GENERAL NOTES

1- These drawings should be used in coordination with all other drawings


presented by the architect, engineer and consultants.

2- It is forbidden to any of the concerned persons to measure the drawing;


5.00
in case of necessity, refer to the architect or engineer.

3- The architect, engineer and consultants, should be immediately informed of


0.03 4.91 any contradiction existing between any of the drawings before settling

VINYL AS Built the construction plan; any personnel interfering is not appreciated.

Slab Level +3.30 Approval Material UNLESS OTHER WISE


MENTIONED ON DRAWINGS :

0.60
1. FOR LIGHTING SYSTEM :
FALSE CEILING +2.70 1. HVAC :

RETURN AIR GRILL


0.60

SUPPLY AIR DIFFUSER

60
0.
0.
18
3.30

0.
18

0.
1. ELECTRICAL :

60
60
2.70

0.
0.
60
MDF PANELS
2.20 F1
RECESSED MOUNTED LED LIGHTING FIXTURE, 600 x 600 mm,

60
0.
0.

0.
F1

60

60
DITTO BUT FED FROM EMERGENCY CURRENT

1.10

0.
60

60
F1A

0.
0.
RECESSED MOUNTED LED LIGHTING FIXTURE, ANTI BACTERIA,

60
FINISH LEVEL

60
25 * 40 WOODEN
STEEL NAILS

0.

0.
60

60
0.
SMOKE DETECTOR
60 S

0.
0.10
60
0.

0.
DOME CAMERA

60

60
0.

0.
600*600 VINYL THK. 2MM 600*600 VINYL THK. 2MM

60
4.
ADHESIVE ADHESIVE

96

60
SELF LEVLLING 3 MM SELF LEVLLING 3 MM
CEILING MOUNTED JUNCTION BOX

0.
B

0.
30 * 30 CM MOSAICO TILES 30 * 30 CM MOSAICO TILES

60

60
0.
0.
2 CM THK. CEMENT MORTAR 2 CM THK. CEMENT MORTAR

60
5 CM THK. SAND LAYER 5 CM THK. SAND LAYER

60
0.
OPERATION BED FLOOR MOUNTED BOX WITH 1No. SOCKET,

0.
60

60
0.
0.
60
60
SECTION (a-a) Operation Room 1 18 DOWN LIGHT

0.
0.

0.
60
0.
60
98
60

4.
0.
B

4.
75

56
4.
60
0.
60
0.
20
CORIAN

0.
RCC

PLASTER BlOCK WORK

PLASTER THK.2CM

25 * 40 WOODEN Vinyl THk. 2mm

STEEL NAILS COVE

0.12
COVE MDF
Ecophon Tiles
Corian THk.6mm
0.30
MDF

30
25 * 40 WOODEN

0.
CORIAN
PANELS
VINYL THK. 6 MM CEILNG PLAN.Operation Room 2
1 SHOP DRAWING Rev-01

600*600 VINYL THK. 2MM Detail 01 Floor PLAN.Operation Room 2 MDF THK. 6 MM scale 1:20 0 SHOP DRAWING Rev-00

Detail 02 No.
A SUBMISSION NO.1
Issued for Date By

ADHESIVE Scale 1:5 Detail 03 WOODEN 5 X 2.5 CM


Scale 1:5 scale 1:20 SUBMITTAL \ REVISION
3 MM SELF LEVLLING PLASTER 2 CM
scale (1:5) KEY PLAN:

30 * 30 CM MOSAICO TILES
‫تحزم جنالم‬

‫تاطقص زتانأ‬

‫تاطقص زتانأ‬ +.045

+0.00
‫نمتلام نمجحوح‬

‫تاعم لتتااص نمتمـعام‬


+.030

‫نوات‬
‫تناو‬
‫ا‬
‫ةوا‬

‫ةوا‬
‫ج‬

‫ا‬
‫ناـ‬
‫عنات‬

‫اماح‬

‫نام‬
‫ماتونـ زامناوص‬

‫تمنج ت‬

‫تمنج‬
‫نام‬
‫حئال‬
+- 0.00 ‫ايحص‬
+.015

‫لم‬

‫نمجص‬
‫تمن‬
‫ووا‬

‫تت‬
‫تونئ‬
‫ـي‬

‫نم‬
‫لم‬
‫تمن‬
‫ووا‬

‫موم‬
‫ـي‬ +.045

2 CM THK. CEMENT MORTAR


‫اةوا‬

‫تين‬

‫مام‬
‫نمح‬
+.045

‫عتص‬
‫يااوص‬

‫موم‬
‫ياوق‬

‫م‬
‫تتا حنزمم‬ +.060

‫ي‬
‫تتتنا‬
‫ــ‬
‫وت‬

‫نا‬
‫امنت‬

‫ـيت‬
‫م‬ ‫تتا زناجم‬ +0.60

‫احنـ‬
‫مـ‬
‫اوا ت‬
‫ـة‬
‫يحت‬

‫اجنـ‬
‫ـ‬

‫ت‬
‫ـوص‬
‫تاطقص‬

‫ةا‬
+.020

‫اماح‬
‫زتانأ‬

‫ناـ‬
‫ةوا‬
‫ا‬
‫وانـ‬
‫ت‬
‫تتتم‬
‫تحزم‬

‫وقص‬
‫ااومم‬

‫يح‬
‫يحوقص‬ ‫تتعم‬

‫تاطقص زتانأ‬
+.020 +.015

‫يااص متا‬ ‫تحزم‬


‫منيص زناجوص‬ ‫نمـقلنم‬

‫اةوا‬

‫اةوا‬
+0.60 +0.15 +0.60 +.045 +.015
‫نمتمـعام‬ ‫تتعم‬ ‫اناااص‬
‫تاعم لتتااص‬
‫ماتونـ زامناوص‬ ‫ااومم‬

5 CM THK. SAND LAYER


‫نمتمـعام‬ ‫نمااومم‬
+- 0.00 +0.15 +0.60 +0.60
+0.30

‫يحوقص‬ ‫تتعم‬ ‫يحوقص‬


‫تحزم‬

‫يح‬
3.98

‫قنتص‬
‫وقص‬

‫ة‬
‫ااومم‬

‫تم‬
‫عام‬

3.97

‫تحوا‬

‫تا‬
‫مـ‬
‫نمت‬

‫قنتص‬
‫ة‬
‫تم‬
‫ا‬ ‫اماح‬

‫تا‬
‫ةوا‬ ‫ناـ‬

‫ناوص‬
‫تاطقص‬

‫واا‬
‫ناـ‬ ‫ةوا‬

‫حاـ‬

‫قنتص‬
+.020

‫ت‬

‫م‬
‫اماح‬

‫ة‬
‫ونحص‬

‫تم‬
‫ا‬
‫زتانأ‬

‫ت‬

‫تا‬
‫عوا‬
‫زنا‬
‫ونحص‬

‫ما‬
‫ت‬
‫متنتص‬

‫قنتص‬
‫ت‬

‫ة‬
‫تم‬
‫انيص ن‬

‫تا‬
‫نمج‬
‫تتا زناجم‬
‫نطاص‬
‫قنتص‬

‫زنا‬
‫ل‬

‫قنتص‬
‫ت‬
‫حموص‬
‫تم‬

‫ة‬
‫ونحص‬
‫تا‬ ‫تحـل ةحناص نمتعاات‬

‫ةو‬
+.060

‫ت‬
‫تتا حنزمم‬

‫طلنأ‬

‫زنا‬
‫قوت‬

‫يااوص‬
+.045

‫م‬

‫ت‬
‫حموص‬ ‫ةقنتص‬

‫يااوص‬

‫ياوق‬
‫ـت‬
‫ياوق‬
‫ةو‬ ‫ـنا‬

‫وت‬

‫تم‬
‫نم‬ ‫اـ‬

‫ـتا‬
‫طانم‬

‫تا‬
+- 0.00 ‫ان‬

‫قلنم‬
+.045

‫ونحص م‬
‫اةوا‬

‫قوت‬

‫مـ‬
‫لنم‬

‫ت‬

‫ـت‬
‫حنـ‬

‫ن‬
‫ـق‬
‫وت‬

‫تون‬

‫زنا‬
‫عنات‬ ‫ااص‬ ‫ينننـ‬

1.41

‫نم‬
‫مـتا‬ ‫لتت‬

‫ت‬
‫تاطقص‬ ‫انمص ن‬

‫عام‬
‫ماتونـ زامناوص‬

‫طلز‬

‫حموص‬

‫اعم‬
‫مـ‬
‫ا‬

‫ت‬

‫ت‬
‫ةو‬
‫زتانأ‬

‫نمت‬
‫تـنت‬

‫ا‬
‫ةوا‬
‫يمنمص‬

‫ووا‬
‫ونحص‬

‫تنـ‬

‫اـي‬

‫ناـ‬
‫حنـ‬

‫ت‬
+.030

‫يمنمص‬

‫تتا‬

‫اماح‬
‫نانـ‬
‫تون‬

‫ممص‬

‫لم‬

‫زن‬
‫تي‬
‫نم‬

‫تمن‬
‫ا‬
‫ةوا‬
‫نطاص‬
‫حزم‬

‫اماح‬
‫ةمنجص‬

‫ل‬

‫ناـ‬
‫ت‬

‫ونحص‬

‫ناـ‬
‫ت‬

‫ةوا‬
‫اماح‬
0.47 0.76 0.76 0.76 0.76 0.46
+0.15 ‫نمياا نمجحوحص‬

0.47 0.76 0.76 0.76 0.76 0.47

‫امأا‬

‫ا‬
‫محوص‬

‫ماا‬

‫النأ‬
‫ج‬ ‫تاعم لتتااص‬

‫ونحص‬
‫تاطقص‬

‫حئ‬
‫ت‬
‫ونحص‬
‫نمتمـعام‬

‫ت‬
‫زتانأ‬
‫منيص زناجوص‬
+.015 ‫تامح‬
‫ماتونـ زامناوص‬
‫تاطقص زتانأ‬ ‫تاطقص زتانأ‬
+.015 +.015 +0.00

‫لمنط‬
‫تلام‬

‫تتا‬
‫نمنمـقلنم انمطاناا‬

0.33 0.33
‫تيام‬
‫تاعم لتتااص نمتمـعام‬
+.015 ‫تميق‬
‫حعح‬
‫تاعم لتتااص‬ ‫تاعم لتتااص‬

0.76
‫نمتمـعام‬ ‫نمتمـعام‬

‫تحزم جنالم‬

+2.70 FALSE CEILING


0.10

+2.70 FALSE CEILING


0.10

0.10

FALSE CEILING +2.70


0.10

0.10

0.10
1.60

WALL MOUNTED TELECOMMUNICATION AND DATA OUTLET


(1 DATA +1 TEL.) WITH BACK BOX

1.41
2.50

2.70
2.50

2.70

2.50

2.70
2.20

1.
05
E1-03
1.60

0.86 0.41

0.
60
FINISH LEVEL FINISH LEVEL
0.45

0.45
0.45

FINISH LEVEL
02

98
0.10

E1-

3.

E1-

3.
96
04
Elev.Operation Room 2 Elev.Operation Room 2 Elev.Operation Room 1
ICC

2.
31
(R2-01) (R2-02)

0.
(R2-03)

22

75
0.
0.
7
5

75
0.
05

0.
E1-

75
3.98 3.98 1.41

75
0.33 0.76 0.32

01
0.46 0.76 0.76 0.76 0.76 0.46 0.47 0.76 0.76 0.76 0.76 0.46

0.
E1-
0.
75
FALSE CEILING +2.70
0.10

+2.70 FALSE CEILING +2.70 FALSE CEILING

5
0.10
0.10

0.10

7
0.
0.10
0.10

0.
75
E1-06

75
0.
0.
75
WALL MOUNTED TELECOMMUNICATION AND DATA OUTLET

22
WALL MOUNTED TELECOMMUNICATION AND DATA OUTLET (1 DATA +1 TEL.) WITH BACK BOX 1.41

0.
(1 DATA +1 TEL.) WITH BACK BOX PAR : PID :
AGS VAC MA4 N2O O2

PLS : PE/CE :
2.50

2.70
2.50

2.70
2.50

2.70

PE/EE : PE/HV :
2.20
2.20

PE/PG : PE/SE :
0.60 DRAWN: CHECK:
1.60

0.60
1.60

FINISH LEVEL
FINISH LEVEL FINISH LEVEL SHOP DRAWING
0.10

DRAWING TITLE:

Elev.Operation Room 2 Elev.Operation Room 2 Elev.Operation Room 1 PLAN.Operation Room 2


OPERATION ROOM 02
(R2-04) (R2-05) (R2-06)