You are on page 1of 1

8 7 6 5 4 3 2 1

R 1-THS-4BH-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- HB4 - NO. 1 BILL OF MATERIALS ASSEMBLY MK'D : HB4 ASSY QTY : 1
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
HB4 ./2-1 EL. +29.799 16 40 8.8XOX Site 4 4 BE16 HB4 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
MARK ASSEMBLY METER QTY. WEIGHT M
16 45 8.8XOX Site 4 4 BE17 HB4 M50 1 SHS80.0X80.0X4.8 10.87 3344.00 37.90 1 37.90 0.00 YST310
F F
P94 2 PL8*80 62.80 255.00 1.28 2 2.56 0.09 E250BR
P95 2 PL8*110 62.80 110.00 0.76 2 1.52 0.02 E250BR
TOTAL 41.98 0.12

E E

P95
P95
P94 HB4 P94
42

15

15

42
M50
8

8
60

60
15

15
10 TYP
TYP 4
10

3870

D 255 8 3344 8 255 D

P95 P94
P94 P95
59

59
HB4
51

51
180 45 M50
45 180

P94
110 4 - 18 Ø HOLES

40
M50
C C

80
110

40
3344 30 60 60 60 45
P95
255

0 RELEASED FOR CONSTRUCTION 13.08.2021 SRK 13.08.2021 NP 13.08.2021 GS 13.08.2021 CRM

REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.

EMPLOYER

NTPC Limited
(A Government of India Enterprise)
B B
PROJECT

FLUE GAS DESULPHURISATION (FGD) SYSTEM PACKAGE FOR


TALCHER STPS STAGE-I (2x500MW) & STAGE-II (4x500MW)
EPC CONTRACTOR

TATA PROJECTS LIMITED


HYDERABAD - INDIA
QFGDM

ANDRITZ AG
GRAZ - AUSTRIA

DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
H_BRACE - HB4
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:

NTPC
---
Tekla Structures

PRELIMINARY
---

RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER

FOR
ONE NO. H_BRACE REQD. AS DRAWN MKD. HB4 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-HB4-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1

You might also like