You are on page 1of 44

BANGUNAN MASJID & DEWAN UTILITI

Masjid RPS DALA


WORK BELOW LOWEST FLOOR FINISH

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

WORK BELOW LOWEST FLOOR FINISH

Excava on Works

Excavate to reduce level commencing from forma on level


not exceeding 0.25m deep get out, deposit, spread and
levelled where directed within the site in making up levels
and remainder load and cart away

A Excavate for ground floor slab M2 442 3.00 1,326.00

B Excavate for apron slab M2 159 3.00 477.00

Excavate commencing from reduce level get out, part


return, fill in and well ram, part load, cart deposit and
spread in making up levels where directed within the site
and remainder removed from site including all necessary
planking and stru ng, trimming sides and levelling and
compac ng bo om of excava on.

Excavate pit for Pad Founda on

C depth not exceeding 2.0 m M3 28 18.00 504.00

Excavate Trench to receive ground beam

D depth not exceeding 1.00 m M3 21 12.60 264.60

Hardcore as described:-

E Hardcore, well spread, levelled and compacted to


receive concrete floor slab. M3 44 85.00 3,740.00

F Di o, for apron slab, di o. M3 16 85.00 1,360.00

Concretor

50 mm lean concrete (G15) as described:-

G under Pile cap M2 37 4.80 177.60

H Underside of ground beam M2 71 4.80 340.80

TOTAL CARRIED TO COLLECTION 8,190.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
WORK BELOW LOWEST FLOOR FINISH

Item Descrip on Unit Qty Rate Amount


WORK BELOW LOWEST FLOOR FINISH (Cont'd)

Concretor (Cont'd)

Reinforced concrete (G35) as described in :-

A Pad Founda on M3 11 378.55 4,164.05

B Column stump M3 2 378.55 757.10

C Ground beam. M3 32 378.55 12,113.60

D Ground floor slab, 150-300 mm thick M3 74 378.55 28,012.70

E Apron slab, 100-125 mm thick. M3 19 378.55 7,192.45

High tensile / mild steel rod reinforcement as described in:-

Pad Foo ng

F various diameters including links and s rrups KG 550 3.47 1,908.50

Column Stump

G various diameter including links and s rrups KG 500 3.47 1,735.00

Ground Beam

H various diameter including links and s rrups KG 4,160 3.47 14,435.20

Steel fabric reinforcement BRC A7 mass of 3.02 kg/m2 to B.S.


4483 with 150mm side and end laps including cu ng,
bending and bedding in concrete (measured ne -no
allowance made for laps) as described in :-

J in ground slab M2 442 11.07 4,892.94

K In Apron Slab M2 159 11.07 1,760.13

Sawn Formwork as described to :-

L To sides of pad foo ng M2 59 25.70 1,516.30

M To sides of column stump M2 37 30.30 1,121.10

N To sides of ground beam, exceeding 250 mm not


exceeding 500 mm high m 756 30.30 22,906.80
TOTAL CARRIED TO COLLECTION 102,515.87
BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
WORK BELOW LOWEST FLOOR FINISH

Item Descrip on Unit Qty Rate Amount


WORK BELOW LOWEST FLOOR FINISH (Cont'd)

Sawn Formwork as described to :- (Cont'd)

A To sides of apron slab, not exceeding 250 mm high M 102 7.50 765.00

Damp Proof Membrane

B A layer of 0.10mm heavy duty polythene sheet as


described laid below concrete bed (measured ne -no
allowance made for laps) M2 442 3.00 1,326.00

An termite

C An -termite chemical soil treatment as described to be


carried out by an approved specialist to soil surfaces
below pile cap, ground beams, ground floor and apron
slab, all in accordance to the specialist and
manufacturer's specifica on including obtaining wri en
cer ficate of guarantee for two (2) years. M2 442 3.00 1,326.00

Perimeter Drain

D Excavate trench not exceeding 1.0 m deep commencing


from pla orm level and disposal of excess materials M3 3 7.60 22.80

E 150 mm half round pre cast drain channel laid on mass


concrete (1:3:6) M 103 20.00 2,060.00

Drain Cover

F 237 mm wide Heavy duty MS gra ng drain cover with


welded connec on, 6mm thick angle all round infilled
with 40 mm x 6 mm thick flats at 30 mm centres, painted
with one coat red oxide primer, set in 100 mm thick
mass concrete on brick edge M 18 55.00 990.00

TOTAL CARRIED TO COLLECTION 6,489.80


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
WORK BELOW LOWEST FLOOR FINISH

Item Descrip on Amount


WORK BELOW LOWEST FLOOR FINISH

COLLECTION

Page NO.1/1/1 ………………………………………………………… 8,190.00

Page NO.1/1/2 ………………………………………………………… 102,515.87

Page NO.1/1/3 ………………………………………………………… 6,489.80

TOTAL CARRIED TO COLLECTION SUMMARY 117,195.67


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
FRAME

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

FRAME

Steel Reinforcement, straight and bent bar

in column

A various sizes KG 4,750 3.31 15,722.50

In Beams

B various sizes KG 1,950 3.42 6,669.00

Roof Beams

C various sizes KG 600 3.51 2,106.00

Reinforced Concrete Grade 35

D Column M3 19 378.55 7,192.45

E Beams M3 15 378.55 5,678.25

F Roof Beams M3 4 378.55 1,514.20

G 100 mm thick flat roof m2 10 38.00 380.00

Fabric reinforcement, including laps and bent to sides

H BRC A8 in flat roof slab m2 10 20.00 200.00

Sawn Formwork as described to:

J Sides of column M2 291 30.30 8,817.30

K Sides and soffit of beam, height above 3.50 m above


ground M2 284 30.30 8,605.20

L Sides and soffit of roof beam, di o M2 8 30.30 242.40

M soffit of flat roof m2 10 30.30 303.00

TOTAL CARRIED TO COLLECTION 57,430.30


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
FRAME

Item Descrip on Unit Qty Rate Amount


FRAME (Cont'd)

Water proofing

A Supply and apply approved cementa ous water proof


membrane to flat room m2 10 40.00 400.00

TOTAL CARRIED TO COLLECTION 400.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
FRAME

Item Descrip on Amount


FRAME

COLLECTION

Page NO.1/2/1 ………………………………………………………… 57,430.30

Page NO.1/2/2 ………………………………………………………… 400.00

TOTAL CARRIED TO COLLECTION SUMMARY 57,830.30


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
ROOF

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

ROOF

Lightweight Steel Roof Truss System

Any deficiency in design and costs of upgrading and


replacement of defec ve members shall be en rely borne by the
Contractor

The Contractor shall provide 10 years structural warranty to the


metal roof structure system proposed and accepted

The Tenderer must submit all his detailed design calcula ons,
drawings of the proposed system complete with specifica ons
and priced Bill of Quan es and Schedule of Rates for the
system proposed

Supply, fabricate and deliver to site including all shop


drawings, fixing and hois ng in posi on all steel roof truss,
ra ers, chord, bearers, e, strut, packing piece, wall plate, truss
connector, pain ng, and other associated works, materials and
labour straps required for the concrete installa on of the steel
roof trusses

Design, supply and fix in posi on including hois ng of metal


roof truss system comprising of main trusses, ra er, wall
plates, ba ens, plates, fixing bolts and brackets, all
inaccordance with manuracturer's instruc ons:

A hoist 10 m above ground level M2 34 70.00 2,380.00

B 3 m above ground level m2 693 60.00 41,580.00

Roof Construc on and Finishes

NOTES:

The Contractor must submit a complete proposal design, details


calcula on, shop drawings all to be cer fied by Professional
Engineer and method statements and to S.O approval before
execu on of the works.

TOTAL CARRIED TO COLLECTION 43,960.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
ROOF

Item Descrip on Unit Qty Rate Amount


ROOF (Cont'd)

Roof Construc on and Finishes (Cont'd)

A er acceptance of the tender and prior to start works the


Contractor shall submit two (2) copies of the detailed working
drawings including calcula ons for review and approval the
S.O. Upon approval he shall resubmit three(3) copies of the
working/construc on drawings including calcula ons for
endorsement by the S.O. All drawings and calcula on shall be
endorsed by a Professional Engineer (P.E) prior submission to
the S.O

The contractor shall submit on comple on of works three (3)


copies as-built drawings including calcula ons properly binded
for acceptance and reference of the S.O.

Measurement of roof trusses shall be taken from/to edges of


trusses. A combina on of various pitch and height of
connected trusses shall be measured together. Isolated trusses
shall be measured separately.

Roof Fihishes

Roofing Covering

A Approved 0.42mm thick superior Rib PU Form metal


deck roofing or other equivalent form to profile as
shown in the architect's drawing complete with ridge,
capping, flashing and all necessary accessories as in
accordance to manufacturer's specifica on as a roof
covering. M2 727 70.00 50,890.00

Fascia Board

B 230mm plank or other equal and approved fascia board


to manufacturer's detail and to S.O approval m 590 30.00 17,700.00

Galvanised Iron Flashing

C Approved profile 20 gauge galvanised iron flashing, 300


mm wide forming V-profile laid under metal roof finish m 11 10.00 110.00

TOTAL CARRIED TO COLLECTION 68,700.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
ROOF

Item Descrip on Amount


ROOF

COLLECTION

Page NO.1/3/1 ………………………………………………………… 43,960.00

Page NO.1/3/2 ………………………………………………………… 68,700.00

TOTAL CARRIED TO COLLECTION SUMMARY 112,660.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
STEPS AND RAMPS

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

STEPS AND RAMPS

STEPS

Concretor

Reinforced concrete (G35) as described in :-

A Steps M3 1 378.55 378.55

High tensile / mild steel rod reinforcement as


described in :-

Steps

B various sizes KG 200 3.51 702.00

Sawn formwork as described to :-

C Sides of steps M2 2 30.30 60.60

D Riser exceeding 100mm high not exceeding 200mm high M 14 6.06 84.84

Steps Finishes

Ceramic les

Ceramic les or other equivalent, 200mm x 200mm, with


cemen ous water proofing as specified; bedded and jointed
in cement and sand (1:3) mortar; poin ng with grout in
white cement; on and including 20mm thick cement and sand
(1:6) screed.

E 250mm wide treads M2 4 90.00 360.00

F 155mm high risers M2 4 90.00 360.00

TOTAL CARRIED TO COLLECTION 1,945.99


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
STEPS AND RAMPS

Item Descrip on Unit Qty Rate Amount


STEPS AND RAMPS (Cont'd)

RAMP

Reinforced Concrete Ramp

100 mm thick overall laid to slopes including 150 mm


thick hardcore including excava on to reduce level not
exceeding 0.25 m, reinforcement, formwork to sides
of ramp, surface finishes as specified and forming
striated lines on the surface

A 1180x1780 wide NO 2 500.00 1,000.00

B 1870 x 2120 wide NO 1 800.00 800.00

TOTAL CARRIED TO COLLECTION 1,800.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
STEPS AND RAMPS

Item Descrip on Amount


STEPS AND RAMPS

COLLECTION

Page NO.1/4/1 ………………………………………………………… 1,945.99

Page NO.1/4/2 ………………………………………………………… 1,800.00

TOTAL CARRIED TO COLLECTION SUMMARY 3,745.99


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
EXTERNAL WALLS

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

EXTERNAL WALLS

EXTERNAL WALLS

Brickwork

A Half brickwall (112mm thick) in clay brick laid on and


cement and sand (1:3) mortar including brick
reinforcement 'Exmet' at every fourth course. M2 230 38.40 8,832.00

B Horizontal damp proof course [DPC] as described laid


on half brickwall (measured ne -no allowance made for
laps). M 89 2.30 204.70

C 6mm Diameter mild steel wall bonding es, 450mm


long, one end cast into concrete and the other end cast
into concrete and the other end built into joints of
brickwall as work proceeds. NO 1,383 0.50 691.50

Mild steel railing

D 1100mm high M.S railing comprising of 75mm x 75 mmx


1.2 mm thick mild steel Handrail to be welded with
intermediate RHS railing and baluster and MS plate
fixed to concrete surface with concrete screw anchor
including cu ng, fixing and pain ng m 74 155.00 11,470.00

TOTAL CARRIED TO COLLECTION 21,198.20


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
EXTERNAL WALLS

Item Descrip on Amount


EXTERNAL WALLS

COLLECTION

Page NO.1/5/1 ………………………………………………………… 21,198.20

TOTAL CARRIED TO COLLECTION SUMMARY 21,198.20


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
WINDOWS AND DOORS

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

WINDOWS AND DOORS

DOORS

Lintols

A Reinforced concrete (G30) lintol,size 125mm x 200mm


as described reinforced with and including 4 nos. 10mm
diameter high tensile steel bar reinforcement and 6mm
diameter mild steel s rrups at 150mm centers including
formwork and all other necessary works. M 42 26.00 1,092.00

Door Frames and Leaves

Supply and install the following doors; glazing,


ironmongeries, pain ng and all other necessary
fi ngs and fixing in accordance to manufacturer's
details

B overall size 3000 x 4500 fixed glass panels according to


the design, including 6 mm thick nted glazing (Type
GP1) nr 1 4,700.00 4,700.00

C overall size sliding aluminium door 2775 x 2700 mm


high sliding door, fixed on heavy duty aluminium track
including nted glazing (Type SD1) nr 2 2,700.00 5,400.00

D overall size sliding aluminium door 3000 x 2700 mm


high sliding door, fixed on heavy duty aluminium track
including nted glazing (Type SD2) nr 2 3,000.00 6,000.00

E overall size 1500 x 2100 high mber panel door with


steel frame (Type D1) Nr 1 1,500.00 1,500.00

F overall size 900 x 2100 high mber panel door with


steel frame (Type D2) Nr 5 750.00 3,750.00

G Overall size 750mm x 2100mm high uPVC door with


metal framing, (Type D3) Nr 3 180.00 540.00

TOTAL CARRIED TO COLLECTION 22,982.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
WINDOWS AND DOORS

Item Descrip on Unit Qty Rate Amount


WINDOWS AND DOORS (Cont'd)

WINDOWS

Lintols

A Reinforced concrete (G30) lintol, size 125mm x 200mm


as described lintol reinforcement with and including 4
nos. 10mm diameter high tensile steel bar reinforcement
hooked at both ends with 6mm diameter mild steel bar
reinforcement as described s rrups at 150mm center
including formwork and all other necessary works. M 14 26.00 364.00

Window Frames and Glazing

Supply and install the following windows; complete with


35 x 150 mm x 3.5 mm thick powder coated aluminium
frames, ironmongeries, 8 mm thick nted glazing all other
necessary fi ngs and fixing in accordance to
manufacturer's details

B Overall size 1800 wide x 1800 mm high fixed casement


window (Type W1) Nr 2 1,135.00 2,270.00

C Overall size 1200mm x 1800 mm high foxed casement


window (Type W2) Nr 2 760.00 1,520.00

D Overall size 600mm x 600 mm high top hung casement


window(Type W3) Nr 2 130.00 260.00

TOTAL CARRIED TO COLLECTION 4,414.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
WINDOWS AND DOORS

Item Descrip on Amount


WINDOWS AND DOORS

COLLECTION

Page NO.1/6/1 ………………………………………………………… 22,982.00

Page NO.1/6/2 ………………………………………………………… 4,414.00

TOTAL CARRIED TO COLLECTION SUMMARY 27,396.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
INTERNAL WALL AND PARTITION

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

INTERNAL WALL AND PARTITION

INTERNAL WALL AND PARTITION

INTERNAL WALL

Brickwork

A Brickwall (113mm thick) in clay brick in strecher bond


with cement and sand (1:3) mortar including brick
reinforcement 'Exmet' at every fourth course. M2 65 44.50 2,892.50

B Horizontal damp proof course [DPC] as described laid


on half brickwall (measured ne -no allowance made for
laps). M 20 2.30 46.00

C 6mm Diameter mild steel wall bonding es, 450mm


long, one end cast into concrete and the other end cast
into concrete and the other end built into joints of
brickwall as work proceeds. Nr 392 0.30 117.60

TOTAL CARRIED TO COLLECTION 3,056.10


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
INTERNAL WALL AND PARTITION

Item Descrip on Amount


INTERNAL WALL AND PARTITION

COLLECTION

Page NO.1/7/1 ………………………………………………………… 3,056.10

TOTAL CARRIED TO COLLECTION SUMMARY 3,056.10


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
INTERNAL FLOOR FINISHES

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

INTERNAL FLOOR FINISHES

INTERNAL FLOOR FINISHES

Cement and sand (1:3) rendering with cemen ous water


proofing as specified, trowelled smooth to falls.

A 20 mm thick On concrete floor slab M2 - 15.00

B 20 mm thick on apron floor slab m2 159 15.00 2,385.00

"White Horse" or approved equivalent Floor Tiles bedded


and jointed in cement and sand (1:3) mortar; poin ng with
grout in white cement; on and including 20mm thick
cement and sand (1:6) screed.

C 600x600 ceramic les M2 392 94.30 36,965.60

D 300 mm x 300 mm non slipped ceramic les M2 47 88.40 4,154.80

300 mm x 150 mm skir ng

E ceramic les M 59 9.80 578.20

Extra over ceramic les for Drop:

F 150 mm m 17

G 50 mm M 2 5.00 10.00

Water proofing to toilet

H Approved cementa ous water proofing m2 26 40.00 1,040.00

TOTAL CARRIED TO COLLECTION 45,133.60


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
INTERNAL FLOOR FINISHES

Item Descrip on Amount


INTERNAL FLOOR FINISHES

COLLECTION

Page NO.1/8/1 ………………………………………………………… 45,133.60

TOTAL CARRIED TO COLLECTION SUMMARY 45,133.60


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
INTERNAL WALL FINISHES

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

INTERNAL WALL FINISHES

INTERNAL WALL FINISHES

Plaster and Pain ng

A 20 mm thick cement and sand (1:3) plastering in two


coats as specified on walls M2 364 15.50 5,642.00

B Prepare and apply one undercoat and two coats of


approved emulsion paint as described to wall and
column, all as per Architect's approval. M2 364 5.40 1,965.60

Ceramic Tiles

C "White Horse" Ceramic le or other approved


equivalent, 300mm x 600mm, bedded and jointed in
cement and sand (1:3) mortar, poin ng with grout in
white cement, on and including 20mm thick cement and
sand (1:6) screed. M2 63 70.00 4,410.00

TOTAL CARRIED TO COLLECTION 12,017.60


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
INTERNAL WALL FINISHES

Item Descrip on Amount


INTERNAL WALL FINISHES

COLLECTION

Page NO.1/9/1 ………………………………………………………… 12,017.60

TOTAL CARRIED TO COLLECTION SUMMARY 12,017.60


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
INTERNAL CEILING FINISHES

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

INTERNAL CEILING FINISHES

INTERNAL CEILING FINISHES

Skim Coat and Pain ng

A 3 mm thick approved skimcoat to underside of concrete


surface M2 10 9.80 98.00

B Prepare and apply one undercoat and two coats of


approved emulsion paint as described to ceiling, all as
per Architect's approval. M2 740 12.00 8,880.00

Suspended plain fibrous plasterglass ceiling, pressure


treated mber suspension system, fixing all in accordance
to manufacturer's specifica on

13mm thick fix plaster ceiling panel to be skim to fine


finish and all join ng to be finish with fiber join ng
stripe including all necessary works and to be
approved by Architect's

C less than 3.50 m high from ground level m2 109 35.00 3,815.00

D 5.0 m to 6.5m high from ground level m2 631 40.00 25,240.00

E Prepare and apply one undercoat and two coats of


approved emulsion paint as described to ceiling, all as
per Architect's approval. M2 740 15.00 11,100.00

F Decora ve cornite: 100 mm x 100 mm M 495 25.00 12,375.00

TOTAL CARRIED TO COLLECTION 61,508.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
INTERNAL CEILING FINISHES

Item Descrip on Amount


INTERNAL CEILING FINISHES

COLLECTION

Page NO.1/10/1 ………………………………………………………… 61,508.00

TOTAL CARRIED TO COLLECTION SUMMARY 61,508.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
EXTERNAL FINISHES

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

EXTERNAL FINISHES

EXTERNAL FLOOR FINISHES

Cement and sand (1:3) rendering with cemen ous water


proofing as specified, trowelled smooth to falls.

A on Apron floor slab M2 159 15.00 2,385.00

EXTERNAL WALL FINISHES

Plaster and Pain ng

B 19mm thick cement and sand (1:3) with an approved


plas ciser as specified; steel trowelled to walls. M2 68 14.00 952.00

C Prepare and apply one undercoat and two coats of


approved An fungal external paint as described to wall
and column, all as per Architect's approval. M2 68 15.00 1,020.00

EXTERNAL CEILING FINISHES

Suspended plain fibrous plasterglass ceiling, pressure


treated mber suspension system, fixing all in accordance
to manufacturer's specifica on

D 13mm thick fix plaster ceiling panel to be skim to fine


finish and all join ng to be finish with fiber join ng
stripe including all necessary works and to be approved
by Architect's. M2 268 35.00 9,380.00

E Prepare and apply one undercoat and two coats of


approved emulsion paint as described to ceiling, all as
per Architect's approval. M2 268 12.00 3,216.00

F Decora ve cornite: 100 mm x 100 mm M 79 25.00 1,975.00

Skim Coat and Pain ng

G Prepare and apply one undercoat and two coats of


approved emulsion paint as described to ceiling, all as
per Architect's approval. M2 268 12.00 3,216.00

TOTAL CARRIED TO COLLECTION 22,144.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
EXTERNAL FINISHES

Item Descrip on Amount


EXTERNAL FINISHES

COLLECTION

Page NO.1/11/1 ………………………………………………………… 22,144.00

TOTAL CARRIED TO COLLECTION SUMMARY 22,144.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
FITTINGS AND FURNITURE

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

FITTINGS AND FURNITURE

Mimbar

A Allow a Provisional Sum for The Design, Construct and


supply "Mimbar" , to be expended in accordance with
the instruc ons given by the S.O. and the amount to be
finalized a er the appointment of the carpenter nr 1 10,000.00 10,000.00

Curtain and Railing

B Supply and install stainless steel railing and suitable


fabric for the curtain and its accessories m 8 100.00 800.00

TOTAL CARRIED TO COLLECTION 10,800.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
FITTINGS AND FURNITURE

Item Descrip on Amount


FITTINGS AND FURNITURE

COLLECTION

Page NO.1/12/1 ………………………………………………………… 10,800.00

TOTAL CARRIED TO COLLECTION SUMMARY 10,800.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
SANITARY FITTINGS

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

SANITARY FITTINGS

SANITARY FITTINGS

Notes:-

The whole works under this sec on shall be executed by a


Licensed plumber registered with the relevant Authority and
shall be carried out to comple on and to the sa sfac on of the
Authority concerned.

Materials and fi ngs used shall be as per requirement or as


stated in the drawings and shall be approved by the Architect
before installa on.

Fixing of all fi ngs to be in accordance to Manufacturer's


details and to include for all brackets, etc.

On comple on of the works, the tenderer is responsible for


arranging to test of the plumbing and sanitary installa ons to
the sa sfac on of the Authority and the S.O.

All piping, bends, tees, junc on, reducer etc, shall be of


approved type and shall include for all fixing accessories.

Supply and fix the following sanitary wares and fi ngs in


standard white colour including all accessories unless otherwise
stated including storing, assembling, bedding, plugging and
screwing with matching screws, cu ng and pining or building
in brackets join ng and connec ng to services and to soil and
waste pipe and making good all works described:-

The tenderer is to allow for any other items deemed required for
the due comple on of the works. (Tenderer to list the items and
indicate costs)

Supply and fix the following sanitary wares and fi ngs in


standard white colour including all accessories unless
otherwise stated including storing, assembling, bedding,
plugging and screwing with matching screws, cu ng and
pining or building in brackets join ng and connec ng to
(Cont'd)

WC pedestal and squat type

A Approved pedestal type (tandas duduk) Nr 3 450.00 1,350.00

TOTAL CARRIED TO COLLECTION 1,350.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
SANITARY FITTINGS

Item Descrip on Unit Qty Rate Amount


SANITARY FITTINGS (Cont'd)

SANITARY FITTINGS (Cont'd)

Supply and fix the following sanitary wares and fi ngs in


standard white colour including all accessories unless
otherwise stated including storing, assembling, bedding,
plugging and screwing with matching screws, cu ng and
pining or building in brackets join ng and connec ng to
(Cont'd) (Cont'd)

Wash hand basin

A Approved white glazed ceramic wash hand basin come


with stopper, bo le traps and connec on to waste pipes Nr 4 180.00 720.00

Hand Spray Flexible Hose

B chrome hand spray bidet with 1.2m flexible hose and


wall bracket Nr 3 250.00 750.00

Mirror

C DOE silver plated quality mirror size 300mm x 450mm x


6mm thick with 20mm bevelled edge fixed on 6mm thick
water proofed plywood backing and 3/8" (9.5mm)
aluminium framing around including 2 nos fixing
bracket Nr 3 150.00 450.00

Abuli on facili es

D Construct and complete 1050mm x 150mm high


reinforced concrete ablu on kerb including all
necessary concrete work, 675 mm x 1000 mm high half
brickwall, reinforcement, formwork, brickwork and
300mm x 300mm x 10mm Thick non slip ceramic floor
le, 300 mm x 300 mm x 10 mm ceramic wall le to
brickwall including all other item to complete
construc on of ablu on kerb Nr -

Bib Tap

E 1/2" "DOE" or approved equivalent chrome plated brass


bib tap Nr 18 90.00 1,620.00

Shower Rose

F Approved Chrome plated shower rose Nr 3 30.00 90.00

TOTAL CARRIED TO COLLECTION 3,630.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
SANITARY FITTINGS

Item Descrip on Unit Qty Rate Amount


SANITARY FITTINGS (Cont'd)

SANITARY FITTINGS (Cont'd)

Floor Trap

A Resistant stainless steel floor trap, 150 MM Chess


square and plas c collar with Stainless steel lining
including 100 mm trap body with inlet and Nr 10 38.00 380.00

Tes ng

B On Comple on of Sanitary Installa on and fi ngs, test


all apparatus, fi ngs and pipings, make good all defects
and leave the whole works in perfect working order and
to the sa sfac on of the S.O and Local Authori es. Item - - 300.00

TOTAL CARRIED TO COLLECTION 680.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
SANITARY FITTINGS

Item Descrip on Amount


SANITARY FITTINGS

COLLECTION

Page NO.1/13/1 ………………………………………………………… 1,350.00

Page NO.1/13/2 ………………………………………………………… 3,630.00

Page NO.1/13/3 ………………………………………………………… 680.00

TOTAL CARRIED TO COLLECTION SUMMARY 5,660.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
SOIL, WASTE AND VENT PIPES

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

SOIL, WASTE AND VENT PIPES

SOIL AND WASTE AND VENT PIPES INSTALLATIONS

(ALL QUANTITIES ARE PROVISIONAL)

Excavate trench

A to receive soil and waste pipes commencing from


reduced level, average depth 0.75 m including grading
bo oms, filling in, compac on and disposal of surplus
soil M 39 12.00 468.00

Supply and install UPVC waste, soil and vent pipe to


BS4515, BS5255 and BS4660 including all joints, bends,
tees, branches, expansion joints, and fi ngs in accorcance
to the manufacturer's specifica on:

B 110 mm Laid in trench under concrete bed M 8 25.00 200.00

C 75 mm diameter laid in trench m 28

Gully Trap

D 300mm x 300 mm Gully trap at Ground Floor of deep


sealed coated cast iron type with outlet to suit come
with all necessary extension piece and 300 mm x 300
mild steel cover to be bedded and surrounded with plain
concrete Grade 30 and 115 mm brickwall on all sides
plastered internally with high alumina cement and sand
rendering nr 2 150.00 300.00

Manholes

E Half brickwall manholes overall dimension 600mm x


450 mm x 600 mm deep, including all excava on works,
common bricks, 100 mm thick concrete base, plastering
internally and on any exposed concrete surfaces,
formworks and reinfocements and to provide pre cast
iron manhole cover Nr 3 500.00 1,500.00

TOTAL CARRIED TO COLLECTION 2,468.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
SOIL, WASTE AND VENT PIPES

Item Descrip on Amount


SOIL, WASTE AND VENT PIPES

COLLECTION

Page NO.1/14/1 ………………………………………………………… 2,468.00

TOTAL CARRIED TO COLLECTION SUMMARY 2,468.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
COLD WATER INSTALLATIONS

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

COLD WATER INSTALLATIONS

Supply and install cold water system pipes including all


necessary elbows, bend, reducers and connec ons with
requisite connectors to water tank storage and sanitary
appliances with requisite pipe fi ngs and stopcock complete

HDPE Pipes for Cold Water

A 25 mm diameter , chased in brickwall m 60 15.00 900.00

Cold Water Storage Tank and associated fi ngs and


accessories

B 400 gallon HDPE tanks with proper mber support and


12 mm thick waterproof plywood based nr 1 1,300.00 1,300.00

TOTAL CARRIED TO COLLECTION 2,200.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
COLD WATER INSTALLATIONS

Item Descrip on Amount


COLD WATER INSTALLATIONS

COLLECTION

Page NO.1/15/1 ………………………………………………………… 2,200.00

TOTAL CARRIED TO COLLECTION SUMMARY 2,200.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
BUILDER'S WORK IN CONNECTION WITH SERVICES

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

BUILDER'S WORK IN CONNECTION WITH SERVICES

Construct and complete reinforced concrete ablu on kerb


including all necessary concrete work, 675 mm x 1000 mm
high half brickwall, reinforcement, formwork, brickwork and
300mm x 300mm x 10mm Thick non slip ceramic floor le,
300 mm x 300 mm x 10 mm ceramic wall le to brickwall,
provide floor traps and including all other item to complete
construc on of ablu on kerb

A overall length 5.10 m x 0.60 m in the Muslimah Wudhuk


Area nr 1 1,000.00 1,000.00

B overall length 7.00 m x 0.60 m in the Muslimin wudhuk


area nr 1 1,500.00 1,500.00

TOTAL CARRIED TO COLLECTION 2,500.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
BUILDER'S WORK IN CONNECTION WITH SERVICES

Item Descrip on Amount


BUILDER'S WORK IN CONNECTION WITH SERVICES

COLLECTION

Page NO.1/16/1 ………………………………………………………… 2,500.00

TOTAL CARRIED TO COLLECTION SUMMARY 2,500.00


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
ELECTRICAL INSTALLATIONS

Item Descrip on Unit Qty Rate Amount


BANGUNAN MASJID & DEWAN UTILITI

ELECTRICAL INSTALLATIONS

TOTAL CARRIED TO COLLECTION


BANGUNAN MASJID & DEWAN UTILITI
Masjid RPS DALA
ELECTRICAL INSTALLATIONS

Item Descrip on Amount


ELECTRICAL INSTALLATIONS

COLLECTION

Page NO.1/17/1 …………………………………………………………

TOTAL CARRIED TO COLLECTION SUMMARY


Masjid RPS DALA BANGUNAN MASJID & DEWAN UTILITI

Item Descrip on Page No. Amount


BANGUNAN MASJID & DEWAN UTILITI

COLLECTION SUMMARY

WORK BELOW LOWEST FLOOR FINISH 1/1/4 117,195.67

FRAME 1/2/3 57,830.30

ROOF 1/3/3 112,660.00

STEPS AND RAMPS 1/4/3 3,745.99

EXTERNAL WALLS 1/5/2 21,198.20

WINDOWS AND DOORS 1/6/3 27,396.00

INTERNAL WALL AND PARTITION 1/7/2 3,056.10

INTERNAL FLOOR FINISHES 1/8/2 45,133.60

INTERNAL WALL FINISHES 1/9/2 12,017.60

INTERNAL CEILING FINISHES 1/10/2 61,508.00

EXTERNAL FINISHES 1/11/2 22,144.00

FITTINGS AND FURNITURE 1/12/2 10,800.00

SANITARY FITTINGS 1/13/4 5,660.00

SOIL, WASTE AND VENT PIPES 1/14/2 2,468.00

COLD WATER INSTALLATIONS 1/15/2 2,200.00

BUILDER'S WORK IN CONNECTION WITH SERVICES 1/16/2 2,500.00

ELECTRICAL INSTALLATIONS 1/17/2

TOTAL CARRIED TO FINAL SUMMARY 507,513.46


Item Descrip on Page No. Amount
MASJID RPS DALA

FINAL SUMMARY

BANGUNAN MASJID & DEWAN UTILITI 1.S/1 507,513.46

TOTAL CARRIED TO FORM OF TENDER 507,513.46

You might also like