10 11 12 13 14 15 16 17 18 19 NOTES:
AIM
P1-L05-009A CONTAINED HEREIN THESE DRAWINGS, ASSOCIATED SCHEDULES &
P1-L05-007 (X4)
AIM
AIM
MD FSC MD OTHER DOCUMENTATION PROVIDED AS PART OF THE IFC PACKAGE IS
REFER TO FIRE PROTECTION LAYOUTS MCC ROOM FOR ACCESS CONTROL PANEL
CA SUFFICIENT FOR THE PURPOSES PROVIDING A COMPLETE & FULLY
AIM
S S P1-L05-013 S S KEY PLAN
AIM
AIM
FOR DETAILS OF FIRE SUPPRESSION SYSTEMS MD (X4) MD AS AS
AS AS
BOH CORRIDOR INCLUSIVE FOR THE WORKS DESCRIBED. NO CLAIMS WILL BE
MCC MCC
D03 BROKERED FOR ADDITIONAL MONIES AS A RESULT OF THE
AOM
AA
AOM
ASD AIM AIM
AIM AIM ASD
CONTRACTOR FAILING TO INCLUDE FOR EQUIPMENT &/OR MATERIALS NOTES:
ARCR ARCR ATM AOM VL NECESSARY THAT MAY NOT BE INDICATED SPECIFICALLY HERE OR
ATM
D03 P1-FL-01
FOR ACCESS CONTROL PANEL ELSEWHERE.
P1-L05-011 LIFT
ST 1-1B FOR ACCESS CONTROL PANEL 5. EQUIPMENT, INSTALLATION, WORKMANSHIP, INSPECTION, AND
AOM
FROM AMP-L1L-1P-1A-1 S S FF LOBBY S
STAIR Repetitive Comments VD
P P TESTING SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF
FROM ACPS-L1L-1P-1A-1 QCDD, NFPA 70, 72, 101, 170 AND 5000.
CF 6. ALL CONDUITS/ CABLE TRAYS PENETRATING THRU WALLS AND SLABS
J
ATM
SHALL BE SEALED WITH AN APPROVED FIRE-RETARDANT MATERIAL
W/P F
ATM
TA/TB
J
FOR ACCESS CONTROL PANEL
J
ATM
HAVING A RATING NOT LESS THAN THAT OF THE WALL OR SLAB BEING
TO AMP-L1L-1P-1A-1
AHU Duct Smoke Detectors, are not TA/TB PENETRATED.
AOM
P1-L05-002 MD FROM PREVIOUS ATM AT LEVEL 04
shown in the layout, shown only in SLD AIM
TA/TB
SMOKE STOP LOBBY 7. BATTERIES FOR FIRE ALARM SYSTEM SHALL BE CAPABLE OF
drawing S OPERATING THE SYSTEM UNDER QUIESCENT (STANDBY) LOAD FOR 24
S S VD
VD F P
C FROM FACP-L1L-1P-1A-1 S HOURS AND THEN IT SHALL BE CAPABLE OF OPERATING THE SYSTEM
SPF P
ST-1-1A-2 UNDER FIRE ALARM OR OTHER EMERGENCY CONDITION FOR (1/2)
AOM W/P
P1-L05-003 P1-L05-008 STAIR HALF HOUR.
P1-L05-004 S H ELEC. EXTERNAL MEP PLANT 8. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, CATALOGUE AND
R F
MEP AIM
CA AIM MD
MATERIAL SAMPLES FOR APPROVAL BY CONSULTING ENGINEER
AOM
S S (X4) (X4) PRIOR TO ACTUAL PROCUREMENT AND INSTALLATION. THE
VD P
CONTRACTOR SHALL PROVIDE DETAILS OF THE VARIOUS
AOM
P1-L05-005 FOR ACCESS CONTROL PANEL
BOH LOBBY COMPONENTS OF THE FIRE ALARM SYSTEM INSTALLATION BASED ON
FOR ACCESS CONTROL PANEL MD S
AIM (X4) AS
S
AS
THE APPROVED PLANS AND ACTUAL MANUFACTURER'S DATA.
C F
AB MD AIM SPF AOM MD AIM
P1-L05-012
MCC ROOM
9. CONTRACTOR SHALL COORDINATE WITH OTHER DISCIPLINES AND
PROVIDE INTERFACES, CONTROL MODULES AND MONITORING
MODULES AS NECESSARY FOR INTERFACED SYSTEMS AS PER QCD
MD AIM ASD AIM MCC REQUIREMENTS:
AIM
AIM
MD - ACMV AND FIRE-FIGHTING SYSTEMS
MD
AIM
AIM AIM
- STANDBY/EMERGENCY POWER SUPPLY SYSTEM
AIM
MD AIM
ZONE-P1-L05-Z1 SV P1-L05-012A
FS SV
- FIRE HOSE CABINETS
AIM
MD FSC - CARBON MONOXIDE SYSTEM
AOM
- GAS LEAK DETECTION SYSTEM
S S H - ACCESS CONTROL SYSTEM AND DOOR OPERATION.
R
P1-L05-006 FOR ACCESS CONTROL PANEL 10. A ZONE CHART OR FIRE EVACUATION PLAN SHALL BE AN AS-BUILT
P1-L05-017 DRAWING PLAN OF THE FACILITY TO BE PROVIDED IN APPROPRIATE
EXTERNAL MEP PLANT
MEP LOCATIONS SUCH THAT IT WILL BE NOTICEABLE BY THE PUBLIC
AOM
SPF (USERS) AND IT WILL INDICATE ALL MANUAL INITIATING DEVICE,
EXIT SIGN, AND OTHER APPLICABLE FIRE MEASURES.
11. ACMV SEQUENCE OF OPERATION SHALL BE AS PER QCDD Drawing Approval Status
P1-PL-01
AOM
AOM
AOM
AOM
VL STANDARDS /RECOMMENDATION, THE CLIENT/OWNER APPROVAL IN (Comments Shall be actioned to achieve A Before construction Utilization)
ACCORDANCE WITH QCDD GUIDELINES & NFPA 72 AS WELL AS THE
AC SPF
M
AOM
AIM
SEF 20. ALL FIRE ALARM AND VOICE EVACUATION SYSTEMS EQUIPMENT
AIM
MUST BE UL LISTED AND FM APPROVED. 9204-BP12A-MMJV-DWG-ME-P1-L05-00304 PODIUM BUILDING P1 LEVEL L05 AIR CONDITIONING D02 25 OCT 2020
LAYOUT
SEF
AOM
PODIUM BUILDING P1 LEVEL L05 FIRE
AIM
AIM
SEF
SEF
AOM
SEF
AIM
AOM
SEF SEF
AIM
SEF SEF
AOM
AIM
AOM
SEF SEF
AIM
SEF SEF
AOM
AIM
SEF
AOM
SEF
AIM
SEF SEF
AOM
AIM
SEF
AOM
SEF
AIM
AE
REVISIONS:
Stage:
Client:
Lusail Real Estate Development Co
Doha, State of Qatar
AF SEF
AIM
SEF
AOM
PM/CM :
SEF
AIM
SEF
AOM
Designer:
SEF
AIM
SEF
AOM
Supervision Consultant :
DAR AL-HANDASAH
SHAIR AND PARTNERS
SEF
AIM
SEF
AOM
Main Contractor :
SEF
MIC Construct
AIM
SEF
AOM
SEF
AIM
SEF
AOM
Sub-Consultant:
SEF SEF SEF SEF SEF SEF SEF SEF SEF SEF SEF SEF SEF SEF SEF
SEF AIM AOM AIM AOM AIM AOM AIM AOM AIM AOM AIM AOM AIM AOM AIM AOM
Project Name:
LUSAIL PLAZA TOWERS
AH PLOT 1 (BP12A)
Drawing Title:
9204-BP12A-MMJV-DWG-FA-P1-L05-02304 D03
Sheet : 01 of 01