Professional Documents
Culture Documents
A - I Scsei DRWG Ebr-Pp-003 0
A - I Scsei DRWG Ebr-Pp-003 0
E
E
417600
417700
417800
417900
417400
417500
.00
165700
0N 87
0 0
87.
EXISTING BARANGAY ROAD 165710
IMPROVEMENT OF EXISTING BARANGAY ROAD 0 N
STA. 0+596.42
91.0
00 0
88.
0
89.0
90.00 92.00
93.00
Lay-By Area
0+500 0+700 0+740
0+600
165690
0N
165700
0N
E
417400
E
90
417500
417600
417700
417800
417900
.00
165690
0 N
90.0
101.00
ELEV = 95.559
ELEV = 94.682
100.000
ELEVATION
90.000
STA. 0+596.42
Install 2-2.75m x 2.75m x 21.168m RCBC.
Provide flared headwall at both sides.
85.000
STATION 0+480 0+500 0+600 0+700 0+760
94.60 94.60
94.90 94.90
94.96 94.96
94.90 94.90
92.02 92.02
88.73 88.73
93.05 93.05
94.97 94.97
95.06 95.06
95.09 95.09
95.29 95.29
95.43 95.43
95.53 95.53
FINISHED GRADE
EXISTING GRADE
R=600.00
HORIZONTAL GEOMETRY PI=2
L=61.73m R=300.00 L=43.46m L=35.44m
g=1.00% g=-0.70% PI=1 g=0.70%
VERTICAL GEOMETRY LVC=60.00 LVC=60.00
L=6.22 L=5.06 L=108.73
0+565.061
0+598.700
e=-3.00%
e=-3.00%
SUPERELEVATION
PREPARED BY: REVIEW AND RECOMMENDING APPROVAL: PROJECT TITLE: SHEET CONTENT: REVISION: SHEET NO:
EPC CONTRACTOR: OEPM CONSULTANT:
SANTA CRUZ SOLAR ENERGY INC.
REV: DATE: DESCRIPTION: 4 OF 12
TERP ASIA Construction Corporation FILIPINAS DRAVO CORPORATION SHOP DRAWING A 08/14/23 - SCALE: AS SHOWN
The Burgundy Place Condominium Unit 306, 174 B. Gonzales Consulting Engineering & Architectural Services
St. Loyola Heights,Quezon City, Philippine
ACCESS AND INFRASTRUCTURE PALN AND PROFILE - - - DRAWING NO.:
Tel: +63 2 929 7661, +63 2 426 5618
REINFORCEMENT CONCRETE BOX - - - A&I.SCSEI.DRWG.EBR-PP-003.0
PROJECT CULVERT (RCBC) - - -
ENGR. RYAN Z. LEGASPI ENGR. PABLITO BULACLAC DRAWN BY: ELAOG, RONELL P.
2 BARREL - 2.75m x 2.75m - - -
TACC - PROJECT MANAGER OE (FDC) - HEAD LOCATION: San Marcelino, Zambales - - - DATE: AUGUST 14, 2023