING
49 330-10"-GA-1-009-67AS-V
G 5214 193201DPFM03704
112
3.5
12" BUNDLE 1 10"
3.5 VERY TOXIC TWO PHASE FLOW
1854 193201DPFM03706 G
NO POCKETS VERY TOXIC NOTE 2, 4, 5 FV 03 TO AMINE REGENERATOR
FROM AMINE REGENERATOR FV 6" 5D MIN.
330-1-VJ-102 4" OVHD REFLUX DRUM
330-1-VA-001
3301HC002 7 2"
BAY A UC
H H
L L
M M
EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
EX-DE 01 23-05-2016 ISSUED FOR DESIGN R. CAREDDU R. FERRARO A. LO BIANCO
EX-DE 00 05-02-2016 ISSUED FOR COMMENTS G. GARITO A. SPOLETO A. LO BIANCO
Validity Revision
Status Number Contractor Contractor Contractor Company Company
Date Description
Prepared Verified Approved Checked Approved
Revision Index
Company Logo and Business Name Project Name Company Document ID:
ZOHR
DEVELOPMENT 193201DPFM03705
Petrobel eni SpA PROJECT
N N
Contractor Logo and business name Contractor Document ID:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03705_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
8 V REFERENCE DOCUMENT
FB 1" 03 17 15493
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
4 0
0
-1
330-2"-GA-1-016-65AS-V 230-2"-AL-1-031-37AS-V FREE DRAINING 28 LP FLARE 193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
3.5 193201DTFM64108_01 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
2"x1" 193201DPFM03653 EQUIPMENT SYMBOLS (3/3)
A PT PIC A
193201DPFM03654 NOMENCLATURE
185 185 PV 03 03 193201DPFM03655
1" 8 PIPING SYMBOLS
1"
+
0
DBB FREE DRAINING
-1
IN : 3"-150# 230-10"-AL-1-012-37AS-V 28 LP FLARE 193201DPFM03659 VALVES TYPICAL (2/2)
OUT: 4"-150# 3.5 193201DTFM64108_01 193201DPFM03660 ELECTRICAL MOTORS DETAIL
03 CSO CSO 10"x6" FC 10"x6" CSO 193201DPFM03661 SAMPLE CONNECTION (1/2)
03 3L4 FB FB TSO FB SAMPLE CONNECTION (2/2)
V 1" 1" 03 6"-150# 03 1" 193201DPFM03662
8 8 03 193201DPFM03663 API PLAN
PSV 8
1 03 D D D 193201DPFQ03963 UNIT 330 RICH AMINE REGENERATION PROCESS FLOW DIAGRAM
15477 17 1" +
193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
0 1 181 B 03
0
6"x4" NOTE 11
-1
230-6"-AL-1-032-37AS-V
330-10"-GA-1-014-65AS-V
LP FLARE 28 H 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
FREE DRAINING
3.5 SET@ 3.5 barg FI PIC 330-2"-GA-1-015-65AS-V
B 193201DTFM64108_01 LO 10525 03 10541 10542 GENERAL NOTES: B
IN : 3"-150# 184 182 V 4
03 OUT: 4"-150# L 230-2"-AL-1-009-37AS-V LP FLARE LP FLARE LP FLARE
03 FB A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGIC TAG NUMBERS ON
03 3L4 03 1" 193201DTFM64108_01 193201DTFM64108_01 03 193201DTFM64108_01
PI 8 2" THIS PID SHALL BE PREFIXED BY 01-330-1-, UNLESS OTHERWISE NOTED.
V 6"x3" 182 230-2"-AL-1-021-37AS-V ESD 230-2"-AL-1-022-37AS-V 03 B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS
PSV NOTE 11 2"x1" 03 03 I 03 OTHERWISE NOTED.
FREE DRAINING
7094
0 17 1 1" 03 +
NOTE 3
-1 0 230-6"-AL-1-008-37AS-V 1 6"x4" 181 A FT PT I4-1007 C. DELETED.
LP FLARE 28 03 8 8 03 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
TG PG 4 4
193201DTFM64108_01 3.5 LO SET@ 3.5 barg 184 182
181 186 OTHERWISE SPECIFIED.
03 1" PV 03 E. DELETED.
1" 6"x3" FE + 7 7
03
1"
V 3/4"-600# 03 182
1"
+
V 03 184 ESDV
3"-300# 03 +
0
C 03 03 FREE DRAINING
DBB 330-10"-GA-1-010-65AS-V 49 ACID GAS C
1" ILO 1" ILC NOTES:
03 SP LK-004 SP LK-004 H VERY TOXIC NO POCKET 3.5 193201DTFM62002
V DBB SC CO2 AI FC FC TSO 1. AUTOSTART OF STAND-BY PUMP ON LOW FLOW.
FV
FB FB 6"-150# FB FB 10"-150#
8 FB FB 8 FB FB 181 NOTE 13 181 A 1" 1" NOTE 3 1" 1" 2. INTERFACE LEVEL GAUGE.
ILO 8 03 ILC 8 03 8 8 8 3. REMOTE INDICATION PI-182 TO BE CLOSE TO PV 182A BY-PASS GLOBE VALVE.
TYPE E 03 8
H D D D D 4. REMOTE INDICATION FI-183 TO BE CLOSE TO FV-183 BYPASS GLOBE VALVE.
SP LK-004 DBB AT H2S AI
03 SP LK-004 03 6" 7 6" 4 03
FREE DRAINING
RS
V 03 181 181 B 03 6" 5. NON-SLAM TYPE CHECK VALVE.
230-2"-AL-1-010-37AS-V V 330-6"-GA-1-017-65AS-V 6. STRAINER SCREEN MESH IS 50 HOLD 4.
37AS 65AS 03 H
VERY TOXIC 7 2" 6" AI LC 7. LG-181 TO BE IN VIEW OF LG-182 AND DEAD MAN VALVE IN ORDER TO DETECT SKIM-OIL .
1" 03 N2 MERCAPTANS
8851
0 17 FB N9 DBB 03 8. LINE TO BE USED ONLY IN CASE OF EXCESS WATER IN SOLVENT SYSTEM.
-1 0 4 7 N7 181 C
LP FLARE 28 330-2"-GA-1-012-65AS-V CN6A 9. 5D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE UPSTREAM PUMP SUCTION NOZZLE.
330-6"-GA-1-011-65AS-V 3"-300#
193201DTFM64108_01 3.5 MIN. FREE DRAINING PDT PDI H 2D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE DOWNSTREAM PUMP DISCHARGE NOZZLE.
CSC
D 03 600MM 186 186 10. DEAD-MAN VALVE (SPRING RETURN). D
03 VERY TOXIC FREE DRAINING
ACID GAS 11 3"-300# 11. PSV DESIGN CASE: BLOCKED OUTLET.
0 2 N10 CN6B
49 FREE DRAINING 330-10"-GA-1-009-67AS-V RS FO 12. THE USE OF BENDS WITHIN 10 PIPE DIAMETER OF THE INLET NOZZLE SHOULD BE AVOIDED.
1854 193201DPFM03705 DBB
IF BENDS CANNOT BE AVOIDED, THEY ARE PERMITTED ONLY IN THE VERTICAL
+
330-2"-ZW-1-026-67AS-V
181 3301VA001 15. (NO POCKET) WILL BE APPLICABLE DOWN STREAM THE GLOBE VALVE.
330-2"-NW-1-013-38A-V DBB 16. REFER TO MECHANICAL SEAL SYMBOL AND LEGEND FOR PLAN 11/53B.
CN3A 03 CN1A
3"-300# DP 17. VALVE IS PART OF CHEMICAL INJECTION FITTING SCOPE OF SUPPLY. 03
522-2"-NW-1-002-38A-V HV HH1 2" CN4A LT
+
03 8" 2" 03
8137 80 03 181 11 DBB 182
E 0 1 1 1 2 NOTE 7 DBB 3"-300# GENERAL HOLDS INDEX: E
0
2
L
11
1" 1 1" 1" 3"-300# DBB MAG SP LV-003 c) Solved.
1 1
49
10
CN2A DBB
03 NOTE 7 11 d) Solved.
CN3B 2" 0 2 SKIM OIL
0
D D D LT NNF 330-2"-SY-1-007-64AST-V e) Solved.
2" CN4B 03 SKIM OIL 330-2"-SY-1-006-67AS-V 49
03 NOTE 2, 7 8437 193201DPFM03712 f) Solved. 03
03 181 DP DBB N4 TOXIC NOTE 15 TOXIC 3.5
6 4 TO AMINE RECOVERY g) Solved.
HHLL 800 mm NOTE 10 1" MIN. DRUM 330-1-VA-002 h) Solved.
ESD ESD 3"-300# DBB CN2B HLL 700 mm SO 8 11 11 15467
I I LLL 400 mm FB 2 2 i) Solved.
TL N11 7 4 03
0
LLLL 300 mm D 49 565-2"-ZW-1-038-67AS-V 49 SOUR WATER j) Solved.
I4-1008 I4-1007 2" 12 12
F TOXIC 193201DTFM62012 k) Solved. F
03 1991 8
03 1"
5000 mm
03 183
11
L
3.5
r) Solved.
49
540-2"-OD-1-080-03A-V
MIN. FLOW
FI FE s) Solved.
TOXIC
0
LAHH 183
+
t) Solved.
540-4"-OD-1-650-81A-N
330-2"-ZW-1-013-67AS-V
FT 183
181 03 FV 11 u) Solved. 03
8839 NOTE 4 183 V 03 +
0 2 v) Solved.
FE 183 330-2"-ZW-1-012-67AS-V 49
LALL OPEN DRAIN + 3/4"-600# 8
G
182 1" 03 VERY TOXIC 5 G
181 NOTE 14 11 FB
FV
2 TYPE A 7 2"x1" 2"x1" 7 7 REFLUX HOLDS:
0
330-2"-ZW-1-016-67AS-V 49
LI 5187 193201DPFM03704 1. Solved.
10
TOXIC
TOXIC FO
181 SP LI-004 FB TO AMINE REGENERATOR 2. Solved.
7 1"-600# 1" 4. Solved.
FB 8 8 330-1-VJ-002 03
CSO 03 D 03 7. Solved.
NOTE 17
3/4"-600#
FREE DRAINING
MIN.
8 FB 1" 03 FB 1" 1"
182 1" 10. Solved.
11. Solved.
FB 8 4 03
CSO FB 6 13. Solved.
FB D
RS
8 7 CSO 8 FB ESD NOTE 4 14. Solved.
H CSO 64 I
H
8 15. Solved.
4
MIN.
NOTE 5 I4-1008 28. Solved.
330-2"-ZW-1-015-67AS-V
FB 03
MIN
MIN
330-2"-ZW-1-014-67AS-V
MIN.
NOTE 5
10602
MIN. PG
2" 7 FI 03 AMINE DRAIN
2" 185
330-2"-ZW-1-037-67AS-V
64 193201DTFM62003_01
7 3"-300# 182
03
FALL
TOXIC
PG 6
183 182 EQUIPMENT LIST MOTORs LIST INSTRUMENT LOOP N°
1
FREE DRAINING
3"-300# H
PDI 3301PA004A / B 3301EPA004A / B
TOXIC
03 013301M004
L
3301VA001 H 3301PA004A 183
3301PA004B 0 80 ANTIFOAM 3301VA001
L
PDI 330-1"-CH-1-003-38A-V 49
3301EPA004A 3301EPA004B 193201DPFM037118777
FREE DRAINING
NOTE 9
181 10
TOXIC
AMINE REGENERATOR OVHD REFLUX DRUM (1x100%) 2"x1" THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
03 NOTE 16 NOTE 16 FROM ANTIFOAM INJECTION
03
INTERNAL DIAMETER mm 914
PACKAGE 330-1-XX-001 STAGE UNDER NUMBER 330-GD-B-03706
HEIGHT (TL/TL) mm 2550 UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
2
11
03
49
10
NOTE 9
49
10
HV @ 175°C RS
8
RS
MCC MCC
330-3/4"-ZW-1-033-67AS-V
330-3/4"-ZW-1-035-67AS-V
004
540-2"-OD-1-178-03A-V
330-1"-ZW-1-021-67AS-V
Validity Revision
Contractor Contractor Contractor Company Company
3301PA004A / B I ESD
Status Number Date Description
Prepared Verified Approved Checked Approved
MIN.
MIN.
Revision Index
FB 8 FB 8 ESD
I4-1008 I Company Logo and Business Name Project Name Company Document ID:
AMINE REGENERATOR REFLUX PUMP (2x100%) I4-1008
330-2"-AD-1-020-64AST-V 03 ZOHR
03 03 03 DEVELOPMENT 193201DPFM03706
03
MIN.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03706_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
3301HA002 193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
3301VA006 3301HL001 193201DPFM03652
193201DPFM03653
EQUIPMENT SYMBOLS (2/3)
EQUIPMENT SYMBOLS (3/3)
A AMINE REGENERATOR REBOILER (1 x 100%) A
AMINE REGENERATOR REBOILER LP STEAM CONDENSATE DRUM AMINE REGENERATOR REBOILER DESUPERHEATER (1x100%) 193201DPFM03654 NOMENCLATURE
193201DPFM03655 PIPING SYMBOLS
(1x100%) DESIGN PRESSURE barg 7.5/ FV@240°C DESIGN DUTY MW 5.7 TO ATM AT 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
INTERNAL DIAMETER mm 1100.0 DESIGN TEMPERATURE (MIN/MAX) °C 0/240 SHELL TUBE SAFE LOCATION 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
HEIGHT (TL/TL) mm 2750 OPERATING PRESSURE barg 5.5 DESIGN PRESSURE barg 5.0 / FV@175°C 7.5 / FV@175°C 193201DPFM03658 VALVES TYPICAL (1/2)
193201DPFM03659 VALVES TYPICAL (2/2)
DESIGN PRESSURE barg 7.5 / FV@240°C OPERATING TEMPERATURE °C 175 DESIGN TEMPERATURE (MIN/MAX) °C 0/175 0/240 193201DPFM03660 ELECTRICAL MOTORS DETAIL
DESIGN TEMPERATURE (MIN/MAX) °C 0/240 IN OUT IN OUT 193201DPFM03661 SAMPLE CONNECTION (1/2)
OPERATING PRESSURE barg 1.43 1.36 2.20 2.00 193201DPFM03662 SAMPLE CONNECTION (2/2)
STEAM OUT CONDITIONS NA 193201DPFM03663 API PLAN
OPERATING PRESSURE barg 1.7 OPERATING TEMPERATURE °C 129 130 136 134 193201DPFQ03963 UNIT 330 RICH AMINE REGENERATION PROCESS FLOW DIAGRAM
INSULATION YES/NO YES - 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
OPERATING TEMPERATURE °C 134
FREE DRAINING
193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
INSULATION YES/NO YES TRIM LINE SHELL 330-TL-1-013-56AST-I
B B
TRIM LINE 330-TL-1-012-15A-I TRIM LINE TUBE 330-TL-1-016-15B-I TO ATM AT
SAFE LOCATION
TRIM LINE 330-TL-1-032-15B-I 03
IN : 2"-150# 03
03 GENERAL NOTES:
OUT: 3"-150#
A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS
330-2"-VA-1-001-15A-V
2J3 PSV ON THIS P&ID SHALL BE PREFIXED BY 01-330-1, UNLESS OTHERWISE SPECIFIED.
+ 17
191 5 B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01-UNLESS OTHERWISE NOTED.
0
330-4"-VA-1-002-15A-V FREE DRAINING
40
SET@ 7.5 barg 0 C. DELETED.
4"x3" WEEP HOLE 3/4" D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
NOTE 10 03 OTHERWISE SPECIFIED.
NOTE 11 4"x2" E. DELETED.
C 1" C
V
03
FREE DRAINING
1
1 LO
NOTE 9 17 NOTES:
5
0
FREE DRAINING
330-2"-LS-1-010-15A-P FREE DRAINING
40 1. REBOILER WEIR ELEVATION TO BE LOCATED 400mm ABOVE AMINE REGENERATOR HIGH
0 WEEP HOLE 3/4" LIQUID LEVEL.
CSC 1 4 FLOW SIGNAL
2. STEAM CONDENSATE DRUM HIGH LIQUID LEVEL TO BE LOCATED.
193201DPFM03697 7828 BELOW HEATER BOTTOM TANGENT LINE.
FROM FIC-081 3. REMOTE INDICATION LI-193 TO BE CLOSE TO LV-193 BY-PASS GLOBE VALVE.
H ESD 4. REMOTE INDICATION FI-191 TO BE CLOSE TO FV-191 BY-PASS GLOBE VALVE.
TIC I
192 SDV 5. CONTROL VALVE TO BE PROVIDED BY DESUPERHEATER VENDOR.
D I4-1005 +
6. REMOTE INDICATION TI-192 TO BE CLOSE TO TV-192 BY-PASS GLOBE VALVE.
D
TV 03 195
330-4"-LS-1-009-15A-P
+ 7. WARM-UP BY-PASS.
192 8. LP STEAM FLOWRATE IS SET TO MAINTAIN STEAM/AMINE RATIO AT ABOUT 1/10.
NOTE 6 03 03
TI TYP 2 03 9. PERSONNEL PROTECTION TO BE EXTENDED DOWNSTREAM LAST VALVE FOR THE SECTION
24 8829
1 2"x1" 2"x1" 1 0 OF PIPING ACCESSIBLE BY OPERATORS.
0
192 175 BOILER FEED WATER
10. SIZING CASE: FIRE.
330-2"-BW-1-001-07C-I
56 193201DTFM62022
FREE DRAINING
FC TSO 11. SPARE PSV IS STORED IN WAREHOUSE BECAUSE PSV IS PROVIDED FOR FIRE CASE ONLY.
SET NOTE 8 D
1" D 1"-600# 1" D 1" FC 12. TEMPERATURE TRANSMITTER SHOULD BE LOCATED AT MINIMUM DISTANCE OF 03
FFIC FI NOTE 5 2"-600# STRAIGHT PIPE DIAMETER FROM DESUPERHEATER AS POSSIBLE.
PI 1 03 03 1
192 191 A 03 7 13. A MINIMUM DISTANCE OF 5D STRAIGHT PIPE DIAMETER AND NOT LESS THAN 1.5m
191 L 1" 1" SHALL PROVIDED UP STREAM DESUPERHEATER AND 3m OF STRAIGHT PIPE ARE 03
1" 15
0 0 REQUIRED DOWNSTREAM.
E FI 130 525-2"-BW-1-001-07C-I E
4 1 14. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
56
191 B NOTE 6 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
0
24
TT PT
15. FOR STEAM TRAP DETAIL, NO. AND LINE NAMES REFER TO P&ID NO. 193201DTFM62021
175
H
56
TOP CONNECTION
TI 192 191 NOTE 4
1 ESD 16. DIFFERENT TYPE. 03
0
193 03 I
RTD FT TG 24
330-10"-LS-1-053-07C-I I4-1005 0
V 1" GENERAL HOLDS INDEX:
0
03 525-10"-LS-1-002-15A-I 175
NOTE 13
191 191 03
NOTE 12 FV FE 7.5
03 HPT SDV a) Solved.
FV
+ +
192
+
191 03 03 03 NOTE 16 194 b) Solved.
TT TG 03 TYP 2 8832 c) Solved.
10"x8" 10"x8" 1 10"x8" 10"x8" 6 62
193 193 LS STEAM d) Solved.
RTD 193201DTFM62021_01 e) Solved.
F 17 1 FC NOTE 13 FC f) Solved. 03 F
VAPOUR RETURN 5 NOTE 13 TSO
330-14"-LA-1-042-56AST-I 8"-600#
0
0
TO AMINE REGENERATOR 1 1 i) Solved.
24
0 0 1"
136
7.5
330-1-VJ-002 7 03 03 175 330-10"-LS-1-001-07C-I j) Solved. 03
4 1 56 4
FV
3301HA002 k) Solved.
0
FB 6" 03 LC
1"
RS
FREE DRAINING
2"
RS
G H 3"-300# OUT: 2"-150# r) Solved. G
LI LT LG 03
03 NOTE 1 PSV s) Solved.
192 192 191 HLL: 1150mm T1 192
+
t) Solved.
L 2"
DP 3"-300# MAG LLL: 150mm 1½F2 17 u) Solved. 03
2" LTB 2" 0 5 v) Solved.
03 40 330-3"-VA-1-003-15A-V
SET@ 7.5 barg
2" V NOTE 10, 11 0 FREE DRAINING
3"x2" 7 3"x2"
SO S1 T2 1 WEEP HOLE 3/4"
2"x1" 03
7
03 3"x1½"
FB 6730 mm 2" D 4"x3" 1"
RS
1" HOLDS:
8 0 V
17 03 7 24
AMINE 5 1 1. Solved.
134
7.5
330-10"-LA-1-043-56AST-I
0
11. Solved.
330-3"-LS-1-002-15A-P
330-2"-LS-1-007-15A-I
330-1-VJ-002
13. Solved.
0 03
TI 24 14. Solved.
134
15. Solved.
7.5
191
FV 28. Solved.
0
31. Solved. 03
FREE DRAINING
330-3"-LC-1-002-15A-I
32. Solved.
33. Solved. 03
FREE DRAINING
FREE DRAINING
TT PG
191 V 192
RTD 1
L
AMINE 17 L
330-10"-LA-1-041-57AS-I 5
LPT
0
FREE DRAINING
EQUIPMENT LIST
RS
NOTE 2 193
64AST 03 EX-DE 01 23-05-2016 ISSUED FOR DESIGN R. CAREDDU A. SPOLETO A. LO BIANCO
N2 1
330-3"-LC-1-004-15A-P EX-DE 00 10-02-2016 ISSUED FOR COMMENTS A. SBALCHIERO A. SPOLETO A. LO BIANCO
6 1
Validity Revision
TI
330-4"-LC-1-003-15A-I
ZOHR
193201DPFM03707
TOXIC
540-4"-OD-1-654-81A-N DEVELOPMENT
330-2"-AD-1-018-64AST-V
175 133 LC CONDENSATE Engineering for the Petroleum and Process Industries
7.5 4"x3" 7.5 193201DTFM64114
FV FC 10"x3" Contract N. 4613-440
3"-150# FV Facility and Sub Facility Name Scale Sheet of Sheets
D 1" 03 03 D 1"
N.A. 1/1
540-4"-OD-1-653-81A-N 03 ZOHR ONSHORE PHASE 01
03 1 1
1855 8845
03 Document Title Superseedes N.
03 3" 3"
P
AMINE DRAIN OPEN DRAIN 3" UNIT 330 - GAS SWEETENING/ACID GAS REMOVAL (AGR) Superseeded by N. P
193201DTFM62003_01 NOTE 14 AMINE REGENERATOR REBOILER (TRAIN 1) Plant Area Plant Unit
1 4 NOTE 3
03 PIPING & INSTRUMENTATION DIAGRAM P10 330
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03707_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
3300VA001 193201DPFM03650
193201DPFM03651
GENERAL NOTES & ABBREVIATIONS
EQUIPMENT SYMBOLS (1/3)
193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
A AMINE DRAIN DRUM (1x100%) 193201DPFM03653 EQUIPMENT SYMBOLS (3/3) A
193201DPFM03654 NOMENCLATURE
INTERNAL DIAMETER mm 1900.0 193201DPFM03655 PIPING SYMBOLS
193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
HEIGHT (TL/TL) mm 6500
193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
DESIGN PRESSURE barg 3.5 / FV 193201DPFM03658 VALVES TYPICAL (1/2)
DESIGN TEMPERATURE (MIN/MAX) °C 0/130 193201DPFM03659 VALVES TYPICAL (2/2)
193201DPFM03660 ELECTRICAL MOTORS DETAIL
STEAM OUT CONDITIONS HV @ 175°C 193201DPFM03661 SAMPLE CONNECTION (1/2)
OPERATING PRESSURE barg 0.2 193201DPFM03662 SAMPLE CONNECTION (2/2)
OPERATING TEMPERATURE °C 105 193201DPFM03663 API PLAN
193201DPFQ03965 UNIT 330 - AMINE DRAIN - PROCESS FLOW DIAGRAM
INSULATION YES/NO YES 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
TRIM LINE 330-TL-0-005-64AST-I 03 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
B TRIM LINE 330-TL-0-033-64AST-I B
GENERAL NOTES:
PSV DISCHARGE 13
0 FREE DRAINING
TOXIC
0
330-3"-RA-0-001-64AST-V 40 A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS ON THIS
15413 193201DPFM03703
P&ID SHALL BE PREFIXED BY 01-330-0-, UNLESS OTHERWISE SPECIFIED.
3.5
FROM PSV-151 1959 B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
H LP FLARE C. DELETED.
ESD PIC
I 193201DTFM62028 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
201 OTHERWISE SPECIFIED.
I4-0001 03 L PT
PV E. DELETED.
330-1-1/2"-AD-0-039-64AST-V 201
V
+
201
SDV 8
C + 03 1" 03 NOTES: C
7979 80 203 FB 3"-300#
0
TYP 2 8 FB 1½"x1" 2"x1" 8 FB 1. DELETED.
17
0
420-1-1/2"-LF-0-307-52A-V
3.5
28
28
LP FUEL GAS
2. PUMP 01-330-0-PA-003A/B SHOWN ON DWG 193201DPFM03703 ON MANUAL START;
8
0
193201DTFM62008_01 AUTOSTOP ON LOW LIQUID LEVEL.
-1
1½"-600# CSO FB FO CSO 3"x2" 3"x2"
FC 1" 1"-600# 3. DELETED.
8
TSO 03 4. DELETED.
FO
230-2"-AL-0-141-37AS-V
+ 5. DELETED.
203 03 6. UNLOADING AREA SHALL BE PROVIDED FOR EQUIPMENT EMPING.
8 4 7. DELETED.
1"
8. CONNECTION FOR REMOVAL OF CONTENTS DURING SHUT DOWN BY VACUUM TRUCK.
FREE DRAINING
LC FB 03 9. DELETED.
DP=8 barg DP=3.5 barg 10. PERSONNEL PROTECTION TO BE EXTENDED DOWN STREAM LAST VALVE FOR THE
D SECTION OF PIPING ACCESSIBLE BY OPERATORS. D
11. SIZING CASE: GAS BREAK THROUGH.
03
12. LOCAL HORN TO BE PROVIDED FOR LAH-201.
13. TAHH TO TRIP PUMP AT 75°C.
V IN : 3"-150#
OUT: 4"-150#
1 1" PSV 3K4
15417 17 +
0 FB 201 B CSO 7
0
230-6"-AL-0-138-37AS-V
-1
0
OUT: 4"-150# f) Solved.
13
1 1" 1"-600#
1"
3.5
28
PSV 3K4 V FC TSO 1" 4 g) Solved.
15416 17 +
03 h) Solved.
0
0 0 FB 201 A
230-6"-AL-0-139-37AS-V -1 NOTE 11 FB 8 2"x1"
LP FLARE 28 03 1" i) Solved.
SET@ 3.5 barg 8 ILO 8 03
193201DTFM62028 3.5 LO 1" FB j) Solved.
6"x4" FB k) Solved.
SP LK-005 03 03 D
03 1" l) Solved.
H FB 8
PIC V m) Solved. 03
6"x3" FB 8 n) Solved.
1" 202
03 1"
F F
L o) Solved.
V p) Solved.
330-2"-AD-0-007-64AST-V
CSO 7 03
FB 8 q) Solved.
8 ILC r) Solved.
FB FB s) Solved.
3"x2"
SP LK-005 03
PT t) Solved.
15415 17 1" 8
0 4 7 u) Solved. 03
0
NOTE 10 202 03
-1
3"x2"
193201DTFM62028 3.5 MIN. 3"-300#
CSC LEVEL SIGNAL
600MM 330-6"-AD-0-008-64AST-P
15411 193201DPFM03703
TOXIC
TOXIC
PAHH TO AMINE DRAIN
330-6"-AD-0-006-64AST-P
G NOTE 12 G
204 PUMP 01-330-0-PA-003A/B
LIC H XA HOLDS:
PI 201 201
0
TOXIC
1. Solved.
13
L
105
204
3.5
HORN 7. Solved.
9. Solved.
0
11. Solved.
ESD 13. Solved.
330-2"-AD-0-010-64AST-P
I 14. Solved.
I4-0001 15. Solved.
03 03 03 28. Solved.
13 29. Solved. 03
0 MIN. FLOW
13 TOXIC
0
1971
FREE DRAINING
H
0 7 330-2"-LA-0-051-64AST-P 70 H
NNF 330-3"-AD-0-005-64AST-P TOXIC TG PT PG 193201DPFM03703 15459
0
RS
7 2"
2"
N1 N7 CN4 CN5 N4 N10 CN3 N3 N5 N6
1 1"
3"x1"
L L
HHLL 1500 mm 3"
CN1A
HLL 1400 mm 3"-300# THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
LG LT STAGE UNDER NUMBER 330-GD-B-03708 EQUIPMENT LIST
M1 M2
201 201 UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440 3300VA001
DP
CN1B CN2B
LLL 400 mm 3"
3"-300# ESD
3"x1"
7 2" LT I LI LALL
3"-300#
SO N9 202 I4-0001 202 202
M LLLL 300 mm DP
M
1 1" N2 03
CN2A EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
N8 EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
MIN. 2000mm
3300VA001 TAHH NOTE 13
3"-300# EX-DE 01 23-05-2016 ISSUED FOR DESIGN R. CAREDDU R. FERRARO A. LO BIANCO
03 EX-DE 00 05-02-2016 ISSUED FOR COMMENTS R. FERRARO A. SPOLETO A. LO BIANCO
201 330-2"-LA-0-031-64AST-P Validity Revision
Contractor Contractor Contractor Company Company
SP LF-001 Status Number Date Description
Prepared Verified Approved Checked Approved
TI 2" Revision Index
Company Logo and Business Name Project Name Company Document ID:
201
7 FB 6 NOTE 8,6
1" ZOHR
193201DPFM03708
8 DEVELOPMENT
N TI H 03 Petrobel eni SpA PROJECT
N
I ESD
202 Contractor Logo and business name Contractor Document ID:
I4-0001
03 Engineering for the Petroleum and Process Industries
RTD
Contract N. 4613-440
TT TT SC
Facility and Sub Facility Name Scale Sheet of Sheets
201 202 201
RTD N.A. 1/1
TYPE C ZOHR ONSHORE PHASE 01
4"x3" 13 AMINE
4"x3" 0 Document Title Superseedes N.
0
TOXIC 330-3"-LA-0-035-64AST-P 105
15410 193201DPFM03703
UNIT 330 - GAS SWEETENING/ACID GAS REMOVAL (AGR)
P GRAVITY FLOW 3.5 Superseeded by N. P
TO AMINE DRAIN AMINE DRAIN DRUM Plant Area Plant Unit
PUMP 330-0-PA-003A/B PIPING & INSTRUMENTATION DIAGRAM P01 330
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03708_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
3300PA001 193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
3300TA001 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
A AGR AMINE TRANSFER PUMP (1x100%) 193201DPFM03653 EQUIPMENT SYMBOLS (3/3) A
AGR AMINE STORAGE TANK (1x100%) 193201DPFM03654 NOMENCLATURE
193201DPFM03655 PIPING SYMBOLS
DESIGN FLOWRATE m3/h 55.00 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
HEIGHT mm 10700 04 SUCTION PRESSURE barg 0.006 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
DIAMETER mm 5000 DIFFERENTIAL HEAD m 120 193201DPFM03658 VALVES TYPICAL (1/2)
DESIGN PRESSURE mbarg 56/-6 193201DPFM03659 VALVES TYPICAL (2/2)
SHUT OFF PRESSURE barg 15.5 193201DPFM03660 ELECTRICAL MOTORS DETAIL
DESIGN TEMPERATURE (MIN/MAX) °C 0/80 DESIGN TEMPERATURE (MIN/MAX) °C 0/80 193201DPFM03661 SAMPLE CONNECTION (1/2)
OPERATING PRESSURE barg 0.015 193201DPFM03662 SAMPLE CONNECTION (2/2)
RATED POWER kW 35.94
193201DPFM03663 API PLAN
OPERATING TEMPERATURE °C 48 TRIM LINE 330-TL-0-004-54AST-V 193201DPFQ03965 AGR AMINE STORAGE PROCESS FLOW DIAGRAM
INSULATION YES/NO NO 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
TRIM LINE 330-TL-0-003-54AST-V 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
B
TRIM LINE 330-TL-0-030-54BST-V TO ATM AT SAFE B
LOCATION GENERAL NOTES:
80 A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGIC TAG NUMBERS ON
DP=12.0 barg
DP=3.5 barg
0
50 600-3"-UN-0-003-06A-V
FREE DRAINING
THIS PID SHALL BE PREFIXED BY 01-330-0, UNLESS OTHERWISE NOTED.
12 V PCV V V PCV B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
600
330
+
+
8 211 8 8 212 C. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
1" 1" 1"
FB FB FB OTHERWISE SPECIFIED.
8143
FB 8 FB 8 7 80 D. DELETED.
330-3"-UN-0-001-06A-V 7
0
NITROGEN 330-3"-VA-0-005-54AST-V 48
193201DTFM62005 0 NOTES:
CSO 3"x2" 2"-150# 3"x2" CSO CSO 3"x2" 2"-150# 3"x2" CSO WEEP HOLE 3/*4"
1. AMINE FILLING FROM ISOCONTAINER VAPOR EQUALIZATION LINE AND FILLING CONNECTION TO BE PROVIDED
C OUTSIDE CURBED AREA.LOADING/UNLOADING AREA SHALL BE PROVIDED FOR EQUIPMENT FILLING/ EMPTYING. C
2. DIKED AREA FOR FULL INVENTORY CONTAINMENT, COMMON WITH 332-0-TA-002 / 332-0-TA-001 / 330-0-TA-002.
FO TO ATM 3. PUMP OUT CONNECTION.
+
AT SAFE LOCATION 4. LEVEL INDICATION VISIBLE AT FILLING POINT LOCATION (BOARD INDICATOR).
212 5. REMOTE INDICATION FI-211B TO BE CLOSE TO GLOBE VALVE.
8 4 7 4 6. REMOTE INDICATION LI-211B TO BE CLOSE TO GLOBE VALVE.
1" 2"
7. PRESSURE/VACUUM RELIEF VALVE SUPPLIED BY TANK VENDOR.
FREE DRAINING
FB NOTE 16 8. VALVE SHALL BE OPENED TO REMOVE RAIN WATER ONLY.
FREE DRAINING
NOTE 16
FREE DRAINING
9. STRAINER SCREEN MESH IS 50. 04
330-1"-UN-0-005-06A-V NOTE 7 10. 5D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE UP STREAM PUMP SUCTION NOZZLE.
SET@ 41/-4 mbarg
2D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE DOWN STREAM PUMP DISCHARGE NOZZLE.
PSV IN : 4"-
330-3"-LA-0-052-54AST-V
11. DEMI WATER HOSE STATION TO BE PROVIDED ADJACENT TO TANK.
330-3"-LA-0-053-54AST-V
OUT: 4"-
+
FREE DRAINING
330-6"-VA-0-006-54AST-V FREE DRAINING
0
48
0 14. DELETED.
15. NON SLAM CHEK VALVE.
NOTE 7 WEEP HOLE 3/4"
D 1" FB 6"x4" SET@ 41/-4 mbarg 16. PG-211 TO BE READABLE FROM PCV-211 AND PCV-212 BY-PASS GLOBE VALVES.
PSV IN : 4"- 17. VACUUM TRUCK CONNECTION. UNLOADING AREA SHALL BE PROVIDED FOR EQUIPMENT EMPTYING.
+
OUT: 4"- 18. CURBED AREA COMMON WITH 332-0-PA-002, 332-0-PA-001 AND 330-O-PA-002.
8 211 B 80
6"x4" 0 19. THE RAIN WATER ACCUMULATED IN THE CURBED AREA SHALL BE ANALYZED CASE BY CASE:
FB ILO 330-6"-VA-0-007-54AST-V FREE DRAINING
48 -IF CONTAMINATED BY CHEMICALS IT WILL BE EMPTIED BY PORTABLE PUMP.
80
3.5
04
3.5
6"x4"
48
FB 21. FLAP VALVE.
80
0 22. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
3.5
48
E D E
1" 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
FREE DRAINING
0
PI H LI 25. LOW FLOW ALARM IS ACTIVATED ONLY WHEN THE PUMP IS IN SERVICE.
80
211 3.5 211 A L 26. LOW LOW LIQUID LEVEL WILL TRIP THE AGR AMINE TRANSFER PUMP.
48
L LL NOTES 4,6, 26 27. REFER TO MECHANICAL SEAL SYMBOL AND LEGEND FOR SEAL MOUNTED INSTRUMENT ACTION AND TIE IN POINT.
0
NOTE 16 LI 28. VALVE IS FOR FULL INVENTORY CONTAINMENT, COMMON WITH 332-0-TA-001 / 332-0-TA-002 / 330-0-TA-002.
FREE DRAINING
29. TANK SHALL BE SUPPLIED COMPLETE WITH MECHANICAL LEVEL INDICATOR,READABLE FROM GROUND LEVEL.
PT PG 211 B 30. MECHANICAL LEVEL INDICATOR TO BE SUPPLIED BY TANK SUPPLIER.
04 NOTE 29,30 LT
211 211 RADAR 04
3"-300# 211 GENERAL HOLDS INDEX:
LG
F 4"-300# F
RS
a) Solved.
213 V DEMI-WATER
RS
3"-300# b) Solved.
330-3"-NW-0-002-38A-V
20" 04 7 16084 193201DPFM03710 c) Solved
24" CN7 CN1A 3"
N7 CN2 CN1B
CN5 CN4 TO AGR FRESH d) Solved
SP LF-002 N6 N10
7 330-3"-LA-0-027-54AST-V AMINE TANK 330-1-T-002 e) Solved.
MH1 CN9
14"-150# 04
NOTE 20
3300TA001 f) Solved.
N11 04 g) Solved.
NOTE 1
04 h) Solved.
NOTE 11 2"-300#
i) Solved.
UC N9 CN6A j) Solved.
7 k) Solved.
2" 80 9009 l) Solved.
G N4 4 6 1 0 G
330-3"-NW-0-001-38A-V 40 522-3"-NW-0-012-38A-V DEMINERALIZED WATER m) Solved.
VENT TO 10 193201DTFM62025 n) Solved.
HPT 3"x3" o) Solved.
ATMOSPHERE
80 1" 1 1" 1 1" 1 p) Solved.
FRESH AMINE 7 0
D
330-4"-LA-0-020-54AST-V
NNF 48 03 q) Solved.
8032 193201DPFM03710 04
17 NOTE 11 r) Solved.
FROM AGR FRESH AMINE LG FI NOTE 25 s) Solved.
SP LF-007
1000 mm
TRANSFER PUMP 80
330-3"-LA-0-003-54AST-V
211 A t) Solved.
0
330-0-PA-002 212 TT TI L 330-4"-LA-0-014-54AST-V 48
MAG CN3 17 u) Solved.
211 211 SC FO v) Solved.
TYPE A FI
RTD
+
LG 211 211 211 B
80
211 HOLDS:
H AMINE 0 NOTE 14 80 NOTE 5 330-3"-LA-0-013-54AST-V H
330-3"-LA-0-049-54AST-P 70 NOTE 14 7 FT 1. Solved.
330-3"-LA-0-023-54AST-V 04
0
15414 193201DPFM03703 330-3"-LA-0-029-54AST-V 48
17 211 80 FRESH AMINE 4. Solved.
FROM AMINE DRAIN 1" N8 MINIMUM FLOW 17 7
0
FB CSO 7 04 48 7. Solved.
PUMPS 330-0-PA-003 A/B 8 SP LF-003 330-1/2"-LA-0-025-54AST-V 193201DPFM03710 10280
6 17 9. Solved.
D 3/4"-600# FROM AGR FRESH AMINE
HHLL=9870.0 mm NOTE 1 29. Solved.
HLL=9670.0 mm 6 PDG PG PG TRANSFER PUMP 31. Solved.
10263
NNF
LLL=500.0 mm FB 8 214 212 1/2"-600# 213 FE 330-0-PA-002 32. Solved.
LEAN AMINE FROM 80 330-3"-LA-0-024-54AST-V 04 04
GAS TRAIN 1,2,3,4 0 7 7 MH2 LLLL=400.0 mm D +
MIN 33. Solved.
48 330-4"-LA-0-017-54AST-V NNF N1 1" 211
3"-300# 3"-300#
193201DTFM62013 17 330-6"-LA-0-021-54AST-V 4 UC 3"-300# 3"-300#
8 FB NOTE 10 EQUIPMENT LIST MOTORs LIST INSTRUMENT LOOP N°
1" 24" 04 NOTE 6 RS 4"x2" NNF 4 64 7 6 7 AMINE
FB 3300PA001 3300EPA001 013300M001
NNF
48 NNF 1"
330-4"-LA-0-016-54AST-V
7 N5 CN8
211 17
FB LO
GRAVITY FLOW 1" NOTE 10
M MCC 8
FB
330-0-CL-001
330-2"-LA-0-018-54AST-V N2
RS
FB ESD D 80 THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
2"-300# 80 FB # I
3" 00 TYP 7A
0
04 CN6B "-6 ING 330-4"-LA-0-015-54AST-P 70 STAGE UNDER NUMBER 330-GD-B-03709
0
M M
NOTE 18,19 540-8"-OD-0-919-03A-B EX-DE 04 28-12-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
NOTE 8, 23, 28
540-4"-OD-0-086-81A-N
NOTE 8, 23, 28 EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
12 12 EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
540-4"-OD-0-924-81A-N
540-4"-OD-0-087-81A-V
0 Company Logo and Business Name Project Name Company Document ID:
ZOHR
DEVELOPMENT 193201DPFM03709
9007 Petrobel eni SpA PROJECT
N 9008 N
OPEN DRAIN OPEN DRAIN
Contractor Logo and business name Contractor Document ID:
NOTE 22 NOTE 22
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03709_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
3300TA002 3300PA002 193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
A 193201DPFM03653 EQUIPMENT SYMBOLS (3/3) A
193201DPFM03654 NOMENCLATURE
AGR FRESH AMINE TRANSFER PUMP (1x100%) 193201DPFM03655 PIPING SYMBOLS
AGR FRESH AMINE STORAGE TANK (1x100%)
193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
DESIGN FLOWRATE m3/h 3.67 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
HEIGHT mm 5500
SUCTION PRESSURE barg 0.550 193201DPFM03658 VALVES TYPICAL (1/2)
DIAMETER mm 3100 193201DPFM03659 VALVES TYPICAL (2/2)
DIFFERENTIAL HEAD m 110
DESIGN PRESSURE mbarg 56/-6 193201DPFM03660 ELECTRICAL MOTORS DETAIL
SHUT OFF PRESSURE barg 14.3 193201DPFM03661 SAMPLE CONNECTION (1/2)
DESIGN TEMPERATURE (MIN/MAX) °C 0/80
193201DPFM03662 SAMPLE CONNECTION (2/2)
DESIGN TEMPERATURE (MIN/MAX) °C 0/80
OPERATING PRESSURE barg 0.015 193201DPFM03663 API PLAN
RATED POWER kW 13.45 193201DPFQ03965 AGR AMINE STORAGE PROCESS FLOW DIAGRAM
OPERATING TEMPERATURE °C 48
80 TRIM LINE 330-TL-0-002-54A-V 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
0 INSULATION YES/NO NO 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
50 330-1-1/2"-UN-0-002-06A-V TO ATM
B TRIM LINE 330-TL-0-031-54B-V
330-TL-0-001-54A-V B
12 NOTE 26 GENERAL NOTES:
DP=12.0 barg DP=3.5 barg
80 A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGIC TAG NUMBERS ON
0
FREE DRAINING
50 600-1-1/2"-UN-0-002-06A-V THIS PID SHALL BE PREFIXED BY 01-330-0, UNLESS OTHERWISE NOTED.
12 V PCV V PCV B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
V
FB FB C. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
+ +
0
NITROGEN 48
193201DTFM62005 0
CSO 1½"-600# 2"x1½" CSO CSO 2"-150# CSO WEEP HOLE 3/4"
04 NOTES:
C
1. AMINE FILLING FROM ISOCONTAINER. VAPOR EQUALIZATION LINE AND FILLING CONNECTION TO BE PROVIDED C
OUTSIDE DIKED AREA. LOADING/UNLOADING AREA SHALL BE PROVIDED FOR EQUIPMENT FILLING/EMPTYING.
1" 2. DIKED AREA FOR FULL INVENTORY CONTAINMENT,COMMON WITH 332-0-TA-001, 332-0-TA-002 AND 330-0-TA-001.
1" TO ATM 3. PUMP OUT CONNECTION.
FB 8 4 AT SAFE LOCATION 4. REMOTE INDICATION LI-221B TO BE CLOSE TO FILLING POINT LOCATION (BOARD INDICATOR).
FREE DRAINING
8 4 NOTE 15 5. REMOTE INDICATION FI-221B TO BE CLOSE TO MANUAL GLOBE VALVE.
NOTE 15
FO 6. REMOTE INDICATION LI-221B TO BE CLOSE TO MANUAL GLOBE VALVE.
600 330
+
7. PRESSURE/VACUUM RELIEF VALVE SUPPLIED BY TANK VENDOR.
222
8. DELETED.
330-2"-LA-0-054-54A-V
330-2"-LA-0-055-54A-V
NOTE 7 9. STRAINER SCREEN MESH IS 50.
SET@ 41/-4 mbarg 10. 5D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE UPSTREAM PUMP SUCTION NOZZLE.
PSV IN : 3"-
FREE DRAINING
330-1"-UN-0-006-06A-V 2D (PIPE DIAMETER) MINIMUM STRAIGHT PIPE DOWNSTREAM PUMP DISCHARGE NOZZLE.
OUT: 3"-
+
8 221 B 80 18. THE RAIN WATER ACCUMULATED IN THE KERBED AREA SHALL BE ANALYZER CASE BY CASE:
3.5
48
NOTE 29,30 D
E
H 1" 193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458. E
FREE DRAINING
223 H 193201DPFM03709.
LI 80 24. LOW FLOW ALARM IS ACTIVATED ONLY WHEN THE PUMP IS IN SERVICE.
3.5
48
221 A NOTE 15 25. LOW LOW LIQUID LEVEL WILL TRIP THE AGR FRESH AMINE TRANSFER PUMP.
L
26. VENT LINE TO BE LOCATED 3M ABOVE THE TANK TOP PLATFORM.
0
LL PT PG
LI 27. REFER TO MECHANICAL SEAL SYMBOLS AND LEGEND FOR PLAN 11/53B.
FREE DRAINING
221 221 28. REFER TO INSTRUMENT SYMBOL AND LEGEND FOR BEARING.
221 B
RADAR 04 29. TANK SHALL BE SUPPLIED COMPLETE WITH MECHANICAL LEVEL INDICATOR READABLE FROM GROUND LEVEL.
NOTE 4, 6,25 LT
30. MECHANICAL LEVEL INDICATOR TO BE SUPPLIED BY TANK SUPPLIER.
221
04 04
RS
F F
NOTE 19 V
RS
CN5
4"-300# CN2 CN3 20" M1 2" 7 GENERAL HOLDS INDEX:
24"
N5 CN1A
N4 CN1B 3300TA002 a) Solved.
SP LF-004 7 CN4 CN9 N8
330-2"-LA-0-007-54A-V b) Solved.
N9 6"-150#
c) Solved.
NOTE 1 d) Solved.
e) Solved.
f) Solved.
N7 DEMI-WATER g) Solved.
CN6A 4 330-3"-NW-0-002-38A-V
NOTE 13 h) Solved.
2"-300# N10 193201DPFM03709 16084 i) Solved.
G 2" G
HHLL4780.0 mm 04 j) Solved.
VENT TO HLL4590.0 mm TT TI k) Solved.
UC 7 TYPE A
ATMOSPHERE LLL500.0 mm CN8 l) Solved.
NOTE 14 221 221 SC
LLLL400.0 mm FO m) Solved.
HPT RTD +
221 221 n) Solved.
o) Solved.
330-2"-LA-0-009-54A-V
80 80 p) Solved.
LG 04 N6 7 0 0 q) Solved.
1000 mm
04 80 NOTE 10
8 LO LO 3"-300# NOTE 5,6 NOTE 11 TO AGR AMINE STORAGE
2" 7 2"-300# GRAVITY FLOW
0
330-3"-LA-0-013-54AST-V
48 330-2"-LA-0-006-54A-V N3 FB 8 FB 4"x3" FB
04 1" TYP 7A 3300PA002 3300EPA002 013300M002
3.5 221 ESD D
FB 0# I
330-1"-OD-0-255-03A-V
7 48 330-4"-LA-0-002-54A-V I4-0001
2" 17 NOTE 12
NNF
540-2"-OD-0-088-03A-V
NOTE 20 3300EPA002 THIS DRAWING WAS ISSUED BY SAIPEM DURING FEED
STAGE UNDER NUMBER 330-GD-B-03710
540-4"-OD-0-920-81A-N 04 UPDATED REISSUED BY ENPPI UNDER PROJECT NO.4613-440
8035
NOTE 12
OPEN DRAIN
NOTE 21 FRESH AMINE
M
1000 mm
10280 193201DPFM03709 EX-DE 04 28-12-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E M
TO AMINE CHARGE FILTER EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
NOTE 23 330-0-CL-001 EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
EX-DE 01 23-05-2016 ISSUED FOR DESIGN D. DANIELE S. BAZZOLI A. LO BIANCO
EX-DE 00 05-02-2016 ISSUED FOR COMMENTS G. GARITO E. SBALCHIERO A. LO BIANCO
NOTE 2 Validity Revision
Status Number Contractor Contractor Contractor Company Company
Date Description
Prepared Verified Approved Checked Approved
Revision Index
Company Logo and Business Name Project Name Company Document ID:
NOTE 23 ZOHR
DEVELOPMENT 193201DPFM03710
Petrobel eni SpA PROJECT
N N
Contractor Logo and business name Contractor Document ID:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03710_EXDE00_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
REFERENCE DOCUMENT
193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
193201DPFM03651 EQUIPMENT SYMBOLS (1/3)
A
3301XX001 193201DPFM03652
193201DPFM03653
EQUIPMENT SYMBOLS (2/3)
EQUIPMENT SYMBOLS (3/3) A
193201DPFM03654 NOMENCLATURE
ANTIFOAM INJECTION PACKAGE (1X100%) 193201DPFM03655 PIPING SYMBOLS
193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
DESIGN FLOWRATE kg/h NOTE 3 193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
193201DPFM03658 VALVES TYPICAL (1/2)
193201DPFM03659 VALVES TYPICAL (2/2)
193201DPFM03660 ELECTRICAL MOTORS DETAIL
193201DPFM03661 SAMPLE CONNECTION (1/2)
193201DPFM03662 SAMPLE CONNECTION (2/2)
193201DPFM03663 API PLAN
193201DPFQ03962 UNIT 330 LEAN / RICH AMINE CIRCUITS PROCESS FLOW DIAGRAM
193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
B B
GENERAL NOTES:
A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT ACTUATED VALVES AND INTERLOCK LOGICS TAG NUMBERS ON
THIS P&ID SHALL BE PREFIXED BY 01-330-1-, UNLESS OTHERWISE NOTED.
B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS OTHERWISE NOTED.
C. DELETED.
D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
OTHERWISE SPECIFIED.
E. DELETED.
C C
NOTES:
1. THE RAIN WATER ACCUMULATED IN THE KERBED AREA SHALL BE ANALYZED CASE BY CASE:
-IF CONTAMINATED BY CHEMICALS IT WILL BE EMPTIED BY PORTABLE PUMP, SUPPLIED
BY VENDOR.
-IF NOT CONTAMINATED IT WILL BE SENT TO OPEN DRAIN.
2. KERBED AREA.
3. PACKAGE IS COMPOSED OF THE FOLLOWING (AS A MINIMUM REQUIREMENT):
-ONE(1) ATMOSPHERIC FEED TANK.
-ONE(1) MIXER INSIDE FEED TANK.
-THREE(3) INJECTION PUMPS (VOLUMETRIC) PLUS THREE(3) AS STANDBY, WITH A FLOWRATE
D OF 60 LT/h EACH. D
-ONE(1) CENTRIFUGAL PUMP WITH A FLOWRATE OF 3000 LT/h.
4. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
5. EXTENDED HANDLE TO BE PROVIDE.
6. FOR MORE DETAILS REFER TO VENDOR P&ID NO. 193201CGFFS9193-7
03
7. VACUUM TRUCK CONNECTION
03 80 ANTIFOAM
330-2"-CH-1-004-38A-V
0
49
TP-2 15358 193201DPFM03701
16
TO LEAN AMINE PUMP
330-1-PA-002 A/B
GENERAL HOLDS INDEX:
a) Solved.
E E
b) Solved.
c) Solved.
d) Solved.
15357 80 e) Solved.
03
f) Solved. 03
0
0
03 TP-3 49 p) Solved. 03
REFER TO VENDOR DWG NOTE 3, 6 8885 193201DPFM03698
2"x1" 12 q) Solved.
TO AMINE REGENERATOR r) Solved.
03 330-1-VJ-002 s) Solved.
t) Solved.
u) Solved.
v) Solved.
G G
I ESD
I4-1012
03 03
03 80 ANTIFOAM
0
330-2"-CH-1-003-38A-V 49
TP-4 8777 193201DPFM03706
2"x1" 10
TO AMINE REGENERATOR
REFLUX PUMP 330-1-PA-004A/B
DISCHARGE
HOLDS:
1. Solved.
H 7. Solved. H
8. Solved.
SP LF-001 03 9. Solved.
1 10. Solved.
540-2"-OD-1-091-03A-N 31. Solved.
NOTE 7
2" 2" 32. Solved. 03
TP-5 TP-6
L
03 L
540-2"-OD-1-005-003A-V
03
NOTE 5
M 03 03
M
1
540-8"-OD-1-089-03A-N EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
8" EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
NOTE 1
03 EX-DE 01 23-05-2016 ISSUED FOR DESIGN D. DANIELE S. BAZZOLI A. LO BIANCO
EX-DE 00 05-02-2016 ISSUED FOR COMMENTS E. SBALCHIERO A. SPOLETO A. LO BIANCO
Validity Revision
Status Number Contractor Contractor Contractor Company Company
Date Description
Prepared Verified Approved Checked Approved
Revision Index
Company Logo and Business Name Project Name Company Document ID:
ZOHR
DEVELOPMENT 193201DPFM03711
Petrobel eni SpA PROJECT
N N
15359 Contractor Logo and business name Contractor Document ID:
OPEN DRAIN
NOTE 4 Engineering for the Petroleum and Process Industries
Contract N. 4613-440
Facility and Sub Facility Name Scale Sheet of Sheets
N.A. 1/1
ZOHR ONSHORE PHASE 01
Document Title Superseedes N.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03711_EXDE01_01.pdf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
9013 REFERENCE DOCUMENT
NOTE 7
LP FLARE IN : 3"-150# 193201DPFM03650 GENERAL NOTES & ABBREVIATIONS
03 V EQUIPMENT SYMBOLS (1/3)
OUT: 4"-150# 193201DPFM03651
3301VA002 193201DTFM64108_01
193201DPFM03652 EQUIPMENT SYMBOLS (2/3)
17 PSV 1 1" 193201DPFM03653 EQUIPMENT SYMBOLS (3/3)
0 0 03
A
-1 230-3"-AL-1-013-37AS-V 03 3K4 +
17 193201DPFM03654 NOMENCLATURE
A
AMINE RECOVERY DRUM (1x100%) 28 231 A 1 0 0
15445
3.5 6"x4" 230-6"-AL-1-033-37AS-V -1 193201DPFM03655 PIPING SYMBOLS
TOXIC 28 LP FLARE
INTERNAL DIAMETER mm 1500.0 SET@ 3.5 barg 193201DPFM03656 INSTRUMENTATION SYMBOLS (1/2)
LO 3.5 193201DTFM64108_01
193201DPFM03657 INSTRUMENTATION SYMBOLS (2/2)
CSO
HEIGHT (TL/TL) mm 3700 7 03 IN : 3"-150#
8 1" NOTE 7 193201DPFM03658 VALVES TYPICAL (1/2)
OUT: 4"-150# V 03 03 193201DPFM03659 VALVES TYPICAL (2/2)
DESIGN PRESSURE barg 3.5 / FV V 1" 8 6"x3"
PSV 03 193201DPFM03660 ELECTRICAL MOTORS DETAIL
DESIGN TEMPERATURE (MIN/MAX) °C 0/130 FB D 3K4 1 1" 193201DPFM03661 SAMPLE CONNECTION (1/2)
231 B
+
03
STEAM OUT CONDITIONS HV @ 175°C FB 17 15444 193201DPFM03662 SAMPLE CONNECTION (2/2)
3"x1½" 6"x4" 1 0 193201DPFM03663 API PLAN
0
OPERATING PRESSURE barg 0.2 230-6"-AL-1-034-37AS-V
-1
03 SET@ 3.5 barg 28 LP FLARE
330-6"-SY-1-013-64AST-V
193201DPFQ03962 UNIT 330 LEAN RICH AMINE CIRCUIT PROCESS FLOW DIAGRAM
OPERATING TEMPERATURE °C 30-49 3.5 193201DTFM64108_01 193201DPEQ03560 CAUSE AND EFFECT DIAGRAM - GENERAL LOGICS
LO
INSULATION YES/NO NO PV 193201DPEQ03592 CAUSE AND EFFECT DIAGRAM - UNIT 330
NOTE 11 03 03
+
B
TRIM LINE 330-TL-1-014-64AST-V 233 03 GENERAL NOTES: B
H 6"x3"
1½"-600#
PIC
TSO
FC
A. ALL INSTRUMENTS, SPECIAL PIPE COMPONENT, ACTUATED VALVES AND INTERLOCK LOGIC
330-6"-SY-1-018-64AST-V
233
TAG NUMBERS ON THIS P&ID SHALL BE PREFIXED BY 01-330-1-, UNLESS OTHERWISE NOTED.
B. ALL EQUIPMENT AND PIPING ON THIS P&ID SHALL BE PREFIXED BY 01 UNLESS
FREE DRAINING
OTHERWISE NOTED.
3"x1½" 03 C. DELETED.
1" 8 D. LINE CONNECTIONS FROM PROCESS LINES TO PSV OR BDV VALVES SHALL BE TAKEN FROM TOP OF PIPE, UNLESS
8 1" D OTHERWISE SPECIFIED.
V FB E. DELETED.
FB
FREE DRAINING
CSO
C 7 1" 8 C
V NOTES:
1" 8
PT FB 1. REMOTE INDICATION LI-231B AND LI-232B TO BE CLOSED TO HYDROCARBON SKIMMING LINE GLOBE VALVE
V
233
AND DEAD MAN VALVE AND AMINE DRAIN LINE GLOBE VALVE AND DEAD MAN VALVE.
FB 03 FB
3"-300# 03 8 2. GLOBE VALVE ON HC DRAIN LINE CAN BE OPENED ONLY AFTER AMINE HAS BEEN SKIMMED
FB ILC THROUGH DEDICATED GLOBE VALVE.
13 8 ILO SP LK-006 600MM 17 15443
0 0 03 7 0 3. DEAD-MAN VALVE (SPRING RETURN).
4
0
MIN. 230-2"-AL-1-441-37AS-V
-1
49 330-3"-SY-1-009-64AST-V 330-2"-SY-1-019-64AST-V 28 LP FLARE 4. MAGNETIC LEVEL TYPE FOR TOTAL LEVEL MEASUREMENT.
3.5 330-6"-SY-1-017-64AST-V SP LK-006
TOXIC FREE DRAINING CSC 3.5 193201DTFM64108_01 5. INTERFACE MEASUREMENT:
FB - TOTAL FLUID LEVEL
8 03
1" - INTERFACE LEVEL.
03 6. VALVES TO BE LOCATED AT MINIMUM FROM DRUM.
D NOTE 12,11
D 7. SIZING CASE: GAS BREAKTHROUGH. D
PT PIC I ESD 8. INTERFACE LEVEL MEASUREMENT.
232 232 I4-1011 03 9. THE USE OF BENDS WITHIN 10 PIPE DIAMETER OF THE INLET NOZZLE SHOULD BE AVOIDED
RS
7 IF BENDS CANNOT BE AVOIDED THEY ARE PERMITTED ONLY IN THE VERTICAL SECTIONING
6" 6"
2" PLANE OF THE VESSEL WHICH CONTAINS THE VESSEL NOZZLE AXIS.
V
N2 PV SDV 10. FOR DETAILS REFER TO OVERALL UNDERGROUND COMPOSITE PLAN PHASE 1 DOC.N. 193201DTDVE0455,
N9 V 8
+
V 8
+
193201DTDVE0456, 193201DTDVE0457 AND 193201DTDVE0458.
N6 3"-300# 232 234
NOTE 6,11 1" FB 1" FB TYP 2 11. THE OPERATING PROCEDURE TO BE FOLLOWED WHEN DRAINING THE EQUIPMENT IS HERE
SKIM OIL 11 13 13 80 9014 03 DESCRIBED: CLOSE ALL MANUAL VALVES ON INLET SKIM OIL LINES, PUT PIC-233 IN MANUAL
2 330-2"-SY-1-007-64AST-V 7 3"x2" 0 0 0 0 6 7 7
NO POCKETS
0
49 49 330-3"-SY-1-022-64AST-V NOTE 9 49
0
8437 193201DPFM03706 N1 330-2"-SY-1-016-64AST-V 28 LP FUEL GAS MODE AND INCREASE PIC-232 SET POINT.
3.5 TOXIC 3.5 TOXIC NNF 3.5 N5
TOXIC 3.5 193201DTFM64112 12. TWO DIFFERENT PRESSURE SET POINTS TO BE CONSIDERED FOR NORMAL OPERATION/
FROM AMINE REGENERATOR 03 FV 03 FV CSO 2"x1" FC CSO FC
HYDROCARBON SKIMMING AND FOR EQUIPMENT DRAINAGE.
TSO
OVHD REFLUX DRUM 03 73 3301VA002 1"-600# FROM DISTRIBUTION
TOXIC
E PT I ESD PI PAHH 03 1"-600# 13. NO POCKET WILL BE APPLICABLE DOWN STREAM GLOBE VALVE. E
330-1-VA-001 CN4 330-1"-LF-1-001-52A-V
NOTE 6,11 7 NOTE 6,11 7 231 I4-1011 231 231
3"-300# 03
03 03 0 80 GENERAL HOLDS INDEX:
NO POCKETS
M1 TT TI
03 CN1A CN5 28 420-1"-LF-1-005-52A-V
231 231 8 a) Solved.
CN2A RTD
03 2" b) Solved.
CN3A c) Solved.
NOTE 5 2" DISP
03 LT d) Solved.
LT LG 03 NOTE 8 e) Solved.
13 03 232
SKIM OIL 0 0 231 03 231 HLL : 2100.0 mm 2" f) Solved.
30 330-2"-SY-1-004-67DS-V NNF LI
9029 193201DPFM03694 DISP NOTE 4 MAG CN3B g) Solved.
92 LLL : 300.0 mm 232 B
F TOXIC h) Solved. F
H
NO POCKETS
0
330-2"-SY-1-008-64AST-V VERY TOXIC NOTE 13
-1
13 49 550-2"-CD-1-189-63AS-P 130 CLOSED DRAIN
SKIM OIL 0 0 330-2"-SY-1-005-67AS-V N4 m) Solved. 03
30 NNF 3.5 TOXIC 3.5 193201DTFM62023_01
9028 193201DPFM03697 6 4 n) Solved.
12 TOXIC MIN. SC o) Solved.
FROM RICH AMINE N7 7 NOTE 3 NOTE 1, 2
TYPE A 8 1" 03 p) Solved.
FLASH DRUM 2" SO 231 03
q) Solved.
330-1-VH-001 7 03 r) Solved.
MIN. 330-2"-SY-1-020-64AST-V
N3 s) Solved.
G N8 t) Solved. G
u) Solved. 03
540-2"-OD-1-179-03A-V
v) Solved.
0 TOXIC
13
03
3.5
49
540-4"-OD-1-663-81A-N
0
H H
9015
330-2"-SY-1-012-64AST-V
SC 13. Solved.
232 14. Solved.
15. Solved.
TYPE A 28. Solved.
03
L L
SP LV-005
M M
EX-DE 03 27-10-2016 ISSUED FOR CONSTRUCTION W. ATEF H.H N.O M.F M.L K.E
4 NOTE 1,2
EX-DE 02 26-07-2016 ISSUED FOR CONSTRUCTION WITH HOLD W. ATEF H.H N.O M.F M.L K.E
13 15438
0 EX-DE 01 23-05-2016 ISSUED FOR DESIGN A. SPOLETO E.SBALCHIERO A. LO BIANCO
0
NNF 330-2"-AD-1-016-64AST-V AMINE DRAIN
3.5 193201DTFM62003_01 EX-DE 00 10-02-2016 ISSUED FOR COMMENTS R. FERRARO A. SPOLETO A. LO BIANCO
TOXIC
Validity Revision
Status Number Contractor Contractor Contractor Company Company
03 Date Description
Prepared Verified Approved Checked Approved
Revision Index
Company Logo and Business Name Project Name Company Document ID:
ZOHR
DEVELOPMENT 193201DPFM03712
Petrobel eni SpA PROJECT
N N
Contractor Logo and business name Contractor Document ID:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software: SmartPlant P&ID File Name: 193201DPFM03712_EXDE01_01.pdf