Professional Documents
Culture Documents
• Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This
document may not, in whole or in part, be reproduced, stored, transmitted or
distributed in any form or by any means, whether electronic, mechanical, by
photocopy, recording or otherwise, without the prior written permission of EX20.
Except where otherwise expressly agreed in writing by EX20, EX20 shall have
no responsibility or liability for any loss (direct, consequential or otherwise)
which may arise from reliance on or use of this document or the information
contained therein.
• Where dimensions are not given, drawings must not be scaled and the matter
should be referred back to John R Harris & Partner's.
1 2 3 4 5 6 7 8 9 10 100 110 120 130 140 150 160 • This drawing should be read in conjunction with all other project information,
produced by John R Harris & Partner's and others. In the event of any conflict
5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 between the information contained on this drawing and in any other project
document, drawings, specifications, schedules etc. the matter must be referred
back to John R Harris & Partner's for clarification.
• All dimensions and conditions are to be checked on site by the contractor prior
to preparing designs, shop drawings, calculations etc. or commencing any
work.
• The contractor is responsible for checking that there is no conflict between site
dimensions and drawn dimensions.
• This drawing’s should be read in conjunction with other relevant architectural,
A SB-06 SB-06 interior design, structural, fire safety, mechanical and electrical drawings and all
relevant sections of the project specifications.
SB-06 • The contractor shall submit full shop / setting out drawing for approval (based
SB-06 HOOKS FOR ALL LIFTS TO BE
SB-06
SB-06
SB-06
SB-06
SB-06
SB-06
on site dimensions) prior to commencement of any site works, placing of
DESIGNED, SUPPLIED AND FIXED BY orders, manufacture of fittings, fixtures and components.
5000
SB-06 STEEL CONTRACTOR. FOR EXACT SB-06 • Approved drawings from consultants do not relief the contractors from his
DIMENSIONS AND LOCATIONS AND contractual obligations or that of adhering to requirements in accordance with
SB-06 REQUIRED CAPACITY REFER TO LIFT SB-06 latest edition of Fire and Life Safety Code of practice and the International
SPECIALIST DRAWINGS. Codes & Standards referred to within where applicable.
• Safety, Health and Environment Information: brief details on the identified
HOOKS FOR ALL LIFTS TO BE hazard symbol referencing the unusual residual hazards / risks are listed
B above.
DESIGNED, SUPPLIED AND FIXED BY
STEEL CONTRACTOR. FOR EXACT
DIMENSIONS AND LOCATIONS AND DO NOT SCALE THIS DRAWING.
REQUIRED CAPACITY REFER TO LIFT
5000
SPECIALIST DRAWINGS.
SB-02 SB-02
5000
SB-09
SB-02
SB-02
N
SB-02
SB-02
SB-02
Makka
SB-02 h
SB-09
-0 7
SB-09
D
SB-02
SB
SB-02 General Notes
SB-02
SB-09
DESIGNED, SUPPLIED AND FIXED BY
6
SB-02
STEEL CONTRACTOR. FOR EXACT
SB-02
SB
-0
SB-09
SB-02
SB
-0
DIMENSIONS AND LOCATIONS AND
SB
REQUIRED CAPACITY REFER TO LIFT
06
-0
SPECIALIST DRAWINGS.
SB
7
-
SB
-0
SB-02
6
E
SB
SB
06
-0
-0
-
SB
SB-09
6
6
S14
SB-02
ST-504
5000
SB-09
SB-02
SB-02
SB-02
7
SB-0
FOR STEEL STRUCTURES FOR EXHIBITION-4
REFER TO THE SUPPLIER DETAILS. SB-02
F S13
ST-504
SB
SB-02
-07
SB-02
5000
SB-09
SB-02
SB-02
SB-09
SB-02 SB-02
G
SB-02 SB-02
SB-02
SB-10
SB-10
SB-10
SB-02
SB-02
5000
S10
ST-503
SB-05 SB-05
1
H -0
10
SB 1
SB -0
-
10
SB
-0
SB
-
1
SB
SB
10
1 No Description
-0
-
-0
SB
SB
1 SB-
1
SB
S12
5000
-0
SB
-
Brief details on the identified hazard symbol referencing the unusual residual
SB
5
1
0
-0
1
1
10
-0
-0
SB
SB
5
1
SB
-0
-0
SB
1 SB-
I 1
-0
SB SB
-0
10
SB-05
-0
J
5000
Architectural Consultant
5000
L Project Title
6324-USA-ST-DG-ST-112