You are on page 1of 1

8 7 6 5 4 3 2 1

R 1-THS-52BV-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- VB25 - NO.s 2 BILL OF MATERIALS ASSEMBLY MK'D : VB25 ASSY QTY : 2
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
VB25 A-./1 EL. +25.214 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
VB25 A-./2 EL. +25.214 MARK ASSEMBLY METER QTY. WEIGHT M
M51 1 SHS113.5X113.5X4.815.92 5845.83 95.77 2 191.54 0.00 YST310
F F
P47 2 PL10*155 78.50 160.00 1.95 4 7.79 0.22 E250BR
P48 2 PL10*145 78.50 180.00 2.05 4 8.20 0.23 E250BR
P49 4 PL8*114 62.80 155.01 0.85 8 6.77 0.14 E250BR
TOTAL 214.29 0.60

60 65 6
P49
P49 6
P48
P47 P47
VB25
27

27
M51
60

60
6 P49 P48 P49 65 60
6
E 6176 E

155 10 5846 10 155

P49 P49 P49


P47 P48 VB25
M51 P47

P49
6 6 6
P48
6
D D
5856

P47 25
4 - 22 Ø HOLES
P49

32
M51

160

114
60

32
50
55 60 25
5846
155
155

C C
145 P48

180

0 RELEASED FOR CONSTRUCTION 13.08.2021 SRK 13.08.2021 NP 13.08.2021 GS 13.08.2021 CRM

REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.

EMPLOYER

NTPC Limited
(A Government of India Enterprise)
B B
PROJECT

FLUE GAS DESULPHURISATION (FGD) SYSTEM PACKAGE FOR


TALCHER STPS STAGE-I (2x500MW) & STAGE-II (4x500MW)
EPC CONTRACTOR

TATA PROJECTS LIMITED


HYDERABAD - INDIA
QFGDM

ANDRITZ AG
GRAZ - AUSTRIA

DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
V_BRACE - VB25
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:

NTPC
---
Tekla Structures

PRELIMINARY
---

RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER

FOR
2-V_BRACES REQD. AS DRAWN MKD. VB25 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-VB25-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1

You might also like