Professional Documents
Culture Documents
F
E
A
B
1 2 2' 3 4 500
230
E'
370 550 520
500 270 370 490
+12.70
+12.70
plastered and painted plastered and painted
Roof Level HCB wall HCB wall
Roof Level +12.00
+12.00 +11.40 +11.40 +12.00 +11.50
plastered and painted plastered and painted plastered and painted +9.50
HCB wall HCB wall HCB wall
Roof Terrace Level Roof Terrace Level +9.00
EGA -500 Roof Cover / C.I.S
+9.00 +8.40 +8.40
4X4Xcm RHS Purline
Steel truss +9.00 +8.40 +8.40
4*5cm Ceilling Buttan c/c60cm
8mm chipwood Ceilling
5 mm thick tinted +8.71 +8.71 5 mm thick tinted 5 mm thick tinted +8.71
glass on glass on +8.71
5 mm thick tinted glass on
Aluminum Frame Aluminum Frame Aluminum Frame
glass on
+7.00 Aluminum Frame
+7.00
+7.00
plastered and painted
HCB wall
150
plastered and painted plastered and painted
plastered and painted plastered and painted
Second Floor Level HCB wall
plastered and painted
HCB wall Second Floor Level plastered and painted HCB wall HCB wall HCB wall
HCB wall
+6.00 +5.70 +5.70 +5.70 +6.00 +5.70 +5.70
+5.70
+5.10
plastered and painted 5 mm thick tinted 5 mm thick tinted
5 mm thick tinted glass on 5 mm thick tinted 5 mm thick tinted
HCB wall glass on 5 mm thick tinted 5 mm thick tinted
glass on Aluminum Frame glass on glass on +4.50
Aluminum Frame glass on glass on
Aluminum Frame Aluminum Frame Aluminum Frame
+4.00 +4.00 +4.00 Aluminum Frame Aluminum Frame
+4.00 +4.00 plastered and painted
HCB wall +4.00
240
glass on +0.95 glass on
plastered and painted Aluminum Frame Aluminum Frame
Aluminum Frame Aluminum Frame
+0.50 +0.50 HCB wall +0.50 plastered and painted
HCB wall
W
S