Professional Documents
Culture Documents
Ø50
Ø40
Ø50
Ø50
Ø40
Ø50
Ø50
Ø40
Ø50
Ø50
Ø40
Ø50
Ø50
Ø40
Ø50
Ø50
Ø40
Ø50
ROOM 334 ROOM 332 ROOM 333 ROOM 331 ROOM 330 ROOM 328 ROOM 329 ROOM 327 ROOM 326 ROOM 324 ROOM 325 ROOM 323 REQUIRED, TO ALL WASH BASINS, BIDETS, SHOWERS AND BATHS
AND SHALL BE SUITABLE FOR USE WITH WATER HEATER
SELECTED TAKING INTO ACCOUNT EXPANSION REQUIREMENTS.
FLOW RESTRICTORS TO BE PROVIDED WHERE HOT WATER
B HEATERS FEED MIXING OUTLETS.
B
8. FINAL OUTLET CONNECTIONS ARE TO BE VERIFIED AGAINST
SANITARYWARE SCHEDULES AND ALLOWANCE MADE FOR ANY
CHANGE IN CONNECTION SIZES ETC.
Ø50
Ø40
Ø40
Ø50
Ø40
Ø40
MAINTENANCE PURPOSES.
Ø50
Ø40
Ø50
Ø50
Ø40
Ø50
Ø50
Ø40
Ø50
Ø50
Ø40
Ø50
10. FINAL SETTING OUT OF OUTLETS TO BE IN LINE WITH INTERIOR
ROOM 234 ROOM 232 ROOM 233 ROOM 231 ROOM 230 ROOM 228 ROOM 229 ROOM 227 ROOM 226 ROOM 224 ROOM 225 ROOM 223 DESIGN/ARCHITECTURAL REQUIREMENTS.
Ø110
Ø110
Ø110
C LEVEL 02 C
Ø90
Ø90
Ø75
Ø90
Ø90
Ø90
· BATHS 44°C
· BIDET 38°C
Ø32
Ø32
Ø32
Ø32
Ø32
Ø32
Ø40
Ø32
Ø40
Ø40
Ø32
Ø40
Ø40
Ø32
Ø40
Ø40
Ø32
Ø40
· SHOWER 41°C
ROOM 134 ROOM 132 ROOM 133 ROOM 131 ROOM 130 ROOM 128 ROOM 129 ROOM 127 ROOM 126 ROOM 124 ROOM 125 ROOM 123
Ø32
Ø32
Ø32
Ø32
Ø32
Ø32
Ø32
Ø32
Ø32
D ROOM 1034 ROOM 1032 ROOM 1033 ROOM 1031 ROOM 1030 ROOM 1028 ROOM 1029 ROOM 1027
ANY OTHER ISSUED INFORMATION, THE CONTRACTOR IS TO
REQUEST CLARIFICATION FROM THE ENGINEER DURING TENDER D
STAGE.
Offices/Meeting Offices/Meeting Offices/Meeting Offices/Meeting Offices/Meeting Offices/Meeting
rooms rooms rooms rooms rooms rooms 19. ALL PIPEWORK EQUIPMENT AND ACCESSORIES SHALL BE
INSTALLED IN A NEAT & TIDY FASHION TO THE SATISFACTION OF
Required Required Required Required Required Required
Plumbing to Plumbing to Plumbing to Plumbing to Plumbing to Plumbing to
THE ENGINEER & ARCHITECT.
be Confirmed be Confirmed be Confirmed be Confirmed be Confirmed be Confirmed
20. REFER TO MANUFACTURERS' LITERATURE FOR INFORMATION
LEVEL 00 REGARDING INSTALLATION REQUIREMENTS SUCH AS SUPPORT
STEELWORK, DRAINAGE, CLEARANCE REQUIREMENTS ETC.
MANUFACTURERS' REQUIREMENTS ARE DEEMED TO HAVE BEEN
INCLUDED IN THE CONTRACTORS' COST.
DRAWING ISSUE
PRELIMINARY (not for construction) FOR TENDER PURPOSES ONLY
South Wing FOR REVIEW & APPROVAL FOR INFORMATION PURPOSES ONLY
AS-BUILT
F Permission to proceed does not release contractor of the obligation to carry out works in accordance with
contract specifications; any variations are to be reported to the architect/engineer as soon as they are noted.
F
- - - -
REVISIONS
- - - -
NOTE: -
-
-
-
-
-
-
-
- - - -
- - - -
LEGEND · BOTH COLD AND HOT WATER 333
South
Wing
- - - -
Rev Description By Date
DOMESTIC COLD WATER SUPPLY . CONNECTION TO ROOMS ARE TO VALVE
331
334
S-02
S-01 329
HEADERS 330
S-03
S-04
327
Central
DOMESTIC HOT WATER SUPPLY .
325
328
Wing
323
S-07
337
S-08
339 341
S-10
343
G
DOMESTIC HOT WATER RETURN .
PPR AQUATHERM SDR 9
PROTECTED AND INSULATED S-13
302 S-09
336 338
S-11
340 342
DESIGN | ENGINEER | MANAGE
304 QPM Ltd., Triq Dun Karm, Birkirkara, BKR 9037, Malta
ISOLATION VALVE 306 S-12
301
T: +356 2551 3000 | F: +356 2551 3001 | E: info@qpml.com
S-15 303
S-14
305
Client Job No.
307
CPH 2411
PRESSURISATION VALVE BALANCING VALVE, TO BE COORDINATED 312
PRV
309
314 S-16
CS CS CS KF A2 N/A 02-06-2022
WITH APPROVED ROOM MATRIX ISSUED
311
316
320
S-21 317
322 S-20
THERMOSTATIC BALANCING 319
S-23
H VALVE H
321