Excava on Works
Hardcore as described:-
Concretor
Concretor (Cont'd)
Pad Foo ng
Column Stump
Ground Beam
A To sides of apron slab, not exceeding 250 mm high M 102 7.50 765.00
An termite
Perimeter Drain
Drain Cover
COLLECTION
FRAME
in column
In Beams
Roof Beams
Water proofing
COLLECTION
ROOF
The Tenderer must submit all his detailed design calcula ons,
drawings of the proposed system complete with specifica ons
and priced Bill of Quan es and Schedule of Rates for the
system proposed
NOTES:
Roof Fihishes
Roofing Covering
Fascia Board
COLLECTION
STEPS
Concretor
Steps
D Riser exceeding 100mm high not exceeding 200mm high M 14 6.06 84.84
Steps Finishes
Ceramic les
RAMP
COLLECTION
EXTERNAL WALLS
EXTERNAL WALLS
Brickwork
COLLECTION
DOORS
Lintols
WINDOWS
Lintols
COLLECTION
INTERNAL WALL
Brickwork
COLLECTION
F 150 mm m 17
G 50 mm M 2 5.00 10.00
COLLECTION
Ceramic Tiles
COLLECTION
C less than 3.50 m high from ground level m2 109 35.00 3,815.00
COLLECTION
EXTERNAL FINISHES
COLLECTION
Mimbar
COLLECTION
SANITARY FITTINGS
SANITARY FITTINGS
Notes:-
The tenderer is to allow for any other items deemed required for
the due comple on of the works. (Tenderer to list the items and
indicate costs)
Mirror
Abuli on facili es
Bib Tap
Shower Rose
Floor Trap
Tes ng
COLLECTION
Excavate trench
Gully Trap
Manholes
COLLECTION
COLLECTION
COLLECTION
ELECTRICAL INSTALLATIONS
COLLECTION
COLLECTION SUMMARY
FINAL SUMMARY