N GENERAL NOTES
MATCHLINE
KIA-B03-L&T-R_
FA-L1-SPD-1187
SEE: 1 /
TELEPHONE COMMUNICATION CABLE L1-SLC-FACP_03-TPS-ZONE-8 10. WALL MOUNTED TELEPHONE JACKS SHALL BE MOUNTED AT
1T77-02 7 m² 1200mm FROM THE FFL.
1T77-03 9 m² LEAD CONSULTANT
1T77-01 98 m²
DEVICE LOOP CABLE TO FACP_03 L1-TELECOM ROOM 1T54-09 CHASE
11. FINAL ROUTING OF THE CABLE SHALL BE CLOSELY COORDINATE AT
WOMEN'S CHASE
L1-PSU-38-ZONE AREA-10-STROBE CIRCUIT TOILETS SITE WITH THE IT CABLE TRAY.
N37 L1-FACP_09-AMP-1-Z169-SPEAKER CIRCUIT 12. 25% SPARE FOR EACH ZONE IS PROVIDED.
800
15. HCP FOR FIRE TELEPHONE CIRCUIT SHALL BE CONNECTED WITH MEPF ENGINEER BAGGAGE CONSULTANT
1T77-13 13 m² SEPARATE DEVICE LOOP FROM FACP.
1T77-05 2 m² 1T77-06 3 m² ARUP LTD. BNP Associate s
700
ARRIVALS 1T77-04 8 m²
77 Water Street P.O. Box 32746
1200
1TPA-02G 992 m
2
CIRCULATION
CHASE
JANITOR'S 16. THE LOCATION OF PROPOSED FIRE ALARM
B
CLOSET FACP_09-AMP-2-Z171-ESSW-03 CONTROL PANEL IS FROM LEVEL - 1 TELECOM ROOM (1T53-04) & New York, NY 10005 Abu Dhabi, UAE
S
FAMILY TOILET
J EAST PIER DOM S
MECH. EQ. CLOSET (1T76-12). LIGHTING CONSULTANT LANDSCAPE
9000
ARRIVAL CIRC B
B
FACP_09-AMP-2-Z171-ESSW-04
S
BPI Grant Associates
800
800 17. TOTAL 01 SPEAKERS/STROBES FOR FACP - 09 (AMP-1), ZONE - 169
EOL TOTAL 03 SPEAKERS/STROBES FOR FACP - 09 (AMP-2), ZONE - 171
EOL
302 5th Ave, 12th FL 22 Milk Street
1T77-07 5 m² TOTAL 04 STROBES CONNECTED IN PSU - 26 New York, NY 10001
FACP_09-AMP-2-Z171-ESSC-05 2500 Bath, UK BA1 1UT
F
JANITOR'S TOTAL 04 STROBES CONNECTED IN PSU - 37
PSU-38-ST_C-05 CLOSET IT / SECURITY / PA / FAS SIGNAGE / WAYFINDING
TOTAL 01 STROBES CONNECTED IN PSU - 38
F
AS PER DRAWING
MBII MSD
800
PSU-37-ST_C-04 18. AS PER THE FINAL APPROVED RCP LAYOUT THE BELOW FALSE 44 Mobile Drive 2 Young Place
CEILING SERVICES SHOULD BE CO-ORDINATED. Toronto, ON M4A 2P2 East Kilbride, GLA G75 0TD
3600
N38 1T77-11 10 m²
1T77-09 73 m²
1T77-10
CHASE
7 m²
12200
2. FOR TYPICAL INTERFACING DETAILS REFER DWG: NO: ARCHITECTS & ENGINEERS:
PSU-37-ST_C-06
3100
KIA-B03-L&T-R_GD-XX-SPD-0003. Engineering Design and Research Center (EDRC),
L&T Construction - Buildings & Factories.
9000
MAIN CONTRACTOR:
S Evacuation Speaker (4 watt ) - False
Nos. 00
ceiling mounted.
N39 PSU-26-ST_C-04
F
S Evacuation Speaker cum Strobe (2 watt ) -
True ceiling mounted.
Nos. 00
FIRE CONTRACTOR:
B Siemens Ltd.,
S #49,Ground Floor, Jyothi Mahal,
Evacuation Speaker (4 watt ) - True ceiling 00 ST.Marks Road, Bangalore -560001,
Nos.
mounted. P:+91(080) 33299154
KEYPLAN
Evacuation Strobe - Wall Mounted. Nos. 00
11800
G
1TPA-02G 992 m
2 T00 T10 T20 T30 T40 T50 T60 T70 T80
F
EAST PIER DOM
Evacuation Strobe - Ceiling Mounted. Nos. 09
ARRIVAL CIRC T01 T11 T21 T31 T41 T51 T61 T71 T81
Phone Jack - Wall Mounted. Nos. 00 T02 T12 T22 T32 T42 T52 T62 T72 T82
HCP T06 T16 T26 T36 T46 T56 T66 T76 T86
4300 Intelligent Control Point Device Nos. 01
12000
N41 (Telephone) Communication cable 80 CHECKED BY
ARCHITECTURE
SIGN DATE CHECKED BY
FPS
SIGN DATE
FACP DETAILS:
D
ZONES PART PLANS
N42 PANEL NO. PANEL LOCATION
8700
2
1TPA-02G 992 m
EAST PIER DOM FACP - 9 L1- MECH. EQ. CLOSET ZONE 171 76, 77
ARRIVAL CIRC
(AMP-2) (1T 76-12)
12000
PSU - 26 77, 78
(1T 78-05)
FA-L1-SPD-1187
KIA-B03-L&T-R_
FACP_03-TPS-03-HCP-11
C L1-PSU-26-ZONE AREA-9-STROBE CIRCUIT L1- TELECOM ROOM 77, 78
PSU - 99
DEVICE LOOP CABLE TO FACP_03 L1-TELECOM ROOM 1T54-09 (1T 78-04)
MATCHLINE
L1-PSU-100 FOR ZONE AREA 9 2200 1000
L1-PSU-26-ZONE AREA-9-STROBE CIRCUIT L1- ELECTRICAL CLOSET 77, 87
REFER NOTE 1 FOR MM & HCP PSU - 100
(1T 77-19)
SEE: 1 /
TAG & CONNECTION DETAILS
L1-PSU-99 FOR TELEPPHONE POWER CIRCUIT
54, 64, 71, 72, 73,
FACP_09-AMP-1-Z169-ESSC-02 1T77-19 32 m² 1T78-04 32 m²
FACP - 3 L1- TELECOM ROOM ZONE - 3 74, 75, 76, 77, 78,
PSU-26-ST_C-01 S
EOL ELECTRICAL
(TPS) (1T 54-09) 80, 81, 83, 84, 85,
3400 CLOSET TELECOM. RM
B 86, 87
N43 F 4300
DEVICE LOOP CABLE TO FACP_03-TPS-03-HCP-11
MATCHLINE MATCHLINE
SEE: 1 / SEE: 1 /
KIA-B03-L&T-R_ 3100 KIA-B03-L&T-R_
FA-L1-SPD-1178 S FA-L1-SPD-1178
B
B
QRCODE
DRAWING TITLE
EVACUATION SYSTEM - T2 -
LEVEL 1 -ARRIVAL
MEZZANINE - PART PLAN
LEVEL 1 - ARRIVALS MEZZANINE - T2 PART PLAN - 77
A 1 SCALE 1 : 100
77_SHEET -2 OF 2
DRAWING NUMBER
KIA-B03-L&T-R_FA-L1-SPD-1177
SCALE: 1:100 SHEET SIZE - A0