Professional Documents
Culture Documents
Excavate, get out, part return, fill in and ram, deposit and
spread in making up levels where directed and remainder
load and cart away from site for :-
B Apron slab di o M2 -
M Pile cap M3 -
N Column stump M3 -
6/1
SM IMTIAZ MARANG DEWAN MAKAN
A Ground beam M3 -
D Pile Cap M2 -
E Column stump M2 -
F ground beam M2 -
K Di o, in column stump KG -
L Di o, in ground beam KG -
An termite Treatment
Perimeter Drain
6/2
SM IMTIAZ MARANG DEWAN MAKAN
Pentas Construc on
FRAME
B Column M3 -
C Suspended beam M3 -
D Roof beam M3 -
F Sides of column M2 -
H 3.50-5.00 m high M2 -
J 6.50-8.00 m high M2 -
6/3
SM IMTIAZ MARANG DEWAN MAKAN
Reinforcements
Formworks
C to soffit of slab M2 9
Roof Structure
Roof Covering
6/4
SM IMTIAZ MARANG DEWAN MAKAN
G. I Flashing
G.I Gu er
D 1850 mm wide Nr -
Concrete Ramp
Selected bricks laid and jointed with cement and sand (1:3)
mortar
6/5
SM IMTIAZ MARANG DEWAN MAKAN
GRC Pa ern
Bonding e
DOORS
Lintel
6/6
SM IMTIAZ MARANG DEWAN MAKAN
DOORS (Cont'd)
WINDOWS
Lintols
H Nr -
J Nr -
K Nr -
6/7
SM IMTIAZ MARANG DEWAN MAKAN
WINDOWS (Cont'd)
A Nr -
B Nr -
E stage floor M2 -
Tiles floor
H 300 x 50 mm drop M -
J 300 x 25 mm drop M -
6/8
SM IMTIAZ MARANG DEWAN MAKAN
EXTERNAL FINISHES
6/9
SM IMTIAZ MARANG DEWAN MAKAN
SANITARY FITTINGS
D Di o for OKU Nr -
6/10
SM IMTIAZ MARANG DEWAN MAKAN
Floor Trap
Tes ng
6/11
SM IMTIAZ MARANG DEWAN MAKAN
COLLECTION
6/12