You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

RRE-RY-RY1-A2A-MP014-PE-DD-TEL-A0-DWG- 00145-00 2970


SHEET NO. PROJECT NO.

EEE

EEE
R R

EEE

EEE

EEE
EEE

EEE
EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE

EEE
EEE
Q Q

EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE

EEE

EEE
EEE

EEE

EEE
EEE
P P

EEE

EEE
2.P

EEE
Sta T.04
1,5 tion
40

EEE
EEE
N m² N

EEE
EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE
A008 EEE EEE EEE EEE EEE EEE

Local Mosque

EEE
1533 sqm EEE EEE EEE EEE EEE EEE
EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE

EEE

EEE
M M

EEE

EEE
.1 ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE NOTED.
A009

EEE
.2 CCTV CAMERAS SHALL BE MOUNTED ON STREET LIGHTING POLES; LOCATIONS AS
IDENTIFIED ON DRAWINGS. THESE LIGHTING POLES SHALL BE PROVIDED UNDER

EEE
Open STREET LIGHTING S.o.Ws AND SHALL BE IN STRICT ACCORDANCE TO MUNICIPALITY/
AMANAH STANDARDS. NECESSARY ARRANGEMENTS (as OPENINGS / HOLES IN

EEE
Commercial POLES etc.) FOR THE FIXATION OF CAMERAS'S AND ITS RESPECTIVE CABLES SHALL
ALSO BE MADE AVAILABLE ON RESPECTIVE LIGHTING POLES. HOWEVER, CCTV

EEE
CONTRACTOR SHALL MAKE SURE THAT ALL OPENINGS PROVIDED IN POLES FOR
L
Space CCTV FIXATION ARE PROPERLY CLOSED AND WATER SEALED. L

EEE
.3 AT LOCATIONS WHERE STREET LIGHTING POLES ARE NOT AVAILABLE, THE

705 sqm DEDICATED POLES SHALL BE PROVIDED TO MOUNT CCTV CAMERAS.

EEE
.4 OUTDOOR ENCLOSURE CABINETS SHALL BE PROVIDED AT EACH LOCATION OF CCTV
CAMERA. THE ENCLOSURE SHALL BE IN STRICT ACCORDANCE TO MOI STANDARDS

EEE
AND SPECIFICATIONS AND SHALL HOUSE FOR BUT NOT LIMITED TO OPTICAL
DISTRIBUTION FRAMES (FIBER PATCH PANELS), RUGGED SWITCH (INDUSTRIAL

EEE
ETHERNET SWITCH), POWER SUPPLY UNITS, EXHAUST FANS etc.
EEE EEE EEE EEE EEE EEE .5 AT EACH LOCATION OF OUTDOOR ENCLOSURE CABINET (CCTV CAMERAS),

EEE
EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE MINI-MANHOLES (WITH 15M FIBER CABLE LEFT LOOPED INSIDE) SHALL BE
PROVIDED FOR SPLICING OF FIBER CABLES.
.6 CONTRACTOR TO COORDINATE AND PROVIDE ANY NECESSARY EQUIPMENT,
K ACCESSORIES, STORAGE, ...ETC AT POLICE STATION TO COMPLETE THE CCTV K
SYSTEM.
7. 2 FIBER CORES SHALL BE PROVIDED FOR EACH INDUSTRIAL SWITCH.

EEE
.8 CONTRACTOR SHALL COORDINATE WITH SITE OWNER / SITE SUPERVISION
EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE ENGINEER TO LOCATE THE LOCATION OF ODFs INSIDE POLICE CENETER BUILDING
AND ACCORDINGLY SHALL PROVIDE AN ADEQUATE LENGTH OF FIBER CABLE LEFT
LOOPED FOR FUTURE CONNECTIONS AT ODF.
.9 ROUTE FOR RESPECTIVE FIBER CABLE IS SHOWN ON DRAWINGS. ALSO, THE
SEQUENCE FOR FIBER CONNECTIONS (BETWEEN POINT TO POINT) ARE IDENTIFIED
ON RISER DIAGRAMS. CONTRACTOR TO MAKE SURE THAT THE BENDING RADIUS
FOR FIBER FOR FIBER OPTIC CABLE IS MAINTAINED IN STRICT ACCORDANCE TO MOI
SPECIFICATIONS AND STANDARD REQUIREMENTS. ALSO, CONTRACTOR TO ENSURE

J
P005 THAT SHORTEST POSSIBLE ROUTE IS SELECTED .
.10 ALL MATERIALS FOR ENTIRE CCTV NETWORK AS CCTV CAMERAS, OUTDOR J

EEE
ENCLOSURE CABINET, MINI-MNHOLE, FIBER OPTIC CABLE, FIBER PATCH PANELS,
INDUSTRIAL SWITCHES, DEDICATED CCTV POLES ETC. SHALL BE IN STRICT
ACCORDANCE TO MOI STANDARDS AND SPECIFICATIONS AND CONTRACTOR MUST
TAKE PRIOR APPROVAL IN THIS REGARD FROM MOI PRIOR TO ANY PROCUREMENT
AND INSTALLATION WORKS.
A010 .11 CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ENTIRE CCTV NETWORK AND
SUBMIT TO MOI / CLIENT FOR APPROVALS.

EEE
H
Early Childhood H

EEE

EEE
EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE
3060 sqm EEE EEE EEE EEE EEE

EEE

EEE
EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE EEE

G G

EEE

EEE
EEE

EEE
F F

KEY PLAN

E PART-20

RT

2.PT.0
Statio Abu Jaffan Park
3
1,541 n

PART-15 PART-16 PART-17 PART-18 PART-19


2.PT.0
Statio
2
1,190 n

T
R
TR

T
R
PART-08 PART-09 PART-10 PART-11 PART-12 PART-13 PART-14
TR

Distric
17,391 t
Park

TR
TR TR

R
T
TR

TR

R
T
TR
TR

TR TR
TR

2.PT.0
Sheet size - ISO A0 (841* 1189 mm)

Statio 4
1,540 n
Natural Wadi

TR

TR

RT TR TR

RT
TR

RT

RT

TR

TR
PART-01 PART-02 PART-03 PART-04 PART-05 PART-06 PART-07
RT RT TR

01 OCT. 2021 100% DETAILED DESIGN Y.AFME T.ASAE T.RMSM A.YOAA


00 OCT. 2021 50% DETAILED DESIGN Y.AFME T.ASAE T.RMSM A.YOAA
C REV C
DATE ISSUED FOR DRW CHK TL PM
100 mm

PROJECT DATA:

RIYADH SEDRA 2

DISCIPLINE
TELECOMMUNICATIONS
SHEET TYPE
B B
50 mm

TELECOMMUNICATION SITE LAYOUT


SHEET TITLE
CCTV CAMERA SYSTEM LAYOUT
Scanning scale

PART 3 OF 20

CCTV CAMERA SYSTEM LAYOUT - PART 3 OF 20


A1 0 500 1000 1500 2000mm N
RRE-RY-RY1-A2A-MP014-PE-DD-TEL-A0-DWG- 00145-00
SCALE PROJECT NO. BLDG/SITE NO REV
10 mm

A SCALE 1:500 AT ORIGINAL SIZE 1:500 2970 RYI 01 A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ECG COPYRIGHT - PRODUCED USING BIM TECHNOLOGY


THIS DRAWING AND THE DESIGN IT COVERS ARE THE PROPERTY OF THE ENGINEERING CONSULTANTS GROUP .THEY ARE MERELY LOANED ON THE BORROWER'S EXPRESSED AGREEMENT THAT THEY WILL NOT BE REPRODUCED, COPIED, LOANED, EXHIBITED NOR USED EXCEPT FOR LIMITED AND PRIVATE USE PERMITTED BY WRITTEN CONSENT GIVEN BY THE LENDER TO THE BORROWER.

You might also like