You are on page 1of 1

8 7 6 5 4 3 2 1

R 1-THS-5BH-2#NU-DOA-LAT-DGF-CPTN :oN.GRD
0 BOLT LIST FOR ASSEMBLY:- HB5 - NO.s 2 BILL OF MATERIALS ASSEMBLY MK'D : HB5 ASSY QTY : 2
GRID LOCATION DIA. LENGTH GRADE TYPE QTY./ONE QTY./ALL CONNECTED MAINPART CONNECTED SECONDARIES REMARK
QTY./ WT./ AREA
HB5 .-B/2-1 EL. +29.799 16 40 8.8XOX Site 8 16 BE17 HB5 ITEM PROFILE LENGTH WT./ITEM TOTAL TOTAL 2 MATL.
HB5 A-./2-1 EL. +29.799 MARK ASSEMBLY METER QTY. WEIGHT M
M50 1 SHS80.0X80.0X4.8 10.87 3344.00 37.90 2 75.80 0.00 YST310
F F
P94 2 PL8*80 62.80 255.00 1.28 4 5.12 0.18 E250BR
P95 2 PL8*110 62.80 110.00 0.76 4 3.04 0.05 E250BR
P124 2 PL8*257 62.80 518.76 8.06 4 32.25 0.53 E250BR
TOTAL 116.21 0.77

1683 115 173 115 1783

P124
6
6

138
P95
P95
HB5 P94
E
51

15

15

51
E P94

144 64
8 M50

8
51

15

15

51
TYP 10
10 6

138
TYP
4
6

P124
1683 115 173 115 1783

3870

255 8 3344 8 255 D


D

P95 P95 P94


P94 P124 BS
59

59
12
HB5
51

51
M50
180 45
45 60 60 60

77
77
M50 110
110 58 115 173 115 58

4 - 18 Ø HOLES 4 - 18 Ø HOLES
C C

30

30
3344

55

55
P95

60

60
64

64
60

60
60
138

138
257

60
P94
4 - 18 Ø HOLES
40

64

64
80

P124
40

0 RELEASED FOR CONSTRUCTION 13.08.2021 SRK 13.08.2021 NP 13.08.2021 GS 13.08.2021 CRM


30 60 60 60 45 519
REVISION DESCRIPTION DATE DRN. DATE DES. DATE CHD. DATE APP.
255
EMPLOYER

NTPC Limited
(A Government of India Enterprise)
B B
PROJECT

FLUE GAS DESULPHURISATION (FGD) SYSTEM PACKAGE FOR


TALCHER STPS STAGE-I (2x500MW) & STAGE-II (4x500MW)
EPC CONTRACTOR

TATA PROJECTS LIMITED


HYDERABAD - INDIA
QFGDM

ANDRITZ AG
GRAZ - AUSTRIA

DWG. TITLE:
NOTES:-
SIGNATURE DATE
A
A
1. ALL DIMENSIONS ARE IN m.m. & LEVELS ARE IN METER.
DRAWN SRK 13.08.2021 ABSORBER OUTLET DUCT - UNIT#2
DESIGNED NP 13.08.2021
H_BRACE - HB5
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DRG. NO. CHECKED GS 13.08.2021
APPROVED CRM 13.08.2021 DEPT. ENGG SCALE: NTS SHEET: 1 SIZE: A2 UNIT DESIG.: -- REV.
---
FILE NAME:

NTPC
---
Tekla Structures

PRELIMINARY
---

RELEASED
DWG.NO.
3. FOR MARKING, REFER ERECTION DRAWING NO. TENDER

FOR
2-H_BRACES REQD. AS DRAWN MKD. HB5 ENGINEERING
TPL DWG.NO. NTPC-FGD-TAL-AOD-UN#2-HB5-SHT-1 0
ANDRITZ
CONSTRUCTION DWG.NO. --- ---
8 7 6 5 4 3 2 1

You might also like