PT: STA. 0+602.03


EXISTING BARANGAY ROAD

BP: STA. 0+500.00

EP: STA. 0+740.00


IMPROVEMENT OF EXISTING BARANGAY ROAD

PC: STA. 0+561.73


STA. 0+596.42 (DETAILED ENGINEERING DESIGN - D.E.D)
Install 2-2.40m x 2.40m x 21.219m RCBC.
Provide flared headwall at both sides. 91.0
00 0
88.
0
89.0
90.00 92.00

1.000
93.00

5.667
00°
45.0

4.667
Lay-By Area
0+500 0+700 0+740
0+600

21.219
2.400

PT: STA. 0+704.56


PC: STA. 0+645.50
45.00

3.556

00
5.0
6.500
IMPROVEMENT OF EXISTING BARANGAY ROAD
(DETAILED ENGINEERING DESIGN - D.E.D)

165690
0N

165700
0N
E
417400

E
90
417500

417600

417700

417800

417900
.00
165690
0 N

90.0
101.00

GRADE BREAK STA = 0+740.00


PVI = STA. 0+536.22
GRADE BREAK STA = 0+500.00

PVI = STA. 0+601.27


105.000 ELEV. = 95.044 ELEV. = 94.589
LVC = 60.00 LVC = 60.00
M.O. = -0.128 M.O. = +0.105
K = 35.294 K = 42.871

ELEV = 95.559
ELEV = 94.682

100.000
ELEVATION

95.000 g=-0.700% g=+0.700%


g=+1.000%

90.000

STA. 0+596.42
Install 2-2.40m x 2.40m x 21.219m RCBC.
Provide flared headwall at both sides.

85.000
STATION 0+480 0+500 0+600 0+700 0+760
94.60 94.60

94.90 94.90

94.96 94.96

94.90 94.90

92.02 92.02

88.73 88.73

93.05 93.05

94.97 94.97

95.06 95.06

95.09 95.09

95.29 95.29

95.43 95.43

95.53 95.53
FINISHED GRADE

EXISTING GRADE
R=600.00
HORIZONTAL GEOMETRY PI=2
L=61.73m R=300.00 L=43.46m L=35.44m
g=1.00% g=-0.70% PI=1 g=0.70%
VERTICAL GEOMETRY LVC=60.00 LVC=60.00
L=6.22 L=5.06 L=108.73
0+565.061

0+598.700
e=-3.00%

e=-3.00%

SUPERELEVATION

PREPARED BY: REVIEW AND RECOMMENDING APPROVAL: PROJECT TITLE: SHEET CONTENT: REVISION: SHEET NO:
EPC CONTRACTOR: OEPM CONSULTANT:
SANTA CRUZ SOLAR ENERGY INC.
REV: DATE: DESCRIPTION: 2 OF 12
TERP ASIA Construction Corporation FILIPINAS DRAVO CORPORATION SHOP DRAWING A 08/11/23 - SCALE: AS SHOWN
The Burgundy Place Condominium Unit 306, 174 B. Gonzales Consulting Engineering & Architectural Services
St. Loyola Heights,Quezon City, Philippine
ACCESS AND INFRASTRUCTURE PALN AND PROFILE - - - DRAWING NO.:
Tel: +63 2 929 7661, +63 2 426 5618
REINFORCEMENT CONCRETE BOX - - - A&I.SCSEI.DRWG.EBR-PP-001.0
PROJECT CULVERT (RCBC) - - -
ENGR. RYAN Z. LEGASPI ENGR. PABLITO BULACLAC DRAWN BY: ELAOG, RONELL P.
2 BARREL - 2.40m x 2.40m - - -
TACC - PROJECT MANAGER OE (FDC) - HEAD LOCATION: San Marcelino, Zambales - - - DATE: AUGUST 11, 2023