You are on page 1of 1

Important Notes:

• Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This
document may not, in whole or in part, be reproduced, stored, transmitted or
distributed in any form or by any means, whether electronic, mechanical, by
photocopy, recording or otherwise, without the prior written permission of EX20.
Except where otherwise expressly agreed in writing by EX20, EX20 shall have
no responsibility or liability for any loss (direct, consequential or otherwise)
which may arise from reliance on or use of this document or the information
contained therein.
• Where dimensions are not given, drawings must not be scaled and the matter
should be referred back to John R Harris & Partner's.
• This drawing should be read in conjunction with all other project information,
produced by John R Harris & Partner's and others. In the event of any conflict
1 2 3 4 5 6 7 8 9 10 100 110 between the information contained on this drawing and in any other project
document, drawings, specifications, schedules etc. the matter must be referred
back to John R Harris & Partner's for clarification.
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 • All dimensions and conditions are to be checked on site by the contractor prior
700 1000 500 500 500 500 to preparing designs, shop drawings, calculations etc. or commencing any
375 500 500
RC WALL 250 THK RC WALL 250 THK RC WALL 250 THK RC WALL 250 THK RC WALL work.
• The contractor is responsible for checking that there is no conflict between site

700

700

700
TOF+ 23.73 dimensions and drawn dimensions.

250 THK RC WALL


250 THK RC WALL
250 THK RC WALL

250 THK RC WALL

250 THK RC WALL


• This drawing’s should be read in conjunction with other relevant architectural,
350 350

250 THK RC WALL


interior design, structural, fire safety, mechanical and electrical drawings and all
relevant sections of the project specifications.
200 THK RC WALL 200 THK RC WALL
700

• The contractor shall submit full shop / setting out drawing for approval (based
on site dimensions) prior to commencement of any site works, placing of
1000 1300
orders, manufacture of fittings, fixtures and components.
• Approved drawings from consultants do not relief the contractors from his
250 THK RC WALL RC WALL 600 THK RC WALL 250 THK RC WALL 250 THK RC WALL 250 THK RC WALL

584
584

584

584
contractual obligations or that of adhering to requirements in accordance with
A

1500

1500

1500
latest edition of Fire and Life Safety Code of practice and the International
P2 P3 250 THK RC WALL P4 P6 CF3
916

916
P1 P5 P2 Codes & Standards referred to within where applicable.
P4 P4 TOF+ 23.73

1365
TOF+ 23.73 TOF+ 23.73

600 THK RC WALL


1065 935
1641

• Safety, Health and Environment Information: brief details on the identified

300
P15 hazard symbol referencing the unusual residual hazards / risks are listed
RC WALL

RC WALL

RC WALL
1035 965
250 THK RC WALL

950
P15 1345 P15 above.

STB
1370
1455 1000 1300 850

2057

2060
S5

2534
DO NOT SCALE THIS DRAWING.

STB
STB
5000

ST-502 P15 CF7


RC WALL 1445 1035 600 THK RC WALL 1915 180 STB

STB
1435 565
F20 830 670
P15 STB P15
P7 P19 P15 STB STB P15 STB SC8 P20 F12,2

1550
165 1335
1340

P15 P15

1270
STB

STB
STB STB STB

930
F15,3

STB
B
F15,2 F15,2

570
571
660

P8

730
955 545 F15,3
822 678
500 500

1215 830 F15,2


890 1110 F20

STB
STB
250 THK RC WALL S7 N

STB
STB

STB
ST-503 F15,1

STB
Makka
h
STB

2190 475
5000

450 1050
810 690 850 650 815 685 1150 550 P15 815 685 P15 F15
F15,2

1500
700
P9 ST B General Notes

2000
P15 P15 P15 P15 P15 P15 P15 P15
STB STB STB STB STB STB STB STB

1290
225 1275

225 1275

225 1275

235 1265
P14
F22,31

550
C

235
410
B
625

805
F15,3

ST
F15 F15,3 1760 2315 925
250 THK RC WALL

F15,3 F17,1 F15,3 2350 815


P8 P15 P21

STB
P15

ST
F20,175-1

B
1700

STB

MATCH
ST

1700
B

LINE B
1500
STB

STB

1120 380
5000

380 1120 P15


1220 845 1885 F12,4 2490
P7 P15 P15 P15

STB
STB
STB

1500

1500
1220 845

2850
F15,2 F17,1 1200 1290 ST F20,1
B 1010 1500
B CF1
P15 STB P15 ST

1000
P15 P15 P15 STB P15 P15 TOF+ 24.34
865

850
F15,3 F15,3 STB

720

720
STB STB
D P15

B
ST
835

850
1000
ST

1130
IN PROGRESS

ST
TOF+ 24.34
1470

B B
ST
1900

B
F12,4 F12,3
1840 1405

STB
1825 1260 740
P8 P15 P15 F15,86
P15 STB F12,3 P15

50
S17 F12,3

L
TOF+ 24.23
STB
5000

AL

STB

STB
0T
STB

P8

STB
W

HK
1200 ST-504

RC
300 THK SLAB
ST

565 1220 1515 320 1405

RC
1290 1235
HK
B

700 1515

W
F12,4
0T

AL

70
P15 P15 P15
50

F20,1

2330
0
540

STB

TOF+ 23.88 TOF+ 24.34

STB
F12,4
1330

CF1
250 THK RC WALL

P15

1000
P15 STB P15 P15 P15 CF9 STB P15
850

850
STB STB 70 STB
0 0
E 70
B

F12,3 L
AL
ST

STB
50

STB
730

730

750
850

850
1000
W
0T

P15 RC S11 P15


HK

F15,3 HK
RC

F15,3
0T
925 475
2510 1200 F12,3 1260 740
W

1235 50 ST-503
AL
L

STB

STB
P8 0 1220 No Description
F12,3 70 CF6
5000

STB
STB

STB

STB
SAFETY, HEALTH AND ENVIRONMENT INFORMATION
Brief details on the identified hazard symbol referencing the unusual residual
ST

ST
B
hazards / risks are listed above.
B

F15,4

ST
1200 2215 1420

B
F17,2 F15,3
P15 P15 STB P7 P15 P7 P22 P7 P7 P15 P15

850
STB STB STB
F P15 P8
CF1
MATCH

850
CF8
1 ISSUED FOR CONSTRUCTION AB AB 23/01/2020
1010 490 F17,2 LINE A 0 DETAIL DESIGN SUBMISSION AB AB 08/01/2020
Rev Description Apvr Chk'd Date
Client
STB
5000

P8

STB
F17,2
F15,2
CF1
STB STB STB STB Programme / Programme Management Consultant
G

Architectural Consultant

Project Title

PLAN AT FOUNDATION LEVEL PART-2 USA PAVILION EXPO 2020


- 1 : 100 Enter address here
Drawing Title

300
FOUNDATION PLAN PART-2
3T25

T10@150
500

NOTE:-STARP BEAM (SB) SIZES ARE 300wX500d UNO.


3T25
NOTE:-TOP OF FOOTING (TOF) +24.34 UNO.
50 THK. P.C.C. BLINDING
Approved Seal Date
(SB) STRAP BEAM AB
Designed Drawn Checked

IA AB
Model File Ref: Scale A1(594x841) Revision No
10101-MDL-S605282-AR-900001 As indicated 1
Drawing No

6324-USA-ST-DG-ST-102