A-SUB STRUCTURE
1.EXCAVATION & EARTH WORK
1.1 Site clearing & removing the top soil of the whole area in which the
should be rest on it in 200 mm thick. M2 2,200 20 44,000
1.2 Bulk excavation in expansive soil in which the should be rest on it to an
average depth of 300 mm. M3 4,260 150 638,963
1.3 Trench excavation to in which the should be rests on it a depth of not
exceeding 1000 mm. M3
1.4 Pit excavation for footing in ordinary soil to a depth not exceeding
3000mm from reduced level M3 1,600 350 560,000
1.5 Back fill around foundation & under hard core with selected & non
expansive granular material brought from outside well rolled and
compacted in layers not exceeding 200 mm. M3 2,986 250 746,513
1.6 Back fill around Isolated footing with selected material from site waste and
compact in layers not exceeding 200mm thick. M3 -
1.7 Cart away excessive excavated soil to a distance not exceeding 5km from
the site M3 3,412 180 614,079
1.8 25 cm thick basaltic or equivalent stone hard core well rolled,
consolidated and blinded with crushed stone. M2 614 220 135,102
SUB TOTAL 2,738,656
2.CONCRETE WORK
2.1 50 mm thick c-5 lean concrete, minimum cement content 150 kg/m3 under
masonry and footing for
A. FOOTING M2 506 250 126,475
B. STONE MASONARY M2 210 250 52,600
C. GRADE BEAM M2 48 250 12,121
2.2 C-25 reinforced concrete minimum cement content 360 kg/m3 filled in to
formwork and vibrated around steel reinforcement. (form work and
reinforcement measured separately) -
A. FOOTING M3 214 3100 663,090
B. FOOTING COLUMN M3 17 3100 51,479
C. in groung floor slab M2 614 450 276,345
D.IN BEAMs M3 31 3200 98,256
F. IN SHEAR WALL M3 29 4000 116,000
2.3 Provide, cut and fix in position sawn zigba wood or steel formwork which
ever appropriate. -
A, in footing M2 292 350 102,235
B, in footing columns M2 147 350 51,520
C.IN BEAMs M2 308 350 107,870
D. IN SHEAR WALL M2 52 350 18,112
2.4 Mild steel reinforcement according to structural drawings rice shall include
cutting bending, placing in position and tying wire. -
A, dia 8 mm K.G 10,309 200 2,061,710
B, dia 10 mm K.G 8,000 200 1,600,000
C, dia 12 mm K.G 6,142 200 1,228,360
D, dia 14 mm K.G 7,346 200 1,469,240
E, dia 16 mm K.G 4,791 200 958,210
F. dia 20 mm K.G 1,766 200 353,280
G. dia 24 mm K.G 200 -
SUB TOTAL 9,346,903
3. MASONARY WORK
3.1 Hard equivalent stone masonry well embedded in cement mortar 1:3 ratio.
A, ditto but below NGL M3 415 1300 539,500
B, ditto but above NGL M3 514 1300 668,720
C. STAIR M3 300 1300 390,000
SUB TOTAL 1,598,220
4. SHORING WALL
CONCRETE WORK
a C-15 reinforced concrete minimum cement content 240kg/m3 f vibrated
around steel reinforcement. (form work and reinforcement measured
separately) M2 -
b RHS STEEL REINFORCMENT KG -
SUB TOTAL -
SUB TOTAL 10,945,123
B. SUPER STRUCTURE
FROM GROUND FLOOR SLAB TO ROOF
1.CONRETE WORK
1.1 C-25 reinforced concrete minimum cement content 360 kg/m3 filled in to
formwork and vibrated around steel reinforcement. (form work and
reinforcement measured separately)
A, in columns M3 145 3000 434,700
B. in shear wall M3 83 3000 248,400
C. in 15 mm solid slabs M2 4,025 450 1,811,250
D. in intermediate beams M3 207 3000 621,000
E. in staircase M3 59 3000 176,985
1.2 Provide, cut and fix in position sawn zigba wood or steel formwork which
ever appropriate. -
B. SUPER-STRUCTURE
1. CONCRETE WORKS Birr 20,550,809.1
2. ROOF WORK Birr 3,480,000.0
3. BLOCK WORK Birr 5,864,780.0
4. PLASTERING WORK Birr 2,741,900.0
5. FINISHING WORK Birr 4,348,425.0
6. PAINTING Birr 6,177,750.0
7. FLOOR FINISHING Birr 4,822,000.0
8. SANITARY INSTALLATION Birr 1,319,680.0
9. ELECTRICAL INSTALLATION Birr 3,370,247.0
94035010
94035010
63064100
63064100
44182000
44182000
69101000
73249000
69101000
94036000
94036000
94036000
84183090
94036000
64041100
84181090
85161000
84221900
94036000
94036000
44140000
94036000
94036000
94036000
69049000
69049000
69049000
85253000
85185000
85181000
85181000
85182200
84282000
85171100
SUMMERY FOR HOTEL GOODS
TOTAL Birr
Y FOR HOTEL GOODS
66,359,370.17
66,359,370.17