You are on page 1of 51

SCHEDULE OF RATES 45M 3 LEGGED SLIM TOWER

Item Description Unit Rate (RM)

EXCAVATOR

General Excavation

A Excavate for footing, pile cap, ground beam,


and the like, maximum depth not exceeding 0.25 m, get out, part
return and well ram and remainder cart away as described M3

B Excavate for footing, pile cap, ground beam,


and the like, maximum depth not exceeding 1.00 m, ditto M3

Hardcore

C 100 mm Thick bed of approved hardcore, spread, levelled, well


compacted and consolidated to receive concrete slab (measured
separately) M2

D 200 mm Thick bed of approved hardcore, spread, levelled, well


compacted and consolidated to receive concrete slab (measured
separately) M2

CONCRETOR

Concrete Works As Described

E Lean concrete (Grade 15) in blinding not exceeding 100mm thick M3

F Lean concrete (Grade 20) in non-structural work M3

G Mass concrete (Grade 25) in non-structural work M3

H Vibrated reinforced concrete (Grade 20) in structural work M3

I Vibrated reinforced concrete (Grade 25) ditto M3

J Vibrated reinforced concrete (Grade 30) ditto M3

SOR
SCHEDULE OF RATES 45M 3 LEGGED SLIM TOWER

Item Description Unit Rate (RM)

Mild Steel Reinforcement Bar As Described

A 6 mm to 8 mm Diameter bar Kg

B 10 mm to 12 mm Diameter bar Kg

C 16 mm to 25 mm Diameter bar Kg

D Exceeding 25 mm diameter bar Kg

High Tensile Deformed Reinforcement Bar As Described

E 6 mm to 8 mm Diameter bar Kg

F 10 mm to 12 mm Diameter bar Kg

G 16 mm to 25 mm Diameter bar Kg

H Exceeding 25 mm diameter bar Kg

Fabric Reinforcement As Described

I BMC A6 steel fabric reinforcement ditto M2

J BMC A7 steel fabric reinforcement ditto M2

K BMC A8 steel fabric reinforcement ditto M2

L BMC A9 steel fabric reinforcement ditto M2

M BMC A10 steel fabric reinforcement ditto M2

Sawn Formwork As Described

N To sides of pile cap, stump, beam and the like M2

SOR
SCHEDULE OF RATES 45M 3 LEGGED SLIM TOWER

Item Description Unit Rate (RM)

SITE PREPARATION AND EARTHWORKS

A Preparing and clearing the site of all rubbish, debris, bushes,


grasses, undergrowth, etc., trees and tree stumps of any
diameter and size and grubbing up roots, etc., fallen dead trees
and disposed off as described M2

B Earthworks comprising stripping of top soil, excavating or cutting,


trimming and compacting the whole area to the required level,
including forming all types of embankments and steps, terraces
and slopes including all necessary works to prevent soil erosion,
silting, delay to the works, etc., allowance for settlement and
displacement of fill over soft areas, all to the satisfaction of the
Site Supervisor. M3

C Earthworks comprising moving selected excavated material to low


areas on site, spread, levelled and compacting the whole area to
the required level, including forming all types of embankments and
steps/terrace including all necessary works to prevent soil
erosion, silting, delay to the works, etc., allowance for settlement
and displacement of fill over soft areas, all to the satisfaction of
Site Supervisor. M3

D Imported sandfilling as described from approved source, well


compacted and consolidated in layers to the required levels,
including forming all types of embankments and steps/terrace
including all necessary works to prevent soil erosion, silting,
delay to the works, etc., allowance for settlement and
displacement of fill over soft areas, all to the satisfaction of the
Site Supervisor. M3

E Imported earthfilling as described from approved source, well


compacted and consolidated in layers to the required levels,
including forming all types of embankments and steps/terrace
including all necessary works to prevent soil erosion, silting,
delay to the works, etc., allowance for settlement and
displacement of fill over soft areas, all to the satisfaction of the
Site Supervisor. M3

F Allow for moving away all surplus excavated material to


dump/stockpile on site and off site within 5 Km radius from the
site, all to the satisfaction of the Site Supervisor. M3

G Extra over earthwork for excavating in rocks as described M3

H Move away all surplus excavated material to Contractor's own


dump site M3

I Spot turfing at 300 mm centres bothways to horizontal


and sloping surfaces including all necessary watering,
rolling, weeding, mowing and maintaining until fully
established (interspaces fully covered) within the
duration of the Contract M2

SOR
SCHEDULE OF RATES 45M 3 LEGGED SLIM TOWER

Item Description Unit Rate (RM)

Earth Drain As Described

A 600 mm wide earth drain, minimum average


300 mm deep to invert level including forming
embankment slope, all bends, angles, ends,
junctions, connecting to outfall drain, all
necessary excavation and cart away surplus,
all constructed as per site layout plan and detailed
drawings and to the satisfaction and approval of
the Site Supervisor M

B Filling using selected excavated earth taken from


within the site boundary and to the approval of the
Site Supervisor for general backfilling to
the proposed platform as indicated or shown in the drawings ,
level spread, levelled and compaction the whole area all to
the satisfaction and approval of the Site Supervisor. M3

Geotextile As Described

C To supply,lay and install geotextile type Polypropylene Needle Punched


Non-Woven MXC-70 by Maccaferri Mactex to ground base
of gravel road or retaining wall or any other structure and to the approval and
satisfaction of the Site Supervisor. M2

Gravel Road As Described

D 3Meter Wide x …...Meter Approximate length including tapered road facing site entrance gate
with 4.80M Wide X 6M Length, consisting of 100 mm Thick 38mmDCR as Base with quarry
sand finishing, 200mm Thick Sub base of 75mm DCRon well consolidated subgrade including
other related works deemed necessary all constructed as to the approval and satisfaction
of the Site Supervisor. M

Reinforced Concrete Road As Described

E 3Meter Wide x .....Meter Approximate Length including tapered road facing site entrance
gate with 4.80M Wide X 6M Length, consisting of 100mm Thick base course of Vibrated
Reinforced Concrete Grade 20 , reinforced with one layer, of BMC A6 , 50 mm thick
Grade 15 lean concrete and 100mm thick sub base of 38 mm DCR on well compacted
subgrade , formwork , earth fill , turfing and including other related works deemed
necessary all constructed to the approval of the Site Supervisor. M

R.C.Pipe Culvert Including All Ends, Junctions,


Connecting To Drain, Excavation,
,Backfilling And Cart Away Surplus And All
Surplus And All Constructed As Per Detailed
Drawing

F 900mm diameter pipe culvert backfill with 100mm


thick 38 mm DCR with quarry sand finishing as Base and 200 mm thick
Sub base of 75mm DCR; including all necessary backfilling ,excavation ,
openings and accessories; all constructed and all to
the satisfaction and approval of the Site Supervisor M

G 600mm diameter pipe culvert backfill with 100mm


thick 38 mm DCR with quarry sand finishing as Base and 200 mm thick
Sub base of 75mm DCR; including all necessary backfilling ,excavation ,
openings and accessories; and all to
the satisfaction and approval of the Site Supervisor M

SOR
SCHEDULE OF RATES 45M 3 LEGGED SLIM TOWER

Item Description Unit Rate (RM)

R.C.Pipe Culvert Including All Ends, Junctions,


Connecting To Drain, Excavation,
,Backfilling And Cart Away Surplus And All
Surplus And All Constructed As Per Detailed
Drawing

A Reinforced concrete pipe culvert, constructed with 200 mm


thick concrete wall reinforced with and including one layer
of BMC A9 fabric mesh reinforcement including forming
opening to receive 1200mm (Class "Z") diameter pipe culvert ;
200mm thick Grade 25 concrete base with Grade 15 , 50mm
thick lean concrete and base reinforced with one layer of
BMC A9; all constructed to the satisfaction and approval of the Site Supervisor M

SOR
SCHEDULE OF RATES 45M 3 LEGGED SLIM TOWER

Item Description Unit Rate (RM)

150mm x 150mm Precast Concrete Piling Works To


RC Foundation Pile Cap

A Supply and transport approved 150 mm x 150 mm


precast concrete initial pile in 6.00 m length with pile
shoe M

B Supply and transport approved 150 mm x 150 mm


precast concrete extension pile in 6.00 m length with pile
shoe M

C Supply and transport approved 150 mm x 150 mm


precast concrete extension pile in 3.00 m length with pile
shoe M

D Handle, pitch and drive approved 150 mm x 150 mm


precast concrete initial/extension pile to
required set M

E Labour and material for 12 mm thick fillet weld


all around and apply two heavy and continuous
coats of approved bituminous paint as jointing NO

F Cut off approved 150 mm x 150 mm precast


concrete pile head at required level including
cutting off reinforcement bar in the pile and clear
away to location as directed by the Site Supervisor. NO

200mm x 200mm Precast Concrete Piling Works To

G Supply and transport approved 200 mm x 200 mm


precast concrete initial pile in 6.00 m length with pile
shoe M

H Supply and transport approved 200 mm x 200 mm


precast concrete extension pile in 6.00 m length with pile
shoe M

I Supply and transport approved 200 mm x 200 mm


precast concrete extension pile in 3.00 m length with pile
shoe M

J Handle, pitch and drive approved 200 mm x 200 mm


precast concrete initial/extension pile to
required set M

K Labour and material for 12 mm thick fillet weld


all around and apply two heavy and continuous
coats of approved bituminous paint as jointing NO

L Cut off approved 200 mm x 200 mm precast


concrete pile head at required level including
cutting off reinforcement bar in the pile and clear
away to location as directed by the Site Supervisor. NO

SOR
SCHEDULE OF RATES 45M 3 LEGGED SLIM TOWER

Item Description Unit Rate (RM)

250mm x 250mm Precast Concrete Piling Works To

A Supply and transport approved 250 mm x 250 mm


precast concrete initial pile in 6.00 m length with pile
shoe M

B Supply and transport approved 250 mm x 250 mm


precast concrete extension pile in 6.00 m length with pile
shoe M

C Supply and transport approved 250 mm x 250 mm


precast concrete extension pile in 3.00 m length with pile
shoe M

D Handle, pitch and drive approved 250 mm x 250 mm


precast concrete initial/extension pile to
required set M

E Labour and material for 12 mm thick fillet weld


all around and apply two heavy and continuous
coats of approved bituminous paint as jointing NO

F Cut off approved 250 mm x 250 mm precast


concrete pile head at required level including
cutting off reinforcement bar in the pile and clear
away to location as directed by the Site Supervisor. NO

300mm x 300mm Precast Concrete Piling Works To

G Supply and transport approved 300 mm x 300 mm


precast concrete initial pile in 6.00 m length with pile
shoe M

H Supply and transport approved 300 mm x 300 mm


precast concrete extension pile in 6.00 m length with pile
shoe M

I Supply and transport approved 300 mm x 300 mm


precast concrete extension pile in 3.00 m length with pile
shoe M

J Handle, pitch and drive approved 300 mm x 300 mm


precast concrete initial/extension pile to
required set M

K Labour and material for 12 mm thick fillet weld


all around and apply two heavy and continuous
coats of approved bituminous paint as jointing NO

L Cut off approved 300 mm x 300 mm precast


concrete pile head at required level including
cutting off reinforcement bar in the pile and clear
away to location as directed by the Site Supervisor NO

SOR
SCHEDULE OF RATES 45M 3 LEGGED SLIM TOWER

Item Description Unit Rate (RM)

Belian Pepper Post

A Supply, handle, transport and pitch 75 mm diameter Belian pepper post as initial/
extension pile in length not exceeding 3.65 m M

B Drive 75 mm diameter Belian Pepper Post to required set M

C 75 mm diameter x 450 mm long x 5 mm thick mild steel pipe sleeve including painting
with anti-rust paint NO

D Cut off 75 mm diameter Belian pepper post head at required level and clear away to
location as directed by the Site Supervisor NO

Bakau Piling

E Supply, handle, transport and pitch 100 mm diameter Bakau


initial/extension pile M

F Drive only 100 mm diameter Bakau pile to required set M

G 100 mm Diameter x 4 mm thick mild steel pile sleeve, 400 mm


long with 4 mm thick mild steel plate divider to suit 100 mm
diameter Bakau pile NO

H Cut off 100 mm diameter Bakau pile head at required


level and clear away to location as directed by the Site Supervisor NO

SOR
ITEM
NO.

ITEM
NO.
ITEM
NO.

1
DESCRIPTION

UNIT

TRANSPORTATION FROM KUCHING TO

30 TONNES MIN CRANED LORRY 1 UNIT

DESCRIPTION

UNIT
UNIT

TRANSPORTATION FROM KUCHING TO

30 TONNES MIN LOW BED TRAILER 1 UNIT


SERIAN SIMUNJAN
SERIAN SIMUNJAN
BAU LUNDU
BAU LUNDU
SEMATAN SARATOK
SEMATAN SARATOK
SAMARAHAN KANOWIT
SAMARAHAN KANOWIT
RA

BALAI RINGIN BETONG

RA
BALAI RINGIN BETONG
RATES (RM)

SARATOK SARIKEI

RATES (RM)
SARATOK SARIKEI
M)

SIBU SELANGAU

M)
SIBU SELANGAU
MUKAH KAPIT
MUKAH KAPIT
BINTULU TATAU
BINTULU TATAU
SIMPANG BAKUN MIRI
SIMPANG BAKUN MIRI
MARUDI LIMBANG
MARUDI LIMBANG
LAWAS
LAWAS
Plant Rates As Of July 2022

Description Type/Capacity Unit Hourly Rate (RM) Daily Rate/ 8hour (RM)

Excavator mch/hr 0.00


Backhoe wth rubber base mch/hr 0.00
Bulldozer D4 mch/hr 0.00
Bulldozer D6 mch/hr 0.00
Portable Generator mch/hr 0.00
Lorry 5 tonne mch/hr 0.00
Lorry 8tonne mch/hr 0.00
Vibrator mch/hr 0.00
Compressor 0.3m3 mch/hr 0.00
Compressor 5m3 mch/hr 0.00
Pnuematic drill mch/hr 0.00
Jack hammer/ Heavy breaker mch/hr 0.00
Piling frame & hammer for rc piles mch/hr 0.00
Piling frame & hammer for bakau/belian piles mch/hr 0.00
Welding and cutting set (oxcyacetylene
inclusive of oxygen and acetylene) mch/hr 0.00
Electric welding set mch/hr 0.00
Mobile crane 25T mch/hr 0.00
Mobile crane 45T mch/hr 0.00
Concrete Mixer 6m3 mch/hr 0.00
Roller sakai (8 Tonnes) mch/hr 0.00
Water Pump mch/hr 0.00
Piling Frame mch/hr 0.00
Pipe Bending Machine mch/hr 0.00
Pneumatic rock-breaking tool mch/hr 0.00
Jack hammer/ Heavy breaker mch/hr 0.00
Rebar Bending Machine mch/hr 0.00

Labour rates 2022 As Of July 2022

Labourers/ Craftsmen Hourly Rate (RM) Daily Rate/ 8hour (RM)

Labourers
Skilled 0.00
Unskilled 0.00
Concrete worker 0.00
Carpenters 0.00
Welders 0.00
Night Watchman 0.00
PROPOSED CONSTRUCTION, ERECTION, TESTING AND
COMPLETION OF 30M 3 LEGGED NARROW BASE TOWER

SITE NAME : Kg. Pabahanan


TOWER ID : U3100035

FROM AMOUNT
DESCRIPTION
PAGE NO. (RM)

BILL NO. 1 - PRELIMINARIES AND GENERALLY Bill No.1/1 -

BILL NO. 2 - TOWER Bill No.2/1 -

BILL NO. 3 - ANCILLARIES Bill No.3/9 -

TOTAL AMOUNT… -

6% SST… -

GRAND TOTAL INCLUDING 6% SST… 0.00

GST/39
BILL NO. 1

PRELIMINARIES & GENERALLY


BILL NO. 1

PRELIMINARIES & GENERALLY

+ % of QS's Rate
Item Description Amount (RM) ###

Scope Of Works

A As per Tender Document, Specifications and Drawings.

Insurance

B To provide Workmen's Compensation, Public Liability, Inland Transit Insurance


and any other Insurance mentioned under this CONTRACT.

Plant And Equipment

C Allow for all costs involved for mobilisation & demobilisation for all labour, plant
& equipment to carry out & complete the contract works & removal from site upon
completion.

Clearing, Cleaning And Making Good On Completion

D Before handing over of the works to the Site Supervisor, the CONTRACTOR shall make sure
that every part of the completed works included in this CONTRACT is in clean,
sound and tidy condition to the approval of the Site Supervisor.

Ensure that the existing roadside drains bounding the site are clear of any ###
debris, earth, etc. at all times. ###

Remove and clear away from site, all temporary buildings, temporary works ###
and temporary installation, upon completion or as and when directed by the Site Supervisor

Watching And Security

E Safeguard the Works and stored materials from theft, vandalism or other damage caused by
persons or animals.

Provide all necessary watching and lighting for the security of the Works. The Contractor shall be
solely responsible for the safety of all materials and goods.

Indemnify SACOFA SDN BHD against any like loss caused by theft or vandalism.

Safety Signboard

F The Contractor shall provide and maintain 1 No. of approved Size 1000mm x 850mm x 0.8mm Thick
Galvanised Iron Plate Signboard, with Digi and Site Safety Wordings with 80mm font size, finished
with outdoor laminating film sticker with white background, installed and mounted at 0.95 Meter
on left hand side to perimeter fencing from front view, fixed into position facing the road, colour,
font size all as per Detailed Drawing and Specifications and to the satisfaction of the Site Supervisor.

No other board or advertisement shall be permitted to be displayed on or around the works.

Temporary Access Tracks

G Provide and maintain all necessary temporary access tracks within the site as
long as required & removed and made good on completion and to the satisfaction
of the Site Supervisor. Site visit is mandatory to determine anticipated costs .

Additional Handling Charges

H Extra Handling Charges is incurred only when the proposed site access is through timber logging
routes and also obstructed by river or sea with no bridge or crossing and accessible only
only by waterway.

Underground Services

I The Contractor shall be solely responsible to ascertain if there are any existing utility services
such as piping , cabling et cetera of similar nature , buried underground and to take appropriate
measures not to cause any damages.

Any claims on damages due to negligence of existing underground services shall not be entertained.

C/C… 0.00

Bill No.1/1
BILL NO. 2

TOWER
BILL NO. 2

TOWER

Contractor
Item Description Qty. Unit Rate Amount (RM)

30 METERS THREE LEGGED NARROW BASE TOWER


AS DESCRIBED

To transport & deliver, install & erect approved three legged


narrow base tower with and including all necessary fittings
and accessories from supplier/fabricator and all to the
approval & satisfaction of the Site Supervisor.

Delivery Of Three Legged Narrow Base Tower With


And Including All Necessary Fittings &
Fixing Accessories From Supplier To Site

A 30 Meters In Height 1 SET - ###

Installation & Erection Of Three Legged Narrow Base


Tower With And Including All Necessary Plant And
Equipment All As Per Detailed Drawing And Specifications

B 30 Meters In Height 1 SET - ###

PAINTING TO TOWER MEMBERS

C To supply and paint tower members with two coats of LUMP


water-based pure acrylic & non-acidy tower paint ----- SUM ----- ###
###
###
###

###

###

###

###

###

C/C… 0.00

Bill No.2/1
BILL NO. 3

ANCILLARIES
BILL NO. 3

PROPOSED 30M NBT

ELEMENT NO. 1 - 30M NBT FOUNDATION WORKS


Contractor
Item Description Qty. Unit Rate Amount (RM)

SITE PREPARATION AS DESCRIBED

Notes:-

Trees and tree stumps are not measured


separately and rate for site clearing is to include
for felling, clearing, grubbing up roots of trees
and tree stumps and remove away as directed
by the Site Supervisor.

The Contractor shall take full responsibility for


any unauthorised site clearance.

A Allow for preparing and clearing the site of all


rubbish, debris, bushes, grasses, undergrowth,
etc., trees and tree stumps of any diameter and
size and grubbing up roots, etc., fallen dead LUMP
trees and disposed off as described ----- SUM -----

Excavation

The Following Excavation Has Been Measured


From Proposed Platform Level

Note:-

The Contractor is to take careful note of the


existing platform levels, slopes, drainage system
and other features as depicted in the Contract
Survey Plans and site visits and to account for
any additional earthworks in trimming, cutting
and filling (including importing or removal of earth)
or any works necessary to the existing site to
make up the required structural slab levels.
No claims shall be entertained for lack of account
for existing site conditions.

B Excavate for pile cap and tie beam maximum depth not
exceeding 4.00 m, get out, part return, fill in and well ram
and remainder cart away as described 63 M3 - ###

C Excavate for ground slab maximum depth not ###


not exceeding 1.00 m, get out and cart away as ###
described 28 M3 - ###

Lean Concrete (Grade 15) As Described In

D 50mm thick blinding laid under pile cap and plinth 3.42 M3 - ###
###
Concrete Works

Vibrated Reinforced Concrete (Grade 30) As


Described In

E Pile cap, stump, plinth and ground beam 38 M3 - ###

Vibrated Reinforced Concrete (Grade 25) As


Described In

F Ground slab 7.28 M3 - ###

Hardcore As Described

G 200mm Thick sub-base of 75mm DCR spread, levelled,


watered, well compacted and consolidated to received
concrete ground slab (measured separately) 108.75 M2 -

###

C/C… 0.00

Bill No.3/1
Contractor
Item Description Qty. Unit Rate Amount (RM)

High Tensile Deformed Reinforcement Bar


As Described
Note:-

Contrary to the provision in the Standard Method


Of Measurement, hooks and cranks for high
tensile deformed reinforcement bar and mild steel
reinforcement bar are not measured separately.
Therefore, the above mentioned items shall be
included in the rates.

In Pile Cap

A 12 mm Diameter bar as stirrup 32.32 Kg - ###

B 16 mm Diameter bar 1211.16 Kg - ###

In Stump

C 10 mm Diameter bar as stirrup 218.21 Kg - ###

D 16 mm Diameter bar 324.39 Kg - ###

Ground Beam

E 10 mm Diameter bar as stirrup 115.32 Kg -

F 12 mm Diameter bar 48.66 Kg -

G 25 mm Diameter bar 211.20 Kg -

Fabric Mesh Reinforcement As Described


(Measured Nett, Rate To Include For
300 mm Minimum Laps And Intersections) ###

H BMC A7 laid in ground slab and plinth 116.97 M2 -

Sawn Formwork As Described To

I Sides of pile cap 19.44 M2 - ###

J Sides of stump 17.94 M2 - ###

K Edge of concrete slab 4.40 M2 - ###

L Edge of concrete plinth slab and sides of beam 31.20 M2 -


###

C/C… 0.00

Bill No.3/2
Contractor
Amount (RM)

COLLECTION

From Page No. ….. Bill No.3/1 -

From Page No. ….. Bill No.3/2 -

###
###
###
###

###

###

###

###

###

Bill No. 3 - Foundation Works For 30M NBT


Total Carried To General Summary Of Tender RM 0.00
On Page GST/1

Bill No.3/3
SECTION 1 - CHAIN LINK FENCING & GALVANISED SWING GATES
Contractor
Item Description Qty. Unit Rate Amount (RM)

The Following In Chain Link Fencing And Galvanised Mild


Steel Gate All As Described And Constructed As Per
Detailed Drawings

Chain Link Fencing

A P.V.C. coated chain link fencing, generally


constructed of 50 mm x 50 mm x 3.3/2.8mm gauge
P.V.C. coated chain mesh, 2600 mm high with
and including 3 strands of 2.8mm P.V.C. coated
straining wires to and including 75 mm x 75 mm
x 5 mm thick galvanised m.s. angle with 25mm x 2mm
thick flat bar as post at every centres and corners with
similar size 673 mm long arm at 45º angle and welded
to top of post; the hole four times drilled for straining and barbed
wires; 50mm x 50 mm x 5 mm thick galvanised m.s. angle
raking strut at every change of direction with flat bar;150mm
Diameter steel pipe as gate post (infilled with concrete) and
strut cast cast into reinforced concrete beam and bedded cast
the bottom of fencing in and including concrete kerb , footings ,
50mm diameter PVC weepholes , with and including all
necessary excavation,mass concrete, reinforcement, formwork,
painting, welding, etc., all constructed as per detailed drawings
and specification. ( Piling Measured Separately) 38 M - ###
###
Galvanised Mild Steel Swing Gates ###

B Galvanised Mild steel gate, overall size 4000mm x 2600mm ###


high consisting of 75 mm x 75 mm x 5mm; 50mm x 50mm x
5mm thick mild steel angleframe and middle rail all around
with and including 50mm x 50 mm x 3.3/2.8mm gauge PVC ###
coated chain link mesh infill fixed to frame including all necessary
fixing accessories, mild steel plate welded to mild steel angle
frame as support hung on m.s. equal angle as hinges, 673mm
long arm at 45º angle and welded to top of post, the hole four times
drilled for straining and barbed wires; complete with bolt including ###
nut and washer , m.s. plate locking device complete with all
necessary clamb, bolt handle,approved lock , long drop bolt ,
including all necessary piling (measured separately) welding , ###
painting , 150mm x 150mm opening ,etc.,all constructed as per
detailed drawings and specifications , and all to the approval
and satisfaction the Site Supervisor. 1 SET - ###

###

###

C/C… 0.00

Bill No.3/4
SECTION 2 - MANHOLE, CABLE GANTRY, INSPECTION & ELECTRICAL PIT
Contractor
Item Description Qty. Unit Rate Amount (RM)

The Following In Galvanised Steel Cable Gantry


All As Described And Constructed As Per Detailed Drawings

A To Supply & Install Hot Dipped Galvanised Mild Steel Cable Gantry
all bolted and welded together including all shop and site welding
in 5mm fillet weld ,filling, smooth, junction raking and tapering ,
cutting, hoisted and fixed into position , cable gantry consisting of
75mm x 75mm x 6mm thk., 50mm x 50mm x 4mm Thick Mild steel
mild steel angle iron as horizontal bracing bolted into main frames
with , drilling holes, washers and nuts all constructed all as per
detailed drawing and including concrete footing, formwork, etc. and
all to the satisfaction and approval of the Site Supervisor. 1 SET -

Inspection Pit

B To supply and construct 450mm x 450mm x 600mm deep inspection


pit complete with 500mm x 500mm x 6mm thick mild steel
chequered plate cover , inspection pit connected by 100mm Dia. two
way PVC duct pipe (measured separately) with and including all
necessary fittings and accessories , excavation , formwork ,
concrete grade 30 reinforced with BMC A7 , all constructed as per
detailed drawing and to the approval and satisfaction of the
Site Supervisor.
(Type A) 1 SET -

C To supply and construct 450mm x 450mm x 600mm deep inspection


pit complete with 500mm x 500mm x 6mm thick mild steel
chequered plate cover , inspection pit connected by 100mm Dia. two ###
way PVC duct pipe (measured separately) with and including all ###
necessary fittings and accessories , excavation , formwork , concrete
grade 30 reinforced with BMC A7 , all constructed as per detailed
drawing and to the approval and satisfaction of the Site Supervisor.
(Type A1) 1 SET - ###

Electrical Pit
###
D To supply and construct 450mm x 450mm x 600mm deep electrical
pit including all brickwall with plastering ,excavation , formwork ,
concrete grade 30 reinforced with BMC A7 and connected by
100mm Dia. two way Galvanised Iron pipe (measured separately) with
and including fittings and accessories , all constructed as per ###
detailed drawing and to the approval and satisfaction of
the Site Supervisor. 1 SET -

Precast Telecommunication Manhole


###
E Overall Size 960mm (L) x 660mm (W) x 630mm (H) constructed
all to the Manufacturer's details (JB30) including accessories
and to the approval and satisfaction of the Site Supervisor 1 SET - ###

###

###

C/C… 0.00

Bill No.3/5
Contractor
Amount (RM)

COLLECTION

From Page No. ….. Bill No.3/4 -

From Page No. ….. Bill No.3/5 -

###
###
###
###

###

###

###

###

###

Infrastructure Works
Total Carried To General Summary Of Tender RM 0.00
On Page GST/1

Bill No.3/6
MECHANICAL & ELECTRICAL WORKS

Contractor
Item Description Qty. Unit Rate Amount (RM)

Earthing Lightning Protection System

A To supply and install 3.0m Air terminal c/w saddle including of LUMP
1.5m Taper Air Rod and 1.5m x 50mm Dia. GI pipe. ----- SUM -----

B Heavy duty 300mm x 300mm Earth Chamber c/w 2 length


16mm diameter copper rod and all associated accessories. 4 NO - ###

C Minimum 2 length 16mm diameter copper rod per point and all
associated accessories. LUMP
(Earthing resistance reading below 5 Ohm) ----- SUM -----

D 25mm x 3mm the Copper tape buried at minimum 750mm from


ground level and cadweld to all earth rod inclusive all associated LUMP
accessories and excavation. ----- SUM ----- ###

E Supply and install earthing system for feeder c/w


355mm x 100mm x 6mm Thick MGB connected with individual
50mm sq earth cable and to be terminated at common Chamber
inclusive of angle bar support and all necessary ###
fitting and associated accessories. 3 SET -
###
F 1200mm x 1200mm x 3mm thk. Copper plate buried at minimum ###
2000mm below ground level at each tower leg/foundation
including all associated accessories, excavation etc. 1 SET - ###

G 25mm x 3mm thk. Copper tape with one end cadweld to tower
leg with expose cable run in 50mm diameter galvanised iron LUMP
pipe and the other end cadweld to the copper plate. ----- SUM ----- ###

COMPOUND LIGHTING

H Supply and install 6m hot dipped Galvanised column c/w 250W


floodlight including excavation, footing, formwork, 2 nos each
complete with all associated accessories and u/g cable 6mm2 2 NO -

AVIATION LIGHT
###
I Supply and install LED Solar System Aviation light (Approved as
per DCA Specification) including all associated accessories
and powered by Lithium Iron Phosphate or LifePO4 Batteries
Only Including Five (5) Years Warranty ###
(TYPE DCA/L/B-BRAND : AVIALITE OR COMDELTA) 1 NO - ###

C/C… 0.00

Bill No.3/8
BILL NO. 3

ANCILLARIES

SUMMARY
Contractor
From Page No. ELEMENT Amount (RM)

Bill No.3/3 No. 1 - Work Below Lowest Floor Finishes -

Bill No.3/6 No. 2 - Infrastructure Works -

Bill No.3/8 No. 3 - M&E -

###
###
###
###

###

###

###

###

###

Bill No. 3 - ANCILLARIES


Total Carried To General Summary Of Tender RM 0.00
On Page GST/1

Bill No.3/9

You might also like