You are on page 1of 1

Important Notes:

• Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This
document may not, in whole or in part, be reproduced, stored, transmitted or
distributed in any form or by any means, whether electronic, mechanical, by
photocopy, recording or otherwise, without the prior written permission of EX20.
Except where otherwise expressly agreed in writing by EX20, EX20 shall have
no responsibility or liability for any loss (direct, consequential or otherwise)
which may arise from reliance on or use of this document or the information
contained therein.
• Where dimensions are not given, drawings must not be scaled and the matter
should be referred back to John R Harris & Partner's.
1 2 3 4 5 6 7 8 9 10 100 110 120 130 140 150 160 • This drawing should be read in conjunction with all other project information,
produced by John R Harris & Partner's and others. In the event of any conflict
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 between the information contained on this drawing and in any other project
document, drawings, specifications, schedules etc. the matter must be referred
back to John R Harris & Partner's for clarification.
• All dimensions and conditions are to be checked on site by the contractor prior
to preparing designs, shop drawings, calculations etc. or commencing any
work.
• The contractor is responsible for checking that there is no conflict between site
dimensions and drawn dimensions.
• This drawing’s should be read in conjunction with other relevant architectural,
A SB-06 SB-06 interior design, structural, fire safety, mechanical and electrical drawings and all
relevant sections of the project specifications.
SB-06 • The contractor shall submit full shop / setting out drawing for approval (based
SB-06 HOOKS FOR ALL LIFTS TO BE

SB-06
SB-06

SB-06

SB-06

SB-06

SB-06
on site dimensions) prior to commencement of any site works, placing of
DESIGNED, SUPPLIED AND FIXED BY orders, manufacture of fittings, fixtures and components.
5000

SB-06 STEEL CONTRACTOR. FOR EXACT SB-06 • Approved drawings from consultants do not relief the contractors from his
DIMENSIONS AND LOCATIONS AND contractual obligations or that of adhering to requirements in accordance with
SB-06 REQUIRED CAPACITY REFER TO LIFT SB-06 latest edition of Fire and Life Safety Code of practice and the International
SPECIALIST DRAWINGS. Codes & Standards referred to within where applicable.
• Safety, Health and Environment Information: brief details on the identified
HOOKS FOR ALL LIFTS TO BE hazard symbol referencing the unusual residual hazards / risks are listed
B above.
DESIGNED, SUPPLIED AND FIXED BY
STEEL CONTRACTOR. FOR EXACT
DIMENSIONS AND LOCATIONS AND DO NOT SCALE THIS DRAWING.
REQUIRED CAPACITY REFER TO LIFT
5000

SPECIALIST DRAWINGS.

SB-02 SB-02
5000

SB-09
SB-02

SB-02
N
SB-02

SB-02
SB-02
Makka
SB-02 h

SB-09
-0 7
SB-09

D
SB-02

SB
SB-02 General Notes
SB-02

HOOKS FOR ALL LIFTS TO BE


5000

SB-09
DESIGNED, SUPPLIED AND FIXED BY
6

SB-02
STEEL CONTRACTOR. FOR EXACT

SB-02
SB
-0
SB-09
SB-02

SB

-0
DIMENSIONS AND LOCATIONS AND

SB
REQUIRED CAPACITY REFER TO LIFT

06

-0
SPECIALIST DRAWINGS.

SB

7
-
SB

-0
SB-02

6
E
SB

SB

06
-0

-0

-
SB

SB-09
6

6
S14
SB-02

ST-504
5000

SB-09

SB-02

SB-02
SB-02

7
SB-0
FOR STEEL STRUCTURES FOR EXHIBITION-4
REFER TO THE SUPPLIER DETAILS. SB-02
F S13
ST-504

SB
SB-02

-07
SB-02
5000

SB-09

SB-02

SB-02
SB-09
SB-02 SB-02
G
SB-02 SB-02
SB-02

SB-10

SB-10
SB-10

SB-02
SB-02
5000

S10
ST-503

SB-05 SB-05
1
H -0
10

SB 1
SB -0
-

10
SB

-0
SB
-

1
SB
SB

10

1 No Description
-0
-
-0

SB

SB
1 SB-

1
SB

-0 SAFETY, HEALTH AND ENVIRONMENT INFORMATION


SB-05
10

S12
5000

-0

SB
-

Brief details on the identified hazard symbol referencing the unusual residual
SB
5

1
0

-0
1

ST-503 hazards / risks are listed above.


SB
SB

1
10

-0
-0

SB
SB
5

1
SB

-0
-0

SB
1 SB-

I 1
-0
SB SB
-0
10

SB-05

1 ISSUED FOR CONSTRUCTION AB AB 23/01/2020


SB
5000

-0

0 DETAIL DESIGN SUBMISSION AB AB 08/01/2020


1

Rev Description Apvr Chk'd Date


Client

J
5000

Programme / Programme Management Consultant

Architectural Consultant
5000

L Project Title

USA PAVILION EXPO 2020


Enter address here
Drawing Title

LOWER ROOF PLAN


MEMBER BEAM SCHEDULE
Mark Type

LOWER ROOF FLOOR NOTE:- SB-01 152x89x16UB


- 1 : 150
1. ALL STEELWORK TO BE GRADE S275JR TO BS EN 10025, 10113 OR 10210 UNLESS NOTED
OTHERWISE. THE DESIGN OF ALL STEELWORK SHALL BE IN ACCORDANCE WITH AISC.
SB-02 305x165x40UB
2.ALL METSEC C-SECTION PRODUCT IS MANUFACTURED FROM PRE HOT DIPPED GALVANISED SB-03 305x165x54UB
STEEL TO BS EN 100346:2015, Z275 COATING AND WITH A MINIMUM YIELD STRENGTH OF 450 N/mm. SB-04 406x178x67UB
3.FOR FILL AREAS LIGHT WEIGHT CONCRETE WITH MAXIMUM DENSITY 1200Kg/m3. SB-05 457x191x106UB
4.ALL DOOR SUPPORTING MEMBERS SHALL BE PLACED ONLY UPON COMPLETING THE MAIN Approved Seal Date
STRUCTURAL ELEMENTS. SB-06 200x200SHS
AB
5.COMPOSITE DECKS TYPE 1.5CD GAUGE 18 BY CMC METAL DECK OR SIMILAR. SB-07 100x100SHS
Designed Drawn Checked
6.DIRECTION OF COMPOSITE DECK SHOULD BE ORIENTED FROM "EAST TO WEST" (U.N.O). SB-09 Metsec-342M27
7.CONNECTIONS ARE NOT SHOWN FOR CLERITY. IA AB
SB-10 Metsec-302M23
Model File Ref: Scale A1(594x841) Revision No
SB-11 230x90x32PFC 10101-MDL-S605282-AR-900001 As indicated 1
Drawing No

6324-USA-ST-DG-ST-112

You might also like