You are on page 1of 1

8 7 6 5 4 3 2 1

R 1-THS-12BV-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- VB21 - NO. 1 BILL OF MATERIALS ASSEMBLY MK'D : VB21 ASSY QTY : 1
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
VB21 A-./2-1 EL. +16.343 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
MARK ASSEMBLY METER QTY. WEIGHT M
M24 1 SHS132.0X132.0X4.818.71 4942.84 94.76 1 94.76 0.00 YST310
F F
P41 1 PL10*132 78.50 135.00 1.40 1 1.40 0.04 E250BR
P42 2 PL10*165 78.50 165.00 2.14 2 4.27 0.12 E250BR
P43 4 PL8*132 62.80 135.00 0.84 4 3.34 0.07 E250BR
P59 1 PL12*132 94.20 135.00 1.68 1 1.68 0.04 E250BR
P85 2 PL10*170 78.50 251.85 2.72 2 5.43 0.09 E250BR
TOTAL 110.89 0.36

2451 55 2447

P85
CTR'D

2
P43 6
TYP P41
P59 6
VB21 P42 P43

202
27.5

27.5
M24
E E
P43
27.5

27.5
202
P43 P42 6
60 55 55 60 TYP
6
P85

2
CTR'D
2437 55 2451

5233

D P43 135 10 4943 10 135 D


P59 P43 BS
P43
VB21

16
16

P85 P85
M24

132
132

17
16

TYP P42
4 P41
TYP P42
10

4943 135
135
165
25
M24 45 61 30
C C
38.5

P43

41
4 - 18 Ø HOLES
55.0
132

165

132
38.5

P59 P42

41
25
104 55 92

52 38 0 RELEASED FOR CONSTRUCTION 13.08.2021 SRK 13.08.2021 NP 13.08.2021 GS 13.08.2021 CRM


135
REVISION DATE DRN. DATE DES. DATE CHD. DATE APP.
32

DESCRIPTION
6

45 60 30
2 2

38.5

EMPLOYER
78 60

P41
NTPC Limited
170

55.0
132

(A Government of India Enterprise)


B B
P85 4 - 18 Ø HOLES PROJECT
38.5

4 - 18 Ø HOLES
252 FLUE GAS DESULPHURISATION (FGD) SYSTEM PACKAGE FOR
TALCHER STPS STAGE-I (2x500MW) & STAGE-II (4x500MW)
EPC CONTRACTOR

TATA PROJECTS LIMITED


HYDERABAD - INDIA
QFGDM

ANDRITZ AG
GRAZ - AUSTRIA

DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
V_BRACE - VB21
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:

NTPC
---
Tekla Structures

PRELIMINARY
---

RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER

FOR
ONE NO. V_BRACE REQD. AS DRAWN MKD. VB21 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-VB21-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1

You might also like