TABLE OF CONTENT

Project: Modern Food Storage Facilities_ MFSP


Location: Chittagong
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

BOQ of Package W-24 Construction Steel silo for Wheat at Chattogram

Item No Description

Table of content
i Grand Summary
ii Specific Provisional Sum
iii Summary Bill
1 Civil Work
1.1 Main Gate & sub gate
1.2 Guard House
1.3 Weight bridge and oprator cabin
1.4 Truck Parking and Internal road
1.5 Public Toilet
1.6 Bagging and Loading House
1.7 Empty Gunny Bag Godown
1.8 Control Room
1.9 Cleaning Tower
1.10 Steel structures support for conveyors
1.10.1_ Steel structures support for conveyors on top steel silo
1.10.2_ Steel structures support for conveyors from bucket elevator tower
to truck & wagon bagging & loading house
1.10.3_Steel structures support for conveyors from cleaning tower to jetty
1.11 Sampling & Laboratory house on jetty
1.12 Silo foundation
1.13 Wagon Bagging and Loading House
1.14 Workshop cum Store
1.15 Silo Office
1.16 Car Parking
1.17 Ansar Barrack 24 persons

Table of Content-BoQ
Page-1/405
Site: Chattogram
Item No Description

1.18 Inspection Bungalow

Table of Content-BoQ
Page-2/405
Site: Chattogram
Item No Description

1.19 Substation
1.20 Scrap Godown
1.21 Dormitory for Officer
1.22 Dormitory for Support Staff
1.23 Fire-Fighting Pump House & water tank
1.24 Canteen & Club
1.25 Mosque
1.26 Unloader substation
1.27 Purification & desalination plant
1.28 Running Water Deep Drill Well
1.29 Link tower
1.30 Water supply system
1.31 Rain water drainage system
1.32 Waste water sewerage system

2 Electrical work
2.1 Electrical and Automation System

3 Mechanical equipment work


3.1 Equipments

4 Utilities
4.1 Compressed Air Work
4.2 Fire-Fighting Work
4.3 Lightning Work
4.4 Communication System

5 Environmental and Social Management


5.1 Environmental & Social Safeguard Management
5.2 Landscaping

Table of Content-BoQ
Page-3/405
Site: Chattogram
at at Chattogram

Page

1
3
4
5

9
13
25
39
42
54
65
75
85

94

101

107
115
130
136
147
158
177
182

Table of Content-BoQ
Page-4/405
Site: Chattogram
Page

197

Table of Content-BoQ
Page-5/405
Site: Chattogram
Page

216
225
236
256
275
287
305
322
330
341
350
356
358
363

366

381

393
395
397
398

399
405

Table of Content-BoQ
Page-6/405
Site: Chattogram
GRAND SUMMARY of Bill of Quantity
W-24 Construction Steel Silo for Wheat at Chattogram
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France
Important: Unit Price shall include cost of material, machine, men, transportation, shipment, taxes, over heads, profit, insurance, installation,
commission, completion of each item in all respect as per BoQ, drawing, specification etc.
Amount with Currency
Item No Description of Work Currency
In Figure In Words

1 Bill of Chattogram BDT

2 Specific Provisional Sum ( electricity etc.) BDT 10,000,000.00

3 Provisional Sum for Contigency BDT 100,000,000.00

4 Total Bid Price (Carried forward to letter of Bid) BDT

Grand Summary
Page-3/405
Site Chattogram
BoQ of W-24 Construction Steel Silo for Wheat at Chattogram
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Owner: Directorate General of Food, Bangladesh
Consultant:

Item No Description of Work Amounts in BDT

1 Connection fee, deposit etc. for electric connection from Government electricity co 10,000,000.00

Sub Total of Specific Provisional Sum (Electricity etc.)

Connection fee
Page-4/405
Site: Chattogram
SUMMARY BOQ
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France
Important: Unit Price shall include cost of material, machine, men, transportation, shipment, taxes, over heads, profit, insurance, installation, commission, completion of each
item in all respect as per BoQ, drawing, specification etc.
Unit Rates Amounts
Item No Description of Work Unit Quantity Currency
In Figure In Word In Figure In Word
1 Civil Work
1.1 Main Gate & sub gate set 1
A350-7-CW-0101
1.2 Guard House set 1
A350-7-CW-0201
1.3 Weight bridge and oprator cabin set 1
A350-7-CW-0301
1.4 Truck Parking and Internal road set 1
A350-7-CW-0001
1.5 Public Toilet set 2
A350-7-CW-5a01
1.6 Bagging and Loading House set 1
A350-7-CW-0601
1.7 Empty Gunny Bag Godown set 1
A350-7-CW-0701
1.8 Control Room set 1
A350-7-CW-0801
1.9 Cleaning Tower set 1
A350-7-CW-0901

Subject: Summary BOQ


Page- 5/405
Site: Chattogram
Unit Rates Amounts
Item No Description of Work Unit Quantity Currency
In Figure In Word In Figure In Word
1.10 Steel structures support for conveyors
1.10.1_ Steel structures support for conveyors on top steel silo set 1
A350-7-CW-10.101
1.10.2_ Steel structures support for conveyors from bucket
set 1
elevator tower to truck & wwagon bagging & loading house
A350-7-CW-10.201
1.10.3_Steel structures support for conveyors from cleaning tower set 1
A350-7-CW-10.301
1.11 Sampling & Laboratory house on jetty set 1
A350-7-CW-1101
1.12 Silo foundation set 1
A350-7-CW-1201
1.13 Wagon Bagging and Loading House set 1
A350-7-CW-1301
1.14 Workshop cum Store set 1
A350-7-CW-1401
1.15 Silo Office set 1
A350-7-CW-1501
1.16 Car Parking set 1
A350-7-CW-1601
1.17 Ansar Barrack 24 persons set 1
A350-7-CW-1701
1.18 Inspection Bungalow set 1
A350-7-CW-1801
1.19 Substation set 1
A350-7-CW-1901
1.20 Scrap Godown set 1
A350-7-CW-2101
1.21 Dormitory for Officer set 1
A350-7-CW-2201

Subject: Summary BOQ


Page- 6/405
Site: Chattogram
Unit Rates Amounts
Item No Description of Work Unit Quantity Currency
In Figure In Word In Figure In Word
1.22 Dormitory for Support Staff set 1
A350-7-CW-2301
1.23 Fire-Fighting Pump House & water tank set 1
A350-7-CW-2401
1.24 Canteen & Club set 1
A350-7-CW-2501
1.25 Mosque set 1
A350-7-CW-2601
1.26 Unloader substation set 1
A350-7-CW-2701
1.27 Purification & desalination plant set 1
A350-7-CW-2801
1.28 Running Water Deep Drill Well set 3
A350-7-CW-29a01
1.29 Link tower set 1
A350-7-CW-3001
1.30 Water supply system set 1
A350-7-WS-3-0001
1.31 Rain water drainage system set 1
A350-7-WS-1-0001
1.32 Waste water sewerage system set 1
A350-7-WS-2-0001
Sub-Total 1
2 Electrical work
2.1 Electrical and Automation System lot 1
A350-7-LA-1-0001 -- A350-7-LA-11-0001
Sub-Total 2

Subject: Summary BOQ


Page- 7/405
Site: Chattogram
Unit Rates Amounts
Item No Description of Work Unit Quantity Currency
In Figure In Word In Figure In Word
3 Mechanical equipment work
3.1 Equipments lot 1
A350-7-ME-4-0101 -- A350-7-ME-9-0001
Sub-Total 3
4 Utilities
4.1 Compressed Air Work lot 1
A350-7-UT-1-0001
4.2 Fire-Fighting Work lot 1
A350-7-UT-4-0001
4.3 Lightning Work lot 1
A350-7-UT-5-0001
4.4 Communication System lot 1
A350-7-UT-2-0001
Sub-Total 4
5 Environmental and Social Management
5.1 Environmental & Social Safeguard Management lot 1
5.2 Landscaping lot 1
A350-7-LS-0001
Sub-Total 5

Subject: Summary BOQ


Page- 8/405
Site: Chattogram
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Main Gate
Owner: Directorate General of Food, Bangladesh VAT
Consultant: Gerico France VAT

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches layout,
providing center lines, local bench-mark pillars, levelling, ramming and preparing
the base, fixing bamboo spikes and marking layout with chalk powder, providing
1 necessary tools and plants, protecting and maintaining the trench dry etc.,
stacking, clearing the excavated earth at a safe distance out of the area enclosed
by the layout etc.

Layout and marking for earth work in excavation in foundation accepted by


1.1 A350-7-CW-0101 sqm 8.82
the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth and
1.2 A350-7-CW-0101, 0104 cum 14.11
maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical work and
1.3 during contract period and demobilization after Completion of the Works under A350-7-CW-0101 sqm 8.82
contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in 150mm layers


with earth available within 90 m of the building site minimum dry density of 95%
1.4 with optimum moisture content (Modified proctor test) including carrying, A350-7-CW-0101, 0104 cum 12.14
watering, levelling, dressing and compacting to a specified percentage each layer
upto finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site by truck
or any other means to a place within 30 km radius of the city or town area
1.5 including loading, unloading at both ends, leveling and dressing the carried earth A350-7-CW-0101, 0104 cum 1.97
etc. complete accepted by the Engineer.

Sub - Total 1
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced by mixer,
2.1 casting in forms in/c supplying & laying of single layer polythene sheet weighing
6.5 kg/Sqm with allowances for lapping complete in all respect and accepted by
the Engineer.

Subject: Detail BOQ of Civil Works


Page - 9/405
Item: Main Gate
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2.1.1_ For footing A350-7-CW-0104 cum 0.29
Reinforced cement concrete works with minimum cement concrete relates to
mix ratio 1:1.5:3 having minimum f’cr = 30 Mpa, and satisfying a specified
compressive strength f’c= 25 Mpa at 28 days on standard cylinders as per
standard practice of code ACI/BNBC/ASTM & Cement conforming to BDS EN-
197-1 CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet
sand or coarse sand of equivalent F.M 2.2 and 20 mm down well graded crushed
stone chips conforming to ASTM C-33; preparing the concrete mix in the Digital
Batching plant, ascertaing the strength by trail mix design, casting in forms,
2.2 compacting by vibrator machine and curing at least for 28 days, removing
centering-shuttering after specified time approved; including all cost of water,
electricity, admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and accepted by
the Engineer.

2.2.1_ Concrete for footing A350-7-CW-0104 cum 1.34

2.2.2_ Concrete for pedestal column A350-7-CW-0104 cum 0.35

2.2.3_ Concrete for column A350-7-CW-0104 cum 1.40

2.2.4_ Concrete for roof beam A350-7-CW-0105 cum 3.59

2.2.5_ Concrete for roof slab A350-7-CW-0101, 0105 cum 7.56


Sub - Total 2
3 Formwork
Steel formwork include making, placing shutter in position and maintaining true
to plumb, making shutter in position and maintaining true to plumb, making
3.1 shutter water-tight properly, placing reinforcement in position. all complete
approved and accepted by the Engineer.

3.1.1_ Formwork for footing A350-7-CW-0104 sqm 2.40

3.1.2_ Formwork for pedestal column A350-7-CW-0104 sqm 3.52

3.1.3_ Formwork for column A350-7-CW-0104 sqm 15.96

Subject: Detail BOQ of Civil Works


Page - 10/405
Item: Main Gate
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.1.4_ Formwork for roof beam A350-7-CW-0105, 0106 sqm 13.33

3.1.5_ Formwork for roof slab A350-7-CW-0101, 0105 sqm 127.33


Sub - Total 3
4 Reinforcement work
Supplying, fabrication and fixing to details as per design: Ribbed or deformed bar
reinforcement Grade 400 (RB 400 / 400W) for Reinforced Cement Concrete,
produced and marked in accordance with BDS ISO 6935-2: 2006 (or standard
subsequently released from BSTI) , the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after fracture
and minimum total elongation at maximum force is 16% and 8% respectively
4.1 including straightening and cleaning rust, if any, bending and binding in position
with supply of G.I. wires, splices or laps what so ever etc. complete in all respects
and accepted by the Engineer (Measurement shall be recorded only on Standard
Mass per Unit length of Bars, while, dia of bars exceeds its standard)

4.1.1_ Reinforcement for Footing A350-7-CW-0104 kg 54.69


4.1.2_ Reinforcement for Pedestal column and column A350-7-CW-0104 kg 339.75
4.1.3_ Reinforcement for roof beam A350-7-CW-0105, 0106 kg 732.66
4.1.4_ Reinforcement for roof slab A350-7-CW-0101, 0105 kg 1,578.85
Sub - Total 4
5 Masonry Work
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2) mortar (1:6),
and making bond with connected wall including necessary scaffolding, raking out
5.1 joints, cleaning and soaking bricks at least 24 hours before use and washing of
sand curing at least 7 days in all floor including cost of water, electricity and other
charges etc. (Cement: CEM-I)

5.1.1_ Normal brick for column A350-7-CW-0101, 0102 sqm 21.66


Sub - Total 5

Subject: Detail BOQ of Civil Works


Page - 11/405
Item: Main Gate
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6 Plastering & Waterproofing Work
75mm damp Damp Proof Course (1:1.5:3) with brick chips and 50% Sylhet sand
6.1
(F.M.2.2) and 50% local sand (F.M.1.2)
6.1.1_Plaster to roof slab A350-7-CW-0101, 0105 sqm 103.03
6.2 Waterprooing
6.2.1_ Three layers waterprooing for roof slab A350-7-CW-0101 sqm 103.03
Sub - Total 6
7 Tiles & Stone Work

Supplying, fitting and fixing glazed homogeneous floor tiles (Mipur ceramic /
equevalent) with cement sand (F.M. 1.2) mortar (1:4) base and raking out the
7.1
joints with white cement including cutting and laying the tiles in proper way and
finishing with care etc. all complete and accepted by the Engineer.

7.1.1_ Ceramic Tile 600mmx600mm, light colour for column A350-7-CW-0101 sqm 13.68
7.1.2_ Ceramic Tile 600mmx600mm, light colour for roof A350-7-CW-0101 sqm 96.66
Sub - Total 7
8 Structural Steel
Electrical Motor Operated sliding Stainless Steel gate (6700mm x 3000mm)
8.1 Providing and erecting Steel gate with all accessaaries. complete in all respect as A350-7-CW-0102, 0103 each 1.00
per drawing and direction of the Engineer in Charge
8.2 Single leaf stainless steel door for sub gate (1180mm x 3100mm) A350-7-CW-0102, 0103 sqm 3.54
Sub - Total 8
9 Drainage system
9.1 Pipe PVC
9.1.1_ PVC pipe D100 A350-7-CW-0102, 0103 m 11.40
9.1.2_ PVC pipe D60 A350-7-CW-0102, 0103 m 1.50
9.2 Strainer ball A350-7-CW-0102, 0103 each 2.00
Sub - Total 9
TOTAL

Subject: Detail BOQ of Civil Works


Page - 12/405
Item: Main Gate
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Guard House
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
layout with chalk powder, providing necessary tools and plants,
1
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the
layout etc.

Layout and marking for earth work in excavation in foundation


1.1 accepted by the Engineer. A350-7-CW-0201 sqm 22.00
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 and maximum 10 m lead: in soft clayey soil/loose sand/silt A350-7-CW-0201, 0205, 0206 cum 71.27

Mobilization and cleaning site before commencing actual physical


1.3 work and during contract period and demobilization after Completion A350-7-CW-0201 sqm 22.00
of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350-7-CW-0201, 0205, 0206 cum 44.27
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of the
1.5 city or town area including loading, unloading at both ends, leveling A350-7-CW-0201, 0205, 0206 cum 27.00
and dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 13/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of single
2.1 layer polythene sheet weighing 6.5 kg/Sqm with allowances for
lapping complete in all respect and accepted by the Engineer.

2.1.1_ For footing A350-7-CW-0205 cum 1.02


2.1.2_ For ground floor beam A350-7-CW-0206 cum 0.79
2.1.3_ For ground floor slab A350-7-CW-0201 cum 1.67
2.1.4_ For drain and appron A350-7-CW-0201 cum 1.90
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1,
52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand
or coarse sand of equivalent F.M 2.2 and 20 mm down well graded
crushed stone chips conforming to ASTM C-33; preparing the
concrete mix in the Digital Batching plant, ascertaing the strength by
2.2 trail mix design, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after
specified time approved; including all cost of water, electricity,
admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the Engineer.

2.2.1_ Concrete for footing A350-7-CW-0205 cum 1.99


2.2.2_ Concrete for pedestal column A350-7-CW-0205 cum 1.15
2.2.3_ Concrete for ground floor beam A350-7-CW-0206 cum 3.24
2.2.4_ Concrete for beam elv +3.900 A350-7-CW-0207 cum 2.52
2.2.5_ Concrete for roof beam A350-7-CW-0207, 0208 cum 1.27
2.2.6_ Concrete for ground floor slab A350-7-CW-0201 cum 2.00
2.2.7_ Concrete for slab elv +3.900 A350-7-CW-0201 cum 0.36
2.2.8_ Concrete for roof slab A350-7-CW-0201, 0207 cum 3.08
2.2.9_ Concrete for gutter slab A350-7-CW-0202 cum 1.04
2.2.10_ Concrete for column A350-7-CW-0205 cum 1.86
2.2.11_ Concrete for lintel A350-7-CW-0202, 0205 cum 0.31
2.2.12_ Concrete for sunshade A350-7-CW-0207 cum 0.16
Sub - Total 2

Subject: Detail BOQ of Civil Works


Page - 14/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3 Formwork
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
3.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.

3.1.1_ Formwork for footing A350-7-CW-0205 sqm 4.48

3.1.2_ Formwork for pedestal column A350-7-CW-0205 sqm 9.20

3.1.3_ Formwork for ground floor beam A350-7-CW-0206 sqm 20.16

3.1.4_ Formwork for beam +3.900 A350-7-CW-0207 sqm 25.66

3.1.5_ Formwork for roof beam A350-7-CW-0207, 0208 sqm 7.22

3.1.6_ Formwork for slab +3.900 A350-7-CW-0201 sqm 2.60

3.1.7_ Formwork for roof slab A350-7-CW-0201, 0207 sqm 18.64

3.1.8_ Formwork for gutter slab A350-7-CW-0205 sqm 8.68

3.1.9_ Formwork for column A350-7-CW-0202 sqm 18.56

3.1.10_ Formwork for lintel A350-7-CW-0202, 0205 sqm 5.23

3.1.11_Formwork for Sunshade A350-7-CW-0207 sqm 3.75


Sub - Total 3
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
4.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

Subject: Detail BOQ of Civil Works


Page - 15/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.1_ Reinforcement for footing A350-7-CW-0205 kg 737.20

Subject: Detail BOQ of Civil Works


Page - 16/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.2_ Reinforcement for pedestal column and column A350-7-CW-0202, 0205 kg 396.56

4.1.3_ Reinforcement for ground floor beam A350-7-CW-0206 kg 626.43

4.1.4_ Reinforcement for beam +3.900 A350-7-CW-0207 kg 671.22

4.1.5_ Reinforcement for roof beam A350-7-CW-0207, 0208 kg 278.17

4.1.6_ Reinforcement for ground floor slab A350-7-CW-0201 kg 184.59

4.1.7_ Reinforcement for slab +3.900 A350-7-CW-0201 kg 111.08

4.1.8_ Reinforcement for roof slab A350-7-CW-0201, 0207, 0208 kg 268.88

4.1.9_ Reinforcement for gutter slab A350-7-CW-0205 kg 168.29

4.1.10_ Reinforcement for lintel A350-7-CW-0202, 0205 kg 94.02

4.1.11_ Reinforcement for sunshade A350-7-CW-0207 kg 78.10


Sub - Total 4
5 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and
depth and depth joints, filling the interstices with mortar, cleaning
5.1 and soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days
and pointing with cement sand (F.M.1.2) mortar (1:2) including cost
of water, electricity and other charges ect. all complete and accepted
by the Engineer. (Cement: CEM-I) in ground floor.

5.1.1_ For ground floor wall A350-7-CW-0201, 0202 cum 10.24

Subject: Detail BOQ of Civil Works


Page - 17/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Exposed brick work for interior wall
Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made 10 holes first class bricks (Mirpur
Ceramics or equivalent) in cement sand (F.M.1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding,
5.2 raking out joints, cleaning and soaking the bricks for at least 24 hours
before use and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges ect. all complete
and acceplete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.
5.2.1_ Toilet wall A350-7-CW-0201, 0202 sqm 8.53
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with
first class bricks in cement sand (F.M. 1.2) mortar (1:6), in
superstructure including raking out joints, filling the interstices with
mortar, cleaning and soaking bricks at least 24 hours before use and
5.3 washing of sand, necessary scaffolding, curing at least 7 days etc. all
complete (measurement to given as 250mm width for one brick
length and 375mm for one brick and a half brick length). (Cement:
CEM-I)

5.3.1_ Entry steps A350-7-CW-0201, 0202 cum 0.41


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
5.4 necessary scaffolding, raking out joints, cleaning and soaking bricks
at least 24 hours before use and washing of sand curing at least 7
days in all floor including cost of water, electricity and other charges
etc. (Cement: CEM-I)

5.4.1_ Gutter wall A350-7-CW-0201, 0202 sqm 8.68

5.4.2_ Drain wall A350-7-CW-0201,0206 sqm 35.42


Sub - Total 5
6 Plastering Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
6.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing
the corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement CEM-I)

Subject: Detail BOQ of Civil Works


Page - 18/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6.1.1_ Plaster to gutter wall A350-7-CW-0201, 0202 sqm 19.53

6.1.2_ Plaster to beams at elv +3.900 m A350-7-CW-0201, 0206 sqm 7.60

6.1.3_ Plaster to below surface of roof slab A350-7-CW-0201, 0202 sqm 8.24

6.1.4_ Plaster to column A350-7-CW-0201, 0205 sqm 18.56

6.1.5_ Plaster to drain A350-7-CW-0201, 0206 sqm 55.66

6.1.6_ Plaster to entry steps A350-7-CW-0201, 0202 sqm 1.48


6.2 Waterproofing
6.2.1_ Three layer waterproofing by sika grout for gutter slab A350-7-CW-0201,0206 sqm 5.97
Sub - Total 6
7 Tiles & Stone Work
Ceramic tile 600x600 light colour for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
7.1 (1:4) base and raking out the joints with white cement including A350-7-CW-0201, 0202 sqm 14.61
cutting and laying the tiles in proper way and finishing with care

Homogenious tile 300 x 300mm for toilet floor


Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
7.2 (1:4) base and raking out the joints with white cement including A350-7-CW-0201, 0202 sqm 2.50
cutting and laying the tiles in proper way and finishing with care

Ceramic tile 300x500mm light colour for toilet wall


Suppling, fitting and fixing glazed wall tile, irrespective of color &/or
design, with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3)
7.3 base and ranking out the joints with respective joint filler & binder A350-7-CW-0201, 0202 sqm 5.46
including cutting, laying and hire charge of machine and finishing
with care etc. including water, electricity and other charges

Mirpur ceramic 75x225 mm, dark colour for outer surface of ground
7.4 floor beam A350-7-CW-0201, 0202 sqm 9.83
Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
7.5 sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
respective joint filler & binder including cutting, laying and finishing
with care etc

7.5.1_ Entry steps A350-7-CW-0201, 0202 sqm 1.34

Subject: Detail BOQ of Civil Works


Page - 19/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Roof tile
7.6 Supplying, fitting and fixing country made roof tile, (Mirpur ceramic A350-7-CW-0201, 0202 sqm 26.08
or equivalent) with adhesive motar
Sub - Total 7
8 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats
8.1 of coal tar to the surface in contact with all, fitting and fixing in
position. Frame (size 250x62mm) & shutter as per design, drawing,
accepted by the Engineer

8.1.1_ Single leaf door DO-01 (2100x1000x38mm) including


varnishing and frence polishing A350-7-CW-0202, 0203 cum 0.16
8.2 Solid uPVC Toilet door (frame 150x62mm)
8.2.1_ Single leaf door DO-02 (2130x76x38mm) A350-7-CW-0202, 0203 each 1.00
5mm thick glass with Thai Aluminium frame sliding window as per
8.3
design, drawing, accepted by the Engineer
8.3.1_ Double shutter window WD-01 (1200x1400mm) including
grill with 12mm square bar, angle, Flat bar etc. as per drawing, A350-7-CW-0202, 0203 sqm 3.36
design, specification etc. all complete & accepted by the Engineer
8.3.2_ Double shutter window WD-02 (1200x2000mm) including
grill with 12mm square bar, angle, Flat bar etc. as per drawing, A350-7-CW-0202, 0203 sqm 2.40
design, specification etc. all complete & accepted by the Engineer

5mm thick glass with Thai Aluminium frame curtain window as per
8.4
design, drawing, accepted by the Engineer
8.4.1_ Single shutter curtain window CW-01 (610x1500mm)
including grill with 12mm square bar, angle, Flat bar etc. as per
drawing, design, specification etc. all complete & accepted by the A350-7-CW-0202, 0203 sqm 0.92
Engineer
Sub - Total 8
9 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm thick
board laminated by mechanical hot press with a milk white PVC
9.1 membrane with Aluminum T- bar frame in natural anodized finish at
600*600 mm in grid suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc.

9.1.1_ Aluminium ceiling of ground floor A350-7-CW-0201, 0202 sqm 17.50

Subject: Detail BOQ of Civil Works


Page - 20/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
9.2 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

9.2.1_ Painting to gutter wall A350-7-CW-0201, 0202 sqm 10.85


9.2.2_ Painting to beam A350-7-CW-0201, 0206 sqm 7.60
9.2.3_ Paiting to column A350-7-CW-0201, 0205 sqm 18.56
9.2.4_ Painting to entry steps A350-7-CW-0201, 0202 sqm 1.48
Sub - Total 9
10 Water supply system / Waste water system
A350-7-DW-3-0202, A350-7-DW-2-0202
Supply and installation of foreign made food grade stainless steel
(SS304) thickness 1.8mm water tank including supply of hardware,
10.1
consumables, fittings etc. all complete approved and accepted by the
Engineer
10.1.1_1000 liter capacity each 1.00
10.2 Valve each 4.00
10.3 uPVC pipe (min thickness 3.0 mm)
10.3.1_uPVC ɸ110 m 3.90
10.3.2_uPVC ɸ76 m 2.90
10.3.3_uPVC ɸ40 m 3.20
10.3.4_VENT PIPE PVC ɸ 60 m 5.00
10.4 PPR pipe (min thickness 4.5 mm)
10.4.1_PPR pipe ɸ 27 m 10.85
10.5 Tee
10.5.1_110 Tee each 1.00
10.5.2_27/20 Tee each 2.00
10.5.3_76 Tee each 1.00
10.6 Reducer each
10.6.1_27-20 Reducer each 1.00
10.6.2_76-40 Reducer each 1.00
10.6.3_27/20 Reducer each 1.00

Subject: Detail BOQ of Civil Works


Page - 21/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10.7 Elbow
10.7.1_90 degree elbow(PPR pipe ɸ 27) each 4.00
10.7.2_90 degree elbow(PPR pipe ɸ 20) each 3.00
10.7.3_90 degree elbow(uPVC ɸ110) each 2.00
10.7.4_90 degree elbow(uPVC ɸ76) each 4.00
10.7.5_90 degree elbow(uPVC ɸ40) each 1.00
10.7.6_45 degree elbow(uPVC ɸ110) each 2.00
Septic tank
Construction of septic tank of different sizes (medium and large
sizes) with walls of brick work in cement mortar (1:6) having a lining
of minimum 125 mm R.C.C cast against the walls as per approved
type plan over a brick flat soling flat soiling and 150 mm thick
reinforced cement concrete flooring (1:2:4) with 125 mm thick walls
in partition and 12 mm thick cement plaster (1:4) with N.C.F. to
insides of walls on floor and all around outside walls by 18” height at
top including supplying fitting and fixing of two R.C.C. Tees and
10.8 providing 450 mm dia water sealed heavy type C.I. manhole cover
with locking/unlocking arrangement and 100 mm thick R.C.C (1:2:4)
top slab, including centering, shuttering, fabricating, casting and
curing etc. all complete as per standard drawing, specification
accepted by the Engineer. (Rate in including cost of reinforcement
and its fabrication, binding and placing.)

10.8.1_ For 50 person each 1.00


Soak well
Construction of soak well of different sizes (medium and large sizes)
with 250mm thick soild brick work and 250mm honey comb brick
work with cement mortar (1:6) as per design over R.C.C. (1:2:4) well
curb with 1% reinforcement up to the depth as per drawing with 450
mmm dia water sealed heavy type. C.I. manhole cover with locking
arrangement, filling the well up to the reqired depth with graded khoa
and sand including suppling and fabicating M.S. Rod, casting, curing
10.9
including necessary earth work in excavation, side filling and bailing
out water including cost of all materials etc. all complete as per
standard drawing, design approved and accepted by the Engineer.
(Rate in including cost of reinforcement and its fabrication,
binding,and placing, form work etc.)

10.9.1_ For 50 users each 1.00

Subject: Detail BOQ of Civil Works


Page - 22/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Construction of masonry inspection pit with 250 mm thick brick
work in cement mortar (1:4) including necessary earth work, side
filling and one layer brick flat soling, 75 mm thick (1:3:6) base
10.10 concrete for making invert channel and 12 mm thick (1:2) cement
plaster with neat finishing etc.all complete up to a depth of 700 mm
approved and accepted by the Engineer.

10.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average 525
mm for single 150 mm dia R.C.C.pipes and 400 mm uPVC pipe each 3.00

Sub - Total 10

11 Sanitary Accessories (Cotto or Eequivalent)


A350-7-CW-0202, A350-7-DW-2-0202
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c
11.1 plastic seat cover, cistern system, preparing the base with cement each 1.00
concrete and with wire mesh or roads if necessary, including making
holes and fitting, fixing, finishing etc.
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx.
size 656×510×845, 26kg by weight including fitting, fixing the same
in position with heavy type C.I. Brackets. 30 mm dia PVC waste
11.2 water pipe with brass coupling (not exceeding 750 mm in length). each 2.00
12mm plastic lead (connection) pipe with brass coupling, basin waste
with chain plug including making holes in walls and floors and fitting
with wooden blocks, screws, finishing etc,

11.3 Bathroom strainer each 1.00


Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
11.4 unframe super quality mirror with hard board at the back with all each 1.00
necessary fitting including making holes in walls and mending good
the damages with cement morta (1:4) etc.
11.5 Shower each 1.00
Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
11.6 150*150*126 mm size including making holes in walls and mending each 1.00
good the damages with cement mortar (1:4) etc.
Porcelain soap tray
Supplying, fitting, and fixing standard size soap tray including
11.7 making holes in walls and mending good the damages with cement each 1.00
mortar (1:4) etc.

Subject: Detail BOQ of Civil Works


Page - 23/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Supplying, fitting and fixing best quality faucets ect. etc. (Cotto or
11.8 equivalent). Complete approved and accepted by the Engineer
11.8.1_12mm CP bib cock each 1.00
11.8.2_12mm CP stop cock each 2.00
11.8.3_12mm CP angle cock each 2.00
Supply, fitting and fixing best quality CP pillar cock etc. all complete
11.9
approved and accepted by the Engineer
11.9.1_12 mm CP medium quality pillar cock each 1.00
Sub - Total 11
12 Electrical Work
Ref: A350-7-LA-0201
Electrical equipment
12.1
Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215 mm.dia
Steel Sheet Carrier, with Powder coated Paint/Oxidized /Chromium each 8.00
finished, suitable glass covers of min. height 92mm
2- Ceiling fan 56" including fitting and fixing
Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS rod each 1.00

3- Exhaust fan 12"


Providing and fixing of following axial flow A.C capacitor type wall
mounted exhaust fan complete with blade, steel frame standard wall each 1.00
louver shutter, PVC insulated connecting wire etc.

4- Combined switch and regulator board


Supply and installation of electronics fans regulators compriasing of
standard component having noise suppression circuit and total loss in
the regulator not exceeding 0.4 watt suitable for 220 10% volt AC each 1.00
single phase 50 Hz manufactured by Micro Electronics Ltd. or
equivalent foreign made

5- Distribution board, IP42 Enclosures each 1.00


6- Socket (3-pin5A ) each 3.00

Subject: Detail BOQ of Civil Works


Page - 24/405
Item: Guard House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7- LED Tube light set (3 x 10W)
Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.37) consisting of
power coated 22 SWG sheet steel frame of min. length 600mm &
breath 600mm, symmetrical mirror reflector of anodized aluminum, each 2.00
superior quality electronic ballast with one year guarantee, holder,
necessary wiring with 2 x 0.4 sq.mm PVC insulated (stranded)
flexible FR wire, earth terminal etc.

8- One button switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 6.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

9- Three button switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 1.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

12.2 Protection (MCB & MCCB)


1- MCB 2px6, 6KA each 2
2- MCB 2px10,6KA each 1
3- MCB 2px16, 6KA each 1
Electrical wire and cable (include conduit pipes,Junction box with
12.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 100
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 203
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 35
core 1c x 2.5 mm²
Sub - Total 12
TOTAL

Subject: Detail BOQ of Civil Works


Page - 25/405
Item: Guard House
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Weight Bridge and operator cabin
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word

Earth work in excavation in all kinds of soil for foundation


trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes
1 and marking layout with chalk powder, providing necessary tools
and plants, protecting and maintaining the trench dry etc.,
stacking, clearing the excavated earth at a safe distance out of the
area enclosed by the layout etc.

Layout and marking for earth work in excavation in


1.1 A350-7-CW-0301 sqm 295.74
foundation accepted by the Engineer.

Earth work in excavation in foundation trenches up to 1.5 m


1.2 A350-7-CW-0306/0310 cum 127.06
depth and maximum 10 m lead: in soft clayey soil/loose sand/silt

Mobilization and cleaning site before commencing actual


1.3 physical work and during contract period and demobilization after A350-7-CW-0306/0310 sqm 282.60
Completion of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building
site minimum dry density of 95% with optimum moisture content
1.4 A350-7-CW-0306/0310 cum 100.87
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the


construction site by truck or any other means to a place within 30
1.6 km radius of the city or town area including loading, unloading at A350-7-CW-0306/0310 cum 26.19
both ends, leveling and dressing the carried earth etc. complete
accepted by the Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 25/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6 m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in
the hole, washing the hole for at least 30 minutes, clean the bore-
hole and make the bore-hole ready for placing steel cage and
concreting including hire charge of drilling rig set, tripod stand,
tremie pipe, cost of fuel, lubricant, mobilization, demobilization,
maintenance, spares, stand-byes, insurance coverage, water,
electricity and other charges all compete approved and accepted
2.1 by the Engineer. Before commencing boring operation,
Contractor shall submit method of statement of cast-in-situ pile
work including sequence of boring and casting, disposal of spoils,
test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350-7-CW-0306 m 440.00

Subject: Detail BOQ of Civil Works


Page - 26/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Cast in situ pile with RCC works of required slump by adding
water reducing admixture with 25 Mpa relates to mix ratio
(1:1.5:3) on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1-
CEM -1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand
[Sylhet sand or coarse sand of equivalent F.M.2.2], 20 mm down
well graded crushed stone chips conforming to ASTM C-33,
including breaking crushed stone chips, screening through proper
sieves, making, placing re-bar cage & binding ms pipes in
position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1
2.2 meter throughout the period of concreting, maintaining required A350-7-CW-0306 cum 124.34
slump, etc. mixing the aggregates in diginal batching plant,
casting in bore holes, acertaining the strength by trial mix design
all complete including all cost of water, electricity, plant &
machinery, bentonite, admixture testing of materials and concrete
etc and other charges as per design, drawing etc all complete
approved and accepted by the Engineer. Concrete should prepared
by Digital batching plant, strength may be acertained by trail mix
design.

Subject: Detail BOQ of Civil Works


Page - 27/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade
400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to
Bangladesh standard, with minimum yield strength, fy (ReH)=
400 MPa but fy not exceeding 450 MPa and whatever is the yield
strength within allowable limit as per BNBC/ ACI 318, the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least
1.25 and minimum elongation after fracture and minimum total
2.3 elongation at maximum force is 16% and 8% respectively A350-7-CW-0306 kg 7,508.54
including welding of lapping and spirals as per design,
drawing, straightening and cleaning rust, if any, bending and
binding in position with supply of G.I. wires, splices or laps what
so ever etc. all complete accepted by the Engineer (Measurement
shall be recorded only on Standard Mass per Unit length of Bars,
while, dia of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm) Lira, National polymer as approved upto total
length in each pile for ultrasonic pulse velocity meter test. The
Pvc pipes should have threaded cap at top and bottom, and
jointed by socket & glue to connect each others. 14 SWG steel
2.4 wires shall be used for binding with rebar cage having minimum A350-7-CW-0306 m 1,320.00
one binding with rebar cages in each 3m interval or apply other
approved devices for fastenening firmly with rebar cage, cleaning
pipes upto full length immediately after concreting, protecting
the pipes from any damage etc. all complete accepted by the
Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe
distance including scraps and cleaning concrete from steel/M.S.
2.5 rods, straightening and bending of pile bars, preparation and A350-7-CW-0306 cum 2.94
making platform where necessary, carrying, all sorts of handling,
stacking the same properly after cleaning, leveling and dressing
the situ and clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 28/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved
expert, preparing, cleaning the holes and providing all relevant
2.6 materials, equipment, result in standard forms and compiling test A350-7-CW-0306 each 10.00
report with recommendations on the test etc. complete in all
respect approve and accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM
D5882- The standard method of testing by a qulifified and
approved PIT expert, preparing pile heads and providing all
relevant materials, equipment, result in standard forms and A350-7-CW-0307 each 9.00
compiling test report with recommendations on the test etc.
complete in all respect approve and accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading
unloading, Kentledge and other plants and equipment including
staging, mobilization, demobilization, hire charge, gunny bags,
sand and filling sacs/gunny bags for loading, record readings and
preparation of results in standard forms and other incidental
2.7 charges per standard practice and procedures including
submission of load test report, furnishing all graph and chart etc.
complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of
his responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test /test 1.00


Sub - Total 2

Subject: Detail BOQ of Civil Works


Page - 29/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of
3.1 single layer polythene sheet weighing 6.5 kg/Sqm with
allowances for lapping complete in all respect and accepted by the
Engineer.

3.1.1_ For footing A350-7-CW-0306 cum 0.78

3.1.2_ For ground floor beam A350-7-CW-0307 cum 0.50

3.1.3_ For truck scale beam A350-7-CW-0310 cum 7.16

3.1.4_ For ground floor slab and ramp A350-7-CW-0310 cum 10.88

3.1.5_ For drain A350-7-CW-0301/0306 cum 0.91

3.1.6_ For plinth wall A350-7-CW-0301/0306 cum 0.70


Reinforced cement concrete works with minimum cement
concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25 Mpa
at 28 days on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1
CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality
Sylhet sand or coarse sand of equivalent F.M 2.2 and 20 mm
down well graded crushed stone chips conforming to ASTM C-
33; preparing the concrete mix in the Digital Batching plant,
3.2 ascertaing the strength by trail mix design, casting in forms,
compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved;
including all cost of water, electricity, admixture, additional
testing charges of materials and cylinders required by Engineer,
other charges etc. all complete approved and accepted by the
Engineer.

3.2.1_ Concrete for footing A350-7-CW-0306 cum 1.43

3.2.2_ Concrete for pedestal column A350-7-CW-0306 cum 0.61

3.2.3_ Concrete for ground floor beam A350-7-CW-0307 cum 0.88

Subject: Detail BOQ of Civil Works


Page - 30/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.2.4_ Concrete for beam level +3.880 A350-7-CW-0307 cum 1.26

3.2.5_ Concrete for roof beam A350-7-CW-0312 cum 0.61

3.2.6_ Concrete for truck scale beam A350-7-CW-0310 cum 18.48

3.2.7_ Concrete for ramp of bridge scale A350-7-CW-0310 cum 30.99

3.2.8_ Concrete for ground floor slab A350-7-CW-0306 cum 11.54

3.2.9_ Concrete for roof slab A350-7-CW-0312 cum 2.11

3.2.10_Concrete for gutter A350-7-CW-0302/0306 cum 0.82

3.2.11_ Concret for column A350-7-CW-0312 cum 0.53

3.2.12_ Concrete for lintel A350-7-CW-0302/0306 cum 0.31

3.2.13_ Concrete for sunshade A350-7-CW-0302/0306 cum 0.30


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.

4.1.1_ Formwork for footing A350-7-CW-0306 sqm 3.84

4.1.2_ Formwork for pedestal column A350-7-CW-0306 sqm 6.08

4.1.3_ Formwork for ground floor beam A350-7-CW-0307 sqm 10.88

4.1.4_ Formwork for beam at level +3.880 A350-7-CW-0307 sqm 6.80

4.1.5_ Formwork for roof beam A350-7-CW-0312 sqm 4.90

4.1.6_ Formwork for truck scale beam A350-7-CW-0310/0311 sqm 117.52

4.1.7_ Formwork for ramp of bridge scale A350-7-CW-0310/0311 sqm 88.52

4.1.8_ Formwork for roof slab A350-7-CW-0312 sqm 14.08

4.1.9_ Formwork for gutter A350-7-CW-0306 sqm 27.20

Subject: Detail BOQ of Civil Works


Page - 31/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.10_Formwork for column A350-7-CW-0306 sqm 14.06

Subject: Detail BOQ of Civil Works


Page - 32/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.11_ Formwork for lintel A350-7-CW-0302/0306 sqm 5.00

4.1.12_ Formwork for sunshade A350-7-CW-0302/0306 sqm 4.00


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed
or deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released
from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16%
and 8% respectively including straightening and cleaning rust, if
5.1
any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds
its standard)

5.1.1_ Reinforcement for footing A350-7-CW-0306 kg 121.22

5.1.2_ Reinforcement for pedestal column and column A350-7-CW-0306 kg 217.02

5.1.3_ Reinforcement for ground floor beam A350-7-CW-0307 kg 338.11

5.1.4_ Reinforcement for Beam +3.880 A350-7-CW-0307 kg 380.05

5.1.5_ Reinforcement for roof beam A350-7-CW-0307 kg 252.88

5.1.6_ Reinforcement for truck scale beam A350-7-CW-0310/0311 kg 3,390.63

5.1.7_ Reinforcement for ramp of bridge scale A350-7-CW-0310/0311 kg 1,953.26

5.1.8_ Reinforcement for ground floor slab A350-7-CW-0306 kg 100.50

5.1.9_ Reinforcement for roof slab A350-7-CW-0312 kg 173.62

5.1.10_ Reinforcement for gutter A350-7-CW-0312 kg 153.51

5.1.11_ Reinforcement for lintel A350-7-CW-0302/0306 kg 57.09

Subject: Detail BOQ of Civil Works


Page - 33/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5.1.12_ Reinforcement for sunshade A350-7-CW-0302/0306 kg 44.39
Sub - Total 5
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole
machine made (Mirpur Ceramics or equivalent) Rock-face or
textured klinker facing bricks having uniform colour carefully
laid in cement sand (F.M.1.2) mortar (1:4) in superstructure with
uniform width and depth and depth joints, filling the interstices
with mortar, cleaning and soaking bricks at least for 24 hours
6.1
before use and washing and screening of sand, necessary
scaffolding, curing at least for 7 days and pointing with cement
sand (F.M.1.2) mortar (1:2) including cost of water, electricity
and other charges ect. all complete and accepted by the Engineer.
(Cement: CEM-I) in all floor.

6.1.1_ All floors A350-7-CW-0302 cum 6.49


Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with
first class bricks in cement sand (F.M. 1.2) mortar (1:6), in
superstructure including raking out joints, filling the interstices
with mortar, cleaning and soaking bricks at least 24 hours before
6.2 use and washing of sand, necessary scaffolding, curing at least 7
days etc. all complete (measurement to given as 250mm width for
one brick length and 375mm for one brick and a half brick
length). (Cement: CEM-I)

6.2.1_ Entry steps A350-7-CW-0302/0306 cum 0.76


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M.
1.2) mortar (1:6), and making bond with connected wall including
necessary scaffolding, raking out joints, cleaning and soaking
6.3 bricks at least 24 hours before use and washing of sand curing at
least 7 days in all floor including cost of water, electricity and
other charges etc. (Cement: CEM-I)

6.3.1_ Gutter wall A350-7-CW-0302/0306 sqm 6.72


6.3.2_ Drain wall A350-7-CW-0302/0306 sqm 16.94
6.3.3_ Plinth wall A350-7-CW-0302/0306 sqm 6.96
Sub - Total 6

Subject: Detail BOQ of Civil Works


Page - 34/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with
fresh cement to ceiling R.C.C, columns, beams, surface of stair
case, sunshades, cornices, railings, drop wall, louvers, fins and
7.1 finishing the corners and edges including washing of sand
cleaning the surface, scaffolding and curing a least for 7 days,
cost of water, electricity and other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to gutter wall A350-7-CW-0302/0306 sqm 15.96

7.1.2_ Plaster for beam A350-7-CW-0306/0307/0312 sqm 11.70

7.1.3_ Plaster for column A350-7-CW-0306/0307 sqm 7.03

7.1.4_ Plaster to below surface of roof slab A350-7-CW-0306/0312 sqm 14.08

7.1.5_ Plaster for entry steps A350-7-CW-0306/0307 sqm 1.80

7.1.6_ Plaster for drain A350-7-CW-0306/0307 sqm 22.08

7.1.7_ Plaster for plinth wall A350-7-CW-0306/0307 sqm 6.96


7.2 Waterproofing
7.2.1_ Three layer waterproofing by sika grout for gutter slab A350-7-CW-0302/0306 sqm 11.76

7.2.2_ Three layer waterproofing by sika grout for roof slab A350-4-CW-0301,0302 sqm 14.08
Sub - Total 7

Subject: Detail BOQ of Civil Works


Page - 35/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
8 Tiles & Stone Work
Homogenious Mirror polish tile 600x600 light colour for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2)
mortar (1:4) base and raking out the joints with white cement
8.1 including cutting and laying the tiles in proper way and finishing
with care

8.1.1_ Ground floor A350-7-CW-0302 sqm 8.39


Mirpur ceramic 75x225 mm, dark colour for outer surface of
8.2 A350-7-CW-0302/0303 sqm 6.96
ground floor beam
Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick
8.3 cement sand (F.M. 1.2) mortar (1:4) base and ranking out the
joints with respective joint filler & binder including cutting,
laying and finishing with care etc
8.1.1_ Entry steps A350-7-CW-0201, 0202 sqm 1.80
Roof tile
8.4 Supplying, fitting and fixing country made roof tile, (Mirpur A350-7-CW-0302/0306/0312 sqm 14.08
ceramic or equivalent) with adhesive motar
Sub - Total 8
9 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and
frame
Supplying and making solid wooden door for all floors with
9.1 matured natural seasoned wood of required size including
painting two coats of coal tar to the surface in contact with all,
fitting and fixing in position. Frame (size 250x62mm) & shutter
as per design, drawing, accepted by the Engineer

9.1.1_ Single leaf door DO-01 (1000x2100x38mm) including


varnishing and frence polishing A350-7-CW-0302/0303/0306 cum 0.88

5mm thick glass with Thai Aluminium frame sliding window as


9.2
design, drawing, accepted by the Engineer
9.2.1_ Double shutter window WD-01(1200x1400mm) including
grill with 12mm square bar, angle, flar bar etc as per drawing, A350-4-CW-0308,0309 sqm 4.80
specification etc. all complete & accepted by the Engineer.

Sub - Total 9

Subject: Detail BOQ of Civil Works


Page - 36/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm
thick board laminated by mechanical hot press with a milk white
10.1 PVC membrane with Aluminum T- bar frame in natural anodized
finish at 600*600 mm in grid suspended from ceiling by 12 SWG
double ply wire fixed to the ceiling by rowel plug, screws, hooks,
nails etc.

10.1.1_ Aluminium ceiling A350-7-CW-0302/0303 sqm 7.82


Emulsion Paint
Plastic emulsion of approved best quality and colour delivered
from authorized local agent of the manufacturere in a sealed
container, applying to wall and ceiling in two coats over lime
putty of specified brand applied on primer or sealer elapsing
10.2 specified time for drying/recoating including cleaning drying,
making free from dirt, grease, wax, removing all chalked and
scaled materials, fungus, mending good the surface defects, sand
papering the surface and necessary scaffolding, spreading by
brush/ roller/ spray etc.

10.2.1_ Painting to gutter wall A350-7-CW-0302/0306 sqm 8.40


10.2.2_ Painting to entry steps A350-7-CW-0302/0306 sqm 1.14
Sub - Total 10
11 Structural Steel
All steel structure, Beams, Columns, Purlins, fittings & fixtures
shall be hot rolled pre-fabricated and hot deep galvanized (EN
11.1 ISO 14713:1999 C5, Galvanized coating conforms to ASTM
A653/A653 M/EN 1461 for zinc coated steel minimum 600
gm/m2)
11.1.1_ Galvanized Steel Plate A350-7-CW-0302/0310 kg 631.74
11.1.2_ Steel window frame A350-7-CW-0306 kg 195.92
11.2 Galvanized bolts
11.2.1_ Galvanized Anchor Bolt M20 A350-4-CW-0319 each 48.00
Sub - Total 11

Subject: Detail BOQ of Civil Works


Page - 37/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
12 Electrical Work
Ref: A350-7-LA-0301
Electrical equipment
14.1
Providing and fixing electric equipment to position
1- Ceiling fan 56" including fitting and fixing
Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS each 3.00
rod
2- Exhaust fan 12"
Providing and fixing of following axial flow A.C capacitor type
wall mounted exhaust fan complete with blade, steel frame each 3.00
standard wall louver shutter, PVC insulated connecting wire etc.

3- Combined switch and regulator board


Supply and installation of electronics fans regulators compriasing
of standard component having noise suppression circuit and total
loss in the regulator not exceeding 0.4 watt suitable for 220 10%
volt AC single phase 50 Hz manufactured by Micro Electronics each 1.00
Ltd. or equivalent foreign made

4- Sub distribution board, IP54, include the terminal block each 1.00
5- Distribution board, IP54 Enclosures each 1.00
6- Socket (3-pin6A ) each 1.00
7- Socket (3-pin15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps.
Combined switch socket outlet (concealed type) manufactured
and tested in accordance with relevant IEC standards and
manufactured and tested in accordance with relevant IEC
standards and approved by BSTI mounted on required size 18 each 4.00
SWG galvanized plain sheet board of 76.2mm. (3”) depth all
electrical contacts shall be of brass/copper (Dynamic/MEP/
SK/Metro/Super Star or equivalent, local made).)

Subject: Detail BOQ of Civil Works


Page - 38/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
8- LED Tube light set (3 x 10W)
Providing & fixing the 3 x 2’× 10 watt Louver type LED Tube
light fitting (False ceiling mounted concealed type) with V- grid
louver of following manufacturers (as per picture No. 12.37)
consisting of power coated 22 SWG sheet steel frame of min.
length 600mm & breath 600mm, symmetrical mirror reflector of each 8.00
anodized aluminum, superior quality electronic ballast with one
year guarantee, holder, necessary wiring with 2 x 0.4 sq.mm PVC
insulated (stranded) flexible FR wire, earth terminal etc.

9- One way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed
type following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards each 2.00
mounted on required size 18 SWG galvanized plain sheet board
of 76.2 mm (3”) depth. All electrical contacts shall be brass/
copper

10- Two way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed
type following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards each 1.00
mounted on required size 18 SWG galvanized plain sheet board
of 76.2 mm (3”) depth. All electrical contacts shall be brass/
copper

11- Four way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed
type following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards each 1.00
mounted on required size 18 SWG galvanized plain sheet board
of 76.2 mm (3”) depth. All electrical contacts shall be brass/
copper

Subject: Detail BOQ of Civil Works


Page - 39/405
Item: Weight Bridge and operator cabin
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
12- Room air cooler- split type 24000 btu/hr (General or
equivalent)
Supply, Installation, Testing & commissioning of split type Air-
cooler comprising condensing and evaporating units having
following cooling capacity based on indoor temperature 27°-30°
C DB / 19.5°-22°C WB and outdoor temperature 35°-40° DB at each 1.00
high fan speed condition suitable for installation & operation in
tropicalized country like Bangladesh & as per detailed
specifications & standard as mentioned below: Wall mounted

14.2 Protection (MCB & MCCB)


1- MCB 4px30. 6KA each 1.00
2- MCB 3px20, 6KA each 1.00
3- MCB 2PX16, 6KA each 1.00
4- MCB 2PX10, 6KA each 1.00
5- MCB 2PX6, 6KA each 1.00
Electrical wire and cable (include conduit pipes, junction box
14.3
with terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu,
m 60.00
Single - core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu,
m 40.00
Single - core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu,
m 30.00
Single - core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu,
m 50.00
Single - core 3c x 4 mm²
Sub - Total 14
TOTAL

Subject: Detail BOQ of Civil Works


Page - 40/405
Item: Weight Bridge and operator cabin
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Internal Road and Truck Parking

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
1 Earthwork
Earth work in excavation in all kinds of soil for foundation
trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes and
marking layout with chalk powder, providing necessary tools and
1.1 plants, protecting and maintaining the trench dry etc., stacking, cum 14,060.59
clearing the excavated earth at a safe distance out of the area
enclosed by the layout etc.

Sand (FM=1.2) filling with Compaction K=0.95, thk 0.3m all


1.2 complete & accepted by the Engineer cum 9,198.52

Transport of surplus soil to a safe distance as per instruction etc. all


1.3 cum 14,060.59
complete & accepted by the Engineer.
2 Concrete Road
Stone chips (well graded 25mm down) filling with compaction
2.1 cum 1,576.89
k=0.95 all completed & accepted by the Engineer
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
maintaining true to plumb, making shutter water-tight properly,
2.2 sqm 301.42
placing reinforcement in position. all complete approved and
accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 39/405
Subject: Internal Road and Truck Parking
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days
on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1,
52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand
or coarse sand of equivalent F.M 2.2 and 20 mm down well graded
crushed stone chips conforming to ASTM C-33; preparing the
concrete mix in the Digital Batching plant, ascertaing the strength by
2.3 trail mix design, casting in forms, compacting by vibrator machine cum 3,285.19
and curing at least for 28 days, removing centering-shuttering after
specified time approved; including all cost of water, electricity,
admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the Engineer.

Reinforcement 10 mm rebar, @ 250 mm c/c double layer


Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
2.4 kg 171,498.06
respectively including straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires, splices or
laps what so ever etc. complete in all respects and accepted by the
Engineer (Measurement shall be recorded only on Standard Mass per
Unit length of Bars, while, dia of bars exceeds its standard)

Expansion Joints
Providing expansion joints across the RCC road and pavement with
2.5 20mm gap between the adjacent panels including dowel bars, filling m 19,144.16
the joints by coarse sand & bitumen 1:1 as approved etc. accepted by
the Engineer.

Subject: Detail BOQ of Civil Works


Page - 40/405
Subject: Internal Road and Truck Parking
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
3 Concrete Curb
Steel form work for Curb
Steel form work include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
3.1 maintaining true to plumb, making shutter water-tight properly, sqm 1,974.88
placing reinforcement in position. all complete approved and
accepted by the Engineer.

Concrete work for Curb


Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days
on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1,
52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand
or coarse sand of equivalent F.M 2.2 and 20 mm down well graded
crushed stone chips conforming to ASTM C-33; preparing the
3.2 concrete mix in the Digital Batching plant, ascertaing the strength by cum 156.12
trail mix design, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after
specified time approved; including all cost of water, electricity,
admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the Engineer.

TOTAL

Subject: Detail BOQ of Civil Works


Page - 41/405
Subject: Internal Road and Truck Parking
DETAIL BOQ
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Public toilet
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350-7-CW-5a01 sqm 40.00
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 A350-7-CW- 5a01, 5a08 cum 61.43
and maximum 10m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-5a01 sqm 40.00
of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350-7-CW- 5a01, 5a08 cum 55.84
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city
1.5 A350-7-CW- 5a01, 5a08 cum 5.59
or town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ


Page - 42/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
2.1 polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

2.1.1_ For footing A350-7-CW-5a08 cum 1.54


2.1.2_ For ground floor beam A350-7-CW-5a09 cum 2.36
2.1.3_ For ground floor slab A350-7-CW-5a09 cum 3.26
2.1.4_ For drain and appron A350-7-CW-5a01 cum 2.20
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
2.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

2.2.1_ Concrete for footing A350-7-CW-5a08 cum 2.85


2.2.2_ Concrete for pedestal column A350-7-CW-5a08 cum 1.20

2.2.3_ Concrete for ground floor beam A350-7-CW-5a09 cum 8.50

2.2.4_ Concrete for beam elv +4.430 A350-7-CW-5a10 cum 3.21

2.2.5_ Concrete for roof floor beam A350-7-CW-5a12 cum 1.51

2.2.6_ Concrete for ground floor slab A350-7-CW-5a09 cum 3.92

2.2.7_ Concrete for slab elv +4.430 A350-7-CW-5a09 cum 0.34

Subject: Detail BOQ


Page - 43/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2.2.8_ Concrete for roof slab A350-7-CW-5a13 cum 2.92

2.2.9_ Concrete for gutter A350-7-CW-5a04 cum 1.79

2.2.10_ Concrete for column A350-7-CW-5a08 cum 3.26

2.2.11_ Concrete for lintel A350-7-CW-5a09 cum 0.62

2.2.12_Concrete for sunshade A350-7-CW-5a10 cum 0.20


Sub - Total 2
3 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
3.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.

3.1.1_ Formwork for footing A350-7-CW-5a08 sqm 6.72

3.1.2_ Formwork for pedestal column A350-7-CW-5a08 sqm 4.80

3.1.3_ Formwork for ground floor beam A350-7-CW-5a09 sqm 20.53

3.1.4_ Formwork for beam elv +4.430 A350-7-CW-5a10 sqm 33.33

3.1.5_ Formwork for roof beam A350-7-CW-5a12 sqm 17.50

3.1.6_ Formwork for slab elv +4.430 A350-7-CW-5a09 sqm 2.85

3.1.7_ Formwork for roof slab A350-7-CW-5a13 sqm 46.60

3.1.8_ Formwork for gutter A350-7-CW-5a04 sqm 14.88

3.1.9_ Formwork for column A350-7-CW-5a08 sqm 16.32

3.1.10_ Formwork for lintel A350-7-CW-5a09 sqm 10.05

3.1.11_ Formwork for Sunshade A350-7-CW-5a10 sqm 4.73


Sub - Total 3

Subject: Detail BOQ


Page - 44/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
4.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

4.1.1_ Reinforcement for footing A350-7-CW-5a08 kg 236.75

4.1.2_ Reinforcement for pedestal column A350-7-CW-5a08 kg 882.20

4.1.3_ Reinforcement for ground floor beam A350-7-CW-5a09 kg 2,530.87

4.1.4_ Reinforcement for beam elv +4.430 A350-7-CW-5a10, 5a11 kg 1,231.42

4.1.5_ Reinforcement for roof beam A350-7-CW-5a12, 5a13 kg 333.35

4.1.6_ Reinforcement for ground floor slab A350-7-CW-5a09 kg 343.39

4.1.7_ Reinforcement for slab elv +4.430 A350-7-CW-5a09 kg 125.32

4.1.8_ Reinforcement for roof slab A350-7-CW-5a13, 5a14 kg 307.78

4.1.9_ Reinforcement for gutter A350-7-CW-5a04 kg 68.13

4.1.10_ Reinforcement for column A350-7-CW-5a08 kg 1,030.78

4.1.11_ Reinforcement for lintel A350-7-CW-5a09 kg 136.25

4.1.12_ Reinforcement for Sunshade A350-7-CW-5a10 kg 109.00


Sub - Total 4

Subject: Detail BOQ


Page - 45/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
5 Masonry Work

Brick work for exterior wall


250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramic or Equivalent) Rock-face, textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
5.1 and depth joints, filling the interstices with mortar, cleaning and
soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

5.1.1_ Ground floor A350-7-CW-5a02-5a04 cum 24.33

Exposed brick work for interior wall


Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made 10 holes first class bricks (Mirpur
Ceramics or equivalent) in cement sand (F.M.1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding,
5.2
raking out joints, cleaning and soaking the bricks for at least 24 hours
before use and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges ect. all complete
and acceplete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.

5.2.1_ Ground floor A350-7-CW-5a02-5a04 sqm 55.93

Normal brick work 250mm to 375mm thick


Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
5.3
and soaking bricks at least 24 hours before use and washing of sand,
necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length) (Cement: CEM-I)

5.3.1_ Entry steps A350-7-CW-5a02-5a04 cum 0.88

Subject: Detail BOQ


Page - 46/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
5.4 necessary scaffolding, raking out joints, cleaning and soaking bricks at
least 24 hours before use and washing of sand curing at least 7 days in
all floor including cost of water, electricity and other charges etc.
(Cement: CEM-I)

5.4.1_ Gutter wall A350-7-CW-5a02-5a04 sqm 11.73


5.4.2_ Drain wall A350-7-CW-5a01, 5a02-5a04 sqm 55.67
Sub - Total 5
6 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
6.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

6.1.1_ Plaster to gutter wall A350-7-CW-5a04 sqm 26.61

6.1.2_ Plaster to beam A350-7-CW-5a10 sqm 22.22

6.1.3_ Plaster to column A350-7-CW-5a08 sqm 10.88

6.1.4_ Plaster to lower surface of roof slab A350-7-CW-5a13 sqm 31.07

6.1.5_ Plaster to drain A350-7-CW-5a01 sqm 55.67

6.1.6_ Plaster to entry steps A350-7-CW-5a04 sqm 1.80


6.2 Waterproofing

6.2.1_ 3 layer waterproofing by sika grout for gutter slab A350-7-CW-5a02-5a04 sqm 14.88
Sub - Total 6
7 Tiles & Stone Work
Homogenious tile 300 x 300mm
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
7.1 (1:4) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care

Subject: Detail BOQ


Page - 47/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
7.1.1_ Toilet floor A350-7-CW-5a02-5a04 sqm 32.51

Ceramic tile 300x500mm light colour


Suppling, fitting and fixing glazed wall tile, irrespective of color &/or
design, with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base
7.2
and ranking out the joints with respective joint filler & binder
including cutting, laying and hire charge of machine and finishing with
care etc. including water, electricity and other charges

7.2.1_ Toilet wall A350-7-CW-5a02-5a04 sqm 63.03


Mirpur ceramic 75x225 mm, dark colour for outer surface of ground
7.3 A350-7-CW-5a02-5a04 sqm 11.33
floor beam
Granite stone thick. 20mm for entry steps
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
7.4 sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
respective joint filler & binder including cutting, laying and finishing
with care etc
7.4.1_ Entry steps A350-7-CW-5a02-5a04 sqm 6.41

7.4.2_ Hand wash basin countertop A350-7-CW-5a02-5a04 sqm 3.24


Roof tile
7.5 Supplying, fitting and fixing country made (Mirpur Ceramics or A350-7-CW-5a02-5a04 sqm 45.33
equivalent) roof tile, with adhesive motar
Sub - Total 7
8 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
8.1 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 250x62mm) & shutter as per design, drawing, accepted by
the Engineer.

8.1.1_ Single leaf door DO-01 (2100x1000x38mm) including


varnishing and frence polishing A350-7-CW-5a02-5a04 cum 0.32
8.2 Solid uPVC Toilet door (frame 150x62mm)
8.2.1_ Single leaf door DO-02 (2130x600x38mm) A350-7-CW-5a02-5a04 each 6.00
5mm thick glass with Thai Aluminium frame curtain window as per
8.3
design, drawing, accepted by the Engineer

Subject: Detail BOQ


Page - 48/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
8.3.1_ 5mm glass Thai Aluminium frame curtain window with 12mm
square bar, angle, flat bar as per drawing, design, specification etc. all
complete & accepted by the Engineer CW-01 (610x610mm) A350-7-CW-5a02-5a04 sqm 3.35

Sub - Total 8
9 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm thick
board laminated by mechanical hot press with a milk white PVC
9.1 membrane with Aluminum T- bar frame in natural anodized finish at
600*600 mm in grid suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc.

9.1.1_ Aluminium ceiling of ground floor A350-7-CW-5a09 sqm 33.75

Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
9.2 brand applied on primer or sealer elapsing specified time for
drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

9.2.1_ Painting to gutter A350-7-CW-5a04 sqm 26.61


9.2.2_ Painting to beam A350-7-CW-5a10 sqm 22.22
9.2.3_ Painting to column A350-7-CW-5a08 sqm 10.88
9.2.4_ Painting to entry steps A350-7-CW-5a04 sqm 1.80
Sub - Total 9
10 Water Supply/ Waste water System
A350-7-DW-3-5a02, A350-7-DW-2-5a02
Supply and installation of food grade stainless steel (SS304) thikness
min 1.8 mm water tank including supply of hardware, consumables,
10.1 fittings etc. all complete approved and accepted by the Engineer

10.1.1_1000 liter capacity each 1.00


10.2 Valve each 15.00
10.3 uPVC pipe (min. thickness 3.0 mm)
10.3.1_ uPVC ɸ110 m 17.00

Subject: Detail BOQ


Page - 49/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
10.3.2_ uPVC ɸ76 m 20.00
10.3.3_ uPVC ɸ40 m 3.00
10.3.4_ VENT PIPE PVC ɸ60 m 5.00
10.4 PPR pipe (min. thicness 4.5)
10.4.1_ PPR pipe ɸ 20 m 13.00
10.4.2_ PPR pipe ɸ 27 m 8.00
10.5 Tee
10.5.1_ 110 Tee each 6.00
10.5.2_ 110/40 Tee each 1.00
10.5.3_ 76/76 Tee each 7.00
10.5.4_ 76/40 Tee each 3.00
10.5.5_ 27/ 27Tee each 4.00
10.5.6_ 27/ 20Tee each 3.00
10.5.7_ 20/ 20Tee each 6.00
10.5.8_ 40X40 Tee each 2.00
10.6 Reducer
10.6.1_ 76-40 Reducer each 1.00
10.7 Elbow
10.7.1_ 90 degree elbow (PPR pipe ɸ 20) each 13.00
10.7.2_ 90 degree elbow (PVC ɸ110) each 1.00
10.7.3_ 90 degree elbow (PVC ɸ76) each 5.00
10.7.4_ 90 degree elbow (PVC ɸ40) each 2.00
10.7.5_ 90 degree elbow (PVC ɸ27) each 4.00
10.7.6_ 45 degree elbow (PVC ɸ110) each 12.00

Subject: Detail BOQ


Page - 50/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Septic tank
Construction of septic tank of different sizes (medium and large sizes)
with walls of brick work in cement mortar (1:6) having a lining of
minimum 125 mm R.C.C cast against the walls as per approved type
plan over a brick flat soling flat soiling and 150 mm thick reinforced
cement concrete flooring (1:2:4) with 125 mm thick walls in partition
and 12 mm thick cement plaster (1:4) with N.C.F. to insides of walls
on floor and all around outside walls by 18” height at top including
10.8 supplying fitting and fixing of two R.C.C. Tees and providing 450 mm
dia water sealed heavy type C.I. manhole cover with
locking/unlocking arrangement and 100 mm thick R.C.C (1:2:4) top
slab, including centering, shuttering, fabricating, casting and curing
etc. all complete as per standard drawing, specification accepted by the
Engineer. (Rate in including cost of reinforcement and its fabrication,
binding and placing.)

10.8.1_ for 50 person each 1.00


Soak well
Construction of soak well of different sizes (medium and large sizes)
with 250mm thick soild brick work and 250mm honey comb brick
work with cement mortar (1:6) as per design over R.C.C. (1:2:4) well
curb with 1% reinforcement up to the depth as per drawing with 450
mmm dia water sealed heavy type. C.I. manhole cover with locking
arrangement, filling the well up to the reqired depth with graded khoa
and sand including suppling and fabicating M.S. Rod, casting, curing
10.9 including necessary earth work in excavation, side filling and bailing
out water including cost of all materialsetc. all complete as per
standard drawing, design approved and accepted by the Engineer.
(Rate in including cost of reinforcement and its fabrication,
binding,and placing, form work etc.)

10.9.1_ 50 users each 1.00


Construction of masonry inspection pit with 250 mm thick brick work
in cement mortar (1:4) including necessary earth work, side filling and
one layer brick flat soling, 75 mm thick (1:3:6) base concrete for
10.10 making invert channel and 12 mm thick (1:2) cement plaster with neat
finishing etc.all complete up to a depth of 700 mm approved and
accepted by the Engineer.

Subject: Detail BOQ


Page - 51/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
10.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average 525
each 3.00
mm for single 150 mm dia R.C.C.pipes and 400 mm PVC pipe
Sub - Total 10
11 Sanitary Accessories (Cotto or Equivalent)
A350-7-CW-5a01, A350-7-DW-2-5a02
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c plastic
11.1 seat cover, cistern system, preparing the base with cement concrete each 6.00
and with wire mesh or roads if necessary, including making holes and
fitting, fixing, finishing etc.

Subject: Detail BOQ


Page - 52/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
11.2 Bowl uniral each 3.00
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx. size
656×510×845, 26kg by weight including fitting, fixing the same in
position with heavy type C.I. Brackets. 30 mm dia PVC waste water
11.3 pipe with brass coupling (not exceeding 750 mm in length). 12mm each 4.00
plastic lead (connection) pipe with brass coupling, basin waste with
chain plug including making holes in walls and floors and fitting with
wooden blocks, screws, finishing etc,

11.4 Bathroom strainer each 7.00


Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
11.5 unframe super quality mirror with hard board at the back with all each 2.00
necessary fitting including making holes in walls and mending good
the damages with cement morta (1:4) etc.
11.6 Wash basin faucet each 4.00
Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
11.7 150*150*126 mm size including making holes in walls and mending each 6.00
good the damages with cement mortar (1:4) etc.
Supplying, fitting and fixing best quality faucets (Cotto or equivalent)
11.8 ect. Complete approved and accepted by the Engineer
11.8.1_12mm CP bib cock (Cotto or equivalent) each 6.00
Supply, fitting and fixing best quality CP pillar cock (Cotto or
11.9 equivalent) ect. Complete approved and accepted by the Engineer
11.9.1_12 mm CP pillar cock (Cotto or equivalent) each 6.00
11.9.2_12mm CP stop cock each 6.00
11.9.3_12mm CP angle stop cock each 6.00
Sub - Total 11
12 Electrical Work
Ref: A350-7-LA-5a01
Electrical equipment
12.1
Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215 mm.dia
Steel Sheet Carrier, with Powder coated Paint/Oxidized /Chromium each 8.00
finished, suitable glass covers of min. height 92mm

Subject: Detail BOQ


Page - 53/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2- Wall mounted LED tube light
Providing & fixing the 1×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
breadth 60mm, superior quality electronic ballast with one year each 3.00
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC insulated
(stranded) flexible FR wire, earth terminal etc.

3- Exhaust fan 12"


Providing and fixing of following axial flow A.C capacitor type wall
mounted exhaust fan complete with blade, steel frame standard wall each 2.00
louver shutter, PVC insulated connecting wire etc.

4- Distribution board, IP42 Enclosures each 2.00


5- Socket (3-pin 6A) each 2.00
6- Two way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 2.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

7- Three way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 1.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

12.2 Protection (MCB & MCCB)


1- MCB 2px6, 6KA each 2.00
2- MCB 2px10, 6KA each 2.00
3- MCB 2px16,6KA each 2.00
Electrical wire and cable (include conduit pipes, junction box with
12.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 144.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 120.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 45.00
core 1c x 2.5 mm²
Sub - Total 12

Subject: Detail BOQ


Page - 54/405
Item: Public Toilet
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
TOTAL

Subject: Detail BOQ


Page - 55/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 56/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 57/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 58/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 59/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 60/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 61/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 62/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 63/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 64/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 65/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 66/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 67/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 68/405
Item: Public Toilet
Amounts
In Word

Subject: Detail BOQ


Page - 69/405
Item: Public Toilet
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Bagging and loading house
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word

Earth work in excavation in all kinds of soil for foundation


trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes
1 and marking layout with chalk powder, providing necessary tools
and plants, protecting and maintaining the trench dry etc., stacking,
clearing the excavated earth at a safe distance out of the area
enclosed by the layout etc.

Layout and marking for earth work in excavation in foundation


1.1 A350-7-CW-0605 sqm 684.00
accepted by the Engineer.

Earth work in excavation in foundation trenches up to 1.5 m


1.2 A350-7-CW-0620/0621 cum 747.87
depth and maximum 10 m lead: in soft clayey soil/loose sand/silt

Mobilization and cleaning site before commencing actual


1.3 physical work and during contract period and demobilization after A350-7-CW-0605 sqm 684.00
Completion of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 A350-7-CW-0620/0621 cum 615.08
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of
1.5 the city or town area including loading, unloading at both ends, A350-7-CW-0620/0621 cum 132.79
leveling and dressing the carried earth etc. complete accepted by
the Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 54/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6 m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in
the hole, washing the hole for at least 30 minutes, clean the bore-
hole and make the bore-hole ready for placing steel cage and
concreting including hire charge of drilling rig set, tripod stand,
tremie pipe, cost of fuel, lubricant, mobilization, demobilization,
maintenance, spares, stand-byes, insurance coverage, water,
electricity and other charges all compete approved and accepted by
2.1 the Engineer. Before commencing boring operation, Contractor
shall submit method of statement of cast-in-situ pile work
including sequence of boring and casting, disposal of spoils, test
result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 38 m A350-7-CW-0619 Rm 2,394.00
Cast in situ pile with RCC works of required slump by adding
water reducing admixture with 25 Mpa relates to mix ratio
(1:1.5:3) on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1-
CEM -1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand
[Sylhet sand or coarse sand of equivalent F.M.2.2], 20 mm down
well graded crushed stone chips conforming to ASTM C-33,
including breaking crushed stone chips, screening through proper
sieves, making, placing re-bar cage & binding ms pipes in
position, placing and removing tri-pod as per requirement, pouring
the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1
2.2 meter throughout the period of concreting, maintaining required A350-7-CW-0619 cum 676.89
slump, etc. mixing the aggregates in diginal batching plant, casting
in bore holes, acertaining the strength by trial mix design all
complete including all cost of water, electricity, plant &
machinery, bentonite, admixture testing of materials and concrete
etc and other charges as per design, drawing etc all complete
approved and accepted by the Engineer. Concrete should prepared
by Digital batching plant, strength may be acertained by trail mix
design.

Subject: Detail BOQ of Civil Works


Page - 55/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade
400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to
Bangladesh standard, with minimum yield strength, fy (ReH)= 400
MPa but fy not exceeding 450 MPa and whatever is the yield
strength within allowable limit as per BNBC/ ACI 318, the ratio of
ultimate tensile strength fu to yield strength fy, shall be at least
1.25 and minimum elongation after fracture and minimum total
2.3 elongation at maximum force is 16% and 8% respectively A350-7-CW-0619 kg 69,536.43
including welding of lapping and spirals as per design, drawing,
straightening and cleaning rust, if any, bending and binding in
position with supply of G.I. wires, splices or laps what so ever etc.
all complete accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia
of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm) Lira, National polymer as approved upto total
length in each pile for ultrasonic pulse velocity meter test. The
Pvc pipes should have threaded cap at top and bottom, and jointed
by socket & glue to connect each others. 14 SWG steel wires shall
2.4 be used for binding with rebar cage having minimum one binding A350-7-CW-0619 m 7,182.00
with rebar cages in each 3m interval or apply other approved
devices for fastenening firmly with rebar cage, cleaning pipes upto
full length immediately after concreting, protecting the pipes from
any damage etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe
distance including scraps and cleaning concrete from steel/M.S.
2.5 rods, straightening and bending of pile bars, preparation and A350-7-CW-0619 cum 16.02
making platform where necessary, carrying, all sorts of handling,
stacking the same properly after cleaning, leveling and dressing the
situ and clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 56/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved
expert, preparing, cleaning the holes and providing all relevant
2.6 materials, equipment, result in standard forms and compiling test A350-7-CW-0619 each 34.00
report with recommendations on the test etc. complete in all
respect approve and accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM
D5882- The standard method of testing by a qulifified and
approved PIT expert, preparing pile heads and providing all
relevant materials, equipment, result in standard forms and A350-7-CW-0620 each 27.00
compiling test report with recommendations on the test etc.
complete in all respect approve and accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and
filling sacs/gunny bags for loading, record readings and
preparation of results in standard forms and other incidental
charges per standard practice and procedures including submission
of load test report, furnishing all graph and chart etc. complete in
2.7 all respects approved and accepted by the Engineer (Minimum
two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of
his responsibilities and obligations under Contract.

a) For 250 tonne load for 1 No. test per test 2.00
Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of
3.1 single layer polythene sheet weighing 6.5 kg/Sqm with allowances
for lapping complete in all respect and accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 57/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.1.1_ For footing A350-7-CW-0620/0621 cum 11.88

3.1.2_ For ground beam A350-7-CW-0622/0623 cum 21.48

3.1.3_ For ground floor slab A350-7-CW-0626 cum 63.00

3.1.4_ For drain and appron A350-7-CW-0605 cum 6.33


Reinforced cement concrete works with minimum cement
concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25 Mpa
at 28 days on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1
CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality
Sylhet sand or coarse sand of equivalent F.M 2.2 and 20 mm down
well graded crushed stone chips conforming to ASTM C-33;
preparing the concrete mix in the Digital Batching plant, ascertaing
3.2 the strength by trail mix design, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing
centering-shuttering after specified time approved; including all
cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-0620/0621 cum 87.03

3.2.2_ Concrete for pedestal column A350-7-CW-0620/0621 cum 24.22

3.2.3_ Concrete for ground floor beam elv +0.300m A350-7-CW-0623/0625 cum 46.46

3.2.4_ Concrete for beam elv +1.400m A350-7-CW-0622/0624 cum 20.63

3.2.5_ Concrete for beam elv +6.000m A350-7-CW-0622/0624 cum 42.90

3.2.6_ Concrete for slab elv +0.300m A350-7-CW-0622/0624 cum 32.40

3.2.7_ Concrete for slab elv +1.400m A350-7-CW-0626/0627 cum 62.10


3.2.8_ Concrete for slab elv +6.000m A350-7-CW-0630/0631 cum 96.39

3.2.9_ Concrete for column A350-7-CW-0620/0621 cum 25.41

3.2.10_ Concrete for lintel A350-7-CW-0606/0644 cum 0.24

3.2.11_ Concrete for staircase A350-7-CW-0609 cum 1.37


Sub - Total 3

Subject: Detail BOQ of Civil Works


Page - 58/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
4.1.1_ Formwork for footing A350-7-CW-0620/0621 sqm 172.80

4.1.2_ Formwork for pedestal column A350-7-CW-0620/0621 sqm 156.24

4.1.3_ Formwork for ground floor beam elv +0.300m A350-7-CW-0623/0625 sqm 265.50

4.1.4_ Formwork for Beam elv +1.400m A350-7-CW-0622/0624 sqm 196.50

4.1.5_Formwork for Beam elv +6.000m A350-7-CW-0628/0629 sqm 234.00


4.1.6_ Formwork for slab elv +6.000m A350-7-CW-0630/0631 sqm 321.21

4.1.7_ Formwork for column A350-7-CW-0620/0621 sqm 184.80

4.1.8_ Formwork for lintel A350-7-CW-0606 sqm 3.30

4.1.9_ Formwork for staircase A350-7-CW-0609 sqm 15.82


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed
or deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released
from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16%
and 8% respectively including straightening and cleaning rust, if
5.1
any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds
its standard)

5.1.1_ Rebar for footing A350-7-CW-0620/0621 kg 5,515.08

5.1.2_ Rebar for pedestal column A350-7-CW-0620/0621 kg 4,558.04

Subject: Detail BOQ of Civil Works


Page - 59/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5.1.3_ Rebar for ground floor beam elv +0.300m A350-7-CW-0621-0625 kg 6,199.41

5.1.4_ Rebar for Beam elv +1.400m A350-7-CW-0622/0624 kg 4,379.88

5.1.5_ Rebar for Beam elv +6.000m A350-7-CW-0628/0629 kg 13,372.45

5.1.6_ Rebar for slab elv +0.300m A350-7-CW-0626/0627 kg 4,262.25


5.1.7_ Rebar for slab elv +1.400m A350-7-CW-0626/0627 kg 7,381.40

5.1.8_ Rebar for slab elv +6.000m A350-7-CW-0626/0627 kg 6,632.68

5.1.9_ Rebar for column A350-7-CW-0622 kg 4,019.82

5.1.10_ Rebar for lintel A350-7-CW-0606/0644 kg 42.42

5.1.11_ Rebar for staircase A350-7-CW-0609 kg 172.52


Sub - Total 5
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured
klinker facing bricks having uniform colour carefully laid in
cement sand (F.M.1.2) mortar (1:4) in superstructure with uniform
width and depth and depth joints, filling the interstices with
6.1 mortar, cleaning and soaking bricks at least for 24 hours before use
and washing and screening of sand, necessary scaffolding, curing
at least for 7 days and pointing with cement sand (F.M.1.2) mortar
(1:2) including cost of water, electricity and other charges ect. all
complete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.

6.1.1_ From elv +0.300m to elv +6.000m A350-7-CW-(0606/0614-0617) cum 49.89


Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with
first class bricks in cement sand (F.M. 1.2) mortar (1:6), in
superstructure including raking out joints, filling the interstices
with mortar, cleaning and soaking bricks at least 24 hours before
6.2 use and washing of sand, necessary scaffolding, curing at least 7
days etc. all complete (measurement to given as 250mm width for
one brick length and 375mm for one brick and a half brick length).
(Cement: CEM-I)

6.2.1_For plinth wall A350-7-CW-(0606/0614-0617) cum 11.70


6.2.2_For staircase A350-7-CW-0609 cum 1.37

Subject: Detail BOQ of Civil Works


Page - 60/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M.
1.2) mortar (1:6), and making bond with connected wall including
6.3 necessary scaffolding, raking out joints, cleaning and soaking
bricks at least 24 hours before use and washing of sand curing at
least 7 days in all floor including cost of water, electricity and
other charges etc. (Cement: CEM-I)

6.3.1_For drain A350-7-CW-0605 sqm 118.16


Sub - Total 6
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with
fresh cement to ceiling R.C.C, columns, beams, surface of stair
case, sunshades, cornices, railings, drop wall, louvers, fins and
7.1 finishing the corners and edges including washing of sand cleaning
the surface, scaffolding and curing a least for 7 days, cost of water,
electricity and other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to plinth wall A350-7-CW-0609 sqm 46.80


7.1.2_ Plaster to beam A350-7-CW-0609 sqm 322.88

7.1.3_ Plaster to column A350-7-CW-0622 sqm 104.50

7.1.4_ Plaster to ceiling A350-7-CW-0622 sqm 385.56

7.1.5_Plaster to drain wall A350-7-CW-0605 sqm 192.43


7.2 Surfacing by hardener 5kg/m2
7.2.1_ For ground floor slab A350-7-CW-0606 sqm 216.00

7.2.2_ For staircase A350-7-CW-0606 sqm 5.36

7.3 Non- shrink grout for column A350-7-CW-0628 cum 0.63


Sub - Total 7
8 Tiles & Stone Work
8.1 Ceramic 75x225 mm, dark colour for lintel A350-7-CW-0606/0644 sqm 7.00
Sub - Total 8

Subject: Detail BOQ of Civil Works


Page - 61/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9 Door & Window
Electrical rolling door DO3 (3000x3000 mm)
9.1 Supplying and fixing electric rolling door, include motor, key A350-7-CW-0622/0644 each 5.00
switch, break release and solid shutter.

9.2 Stainless steel collapsible gate DO2 (1800x2200 mm), thk 0.5mm A350-7-CW-0606/0612/0644 sqm 3.96
Stainless steel frame door and glass 5mm thick DO1 (1000x2200
9.3 A350-7-CW-0606/0612/0644 sqm 13.20
mm)
Window 2000x800mm Louver type Galvanized steel (frame steel
9.4 A350-7-CW-0606/0612/0644 sqm 84.80
30x630x2 mm) Galvanized steel leaf 2mm
Sub - Total 9
10 Structural Steel
All steel structure, Beams, Columns, Purlins, fittings & fixtures
shall be hot rolled pre-fabricated and hot deep galvanized (EN
10.1 ISO 14713:1999 C5, Galvanized coating conforms to ASTM
A653/A653 M/EN 1461 for zinc coated steel minimum 600
gm/m2)
A350-7-CW-
10.1.1_Galvanized Steel column kg 33,935.41
0614/0628/0635/0636
10.1.2_Galvanized Steel beams A350-7-CW-(0632-0638) kg 36,607.58
10.1.3_ Galvanized steel purlin for roof and wall C200x65x20x2
A350-7-CW-(0637-0638) kg 3,768.97
mm
10.1.4_ Galvanized steel purlin for roof Z250x65x20x2 mm A350-7-CW-(0633-0638) kg 27,067.30

10.1.5_ Galvanized Steel Plate A350-7-CW-(0632-0643) kg 10,044.96

10.2 Galvaized Buckle D16mm A350-7-CW-0633/0634 pcs 48.00

10.2 Galvaized Buckle D50mm A350-7-CW-0633/0634 pcs 8.00

10.3 Galvaized Steel Wire rope D14mm A350-7-CW-(0632-0638) m 180.00

10.4 Galvaized steel Bracing D12mm with 2 nuts for purlin A350-7-CW-(0632-0638) m 580.80
10.5 Galvaized steel Bracing C chanel 200mm for column A350-7-CW-(0632-0638) m 24.49

10.6 Galvanized Steel stair (include: stair 1, stair 2, stair 3, stair 4)

10.6.1_ Galvanized Steel Beam A350-7-CW-(0632-0638) kg 1,059.92

10.6.2_ Galvanized Steel Plate A350-7-CW-(0632-0638) kg 3,430.82


10.6.3_Galvanized Grating for stairtread (PL50x5mm and
A350-7-CW-(0632-0638) sqm 21.43
PL50x3mm)

Subject: Detail BOQ of Civil Works


Page - 62/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10.6.4_Galvanized Grating for walkways and platforms
A350-7-CW-(0632-0638) sqm 18.69
(F40x3mm)
10.6.5_ Galvanized Steel handrail A350-7-CW-(0632-0638) kg 1,299.30
10.6.6_ Galvanized Bolt M16, L50 mm A350-7-CW-(0632-0638) kg 46.53
10.7 Galvanized Grating platforms
10.7.1_Galvanized Steel platforms (F40x3mm) A350-7-CW-(0632-0638) sqm 395.58
10.7.2_Galvanized Steel handrail A350-7-CW-(0632-0638) kg 1,407.35
10.8 Galvanized Bolts for steel structure
10.8.1_Galvanized anchor bolt M24, L700 mm A350-7-CW-(0632-0638) each 112.00
10.8.2_ Galvanized Bolt M20, L70 mm A350-7-CW-(0632-0638) kg 453.74
10.8.3_ Galvanized Bolt M12, L50 mm A350-7-CW-(0632-0638) kg 854.40
Klip lok roof sheet
ZincAlume Steel (ASTM A792 / A792M Grade 340 class 2, AZM
180, 0.61 mm thick minimum)
10.9 Supplying, fitting, and fixing 0.61 mm thick Lysaght klip lok A350-7-CW-(0610-0613) sqm 1,564.09
fitted and fixed with “J” hook limpet washers and putty etc. all
complete and accepted by the Engineer

10.10 Roof Insulation (fiber glass with galvanized mesh) A350-7-CW-(0610-0613) sqm 1,564.09
10.11 Pre_ painted galvanized Steel wall, 0.61mm thick A350-7-CW-(0610-0613) sqm 369.84

10.12 Pre_ painted galvanized Steel Flashing, 0.61mm thick A350-7-CW-(0610-0613) m 291.30

10.13 Stainless steel gutter thk 1.2mm A350-7-CW-(0610-0613) m 48.00

10.14 Balloon gutter guard A350-7-CW-(0610-0613) each 4.00

10.15 Square galvanized steel tube 100x50x2 and 50x50x2 A350-7-CW-(0610-0613) kg 931.51

10.16 Down spout uPVC D100mm, thk 2.8mm A350-7-CW-(0610-0613) m 58.36


Sub - Total 10

Subject: Detail BOQ of Civil Works


Page - 63/405
Item Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
11 Electrical Work
Ref: A350-7-LA-0601
Electric equipment
11.1
Providing and fixing electric equipment to position

1- Wall mounted tube light


Providing & fixing the 2×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm
each 41.00
& breadth 60mm, superior quality electronic ballast with one year
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC
insulated (stranded) flexible FR wire, earth terminal etc.

2- Sub distribution board, IP54, include the terminal block each 3.00
3- Distribution board, IP54 Enclosures each 1.00
4- High pressure lamp 250W (SODIUM VAPOUR
LAMP(230V,50Hz) (Osram/Philips/GE/Harmonics or equivalent
each 26.00
brand accepted/approved by the Engineer)250 watt high pressure
sodium vapour lamp.)
11.2 Protection (MCB & MCCB)
2- MCB 2px6, 6KA each 7.00
3- MCB 2px10, 6KA each 8.00
4- MCB 2px16,6KA each 1.00
5- MCB 2px20, 6KA each 1.00
6- MCB 3px6, 6KA each 1.00
7- MCB 4px20, 6KA each 8.00
8- MCB 4px32, 6KA each 2.00
9- MCB 4px80, 6KA each 1.00
Electrical wire and cable (include conduit pipes, junction box with
11.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 1,910.00
- core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 1,730.00
- core 1c x 1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 320.00
- core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Multi
m 30.00
- core 5c x 6 mm²
5- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Multi
m 15.00
- core 5c x 10 mm²
Sub - Total 11
TOTAL

Subject: Detail BOQ of Civil Works


Page - 64/405
Item Bagging and Loading House
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Empty Gunny Bag Godown
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350-7-CW-0706 sqm 465.00
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 A350-7-CW-0713, 0710 cum 59.80
and maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-0706 sqm 465.00
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350-7-CW-0713, 0710 cum 27.85
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

1.5 Sand filling to elv +1.00 with compaction k=0.95 A350-7-CW-0713, 0710 cum 465.00

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city
1.6 A350-7-CW-0713, 0710 cum 31.95
or town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page -65/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire of drilling rig set, tripod stand, tremie pipe, cost of fuel,
lubricant, mobilization, demobilization, maintenance, spares, stand-
byes, insurance coverage, water, electricity and other charges all
2.1 compete approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement of cast-
in-situ pile work including sequence of boring and casting, disposal of
spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 450 mm dia
b) Depth up to 38 m A350-7-CW-0712 m 608.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage & binding
ms pipes in position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1 meter
2.2 throughout the period of concreting, maintaining required slump, etc. A350-7-CW-0712 cum 95.93
mixing the aggregates in diginal batching plant, casting in bore holes,
acertaining the strength by trial mix design all complete including all
cost of water, electricity, plant & machinery, bentonite, admixture
testing of materials and concrete etc and other charges as per design,
drawing etc all complete approved and accepted by the Engineer.
Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page -66/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding
450 MPa and whatever is the yield strength within allowable limit as
per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
2.3 fracture and minimum total elongation at maximum force is 16% and A350-7-CW-0712 kg 7,134.19
8% respectively including welding of lapping and spirals as per
design, drawing, straightening and cleaning rust, if any, bending and
binding in position with supply of G.I. wires, splices or laps what so
ever etc. all complete accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia of
bars exceeds its standard)

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.4 straightening and bending of pile bars, preparation and making A350-7-CW-0712 cum 1.78
platform where necessary, carrying, all sorts of handling, stacking the
same properly after cleaning, leveling and dressing the situ and clearing
the bed etc.

i) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT expert,
preparing pile heads and providing all relevant materials, equipment,
2.5 result in standard forms and compiling test report A350-7-CW-0712 each 15.00
withhrecommendations on the test etc. complete in all respect approve
and accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page -67/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word

Conducting static load test as per ASTM D1143 or equivalent standard


for the cast-in-situ/pre-cast pile providing required scaffolding, bracing,
jacks, pressure test gauge, loading unloading, Kentledge and other
plants and equipment including staging, mobilization, demobilization,
hire charge, gunny bags, sand and filling sacs/gunny bags for loading,
record readings and preparation of results in standard forms and other
incidental charges per standard practice and procedures including
2.6 A350-7-CW-0712
submission of load test report, furnishing all graph and chart etc.
complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 150 tonne load for 1 No. test test 1.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
3.1 polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW- 0713 cum 1.30


3.1.2_ For beam at +1.000 A350-7-CW- 0713 cum 3.86

3.1.3_ For slab at +1.000 A350-7-CW- 0715 cum 4.65

3.1.4_ For plinth wall A350-7-CW- 0710 cum 2.17


3.1.5_ For drain and appron A350-7-CW- 0706, 0715 cum 2.10

Subject: Detail BOQ of Civil Works


Page -68/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW- 0713 cum 9.07

3.2.2_ Concrete for pedestal column and column A350-7-CW- 0713 cum 1.12

3.2.3_ Concrete for beam +1.000m A350-7-CW- 0713 cum 11.79

3.2.4_ Concrete for beam elv +4.300m A350-7-CW- 0717 cum 9.20

3.2.5_ Concrete for beam elv +6.050m A350-7-CW- 0717 cum 9.20

3.2.6_ Concrete for slab +1.000m A350-7-CW- 0715 cum 93.00

3.2.7_ Concrete for ramp slope A350-7-CW- 0706, 0715 cum 4.23

3.2.8_ Concrete for lintel A350-7-CW- 0706, 0715 cum 1.47

3.2.9_ Concrete for staircase A350-7-CW- 0706, 0715 cum 0.16


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
4.1.1_ Formwork for footing A350-7-CW- 0713 sqm 40.32

4.1.2_ Formwork for pedestal column and column A350-7-CW- 0713, 0714, 0716 sqm 9.44

Subject: Detail BOQ of Civil Works


Page -69/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.3_ Formwork for beam elv +1.000m A350-7-CW- 0714 sqm 85.52

Subject: Detail BOQ of Civil Works


Page -70/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.4_ Formwork for beam +4.300m A350-7-CW- 0716 sqm 96.60

4.1.5_ Formwork for beam +6.050m A350-7-CW- 0716 sqm 96.60


4.1.6_ Formwork for lintel A350-7-CW- 0703, 0706 sqm 23.45

4.1.7_ Formwork for staircase A350-7-CW- 0703, 0706 sqm 0.47


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance with
BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
5.1 minimum total elongation at maximum force is 16% and 8%
respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit length
of Bars, while, dia of bars exceeds its standard)

5.1.1_ Rebar for footing A350-7-CW- 0713 kg 742.06

5.1.2_ Rebar for for Padestal column and column A350-7-CW- 0713 kg 4,185.67
5.1.3_ Rebar for beam elv +1.000m A350-7-CW- 0713, 0714 kg 3,110.91

5.1.4_ Rebar for beam elv +4.300m A350-7-CW- 0716, 0717 kg 2,269.53

5.1.5_ Rebar for beam elv +6.050m A350-7-CW- 0716, 0717 kg 2,269.53

5.1.6_ Rebar for slab elv +1.000m A350-7-CW- 0715 kg 4,148.76

5.1.7_ Rebar for ramp slope A350-7-CW- 0706, 0715 kg 254.01

5.1.8_ Rebar for lintel A350-7-CW- 0706, 0715 kg 529.64

5.1.9_ Rebar for staircase A350-7-CW- 0706, 0715 kg 271.40


Sub - Total 5

Subject: Detail BOQ of Civil Works


Page -71/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and
6.1 soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

6.1.1_ Exterior wall A350 -7- CW - 0710 cum 74.87


Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
and soaking bricks at least 24 hours before use and washing of sand,
6.2 necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length). (Cement: CEM-I)

6.2.1_ For plinth wall A350 -7- CW - 0710 cum 23.00


6.2.2_ For staircase A350 -7- CW - 0715 cum 1.27
6.2.3_ For ramp slope A350 -7- CW - 0715 cum 3.48
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including necessary
6.3 scaffolding, raking out joints, cleaning and soaking bricks at least 24
hours before use and washing of sand curing at least 7 days in all floor
including cost of water, electricity and other charges etc. (Cement:
CEM-I)

6.3.1_ Drain wall A350 -7- CW - 0715 sqm 5.43


Stone 1x4 layer
6.4 Supplying, laying, compacting etc. as per drawing, specification A350 - 7 - CW - 0706 cum 51.15
instruction
Sub - Total 6

Subject: Detail BOQ of Civil Works


Page -72/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
7.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to plinth wall A350-7-CW- 0708, 0709 sqm 677.98

7.1.2_ Plaster to column A350-7-CW- 0708, 0709 sqm 4.72

7.1.3_ Plaster to beam at +1.000m, +4.300m, +6.050m A350-7-CW- 0714, 0716 sqm 244.40

7.1.4_ Plaster to drain wall A350-7-CW- 0710 sqm 86.80

7.2 Surfacing by hardener 5kg/m2

7.2.1_ For ground floor slab at +1.000 A350-7-CW- 0715 sqm 3.06

7.2.2_ For staircase A350-7-CW- 0715 sqm 465.00

7.2.3_ For ramp slope A350-7-CW- 0715 sqm 18.72


7.3 Non- shrink grout for column A350-7-CW- 0715 cum 0.06
Sub - Total 7
8 Tiles & Stone Work
8.1 Ceramic 75x225 mm, dark colour for lintel A350-7-CW- 0703, 0706 sqm 23.45
Sub - Total 8
9 Door & Window
Electrical rolling door DO1 (3000x3000 mm)
9.1 Supplying and fixing electric rolling door, include motor, key switch, A350-7-CW- 0706, 0708 each 2.00
break release and solid shutter.
Window WD1 (1600x800mm) Louver type Galvanized steel (steel
9.2 frame 30x630x2 mm) Galvanized steel leaf 2mm thick A350-7-CW- 0706, 0708 sqm 23.04
Sub - Total 9

Subject: Detail BOQ of Civil Works


Page -73/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10 Structural Steel
All steel structure, Beams, Columns, Purlins, fittings & fixtures shall
be hot rolled pre-fabricated and hot deep galvanized (EN ISO
10.1 14713:1999 C5, Galvanized coating conforms to ASTM A653/A653
M/EN 1461 for zinc coated steel minimum 600 gm/m2)

10.1.1_ Galvanized steel purlin C200x65x20x2mm A350-7-CW-0717-0720 kg 2,602.57

10.1.2_ Galvanized Steel column A350-7-CW-0717-0720 kg 3,716.37

10.1.3_ Galvanized Steel beam A350-7-CW-0717-0720 kg 4,973.26

10.1.4_ Galvanized Canopy A350-7-CW-0717-0720 kg 346.39

10.1.5_ Galvanized Steel Plate A350-7-CW-0717-0720 kg 716.13

10.2 Galvaized Buckle D16mm A350-7-CW-0717-0720 pcs 20.00

10.3 Galvaized Steel Wire rope D14mm A350-7-CW-0717-0720 m 96.00


10.4 Galvaized steel Bracing D12mm with 2 nuts for purlin A350-7-CW-0717-0720 m 78.00

10.5 Galvaized steel Bracing D20mm for column A350-7-CW-0717-0720 m 60.00

10.6 Galvanized Bolts for steel structure

10.6.1_Galvanized anchor bolt M24, L700 mm A350-7-CW-0717-0720 pcs 64.00

10.6.2_ Galvanized Bolt M16, L70 mm A350-7-CW-0717-0720 kg 8.37

10.6.3_ Galvanized Bolt M12, L50 mm A350-7-CW-0717-0720 kg 18.88

Klip lok roof sheet


ZincAlume Steel (ASTM A792 / A792M Grade 340 class 2, AZM 180,
0.61 mm thick minimum)
10.7 A350-7-CW-0707 sqm 513.70
Supplying, fitting, and fixing 0.61 mm thick Lysaght klip lok fitted
and fixed with “J” hook limpet washers and putty etc. all complete
and accepted by the Engineer

10.8 Roof Insulation (fiber glass with galvanized mesh) A350-7-CW-0707 sqm 513.70

10.9 Pre_painted galvanized Steel wall, 0.61 thick A350-7-CW-0707 sqm 124.00

10.10 Pre_painted galvanized Steel Flashing, 0.61 thick A350-7-CW-0707 m 59.20

10.11 Galvanized handrail D48.1mm, 3.5mm thk for staircase and ramp A350-7-CW-0706 kg 85.78

Subject: Detail BOQ of Civil Works


Page -74/405
Item: Empty Gunny Bag Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10.12 Stainless steel gutter thk 1.2mm A350-7-CW-0706 m 62.00

10.13 Balloon gutter guard A350-7-CW-0708 each 4.00


10.14 Square galvanized steel tube 50x50x2 A350-7-CW-0708 kg 194.68

10.15 Downspout uPVC D100 mm, 2.8mm thk A350-7-CW-0708 m 25.60


Sub - Total 10
11 Electrical Work
Ref: A350-7-LA-0701
Electrical equipment
11.1
Providing and fixing electric equipment to position
1- Distribution board, IP54 Enclosures each 1.00
2- High pressure lamp 250W (SODIUM VAPOUR
LAMP(230V,50Hz) (Osram/Philips/GE/Harmonics or equivalent brand
accepted/approved by the Engineer))250 watt high pressure sodium each 12.00
vapour lamp.)
11.2 Protection (MCB & MCCB)
1- MCB 2px10, 6KA each 1.00

2- MCB 2px16, 6KA each 3.00

3- MCB 4px25, 6KA each 2.00


Electrical wire and cable (include conduit pipes,junction box with
11.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 450.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 100.00
core 1c x 2.5 mm²

Sub - Total 11
TOTAL

Subject: Detail BOQ of Civil Works


Page -75/405
Item: Empty Gunny Bag Godown
DETAIL BOQ of Civil Works

Project: Modern Food Storage Facilities_ MFSP


Location: Chattogram
Item: Control Room
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
layout with chalk powder, providing necessary tools and plants,
1 protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.

Layout and marking for earth work in excavation in foundation


1.1 accepted by the Engineer. A350-7-CW-0801 sqm 106.40

Earth work in excavation in foundation trenches up to 1.5 m depth


1.2 and maximum 10 m lead: in soft clayey soil/loose sand/silt A350-7-CW-0801, 0808 cum 61.47

Mobilization and cleaning site before commencing actual physical


1.3 work and during contract period and demobilization after Completion A350-7-CW-0801 sqm 106.40
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350-7-CW-0801, 0808 cum 26.57
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city
1.5 A350-7-CW-0801, 0808 cum 34.90
or town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 75/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
2.1
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

2.1.1_ For footing A350-7-CW-0808 cum 2.37


2.1.2_ For trench A350-7-CW-0806 cum 5.43
2.1.3_ For ground floor beam A350-7-CW-0809, 0810 cum 2.00
2.1.4_ For ground floor slab A350-7-CW-0801 cum 5.87
2.1.5_ For drain and appron A350-7-CW-0804 cum 3.53
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
2.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

2.2.1_ Concrete for footing A350-7-CW-0808 cum 4.40


2.2.2_ Concrete for pedestal column A350-7-CW-0808, 0808 cum 2.70
2.2.3_ Concrete for ground floor beam A350-7-CW-0809, 0810 cum 3.83
2.2.4_ Concrete for beam at elv +4.700 A350-7-CW-0809-0811 cum 5.49
2.2.5_ Concrete for roof beam A350-7-CW-0813,0814 cum 3.94
2.2.6_ Concrete for trench A350-7-CW-0806 cum 8.85
2.2.7_ Concrete for ground floor slab A350-7-CW-0801 cum 8.81
2.2.8_ Concrete for roof slope slab A350-7-CW-0815 cum 8.00
2.2.9_ Concrete for gutter slab A350-7-CW-0803 cum 2.23
2.2.10_ Concrete for column A350-7-CW-0808, 0808 cum 6.34

Subject: Detail BOQ of Civil Works


Page - 76/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2.2.11_ Concrete for lintel A350-7-CW-0808 cum 0.80
2.2.12.12_Concrete for sunshade A350-7-CW-0808 cum 0.32
Sub - Total 2
3 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
3.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
3.1.1_ Formwork for footing A350-7-CW-0808 sqm 10.24
3.1.2_ Formwork for pedestal column A350-7-CW-0808, 0808 sqm 21.60
3.1.3_ Formwork for ground floor beam A350-7-CW-0809, 0810 sqm 42.14
3.1.4_ Formwork for beam at elv +4.700 A350-7-CW-0809-0811 sqm 57.65
3.1.5_ Formwork for roof beam A350-7-CW-0813,0814 sqm 41.32
3.1.6_ Formwork for trench A350-7-CW-0806 sqm 81.60
3.1.7_ Formwork for roof slab A350-7-CW-0815 sqm 107.18
3.1.8_ Formwork for gutter slab A350-7-CW-0803 sqm 26.57
3.1.9_ Formwork for column A350-7-CW-0808, 0808 sqm 63.36
3.1.10_ Formwork for lintel A350-7-CW-0808 sqm 14.31
3.1.11_ Formwork for sunshade A350-7-CW-0808 sqm 7.42
Sub - Total 3
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance with
BDS ISO 6935-2: 2006 (or standard subsequently released from BSTI)
, the ratio of ultimate tensile strength fu to yield strength fy, shall be at
least 1.25 and minimum elongation after fracture and minimum total
elongation at maximum force is 16% and 8% respectively including
4.1 straightening and cleaning rust, if any, bending and binding in position
with supply of G.I. wires, splices or laps what so ever etc. complete in
all respects and accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia of
bars exceeds its standard)

Subject: Detail BOQ of Civil Works


Page - 77/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.1_ Reinforcement for footing A350-7-CW-0808 kg 347.55

Subject: Detail BOQ of Civil Works


Page - 78/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.2_ Reinforcement for pedestal column and column A350-7-CW-0808, 0808 kg 3,065.62

4.1.3_ Reinforcement for ground floor beam A350-7-CW-0809, 0810 kg 1,575.46

4.1.4_ Reinforcement for beam at elv +4.70 A350-7-CW-0809-0811 kg 1,703.27


4.1.5_ Reinforcement for roof beam A350-7-CW-0813,0814 kg 852.89

4.1.6_ Reinforcement for trench A350-7-CW-0806 kg 774.19

4.1.7_ Reinforcement for ground floor slab A350-7-CW-0801 kg 789.46

4.1.8_ Reinforcement for roof slab A350-7-CW-0815 kg 2,374.90

4.1.9_ Reinforcement for gutter slab A350-7-CW-0803 kg 543.69

4.1.10_ Reinforcement for lintel A350-7-CW-0808 kg 192.97

4.1.11_ Reinforcement for Sunshade A350-7-CW-0808 kg 72.08


Sub - Total 4
5 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and
5.1 soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

5.1.1_ Ground floor A350-7-CW-0802-0804 cum 34.94

Subject: Detail BOQ of Civil Works


Page - 79/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Exposed brick work for interior wall
Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made first class bricks in cement sand
(F.M.1.2) mortar (1:4) and making bond with connected walls
including necessary scaffolding, raking out joints, cleaning and
5.2 soaking the bricks for at least 24 hours before use and washing of sand
curing at least for 7 days in all floors including cost of water,
electricity and other charges ect. all complete and acceplete and
accepted by the Engineer. (Cement: CEM-I)

Subject: Detail BOQ of Civil Works


Page - 80/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5.2.1_ Ground floor A350-7-CW-0802-0804 sqm 14.82

Normal brick work 250mm to 375mm thick


Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
5.3
and soaking bricks at least 24 hours before use and washing of sand,
necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length). (Cement: CEM-I)

5.3.1_ Entry steps A350-7-CW-0802-0804 cum 0.38


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
5.4 necessary scaffolding, raking out joints, cleaning and soaking bricks at
least 24 hours before use and washing of sand curing at least 7 days in
all floor including cost of water, electricity and other charges etc.
(Cement: CEM-I)

5.4.1_ External wall of gutter A350-7-CW-0802-0804 sqm 17.24


5.4.2_ Drain wall A350-7-CW-0802-0804 sqm 65.80
Sub - Total 5
6 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
6.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

6.1.1_ Plaster to gutter wall A350-7-CW-0802-0804 sqm 55.87

6.1.2_ Plaster to beam A350-7-CW-0809-0811 sqm 14.64

6.1.3_ Plaster to below surface of roof slab A350-7-CW-0811 sqm 97.28

6.1.4_ Plaster to column A350-7-CW-0808, 0808 sqm 64.26

6.1.5_ Plaster to drain A350-7-CW-0802-0804 sqm 103.40

Subject: Detail BOQ of Civil Works


Page - 81/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6.1.6_ Plaster to entry steps A350-7-CW-0803 sqm 1.55

6.2 Waterproofing
6.2.1_ Three layers waterproofing by sika grout for gutter slab A350-7-CW-0803 sqm 18.54
Sub - Total 6
7 Tiles & Stone Work
Ceramic tile 600x600 light colour for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
7.1 (1:4) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care

7.1.1_ Ground floor A350-7-CW-0802-0804 sqm 47.25


Granite stone 20mm thick
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
7.2 sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
respective joint filler & binder including cutting, laying and finishing
with care etc

7.2.1_ For entry steps A350-7-CW-0802-0804 sqm 3.60

7.3 Ceramic 75x225, dark colour for outer surface of ground floor beam A350-7-CW-0802-0804 sqm 24.84

Roof tile
7.4 Supplying, fitting and fixing country made (Mirpur A350-7-CW-0802-0804 sqm 97.28
Ceramic/equivalent) roof tile, with adhesive motar
Sub - Total 7
8 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
8.1 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 250x62mm) & shutter as per design, drawing, accepted by
the Engineer

8.1.1_ Double leaf door DO-01 (2100x1600x38mm) including


A350-7-CW-0805 cum 0.22
varnishing and frence polishing
5mm thick glass with Thai Aluminium frame sliding window as
8.2
design, drawing, accepted by the Engineer
8.2.1_ Double shutter window WD-01 (1200x1400mm) including grill
with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-0805 sqm 3.36
complete & accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 82/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5mm glass Thai Aluminium frame curtain window as design, drawing,
8.3
accepted by the Engineer
8.3.1_ Single shutter curtain window CW-02 (2500x2400mm) A350-7-CW-0805 sqm 12.00

8.3.2_ Single shutter curtain window CW-01 (610x1500mm) A350-7-CW-0805 sqm 3.66
Sub - Total 8
9 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium ceiling of 9 mm thick board
laminated by mechanical hot press with a milk white PVC membrane
9.1 with Aluminum T- bar frame in natural anodized finish at 600*600
mm in grid suspended from ceiling by 12 SWG double ply wire fixed
to the ceiling by rowel plug, screws, hooks, nails etc.

9.1.1_ Aluminium ceiling for ground floor A350-7-CW-0811 sqm 102.06


Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
9.2 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

9.2.1_ Painting to gutter wall A350-7-CW-0802-0804 sqm 55.87

9.2.2_ Painting to beam A350-7-CW-0809-0811 sqm 14.64

9.2.3_ Painting to column A350-7-CW-0808, 0808 sqm 64.26

9.2.4_ Painting to entry steps A350-7-CW-0802-0804 sqm 1.55


Sub - Total 9
Structural Steel
10
All steel structure, Beams, Columns, Purlins, fittings & fixtures shall
be hot rolled pre-fabricated and hot deep galvanized (EN ISO
14713:1999 C5, Galvanized coating conforms to ASTM A653/A653
M/EN 1461 for zinc coated steel minimum 600 gm/m2)
A350-7-CW-(0801-
10.1 Galvanized grating F40x3 mm for trench cover sqm 47.70
0806,0808-0813)

Subject: Detail BOQ of Civil Works


Page - 83/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Sub - Total 10

Subject: Detail BOQ of Civil Works


Page - 84/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
11 Electrical Work
Ref: A350-7-LA-1-0803, A350-7-LA-5-1
Electrical equipment
11.1
Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215 mm.dia
each 9.00
Steel Sheet Carrier, with Powder coated Paint/Oxidized /Chromium
finished, suitable glass covers of min. height 92mm
2- Exhaust fan 12"
Providing and fixing of following axial flow A.C capacitor type wall
each 4.00
mounted exhaust fan complete with blade, steel frame standard wall
louver shutter, PVC insulated connecting wire etc.
3- Distribution board, IP54 Enclosures each 1.00

4- Socket (3-pin6A ) each 8.00


5- Socket (3-pin15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps.
Combined switch socket outlet (concealed type) manufactured and
tested in accordance with relevant IEC standards and manufactured and
tested in accordance with relevant IEC standards and approved by
BSTI mounted on required size 18 SWG galvanized plain sheet board each 6.00
of 76.2mm. (3”) depth all electrical contacts shall be of brass/copper
(Dynamic/MEP/ SK/Metro/Super Star or equivalent, local made).)

6- LED tube light set (3 x 10W)


Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.37) consisting of power
coated 22 SWG sheet steel frame of min. length 600mm & breath
600mm, symmetrical mirror reflector of anodized aluminum, superior each 12.00
quality electronic ballast with one year guarantee, holder, necessary
wiring with 2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire,
earth terminal etc.

Subject: Detail BOQ of Civil Works


Page - 85/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7- LED tube light set (3 x 20W)
Providing & fixing the 3 x 2’× 20 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.19) consisting of power
coated enameled22 SWG sheet steel frame of min. length 1213mm &
breath 600mm, louver of steel sheet/aluminum, superior quality each 4.00
electronic ballast with one year guarantee, holder, necessary wiring
with 2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire, earth
terminal etc.

8- One way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 1.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

1- Wall mounted LED tube light


Providing & fixing the 1×4’×40-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
breadth 60mm, superior quality electronic ballast with one year each 1.00
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC insulated
(stranded) flexible FR wire, earth terminal etc.

10 - Four way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 2.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

11- Room air cooler- split type (24000 btu/hr)


Supply, Installation, Testing & commissioning of split type Air-cooler
comprising condensing and evaporating units having following cooling
capacity based on indoor temperature 27°-30° C DB / 19.5°-22°C WB
and outdoor temperature 35°-40° DB at high fan speed condition each 4.00
suitable for installation & operation in tropicalized country like
Bangladesh & as per detailed specifications & standard as mentioned
below: Wall mounted

11.2 Protection (MCB & MCCB)


Ref: A350-7-LA-1-0803, A350-7-LA-5-1

Subject: Detail BOQ of Civil Works


Page - 86/405
Item: Control Room
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
1- MCB 2px10, 6KA each 2.00

3- MCB 2px25, 6KA each 1.00

4- MCB 2px16,6KA each 5.00


5- MCB 4px30,6KA each 1.00
Electrical wire and cable (include conduit pipes,junction box with
11.3
terminal block and concealed)
Ref: A350-7-LA-1-0802, A350-7-LA-5-1
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 348.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 185.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 100.00
core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 200.00
core 3c x 4 mm²
Sub - Total 11
TOTAL

Subject: Detail BOQ of Civil Works


Page - 87/405
Item: Control Room
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chittagong
Item: Cleaning tower
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the
layout etc.
Layout and marking for earth work in excavation in foundation
1.1 A350-7-CW-0906/0931 sqm 175.68
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 A350-7-CW-0906/0931 cum 2,702.31
and maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-0906/0931 sqm 347.20
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350-7-CW-0906/0931 cum 1,033.97
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of the
1.5 A350-7-CW-0906/0931 cum 1,668.35
city or town area including loading, unloading at both ends, leveling
and dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 75/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6 m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire charge of drilling rig set, tripod stand, tremie pipe,
cost of fuel, lubricant, mobilization, demobilization, maintenance,
spares, stand-byes, insurance coverage, water, electricity and other
2.1 charges all compete approved and accepted by the Engineer. Before
commencing boring operation, Contractor shall submit method of
statement of cast-in-situ pile work including sequence of boring and
casting, disposal of spoils, test result of materials to the Engineer for
approval. However, Engineer' approval shall not relieve the
Contractor of his responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 38 m A350-7-CW-0931 m 3,230.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM
-1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand [Sylhet
sand or coarse sand of equivalent F.M.2.2], 20 mm down well graded
crushed stone chips conforming to ASTM C-33, including breaking
crushed stone chips, screening through proper sieves, making, placing
re-bar cage & binding ms pipes in position, placing and removing tri-
pod as per requirement, pouring the concrete in bore-hole with the
help of a tremie pipe, maintaining the tremie pipe immersed in
concrete by at least 1 meter throughout the period of concreting,
2.2 A350-7-CW-0931 cum 912.80
maintaining required slump, etc. mixing the aggregates in diginal
batching plant, casting in bore holes, acertaining the strength by trial
mix design all complete including all cost of water, electricity, plant
& machinery, bentonite, admixture testing of materials and concrete
etc and other charges as per design, drawing etc all complete
approved and accepted by the Engineer. Concrete should prepared by
Digital batching plant, strength may be acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 76/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy
not exceeding 450 MPa and whatever is the yield strength within
allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile
strength fu to yield strength fy, shall be at least 1.25 and minimum
elongation after fracture and minimum total elongation at maximum
2.3 force is 16% and 8% respectively including welding of lapping and A350-7-CW-0931 kg 100,243.80
spirals as per design, drawing, straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires, splices or
laps what so ever etc. all complete accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm) Lira, National polymer as approved upto total length
in each pile for ultrasonic pulse velocity meter test. The Pvc pipes
should have threaded cap at top and bottom, and jointed by socket &
glue to connect each others. 14 SWG steel wires shall be used for
2.4 binding with rebar cage having minimum one binding with rebar A350-7-CW-0931 m 7,980.00
cages in each 3m interval or apply other approved devices for
fastenening firmly with rebar cage, cleaning pipes upto full length
immediately after concreting, protecting the pipes from any damage
etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making A350-7-CW-0931 cum 17.80
platform where necessary, carrying, all sorts of handling, stacking the
same properly after cleaning, leveling and dressing the situ and
clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 77/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved expert,
2.6 preparing, cleaning the holes and providing all relevant materials, A350-7-CW-0931 each 45.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT
expert, preparing pile heads and providing all relevant materials,
equipment, result in standard forms and compiling test report with A350-7-CW-0932 each 37.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and
filling sacs/gunny bags for loading, record readings and preparation
of results in standard forms and other incidental charges per standard
2.8
practice and procedures including submission of load test report,
furnishing all graph and chart etc. complete in all respects approved
and accepted by the Engineer (Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 250 tonne load for 1 No. test test 3.00


Sub - Total 2

Subject: Detail BOQ of Civil Works


Page - 78/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
3.1 polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-0931 cum 35.48

3.1.2_ For slab A350-7-CW-0931 cum 1.76

3.1.3_ For drain A350-7-CW-0908 cum 5.07


Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1,
52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand
or coarse sand of equivalent F.M 2.2 and 20 mm down well graded
crushed stone chips conforming to ASTM C-33; preparing the
3.2 concrete mix in the Digital Batching plant, ascertaing the strength by
trail mix design, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after
specified time approved; including all cost of water, electricity,
admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-0929, 0931, 0938 cum 416.64

3.2.2_ Concrete for pit A350-7-CW-0929, 0931, 0938 cum 172.46

3.2.3_ Concrete for pedestal column A350-7-CW-0932, 0933, 0938 cum 92.26

3.2.4_ Concrete for beam at elv +0.300 A350-7-CW-0934, 0938 cum 18.20

3.2.5_ Concrete for beam at elv +5.000 A350-7-CW-0934, 0938 cum 18.20

3.2.6_ Concrete for slab at elv +0.300 A350-7-CW-0934, 0941 cum 54.22

3.2.7_ Concrete for slab at elv +5.000 A350-7-CW-0934, 0941 cum 49.40

3.2.8_ Concrete for column A350-7-CW-0933, 0934 cum 66.75

Subject: Detail BOQ of Civil Works


Page - 79/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Sub - Total 3

Subject: Detail BOQ of Civil Works


Page - 80/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.

4.1.1_ Formwork for footing A350-7-CW-0929, 0931, 0938 sqm 90.48

4.1.2_ Formwork for pit A350-7-CW-0929, 0931, 0938 sqm 507.72

4.1.3_ Formwork for pedestal column A350-7-CW-0932, 0933, 0938 sqm 386.28

4.1.4_ Formwork for beam at elv +0.300 A350-7-CW-0934, 0938 sqm 113.26

4.1.5_ Formwork for beam at elv +5.000 A350-7-CW-0934, 0938 sqm 113.26

4.1.6_ Formwork for slab at elv +5.000 A350-7-CW-0934, 0941 sqm 197.60

4.1.7_ Formwork for column A350-7-CW-0933, 0934 sqm 273.60


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

5.1.1_ Rebar for footing A350-7-CW-0931, 0932 kg 20,070.95

5.1.2_ Rebar for pit A350-7-CW-0929, 0931, 0932 kg 14,258.05

5.1.3_ Rebar for pedestal column A350-7-CW-0931, 0933 kg 17,676.79

5.1.4_ Rebar for beam at elv +0.300 A350-7-CW-0934, 0938 kg 32,991.80

Subject: Detail BOQ of Civil Works


Page - 81/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
5.1.5_ Rebar for beam at elv +5.000 A350-7-CW-0934, 0938 kg 14,039.12

5.1.6_ Rebar for slab at elv +0.300 A350-7-CW-0934, 0939 kg 3,817.64

5.1.7_ Rebar for slab at elv +5.000 A350-7-CW-0934, 0940 kg 4,579.76

5.1.8_ Rebar for column A350-7-CW-0931, 0933 kg 11,257.21


Sub - Total 5
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and
depth and depth joints, filling the interstices with mortar, cleaning
6.1 and soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days
and pointing with cement sand (F.M.1.2) mortar (1:2) including cost
of water, electricity and other charges ect. all complete and accepted
by the Engineer. (Cement: CEM-I) in ground floor.

6.1.1_ Exterior wall A350-7-CW-0909, 0913 cum 36.52


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
6.2 necessary scaffolding, raking out joints, cleaning and soaking bricks
at least 24 hours before use and washing of sand curing at least 7 days
in all floor including cost of water, electricity and other charges etc.
(Cement: CEM-I)

6.2.1_ Drain wall A350-7-CW-0908 sqm 94.72


Sub - Total 6
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
sunshades, cornices, railings, drop wall, louvers, fins and finishing
7.1 the corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to column A350-7-CW-0933-0941 sqm 273.60

Subject: Detail BOQ of Civil Works


Page - 82/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
7.1.2_ Plaster to beams A350-7-CW-0933-0941 sqm 226.52

7.1.3_ Plaster to drain wall A350-7-CW-0908 sqm 154.26

7.2 Non- shrink grout for column A350-7-CW-0934, 0941 cum 0.33
Sub - Total 7
8 Door & Window
Electrical rolling door DO3 (3000x3000 mm)
8.1 Supplying and fixing electric rolling door, include motor, key switch, A350-7-CW-0906, 0912, 0918, each 2.00
break release and solid shutter. 0920

8.2 Stainless steel frame door, 1.5mm thick and glass 5mm thick

8.2.1_Stainless steel frame door DO1 single leaf (1000x2200 mm) A350-7-CW-0912, 0921, sqm 24.20

8.2.2_Stainless steel frame door DO2 double leaf (1800x2200 mm) A350-7-CW-0912, 0921 sqm 3.96
Window WD1 (1500x800mm) Louver type Galvanized steel (steel
8.3 A350-7-CW- 0918, 0921 sqm 158.40
frame 30x630x2 mm) Galvanized steel leaf 2mm thick
Sub - Total 8
9 Structural Steel
All steel structure, Beams, Columns, Angles, C- Channels, fittings &
fixtures shall be hot rolled pre-fabricated and hot deep galvanized
9.1 (EN ISO 14713:1999 C5, Galvanized coating conforms to ASTM
A653/A653 M/EN 1461 for zinc coated steel minimum 600 gm/m2)

9.1.1_ Galvanized Steel column A350-7-CW-0922-0934 kg 98,671.00


9.1.2_ Galvanized Steel beams A350-7-CW-0922-0934 kg 83,582.48

9.1.3_ Galvanized Steel bracing A350-7-CW-0922-0937 kg 12,404.89

9.1.4_ Galvanized Steel Plate A350-7-CW-0922-0948 kg 29,628.52

9.2 Galvaized steel Bracing D12mm with 2 nuts for purlin A350-7-CW-0922-0925 m 574.20

9.3 Galvaized steel Bracing C channel 200mm for column A350-7-CW-0922-0925 kg 12,265.44

9.4 Galvanized Steel stair


9.4.1_ Galvanized Steel beams A350-7-CW-0922-0930 kg 11,637.28
9.4.2_ Galvanized Steel Plate A350-7-CW-0922-0930 kg 276.01

9.4.3_ Galvanized grating for stairtread (PL50x5mm and PL50x3mm) A350-7-CW-0922-0930 sqm 58.66

Subject: Detail BOQ of Civil Works


Page - 83/405
Item: Cleaning tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
9.4.4_ Galvanized Grating for walkways and platforms (F40x3mm) A350-7-CW-0922-0930 sqm 95.76

9.4.5_ Galvanized Steel handrail A350-7-CW-0922-0930 kg 3,251.48

9.4.6_ Galvanized Bolt M16, L50 A350-7-CW-0922-0925 kg 165.00

9.5 Galvanized Steel platforms

9.5.1_ Galvanized grating platforms (F40x3mm) A350-7-CW-0934-0937 sqm 718.42

9.5.2_ Galvanized Steel handrail A350-7-CW-0922-0938 kg 1,471.93

9.6 Galvanized Bolts for steel structure

9.6.1_ Galvanized anchor Bolt M24, L700 mm A350-7-CW-0922-0938 each 100.00

9.6.2_ Galvanized anchor Bolt M24, L50 mm A350-7-CW-0922-0938 each 16.00

9.6.3_ Galvanized Bolt M20, L50, L60, L70 mm A350-7-CW-0922-0938 kg 1,443.95

9.6.4_ Galvanized Bolt M16, L50 mm A350-7-CW-0922-0938 kg 280.42

9.6.5_ Galvanized Bolt M14, L50 mm A350-7-CW-0922-0938 kg 346.70


Klip lok roof sheet
ZincAlume Steel (ASTM A792 / A792M Grade 340 class 2, AZM
180, 0.61 mm thick minimum)
9.7 Supplying, fitting, and fixing 0.61 mm thick Lysaght klip lok fitted A350-7-CW-0922-0925 sqm 216.37
and fixed with “J” hook limpet washers and putty etc. all complete
and accepted by the Engineer

9.8 Roof Insulation (fiber glass with galvanized mesh) A350-7-CW-0922-0925 sqm 216.37

9.9 Pre_ painted galvanized Steel wall, 0.61 thick A350-7-CW-0911-0925 sqm 2,258.25

9.10 Pre_ painted galvanized Steel Flashing, 0.61 thick A350-7-CW-0911-0925 m 268.81
Sub - Total 9
TOTAL

Subject: Detail BOQ of Civil Works


Page - 84/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 85/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 86/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 87/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 88/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 89/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 90/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 91/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 92/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 93/405
Item: Cleaning tower
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 94/405
Item: Cleaning tower
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Steel Supporting Structure for Conveyors on Top of Silo
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation
trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo
spikes and marking layout with chalk powder, providing
1 necessary tools and plants, protecting and maintaining the
trench dry etc., stacking, clearing the excavated earth at a safe
distance out of the area enclosed by the layout etc.

Earth work in excavation in foundation trenches up to 1.5 m


1.1 depth and maximum 10 m lead: in soft clayey soil/loose A350-7-CW-10.116-10.118 cum 99.09
sand/silt

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building
site minimum dry density of 95% with optimum moisture
content (Modified proctor test) including carrying, watering,
1.2 levelling, dressing and compacting to a specified percentage A350-7-CW-10.116-10.118 cum 42.95
each layer upto finished level etc. all complete and accepted by
the Engineer.

Clearing and disposing of excavated earth from the


construction site by truck or any other means to a place within
30 km radius of the city or town area including loading,
1.3 A350-7-CW-10.116-10.118 cum 56.13
unloading at both ends, leveling and dressing the carried earth
etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 94/405
Item: Steel Supporting Structure for Conveyor on Top of Silo
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6 m long temporary steel casing, true
to vertical, providing bentonite slurry and maintaining water
level in the hole, washing the hole for at least 30 minutes, clean
the bore-hole and make the bore-hole ready for placing steel
cage and concreting including hire of drilling rig set, tripod
stand, tremie pipe, cost of fuel, lubricant, mobilization,
demobilization, maintenance, spares, stand-byes, insurance
coverage, water, electricity and other charges all compete
2.1 approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement
of cast-in-situ pile work including sequence of boring and
casting, disposal of spoils, test result of materials to the
Engineer for approval. However, Engineer' approval shall not
relieve the Contractor of his responsibilities and obligations
under contract.

a) 500 mm dia
b) Depth up to 38 m A350-7-CW-10.116-10.118 m 1,368.00

Subject: Detail BOQ of Civil Works


Page - 95/405
Item: Steel Supporting Structure for Conveyor on Top of Silo
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word

Cast in situ pile with RCC works of required slump by adding


water reducing admixture with 25 Mpa relates to mix ratio
(1:1.5:3) on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1-
CEM -1,52.5 N / ASTM-C 150 Type – I, best quality coarse
sand [Sylhet sand or coarse sand of equivalent F.M.2.2], 20 mm
down well graded crushed stone chips conforming to ASTM C-
33, including breaking crushed stone chips, screening through
proper sieves, making, placing re-bar cage & binding ms pipes
in position, placing and removing tri-pod as per requirement,
2.2 pouring the concrete in bore-hole with the help of a tremie pipe, A350-7-CW-10.116-10.118 cum 268.47
maintaining the tremie pipe immersed in concrete by at least 1
meter throughout the period of concreting, maintaining required
slump, etc. mixing the aggregates in diginal batching plant,
casting in bore holes, acertaining the strength by trial mix
design all complete including all cost of water, electricity, plant
& machinery, bentonite, admixture testing of materials and
concrete etc and other charges as per design, drawing etc all
complete approved and accepted by the Engineer. Concrete
should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade
400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to
Bangladesh standard, with minimum yield strength, fy (ReH)=
400 MPa but fy not exceeding 450 MPa and whatever is the
yield strength within allowable limit as per BNBC/ ACI 318,
the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture
and minimum total elongation at maximum force is 16% and
2.3 A350-7-CW-10.116-10.118 kg 39,942.17
8% respectively including welding of lapping and spirals as
per design, drawing, straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. all complete accepted by the
Engineer (Measurement shall be recorded only on Standard
Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

Subject: Detail BOQ of Civil Works


Page - 96/405
Item: Steel Supporting Structure for Conveyor on Top of Silo
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Pile head concrete breaking & removing
Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe
distance including scraps and cleaning concrete from steel/M.S.
rods, straightening and bending of pile bars, preparation and
2.4 making platform where necessary, carrying, all sorts of A350-7-CW-10.116-10.118 cum 6.36
handling, stacking the same properly after cleaning, leveling
and dressing the situ and clearing the bed etc.

i) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM
D5882- The standard method of testing by a qulifified and
approved PIT expert, preparing pile heads and providing all
2.5 relevant materials, equipment, result in standard forms and A350-7-CW-10.116-10.118 each 34.00
compiling test report withhrecommendations on the test etc.
complete in all respect approve and accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading
unloading, Kentledge and other plants and equipment including
staging, mobilization, demobilization, hire charge, gunny bags,
sand and filling sacs/gunny bags for loading, record readings
and preparation of results in standard forms and other incidental
charges per standard practice and procedures including
2.7 submission of load test report, furnishing all graph and chart
etc. complete in all respects approved and accepted by the
Engineer (Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor
of his responsibilities and obligations under Contract.

a) For170 tonne load for 1 No. test test 2.00


Sub - Total 2

Subject: Detail BOQ of Civil Works


Page - 97/405
Item: Steel Supporting Structure for Conveyor on Top of Silo
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of
3.1 single layer polythene sheet weighing 6.5 kg/Sqm with
allowances for lapping complete in all respect and accepted by
the Engineer.

3.1.1_ For footing A350-7-CW-10.116-10.118 cum 8.75


Reinforced cement concrete works with minimum cement
concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25
Mpa at 28 days on standard cylinders as per standard practice of
code ACI/BNBC/ASTM & Cement conforming to BDS EN-
197-1 CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best
quality Sylhet sand or coarse sand of equivalent F.M 2.2 and 20
mm down well graded stone chips conforming to ASTM C-33;
3.2 mixing with standard mixer machine with hopper, fed by
standard measuring boxes, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing
centering-shuttering after specified time approved; including
cost of water, electricity, additional testing charges of materials
and cylinders required by engineer, other charges etc.

3.2.1_ Concrete for footing A350-7-CW-10.116-10.118 cum 71.07


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
4.1.1_ Formwork for footing A350-7-CW-10.116-10.118 sqm 74.95
Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 98/405
Item: Steel Supporting Structure for Conveyor on Top of Silo
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design:
Ribbed or deformed bar reinforcement Grade 400 (RB 400 /
400W) for Reinforced Cement Concrete, produced and marked
in accordance with BDS ISO 6935-2: 2006 (or standard
subsequently released from BSTI) , the ratio of ultimate tensile
strength fu to yield strength fy, shall be at least 1.25 and
minimum elongation after fracture and minimum total
elongation at maximum force is 16% and 8% respectively
5.1 including straightening and cleaning rust, if any, bending and
binding in position with supply of G.I. wires, splices or laps
what so ever etc. complete in all respects and accepted by the
Engineer (Measurement shall be recorded only on Standard
Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

5.1.1_ Rebar for footing A350-7-CW-10.116-10.118 kg 6,244.41


Sub - Total 5
6 Structural Steel
All steel structure, Beams, Columns, Angles, C- Channels,
fittings & fixtures shall be hot rolled pre-fabricated and hot
6.1 deep galvanized (EN ISO 14713:1999 C5, Galvanized coating
conforms to ASTM A653/A653 M/EN 1461 for zinc coated
steel minimum 600 gm/m2)

6.1.1_ Galvanized Steel Frame A350-7-CW-10.114- 10.126 kg 283,026.27


6.1.2_ Galvanized Steel Plate A350-7-CW-10.119- 10.126 kg 36,785.90

6.2 Galvanized grating for platform


6.2.1_Galvanized grating F40x3mm for platform at elv
A350-7-CW-10.123- 10.125 sqm 364.39
+28.700, +30.200
6.2.2_Galvanized haindrail D48.1mm, 3.5mm thk for platforms A350-7-CW-10.113- 10.128 kg 11,224.73

6.3 Galvanized Steel ladder

6.3.1_ Galvanized Steel structure A350-7-CW-10.120, 10.121, 10.128 kg 1,712.80

6.3.2_Galvanized Handrail for ladder A350-7-CW-10.120, 10.121, 10.128 kg 1,582.35

6.3.3_Galvanized Rung A350-7-CW-10.120, 10.121, 10.128 kg 333.50

6.3.4_Galvanized grating F40x3mm for rest platforms A350-7-CW-10.120, 10.121, 10.128 sqm 30.00

Subject: Detail BOQ of Civil Works


Page - 99/405
Item: Steel Supporting Structure for Conveyor on Top of Silo
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6.3.5_ Horizontal Galvanized wide hoops, PL 75x6mm thk for
A350-7-CW-10.120, 10.121, 10.128 kg 508.68
protection

6.3.6_ Vertical galvanized steel PL 40x5mm thk for protection A350-7-CW-10.120, 10.121, 10.128 kg 743.36

6.4 Galvanized Bolt for steel structure

6.4.1_ Galvanized Anchor Bolt M24, L700mm A350-7-CW-10.122 pcs 352.00

6.4.2_ Galvanized Bolt M20, L70mm A350-7-CW-10.122 kg 2,116.69

6.4.3_ Galvanized Bolt M12, L50mm A350-7-CW-10.124, 10.126 kg 403.15

6.5 Non- shrink grout for column A350-7-CW-10.122 cum 0.39

Sub - Total 6
TOTAL

Subject: Detail BOQ of Civil Works


Page - 100/405
Item: Steel Supporting Structure for Conveyor on Top of Silo
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Steel supporting structure for conveyors from Bucket elevator tower to truck & Wagon BLH
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation
trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes
and marking layout with chalk powder, providing necessary tools
1 and plants, protecting and maintaining the trench dry etc., stacking,
clearing the excavated earth at a safe distance out of the area
enclosed by the layout etc.

Earth work in excavation in foundation trenches up to 1.5 m


1.1 depth and maximum 10 m lead: in soft clayey soil/loose sand/silt A350-7-CW-10.206 cum 23.04

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.2 A350-7-CW-10.206 cum 5.23
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of
1.3 the city or town area including loading, unloading at both ends, A350-7-CW-10.206 cum 17.81
leveling and dressing the carried earth etc. complete accepted by
the Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 101/405
Item: Steel supporting structure for conveyors from Bucket elevator tower to truck Wagon BLH
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6 m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in
the hole, washing the hole for at least 30 minutes, clean the bore-
hole and make the bore-hole ready for placing steel cage and
concreting including hire charge of drilling rig set, tripod stand,
tremie pipe, cost of fuel, lubricant, mobilization, demobilization,
maintenance, spares, stand-byes, insurance coverage, water,
electricity and other charges all compete approved and accepted by
2.1 the Engineer. Before commencing boring operation, Contractor
shall submit method of statement of cast-in-situ pile work including
sequence of boring and casting, disposal of spoils, test result of
materials to the Engineer for approval. However, Engineer'
approval shall not relieve the Contractor of his responsibilities and
obligations under contract.

a) 600 mm dia
b) Depth up to 38 m A350-7-CW-10.210 m 608.00
Cast in situ pile with RCC works of required slump by adding
water reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3)
on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM
-1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand [Sylhet
sand or coarse sand of equivalent F.M.2.2], 20 mm down well
graded crushed stone chips conforming to ASTM C-33, including
breaking crushed stone chips, screening through proper sieves,
making, placing re-bar cage & binding ms pipes in position,
placing and removing tri-pod as per requirement, pouring the
concrete in bore-hole with the help of a tremie pipe, maintaining
the tremie pipe immersed in concrete by at least 1 meter throughout
2.2 the period of concreting, maintaining required slump, etc. mixing A350-7-CW-10.210 cum 171.91
the aggregates in diginal batching plant, casting in bore holes,
acertaining the strength by trial mix design all complete including
all cost of water, electricity, plant & machinery, bentonite,
admixture testing of materials and concrete etc and other charges as
per design, drawing etc all complete approved and accepted by the
Engineer. Concrete should prepared by Digital batching plant,
strength may be acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 102/405
Item: Steel supporting structure for conveyors from Bucket elevator tower to truck Wagon BLH
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade
400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed
or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy
not exceeding 450 MPa and whatever is the yield strength within
allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile
strength fu to yield strength fy, shall be at least 1.25 and minimum
elongation after fracture and minimum total elongation at
2.3 maximum force is 16% and 8% respectively including welding of A350-7-CW-10.210 kg 17,619.51
lapping and spirals as per design, drawing, straightening and
cleaning rust, if any, bending and binding in position with supply
of G.I. wires, splices or laps what so ever etc. all complete accepted
by the Engineer (Measurement shall be recorded only on Standard
Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total
length in each pile for ultrasonic pulse velocity meter test. The Pvc
pipes should have threaded cap at top and bottom, and jointed by
socket & glue to connect each others. 14 SWG steel wires shall be
2.4 used for binding with rebar cage having minimum one binding A350-7-CW-10.210 m 1,824.00
with rebar cages in each 3m interval or apply other approved
devices for fastenening firmly with rebar cage, cleaning pipes upto
full length immediately after concreting, protecting the pipes from
any damage etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe
distance including scraps and cleaning concrete from steel/M.S.
2.5 rods, straightening and bending of pile bars, preparation and A350-7-CW-10.210 cum 4.07
making platform where necessary, carrying, all sorts of handling,
stacking the same properly after cleaning, leveling and dressing the
situ and clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 103/405
Item: Steel supporting structure for conveyors from Bucket elevator tower to truck Wagon BLH
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved
2.6 expert, preparing, cleaning the holes and providing all relevant A350-7-CW-10.210 each 8.00
materials, equipment, result in standard forms and compiling test
report with recommendations on the test etc. complete in all respect
approve and accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM
D5882- The standard method of testing by a qulifified and
approved PIT expert, preparing pile heads and providing all
relevant materials, equipment, result in standard forms and A350-7-CW-10.211 7.00
compiling test report with recommendations on the test etc.
complete in all respect approve and accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and
filling sacs/gunny bags for loading, record readings and preparation
of results in standard forms and other incidental charges per
standard practice and procedures including submission of load test
2.7 report, furnishing all graph and chart etc. complete in all respects
approved and accepted by the Engineer (Minimum two cyclic
loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of
his responsibilities and obligations under Contract.

a) For 220 tonne load for 1 No. test test 1.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of
3.1 single layer polythene sheet weighing 6.5 kg/Sqm with allowances
for lapping complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-10.211, 10.212 cum 1.94

Subject: Detail BOQ of Civil Works


Page - 104/405
Item: Steel supporting structure for conveyors from Bucket elevator tower to truck Wagon BLH
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforced cement concrete works with minimum cement
concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25 Mpa
at 28 days on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1
CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality
Sylhet sand or coarse sand of equivalent F.M 2.2 and 20 mm down
well graded crushed stone chips conforming to ASTM C-33;
preparing the concrete mix in the Digital Batching plant, ascertaing
3.2 the strength by trail mix design, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing
centering-shuttering after specified time approved; including all
cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-10.211, 10.212 cum 15.88


3.2.2_ Concrete for column A350-7-CW-10.211, 10.212 cum 0.48
Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
4.1.1_ Formwork for footing A350-7-CW-10.211, 10.212 sqm 15.12
4.1.2_ Formwork for column A350-7-CW-10.211, 10.212 sqm 3.12
Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 105/405
Item: Steel supporting structure for conveyors from Bucket elevator tower to truck Wagon BLH
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released
from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16%
5.1 and 8% respectively including straightening and cleaning rust, if
any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds
its standard)

5.1.1_ Rebar for footing A350-7-CW-10.211, 10.212 kg 1,034.20


5.1.2_ Rebar for column A350-7-CW-10.211, 10.212 kg 232.80
Sub - Total 5
6 Plastering & Waterproofing Work
6.1 Non- shrink grout for column A350-7-CW-10.211, 10.212 cum 0.02
Sub - Total 6
7 Structural Steel
All steel structure, Beams, Columns, Angles, C- Channels, fittings
& fixtures shall be hot rolled pre-fabricated and hot deep
7.1 galvanized (EN ISO 14713:1999 C5, Galvanized coating conforms
to ASTM A653/A653 M/EN 1461 for zinc coated steel minimum
600 gm/m2)
7.1.1_ Galvanized Steel Bracing A350-7-CW-10.213- 10.216 kg 2,393.85
7.1.2_ Galvanized Steel Plate A350-7-CW-10.213- 10.216 kg 1,724.44
7.1.3_ Galvanized Steel beam A350-7-CW-10.213- 10.216 kg 9,713.00
7.1.4_ Galvanized Steel column A350-7-CW-10.213- 10.216 kg 3,972.04
7.2 Galvanized grating for platform
7.2.1_Galvanized grating F40x3mm for platform at elv +14.600,
A350-7-CW-10.213- 10.216 sqm 106.97
+20.000, +23.000 m
7.2.2_Galvanized haindrail D48.1mm, 3.5mm thk for platforms A350-7-CW-10.213- 10.216 kg 1,109.98
7.3 Galvanized Bolt for steel structure
7.3.1_Galvanized Anchor Bolt M24, L700mm A350-7-CW-10.213- 10.216 pcs 24.00
7.3.2_Galvanized Bolt M20, L70mm A350-7-CW-10.213- 10.216 kg 49.73
7.3.3_Galvanized Bolt M20, L50mm A350-7-CW-10.213- 10.216 kg 155.93
7.3.4_ Galvanized Bolt M16, L50mm A350-7-CW-10.213- 10.216 kg 24.00
Sub - Total 7

Subject: Detail BOQ of Civil Works


Page - 106/405
Item: Steel supporting structure for conveyors from Bucket elevator tower to truck Wagon BLH
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
TOTAL

Subject: Detail BOQ of Civil Works


Page - 107/405
Item: Steel supporting structure for conveyors from Bucket elevator tower to truck Wagon BLH
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
layout with chalk powder, providing necessary tools and plants,
1
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the
layout etc.

Earth work in excavation in foundation trenches up to 1.5 m depth A350-7-CW-


1.1 and maximum 10 m lead: in soft clayey soil/loose sand/silt cum 390.71
10.314/10.315/10.316

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content A350-7-CW-
1.2 cum 80.91
(Modified proctor test) including carrying, watering, levelling, 10.314/10.315/10.316
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of the A350-7-CW-
1.3 cum 309.80
city or town area including loading, unloading at both ends, leveling 10.314/10.315/10.316
and dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail Abstract of Cost


Page - 107/405
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6 m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire charge of drilling rig set, tripod stand, tremie pipe,
cost of fuel, lubricant, mobilization, demobilization, maintenance,
spares, stand-byes, insurance coverage, water, electricity and other
2.1 charges all compete approved and accepted by the Engineer. Before
commencing boring operation, Contractor shall submit method of
statement of cast-in-situ pile work including sequence of boring and
casting, disposal of spoils, test result of materials to the Engineer for
approval. However, Engineer' approval shall not relieve the
Contractor of his responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 38 m A350-7-CW-10.313 m 2,280.00

Subject: Detail Abstract of Cost


Page - 108/405
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM
-1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand [Sylhet
sand or coarse sand of equivalent F.M.2.2], 20 mm down well graded
crushed stone chips conforming to ASTM C-33, including breaking
crushed stone chips, screening through proper sieves, making,
placing re-bar cage & binding ms pipes in position, placing and
removing tri-pod as per requirement, pouring the concrete in bore-
hole with the help of a tremie pipe, maintaining the tremie pipe
immersed in concrete by at least 1 meter throughout the period of
2.2 A350-7-CW-10.313 cum 644.33
concreting, maintaining required slump, etc. mixing the aggregates in
diginal batching plant, casting in bore holes, acertaining the strength
by trial mix design all complete including all cost of water,
electricity, plant & machinery, bentonite, admixture testing of
materials and concrete etc and other charges as per design, drawing
etc all complete approved and accepted by the Engineer. Concrete
should prepared by Digital batching plant, strength may be acertained
by trail mix design.

Subject: Detail Abstract of Cost


Page - 109/405
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy
not exceeding 450 MPa and whatever is the yield strength within
allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile
strength fu to yield strength fy, shall be at least 1.25 and minimum
elongation after fracture and minimum total elongation at maximum
2.3 force is 16% and 8% respectively including welding of lapping and A350-7-CW-10.313 kg 66,451.51
spirals as per design, drawing, straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires, splices or
laps what so ever etc. all complete accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length
in each pile for ultrasonic pulse velocity meter test. The Pvc pipes
should have threaded cap at top and bottom, and jointed by socket &
glue to connect each others. 14 SWG steel wires shall be used for
2.4 binding with rebar cage having minimum one binding with rebar A350-7-CW-10.313 m 6,840.00
cages in each 3m interval or apply other approved devices for
fastenening firmly with rebar cage, cleaning pipes upto full length
immediately after concreting, protecting the pipes from any damage
etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making A350-7-CW-10.313 cum 15.26
platform where necessary, carrying, all sorts of handling, stacking the
same properly after cleaning, leveling and dressing the situ and
clearing the bed etc.

Subject: Detail Abstract of Cost


Page - 110/405
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved expert,
2.6 preparing, cleaning the holes and providing all relevant materials, A350-7-CW-10.313 each 32.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT
expert, preparing pile heads and providing all relevant materials,
equipment, result in standard forms and compiling test report with A350-7-CW-10.314 each 26.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and
filling sacs/gunny bags for loading, record readings and preparation
of results in standard forms and other incidental charges per standard
2.7
practice and procedures including submission of load test report,
furnishing all graph and chart etc. complete in all respects approved
and accepted by the Engineer (Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 220 tonne load for 1 No. test /test 2.00


Sub - Total 2

Subject: Detail Abstract of Cost


Page - 111/405
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of single
3.1 layer polythene sheet weighing 6.5 kg/Sqm with allowances for
lapping complete in all respect and accepted by the Engineer.

A350-7-CW-
3.1.1_ For footing cum 33.39
10.314/10.315/10.316
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1,
52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand
or coarse sand of equivalent F.M 2.2 and 20 mm down well graded
crushed stone chips conforming to ASTM C-33; preparing the
concrete mix in the Digital Batching plant, ascertaing the strength by
3.2 trail mix design, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after
specified time approved; including all cost of water, electricity,
admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the Engineer.

A350-7-CW-
3.2.1_ Concrete for footing cum 276.42
10.314/10.315/10.316
3.2.2_ Concrete for pedestal column and column A350-7-CW-1414/1417 cum 12.53
Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.

Subject: Detail Abstract of Cost


Page - 112/405
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
A350-7-CW-
4.1.1_ Formwork for footing sqm 235.62
10.314/10.315/10.316
4.1.2_ Formwork for pedestal column and column A350-7-CW-1414/1417 sqm 222.72
Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

A350-7-CW-
5.1.1_ Rebar for footing, Padestal column and column kg 24,966.64
10.314/10.315/10.316
Sub - Total 5
6 Plastering & Waterproofing Work
6.1 Non- shrink grout for column A350-7-CW- 10.317-1025 cum 3.04
Sub - Total 6
7 Structural Steel
All steel structure, Beams, Columns, Angles, C- Channels, fittings &
fixtures shall be hot rolled pre-fabricated and hot deep galvanized
7.1 (EN ISO 14713:1999 C5, Galvanized coating conforms to ASTM
A753/A753 M/EN 1471 for zinc coated steel minimum 600 gm/m2)

7.1.1_ Galvanized Steel purlin A350-7-CW-10.317/10.319 kg 1,466.42

7.1.2_ Galvanized Steel column A350-7-CW- 10.317-1025 kg 111,093.92

7.1.3_ Galvanized Steel beam A350-7-CW- 10.317-1025 kg 344,899.45

7.1.4_Galvanized Steel Plate A350-7-CW-10.317÷1027 kg 27,856.51

7.2 Galvanized Bolt for steel structure

Subject: Detail Abstract of Cost


Page - 113/405
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7.2.1_ Galvanized Anchor Bolt M20, L700mm A350-7-CW-10.317÷1027 pcs 744.00

7.2.2_ Galvanized Bolt M20, L50mm A350-7-CW-10.317÷1027 kg 1,897.02


Sub - Total 7
TOTAL

Subject: Detail Abstract of Cost


Page - 114/405
Item: Steel Support Structure for Conveyor from Cleaning tower to Jetty
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Sampling and laboratory on jetty
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation
trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes
and marking layout with chalk powder, providing necessary tools
1 and plants, protecting and maintaining the trench dry etc., stacking,
clearing the excavated earth at a safe distance out of the area
enclosed by the layout etc.

Layout and marking for earth work in excavation in foundation


1.1 A350-7-CW-1108 sqm 91.20
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m
1.2 depth and maximum 10 m lead: in soft clayey soil/loose sand/silt A350-7-CW-1108 cum 72.06

Mobilization and cleaning site before commencing actual


1.3 physical work and during contract period and demobilization after A350-7-CW-1108 sqm 91.20
Completion of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 A350-7-CW-1108 cum 62.06
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

1.5 Sand filling with compaction k=0.95 A350-7-CW-1108 cum 97.00


Clearing and disposing of excavated earth from the construction
site by truck or any other means to a place within 30 km radius of
1.6 the city or town area including loading, unloading at both ends, A350-7-CW-1108 cum 10.01
leveling and dressing the carried earth etc. complete accepted by the
Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 115/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of
2.1 single layer polythene sheet weighing 6.5 kg/Sqm with allowances
for lapping complete in all respect and accepted by the Engineer.

2.1.1_ For footing A350-7-CW-1108 cum 1.48

2.1.2_ For ground floor beam A350-7-CW-1108/1109 cum 1.49

2.1.3_ For slab A350-7-CW-1108/1109 cum 4.56


A350-7-CW-
2.1.4_ For drain cum 2.70
1108/1109/1101
Reinforced cement concrete works with minimum cement
concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25 Mpa
at 28 days on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1
CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality
Sylhet sand or coarse sand of equivalent F.M 2.2 and 20 mm down
well graded crushed stone chips conforming to ASTM C-33;
preparing the concrete mix in the Digital Batching plant, ascertaing
2.2 the strength by trail mix design, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing
centering-shuttering after specified time approved; including all
cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

A350-7-CW-
2.2.1_ Concrete for footing cum 3.07
1108/1109/1101
A350-7-CW-
2.2.2_ Concrete for pedestal column cum 2.82
1108/1109/1101
A350-7-CW-
2.2.3_ Concrete for ground floor beam cum 7.09
1108/1109/1101
A350-7-CW-
2.2.4_ Concrete for beam at level +4.450 cum 7.83
1108/1109/1101
A350-7-CW-
2.2.5_ Concrete for roof beam cum 3.18
1108/1109/1111

Subject: Detail BOQ of Civil Works


Page - 116/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
A350-7-CW-
2.2.6_ Concrete for ground floor slab cum 91.20
1108/1109/1111
A350-7-CW-
2.2.7_ Concrete for 1st floor slab at elv +4.450 cum 4.59
1108/1109/1111
A350-7-CW-
2.2.8_ Concrete for roof slab cum 13.98
1108/1109/1111
A350-7-CW-
2.2.9_ Concrete for column cum 7.96
1108/1109/1101
2.2.10_ Concrete for lintel A350-4-CW-0312 cum 0.68

2.2.11_ Concrete for sunshade A350-4-CW-0312 cum 0.58


Sub - Total 2
3 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
3.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
A350-7-CW-
3.1.1_ Formwork for footing sqm 12.16
1108/1109/1101
A350-7-CW-
3.1.2_ Formwork for pedestal column sqm 23.28
1108/1109/1101
A350-7-CW-
3.1.3_ Formwork for ground floor beam sqm 50.60
1108/1109/1101
A350-7-CW-
3.1.4_ Formwork for beam at +4.450 sqm 61.95
1108/1109/1101
A350-7-CW-
3.1.5_ Formwork for roof beam sqm 38.16
1108/1109/1101
A350-7-CW-
3.1.6_ Formwork for 1st floor slab at elv +4.450 sqm 38.28
1108/1109/1111
A350-7-CW-
3.1.7_ Formwork for roof slab sqm 179.52
1108/1109/1111
A350-7-CW-
3.1.8_ Formwork for column sqm 80.86
1108/1109/1111
A350-7-CW-
3.1.9_ Formwork for lintel sqm 11.66
1108/1109/1111
A350-7-CW-
3.1.10_ Formwork for sunshade sqm 5.84
1107/1108/1109/1106
Sub - Total 3

Subject: Detail BOQ of Civil Works


Page - 117/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released
from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16%
4.1 and 8% respectively including straightening and cleaning rust, if
any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds
its standard)

4.1.1_ Reinforcement for footing A350-7-CW-1108 kg 510.12

4.1.2_ Reinforcement for pedestal column A350-7-CW-1108 kg 786.09

4.1.3_ Reinforcement for ground floor beam A350-7-CW-1109/1110 kg 1,838.34


4.1.4_ Reinforcement for beam at +4.450 A350-7-CW-1109/1110 kg 2,120.57
A350-7-CW-
4.1.5_ Reinforcement for roof beam kg 1,035.04
1109/1110/1111
A350-7-CW-
4.1.6_ Reinforcement for ground floor slab kg 1,499.42
1109/1110/1111
A350-7-CW-
4.1.7_ Reinforcement for 1st floor slab at elv +4.450 kg 296.49
1109/1110/1111
A350-7-CW-
4.1.8_ Reinforcement for roof slab kg 1,800.29
1109/1112/1111
4.1.9_ Reinforcement for column A350-7-CW-1109/1108 kg 2,551.66
4.1.10_ Reinforcement for lintel A350-7-CW-1109/1108 kg 129.99
4.1.11_ Reinforcement for sunshade A350-7-CW-1109/1108 kg 74.35
Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 118/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured
klinker facing bricks having uniform colour carefully laid in cement
sand (F.M.1.2) mortar (1:4) in superstructure with uniform width
and depth and depth joints, filling the interstices with mortar,
5.1 cleaning and soaking bricks at least for 24 hours before use and
washing and screening of sand, necessary scaffolding, curing at
least for 7 days and pointing with cement sand (F.M.1.2) mortar
(1:2) including cost of water, electricity and other charges ect. all
complete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.

5.1.1_ All floors A350-7-CW-1101 cum 54.74

Exposed brick work for interior wall


Exposed 125mm thick pointing extra ordinary ornamental brick
work with automatic machine made 10 holes first class bricks
(Mirpur Ceramics or equivalent) in cement sand (F.M.1.2) mortar
(1:4) and making bond with connected walls including necessary
5.2 scaffolding, raking out joints, cleaning and soaking the bricks for at
least 24 hours before use and washing of sand curing at least for 7
days and pointing with cement sand (F.M.1.2) mortar (1:2) in all
floors including cost of water, electricity and other charges ect. all
complete and acceplete and accepted by the Engineer. (Cement:
CEM-I)

5.2.1_ Ground floor A350-7-CW-1101 sqm 108.15


Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with
first class bricks in cement sand (F.M. 1.2) mortar (1:6), in
superstructure including raking out joints, filling the interstices with
5.3 mortar, cleaning and soaking bricks at least 24 hours before use and
washing of sand, necessary scaffolding, curing at least 7 days etc.
all complete (measurement to given as 250mm width for one brick
length and 375mm for one brick and a half brick length) (Cement:
CEM-I)

5.3.1_ Entry step A350-7-CW-1101 cum 2.68

Subject: Detail BOQ of Civil Works


Page - 119/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
5.4 necessary scaffolding, raking out joints, cleaning and soaking
bricks at least 24 hours before use and washing of sand curing at
least 7 days in all floor including cost of water, electricity and other
charges etc. (Cement: CEM-I)

5.4.1_ Drain wall A350-7-CW-1101 sqm 50.40


Sub - Total 5
6 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with
fresh cement to ceiling R.C.C, columns, beams, surface of stair
case, sunshades, cornices, railings, drop wall, louvers, fins and
6.1 finishing the corners and edges including washing of sand cleaning
the surface, scaffolding and curing a least for 7 days, cost of water,
electricity and other charges etc. (Cement: CEM-I)

6.1.1_ Plaster for gutter A350-7-CW-1103 sqm 52.92

6.1.2_ Plaster to beam A350-7-CW-1106 sqm 111.76

6.1.3_Plaster to ceiling and lower surface of roof slab A350-7-CW-1101, 1103 sqm 93.03

6.1.4_ Plaster to column A350-7-CW-1106 sqm 23.28

6.1.5_ Plaster to entry steps A350-7-CW-1106 sqm 5.43

6.1.6_ Plaster to drain A350-7-CW-1106 sqm 27.00


6.2 Waterproofing
6.2.1_ Three layer waterproofing by sika grout for toilet floor slab A350-7-CW-1106 sqm 12.75
6.2.2_ Three layer waterproofing by sika grout for slab at elv
A350-7-CW-1106 sqm 250.30
+4.450
Sub - Total 6

Subject: Detail BOQ of Civil Works


Page - 120/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7 Tiles & Stone Work
Homogenious Mirror polish tile 600x600 light colour for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2)
mortar (1:4) base and raking out the joints with white cement
7.1
including cutting and laying the tiles in proper way and finishing
with care

7.1.1_ Ground floor A350-7-CW-1103, 1101 sqm 78.45


Homogenious tile 300 x 300mm for toilet floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2)
7.2 mortar (1:4) base and raking out the joints with white cement
including cutting and laying the tiles in proper way and finishing
with care

7.2.1_Toilet floor A350-7-CW-1103, 1101 sqm 91.20


Ceramic tile 300x500mm light colour for toilet wall
Suppling, fitting and fixing glazed wall tile, irrespective of color
&/or design, with on 20 mm thick cement sand (F.M. 1.2) mortar
7.3 (1:3) base and ranking out the joints with respective joint filler &
binder including cutting, laying and hire charge of machine and
finishing with care etc. including water, electricity and other
charges

7.3.1_ Toilet wall A350-7-CW-1103, 1101 sqm 53.46


Mirpur ceramic 75x225 mm, dark colour for outer surface of
7.4 ground floor beam A350-7-CW-1103, 1101 sqm 26.48
Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick
7.5 cement sand (F.M. 1.2) mortar (1:4) base and ranking out the joints
with respective joint filler & binder including cutting, laying and
finishing with care etc

7.5.1_ For entry steps A350-7-CW-1103, 1101 sqm 5.43


Roof tile
7.6 Supplying, fitting and fixing country made (Mirpur A350-7-CW-1106 sqm 197.38
Ceramic/equivalent) roof tile, with adhesive motar
Sub - Total 7

Subject: Detail BOQ of Civil Works


Page - 121/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
8 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and
frame
Supplying and making solid wooden door for all floors with
8.1 matured natural seasoned wood of required size including painting
two coats of coal tar to the surface in contact with all, fitting and
fixing in position. Frame (size 250x62mm) & shutter as per design,
drawing, accepted by the Engineer

8.1.1_ Double leaf door DO-01 (1200x2100x38mm) including


varnishing and frence polishing A350-7-CW-1101 cum 0.18
Wooden (matured & seasoned Mehaghani) entry door and
frame
Supplying and making solid wooden door for all floors with
8.2 matured natural seasoned wood of required size including painting
two coats of coal tar to the surface in contact with all, fitting and
fixing in position. Frame (size 125x62mm) & shutter as per design,
drawing, accepted by the Engineer

8.2.1_ Single leaf door DO-02 (1000x2100x38mm) including


A350-7-CW-1101 cum 0.12
varnishing and frence polishing
8.3 Solid uPVC Toilet door (Frame 150x62.5mm)
8.3.1_ Single leaf door DO-03 (2130x600mm) A350-7-CW-1101 each 3.00
8.4 Solid uPVC Toilet door (Frame 250x62.5mm)
8.4.1_ Single leaf door DO-04 (2130x600mm) A350-7-CW-1101 each 1.00
5mm thick glass with Thai Aluminium frame sliding window as
8.5
design, drawing, accepted by the Engineer
8.5.1_ Double shutter window WD-01(1200x1400mm) including
grill with 12mm square bar as per drawing, design, specification A350-4-CW-0308,0309 sqm 11.76
etc. all complete & accepted by the Engineer
5mm thick glass with Thai Aluminium frame curtain window as
8.6
design, drawing, accepted by the Engineer
8.6.1_ Single shutter curtain window CW-01 (600x600mm) A350-4-CW-0308,0309 sqm 1.08
Sub - Total 8

Subject: Detail BOQ of Civil Works


Page - 122/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing Aluminium board ceiling of 9 mm
thick board laminated by mechanical hot press with a milk white
9.1 PVC membrane with Aluminum T- bar frame in natural anodized
finish at 600*600 mm in grid suspended from ceiling by 12 SWG
double ply wire fixed to the ceiling by rowel plug, screws, hooks,
nails etc.

9.1.1_ Aluminium ceiling all floors A350-7-CW-1106 sqm 197.38

Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of
specified brand applied on primer or sealer elapsing specified time
9.2
for drying/recoating including cleaning drying, making free from
dirt, grease, wax, removing all chalked and scaled materials,
fungus, mending good the surface defects, sand papering the
surface and necessary scaffolding, spreading by brush/ roller/ spray
etc.

9.2.1_ Painting to gutter A350-7-CW-1102/03 sqm 52.92


A350-7-CW-1520, 1522,
9.2.2_ Painting to beam sqm 111.76
1523
9.2.3_ Painting to column A350-7-CW-1522,1525 sqm 76.00
Sub - Total 9
12 Water Supply System and Waste water drainage system
A350-7-DW-3-1102, A350-7-DW-2-1102
Supply and installation of food grade stainless steel (SS304)
thikness min 1.8 mm water tank including supply of hardware,
10.1
consumables, fittings etc. all complete approved and accepted by
the Engineer
10.1.1_2000 liter capacity each 1.00

10.2 Valve each 3.00


10.3 uPVC pipe (min. thickness 3.0 mm)

10.3.1_ uPVC ɸ110 m 5.00

10.3.2_ uPVC ɸ76 m 5.00

Subject: Detail BOQ of Civil Works


Page - 123/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10.3.3_ uPVC ɸ40 m 10.00

10.5 Tee

10.5.1_ 110 Tee each 1.00


10.5.2_ 110/60 Tee each 1.00

10.5.3_ 76/40 Tee each 2.00

11.5.4_ 76/76 Tee each 2.00

10.5.7_ 20/20 Tee each 2.00

10.6 Reducer

10.6.1_ 76-40 Reducer each 1.00

10.7 Elbow

10.7.1_ 90 degree elbow (PPR pipe ɸ 20) each 4.00

10.7.2_ 90 degree elbow (uPVC ɸ76) each 1.00


10.7.3_ 90 degree elbow (uPVC ɸ60) each 2.00

10.7.4_ 90 degree elbow (uPVC ɸ40) each 4.00

10.7.5_ 45 degree elbow (uPVC ɸ110) each 2.00


Septic tank
Construction of septic tank of different sizes (medium and large
sizes) with walls of brick work in cement mortar (1:6) having a
lining of minimum 125 mm R.C.C cast against the walls as per
approved type plan over a brick flat soling flat soiling and 150 mm
thick reinforced cement concrete flooring (1:2:4) with 125 mm
thick walls in partition and 12 mm thick cement plaster (1:4) with
N.C.F. to insides of walls on floor and all around outside walls by
18” height at top including supplying fitting and fixing of two
10.8 R.C.C. Tees and providing 450 mm dia water sealed heavy type
C.I. manhole cover with locking/unlocking arrangement and 100
mm thick R.C.C (1:2:4) top slab, including centering, shuttering,
fabricating, casting and curing etc. all complete as per standard
drawing, specification accepted by the Engineer. (Rate in including
cost of reinforcement and its fabrication, binding and placing.)

Subject: Detail BOQ of Civil Works


Page - 124/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10.8.1_ for 30 person each 1.00
Soak well
Construction of soak well of different sizes (medium and large
sizes) with 250mm thick soild brick work and 250mm honey comb
brick work with cement mortar (1:6) as per design over R.C.C.
(1:2:4) well curb with 1% reinforcement up to the depth as per
drawing with 450 mmm dia water sealed heavy type. C.I. manhole
cover with locking arrangement, filling the well up to the reqired
10.9 depth with graded khoa and sand including suppling and fabicating
M.S. Rod, casting, curing including necessary earth work in
excavation, side filling and bailing out water including cost of all
materials etc. all complete as per standard drawing, design
approved and accepted by the Engineer. (Rate in including cost of
reinforcement and its fabrication, binding,and placing, form work
etc.)

10.9.1_ 30 users each 1.00


Construction of masonry inspection pit with 250 mm thick brick
work in cement mortar (1:4) including necessary earth work, side
filling and one layer brick flat soling, 75 mm thick (1:3:6) base
10.10 concrete for making invert channel and 12 mm thick (1:2) cement
plaster with neat finishing etc.all complete up to a depth of 700 mm
approved and accepted by the Engineer.

10.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average


525 mm for single 150 mm dia R.C.C.pipes and 400 mm PVC pipe each 3.00

Sub - Total 10
11 Sanitary Accessories (Cotto or equivalent)
A350-7-CW-1105,1104, A350-7-DW-2-1102
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c
11.1 plastic seat cover, cistern system, preparing the base with cement each 1.00
concrete and with wire mesh or roads if necessary, including
making holes and fitting, fixing, finishing etc.

Subject: Detail BOQ of Civil Works


Page - 125/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx.
size 656×510×845, 26kg by weight including fitting, fixing the
same in position with heavy type C.I. Brackets. 30 mm dia PVC
waste water pipe with brass coupling (not exceeding 750 mm in
11.2 length). 12mm plastic lead (connection) pipe with brass coupling, each 1.00
basin waste with chain plug including making holes in walls and
floors and fitting with wooden blocks, screws, finishing etc,

11.3 Bathroom strainer each 2.00


Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
11.4 unframe super quality mirror with hard board at the back with all each 1.00
necessary fitting including making holes in walls and mending
good the damages with cement morta (1:4) etc.

11.5 Flush faucet for toilet bowl each 1.00

11.6 Wash basin faucet each 1.00


Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
11.7 150*150*126 mm size including making holes in walls and each 1.00
mending good the damages with cement mortar (1:4) etc.
Porcelain soap tray
Supplying, fitting, and fixing standard size soap tray including
11.8 making holes in walls and mending good the damages with cement each 1.00
mortar (1:4) etc.
Supplying, fitting and fixing best quality faucets ect. (Cotto or
11.9 equivalent). Complete approved and accepted by the Engineer

11.9.1_ 12mm CP bib cock each 1.00

Supply, fitting and fixing best quality CP pillar cock ect. (Cotto or
11.10
equivalent). Complete approved and accepted by the Engineer

11.10.1_ 12 mm CP medium quality pillar cock each 1.00

11.10.2_12 mm CP stop cock each 1.00

11.10.3_12 mm CP angle stop cock each 1.00


Sub - Total 11

Subject: Detail BOQ of Civil Works


Page - 126/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
12 Electrical Work
Ref: A350-7-LA-1101
Electrical equipment
12.1
Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215
mm.dia Steel Sheet Carrier, with Powder coated Paint/Oxidized each 17.00
/Chromium finished, suitable glass covers of min. height 92mm
2- Ceiling fan 56" including fitting and fixing
Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS each 4.00
rod
3- Exhaust fan 12"
Providing and fixing of following axial flow A.C capacitor type
wall mounted exhaust fan complete with blade, steel frame standard each 4.00
wall louver shutter, PVC insulated connecting wire etc.
4- Combined switch and regulator board
Supply and installation of electronics fans regulators compriasing
of standard component having noise suppression circuit and total
loss in the regulator not exceeding 0.4 watt suitable for 220 10% each 2.00
volt AC single phase 50 Hz manufactured by Micro Electronics
Ltd. or equivalent foreign made

5- Sub distribution board, IP54, include the terminal block each 2.00
6- Distribution board, IP54 Enclosures each 1.00
7- Socket (3-pin6A ) each 5.00
8- Socket (3-pin15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps.
Combined switch socket outlet (concealed type) manufactured and
tested in accordance with relevant IEC standards and manufactured
and tested in accordance with relevant IEC standards and approved
by BSTI mounted on required size 18 SWG galvanized plain sheet each 6.00
board of 76.2mm. (3”) depth all electrical contacts shall be of
brass/copper (Dynamic/MEP/ SK/Metro/Super Star or equivalent,
local made).)

Subject: Detail BOQ of Civil Works


Page - 127/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9- LED Tube light set (3 x 10W)
Providing & fixing the 3 x 2’× 10 watt Louver type LED Tube
light fitting (False ceiling mounted concealed type) with V- grid
louver of following manufacturers (as per picture No. 12.37)
consisting of power coated 22 SWG sheet steel frame of min.
length 600mm & breath 600mm, symmetrical mirror reflector of each 9.00
anodized aluminum, superior quality electronic ballast with one
year guarantee, holder, necessary wiring with 2 x 0.4 sq.mm PVC
insulated (stranded) flexible FR wire, earth terminal etc.

10- LED Tube light set (3 x 20W)


Providing & fixing the 3 x 2’× 20 watt Louver type LED Tube
light fitting (False ceiling mounted concealed type) with V- grid
louver of following manufacturers (as per picture No. 12.19)
consisting of power coated enameled22 SWG sheet steel frame of
min. length 1213mm & breath 600mm, louver of steel each 3.00
sheet/aluminum, superior quality electronic ballast with one year
guarantee, holder, necessary wiring with 2 x 0.4 sq.mm PVC
insulated (stranded) flexible FR wire, earth terminal etc.

11- One way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 5.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

12- Two way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
each 2.00
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

Subject: Detail BOQ of Civil Works


Page - 128/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
13- Four way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 2.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

14- High pressure lamp 250V (SODIUM VAPOUR


LAMP(230V,50Hz) (Osram/Philips/GE/Harmonics or equivalent
brand accepted/approved by the Engineer)) 250 watt high pressure each 7.00
sodium vapour lamp.)
15- Room air cooler- split type 24000 btu/hr (General or
equivalent)
Supply, Installation, Testing & commissioning of split type Air-
cooler comprising condensing and evaporating units having
following cooling capacity based on indoor temperature 27°-30° C
DB / 19.5°-22°C WB and outdoor temperature 35°-40° DB at high each 4.00
fan speed condition suitable for installation & operation in
tropicalized country like Bangladesh & as per detailed
specifications & standard as mentioned below: Wall mounted

12.2 Protection (MCB & MCCB)


1- MCB 2px10,6KA each 3.00

2- MCB 2px16,6KA each 8.00


3- MCB 2px25, 6KA each 1.00
4- MCB 4px30,6KA each 1.00
4- MCB 4px63,6KA each 1.00
Electrical wire and cable (include conduit pipes, junction box with
12.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 120.00
- core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 80.00
- core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 60.00
- core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 100.00
- core 3c x 4mm²
Sub - Total 12
Subject: Detail BOQ of Civil Works
Page - 129/405
Item: Sampling House and Weight Bridge
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
TOTAL

Subject: Detail BOQ of Civil Works


Page - 130/405
Item: Sampling House and Weight Bridge
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Silo Foundation
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
layout with chalk powder, providing necessary tools and plants,
1
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.

Layout and marking for earth work in excavation in foundation


1.1 A350-7-CW-1202 sqm 8,018.31
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 and maximum 10 m lead: in soft clayey soil/loose sand/silt A350-7-CW-1202/1207 cum 9,120.06

Mobilization and cleaning site before commencing actual physical


1.3 work and during contract period and demobilization after Completion A350-7-CW-1202 sqm 8,018.31
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350-7-CW-1202/1207 cum 291.40
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city
1.5 A350-7-CW-1202/1207 cum 8,828.66
or town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works Page - 130/405


Item: Silo Foundation
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6 m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire charge of drilling rig set, tripod stand, tremie pipe, cost
of fuel, lubricant, mobilization, demobilization, maintenance, spares,
stand-byes, insurance coverage, water, electricity and other charges all
2.1 compete approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement of cast-
in-situ pile work including sequence of boring and casting, disposal of
spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 42 m A350-7-CW-1203/1204 m 42,336.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage &
binding ms pipes in position, placing and removing tri-pod as per
requirement, pouring the concrete in bore-hole with the help of a
tremie pipe, maintaining the tremie pipe immersed in concrete by at
2.2 least 1 meter throughout the period of concreting, maintaining required A350-7-CW-1203/1204 cum 11,964.15
slump, etc. mixing the aggregates in diginal batching plant, casting in
bore holes, acertaining the strength by trial mix design all complete
including all cost of water, electricity, plant & machinery, bentonite,
admixture, testing of materials and concrete etc and other charges as
per design, drawing etc all complete approved and accepted by the
Engineer. Concrete should prepared by Digital batching plant, strength
may be acertained by trail mix design.

Subject: Detail BOQ of Civil Works Page - 131/405


Item: Silo Foundation
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within
allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile
strength fu to yield strength fy, shall be at least 1.25 and minimum
2.3 elongation after fracture and minimum total elongation at maximum A350-7-CW-1203/1204 kg 726,525.10
force is 16% and 8% respectively including welding of lapping and
spirals as per design, drawing, straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires, splices or
laps what so ever etc. all complete accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length
in each pile for ultrasonic pulse velocity meter test. The Pvc pipes
should have threaded cap at top and bottom, and jointed by socket &
glue to connect each others. 14 SWG steel wires shall be used for
2.4 binding with rebar cage having minimum one binding with rebar A350-7-CW-1203/1204 m 127,008.00
cages in each 3m interval or apply other approved devices for
fastenening firmly with rebar cage, cleaning pipes upto full length
immediately after concreting, protecting the pipes from any damage
etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making A350-7-CW-1203/1204 cum 313.35
platform where necessary, carrying, all sorts of handling, stacking the
same properly after cleaning, leveling and dressing the situ and
clearing the bed etc.

Subject: Detail BOQ of Civil Works Page - 132/405


Item: Silo Foundation
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved expert,
2.6 preparing, cleaning the holes and providing all relevant materials, A350-7-CW-1203/1204 each 1,008.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT
expert, preparing pile heads and providing all relevant materials,
A350-7-CW-1203/1205 each 782.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and filling
sacs/gunny bags for loading, record readings and preparation of results
in standard forms and other incidental charges per standard practice
2.7 196.00
and procedures including submission of load test report, furnishing all
graph and chart etc. complete in all respects approved and accepted by
the Engineer (Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 334 tonne load for 1 No. test /test 30.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
3.1 polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-1202/1207 cum 686.18

Subject: Detail BOQ of Civil Works Page - 133/405


Item: Silo Foundation
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-1202/1207 cum 10,178.10

3.2.2_ Concrete for column A350-7-CW-1208 cum 693.00

3.2.3_ Concrete for ring beam A350-7-CW-1211/1212 cum 80.13


3.2.4_ Concrete for lower slab A,B,C,D A350-7-CW-1211/1212 cum 2,501.29

3.2.5_ Concrete for lower slab E A350-7-CW-1211/1212 cum 312.66

3.2.6_ Concrete for upper slab A,B,C,D A350-7-CW-1210 cum 1,405.53

3.2.7_ Concrete for upper slab E A350-7-CW-1210 cum 175.69


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
4.1.1_ Footing formwork A350-7-CW-1202/1207 sqm 1,142.61
4.1.2_ Formwork for column A350-7-CW-1208 sqm 5,544.00

4.1.3_ Formwork for ring beam A350-7-CW-1210/1211 sqm 1,800.16

4.1.4_ Form for lower slab A,B,C,D A350-7-CW-1210/1211 sqm 3,944.82

Subject: Detail BOQ of Civil Works Page - 134/405


Item: Silo Foundation
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.5_ Form for lower slab E A350-7-CW-1210/1211 sqm 493.10

Subject: Detail BOQ of Civil Works Page - 135/405


Item: Silo Foundation
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.6_ Form for upper slab A,B,C,D A350-7-CW-1210/1211 sqm 1,773.52

4.1.7_ Form for upper slab E A350-7-CW-1210/1211 sqm 221.69


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

5.1.1_ Rebar for footing A350-7-CW-1205/1206/1207 kg 494,886.32

5.1.2_ Rebar for for Column A350-7-CW-1208 kg 390,780.25

5.1.3_ Rebar for ring beam A350-7-CW-1210 kg 62,801.29

5.1.4_ Rebar for slab (upper and lower slab) A350-7-CW-1211/1212/1213 kg 485,742.89
Sub - Total 5
6 Structural Steel
Hot deep galvanized (EN ISO 14713:1999 C5, Galvanized coating
6.1 conforms to ASTM A653/A653 M/EN 1461 for zinc coated steel
minimum 600 gm/m2)
6.1.1_ Galvanized Steel L-50x50x5mm A350-7-CW-1210/1211 kg 18,804.68

6.1.2_ Galvanized Steel Plate, thk=6mm A350-7-CW-1210/1211/1212 kg 12,411.79


6.2 Galvanized Bolt
6.2.1_ Galvanized fixing bolt for angle Ø12, L=150mm A350-7-CW-1209 pcs 810.00
Sub - Total 6
TOTAL

Subject: Detail BOQ of Civil Works Page - 136/405


Item: Silo Foundation
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Wagon Bagging and Loading House
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350-7-CW-1322 sqm 1,053.00
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 A350-7-CW-1313, 1320-1325 cum 1,195.24
and maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-1322 sqm 1,053.00
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, dressing A350-7-CW-1313, 1320-1325 cum 1,016.30
and compacting to a specified percentage each layer upto finished level
etc. all complete and accepted by the Engineer.

1.5 Sand filling with compaction k=0.95 A350-7-CW-1313, 1320-1325 cum 426.60

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city
1.6 A350-7-CW-1313, 1320-1325 cum 178.94
or town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 136/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6 m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire charge of drilling rig set, tripod stand, tremie pipe, cost
of fuel, lubricant, mobilization, demobilization, maintenance, spares,
stand-byes, insurance coverage, water, electricity and other charges all
2.1 compete approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement of cast-
in-situ pile work including sequence of boring and casting, disposal of
spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 38 m A350-7-CW-1318, 1321 m 1,900.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage & binding
ms pipes in position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1 meter
2.2 throughout the period of concreting, maintaining required slump, etc. A350-7-CW-1318, 1321 cum 537.21
mixing the aggregates in diginal batching plant, casting in bore holes,
acertaining the strength by trial mix design all complete including all
cost of water, electricity, plant & machinery, bentonite, admixture,
testing of materials and concrete etc and other charges as per design,
drawing etc all complete approved and accepted by the Engineer.
Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 137/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding
450 MPa and whatever is the yield strength within allowable limit as
per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
2.3 fracture and minimum total elongation at maximum force is 16% and A350-7-CW-1318, 1321 kg 53,946.13
8% respectively including welding of lapping and spirals as per
design, drawing, straightening and cleaning rust, if any, bending and
binding in position with supply of G.I. wires, splices or laps what so
ever etc. all complete accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia of
bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length
in each pile for ultrasonic pulse velocity meter test. The Pvc pipes
should have threaded cap at top and bottom, and jointed by socket &
glue to connect each others. 14 SWG steel wires shall be used for
2.4 binding with rebar cage having minimum one binding with rebar cages A350-7-CW-1318, 1321 m 5,700.00
in each 3m interval or apply other approved devices for fastenening
firmly with rebar cage, cleaning pipes upto full length immediately
after concreting, protecting the pipes from any damage etc. all
complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making platform A350-7-CW-1318, 1321 cum 12.72
where necessary, carrying, all sorts of handling, stacking the same
properly after cleaning, leveling and dressing the situ and clearing the
bed etc.

Subject: Detail BOQ of Civil Works


Page - 138/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full length
for each pile (3 holes/pile) by a qulifified and approved expert,
2.6 preparing, cleaning the holes and providing all relevant materials, A350-7-CW-1318, 1321 each 26.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT expert,
preparing pile heads and providing all relevant materials, equipment,
A350-7-CW-1318, 1322 each 22.00
result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent standard


for the cast-in-situ/pre-cast pile providing required scaffolding, bracing,
jacks, pressure test gauge, loading unloading, Kentledge and other
plants and equipment including staging, mobilization, demobilization,
hire charge, gunny bags, sand and filling sacs/gunny bags for loading,
record readings and preparation of results in standard forms and other
incidental charges per standard practice and procedures including
2.7
submission of load test report, furnishing all graph and chart etc.
complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 250 tonne load for 1 No. test /test 2.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
3.1 by mixer, casting in forms in/c supplying & laying of single layer
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-1320/1321 cum 14.30

Subject: Detail BOQ of Civil Works


Page - 139/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3.1.2_ For beam at +0.00 and +1.400 A350-7-CW-1324-1325 cum 13.99

Subject: Detail BOQ of Civil Works


Page - 140/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3.1.3_ For slab +1.400 A350-7-CW-1323 cum 30.96

3.1.4_ For drain and appron A350-7-CW-1320/1321 cum 6.30


Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-1320/1321 cum 83.66


3.2.2_ Concrete for pedestal column A350-7-CW-1320/1321 cum 22.49

3.2.3_ Concrete for beam elv +0.000 m A350-7-CW- 1322- 1325 cum 44.50

3.2.4_ Concrete for beam elv +1.400 A350-7-CW-1323/1326/1327 cum 13.32

3.2.5_ Concrete for beam elv +6.00m A350-7-CW-1331/1332 cum 31.41

3.2.7_ Concrete for slab elv +1.350m and +1.400m A350-7-CW-1323 cum 65.35

3.2.7_ Concrete for slab elv +5.200m and +6.000m A350-7-CW-1331 cum 34.97

3.2.8_ Concrete for column A350-7-CW-1320/1321/1331 cum 22.22

3.2.8_ Concrete for lintel A350-7-CW-1306 ÷ 1314 cum 0.88

3.2.9_ Concrete for staircase A350-7-CW-1306 ÷ 1314 cum 1.49


Sub - Total 3

Subject: Detail BOQ of Civil Works


Page - 141/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
4.1.1_ Formwork for footing A350-7-CW-1320/1321 sqm 172.80

4.1.2_ Formwork for pedestal column A350-7-CW-1320/1321 sqm 165.12

4.1.3_ Formwork for beam elv +0.000m A350-7-CW- 1322-1325 sqm 254.28

4.1.4_ Formwork for beam elv +1.400m A350-7-CW-1323/1326/1327 sqm 283.28

4.1.5_ Formwork for beam elv +6.000m A350-7-CW-1331/1332 sqm 173.53

4.1.6_ Formwork for slab +6.00m A350-7-CW-1331/1333/1334 sqm 149.95


4.1.7_ Formwork for column A350-7-CW-1320/1321/1331 sqm 186.40

4.1.7_ Formwork for lintel A350-7-CW-1306 ÷ 1314 sqm 12.27

4.1.8_ Formwork for staircase A350-7-CW-1306 ÷ 1314 sqm 13.95


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance with
BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit length
of Bars, while, dia of bars exceeds its standard)

5.1.1_ Rebar for footing A350-7-CW-1320/1321 kg 5,440.28

5.1.2_ Rebar for pedestal column A350-7-CW-1320/1321 kg 3,958.31

5.1.3_ Rebar for beam at +0.000m A350-7-CW- 1322- 1325 kg 5,858.52

Subject: Detail BOQ of Civil Works


Page - 142/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
5.1.4_ Rebar beam at +1.400m A350-7-CW-1323/1326/1327 kg 5,907.54

5.1.5_ Rebar beam at +6.00m A350-7-CW-1331/1332 kg 6,898.11

5.1.6_ Rebar slab at +1.400m A350-7-CW-1328-1330 kg 7,055.82

5.1.7_Rebar slab at elv +6.400m A350-7-CW-1333/1334 kg 3,508.78

5.1.8_ Rebar for column A350-7-CW-1320/1321 kg 2,628.37

5.1.8_ Rebar for lintel A350-7-CW-1306 ÷ 1314 kg 105.34

5.1.9_ Rebar for staircase A350-7-CW-1306 ÷ 1314 kg 142.43


Sub - Total 5
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and
6.1 soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

6.1.1_ Exterior wall from +1.400 to +5.200 A350-7-CW- 1315-1317 cum 116.34
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
6.2 and soaking bricks at least 24 hours before use and washing of sand,
necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length)

6.2.1_ For plinth wall A350-7-CW-1306 cum 117.93

6.2.2_ For staircase A350-7-CW-1306 ÷ 1314 cum 1.49

Subject: Detail BOQ of Civil Works


Page - 143/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including necessary
6.3 scaffolding, raking out joints, cleaning and soaking bricks at least 24
hours before use and washing of sand curing at least 7 days in all floor
including cost of water, electricity and other charges etc.

6.3.1_ For drain A350-7-CW-1306 ÷ 1314 sqm 6.30


Sub - Total 6
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
7.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc.

7.1.1_ Plaster to plinth wall A350-7-CW-1306 sqm 471.73

7.1.2_ Plaster to column A350-7-CW-1306 ÷ 1314 sqm 711.08


7.1.3_ Plaster to beam at elv +1.400, elv +3.550, elv +8.950 A350-7-CW-1306 ÷ 1314 sqm 186.40

7.1.4_ Plaster to drain wall A350-7-CW-1306 ÷ 1314 sqm 6.30

7.2 Surfacing by hardener 5kg/m2 for slab at +1.400 and staircase

7.2.1_ For ground floor slab A350-7-CW-1306 ÷ 1314 sqm 547.06

7.2.2_ For staircase A350-7-CW-1306 ÷ 1314 sqm 21.00

7.3 Non- shrink grout for column A350-7-CW-1306 ÷ 1314 cum 1.20
Sub - Total 7
8 Tiles & Stone Work
8.1 Ceramic 75x225 mm, dark colour for lintel A350-7-CW-1306 ÷ 1314 sqm 12.27
Sub - Total 8

Subject: Detail BOQ of Civil Works


Page - 144/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
9 Door & Window
Electrical rolling door D3 (3000mm x3000mm)
9.1 Supplying and fixing electrical rolling door, include motor, key switch, A350-7-CW-1306, 1311-1314 each 1.00
break release and solid shutter.
9.2 Stainless steel frame door, 1.5mm thick and glass 5mm thick
9.2.1_Stainless steel frame door DO2 double leaf (1800x2200 mm) A350-7-CW-1306, 1311-1314 sqm 7.92

9.2.2_Stainless steel frame door DO1 single leaf (1000x2200 mm) A350-7-CW-1306, 1311-1314 sqm 2.20
Window WD-01 (2000x800mm) Louver type Galvanized steel (steel
9.3 frame 30x630x2 mm) Galvanized steel leaf 2mm thk A350-7-CW-1306, 1311-1314 sqm 57.60
Sub - Total 9
10 Structural Steel
All steel structure, Beams, Columns, Purlins, fittings & fixtures shall be
hot rolled pre-fabricated and hot deep galvanized (EN ISO 14713:1999
10.1 C5, Galvanized coating conforms to ASTM A653/A653 M/EN 1461
for zinc coated steel minimum 600 gm/m2)

10.1.1_ Galvanized Steel column A350-7-CW- 1306-1317 kg 26,586.16

10.1.2_ Galvanized Steel beams A350-7-CW- 1331-1338 kg 26,478.71

10.1.3_ Galvanized Purlin for wall Z200x62x68x20 A350-7-CW-1343-1346 kg 2,835.92

10.1.4_ Galvanized Purlin for roof Z200x62x68x20 A350-7-CW-1343-1346 kg 254.16

10.1.5_Galvanized Steel Plate A350-7-CW-1331-1339 kg 6,409.34

10.2 Galvaized Buckle D16mm A350-7-CW-1348-1353 pcs 48.00

10.3 Galvaized Steel Wire rope D14mm A350-7-CW-1345/1346 m 175.60

10.4 Galvaized steel Bracing D12mm with 2 nuts for purlin A350-7-CW-1343-1346 m 411.40

10.5 Galvaized steel Bracing C channel 200mm for column A350-7-CW-1343/1344 kg 187.20
10.6 Galvanized Steel stair

10.6.1_Galvanized Steel plate A350-7-CW-1337/1338 kg 2,524.37

10.6.2_Galvanized Grating for stairtread (PL50x5mm and PL50x3mm) A350-7-CW-1337/1338 sqm 34.57

10.6.3_Galvanized Grating for walkways and platforms (F40x3mm) A350-7-CW-1337/1338 sqm 15.13

10.6.4_ Galvanized steel handrail A350-7-CW-1337/1338 kg 52.04

10.6.5_ Galvanized Bolt M16, L50 mm A350-7-CW-1337/1338 kg 25.00

Subject: Detail BOQ of Civil Works


Page - 145/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
10.7 Galvanized Grating platforms

10.7.1_Galvanized Steel platforms (F40x3mm) A350-7-CW-1308/1309 sqm 275.86

10.7.2_Galvanized Steel handrail A350-7-CW-1308/1309 sqm 75.16

10.8 Galvanized Bolts for steel structure

10.8.1_ Galvanized anchor bolt M24, L700 mm A350-7-CW-1306/1307 each 144.00

10.8.2_ Galvanized Bolt M20, L80 mm A350-7-CW-1331-1339 kg 304.64

10.8.3_ Galvanized Bolt M20, L70 mm A350-7-CW-1331-1339 kg 258.72

10.8.4_ Galvanized Bolt M20, L50 mm A350-7-CW-1331-1339 kg 176.00


Klip lok roof sheet
ZincAlume Steel (ASTM A792 / A792M Grade 340 class 2, AZM 180,
0.61 mm thick minimum)
10.9 Supplying, fitting, and fixing 0.61 mm thick Lysaght klip lok fitted A350-7-CW-1310 sqm 712.15
and fixed with “J” hook limpet washers and putty etc. all complete and
accepted by the Engineer

10.10 Roof Insulation (fiber glass with galvanized mesh) A350-7-CW-1310 sqm 712.15
10.11 Pre_ painted galvanized Steel wall, 0.61 thick A350-7-CW-1311-1315 sqm 1,015.45

10.12 Pre_ painted galvanized Steel Flashing, 0.61 thick A350-7-CW-1311-1315 m 229.80

10.13 Stainless steel gutter thk 1.2mm A350-7-CW-1310 m 78.10

10.14 Balloon gutter guard A350-7-CW-1311-1315 each 2.00

10.15 Galvanized square steel tube 100x50x2 and 50x50x2 A350-7-CW-1311-1315 kg 27.00

10.16 Downspout uPVC D100 mm, 2.8mm thk A350-7-CW-1311-1315 m 71.93


Sub - Total 10
11 Electrical Work
Ref: A350-7-LA-1301
Electrical equipment
11.1
Providing and fixing electric equipment to position

Subject: Detail BOQ of Civil Works


Page - 146/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
1- Wall mounted LED tube light
Providing & fixing the 1×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
breadth 60mm, superior quality electronic ballast with one year each 3.00
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC insulated
(stranded) flexible FR wire, earth terminal etc.

2- Wall mounted tube light


Providing & fixing the 2×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
breadth 60mm, superior quality electronic ballast with one year each 14.00
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC insulated
(stranded) flexible FR wire, earth terminal etc.

3 - Four way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 10.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

4- Distribution board IP54 Enclosure each 1.00

5- Sub distribution board IP 54 Enclosure each 2.00


11.2 Protection (MCB & MCCB)
1- MCB 2px10, 6KA each 5.00

2- MCB 2px16, 6KA each 2.00

3- MCB 4px20,6KA each 3.00

4- MCB 4PX25,6KA each 2.00


5- MCB 4px40, 6KA each 1.00
Electrical wire and cable (include conduit pipes, junction box with
11.3
terminal blockand concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 960.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 300.00
core 1c x 1.5 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
250.00
core 1c x 2.5 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
50.00
core 5c x 10 mm²

Subject: Detail BOQ of Civil Works


Page - 147/405
Item: Wagon Bagging and Loading House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Sub - Total 11
TOTAL

Subject: Detail BOQ of Civil Works


Page - 148/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 149/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 150/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 151/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 152/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 153/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 154/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 155/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 156/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 157/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 158/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 159/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 160/405
Item: Wagon Bagging and Loading House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 161/405
Item: Wagon Bagging and Loading House
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Workshop cum store
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Unit Rates Amounts


Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure

Earth work in excavation in all kinds of soil for foundation


trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes
1 and marking layout with chalk powder, providing necessary tools
and plants, protecting and maintaining the trench dry etc.,
stacking, clearing the excavated earth at a safe distance out of the
area enclosed by the layout etc.

Layout and marking for earth work in excavation in


1.1 A350-7-CW-1406 sqm 420.00
foundation accepted by the Engineer.

Earth work in excavation in foundation trenches up to 1.5 m


1.2 A350-7-CW-1409/1413 cum 122.44
depth and maximum 10 m lead: in soft clayey soil/loose sand/silt

Mobilization and cleaning site before commencing actual


1.3 physical work and during contract period and demobilization after A350-7-CW-1406 sqm 420.00
Completion of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building
site minimum dry density of 95% with optimum moisture content
1.4 A350-7-CW-1409/1413/1414 cum 73.86
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

1.5 Sand filling to elv +1.00 with compaction k=0.95 A350-7-CW-1409/1413/1414 cum 325.00
Clearing and disposing of excavated earth from the
construction site by truck or any other means to a place within 30
1.6 km radius of the city or town area including loading, unloading at A350-7-CW-1409/1413/1414 cum 48.58
both ends, leveling and dressing the carried earth etc. complete
accepted by the Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works


Page: 147/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in
the hole, washing the hole for at least 30 minutes, clean the bore-
hole and make the bore-hole ready for placing steel cage and
concreting including hire of drilling rig set, tripod stand, tremie
pipe, cost of fuel, lubricant, mobilization, demobilization,
maintenance, spares, stand-byes, insurance coverage, water,
electricity and other charges all compete approved and accepted
2.1 by the Engineer. Before commencing boring operation,
Contractor shall submit method of statement of cast-in-situ pile
work including sequence of boring and casting, disposal of spoils,
test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 450 mm dia
b) Depth up to 38 m A350-7-CW-1412 m 684.00

Subject: Detail BOQ of Civil Works


Page: 148/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Cast in situ pile with RCC works of required slump by adding
water reducing admixture with 25 Mpa relates to mix ratio
(1:1.5:3) on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1-
CEM -1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand
[Sylhet sand or coarse sand of equivalent F.M.2.2], 20 mm down
well graded crushed stone chips conforming to ASTM C-33,
including breaking crushed stone chips, screening through proper
sieves, making, placing re-bar cage & binding ms pipes in
position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1
2.2 meter throughout the period of concreting, maintaining required A350-7-CW-1412 cum 108.73
slump, etc. mixing the aggregates in diginal batching plant,
casting in bore holes, acertaining the strength by trial mix design
all complete including all cost of water, electricity, plant &
machinery, bentonite, admixture testing of materials and concrete
etc and other charges as per design, drawing etc all complete
approved and accepted by the Engineer. Concrete should prepared
by Digital batching plant, strength may be acertained by trail mix
design.

Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade
400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to
Bangladesh standard, with minimum yield strength, fy (ReH)=
400 MPa but fy not exceeding 450 MPa and whatever is the yield
strength within allowable limit as per BNBC/ ACI 318, the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least
1.25 and minimum elongation after fracture and minimum total
2.3 elongation at maximum force is 16% and 8% respectively A350-7-CW-1412 kg 8,403.67
including welding of lapping and spirals as per design,
drawing, straightening and cleaning rust, if any, bending and
binding in position with supply of G.I. wires, splices or laps what
so ever etc. all complete accepted by the Engineer (Measurement
shall be recorded only on Standard Mass per Unit length of Bars,
while, dia of bars exceeds its standard)

Subject: Detail BOQ of Civil Works


Page: 149/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Pile head concrete breaking & removing
Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe
distance including scraps and cleaning concrete from steel/M.S.
2.4 rods, straightening and bending of pile bars, preparation and A350-7-CW-1412 cum 1.72
making platform where necessary, carrying, all sorts of handling,
stacking the same properly after cleaning, leveling and dressing
the situ and clearing the bed etc.

i) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM
D5882- The standard method of testing by a qulifified and
approved PIT expert, preparing pile heads and providing all
2.5 relevant materials, equipment, result in standard forms and A350-7-CW-1412 each 17.00
compiling test report withhrecommendations on the test etc.
complete in all respect approve and accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page: 150/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading
unloading, Kentledge and other plants and equipment including
staging, mobilization, demobilization, hire charge, gunny bags,
sand and filling sacs/gunny bags for loading, record readings and
preparation of results in standard forms and other incidental
2.6 charges per standard practice and procedures including
submission of load test report, furnishing all graph and chart etc.
complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of
his responsibilities and obligations under Contract.

a) For 140 tonne load for 1 No. test /test 1.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of
3.1 single layer polythene sheet weighing 6.5 kg/Sqm with
allowances for lapping complete in all respect and accepted by the
Engineer.

3.1.1_ For footing A350-7-CW-1413 cum 2.18

3.1.2_ For beam at +1.000 A350-7-CW-1409/1413 cum 6.59

3.1.3_ For slab +1.000 A350-7-CW-1415 cum 37.29


3.1.4_ For plinth wall A350-7-CW-1406/1409 cum 3.05

3.1.5_ For drain and appron A350-7-CW-1409 cum 5.84

Subject: Detail BOQ of Civil Works


Page: 151/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Reinforced cement concrete works with minimum cement
concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25 Mpa
at 28 days on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1
CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality
Sylhet sand or coarse sand of equivalent F.M 2.2 and 20 mm
down well graded crushed stone chips conforming to ASTM C-
33; preparing the concrete mix in the Digital Batching plant,
3.2 ascertaing the strength by trail mix design, casting in forms,
compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved;
including all cost of water, electricity, admixture, additional
testing charges of materials and cylinders required by Engineer,
other charges etc. all complete approved and accepted by the
Engineer.

3.2.1_ Concrete for footing A350-7-CW-1413 cum 15.25

3.2.2_ Concrete for pedestal column and column A350-7-CW-1414/1417 cum 0.86
3.2.3_ Concrete for beam elv +1.000m A350-7-CW-1415 cum 9.42

3.2.4_ Concrete for beam level +4.450m A350-7-CW-1416 cum 8.70

3.2.5_ Concrete for beam level +6.450m A350-7-CW-1416 cum 6.53

3.2.6_ Concrete for slab elv +1.000m A350-7-CW-1416 cum 84.00

3.2.7_ Concrete for R.C.C shelf A350-7-CW-1417/1418 cum 75.51

3.2.8_ Concrete for ramp slope A350-7-CW-1406/1409 cum 4.58

3.2.9_ Concrete for lintel A350-7-CW-1406/1411 cum 1.36


Sub - Total 3

Subject: Detail BOQ of Civil Works


Page: 152/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
4.1.1_ Formwork for footing A350-7-CW-1413 sqm 55.44

4.1.2_ Formwork for pedestal column and column A350-7-CW-1414/1417 sqm 11.52

4.1.3_ Formwork for beam elv +1.000m A350-7-CW-1415 sqm 75.36

4.1.4_ Formwork for beam level +4.450m A350-7-CW-1416 sqm 69.60


4.1.5_ Formwork for beam level +6.450m A350-7-CW-1416 sqm 52.20

4.1.6_ Formwork for R.C.C shelf A350-7-CW-1417/1418 sqm 158.31

4.1.7_ Formwork for lintel A350-7-CW-1406/1411 sqm 12.32


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed
or deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released
from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16%
and 8% respectively including straightening and cleaning rust, if
5.1 any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds
its standard)

5.1.1_ Rebar for footing A350-7-CW-1413 kg 341.36

5.1.2_ Rebar for Padestal column and column A350-7-CW-1414/1217 kg 2,140.55

5.1.3_ Rebar for beam elv +1.000m A350-7-CW-1415 kg 4,470.96

5.1.4_ Rebar for beam level +4.450m A350-7-CW-1416/1220 kg 1,683.61


5.1.5_ Rebar for beam level +6.450m A350-7-CW-1416/1220 kg 1,284.45
Subject: Detail BOQ of Civil Works
Page: 153/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
5.1.6_ Rebar for slab elv +1.000m A350-7-CW-1416 kg 5,260.55

5.1.7_ Rebar for R.C.C shelf A350-7-CW-1417/1218 kg 16,743.36

5.1.8_ Rebar for ramp slope A350-7-CW-1406/1209 kg 443.52


5.1.9_ Rebar for lintel A350-7-CW-1406/1211 kg 248.49
Sub - Total 5
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole
machine made (Mirpur Ceramics or equivalent) Rock-face or
textured klinker facing bricks having uniform colour carefully
laid in cement sand (F.M.1.2) mortar (1:4) in superstructure with
uniform width and depth and depth joints, filling the interstices
6.1 with mortar, cleaning and soaking bricks at least for 24 hours
before use and washing and screening of sand, necessary
scaffolding, curing at least for 7 days and pointing with cement
sand (F.M.1.2) mortar (1:2) including cost of water, electricity
and other charges ect. all complete and accepted by the Engineer.
(Cement: CEM-I) in ground floor.

6.1.1_ For wall from +1.000 to +6.450 m and to roof A350-7-CW-1406-1410 cum 160.78
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with
first class bricks in cement sand (F.M. 1.2) mortar (1:6), in
superstructure including raking out joints, filling the interstices
with mortar, cleaning and soaking bricks at least 24 hours before
6.2 use and washing of sand, necessary scaffolding, curing at least 7
days etc. all complete (measurement to given as 250mm width for
one brick length and 375mm for one brick and a half brick
length). (Cement: CEM-I)

6.2.1_ For plinth wall A350-7-CW-1406/1409 cum 21.75


6.2.2_ For ramp slope A350-7-CW-1406/1409 cum 1.35

Subject: Detail BOQ of Civil Works


Page: 154/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M.
1.2) mortar (1:6), and making bond with connected wall including
necessary scaffolding, raking out joints, cleaning and soaking
6.3 bricks at least 24 hours before use and washing of sand curing at
least 7 days in all floor including cost of water, electricity and
other charges etc. (Cement: CEM-I)

Subject: Detail BOQ of Civil Works


Page: 155/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
6.3.1_ Drain wall A350-7-CW-1409 sqm 108.96
Stone 1x4 layer
6.4 Supplying, laying, compacting etc. as per drawing, specification A350- 7-CW-1409 cum 49.20
instruction
Sub - Total 6
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with
fresh cement to ceiling R.C.C, columns, beams, surface of stair
case, sunshades, cornices, railings, drop wall, louvers, fins and
7.1 finishing the corners and edges including washing of sand
cleaning the surface, scaffolding and curing a least for 7 days,
cost of water, electricity and other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to plinth wall A350-7-CW-1406/1409 sqm 52.20

7.1.2_ Plaster to column A350-4-CW-1406/1408/1409 sqm 88.71


7.1.3_ Plaster to beam +1.000m, +4.450m, +6.450m A350-7-CW-1406/1409 sqm 156.60

7.1.4_ Plaster to drain wall A350-7-CW-1409 sqm 108.96


7.2 Surfacing by hardener 5kg/m2
7.2.1_ For ground floor slab at +1.000 A350-7-CW-1406/1409 sqm 380.85

7.2.2_ For ramp slope A350-7-CW-1406/1409 sqm 22.88


7.3 Non- shrink grout for column A350-7-CW-1424÷1432 cum 0.15
Sub - Total 7
8 Tiles & Stone Work
8.1 Ceramic 75x225 mm, dark colour for lintel A350-7-CW-1406/1411 sqm 12.32
Sub - Total 8

Subject: Detail BOQ of Civil Works


Page: 156/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
9 Door & Window
Electrical rolling door DO1 (3000mm x3000mm)
9.1 Supplying and fixing electrical rolling door, include motor, key A350-7-CW-1406/1411 each 2.00
switch, break release and solid shutter.
9.2 5mm thick glass stainless steel frame door
9.2.1_5mm thick glass stainless steel frame door DO-02
A350-7-CW-1406/1411 sqm 2.50
(1000mm x 2500mm)
9.2.2_5mm thick glass stainless steel frame door DO-03
A350-7-CW-1406/1411 sqm 2.20
(1000mm x 2200mm)
5mm thick glass stainless steel frame window WD-01 (1500mm x
9.3 A350-7-CW-1406/1411 sqm 15.30
1700mm)
Window 1500x1000mm Louver type Galvanized steel (steel
9.4 A350-7-CW-1406/1411 sqm 16.50
frame 30x630x2 mm) Galvanized steel leaf 2mm
Sub - Total 9
10 Finishing Work
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered
from authorized local agent of the manufacturere in a sealed
container, applying to wall and ceiling in two coats over lime
putty of specified brand applied on primer or sealer elapsing
10.1 specified time for drying/recoating including cleaning drying,
making free from dirt, grease, wax, removing all chalked and
scaled materials, fungus, mending good the surface defects, sand
papering the surface and necessary scaffolding, spreading by
brush/ roller/ spray etc.

10.1.1_ Painting to plinth wall A350-7-CW-1406/1409 sqm 79.00


Sub - Total 10
11 Structural Steel
All steel structure, Beams, Columns, Purlins, fittings & fixtures
shall be hot rolled pre-fabricated and hot deep galvanized (EN
11.1 ISO 14713:1999 C5, Galvanized coating conforms to ASTM
A653/A653 M/EN 1461 for zinc coated steel minimum 600
gm/m2)

11.1.1_ Galvanized steel purlin C200x65x20x2mm A350-7-CW-1422/1430 kg 1,466.42

11.1.2_ Galvanized Steel column A350-7-CW-1424/1427/1430 kg 3,998.07

11.1.3_ Galvanized Steel beam A350-7-CW-1421/ 1424÷1430 kg 5,155.68

11.1.4_ Galvanized Canopy A350-7-CW-1432 kg 518.71

Subject: Detail BOQ of Civil Works


Page: 157/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
11.1.5_ Galvanized Steel Plate A350-7-CW-1424÷1432 kg 800.58

11.2 Galvaized Buckle D16mm A350-7-CW-1423 pcs 24.00

11.3 Galvaized Steel Wire rope D14mm A350-7-CW-1423 m 98.40


11.4 Galvaized steel Bracing D12mm with 2 nuts for purlin A350-7-CW-1423 m 80.00

11.5 Galvaized steel Bracing D20mm for column A350-7-CW-1423 m 763.02


11.6 Galvanized Bolts for steel structure
11.6.1_Galvanized anchor bolt M24, L700 mm A350-7-CW-1425/1428/1431 each 68.00

11.6.2_ Galvanized Bolt M16, L70 mm A350-7-CW-1424÷1432 kg 16.43

11.6.3_ Galvanized Bolt M12, L50 mm A350-7-CW-1424÷1432 kg 24.20


Klip lok roof sheet
ZincAlume Steel (ASTM A792 / A792M Grade 340 class 2,
AZM 180, 0.61 mm thick minimum)
11.7 Supplying, fitting, and fixing 0.61 mm thick Lysaght klip lok A350-7-CW-1407/ 1408/ 1409 sqm 486.45
fitted and fixed with “J” hook limpet washers and putty etc. all
complete and accepted by the Engineer

11.8 Roof Insulation (fiber glass with galvanized mesh) A350-7-CW-1407/ 1408/ 1409 sqm 486.45

11.9 Pre_painted galvanized Steel wall, 0.61 thick A350-7-CW-1407/ 1408/ 1409 sqm 588.90
11.10 Pre_painted galvanized Steel Flashing, 0.61 thick A350-7-CW-1407/ 1408/ 1410 m 59.20

11.11 Stainless steel gutter thk 1.2mm A350-7-CW-1407/ 1408/ 1409 m 60.00

11.12 Balloon gutter guard A350-7-CW-1407/ 1408/ 1409 each 12.00

11.13 Square galvanized steel tube 50x50x2 A350-7-CW-1407/ 1408/ 1409 kg 188.40

11.14 Downspout uPVC D100 mm, 2.8mm thk A350-7-CW-1407/ 1408/ 1409 m 86.40
Sub - Total 11
12 Electrical Work
Ref: A350-7-LA-1401
Electrical equipment
12.1
Providing and fixing electric equipment to position

Subject: Detail BOQ of Civil Works


Page: 158/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
1- Wall mounted tube light
Providing & fixing the 2×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm
& breadth 60mm, superior quality electronic ballast with one year
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC each 2.00
insulated (stranded) flexible FR wire, earth terminal etc.

2- Distribution board for workshop equipment's :


The workshop equipments include separate electrical floor
mounted board specification as following:
Circuit breaker MCCB, 25 KA, complete with thermal overload
and short circuit protection.
Protection IP 54, complete with the inside wiring.
Three phase indicating lamps and three indicating lamp (on-off-
failure). each 1.00
Phase sequence, one phase failure
Three phase current transformer
Three phase moving iron ammeter
Three phase moving iron voltmeter
Earth fault relay.

3- Distribution board IP54 Enclosures each 1.00


4- One way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed
type following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards each 2.00
mounted on required size 18 SWG galvanized plain sheet board
of 76.2 mm (3”) depth. All electrical contacts shall be brass/
copper

5- High pressure lamp 250V (SODIUM VAPOUR


LAMP(230V,50Hz) (Osram/Philips/GE/Harmonics or equivalent
brand accepted/approved by the Engineer))250 watt high pressure each 18.00
sodium vapour lamp.)
12.2 Protection (MCB & MCCB)
1- MCB 2px10, 6KA each 1.00

2- MCB 2px16, 6KA each 6.00


3- MCB 4px25, 6KA each 2.00

Subject: Detail BOQ of Civil Works


Page: 159/608
Item: Workshop Cum Store
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Electrical wire and cable (include conduit pipes, junction box
12.3
with terminal box and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu,
m 1,320.00
Single - core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu,
m 660.00
Single - core 1c x 2.5 mm²
Sub - Total 12
TOTAL

Subject: Detail BOQ of Civil Works


Page: 160/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 161/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 162/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 163/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 164/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 165/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 166/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 167/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 168/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 169/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 170/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 171/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 172/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 173/608
Item: Workshop Cum Store
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page: 174/608
Item: Workshop Cum Store
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Silo Office
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure

Earth work in excavation in all kinds of soil for foundation


trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes
1 and marking layout with chalk powder, providing necessary tools
and plants, protecting and maintaining the trench dry etc.,
stacking, clearing the excavated earth at a safe distance out of the
area enclosed by the layout etc.

Layout and marking for earth work in excavation in


1.1 A350-7-CW-1501 sqm 153.90
foundation accepted by the Engineer.

Earth work in excavation in foundation trenches up to 1.5 m


1.2 A350-7-CW-1501,1516-1518 cum 220.35
depth and maximum 10 m lead: in soft clayey soil/loose sand/silt

Mobilization and cleaning site before commencing actual


1.3 physical work and during contract period and demobilization after A350-7-CW-1501 sqm 153.90
Completion of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 A350-7-CW-1501,1516-1518 cum 51.87
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of
1.5 the city or town area including loading, unloading at both ends, A350-7-CW-1501,1516-1518 cum 168.48
leveling and dressing the carried earth etc. complete accepted by
the Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 158/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in
the hole, washing the hole for at least 30 minutes, clean the bore-
hole and make the bore-hole ready for placing steel cage and
concreting including hire of drilling rig set, tripod stand, tremie
pipe, cost of fuel, lubricant, mobilization, demobilization,
maintenance, spares, stand-byes, insurance coverage, water,
electricity and other charges all compete approved and accepted by
2.1 the Engineer. Before commencing boring operation, Contractor
shall submit method of statement of cast-in-situ pile work
including sequence of boring and casting, disposal of spoils, test
result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350-7-CW-1516 m 1,210.00
Cast in situ pile with RCC works of required slump by adding
water reducing admixture with 25 Mpa relates to mix ratio
(1:1.5:3) on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1-
CEM -1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand
[Sylhet sand or coarse sand of equivalent F.M.2.2], 20 mm down
well graded crushed stone chips conforming to ASTM C-33,
including breaking crushed stone chips, screening through proper
sieves, making, placing re-bar cage & binding ms pipes in
position, placing and removing tri-pod as per requirement, pouring
the concrete in bore-hole with the help of a tremie pipe,
2.2 maintaining the tremie pipe immersed in concrete by at least 1 A350-7-CW-1516 cum 341.95
meter throughout the period of concreting, maintaining required
slump, etc. mixing the aggregates in batching plant, casting inbore
holes, all complete including water, electricity, testing of materials
and concrete etc and other charges as per design, drawing etc all
complete approved and accepted by the Engineer. Concrete should
prepared by Digital batching plant, strength may be acertained by
trail mix design.

Subject: Detail BOQ of Civil Works


Page - 159/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade
400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to
Bangladesh standard, with minimum yield strength, fy (ReH)= 400
MPa but fy not exceeding 450 MPa and whatever is the yield
strength within allowable limit as per BNBC/ ACI 318, the ratio of
ultimate tensile strength fu to yield strength fy, shall be at least
1.25 and minimum elongation after fracture and minimum total
elongation at maximum force is 16% and 8% respectively
2.3 A350-7-CW-1516 kg 20,492.70
including welding of lapping and spirals as per design, drawing,
straightening and cleaning rust, if any, bending and binding in
position with supply of G.I. wires, splices or laps what so ever etc.
all complete accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia
of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total
length in each pile for ultrasonic pulse velocity meter test. The
Pvc pipes should have threaded cap at top and bottom, and jointed
by socket & glue to connect each others. 14 SWG steel wires shall
2.4 be used for binding with rebar cage having minimum one binding A350-7-CW-1516 m 3,630.00
with rebar cages in each 3m interval or apply other approved
devices for fastenening firmly with rebar cage, cleaning pipes
upto full length immediately after concreting, protecting the pipes
from any damage etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe
distance including scraps and cleaning concrete from steel/M.S.
2.5 rods, straightening and bending of pile bars, preparation and A350-7-CW-1516 cum 15.54
making platform where necessary, carrying, all sorts of handling,
stacking the same properly after cleaning, leveling and dressing
the situ and clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 160/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved
expert, preparing, cleaning the holes and providing all relevant
2.6 materials, equipment, result in standard forms and compiling test A350-7-CW-1516 each 29.00
report with recommendations on the test etc. complete in all
respect approve and accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM
D5882- The standard method of testing by a qulifified and
approved PIT expert, preparing pile heads and providing all
relevant materials, equipment, result in standard forms and A350-7-CW-1517 each 24.00
compiling test report with recommendations on the test etc.
complete in all respect approve and accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and
filling sacs/gunny bags for loading, record readings and
preparation of results in standard forms and other incidental
charges per standard practice and procedures including submission
of load test report, furnishing all graph and chart etc. complete in
2.7 all respects approved and accepted by the Engineer (Minimum
two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of
his responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test /test 2.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded stone chips; produced by
mixer, casting in forms in/c supplying & laying of single layer
3.1 polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 161/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3.1.1_ For footing A350-7-CW-1516-1518 cum 13.51

3.1.2_ For bracing beam A350-7-CW-1518, 1519 cum 0.78


3.1.3_ For ground floor slab A350-7-CW-1518 cum 13.96

3.1.4_ For drain and appron A350-7-CW-1501 cum 4.69


Reinforced cement concrete works with minimum cement
concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25 Mpa
at 28 days on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1
CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality
Sylhet sand or coarse sand of equivalent F.M 2.2 and 20 mm down
well graded crushed stone chips conforming to ASTM C-33;
preparing the concrete mix in the Digital Batching plant,
3.2 ascertaing the strength by trail mix design, casting in forms,
compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved;
including all cost of water, electricity, admixture, additional
testing charges of materials and cylinders required by Engineer,
other charges etc. all complete approved and accepted by the
Engineer.

3.2.1_ Concrete for footing A350-7-CW-1516, 1517 cum 93.40

3.2.2_ Concrete for pedestal column A350-7-CW-1516, 1517 cum 1.65

3.2.3_ Concrete for bracing beam A350-7-CW-1518, 1519 cum 4.68

3.2.4_ Concrete for 1st floor beam A350-7-CW-1520 cum 17.07

3.2.5_ Concrete for beam elv + 7.150m A350-7-CW-1520 cum 19.87

3.2.6_ Concrete for roof beam A350-7-CW-1522, 1523 cum 9.34

3.2.7_ Concrete for ground floor slab A350-7-CW-1518 cum 13.96

3.2.8_ Concrete for 1st floor slab A350-7-CW-1520 cum 16.16

3.2.9_ Concrete for slab elv + 7.150m A350-7-CW-1520 cum 1.78

3.2.10_ Concrete for roof slab A350-7-CW-1522, 1523 cum 17.71

3.2.11_ Concrete for gutter A350-7-CW-1506 cum 4.74

Subject: Detail BOQ of Civil Works


Page - 162/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3.2.12_ Concrete for column A350-7-CW-1522,1525 cum 32.84

3.2.13_ Concrete for lintel A350-7-CW-1511 cum 2.51

3.2.14_ Concrete for sunshade A350-7-CW-1511 cum 0.56

3.2.15_ Concrete for staircase A350-7-CW-1526, 1510 cum 1.69


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
4.1.1_ Formwork for footing A350-7-CW-1516, 1517 sqm 102.74

4.1.2_ Formwork for pedestal column A350-7-CW-1516, 1517 sqm 44.00

4.1.3_ Formwork for bracing beam A350-7-CW-1518, 1519 sqm 31.44

4.1.4_ Formwork for 1st floor beam A350-7-CW-1520 sqm 151.02

4.1.5_ Formwork for beam elv + 7.150m A350-7-CW-1520 sqm 167.16

4.1.6_ Formwork for roof beam A350-7-CW-1522, 1523 sqm 87.71


4.1.7_ Formwork for 1st floor slab A350-7-CW-1520 sqm 102.80

4.1.8_ Formwork for slab elv + 7.150m A350-7-CW-1520 sqm 14.85

4.1.9_ Formwork for roof slab A350-7-CW-1522, 1523 sqm 168.02

4.1.10_ Formwork for gutter slab A350-7-CW-1506 sqm 39.51

4.1.11_ Formwork for column A350-7-CW-1522,1525 sqm 291.10

4.3.12_ Formwork for lintel A350-7-CW-1511 sqm 43.31

4.1.13_ Formwork for sunshade A350-7-CW-1511 sqm 12.99

4.3.14_ Formwork for staircase A350-7-CW-1526, 1510 sqm 12.81


Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 163/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed
or deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released
from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16%
5.1 and 8% respectively including straightening and cleaning rust, if
any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds
its standard)

5.1.1_ Reinforcement for footing A350-7-CW-1516, 1517 kg 10,245.83

5.1.2_ Reinforcement for pedestal column A350-7-CW-1516, 1517 kg 3,140.03

5.1.3_ Reinforcement for bracing beam A350-7-CW-1518, 1519 kg 3,103.40

5.1.4_ Reinforcement for 1st floor beam A350-7-CW-1520 kg 4,164.42

5.1.5_ Reinforcement for beam at elv + 7.150m A350-7-CW-1520 kg 4,499.52

5.1.6_ Reinforcement for roof beam A350-7-CW-1522-2425 kg 1,989.25

5.1.7_ Reinforcement for ground floor slab A350-7-CW-1518 kg 2,076.77

5.1.8_ Reinforcement for 1st floor slab A350-7-CW-1520 kg 2,597.46

5.1.9_ Reinforcement for slab at elv +7.150m A350-7-CW-1520 kg 610.76

5.1.10_ Reinforcement for roof slab A350-7-CW-1522-2425 kg 3,378.99

5.1.11_ Reinforcement for gutter A350-7-CW-1506 kg 868.72

5.1.12_ Reinforcement for column A350-7-CW-1522,1525 kg 8,266.65

5.1.13_ Reinforcement for lintel A350-7-CW-1511 kg 596.50

5.1.14_ Reinforcement for sunshade A350-7-CW-1511 kg 144.70

5.1.15_ Reinforcement for staircase A350-7-CW-1526 kg 292.52

Subject: Detail BOQ of Civil Works


Page - 164/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Sub - Total 5
6 Masonry Work

Brick work for exterior wall


250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole
machine made (Mirpur Ceramics or equivalent) Rock-face or
textured klinker facing bricks having uniform colour carefully laid
in cement sand (F.M.1.2) mortar (1:4) in superstructure with
uniform width and depth and depth joints, filling the interstices
6.1
with mortar, cleaning and soaking bricks at least for 24 hours
before use and washing and screening of sand, necessary
scaffolding, curing at least for 7 days and pointing with cement
sand (F.M.1.2) mortar (1:2) including cost of water, electricity and
other charges ect. all complete and accepted by the Engineer.
(Cement: CEM-I) in ground floor.

6.1.1_ Ground floor wall include balcony wall A350-7-CW-1503-1505 cum 44.96

6.1.2_ 1st floor wall include balcony wall A350-7-CW-1503-1505 cum 43.10

Exposed brick work for interior wall


Exposed 125mm thick pointing extra ordinary ornamental brick
work with automatic machine made 10 holes first class bricks
(Mirpur Ceramics or equivalent) in cement sand (F.M.1.2) mortar
(1:4) and making bond with connected walls including necessary
6.2 scaffolding, raking out joints, cleaning and soaking the bricks for
at least 24 hours before use and washing of sand curing at least for
7 days and pointing with cement sand (F.M.1.2) mortar (1:2) in all
floors including cost of water, electricity and other charges ect. all
complete and acceplete and accepted by the Engineer. (Cement:
CEM-I)

6.2.1_ Ground floor A350-7-CW-1503-1505 sqm 52.08


6.2.2_ 1st floor A350-7-CW-1503-1505 sqm 75.65
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with
first class bricks in cement sand (F.M. 1.2) mortar (1:6), in
superstructure including raking out joints, filling the interstices
with mortar, cleaning and soaking bricks at least 24 hours before
6.3 use and washing of sand, necessary scaffolding, curing at least 7
days etc. all complete (measurement to given as 250mm width for
one brick length and 375mm for one brick and a half brick length)
(Cement: CEM-I)

Subject: Detail BOQ of Civil Works


Page - 165/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
6.3.1_ Staircase A350-7-CW-1526, 1510 cum 3.94

Subject: Detail BOQ of Civil Works


Page - 166/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
6.3.2_ Entry step A350-7-CW-1504 cum 1.14

125mm thick normal brick work in superstructure


125mm brick work with first class bricks in cement sand (F.M.
1.2) mortar (1:6), and making bond with connected wall including
6.4 necessary scaffolding, raking out joints, cleaning and soaking
bricks at least 24 hours before use and washing of sand curing at
least 7 days in all floor including cost of water, electricity and
other charges etc. (Cement: CEM-I)

6.4.1_ Gutter wall A350-7-CW-1503-1506 sqm 34.24

6.4.2_ Drain wall A350-7-CW-1501 sqm 95.20


Sub - Total 6
7 Plastering & Waterproofing Work

Plaster ceiling R.C.C, columns, beams, staircase etc


Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with
fresh cement to ceiling R.C.C, columns, beams, surface of stair
7.1 case, sunshades, cornices, railings, drop wall, louvers, fins and
finishing the corners and edges including washing of sand cleaning
the surface, scaffolding and curing a least for 7 days, cost of water,
electricity and other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to gutter A350-7-CW-1506 sqm 139.27

7.1.2_ Plaster to beam A350-7-CW-1520, 1522, 1523 sqm 212.12

7.1.3_ Plaster to ceiling and lower surface of roof slab A350-7-CW-1520, 1522, 1523 sqm 285.67

7.1.4_ Plaster to column A350-7-CW-1522,1525 sqm 194.06

7.1.2_ Plaster to drain A350-7-CW-1501 sqm 95.20

7.1.3_Plaster to staircase A350-7-CW-1526, 1510 sqm 15.02


7.2 Waterproofing
7.2.1_ Three layers waterproofing by sika for gutter slab A350-7-CW-1505 sqm 31.28
Sub - Total 7

Subject: Detail BOQ of Civil Works


Page - 167/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
8 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2)
8.1 mortar (1:4) base and raking out the joints with white cement
including cutting and laying the tiles in proper way and finishing
with care

8.1.1_ Ground floor A350-7-CW-1502-1504 sqm 97.06

8.1.2_ 1st floor A350-7-CW-1502-1504 sqm 96.06


Homogenious tile 300 x 300mm
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2)
8.2 mortar (1:4) base and raking out the joints with white cement
including cutting and laying the tiles in proper way and finishing
with care
8.2.1_ Toilet floor A350-7-CW-1505, 1506 sqm 57.78
Ceramic tile 300x500mm light colour for toilet wall
Suppling, fitting and fixing glazed wall tile, irrespective of color
&/or design, with on 20 mm thick cement sand (F.M. 1.2) mortar
8.3 (1:3) base and ranking out the joints with respective joint filler &
binder including cutting, laying and hire charge of machine and
finishing with care etc. including water, electricity and other
charges

8.3.1_ Toilet wall A350-7-CW-1505, 1506 sqm 95.40


Mirpur ceramic 75x225 mm, dark colour for outer surface of
8.5 A350-7-CW-1502-1504 sqm 35.58
ground floor beam
Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick
8.4 cement sand (F.M. 1.2) mortar (1:4) base and ranking out the
joints with respective joint filler & binder including cutting, laying
and finishing with care etc

8.5.1_ For staircase A350-7-CW-1510 sqm 10.09

8.5.2_ For entry steps A350-7-CW-1502-1504 sqm 5.89


Roof tile
8.6 Supplying, fitting and fixing country made (Mirpur A350-7-CW-1502-1504 sqm 158.20
Ceramic/equivalent) roof tile, with adhesive motar
Sub - Total 8

Subject: Detail BOQ of Civil Works


Page - 168/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
9 Door & Window
Wooden (matured and seasoned Mehaghani) entry door and
frame
Supplying and making solid wooden door for all floors with
matured natural seasoned wood of required size including painting
9.1
two coats of coal tar to the surface in contact with all, fitting and
fixing in position. Frame (size 250x62mm) & shutter as per
design,drawing, accepted by the Engineer

9.1.1_ Double leaf door DO-01 (2100x1200mm x 38 mm)


A350-7-CW-1508-1512 cum 0.36
including varnishing and frence polishing
9.1.2_ Single leaf door DO-02 (2100x1000mm x38 mm) including
A350-7-CW-1508-1512 cum 0.96
varnishing and frence polishing
Wooden (matured and seasoned Mehaghani) entry door and
frame
Supplying and making solid wooden door for all floors with
9.2 matured natural seasoned wood of required size including painting
two coats of coal tar to the surface in contact with all, fitting and
fixing in position. Frame (size 150x62mm) & shutter as per
design,drawing, accepted by the Engineer

9.2.1_ Single leaf door DO-03 (2100x700mm x 38 mm) including


A350-7-CW-1508-1512 cum 0.26
varnishing and frence polishing
9.3 Solid uPVC Toilet door (Frame size 150 x 62 mm)
9.3.1_ Single leaf door DO-04 (2130x760mm x 38 mm) A350-7-CW-1508-1512 each 6.00
9.3.2_ Single leaf door DO-05 (2130x600mm x 38 mm) A350-7-CW-1508-1512 each 7.00
5mm thick glass Thai Aluminium frame sliding window as per
9.4
design, drawing, accepted by the Engineer
9.4.1_ Double shutter window WD-01 (1200x1400mm) including
grill with 12mm square bar as per drawing, design, specification A350-7-CW-1508-1512 sqm 33.60
etc. all complete & accepted by the Engineer
9.4.2_ Double shutter window WD-02 (1200x1000mm) including
grill with 12mm square bar as per drawing, design, specification A350-7-CW-1508-1512 sqm 2.40
etc. all complete & accepted by the Engineer
5mm thick glass Thai Aluminium frame curtain window as per
9.5 design,drawing, accepted by the Engineer
9.5.1_ Single shutter curtain window CW-01 (600x600mm)
including grill with 12mm square bar as per drawing, design, A350-7-CW-1508-1512 sqm 5.04
specification etc. all complete & accepted by the Engineer
9.5.2_ Single shutter curtain window CW-02 (1250x600mm)
including grill with 12mm square bar as per drawing, design, A350-7-CW-1508-1512 sqm 1.50
specification etc. all complete & accepted by the Engineer
Sub - Total 9
Subject: Detail BOQ of Civil Works
Page - 169/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
10 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm
thick board laminated by mechanical hot press with a milk white
10.1 PVC membrane with Aluminum T- bar frame in natural anodized
finish at 600*600 mm in grid suspended from ceiling by 12 SWG
double ply wire fixed to the ceiling by rowel plug, screws, hooks,
nails etc.

10.1.1_ Aluminium ceiling all floor A350-7-CW-1520 sqm 308.00

Emulsion Paint
Plastic emulsion of approved best quality and colour delivered
from authorized local agent of the manufacturere in a sealed
container, applying to wall and ceiling in two coats over lime putty
of specified brand applied on primer or sealer elapsing specified
10.2
time for drying/recoating including cleaning drying, making free
from dirt, grease, wax, removing all chalked and scaled materials,
fungus, mending good the surface defects, sand papering the
surface and necessary scaffolding, spreading by brush/ roller/
spray etc.

10.2.1_ Painting to gutter A350-7-CW-1506 sqm 73.75

10.2.2_ Painting to beam A350-7-CW-1520, 1522, 1523 sqm 212.12

10.2.3_ Painting to column A350-7-CW-1522,1525 sqm 194.06

10.2.4_ Painting to staircase A350-7-CW-1502-1504 sqm 8.23


Sub - Total 10
11 Structural Steel
11.1 Balloon gutter guard F114 A350-7-CW-1507 each 12.00

11.2 Stainless steel handrail with wooden top rail for staircase A350-7-CW-1510 m 12.22

11.3 Stainless steel handrail for balcony wall A350-7-CW-1510 m 32.40


Sub - Total 11
12 Water Supply/ Waste water System
A350-7-DW-3-1502, A350-7-DW-2-1502
Supply and installation of foreign made food grade stainless steel
(SS304) thickness 1.8mm water tank including supply of
12.1
hardware, consumables, fittings etc. all complete approved and
accepted by the Engineer
12.1.1_2000 liter capacity each 2.00

Subject: Detail BOQ of Civil Works


Page - 170/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
12.2 Valve each 28.00

12.3 uPVC pipe (min. thickness3.0 mm)

12.3.1_ uPVC ɸ110 m 21.50

12.3.2_ uPVC ɸ76 m 16.00

12.3.3_ uPVC ɸ40 m 7.00

12.3.4_VENT PIPE uPVC ɸ60 m 8.00

12.3.5_VENT PIPE uPVC ɸ76 m 8.00


12.4 PPR pipe (min. thickness 4.5 mm)
12.4.1_PPR pipe ɸ 20 m 51.00

12.4.2_PPR pipe ɸ 27 m 2.00


12.5 Tee
12.5.1_110 Tee each 10.00

12.5.2_110/76 Tee each 3.00

12.5.3_110/40 Tee each 2.00

12.5.4_76/76 Tee each 18.00

12.5.5_76/40 Tee each 1.00

12.5.6_27/ 27Tee each 3.00

12.5.7_27/ 20Tee each 1.00

12.5.8_20/ 20Tee each 21.00

12.5.9_40/40 Tee each 6.00


12.6 Reducer
12.6.1_76-40 Reducer each 5.00

12.6.2_27-20 Reducer each 6.00


12.7 Elbow
12.7.1_ 90 degree elbow (PPR pipe ɸ 20) each 35.00

Subject: Detail BOQ of Civil Works


Page - 171/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
12.7.2_ 90 degree elbow (uPVC ɸ110) each 13.00

12.7.3_ 90 degree elbow (uPVC ɸ76) each 9.00

12.7.4_ 90 degree elbow (uPVC ɸ40) each 8.00

12.7.5_ 90 degree elbow (uPVC ɸ27) each 3.00

12.7.6_ 45 degree elbow (uPVC ɸ110) each 20.00


Septic tank
Construction of septic tank of different sizes (medium and large
sizes) with walls of brick work in cement mortar (1:6) having a
lining of minimum 125 mm R.C.C cast against the walls as per
approved type plan over a brick flat soling flat soiling and 150 mm
thick reinforced cement concrete flooring (1:2:4) with 125 mm
thick walls in partition and 12 mm thick cement plaster (1:4) with
N.C.F. to insides of walls on floor and all around outside walls by
18” height at top including supplying fitting and fixing of two
12.8 R.C.C. Tees and providing 450 mm dia water sealed heavy type
C.I. manhole cover with locking/unlocking arrangement and 100
mm thick R.C.C (1:2:4) top slab, including centering, shuttering,
fabricating, casting and curing etc.all complete as per standard
drawing, specification accepted by the Engineer. (Rate in
including cost of reinforcement and its fabrication, binding and
placing.)

12.8.1_ for 30 person each 1.00


Soak well
Construction of soak well of different sizes (medium and large
sizes) with 250mm thick soild brick work and 250mm honey comb
brick work with cement mortar (1:6) as per design over R.C.C.
(1:2:4) well curb with 1% reinforcement up to the depth as per
drawing with 450 mmm dia water sealed heavy type. C.I. manhole
cover with locking arrangement, filling the well up to the reqired
depth with graded khoa and sand including suppling and fabicating
12.9 M.S. Rod, casting, curing including necessary earth work in
excavation, side filling and bailing out water including cost of all
materials etc. all complete as per standard drawing, design
approved and accepted by the Engineer. (Rate in including cost of
reinforcement and its fabrication, binding,and placing, form work
etc.)

Subject: Detail BOQ of Civil Works


Page - 172/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
12.9.1_ 30 users each 1.00
Construction of masonry inspection pit with 250 mm thick brick
work in cement mortar (1:4) including necessary earth work, side
filling and one layer brick flat soling, 75 mm thick (1:3:6) base
12.10 concrete for making invert channel and 12 mm thick (1:2) cement
plaster with neat finishing etc.all complete up to a depth of 700
mm approved and accepted by the Engineer.

12.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average


525 mm for single 150 mm dia R.C.C.pipes and 400 mm uPVC each 3.00
pipe
Sub - Total 12
13 Sanitary Accessories (Cotto or equivalent)
A350-7-CW-1505-2107, A350-7-DW-2-1502
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c
13.1 plastic seat cover, cistern system, preparing the base with cement each 10.00
concrete and with wire mesh or roads if necessary, including
making holes and fitting, fixing, finishing etc.
13.2 Bowl uniral each 6.00
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx.
size 656×510×845, 26kg by weight including fitting, fixing the
same in position with heavy type C.I. Brackets. 30 mm dia PVC
waste water pipe with brass coupling (not exceeding 750 mm in
13.3 length). 12mm plastic lead (connection) pipe with brass coupling, each 9.00
basin waste with chain plug including making holes in walls and
floors and fitting with wooden blocks, screws, finishing etc,

13.4 Bathroom strainer each 14.00


Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
unframe super quality mirror with hard board at the back with all
13.5 each 4.00
necessary fitting including making holes in walls and mending
good the damages with cement morta (1:4) etc.

13.6 Shower each 10.00


13.7 Wash basin faucet each 9.00
Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
13.8 150*150*126 mm size including making holes in walls and each 10.00
mending good the damages with cement mortar (1:4) etc.

Subject: Detail BOQ of Civil Works


Page - 173/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Porcelain soap tray
Supplying, fitting, and fixing standard size soap tray including
13.9 making holes in walls and mending good the damages with cement each 9.00
mortar (1:4) etc.
Supplying, fitting and fixing best quality faucets ect. (Cotto or
13.10 equivalent). Complete approved and accepted by the Engineer

13.10.1_12mm CP bib cock each 10.00


Supply, fitting and fixing best quality CP pillar cock ect. (Cotto or
13.11 equivalent). Complete approved and accepted by the Engineer

13.11.1_12 mm CP medium quality pillar cock each 10.00


13.11.2_12 mm CP stop cock each 10.00
13.11.3_12 mm CP angle stop cock each 10.00
Sub - Total 13
14 Electrical Work
Ref: A350-7-LA-1501
Electrical equipment
14.1 Providing and fixing electric equipment to position
1-LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215
mm.dia Steel Sheet Carrier, with Powder coated Paint/Oxidized each 56.00
/Chromium finished, suitable glass covers of min. height 92mm
3- Wall mounted bracket LED light
Providing & fixing the Special type fancy bracket LED light
consisting of white colour conical fiber sheet shade of minimum
dia 150mm, minimum total height of fitting 250mm, golden or each 2.00
oxidized or chromium plated/ brass bracket with carrier, brass
holder, earth terminal, necessary wiring with 2× 0.4 sq.mm
stranded PVC insulated flexible FR cable etc.

4- Ceiling fan 56" including fitting and fixing


Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS each 8.00
rod
5- Exhaust fan 12"
Providing and fixing of following axial flow A.C capacitor type
wall mounted exhaust fan complete with blade, steel frame
each 15.00
standard wall louver shutter, PVC insulated connecting wire etc.

Subject: Detail BOQ of Civil Works


Page - 174/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
6- Combined switch and regulator board
Supply and installation of electronics fans regulators compriasing
of standard component having noise suppression circuit and total
loss in the regulator not exceeding 0.4 watt suitable for 220 10% each 8.00
volt AC single phase 50 Hz manufactured by Micro Electronics
Ltd. or equivalent foreign made

7- Sub distribution board, IP42, include the terminal block each 2.00
8- Distribution board, IP42 Enclosures each 1.00
9- Socket (3-pin 6A) each 29.00
10- Socket (3-pin 15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps.
Combined switch socket outlet (concealed type) manufactured and
tested in accordance with relevant IEC standards and
manufactured and tested in accordance with relevant IEC
standards and approved by BSTI mounted on required size 18 each 10.00
SWG galvanized plain sheet board of 76.2mm. (3”) depth all
electrical contacts shall be of brass/copper (Dynamic/MEP/
SK/Metro/Super Star or equivalent, local made).)

11- LED tube light set (3 x 10W)


Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver
of following manufacturers (as per picture No. 12.37) consisting of
power coated 22 SWG sheet steel frame of min. length 600mm &
breath 600mm, symmetrical mirror reflector of anodized each 13.00
aluminum, superior quality electronic ballast with one year
guarantee, holder, necessary wiring with 2 x 0.4 sq.mm PVC
insulated (stranded) flexible FR wire, earth terminal etc.

12- LED tube light set (3 x 20W)


Providing & fixing the 3 x 2’× 20 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver
of following manufacturers (as per picture No. 12.19) consisting of
power coated enameled22 SWG sheet steel frame of min. length
1213mm & breath 600mm, louver of steel sheet/aluminum, each 14.00
superior quality electronic ballast with one year guarantee, holder,
necessary wiring with 2 x 0.4 sq.mm PVC insulated (stranded)
flexible FR wire, earth terminal etc.

Subject: Detail BOQ of Civil Works


Page - 175/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
13- One way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards
mounted on required size 18 SWG galvanized plain sheet board of each 10.00
76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

14- Two way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards each 3.00
mounted on required size 18 SWG galvanized plain sheet board of
76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

15- Three way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards each 8.00
mounted on required size 18 SWG galvanized plain sheet board of
76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

16- Four way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards each 2.00
mounted on required size 18 SWG galvanized plain sheet board of
76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

18- Room air cooler- split type 24000 btu / hr


Supply, Installation, Testing & commissioning of split type Air-
cooler comprising condensing and evaporating units having
following cooling capacity based on indoor temperature 27°-30° C
DB / 19.5°-22°C WB and outdoor temperature 35°-40° DB at high
fan speed condition suitable for installation & operation in each 9.00
tropicalized country like Bangladesh & as per detailed
specifications & standard as mentioned below: Wall mounted

14.2 Protection (MCB & MCCB)


1- MCB 2px10,6KA each 9.00
2- MCB 2px16,6KA each 8.00
3- MCB 4px20,6KA each 7.00

Subject: Detail BOQ of Civil Works


Page - 176/405
Item: Silo Office
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4- MCB 4px50,6KA each 1.00
Electrical wire and cable (include conduit pipes, junction box with
14.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 1,370.00
- core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 1,723.00
- core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 1,867.00
- core 1c x 2.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
500.00
- core 1c x 4 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 40.00
- core 5c x 6 mm²
5- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single
m 30.00
- core 5c x 10 mm²
Sub - Total 14
TOTAL

Subject: Detail BOQ of Civil Works


Page - 177/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 178/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 179/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 180/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 181/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 182/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 183/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 184/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 185/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 186/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 187/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 188/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 189/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 190/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 191/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 192/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 193/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 194/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 195/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 196/405
Item: Silo Office
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 197/405
Item: Silo Office
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Car Parking (6 cars)
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word

Earth work in excavation in all kinds of soil for foundation


trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes
1 and marking layout with chalk powder, providing necessary tools
and plants, protecting and maintaining the trench dry etc.,
stacking, clearing the excavated earth at a safe distance out of the
area enclosed by the layout etc.

Layout and marking for earth work in excavation in


1.1 A350-7-CW-1605 sqm 108.00
foundation accepted by the Engineer.

Earth work in excavation in foundation trenches up to 1.5 m


1.2 A350-7-CW-1605, 1607 cum 116.00
depth and maximum 10 m lead: in soft clayey soil/loose sand/silt

Mobilization and cleaning site before commencing actual


1.3 physical work and during contract period and demobilization after A350-7-CW-1605 sqm 108.00
Completion of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building
site minimum dry density of 95% with optimum moisture content
1.4 A350-7-CW-1605, 1607 cum 92.11
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the


construction site by truck or any other means to a place within 30
1.5 km radius of the city or town area including loading, unloading at A350-7-CW-1605, 1607 cum 23.89
both ends, leveling and dressing the carried earth etc. complete
accepted by the Engineer.

Subject: Detail BOQ of Civil Works Page - 177/405


Item: Car Parking
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Sub - Total 1
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded stone chips; produced by
mixer, casting in forms in/c supplying & laying of single layer
2.1 polythene sheet weighing 6.5 kg/Sqm with allowances for A350-7-CW-1605, 1607 cum 15.18
lapping complete in all respect and accepted by the Engineer.

Reinforced cement concrete works with minimum cement


concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25 Mpa
at 28 days on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1
CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality
Sylhet sand or coarse sand of equivalent F.M 2.2 and 20 mm
down well graded crushed stone chips conforming to ASTM C-
33; preparing the concrete mix in the Digital Batching plant,
2.2 ascertaing the strength by trail mix design, casting in forms,
compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved;
including all cost of water, electricity, admixture, additional
testing charges of materials and cylinders required by Engineer,
other charges etc. all complete approved and accepted by the
Engineer.

2.2.1_ Concrete for footing A350-7-CW-1607 cum 3.13

2.2.2_ Concrete for pedestal column A350-7-CW-1607 cum 1.75

2.2.3_ Concrete for ground floor beam A350-7-CW-1607 cum 3.83

2.2.4_ Concrete for ground floor slab A350-7-CW-1607 cum 28.55


Sub - Total 2

Subject: Detail BOQ of Civil Works Page - 178/405


Item: Car Parking
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
3.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
3.1.1_ Formwork for footing A350-7-CW-1607 sqm 4.88

3.1.2_ Formwork for pedestal column A350-7-CW-1607 sqm 14.04

3.1.3_ Formwork for ground floor beam A350-7-CW-1607 sqm 43.78


Sub - Total 3
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed
or deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released
from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16%
and 8% respectively including straightening and cleaning rust, if
4.1 any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds
its standard)

4.1.2_ Rebar for footing A350-7-CW-1607 kg 214.34

4.1.3_ Rebar for for Padestal column A350-7-CW-1607 kg 52.28

4.1.1_ Rebar for ground beam A350-7-CW-1607 kg 1,359.22

4.1.4_ Rebar for ground slab A350-7-CW-1607 kg 722.21


Sub - Total 4
5 Structural Steel

Subject: Detail BOQ of Civil Works Page - 179/405


Item: Car Parking
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
All steel structure, Beams, Columns, Purlins, fittings & fixtures
shall be hot rolled pre-fabricated and hot deep galvanized (EN
5.1 ISO 14713:1999 C5, Galvanized coating conforms to ASTM
A653/A653 M/EN 1461 for zinc coated steel minimum 600
gm/m2)

5.1.1_ Galvanized Purlin C200x65x15x.2 mm A350-7-CW-1605-1607 kg 634.80

5.1.2_ Galvanized steel column A350-7-CW-1605-1607 kg 524.56

5.1.3_ Galvanized bracing A350-7-CW-1605-1607 kg 178.24

5.1.4_ Galvanized steel Plate A350-7-CW-1605-1607 kg 126.15


Klip lok roof sheet
ZincAlume Steel (ASTM A792 / A792M Grade 340 class 2, AZM
180, 0.61 mm thick minimum)
5.2 Supplying, fitting, and fixing 0.61 mm thick Lysaght klip lok A350-7-CW-1605-1607 sqm 138.00
fitted and fixed with “J” hook limpet washers and putty etc. all
complete and accepted by the Engineer

5.3 Pre_painted galvanized Steel Flashing, 0.61mm thick A350-7-CW-1605-1607 m 138.00


5.4 Galvanized Bolt for steel structure
5.4.1_ Galvanized Bolt M22-600mm A350-7-CW-1605-1607 kg 24.00

5.4.2_ Galvanized Bolt D12 - L50 A350-7-CW-1605-1607 kg 4.97


Sub - Total 5
6 Electrical Work
Electrical equipment
6.1
Providing and fixing electric equipment to position
Ref: A350-7-LA-1601
1- Wall mounted LED tube light
Providing & fixing the 2×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm
& breadth 60mm, superior quality electronic ballast with one year each 3
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC
insulated (stranded) flexible FR wire, earth terminal etc.

Subject: Detail BOQ of Civil Works Page - 180/405


Item: Car Parking
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2- Three way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards each 3.00
mounted on required size 18 SWG galvanized plain sheet board of
76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

3- Distribution board IP54 Enclosure each 1.00


6.2 Protection (MCB & MCCB)
1- MCB 2px16, 6KA each 1.00
Electrical wire and cable (include conduit pipes, junction box with
6.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu,
m 70.00
Single - core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu,
m 100
Single - core 1c x1.5 mm²
Sub - Total 6
TOTAL

Subject: Detail BOQ of Civil Works Page - 181/405


Item: Car Parking
DETAIL BOQ of Civil Works

Project: Modern Food Storage Facilities_ MFSP


Location: Chattogram
Item: Anssars barrack 24 persons
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Unit Rates Amounts


Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350- 7 - CW - 1701 sqm 298.41
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth and
1.2 A350-7-CW-1701,1713,1714 cum 437.29
maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion of A350- 7 - CW - 1701 sqm 298.41
the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in 150mm
layers with earth available within 90 m of the building site minimum dry
density of 95% with optimum moisture content (Modified proctor test)
1.4 A350-7-CW-1701,1713,1714 cum 261.45
including carrying, watering, levelling, dressing and compacting to a
specified percentage each layer upto finished level etc. all complete and
accepted by the Engineer.
Clearing and disposing of excavated earth from the construction site
by truck or any other means to a place within 30 km radius of the city or
1.5 town area including loading, unloading at both ends, leveling and A350-7-CW-1701,1713,1714 cum 175.84
dressing the carried earth etc. complete accepted by the Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works


Page -182/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded stone chips; produced by mixer,
casting in forms in/c supplying & laying of single layer polythene sheet
2.1 weighing 6.5 kg/Sqm with allowances for lapping complete in all
respect and accepted by the Engineer.

2.1.1_ For footing A350-7-CW-1713,1714 cum 21.23

2.1.2_ For ground floor beam A350-7-CW-1713,1717 cum 7.84


2.1.3_ For ground floor slab A350-7-CW-1713,1717 cum 37.00

2.1.4_ For drain and appron A350-7-CW-1703 cum 7.70


Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
2.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

2.2.1_ Concrete for footing A350-7-CW-1713,1714 cum 77.99

2.2.2_ Concrete for pedestal column A350-7-CW-1714, 1715 cum 13.33

2.2.3_ Concrete for ground floor beam A350-7-CW-1717 cum 18.16

2.2.4_ Concrete for beam +4.450m A350-7-CW-1719 cum 21.95

2.2.5_ Concrete for roof beam A350-7-CW-1723 cum 11.36

2.2.6_ Concrete for ground floor slab A350-7-CW-1722 cum 44.40

2.2.7_ Concrete for slab +4.450m A350-7-CW-1719 cum 1.37


2.2.8_ Concrete for roof slab A350-7-CW-1726 cum 46.68

Subject: Detail BOQ of Civil Works


Page -183/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
2.2.9_ Concrete for column A350-7-CW-1715 cum 29.12

2.2.10_ Concrete for gutter slab A350-7-CW-1705 cum 6.91

2.2.11_ Concrete for lintel A350-7-CW-1715 cum 2.15

2.2.12_ Concrete for sunshade A350-7-CW-1715 cum 0.71


Sub - Total 2
3 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
3.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
3.1.1_ Formwork for footing A350-7-CW-1713,1714 sqm 90.64

3.1.2_ Formwork for pedestal column A350-7-CW-1714, 1715 sqm 53.30

3.1.3_ Formwork for ground floor beam A350-7-CW-1717 sqm 137.69

3.1.4_ Formwork for Beam at elv +4.450m A350-7-CW-1719 sqm 230.50

3.1.5_ Formwork for roof beam A350-7-CW-1723 sqm 129.18

3.1.6_ Formwork for slab +4.450m A350-7-CW-1719 sqm 11.38

3.1.7_ Formwork for roof slab A350-7-CW-1726 sqm 359.82


3.1.8_ Formwork for column A350-7-CW-1715 sqm 318.57

3.1.9_ Formwork for gutter slab A350-7-CW-1705 sqm 57.56

3.1.10_ Formwork for lintel A350-7-CW-1715 sqm 41.22

3.1.11_ Formwork for sunshade A350-7-CW-1715 sqm 16.49


Sub - Total 3

Subject: Detail BOQ of Civil Works


Page -184/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for Reinforced
Cement Concrete, produced and marked in accordance with BDS ISO
6935-2: 2006 (or standard subsequently released from BSTI) , the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least 1.25
and minimum elongation after fracture and minimum total elongation at
maximum force is 16% and 8% respectively including straightening and
4.1 cleaning rust, if any, bending and binding in position with supply of G.I.
wires, splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

4.1.1_ Reinforcement for footing A350-7-CW-1713,1714 kg 4,982.46

4.1.2_ Reinforcement for pedestal colum A350-7-CW-1714, 1715 kg 7,071.96


4.1.3_ Reinforcement for ground floor beam A350-7-CW-1717-1718 kg 4,507.09

4.1.4_ Reinforcement beam +4.450m A350-7-CW-1719-1721 kg 4,694.13

4.1.5_ Reinforcement for roof beam A350-7-CW-1723-1725 kg 2,814.51

4.1.6_ Rebar for ground floor slab A350-7-CW-1722 kg 343.39

4.1.7_ Rebar for slab +4.450m A350-7-CW-1719 kg 163.80

4.1.8_ Reinforcement for roof slab A350-7-CW-1726 kg 1,978.62

4.1.9_ Reinforcement for column A350-7-CW-1715 kg 11,542.59

4.1.10_ Reinforcement for gutter slab A350-7-CW-1705 kg 5.87


4.1.11_ Reinforcement for lintel A350-7-CW-1715 kg 493.74

4.1.12_ Rebar for Sunshade A350-7-CW-1715 kg 419.68


Sub - Total 4

Subject: Detail BOQ of Civil Works


Page -185/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
5 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and soaking
5.1 bricks at least for 24 hours before use and washing and screening of
sand, necessary scaffolding, curing at least for 7 days and pointing with
cement sand (F.M.1.2) mortar (1:2) including cost of water, electricity
and other charges ect. all complete and accepted by the Engineer.
(Cement: CEM-I) in ground floor.

5.1.1_ Ground floor A350-7-CW-1701-1704 cum 95.98


Exposed brick work for interior wall
Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made 10 holes first class bricks (Mirpur
Ceramics or equivalent) in cement sand (F.M.1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding,
5.2 raking out joints, cleaning and soaking the bricks for at least 24 hours
before use and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges ect. all complete
and acceplete and accepted by the Engineer. (Cement: CEM-I) in ground
floor.
5.2.1_ Ground floor A350-7-CW-1701-1704 sqm 158.38

Normal brick work 250mm to 375mm thick


Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
5.3
and soaking bricks at least 24 hours before use and washing of sand,
necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length)
5.3.1_ For entry steps A350-7-CW-1703 cum 1.42

Subject: Detail BOQ of Civil Works


Page -186/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including necessary
5.4 scaffolding, raking out joints, cleaning and soaking bricks at least 24
hours before use and washing of sand curing at least 7 days in all floor
including cost of water, electricity and other charges etc.

Subject: Detail BOQ of Civil Works


Page -187/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
5.4.1_ Gutter wall A350-7-CW-1705 sqm 44.11
5.4.2_ For drain wall A350-7-CW-1703 sqm 143.64
Sub - Total 5
6 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
6.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement CEM 1)

6.1.1_ Plaster to gutter A350-7-CW-1705 sqm 162.31

6.1.2_ Plaster to beam A350-7-CW-1717-1718 sqm 316.00

6.1.3_ Plaster to ceiling and below surface of roof slab A350-7-CW-1719 sqm 400.38
6.1.4_ Plaster to column A350-7-CW-1714, 1715 sqm 318.57

6.1.5_ Plaster to drain A350-7-CW-1703 sqm 143.64

6.1.6_ Plaster to entry steps A350-7-CW-1703 sqm 1.90


6.2 Waterproofing
6.2.1_ Three layers waterproofing by sika grout for gutter slab A350-7-CW-1705 sqm 57.56
Sub - Total 6
7 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
7.1
(1:4) base and raking out the joints with white cement including cutting
and laying the tiles in proper way and finishing with care
7.1.1_ Ground floor A350-7-CW-1705-1707 sqm 191.78
Homogenious tile 300 x 300mm
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
7.2 (1:4) base and raking out the joints with white cement including cutting
and laying the tiles in proper way and finishing with care

7.2.1_ Bathroom and Toilet A350-7-CW-1705-1707 sqm 34.00

Subject: Detail BOQ of Civil Works


Page -188/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Ceramic tile 300x500mm light colour for toilet wall
Suppling, fitting and fixing glazed wall tile, irrespective of color &/or
design, with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base
7.3 and ranking out the joints with respective joint filler & binder including A350-7-CW-1705-1707 sqm 42.97
cutting, laying and hire charge of machine and finishing with care etc.
including water, electricity and other charges

Mirpur ceramic 75x225 mm, dark colour for outer surface of ground
7.4 floor beam A350-7-CW-1717-1718 sqm 64.23
Granite stone 20mm thick
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
7.5 sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
respective joint filler & binder including cutting, laying and finishing
with care etc

7.5.1_ Entry steps A350-7-CW-1703 sqm 6.30


Roof tile
7.6 Supplying, fitting and fixing country made (Mirpur Ceramic/equivalent) A350-7-CW-1702 sqm 437.70
roof tile, with adhesive motar
Sub - Total 7
8 Door & Window
Wooden (matured and seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
8.1 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 150x62mm) & shutter as per design, drawing, accepted by
the Engineer

8.1.1_ Double leaf door DO-01 (2100x1200x38mm) including


varnishing and frence polishing. A350-7-CW-1708,1709 cum 0.73
8.1.2_ Single leaf door DO-02 (2100x1000x38mm) including varnishing
and frence polishing A350-7-CW-1708,1709 cum 0.26

Subject: Detail BOQ of Civil Works


Page -189/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Wooden (matured and seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 250x62mm) & shutter as per design, drawing, accepted by
the Engineer

8.1.2_ Single leaf door DO-02a (2100x1000x38mm) including


A350-7-CW-1708,1709 cum 0.16
varnishing and frence polishing
8.2 Solid uPVC Toilet door (frame 150x62mm)
8.2.1_ Single leaf door DO-03 (2130x760x38mm) A350-7-CW-1708,1709 each 3.00

8.2.2_ Single leaf door DO-04 (2130x600x38mm) A350-7-CW-1708,1709 each 10.00


5mm thick glass Thai Aluminium frame sliding window as per design,
8.3
drawing, accepted by the Engineer
8.4.1_ Double shutter window WD-01 (1200x1400mm) including grill
with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-1708,1709 sqm 28.56
complete & accepted by the Engineer
8.4.2_ Double shutter window WD-02 (1200x1400mm) including grill
with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-1708,1709 sqm 16.80
complete & accepted by the Engineer
5mm thick glass Thai Aluminium frame curtain window as per design,
8.4
drawing, accepted by the Engineer
8.5.1_ Single shutter curtain window CW-01 (610x610mm) A350-7-CW-1708,1709 sqm 4.47
Sub - Total 8
9 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm thick
board laminated by mechanical hot press with a milk white PVC
9.1 membrane with Aluminum T- bar frame in natural anodized finish at
600*600 mm in grid suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc.

9.1.1_ Aluminium ceiling Ground floor A350-7-CW-1719 sqm 297.00

Subject: Detail BOQ of Civil Works


Page -190/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
9.2 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

9.2.1_ Painting for gutter A350-7-CW-1705 sqm 44.11

9.2.2_ Painting to beam A350-7-CW-1717-1718 sqm 316.00


9.2.3_ Painting to column A350-7-CW-1714-1715 sqm 291.20

9.2.4_ Painting to entry steps A350-7-CW-1703 sqm 1.90


Sub - Total 9
10 Water Supply/ Waste water System
A350-7-DW-3-1703, A350-7-DW-2-1703
Supply and installation of foreign made food grade stainless steel
(SS304) thickness 1.8mm water tank including supply of hardware,
10.1
consumables, fittings etc. all complete approved and accepted by the
Engineer
11.1.1_2000 liter capacity each 2.00

11.2 Valve each 19.00

11.3 uPVC pipe (min. Thickness 3.0 mm)


11.3.1_ uPVC ɸ110 m 18.20

11.3.2_ uPVC ɸ76 m 31.00

11.3.3_ uPVC ɸ40 m 4.60

11.3.4_VENT PIPE uPVC ɸ 60 m 8.00

11.4 PPR pipe (min. Thickness 4.5 mm)


11.4.1_PPR pipe ɸ 27 m 11.50
11.4.2_PPR pipe ɸ 20 m 27.00

11.5 Tee

Subject: Detail BOQ of Civil Works


Page -191/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
11.5.1_110 Tee each 5.00

Subject: Detail BOQ of Civil Works


Page -192/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
11.5.2_76/76 Tee each 14.00

11.5.3_76/40 Tee each 2.00

11.5.4_27/ 27Tee each 3.00

11.5.5_27/ 20Tee each 4.00

11.5.6_20/ 20Tee each 7.00

11.6 Reducer
11.6.1_27-20 Reducer each 5.00

11.6.2_76-40 Reducer each 3.00

11.7 Elbow

11.7.1_90 degree elbow (PPR pipe ɸ 27) each 6.00

11.7.2_90 degree elbow (PPR pipe ɸ 20) each 27.00

11.7.3_90 degree elbow (uPVC ɸ110) each 2.00

11.7.4_90 degree elbow (uPVC ɸ76) each 16.00

11.7.5_90 degree elbow (uPVC ɸ40) each 3.00


11.7.6_45 degree elbow (uPVC ɸ110) each 14.00
Septic tank
Construction of septic tank of different sizes (medium and large sizes)
with walls of brick work in cement mortar (1:6) having a lining of
minimum 125 mm R.C.C cast against the walls as per approved type
plan over a brick flat soling flat soiling and 150 mm thick reinforced
cement concrete flooring (1:2:4) with 125 mm thick walls in partition
and 12 mm thick cement plaster (1:4) with N.C.F. to insides of walls on
floor and all around outside walls by 18” height at top including
11.8 supplying fitting and fixing of two R.C.C. Tees and providing 450 mm
dia water sealed heavy type C.I. manhole cover with locking/unlocking
arrangement and 100 mm thick R.C.C (1:2:4) top slab, including
centering, shuttering, fabricating, casting and curing etc. all complete as
per standard drawing, specification accepted by the Engineer. (Rate in
including cost of reinforcement and its fabrication, binding and placing.)

11.8.1_ for 50 users each 1.00

Subject: Detail BOQ of Civil Works


Page -193/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Soak well
Construction of soak well of different sizes (medium and large sizes)
with 250mm thick soild brick work and 250mm honey comb brick work
with cement mortar (1:6) as per design over R.C.C. (1:2:4) well curb
with 1% reinforcement up to the depth as per drawing with 450 mmm
dia water sealed heavy type. C.I. manhole cover with locking
arrangement, filling the well up to the reqired depth with graded khoa
11.9 and sand including suppling and fabicating M.S. Rod, casting, curing
including necessary earth work in excavation, side filling and bailing out
water including cost of all materials etc. all complete as per standard
drawing, design approved and accepted by the Engineer. (Rate in
including cost of reinforcement and its fabrication, binding,and placing,
form work etc.)

11.9.1_ 50 users each 1.00

Construction of masonry inspection pit with 250 mm thick brick work in


cement mortar (1:4) including necessary earth work, side filling and one
layer brick flat soling, 75 mm thick (1:3:6) base concrete for making
11.10
invert channel and 12 mm thick (1:2) cement plaster with neat finishing
etc.all complete up to a depth of 700 mm approved and accepted by the
Engineer.
11.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average 525 mm
each 3.00
for single 150 mm dia R.C.C.pipes and 400 mm uPVC pipe
Sub - Total 11
12 Sanitary Accessories (Cotto or equivalent)
A350-7-CW-1701-1709, A350-7-DW-2-1703
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c plastic
12.1 seat cover, cistern system, preparing the base with cement concrete and each 7.00
with wire mesh or roads if necessary, including making holes and
fitting, fixing, finishing etc.
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx. size
656×510×845, 26kg by weight including fitting, fixing the same in
position with heavy type C.I. Brackets. 30 mm dia PVC waste water
12.2 pipe with brass coupling (not exceeding 750 mm in length). 12mm each 5.00
plastic lead (connection) pipe with brass coupling, basin waste with
chain plug including making holes in walls and floors and fitting with
wooden blocks, screws, finishing etc,

12.3 Bathroom strainer each 13.00

Subject: Detail BOQ of Civil Works


Page -194/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
12.4 Kitchen Sink each 1.00

Subject: Detail BOQ of Civil Works


Page -195/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
12.5 unframe super quality mirror with hard board at the back with all each 5.00
necessary fitting including making holes in walls and mending good the
damages with cement morta (1:4) etc.
12.6 Shower each 5.00
12.7 Glass shelf each 5.00
12.8 Flush faucet for toilet bowl (Cotto or equivalent) each 11.00
12.9 Wash basin faucet (Cotto or equivalent) each 5.00
Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
12.10 150*150*126 mm size including making holes in walls and mending each 7.00
good the damages with cement mortar (1:4) etc.
Porcelain soap tray
Supplying, fitting, and fixing standard size soap tray including making
12.11 holes in walls and mending good the damages with cement mortar (1:4) each 5.00
etc.
Supplying, fitting and fixing best quality faucets ect. (Cotto or
12.12 equivalent). Complete approved and accepted by the Engineer
12.12.1_12mm CP bib cock each 7.00
Supply, fitting and fixing best quality CP pillar cock ect. (Cotto or
12.13 equivalent). Complete approved and accepted by the Engineer
12.13.1_12 mm CP medium quality pillar cock each 7.00
13.13.2_12 mm CP stop cock each 7.00
13.13.3_12 mm CP angle stop cock each 7.00
Sub - Total 12
13 Electrical Work
Ref: A350-7-LA-1701
Electrical equipment
13.1
Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215 mm.dia
each 32.00
Steel Sheet Carrier, with Powder coated Paint/Oxidized /Chromium
finished, suitable glass covers of min. height 92mm

Subject: Detail BOQ of Civil Works


Page -196/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
2- Wall mounted bracket LED light
Providing & fixing the Special type fancy bracket LED light consisting
of white colour conical fiber sheet shade of minimum dia 150mm,
minimum total height of fitting 250mm, golden or oxidized or each 32.00
chromium plated/ brass bracket with carrier, brass holder, earth terminal,
necessary wiring with 2× 0.4 sq.mm stranded PVC insulated flexible FR
cable etc.
3- Ceiling fan 56" including fitting and fixing
each 23.00
Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS rod
4- Exhaust fan 12"
Providing and fixing of following axial flow A.C capacitor type wall
each 9.00
mounted exhaust fan complete with blade, steel frame standard wall
louver shutter, PVC insulated connecting wire etc.
5- Combined switch and regulator board
Supply and installation of electronics fans regulators compriasing of
standard component having noise suppression circuit and total loss in
each 23.00
the regulator not exceeding 0.4 watt suitable for 220 10% volt AC single
phase 50 Hz manufactured by Micro Electronics Ltd. or equivalent
foreign made
6- Distribution board, IP42 Enclosures each 1.00
7- Socket (3-pin6A ) each 1.00
8- Socket (3-pin15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps.
Combined switch socket outlet (concealed type) manufactured and
tested in accordance with relevant IEC standards and manufactured and
tested in accordance with relevant IEC standards and approved by BSTI
mounted on required size 18 SWG galvanized plain sheet board of each 2.00
76.2mm. (3”) depth all electrical contacts shall be of brass/copper
(Dynamic/MEP/ SK/Metro/Super Star or equivalent, local made).)

9- LED tube light set (3 x 10W)


Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.37) consisting of power
coated 22 SWG sheet steel frame of min. length 600mm & breath
600mm, symmetrical mirror reflector of anodized aluminum, superior each 2.00
quality electronic ballast with one year guarantee, holder, necessary
wiring with 2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire,
earth terminal etc.

Subject: Detail BOQ of Civil Works


Page -197/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
10- LED tube light set (3 x 20W)
Providing & fixing the 3 x 2’× 20 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.19) consisting of power
coated enameled22 SWG sheet steel frame of min. length 1213mm & each 16.00
breath 600mm, louver of steel sheet/aluminum, superior quality
electronic ballast with one year guarantee, holder, necessary wiring with
2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire, earth terminal
etc.

11- One way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
each 31.00
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

12- Two way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
each 7.00
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper
13- Three way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 4.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

14- Four way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 1.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

Subject: Detail BOQ of Civil Works


Page -198/405
Item: Ansar Barack
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure
15- Room air cooler- split type 24000btu / hr
Supply, Installation, Testing & commissioning of split type Air-cooler
comprising condensing and evaporating units having following cooling
capacity based on indoor temperature 27°-30° C DB / 19.5°-22°C WB
and outdoor temperature 35°-40° DB at high fan speed condition each 1.00
suitable for installation & operation in tropicalized country like
Bangladesh & as per detailed specifications & standard as mentioned
below: Wall mounted

13.2 Protection (RCCB)


1- RCCB 2px10, 6KA each 5.00
2- RCCB 2px16,6KA each 3.00
3- RCCB 2px20, 6KA each 2.00
4- RCCB 4px40.6KA each 1.00
Electrical wire and cable (include conduit pipes, junction box with
13.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 1,823.00
core 1c x0.75 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 460.00
core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 1,000.00
core 1c x 4/ mm²
5- (NYY) XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 85.00
core 5c x 16 mm² Sub - Total 13
TOTAL

Subject: Detail BOQ of Civil Works


Page -199/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -200/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -201/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -202/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -203/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -204/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -205/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -206/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -207/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -208/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -209/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -210/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -211/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -212/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -213/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -214/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -215/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -216/405
Item: Ansar Barack
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page -217/405
Item: Ansar Barack
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Inspection Bungalow
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350 - 7 -CW- 1801 sqm 259.71
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth A350 - 7 -CW- 1801,1815,
1.2 cum 350.73
and maximum 10 m lead: in soft clayey soil/loose sand/silt 1816
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350 - 7 -CW- 1801 sqm 259.71
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
A350 - 7 -CW- 1801,1815,
1.4 (Modified proctor test) including carrying, watering, levelling, cum 248.85
dressing and compacting to a specified percentage each layer upto 1816
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city A350 - 7 -CW- 1801,1815,
1.5 cum 101.89
or town area including loading, unloading at both ends, leveling and 1816
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 197/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire of drilling rig set, tripod stand, tremie pipe, cost of fuel,
lubricant, mobilization, demobilization, maintenance, spares, stand-
byes, insurance coverage, water, electricity and other charges all
2.1 compete approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement of cast-
in-situ pile work including sequence of boring and casting, disposal of
spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350 - 7 -CW- 1814 Rm 1,276.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage &
binding ms pipes in position, placing and removing tri-pod as per
requirement, pouring the concrete in bore-hole with the help of a
2.2 tremie pipe, maintaining the tremie pipe immersed in concrete by at A350 - 7 -CW- 1814 cum 360.60
least 1 meter throughout the period of concreting, maintaining required
slump, etc. mixing the aggregates in batching plant, casting inbore
holes, all complete including water, electricity, testing of materials and
concrete etc and other charges as per design, drawing etc all complete
approved and accepted by the Engineer. Concrete should prepared by
Digital batching plant, strength may be acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 198/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within
allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile
strength fu to yield strength fy, shall be at least 1.25 and minimum
2.3 elongation after fracture and minimum total elongation at maximum A350 - 7 -CW- 1814 kg 21,740.88
force is 16% and 8% respectively including welding of lapping and
spirals as per design, drawing, straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires, splices or
laps what so ever etc. all complete accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length
in each pile for ultrasonic pulse velocity meter test. The Pvc pipes
should have threaded cap at top and bottom, and jointed by socket &
glue to connect each others. 14 SWG steel wires shall be used for
2.4 binding with rebar cage having minimum one binding with rebar A350 - 7 -CW- 1814 m 3,828.00
cages in each 3m interval or apply other approved devices for
fastenening firmly with rebar cage, cleaning pipes upto full length
immediately after concreting, protecting the pipes from any damage
etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making A350 - 7 -CW- 1814 cum 16.39
platform where necessary, carrying, all sorts of handling, stacking the
same properly after cleaning, leveling and dressing the situ and
clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 199/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved expert,
2.6 preparing, cleaning the holes and providing all relevant materials, A350 - 7 -CW- 1814 each 31.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT
expert, preparing pile heads and providing all relevant materials,
A350 - 7 -CW- 1814 25.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and filling
sacs/gunny bags for loading, record readings and preparation of results
in standard forms and other incidental charges per standard practice
2.7
and procedures including submission of load test report, furnishing all
graph and chart etc. complete in all respects approved and accepted by
the Engineer (Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test /test 2.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded stone chips; produced by
3.1 mixer, casting in forms in/c supplying & laying of single layer
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350 - 7 -CW-1815,1816 cum 14.43


3.1.2_ For ground floor beam A350 - 7 -CW-1815,1816,1817 cum 0.41

Subject: Detail BOQ of Civil Works


Page - 200/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.1.3_ For ground floor slab A350 - 7 -CW-1801,1817 cum 19.05

3.1.4_ For drain and appron A350 - 7 -CW-1802 cum 4.72


Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350 - 7 -CW-1815,1816 cum 100.66

3.2.2_ Concrete for pedestal column A350 - 7 -CW-1816, 1817 cum 1.50

3.2.3_ Concrete for ground floor beam A350 - 7 -CW-1815,1816,1817 cum 0.18

3.2.4_ Concrete for 1st floor beam A350 - 7 -CW-1820,1819 cum 16.96

3.2.5_ Concrete for 2nd floor beam A350 - 7 -CW-1820,1821 cum 16.96

3.2.6_ Concrete for beam elv + 10.700m and +10.980m A350 - 7 -CW-1822,1823 cum 11.62

3.2.7_ Concrete for roof beam A350 - 7 -CW-1824,1825 cum 7.53

3.2.8_ Concrete for ground floor slab A350 - 7 -CW-1801,1817 cum 18.73

3.2.9_ Concrete for 1st floor slab A350 - 7 -CW-1820 cum 16.76

3.2.10_ Concrete for 2nd floor slab A350 - 7 -CW-1820 cum 16.76

3.2.11_ Concrete for roof slab A350 - 7 -CW-1824 cum 17.81

3.2.12_ Concrete for gutter A350 - 7 -CW-1824 cum 3.11

Subject: Detail BOQ of Civil Works


Page - 201/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.2.13_ Concrete for column A350 - 7 -CW-1817 cum 35.28

3.2.14_ Concrete for lintel A350 - 7 -CW-1817 cum 2.38

3.2.15_Concrete for sunshade A350 - 7 -CW-1817 cum 2.43

3.2.16_ Concrete for staircase A350 - 7 -CW-1807 cum 3.50


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.

4.1.1_ Formwork for footing A350 - 7 -CW-1815,1816 sqm 139.87

4.1.2_ Formwork for pedestal column A350 - 7 -CW-1816, 1817 sqm 12.00

4.1.3_ Formwork for ground floor beam A350 - 7 -CW-1815,1816,1817 sqm 8.20

4.1.4_ Formwork for 1st floor beam A350 - 7 -CW-1820,1819 sqm 152.40

4.1.5_ Formwork for 2nd floor beam A350 - 7 -CW-1820,1821 sqm 152.40

4.1.6_ Formwork for beam elv + 10.700m and +10.980m A350 - 7 -CW-1822,1823 sqm 121.96

4.1.7_ Formwork for roof beam A350 - 7 -CW-1824,1825 sqm 79.07

4.1.8_ Formwork for 1st floor slab A350 - 7 -CW-1820 sqm 147.00

4.1.9_ Formwork for 2nd floor slab A350 - 7 -CW-1820 sqm 147.00

4.1.10_ Formwork for roof slab A350 - 7 -CW-1824 sqm 148.38

4.1.11_ Formwork for gutter slab A350 - 7 -CW-1824 sqm 25.92

4.1.12_ Formwork for column A350 - 7 -CW-1817 sqm 353.60

4.1.13_ Formwork for lintel A350 - 7 -CW-1817 sqm 41.13

Subject: Detail BOQ of Civil Works


Page - 202/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.14_ Formwork for sunshade A350 - 7 -CW-1817 sqm 27.26

4.1.15_ Formwork for staircase A350 - 7 -CW-1807 sqm 29.08


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

5.1.1_ Reinforcement for footing A350 - 7 -CW-1815,1816 kg 7,013.85

5.1.2_ Reinforcement for pedestal column A350 - 7 -CW-1816, 1817 kg 1,842.58

5.1.3_ Reinforcement for ground floor beam A350 - 7 -CW-1815,1816,1817 kg 2,761.03

5.1.4_ Reinforcement 1st floor beam A350 - 7 -CW-1820,1819 kg 3,726.15

5.1.5_ Reinforcement for 2nd floor beam A350 - 7 -CW-1820,1821 kg 3,726.15

5.1.6_ Reinforcement for beam at elv + 10.700m A350 - 7 -CW-1822,1823 kg 3,315.96

5.1.7_ Reinforcement for roof beam A350 - 7 -CW-1824,1825 kg 1,263.77

5.1.8_ Reinforcement for ground floor slab A350 - 7 -CW-1801,1817 kg 2,247.60

5.1.9_ Reinforcement for 1st floor slab A350 - 7 -CW-1820 kg 2,537.26

5.1.10_ Reinforcement for 2nd floor slab A350 - 7 -CW-1820 kg 2,537.26

5.1.11_ Reinforcement for roof slab A350 - 7 -CW-1824 kg 2,136.67

5.1.12_ Reinforcement for column A350 - 7 -CW-1824 kg 373.25

5.1.13_ Reinforcement for gutter A350 - 7 -CW-1817 kg 9,425.01

Subject: Detail BOQ of Civil Works


Page - 203/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5.1.14_ Reinforcement for lintel A350 - 7 -CW-1817 kg 918.74

5.1.15_ Reinforcement for sunshade A350 - 7 -CW-1817 kg 926.89

5.1.16_ Reinforcement for staircase A350 - 7 -CW-1807,1826, 1827 kg 958.83


Sub - Total 5
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and
6.1 soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

6.1.1_ Ground floor wall include balcony wall A350 - 7 -CW-1803,1804 cum 28.83

6.1.2_ 1st floor wall include balcony wall A350 - 7 -CW-1803,1804 cum 38.25

6.1.3_ 2nd floor wall include balcony wall A350 - 7 -CW-1803,1804 cum 38.25
Exposed brick work for interior wall
Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made 10 holes first class bricks (Mirpur
Ceramics or equivalent) in cement sand (F.M.1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding,
6.2 raking out joints, cleaning and soaking the bricks for at least 24 hours
before use and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges ect. all complete
and acceplete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.
6.2.1_ Ground floor A350 - 7 -CW-1803,1804 sqm 119.39

6.2.2_ 1st floor A350 - 7 -CW-1803,1804 sqm 117.24

6.2.3_ 2nd floor A350 - 7 -CW-1803,1804 sqm 117.24

Subject: Detail BOQ of Civil Works


Page - 204/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
and soaking bricks at least 24 hours before use and washing of sand,
6.3 necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length). (Cement: CEM-I)

6.3.1_ Staircase A350 - 7 -CW-1807 cum 0.94

6.3.2_ Entry steps A350 - 7 -CW-1804 cum 6.06


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
6.4 necessary scaffolding, raking out joints, cleaning and soaking bricks at
least 24 hours before use and washing of sand curing at least 7 days in
all floor including cost of water, electricity and other charges etc.
(Cement: CEM-I)

6.4.1_ Gutter A350 - 7 -CW-1803,1804 sqm 3.16

6.4.2_ Drain wall A350 - 7 -CW-1802 sqm 88.06


Sub - Total 6
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
7.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to gutter wall A350 - 7 -CW-1804 sqm 25.60

7.1.2_ Plaster to beam A350 - 7 -CW-1815-1820 sqm 505.82

7.1.3_ Plaster to ceiling and below surface of roof slab A350 - 7 -CW-1820, 1820 sqm 442.38

7.1.4_ Plaster to column A350 - 7 -CW-1817 sqm 226.15

7.1.5_ Plaster to drain A350 - 7 -CW-1802 sqm 88.06

7.1.6_ Plaster to staircase A350 - 7 -CW-1807 sqm 3.13

Subject: Detail BOQ of Civil Works


Page - 205/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7.2 Waterproofing

7.2.1_ Three layers waterproofing by sika for gutter slab A350 - 7 -CW-1803,1804 sqm 25.92
Sub - Total 7
8 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.1 (1:4) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care

8.1.1_ Ground floor A350 - 7 -CW-1801-1804 sqm 111.00

8.1.2_ 1st floor A350 - 7 -CW-1801-1804 sqm 108.00

8.1.3_ 2nd floor A350 - 7 -CW-1801-1804 sqm 108.00


Homogenious tile 300 x 300mm
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.2 (1:4) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care

8.2.1_ Toilet floor A350 - 7 -CW-1805, 1806 sqm 19.80


Ceramic tile 300x500mm light colour
Suppling, fitting and fixing glazed wall tile, irrespective of color &/or
design, with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base
8.3 and ranking out the joints with respective joint filler & binder
including cutting, laying and hire charge of machine and finishing with
care etc. including water, electricity and other charges

8.3.1_ Toilet wall A350 - 7 -CW-1805, 1806 sqm 328.23


8.4 Mirpur ceramic 75x225 mm, dark colour A350 - 7 -CW-1801-1804 sqm 30.48
Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
8.5 sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
respective joint filler & binder including cutting, laying and finishing
with care etc

8.5.1_ For staircase A350 - 7 -CW-1807 sqm 29.88

8.5.2_ For entry steps A350 - 7 -CW-1804 sqm 6.31

Subject: Detail BOQ of Civil Works


Page - 206/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Roof tile
8.6 Supplying, fitting and fixing country made (Mirpur A350 - 7 -CW-1801-1804 sqm 176.64
Ceramic/equivalent) roof tile, with adhesive motar
Sub - Total 8
9 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
9.1 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 250x62mm) & shutter as per design,drawing, accepted by
the Engineer

9.1.1_ Quadruple leaf door DO-01 (2400x2100x38mm) including


varnishing and frence polishing A350 - 7 -CW-1808-1810 cum 0.88
9.1.2_ Single leaf door DO-02 (2100x850x38mm) including
varnishing and frence polishing A350 - 7 -CW-1808-1810 cum 1.75
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
9.2 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 150x62mm) & shutter as per design,drawing, accepted by
the Engineer

9.2.1_ Single leaf door DO-03 (2100x700x38mm) including


varnishing and frence polishing A350 - 7 -CW-1808-1810 cum 0.20
9.2.2_ Single leaf door DO-05 (2100x850x38mm) including
varnishing and frence polishing A350 - 7 -CW-1808-1810 cum 0.23
9.3 Solid uPVC Toilet door (frame 150x62mm)
9.3.1_ Single leaf door DO-04 (2130x760x38mm) A350 - 7 -CW-1808-1810 each 11.00
5mm thick glass Thai Aluminium frame sliding window as per design,
9.4 drawing, accepted by the Engineer
9.4.1_ Double shutter window WD-01 (1200x1400mm) including grill
with 12mm square bar as per drawing, design, specification etc. all A350 - 7 -CW-1808-1810 sqm 20.16
complete & accepted by the Engineer
9.4.2_ Double shutter window WD-02 (1200x1200mm) including grill
with 12mm square bar as per drawing, design, specification etc. all A350 - 7 -CW-1808-1810 sqm 2.88
complete & accepted by the Engineer
5mm thick glass Thai Aluminium frame curtain window as per design,
9.5 drawing, accepted by the Engineer
9.5.1_ Single shutter curtain window CW-01 (600x600mm) including
grill with 12mm square bar as per drawing, design, specification etc. A350 - 7 -CW-1808-1810 sqm 3.96
all complete & accepted by the Engineer

Subject: Detail BOQ of Civil Works


Page - 207/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9.5.2_ Single shutter curtain window CW-02 (1250x600mm)
including grill with 12mm square bar as per drawing, design, A350 - 7 -CW-1808-1810 sqm 2.25
specification etc. all complete & accepted by the Engineer
Sub - Total 9
10 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm thick
board laminated by mechanical hot press with a milk white PVC
10.1 membrane with Aluminum T- bar frame in natural anodized finish at
600*600 mm in grid suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc.

10.1.1_ Aluminium ceiling of ground floor A350 - 7 -CW-1820, 1820 sqm 147.00

10.1.2_ Aluminium ceiling of 1st floor A350 - 7 -CW-1820, 1820 sqm 147.00

10.1.3_ Aluminium ceiling of 2nd floor A350 - 7 -CW-1820, 1820 sqm 147.00
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
10.2 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

10.2.1_ Painting to Gutter wall A350 - 7 -CW-1804 sqm 3.16

10.2.2_ Plaster to beam A350 - 7 -CW-1815-1820 sqm 505.82

10.2.3_ Plaster to column A350 - 7 -CW-1817 sqm 226.15

10.2.4_ Painting to staircase A350 - 7 -CW-1804 sqm 24.13


Sub - Total 10
11 Structural Steel
11.1 Balloon gutter guard F114 A350 - 7 -CW-1804 each 4.00

11.2 Stainless steel handrail with wooden top rail for staircase A350 - 7 -CW-1807 m 12.22

11.3 Stainless steel handrail for balcony wall A350 - 7 -CW-1802 m 52.20
Sub - Total 11

Subject: Detail BOQ of Civil Works


Page - 208/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
12 Water Supply/Waste water System
A350-7-DW-3-1805, A350-7-DW-2-1805
Supply and installation of foreign made food grade stainless steel
(SS304) thickness 1.8mm water tank including supply of hardware,
12.1
consumables, fittings etc. all complete approved and accepted by the
Engineer
12.1.1_2000 liter capacity each 3.00

12.2 Valve each 40.00

12.3 uPVC pipe (min. thickness 3.0 mm)

12.3.1_ uPVC ɸ110 m 19.00

12.3.2_ uPVC ɸ76 m 26.00

12.3.3_ uPVC ɸ40 m 28.40

12.3.4_ uPVC ɸ20 m 53.60

12.3.5_VENT PIPE uPVC ɸ 90 m 8.00

12.4 PPR pipe (min. thickness 4.5 mm)

12.4.1_PPR pipe ɸ 40 m 10.00

12.5 Tee

12.5.1_110 Tee each 11.00

12.5.2_90/ 76 Tee each 6.00

12.5.3_76/40 Tee each 12.00

11.5.4_76/76 Tee each 6.00

12.5.5_40/20 Tee each 6.00

12.5.6_ɸ20/ 20Tee each 11.00

12.5.7_ɸ 40X40 Tee each 1.00

12.6 Reducer

12.6.1_76-40 Reducer each 1.00

Subject: Detail BOQ of Civil Works


Page - 209/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
12.6.2_27-20 Reducer each 1.00

12.7 Degree elbow

12.7.1_90 degree elbow(PPR pipe ɸ 20) each 44.00

12.7.2_90 degree elbow(uPVC ɸ110) each 24.00

12.7.3_90 degree elbow(uPVC ɸ76) each 17.00

12.7.4_90 degree elbow(uPVC ɸ40) each 12.00

12.7.5_45 degree elbow (uPVC ɸ110) each 22.00


Septic tank
Construction of septic tank of different sizes with (medium and large
sizes) walls of brick work in cement mortar (1:6) having a lining of
minimum 125 mm R.C.C cast against the walls as per approved type
plan over a brick flat soling flat soiling and 150 mm thick reinforced
cement concrete flooring (1:2:4) with 125 mm thick walls in partition
and 12 mm thick cement plaster (1:4) with N.C.F. to insides of walls
on floor and all around outside walls by 18” height at top including
12.8 supplying fitting and fixing of two R.C.C. Tees and providing 450 mm
dia water sealed heavy type C.I. manhole cover with locking/unlocking
arrangement and 100 mm thick R.C.C (1:2:4) top slab, including
centering, shuttering, fabricating, casting and curing etc. all complete
as per standard drawing, specification accepted by the Engineer. (Rate
in including cost of reinforcement and its fabrication, binding and
placing.)

12.8.1_ for 50 users each 1.00

Subject: Detail BOQ of Civil Works


Page - 210/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Soak well
Construction of soak well of different sizes (medium and large sizes)
with 250mm thick soild brick work and 250mm honey comb brick
work with cement mortar (1:6) as per design over R.C.C. (1:2:4) well
curb with 1% reinforcement up to the depth as per drawing with 450
mmm dia water sealed heavy type. C.I. manhole cover with locking
arrangement, filling the well up to the reqired depth with graded khoa
12.9 and sand including suppling and fabicating M.S. Rod, casting, curing
including necessary earth work in excavation, side filling and bailing
out water including cost of all materials etc. all complete as per
standard drawing, design approved and accepted by the Engineer.
(Rate in including cost of reinforcement and its fabrication,
binding,and placing, form work etc.)

12.9.1_ 50 users each 1.00


Construction of masonry inspection pit with 250 mm thick brick work
in cement mortar (1:4) including necessary earth work, side filling and
one layer brick flat soling, 75 mm thick (1:3:6) base concrete for
12.10
making invert channel and 12 mm thick (1:2) cement plaster with neat
finishing etc.all complete up to a depth of 700 mm approved and
accepted by the Engineer.
12.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average 525
each 3.00
mm for single 150 mm dia R.C.C.pipes and 400 mm uPVC pipe
Sub - Total 12
13 Sanitary Accessories (Cotto or Equivalent)
A350-7-CW-2001-1804, A350-7-DW-2-1805
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c plastic
13.1 seat cover, cistern system, preparing the base with cement concrete and each 11.00
with wire mesh or roads if necessary, including making holes and
fitting, fixing, finishing etc.
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx. size
656×510×845, 26kg by weight including fitting, fixing the same in
position with heavy type C.I. Brackets. 30 mm dia PVC waste water
13.2 pipe with brass coupling (not exceeding 750 mm in length). 12mm each 13.00
plastic lead (connection) pipe with brass coupling, basin waste with
chain plug including making holes in walls and floors and fitting with
wooden blocks, screws, finishing etc,

13.3 Bathroom strainer each 12.00


13.4 Kitchen Sink each 1.00

Subject: Detail BOQ of Civil Works


Page - 211/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
13.5 unframe super quality mirror with hard board at the back with all each 11.00
necessary fitting including making holes in walls and mending good
the damages with cement morta (1:4) etc.

13.6 Shower each 11.00

13.7 Flush faucet for toilet bowl (Cotto or equivalent) each 11.00
13.8 Wash basin faucet (Cotto or equivalent) each 13.00
Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
13.9 150*150*126 mm size including making holes in walls and mending each 11.00
good the damages with cement mortar (1:4) etc.
Porcelain soap tray
Supplying, fitting, and fixing standard size soap tray including making
13.10 holes in walls and mending good the damages with cement mortar each 11.00
(1:4) etc.
Supplying, fitting and fixing best quality faucets etc. (Cotto or
13.11 equivalent). Complete approved and accepted by the Engineer
13.11.1_12mm CP bib cock each 11.00
Supply, fitting and fixing best quality CP pillar cock ect. (Cotto or
13.12 equivalent). Complete approved and accepted by the Engineer

13.12.1_12 mm CP medium quality pillar cock each 11.00

13.12.2_12 mm CP stop cock each 11.00

13.12.3_12 mm CP angle stop cock each 11.00


Sub - Total 13
14 Electrical Work
Ref: A350-7-LA-1801
Electrical equipment
14.1
Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215 mm.dia
each 61.00
Steel Sheet Carrier, with Powder coated Paint/Oxidized /Chromium
finished, suitable glass covers of min. height 92mm

Subject: Detail BOQ of Civil Works


Page - 212/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2- Wall mounted bracket LED light
Providing & fixing the Special type fancy bracket LED light consisting
of white colour conical fiber sheet shade of minimum dia 150mm,
minimum total height of fitting 250mm, golden or oxidized or each 41.00
chromium plated/ brass bracket with carrier, brass holder, earth
terminal, necessary wiring with 2× 0.4 sq.mm stranded PVC insulated
flexible FR cable etc.

3- Ceiling fan 56" including fitting and fixing


each 23.00
Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS rod

4- Exhaust fan 12"


Providing and fixing of following axial flow A.C capacitor type wall
each 12.00
mounted exhaust fan complete with blade, steel frame standard wall
louver shutter, PVC insulated connecting wire etc.
5- Combined switch and regulator board
Supply and installation of electronics fans regulators compriasing of
standard component having noise suppression circuit and total loss in
each 23.00
the regulator not exceeding 0.4 watt suitable for 220 10% volt AC
single phase 50 Hz manufactured by Micro Electronics Ltd. or
equivalent foreign made

6- Sub distribution board, IP42, include the terminal block each 3.00

7- Distribution board, IP42 Enclosures each 1.00

8- Socket (3-pin 6A ) each 44.00


9- Socket (3-pin 15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps.
Combined switch socket outlet (concealed type) manufactured and
tested in accordance with relevant IEC standards and manufactured
and tested in accordance with relevant IEC standards and approved by
BSTI mounted on required size 18 SWG galvanized plain sheet board each 10.00
of 76.2mm. (3”) depth all electrical contacts shall be of brass/copper
(Dynamic/MEP/ SK/Metro/Super Star or equivalent, local made).)

Subject: Detail BOQ of Civil Works


Page - 213/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10- LED tube light set (3 x 10W)
Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.37) consisting of power
coated 22 SWG sheet steel frame of min. length 600mm & breath
600mm, symmetrical mirror reflector of anodized aluminum, superior each 34.00
quality electronic ballast with one year guarantee, holder, necessary
wiring with 2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire,
earth terminal etc.

11- LED tube light set (3 x 20W)


Providing & fixing the 3 x 2’× 20 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.19) consisting of power
coated enameled22 SWG sheet steel frame of min. length 1213mm & each 5.00
breath 600mm, louver of steel sheet/aluminum, superior quality
electronic ballast with one year guarantee, holder, necessary wiring
with 2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire, earth
terminal etc.
12- One way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 46.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

13- Two way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 6.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

14- Three way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 15.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

Subject: Detail BOQ of Civil Works


Page - 214/405
Item: Inspection Bungalow
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
15- Four way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 3.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

16- Room air cooler- split type 24000 btu/hr


Supply, Installation, Testing & commissioning of split type Air-cooler
comprising condensing and evaporating units having following cooling
capacity based on indoor temperature 27°-30° C DB / 19.5°-22°C WB
and outdoor temperature 35°-40° DB at high fan speed condition each 10.00
suitable for installation & operation in tropicalized country like
Bangladesh & as per detailed specifications & standard as mentioned
below: Wall mounted

14.2 Protection (RCCB)


1- RCCB 2px6,6KA each 2.00

2- RCCB 2px16,6KA each 20.00

3- RCCB 2px20,6KA each 5.00

4- RCCB 4px20,6KA each 7.00

5- RCCB 4px63,6KA each 1.00


Electrical wire and cable (include conduit pipes, junction box with
14.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 5,350.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 2,680.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 2,200.00
core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 830.00
core 1c x 4 mm²
5- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Multi -
m 60.00
core 5c x 6mm²
Sub - Total 14
TOTAL

Subject: Detail BOQ of Civil Works


Page - 215/405
Item: Inspection Bungalow
DETAIL BOQ of Civil Works

Project: Modern Food Storage Facilities_ MFSP


Location: Chattogram
Item: Substation
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Unit Rates Amounts


Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
layout with chalk powder, providing necessary tools and plants,
1 protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the
layout etc.

Layout and marking for earth work in excavation in foundation


1.1 A350 - 7 - CW - 1901 sqm 200.00
accepted by the Engineer.

Earth work in excavation in foundation trenches up to 1.5 m depth


1.2 A350 - 7 - CW - 1901,1907 cum 119.33
and maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350 - 7 - CW - 1901 sqm 200.00
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350 - 7 - CW - 1901,1907 cum 79.19
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of the
1.5 city or town area including loading, unloading at both ends, leveling A350 - 7 - CW - 1901,1907 cum 40.15
and dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 216/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
2.1 polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

2.1.1_ For footing A350 - 7 - CW - 1907 cum 4.59

2.1.2_ For trench A350 - 7 - CW - 1910 cum 2.65

2.1.3_ For ground floor beam A350 - 7 - CW - 1908 cum 3.90

2.1.4_ For ground floor slab A350 - 7 - CW - 1901 cum 21.51

2.1.5_ For drain and appron A350 - 7 - CW - 1902 cum 4.70


Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1,
52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand
or coarse sand of equivalent F.M 2.2 and 20 mm down well graded
crushed stone chips conforming to ASTM C-33; preparing the
2.2 concrete mix in the Digital Batching plant, ascertaing the strength by
trail mix design, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after
specified time approved; including all cost of water, electricity,
admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the Engineer.

2.2.1_ Concrete for footing A350 - 7 - CW - 1907 cum 8.64

2.2.2_ Concrete for pedestal column A350 - 7 - CW - 1907 cum 6.56

2.2.3_ Concrete for trench A350 - 7 - CW - 1910 cum 8.99

2.2.4_ Concrete for ground floor beam A350 - 7 - CW - 1908 cum 14.87

2.2.5_ Concrete for beam +5.35m A350 - 7 - CW - 1908, 1909 cum 9.50

Subject: Detail BOQ of Civil Works


Page - 217/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
2.2.6_ Concrete for roof beam A350 - 7 - CW - 1912, 1913 cum 6.12

Subject: Detail BOQ of Civil Works


Page - 218/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
2.2.7_ Concrete for ground floor slab A350 - 7 - CW - 1901 cum 41.33

2.2.8_ Concrete for roof slab A350 - 7 - CW - 1914 cum 16.64

2.2.9_ Concrete for column A350 - 7 - CW - 1907, 1908 cum 11.52

2.2.10_ Concrete for ramp slope A350 - 7 - CW - 1902, 1903 cum 2.46
2.2.11_ Concrete for gutter slab A350 - 7 - CW - 1904 cum 3.26

2.2.12_ Concrete for lintel A350-7-CW-1905 cum 0.69

2.2.13_Concrete for sunshade A350-7-CW-1905 cum 0.31


Sub - Total 2
3 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
3.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.

3.1.1_ Formwork for footing A350 - 7 - CW - 1907 sqm 18.56


3.1.2_ Formwork for pedestal column A350 - 7 - CW - 1907 sqm 26.58
3.1.3_ Formwork for trench A350 - 7 - CW - 1910 sqm 142.83
3.1.4_ Formwork for ground floor beam A350 - 7 - CW - 1908 sqm 74.34
3.1.5_ Formwork for beam +5.35m A350 - 7 - CW - 1908, 1909 sqm 76.95
3.1.6_ Formwork for roof beam A350 - 7 - CW - 1912, 1913 sqm 70.85
3.1.7_ Formwork for roof slab A350 - 7 - CW - 1914 sqm 116.82
3.1.8_ Formwork for column A350 - 7 - CW - 1907, 1908 sqm 110.80

3.1.9_ Formwork for gutter slab A350 - 7 - CW - 1904 sqm 39.12

3.1.10_ Formwork for lintel A350-7-CW-1905 sqm 11.62


3.1.11_ Formwork for sunshade A350-7-CW-1905 sqm 6.68
Sub - Total 3

Subject: Detail BOQ of Civil Works


Page - 219/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
4.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

4.1.1_ Reinforcement for footing A350 - 7 - CW - 1907 kg 83.34

4.1.2_ Reinforcement for pedestal column A350 - 7 - CW - 1907 kg 2,907.04

4.1.3_ Reinforcement for trench A350 - 7 - CW - 1910 kg 1,099.66

4.1.4_ Reinforcement for ground floor beam A350 - 7 - CW - 1908 kg 2,385.26

4.1.5_ Reinforcement for Beam +5.35m A350 - 7 - CW - 1908, 1909 kg 2,223.53

4.1.6_ Reinforcement for roof beam A350 - 7 - CW - 1912, 1913 kg 2,639.25

4.1.7_ Reinforcement for ground floor slab A350 - 7 - CW - 1910, 1911 kg 1,060.63

4.1.8_ Reinforcement for roof slab A350 - 7 - CW - 1914 kg 1,997.11

4.1.9_ Reinforcement for ramp slope A350 - 7 - CW - 1907, 1908 kg 295.20

Subject: Detail BOQ of Civil Works


Page - 220/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
4.1.10_ Reinforcement for column A350 - 7 - CW - 1902, 1903 kg 3,435.84

4.1.11_ Reinforcement for gutter A350 - 7 - CW - 1904 kg 391.20

4.1.12_ Reinforcement for lintel A350-7-CW-1905 kg 129.42

4.1.13_ Rebar for sunshade A350-7-CW-1905 kg 110.00


Sub - Total 4
5 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and
depth and depth joints, filling the interstices with mortar, cleaning
5.1 and soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days
and pointing with cement sand (F.M.1.2) mortar (1:2) including cost
of water, electricity and other charges ect. all complete and accepted
by the Engineer. (Cement: CEM-I) in ground floor.

5.1.1_ Ground floor A350 - 7 - CW - 1902-1904 cum 678.43


Exposed brick work for interior wall
Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made 10 holes first class bricks (Mirpur
Ceramics or equivalent) in cement sand (F.M.1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding,
raking out joints, cleaning and soaking the bricks for at least 24 hours
5.2 before use and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges ect. all complete
and acceplete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.

5.2.1_ Ground floor A350 - 7 - CW - 1902-1904 sqm 119.70

Subject: Detail BOQ of Civil Works


Page - 221/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar,
cleaning and soaking bricks at least 24 hours before use and washing
5.3 of sand, necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length) (Cement: CEM-I)

5.3.1_ Entry steps A350 - 7 - CW - 1904 cum 1.18


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
necessary scaffolding, raking out joints, cleaning and soaking bricks
5.4 at least 24 hours before use and washing of sand curing at least 7 days
in all floor including cost of water, electricity and other charges etc.
(Cement: CEM-I)

5.4.1_ Gutter wall A350 - 7 - CW - 1902-1904 sqm 25.86

5.4.2_ Drain wall A350 - 7 - CW - 1902 sqm 87.64


Sub - Total 5
6 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
sunshades, cornices, railings, drop wall, louvers, fins and finishing
6.1
the corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

6.1.1_ Plaster to gutter A350 - 7 - CW - 1904 sqm 113.80

6.1.2_ Plaster to beam A350 - 7 - CW - 1908 sqm 76.95

6.1.3_ Plaster to below surface of roof slab A350 - 7 - CW - 1907, 1908 sqm 138.69

Subject: Detail BOQ of Civil Works


Page - 222/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
6.1.5_ Plaster to drain A350 - 7 - CW - 1902 sqm 87.64

6.1.6_ Plaster to entry steps A350 - 7 - CW - 1904 sqm 1.89

6.2 Waterproofing

6.2.1_ Three layer waterproofing by sika grout for gutter slab A350 - 7 - CW - 1902-1904 sqm 23.28
Sub - Total 6
7 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
(1:4) base and raking out the joints with white cement including
7.1 cutting and laying the tiles in proper way and finishing with care

7.1.1_ Ground floor A350 - 7 - CW - 1902-1904 sqm 120.93


Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
7.2 sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
respective joint filler & binder including cutting, laying and finishing
with care etc
7.2.1_ Entry steps A350 - 7 - CW - 1904 sqm 1.89
7.3 Ceramic 75x225, dark colour for outside of ground floor beam A350 - 7 - CW - 1902-1904 sqm 36.00
Roof tile
7.4 Supplying, fitting and fixing country made (Mirpur Ceramic / A350 - 7 - CW - 1902-1904 sqm 138.69
equivalent) roof tile, with adhesive motar

Sub - Total 7
8 Door & Window
8.1 Door
8.1.1_ Single leaf stainless steel door DO-01 (1000x2100mm) A350-7-CW-1905, 1906 sqm 8.40

8.1.2_ Stainless steel collapsible gate DO-02 (4000x3000mm) A350-7-CW-1905, 1906 sqm 24.00

8.1.3_ Stainless steel collapsible gate DO-03 (3000x3000mm) A350-7-CW-1905, 1906 sqm 18.00

5mm thick glass Thai Aluminium frame sliding window as per


8.2
design, drawing, accepted by the Engineer

Subject: Detail BOQ of Civil Works


Page - 223/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
8.2.1_ Double shutter window WD-01 (1200x1400mm) including
grill with 12mm square bar as per drawing, design, specification etc. A350-7-CW-1905, 1906 sqm 1.68
all complete & accepted by the Engineer
8.3 Stainless steel window WD-02 (600x4400mm) A350-7-CW-1905, 1906 sqm 31.68
Sub - Total 8
Structural Steel
9
9.1 Galvanized grating F40x3 mm for trench cover A350 - 7 - CW - 1910 sqm 27.77
Sub - Total 9
10 Electrical Work
Ref: A350-7-LA-1901
Electrical equipment
10.1
Providing and fixing electric equipment to position
1- Wall mounted LED tube light
Providing & fixing the 1×4’×20- LED tube light consisting of powder
coated 22 SWG sheet steel frame of min. length 1226mm & breadth
60mm, superior quality electronic ballast with one year guarantee, each 5.00
holder, necessary wiring with 2× 0.4 sq mm PVC insulated (stranded)
flexible FR wire, earth terminal etc.

2- Exhaust fan 12"


Providing and fixing of following axial flow A.C capacitor type wall
mounted exhaust fan complete with blade, steel frame standard wall each 2.00
louver shutter, PVC insulated connecting wire etc.

4- Distribution board, IP54 Enclosures each 1.00


5- Socket (3-pin6A ) each 10.00

Subject: Detail BOQ of Civil Works


Page - 224/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
6- LED tube light set (3 x 10W)
Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.19) consisting of
power coated enameled22 SWG sheet steel frame of min. length
1213mm & breath 600mm, louver of steel sheet/aluminum, superior each 6.00
quality electronic ballast with one year guarantee, holder, necessary
wiring with 2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire,
earth terminal etc.

7- One way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 3.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

8- Three way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 2.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

10.2 Protection (MCB & MCCB)


1- MCB 2px10,6KA each 2.00

2- MCB 2px16,6KA each 1.00


3- MCB 4px10,6KA each 1.00

4- MCB 4px20,6KA each 1.00


4- MCB 4px16,6KA each 1.00

Subject: Detail BOQ of Civil Works


Page - 225/405
Item: Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
Electrical wire and cable (include conduit pipes, junction box with
10.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 270.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 420.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 160.00
core 1c x 2.5 mm²
Sub - Total 10
TOTAL

Subject: Detail BOQ of Civil Works


Page - 226/405
Item: Substation
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Scrap Godown
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
layout with chalk powder, providing necessary tools and plants,
1 protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.

Layout and marking for earth work in excavation in foundation


1.1 A350-7-CW-2106 sqm 420.00
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 and maximum 10 m lead: in soft clayey soil/loose sand/silt A350-7-CW-2106/2113 cum 114.44

Mobilization and cleaning site before commencing actual physical


1.3 work and during contract period and demobilization after Completion of A350-7-CW-2106 sqm 420.00
the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in 150mm
layers with earth available within 90 m of the building site minimum
dry density of 95% with optimum moisture content (Modified proctor
1.4 A350-7-CW-2106/2113 cum 36.51
test) including carrying, watering, levelling, dressing and compacting to
a specified percentage each layer upto finished level etc. all complete
and accepted by the Engineer.
1.5 Sand filling to elv +1.00 with compaction k=0.95 A350-7-CW-2106/2113 cum 10.80

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city or
1.6 A350-7-CW-2106/2113 cum 12.09
town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 225/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire of drilling rig set, tripod stand, tremie pipe, cost of fuel,
lubricant, mobilization, demobilization, maintenance, spares, stand-
byes, insurance coverage, water, electricity and other charges all
2.1 compete approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement of cast-
in-situ pile work including sequence of boring and casting, disposal of
spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his responsibilities
and obligations under contract.

a) 450 mm dia
b) Depth up to 38 m A350-7-CW-2112 Rm 684.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage & binding
ms pipes in position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1 meter
2.2 throughout the period of concreting, maintaining required slump, etc. A350-7-CW-2112 cum 108.73
mixing the aggregates in diginal batching plant, casting in bore holes,
acertaining the strength by trial mix design all complete including all
cost of water, electricity, plant & machinery, bentonite, admixture
testing of materials and concrete etc and other charges as per design,
drawing etc all complete approved and accepted by the Engineer.
Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 226/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding
450 MPa and whatever is the yield strength within allowable limit as
per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
2.3 fracture and minimum total elongation at maximum force is 16% and A350-7-CW-2112 kg 8,401.92
8% respectively including welding of lapping and spirals as per
design, drawing, straightening and cleaning rust, if any, bending and
binding in position with supply of G.I. wires, splices or laps what so
ever etc. all complete accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia of
bars exceeds its standard)

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.4 straightening and bending of pile bars, preparation and making platform A350-7-CW-2112 cum 2.00
where necessary, carrying, all sorts of handling, stacking the same
properly after cleaning, leveling and dressing the situ and clearing the
bed etc.

i) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT expert,
preparing pile heads and providing all relevant materials, equipment,
2.5 A350-7-CW-2112 each 17.00
result in standard forms and compiling test report
withhrecommendations on the test etc. complete in all respect approve
and accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 227/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Conducting static load test as per ASTM D1143 or equivalent standard
for the cast-in-situ/pre-cast pile providing required scaffolding, bracing,
jacks, pressure test gauge, loading unloading, Kentledge and other
plants and equipment including staging, mobilization, demobilization,
hire charge, gunny bags, sand and filling sacs/gunny bags for loading,
record readings and preparation of results in standard forms and other
incidental charges per standard practice and procedures including
submission of load test report, furnishing all graph and chart etc.
2.6 complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method statement
for conducting load test to the Engineer for approval. However,
Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 140 tonne load for 1 No. test per test 1.00
Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
3.1
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-2113-2115 cum 9.32

3.1.2_ For slab +1.000 A350-7-CW-2113-2115 cum 42.00

3.1.3_ For plinth wall A350-7-CW-2113-2115 cum 2.20

3.1.4_ For drain and appron A350-7-CW-2109 cum 5.70

Subject: Detail BOQ of Civil Works


Page - 228/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.3.1_ Concrete for footing A350-7-CW-2113-2115 cum 10.21

3.3.2_ Concrete for pedestal column and column A350-7-CW-2113-2115 cum 1.98

3.3.3_ Concrete for beam elv +1.000m A350-7-CW-2113-2115 cum 16.35

3.3.4_ Concrete for beam level +3.850m A350-7-CW-2116-2115 cum 8.60

3.3.5_ Concrete for beam level +6.450m A350-7-CW-2116-2115 cum 6.45

3.3.6_ Concrete for ground floor slab elv +1.000m A350-7-CW-2113-2115 cum 84.00

3.2.7_ Concrete for ramp slope A350-7-CW-2110-2106 cum 2.30

3.2.8_ Concrete for lintel A350-4-CW-2403 cum 1.02


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
4.1.1_ Formwork for footing A350-7-CW-2113-2115 sqm 45.36

4.1.2_ Formwork for pedestal column and column A350-7-CW-2113-2115 sqm 24.00

4.1.3_ Formwork for beam elv +1.000m A350-7-CW-2113-2115 sqm 130.80

Subject: Detail BOQ of Civil Works


Page - 229/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4.1.4_ Formwork for beam concrete elv +4.450 A350-7-CW-2116-2115 sqm 94.35

Subject: Detail BOQ of Civil Works


Page - 230/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4.1.5_ Formwork for beam concrete elv +6.450 A350-7-CW-2116-2115 sqm 73.10

4.1.6_ Formwork for ramp slope A350-7-CW-2110-2106 sqm 2.70

4.1.7_ Formwork for lintel A350-4-CW-2403 sqm 9.24


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for Reinforced
Cement Concrete, produced and marked in accordance with BDS ISO
6935-2: 2006 (or standard subsequently released from BSTI) , the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least 1.25
and minimum elongation after fracture and minimum total elongation
at maximum force is 16% and 8% respectively including straightening
5.1
and cleaning rust, if any, bending and binding in position with supply of
G.I. wires, splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

5.1.1_ Rebar for footing A350-7-CW-2113 kg 996.70

5.1.2_ Rebar for pedestal column and column A350-7-CW-2113/2114 kg 1,119.65

5.1.3_ Rebar for beam elv +1.000m A350-7-CW-2114 kg 4,231.17

5.1.4_ Rebar for beam elv +3.850 A350-7-CW-2117 kg 1,715.61

5.1.5_ Rebar for beam elv +6.450 A350-7-CW-2117 kg 1,221.32


5.1.6_ Rebar for ground floor slab and ramp slope A350-7-CW-2117 kg 7,155.95

5.1.7_ Rebar for lintel A350-4-CW-2403 kg 121.97


Sub - Total 5

Subject: Detail BOQ of Civil Works


Page - 231/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and soaking
6.1 bricks at least for 24 hours before use and washing and screening of
sand, necessary scaffolding, curing at least for 7 days and pointing with
cement sand (F.M.1.2) mortar (1:2) including cost of water, electricity
and other charges ect. all complete and accepted by the Engineer.
(Cement: CEM-I) in ground floor.

6.1.1_ For wall from +1.000 to +6.450 and roof A350-7-CW-2108/2109 cum 67.99
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
and soaking bricks at least 24 hours before use and washing of sand,
6.2 necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length). (Cement: CEM-I)

6.2.1_ For plinth wall A350-7-CW-2108/2109 cum 22.00

6.2.2_ For ramp slope A350-7-CW-2110/2109 cum 0.68


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including necessary
6.3 scaffolding, raking out joints, cleaning and soaking bricks at least 24
hours before use and washing of sand curing at least 7 days in all floor
including cost of water, electricity and other charges etc. (Cement:
CEM-I)

6.3.1_ Drain wall A350-7-CW-2110/2109 sqm 125.40


Stone 1x4 layer
6.4 Supplying, laying, compacting etc. as per drawing, specification A350-7-CW-2105/2113 cum 42.00
instruction
Sub - Total 6

Subject: Detail BOQ of Civil Works


Page - 232/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
sunshades, cornices, railings, drop wall, louvers, fins and finishing the
7.1 corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to plinth wall A350-4-CW- 1310 sqm 62.00

7.1.2_ Plaster to column A350-7-CW-2113-2115 sqm 24.00


A350-7-CW-2113-
7.1.3_ Plaster to beam at +1.000m, +4.450m, +6.450m sqm 298.25
2115/2116
7.1.4_ Plaster to drain wall A350-7-CW-2109 sqm 110.20

7.2 Surfacing by hardener 5kg/m2

7.2.1_ For ground floor slab at +1.000 A350-7-CW-2113-2115 sqm 420.00

7.2.2_ For ramp slope A350-7-CW-2110-2106 sqm 23.03

7.3 Non- shrink grout for column A350-7-CW-2118-2122 cum 0.06


Sub - Total 7
8 Tiles & Stone Work
8.1 Ceramic 75x225 mm, dark colour for lintel A350-7-CW-2103 sqm 9.24
Sub - Total 8
9 Door & Window
Electrical rolling door DO1 (3000x3000mm)
9.1 Supplying and fixing electrical rolling door, include motor, key switch, A350-7-CW-2108-2109 each 2.00
break release and solid shutter.
Window 1500x1000mm Louver type Galvanized steel (steel frame
9.2 30x630x2 mm) Galvanized steel leaf 2mm thick A350-7-CW-2108-2109 sqm 27.00
Sub - Total 9

Subject: Detail BOQ of Civil Works


Page - 233/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
10 Finishing Work
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
10.1 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

10.1.1_ Painting to plinth wall A350-7-CW-2108-2109 sqm 80.00


Sub - Total 10
11 Structural Steel
All steel structure, Beams, Columns, Purlins, fittings & fixtures shall be
hot rolled pre-fabricated and hot deep galvanized (EN ISO 14713:1999
11.1 C5, Galvanized coating conforms to ASTM A653/A653 M/EN 1461 for
zinc coated steel minimum 600 gm/m2)

11.1.1_ Galvanized steel purlin C200x65x20x2mm A350-7-CW-2118-2129 kg 2,719.01

11.1.2_ Galvanized steel column A350-7-CW-2118-2129 kg 4,009.25

11.1.3_ Galvanized steel beam A350-7-CW-2118-2129 kg 2,777.11

11.1.4_ Galvanized steel canopy A350-7-CW-2118-2129 kg 245.23

11.1.5_ Galvanized steel bracing Truss A350-7-CW-2118-2129 kg 763.02

11.1.6_ Galvanized steel plate A350-7-CW-2118-2129 kg 1,024.18

11.2 Galvanized Buckle D16mm A350-7-CW-2118-2129 pcs 24.00

11.3 Galvanized Steel wire rope D14mm for roof A350-7-CW-2118-2129 m 110.64

11.4 Galvanized Bracing D12mm for purlin A350-7-CW-2118-2129 m 70.00

11.5 Galvanized Bracing D20mm for column A350-7-CW-2118-2129 m 115.00

Subject: Detail BOQ of Civil Works


Page - 234/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
11.6 Galvanized Bolt
11.6.1_ Galvanized Anchor Bolt M24, L700mm A350-7-CW-2118-2129 pcs 68.00

11.6.2_ Galvanized Bolt M16, L70mm A350-7-CW-2118-2129 kg 21.52

11.6.2_ Galvanized Bolt M12, L50mm A350-7-CW-2118-2129 kg 37.75


Klip lok roof sheet
ZincAlume Steel (ASTM A792 / A792M Grade 340 class 2, AZM 180,
0.61 mm thick minimum)
11.7 Supplying, fitting, and fixing 0.61 mm thick Lysaght klip lok fitted A350-7-CW-2118-2129 sqm 434.81
and fixed with “J” hook limpet washers and putty etc. all complete and
accepted by the Engineer

11.8 Roof Insulation (fiber glass with galvanized mesh) A350-7-CW-2118-2129 sqm 60.00

11.9 Pre_painted galvanized Steel Flashing, 0.61 thick A350-7-CW-2118-2129 m 56.38

11.10 Stainless steel gutter thk 1.2mm A350-7-CW-2118-2129 m 60.00

11.11 Balloon gutter guard A350-7-CW-2118-2129 each 12.00

11.12 Square galvanized steel tube 50x50x2 A350-7-CW-2118-2129 kg 188.40

11.13 Downspout uPVC D110 mm, 2.8mm thk A350-7-CW-2118-2129 m 66.00


Sub - Total 11
12 Electrical Work
Ref: A350-7-LA-2101

Subject: Detail BOQ of Civil Works


Page - 235/405
Item: Scrap Godown
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure

Electrical equipment
12.1
Providing and fixing electrical equipment to position

1- Distribution board, IP54 Enclosures each 1.00


2- High pressure lamp 250V (SODIUM VAPOUR LAMP(230V,50Hz)
(Osram/Philips/GE/Harmonics or equivalent brand accepted/approved
by the Engineer))250 watt high pressure sodium vapour lamp.)
each 10.00

12.2 Protection (MCB & MCCB)


1- MCB 2px16,6KA each 4.00

2- MCB 4px25, 6KA each 2.00

Electrical wire and cable (include conduit pipes, junction box with
12.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 300.00
core 1c x 2.5 mm²
Sub - Total 11
TOTAL

Subject: Detail BOQ of Civil Works


Page - 236/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 237/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 238/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 239/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 240/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 241/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 242/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 243/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 244/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 245/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 246/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 247/405
Item: Scrap Godown
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 248/405
Item: Scrap Godown
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Dormitory for Officer
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
layout with chalk powder, providing necessary tools and plants,
1 protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the
layout etc.

Layout and marking for earth work in excavation in foundation


1.1 accepted by the Engineer. A350-7-CW-2201 sqm 161.60

Earth work in excavation in foundation trenches up to 1.5 m depth


1.2 and maximum 10 m lead: in soft clayey soil/loose sand/silt A350-7-CW-2201, 2216-2218 cum 292.23
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-2201 sqm 161.60
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350-7-CW-2201, 2216-2218 cum 163.52
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of the
1.5 A350-7-CW-2201, 2216-2218 cum 128.71
city or town area including loading, unloading at both ends, leveling
and dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 236/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire of drilling rig set, tripod stand, tremie pipe, cost of
fuel, lubricant, mobilization, demobilization, maintenance, spares,
stand-byes, insurance coverage, water, electricity and other charges
2.1 all compete approved and accepted by the Engineer. Before
commencing boring operation, Contractor shall submit method of
statement of cast-in-situ pile work including sequence of boring and
casting, disposal of spoils, test result of materials to the Engineer for
approval. However, Engineer' approval shall not relieve the
Contractor of his responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350-7-CW-2215 m 1,056.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM
-1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand [Sylhet
sand or coarse sand of equivalent F.M.2.2], 20 mm down well graded
crushed stone chips conforming to ASTM C-33, including breaking
crushed stone chips, screening through proper sieves, making, placing
re-bar cage & binding ms pipes in position, placing and removing tri-
pod as per requirement, pouring the concrete in bore-hole with the
2.2 help of a tremie pipe, maintaining the tremie pipe immersed in A350-7-CW-2215 cum 298.43
concrete by at least 1 meter throughout the period of concreting,
maintaining required slump, etc. mixing the aggregates in batching
plant, casting inbore holes, all complete including water, electricity,
testing of materials and concrete etc and other charges as per design,
drawing etc all complete approved and accepted by the Engineer.
Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 237/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy
not exceeding 450 MPa and whatever is the yield strength within
allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile
strength fu to yield strength fy, shall be at least 1.25 and minimum
elongation after fracture and minimum total elongation at maximum
2.3 force is 16% and 8% respectively including welding of lapping and A350-7-CW-2215 kg 18,140.67
spirals as per design, drawing, straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires, splices or
laps what so ever etc. all complete accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length
in each pile for ultrasonic pulse velocity meter test. The Pvc pipes
should have threaded cap at top and bottom, and jointed by socket &
glue to connect each others. 14 SWG steel wires shall be used for
2.4 binding with rebar cage having minimum one binding with rebar A350-7-CW-2215 m 3,168.00
cages in each 3m interval or apply other approved devices for
fastenening firmly with rebar cage, cleaning pipes upto full length
immediately after concreting, protecting the pipes from any damage
etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making A350-7-CW-2215 cum 13.56
platform where necessary, carrying, all sorts of handling, stacking the
same properly after cleaning, leveling and dressing the situ and
clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 238/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved expert,
preparing, cleaning the holes and providing all relevant materials, A350-7-CW-2215 each 26.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.
2.6 ii) Double PIT (pile integrity test)
Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT
expert, preparing pile heads and providing all relevant materials,
equipment, result in standard forms and compiling test report with A350-7-CW-2215 each 21.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and
filling sacs/gunny bags for loading, record readings and preparation of
results in standard forms and other incidental charges per standard
2.7 A350-7-CW-2215
practice and procedures including submission of load test report,
furnishing all graph and chart etc. complete in all respects approved
and accepted by the Engineer (Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test /test 1.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
3.1 by mixer, casting in forms in/c supplying & laying of single layer
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-2216-2218 cum 6.10

3.1.2_ For ground floor beam A350-7-CW-2218 cum 0.71

Subject: Detail BOQ of Civil Works


Page - 239/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.1.3_ For ground floor slab A350-7-CW-2225 cum 13.54

3.1.4_ For drain and appron A350-7-CW-2201 cum 4.86


Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1,
52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand
or coarse sand of equivalent F.M 2.2 and 20 mm down well graded
crushed stone chips conforming to ASTM C-33; preparing the
3.2 concrete mix in the Digital Batching plant, ascertaing the strength by
trail mix design, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after
specified time approved; including all cost of water, electricity,
admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-2216-2218 cum 92.12

3.2.2_ Concrete for pedestal column A350-7-CW-2216 cum 1.35

3.2.3_ Concrete for ground floor beam A350-7-CW-2218 cum 5.14

3.2.4_ Concrete for 1st floor beam A350-7-CW-2220, 2221 cum 10.90
3.2.5_ Concrete for 2nd floor beam A350-7-CW-2222, 2223 cum 10.90

3.2.6_ Concrete for beam elv + 10.450m A350-7-CW-2224 cum 9.56

3.2.7_ Concrete for roof beam A350-7-CW-2224-2226 cum 6.81

3.2.8_ Concrete for ground floor slab A350-7-CW-2225 cum 13.54

3.2.9_ Concrete for 1st floor slab A350-7-CW-2220, 2221 cum 15.51

3.2.10_ Concrete for 2nd floor slab A350-7-CW-2222, 2223 cum 15.51

3.2.11_ Concrete for slab elv + 10.450m A350-7-CW-2227 cum 4.33

3.2.12_ Concrete for roof slab A350-7-CW-2227 cum 19.94

3.2.13_ Concrete for ground floor column A350-7-CW-2219 cum 10.74


3.2.14_ Concrete for 1st floor column A350-7-CW-2219 cum 9.16

Subject: Detail BOQ of Civil Works


Page - 240/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.2.15_ Concrete for 2nd floor column A350-7-CW-2219 cum 9.50

3.2.16_ Concrete for lintel A350-7-CW-2219 cum 2.26


3.2.17_Concrete for sunshade A350-7-CW-2219 cum 2.17

3.2.18_ Concrete for staircase A350-7-CW-2208 cum 3.63


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
4.1.1_ Formwork for footing A350-7-CW-2216-2218 sqm 102.24

4.1.2_ Formwork for pedestal column A350-7-CW-2216 sqm 10.80

4.1.3_ Formwork for ground floor beam A350-7-CW-2218 sqm 27.78


4.1.4_ Formwork for 1st floor beam A350-7-CW-2220, 2221 sqm 88.11

4.1.5_ Formwork for 2nd floor beam A350-7-CW-2222, 2223 sqm 88.11

4.1.6_ Formwork for beam elv + 10.450m A350-7-CW-2224 sqm 82.82

4.1.7_ Formwork for roof beam A350-7-CW-2224-2226 sqm 60.86

4.1.8_ Formwork for 1st floor slab A350-7-CW-2220, 2221 sqm 126.40

4.1.9_ Formwork for 2nd floor slab A350-7-CW-2222, 2223 sqm 126.40

4.1.10_ Formwork for slab elv + 10.450m A350-7-CW-2227 sqm 36.08

4.1.11_ Formwork for roof slab A350-7-CW-2227 sqm 166.19

4.1.12_ Formwork for ground floor column A350-7-CW-2219 sqm 96.48


4.1.13_ Formwork for 1st floor column A350-7-CW-2219 sqm 91.58

4.1.14_ Formwork for 2nd floor column A350-7-CW-2219 sqm 83.52

4.1.15_ Formwork for lintel A350-7-CW-2219 sqm 39.48

4.1.16_ Formwork for sunshade A350-7-CW-2219 sqm 21.71

4.1.17_ Formwork for staircase A350-7-CW-2208 sqm 33.06

Subject: Detail BOQ of Civil Works


Page - 241/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 242/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

5.1.1_ Reinforcement for footing A350-7-CW-2216-2218 kg 7,467.25


5.1.2_ Reinforcement for pedestal column A350-7-CW-2216, 2219 kg 497.18

5.1.3_ Reinforcement for ground floor beam A350-7-CW-2218 kg 2,224.28

5.1.4_ Reinforcement 1st floor beam A350-7-CW-2220, 2221 kg 2,983.68

5.1.5_ Reinforcement for 2nd floor beam A350-7-CW-2222, 2223 kg 2,983.68

5.1.6_ Reinforcement for beam at elv + 10.450m A350-7-CW-2224 kg 2,983.68

5.1.7_ Reinforcement for roof beam A350-7-CW-2224-2226 kg 2,171.00

5.1.8_ Reinforcement for ground floor slab A350-7-CW-2225 kg 1,091.39

5.1.9_ Reinforcement for 1st floor slab A350-7-CW-2220, 2221 kg 2,173.42

5.1.10_ Reinforcement for 2nd floor slab A350-7-CW-2222, 2223 kg 2,173.42


5.1.11_ Reinforcement for roof slab at elv +10.450m and slope slab A350-7-CW-2227 kg 1,937.26

5.1.12_ Reinforcement for column A350-7-CW-2216, 2219 kg 7,989.22

5.1.13_ Reinforcement for lintel A350-7-CW-2219 kg 552.04

5.1.14_ Reinforcement for Sunshade A350-7-CW-2219 kg 360.06

5.1.15_ Reinforcement for staircase A350-7-CW-2208,2228 kg 516.48


Sub - Total 5

Subject: Detail BOQ of Civil Works


Page - 243/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and
6.1 soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

6.1.1_ Ground floor wall include balcony wall A350-7-CW-2209/2203 cum 47.77

6.1.2_ 1st floor wall include balcony wall A350-7-CW-2209/2203 cum 37.67

6.1.3_ 2nd floor wall include balcony wall A350-7-CW-2209/2203 cum 38.99
Exposed brick work for interior wall
Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made 10 holes first class bricks (Mirpur
Ceramics or equivalent) in cement sand (F.M.1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding,
6.2 raking out joints, cleaning and soaking the bricks for at least 24 hours
before use and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges ect. all complete
and acceplete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.
6.2.1_Ground floor A350-7-CW-2203-2205 sqm 76.07

6.2.2_ 1st floor A350-7-CW-2203-2205 sqm 66.85

6.2.3_ 2nd floor A350-7-CW-2203-2205 sqm 69.55

Subject: Detail BOQ of Civil Works


Page - 244/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar,
cleaning and soaking bricks at least 24 hours before use and washing
6.3 of sand, necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length). (Cement: CEM-I)

6.3.1_ Staircase A350-7-CW-2208 cum 0.83


6.3.2_ Entry steps A350-7-CW-2207 cum 0.87
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
necessary scaffolding, raking out joints, cleaning and soaking bricks
6.4 at least 24 hours before use and washing of sand curing at least 7 days
in all floor including cost of water, electricity and other charges etc.
(Cement: CEM-I)

6.4.1_ Gutter and parapet wall A350-7-CW-2203-2205 sqm 13.82


6.4.2_ Drain wall A350-7-CW-2201 sqm 90.64
Sub - Total 6

Subject: Detail BOQ of Civil Works


Page - 245/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
sunshades, cornices, railings, drop wall, louvers, fins and finishing the
7.1 corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to gutter wall A350-7-CW-2203-2205 sqm 13.82

7.1.2_ Plaster to beam A350-7-CW-2220-2226 sqm 172.69

7.1.3_ Plaster to column A350-7-CW-2219 sqm 135.79

7.1.4_ Plaster to ceiling and below surface of roof slab A350-7-CW-2203-2205 sqm 36.08

7.1.5_ Plaster to drain A350-7-CW-2201 sqm 90.64


7.1.6_ Plaster to staircase A350-7-CW-2208 sqm 33.06

7.2 Waterproofing

7.2.1_ Three layers waterproofing by sika for roof slab A350-7-CW-2203-2205 sqm 36.08
Sub - Total 7
8 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.1 (1:4) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care

8.1.1_ Ground floor A350-7-CW-2203-2205 sqm 97.29

8.1.2_ 1st floor A350-7-CW-2203-2205 sqm 93.82


8.1.3_ 2nd floor A350-7-CW-2203-2205 sqm 93.82
Homogenious tile 300 x 300mm
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
(1:4) base and raking out the joints with white cement including
8.2
cutting and laying the tiles in proper way and finishing with care

Subject: Detail BOQ of Civil Works


Page - 246/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
8.2.1_ Toilet floor A350-7-CW-2203-2207 sqm 26.34
Ceramic tile 300x500mm light colour for toilet wall
Suppling, fitting and fixing glazed wall tile, irrespective of color &/or
design, with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3)
base and ranking out the joints with respective joint filler & binder
8.3 including cutting, laying and hire charge of machine and finishing
with care etc. including water, electricity and other charges

8.3.1_ Toilet wall A350-7-CW-2203-2207 sqm 141.75


Mirpur ceramic 75x225 mm, dark colour for outer surface of ground
8.4 A350-7-CW-2203-2205 sqm 40.89
floor beam
Granite stone thick. 20mm for entry steps
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
8.5
respective joint filler & binder including cutting, laying and finishing
with care etc

8.5.1_ For staircase A350-7-CW-2208 sqm 23.61


8.5.2_ For entry steps A350-7-CW-2207 sqm 5.26
Roof tile
8.6 Supplying, fitting and fixing country made (Mirpur Ceramic / A350-7-CW-2202 sqm 166.19
equivalent) roof tile, with adhesive motar
Sub - Total 8
9 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats
9.1 of coal tar to the surface in contact with all, fitting and fixing in
position. Frame (size 250x62mm) & shutter as per design, drawing,
accepted by the Engineer

9.1.1_ Double leaf door DO-01 (2100x1200x38mm) including


varnishing and frence polishing A350-7-CW-2209-2211 cum 0.90

9.1.2_ Single leaf door DO-02 (2100x850x38mm) including


varnishing and frence polishing A350-7-CW-2209-2211 cum 2.19
9.1.3_ Single leaf door DO-03 (2100x700x38mm) including
varnishing and frence polishing A350-7-CW-2209-2211 cum 0.26

9.2 Solid uPVC Toilet door (frame 150x62mm)

Subject: Detail BOQ of Civil Works


Page - 247/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9.2.1_ Single leaf door DO-04 (2130x760x38mm) A350-7-CW-2209-2211 each 10.00
5mm thick glass Thai Aluminium frame sliding window as per
9.3 design, drawing, accepted by the Engineer
9.3.1_ Double shutter window WD-01 (1200x1400mm) including
grill with 12mm square bar, angle flat bar etc. and epoxy paint A350-7-CW-2209-2211 sqm 18.48

9.3.2_ Double shutter window WD-01 (1200x1200mm) including


grill with 12mm square bar, angle flat bar etc. and epoxy paint A350-7-CW-2209-2211 sqm 1.44

5mm thick glass Thai Aluminium frame curtain windowas per design,
9.4 drawing, accepted by the Engineer
9.4.1_ Single shutter curtain window CWD-01 (600x600mm)
including grill with 12mm square bar as per drawing, design, A350-7-CW-2209-2211 sqm 3.60
specification etc. all complete & accepted by the Engineer.

9.4.2_ Single shutter curtain window CW-02 (1250x600mm)


including grill with 12mm square bar as per drawing, design, A350-7-CW-2209-2211 sqm 1.80
specification etc. all complete & accepted by the Engineer
9.4.3_ Single shutter curtain window CW-03 (500x500mm) including
grill with 12mm square bar as per drawing, design, specification etc. A350-7-CW-2209-2211 sqm 0.25
all complete & accepted by the Engineer.

9.4.4_ Single shutter curtain window GCW (600x600mm) including


grill with 12mm square bar as per drawing, design, specification etc. A350-7-CW-2209-2211 sqm 0.36
all complete & accepted by the Engineer
Sub - Total 9
10 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm thick
board laminated by mechanical hot press with a milk white PVC
10.1 membrane with Aluminum T- bar frame in natural anodized finish at
600*600 mm in grid suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc.

10.1.1_ Aluminium ceiling of ground floor A350-7-CW-2203-2205 sqm 105.49

10.1.2_ Aluminium ceiling of 1st floor A350-7-CW-2203-2205 sqm 107.29

10.1.3_ Aluminium ceiling of 2nd floor A350-7-CW-2203-2205 sqm 104.36

Subject: Detail BOQ of Civil Works


Page - 248/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
10.2 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

10.2.1_ Painting to gutter wall A350-7-CW-2203-2205 sqm 7.32

10.2.2_ Painting to beam A350-7-CW-2218, 2220, 2222-2224 sqm 172.69

10.2.3_ Painting to column A350-7-CW-2219 sqm 135.79


10.2.4_ Painting to staircase A350-7-CW-2207 sqm 27.10
Sub - Total 10
11 Structural Steel
11.1 Balloon gutter guard F114 A350-7-CW-2206 each 2.00
11.2 Stainless steel handrail with wooden top rail for staircase A350-7-CW-2208 m 18.33
11.3 Stainless steel handrail for balcony wall A350-7-CW-2201 m 35.00
Sub - Total 11
12 Water Supply/ Waste water System
A350-7-DW-3-2205, A350-7-DW-2-2205
Supply and installation of foreign made food grade stainless steel
(SS304) thickness 1.8mm water tank including supply of hardware,
12.1
consumables, fittings etc. all complete approved and accepted by the
Engineer
12.1.1_2000 liter capacity each 2.00

12.2 Valve each 32.00

12.3 uPVC pipe (min. Thickness 3.0 mm)

12.3.1_ uPVC ɸ110 m 30.00


12.3.2_ uPVC ɸ76 m 60.00

12.3.3_ uPVC ɸ40 m 50.00

12.3.5_VENT PIPE uPVC ɸ 76 m 16.00

12.4 PPR pipe (min. Thickness 4.5 mm)

Subject: Detail BOQ of Civil Works


Page - 249/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
12.4.1_PPR pipe ɸ 27 m 115.00

12.4.2_PPR pipe ɸ 20 m 16.00


12.5 Tee

12.5.1_ 110 Tee each 20.00

12.5.2_ 110/ 76 Tee each 9.00

12.5.3_ 110/ 40Tee each 5.00

12.5.4_ 76/40 Tee each 1.00

11.5.5_ 76/76 Tee each 44.00

11.5.6_ 40/27 Tee each 4.00

12.5.7_ 27/ 27Tee each 3.00

12.5.8_ 27/ 20Tee each 56.00

12.5.9_ 20/ 20Tee each 7.00

12.5.10_ 40/40 Tee each 16.00

12.5.11_ 40/27 Tee each 1.00

12.6 Reducer

12.6.1_110-40 Reducer each 4.00

12.6.2_76-40 Reducer each 2.00

12.6.3_40-27 Reducer each 4.00

12.6.4_27-20 Reducer each 8.00


12.7 Elbow
12.7.1_90 degree elbow(PPR pipe ɸ 20) each 24.00

12.7.2_90 degree elbow(uPVC ɸ110) each 4.00

12.7.3_90 degree elbow(uPVC ɸ76) each 12.00

12.7.4_90 degree elbow(uPVC ɸ40) each 40.00

12.7.5_90 degree elbow(uPVC ɸ27) each 28.00

12.7.6_45 degree elbow(uPVC ɸ110) each 32.00

Subject: Detail BOQ of Civil Works


Page - 250/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Septic tank
Construction of septic tank of different sizes (medium and large sizes)
with walls of brick work in cement mortar (1:6) having a lining of
minimum 125 mm R.C.C cast against the walls as per approved type
plan over a brick flat soling flat soiling and 150 mm thick reinforced
cement concrete flooring (1:2:4) with 125 mm thick walls in partition
and 12 mm thick cement plaster (1:4) with N.C.F. to insides of walls
on floor and all around outside walls by 18” height at top including
supplying fitting and fixing of two R.C.C. Tees and providing 450
12.8 mm dia water sealed heavy type C.I. manhole cover with
locking/unlocking arrangement and 100 mm thick R.C.C (1:2:4) top
slab, including centering, shuttering, fabricating, casting and curing
etc.all complete as per standard drawing, specification accepted by the
Engineer. (Rate in including cost of reinforcement and its fabrication,
binding and placing.)

12.8.1_ for 30 person each 1.00


Soak well
Construction of soak well of different sizes (medium and large sizes)
with 250mm thick soild brick work and 250mm honey comb brick
work with cement mortar (1:6) as per design over R.C.C. (1:2:4) well
curb with 1% reinforcement up to the depth as per drawing with 450
mmm dia water sealed heavy type. C.I. manhole cover with locking
arrangement, filling the well up to the reqired depth with graded khoa
12.9 and sand including suppling and fabicating M.S. Rod, casting, curing
including necessary earth work in excavation, side filling and bailing
out water including cost of all materials etc. all complete as per
standard drawing, design approved and accepted by the Engineer.
(Rate in including cost of reinforcement and its fabrication,
binding,and placing, form work etc.)

12.9.1_ 30 users each 1.00


Construction of masonry inspection pit with 250 mm thick brick work
in cement mortar (1:4) including necessary earth work, side filling
and one layer brick flat soling, 75 mm thick (1:3:6) base concrete for
12.10
making invert channel and 12 mm thick (1:2) cement plaster with neat
finishing etc.all complete up to a depth of 700 mm approved and
accepted by the Engineer.
12.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average 525
mm for single 150 mm dia R.C.C.pipes and 400 mm uPVC pipe each 3.00

Subject: Detail BOQ of Civil Works


Page - 251/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Sub - Total 12
13 Sanitary Accessories (Cotto or Equivalent)
A350-7-CW-2206,2207,2209, A350-7-DW-2-2205
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c
13.1 plastic seat cover, cistern system, preparing the base with cement each 24.00
concrete and with wire mesh or roads if necessary, including making
holes and fitting, fixing, finishing etc.
13.2 Bowl uniral each 23.00
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx. size
656×510×845, 26kg by weight including fitting, fixing the same in
position with heavy type C.I. Brackets. 30 mm dia PVC waste water
13.3 pipe with brass coupling (not exceeding 750 mm in length). 12mm each 18.00
plastic lead (connection) pipe with brass coupling, basin waste with
chain plug including making holes in walls and floors and fitting with
wooden blocks, screws, finishing etc,

13.4 Bathroom strainer each 50.00


13.5 Kitchen Sink each 3.00
Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
13.6 unframe super quality mirror with hard board at the back with all each 18.00
necessary fitting including making holes in walls and mending good
the damages with cement morta (1:4) etc.

13.7 Shower each 16.00

13.8 Flush faucet for toilet bowl (Cotto or equivalent) each 24.00

13.9 Wash basin faucet (Cotto or equivalent) each 18.00


Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
13.10 each 24.00
150*150*126 mm size including making holes in walls and mending
good the damages with cement mortar (1:4) etc.
Porcelain soap tray
Supplying, fitting, and fixing standard size soap tray including
13.11 making holes in walls and mending good the damages with cement each 16.00
mortar (1:4) etc.
Supplying, fitting and fixing best quality faucets ect. (Cotto or
13.12 equivalent). Complete approved and accepted by the Engineer
13.12.1_12mm CP bib cock each 24.00

Subject: Detail BOQ of Civil Works


Page - 252/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Supply, fitting and fixing best quality CP pillar cock ect. (Cotto or
13.13 equivalent). Complete approved and accepted by the Engineer

13.13.1_12 mm CP medium quality pillar cock each 24.00

13.13.2_12 mm CP stop cock each 24.00

13.13.3_12 mm CP angle stop cock each 24.00


Sub - Total 13
14 Electrical Work
Ref: A350-7-LA-2201
Electrical equipment
14.1 Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215 mm.dia
Steel Sheet Carrier, with Powder coated Paint/Oxidized /Chromium each 67.00
finished, suitable glass covers of min. height 92mm
2- Wall mounted LED tube light
Providing & fixing the 1×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
breadth 60mm, superior quality electronic ballast with one year each 12.00
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC insulated
(stranded) flexible FR wire, earth terminal etc.

3- Wall mounted bracket LED light


Providing & fixing the Special type fancy bracket LED light
consisting of white colour conical fiber sheet shade of minimum dia
150mm, minimum total height of fitting 250mm, golden or oxidized each 28.00
or chromium plated/ brass bracket with carrier, brass holder, earth
terminal, necessary wiring with 2× 0.4 sq.mm stranded PVC insulated
flexible FR cable etc.

4- Ceiling fan 56" including fitting and fixing


Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS rod each 18.00

5- Exhaust fan 12"


Providing and fixing of following axial flow A.C capacitor type wall
mounted exhaust fan complete with blade, steel frame standard wall each 11.00
louver shutter, PVC insulated connecting wire etc.

Subject: Detail BOQ of Civil Works


Page - 253/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6- Combined switch and regulator board
Supply and installation of electronics fans regulators compriasing of
standard component having noise suppression circuit and total loss in
the regulator not exceeding 0.4 watt suitable for 220 10% volt AC each 11.00
single phase 50 Hz manufactured by Micro Electronics Ltd. or
equivalent foreign made

7- Sub distribution board, IP42, include the terminal block each 3.00
8- Distribution board, IP42Enclosures each 1.00
9- Socket (3-pin 6A ) each 34.00
10- Socket (3-pin 15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps.
Combined switch socket outlet (concealed type) manufactured and
tested in accordance with relevant IEC standards and manufactured
and tested in accordance with relevant IEC standards and approved by
BSTI mounted on required size 18 SWG galvanized plain sheet board each 12.00
of 76.2mm. (3”) depth all electrical contacts shall be of brass/copper
(Dynamic/MEP/ SK/Metro/Super Star or equivalent, local made).)

11- LED tube light set (3 x 10W)


Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.37) consisting of
power coated 22 SWG sheet steel frame of min. length 600mm &
breath 600mm, symmetrical mirror reflector of anodized aluminum, each 9.00
superior quality electronic ballast with one year guarantee, holder,
necessary wiring with 2 x 0.4 sq.mm PVC insulated (stranded)
flexible FR wire, earth terminal etc.

12- LED tube light set (3 x 20W)


Providing & fixing the 3 x 2’× 20 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.19) consisting of
power coated enameled22 SWG sheet steel frame of min. length
1213mm & breath 600mm, louver of steel sheet/aluminum, superior each 6.00
quality electronic ballast with one year guarantee, holder, necessary
wiring with 2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire,
earth terminal etc.

Subject: Detail BOQ of Civil Works


Page - 254/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
13- One way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 40.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

14- Two way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 6.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

15- Three way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 8.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

16- Four way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 5.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

17- Room air cooler- split type 24000btu / hr


Supply, Installation, Testing & commissioning of split type Air-
cooler comprising condensing and evaporating units having following
cooling capacity based on indoor temperature 27°-30° C DB / 19.5°-
22°C WB and outdoor temperature 35°-40° DB at high fan speed each 11.00
condition suitable for installation & operation in tropicalized country
like Bangladesh & as per detailed specifications & standard as
mentioned below: Wall mounted

14.2 Protection (RCCB)


1- RCCB 2px10,6KA each 11.00
2- RCCB 2px16,6KA each 13.00
3- RCCB 4px40,6KA each 7.00
4- RCCB 4px50, 6KA each 1.00
Electrical wire and cable (include conduit pipes,junction box with
14.3
terminal block and concealed)

Subject: Detail BOQ of Civil Works


Page - 255/405
Item: Dormitory for Officer
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 2,489.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 2,510.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 1,389.00
core 1c x 2.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 800.00
core 1c x 4mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Multi -
m 195.00
core 5c x 10 mm²
Sub - Total 14
TOTAL

Subject: Detail BOQ of Civil Works


Page - 256/405
Item: Dormitory for Officer
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Dormitory for Support Staff
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350-7-CW-2301 sqm 404.04
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth A350-7-CW-2301, 2322-
1.2 and maximum 10 m lead: in soft clayey soil/loose sand/silt cum 812.84
2326
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-2301 sqm 404.04
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content (Modified
A350-7-CW-2301, 2322-
1.4 proctor test) including carrying, watering, levelling, dressing and cum 340.93
2326
compacting to a specified percentage each layer upto finished level etc.
all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city or A350-7-CW-2301, 2322-
1.5 cum 471.91
town area including loading, unloading at both ends, leveling and 2326
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 256/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire of drilling rig set, tripod stand, tremie pipe, cost of fuel,
lubricant, mobilization, demobilization, maintenance, spares, stand-
byes, insurance coverage, water, electricity and other charges all
2.1 compete approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement of cast-
in-situ pile work including sequence of boring and casting, disposal of
spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350-7-CW-2322, 2323 m 2,816.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage & binding
ms pipes in position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1 meter
throughout the period of concreting, maintaining required slump, etc.
2.2 A350-7-CW-2322, 2323 cum 795.80
mixing the aggregates in diginal batching plant, casting in bore holes,
acertaining the strength by trial mix design all complete including all
cost of water, electricity, plant & machinery, bentonite, admixture
testing of materials and concrete etc and other charges as per design,
drawing etc all complete approved and accepted by the Engineer.
Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 257/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding
450 MPa and whatever is the yield strength within allowable limit as
per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
2.3 fracture and minimum total elongation at maximum force is 16% and A350-7-CW-2322, 2323 kg 48,049.72
8% respectively including welding of lapping and spirals as per
design, drawing, straightening and cleaning rust, if any, bending and
binding in position with supply of G.I. wires, splices or laps what so
ever etc. all complete accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia of
bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length in
each pile for ultrasonic pulse velocity meter test. The Pvc pipes should
have threaded cap at top and bottom, and jointed by socket & glue to
connect each others. 14 SWG steel wires shall be used for binding with
2.4 rebar cage having minimum one binding with rebar cages in each 3m A350-7-CW-2322, 2323 m 8,448.00
interval or apply other approved devices for fastenening firmly with
rebar cage, cleaning pipes upto full length immediately after
concreting, protecting the pipes from any damage etc. all complete
accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making platform A350-7-CW-2322, 2323 cum 36.17
where necessary, carrying, all sorts of handling, stacking the same
properly after cleaning, leveling and dressing the situ and clearing the
bed etc.

Subject: Detail BOQ of Civil Works


Page - 258/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full length
for each pile (3 holes/pile) by a qulifified and approved expert,
2.6 preparing, cleaning the holes and providing all relevant materials, A350-7-CW-2322, 2323 each 68.00
equipment, result in standard forms and compiling test report with
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT expert,
preparing pile heads and providing all relevant materials, equipment,
result in standard forms and compiling test report with A350-7-CW-2322, 2323 each 56.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent standard


for the cast-in-situ/pre-cast pile providing required scaffolding, bracing,
jacks, pressure test gauge, loading unloading, Kentledge and other
plants and equipment including staging, mobilization, demobilization,
hire charge, gunny bags, sand and filling sacs/gunny bags for loading,
record readings and preparation of results in standard forms and other
incidental charges per standard practice and procedures including
2.8 A350-7-CW-2322, 2323
submission of load test report, furnishing all graph and chart etc.
complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test /test 4.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
3.1
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-2322-2326 cum 34.56


3.1.2_ For ground floor beam A350-7-CW-2327 cum 3.75
3.1.3_ For ground floor slab A350-7-CW-2329 cum 39.04

Subject: Detail BOQ of Civil Works


Page - 259/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3.1.4_ For drain and appron A350-7-CW-2301 cum 4.86
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-2322-2326 cum 251.86

3.2.2_ Concrete for pedestal column A350-7-CW-2328 cum 3.60

3.2.3_ Concrete for ground floor beam A350-7-CW-2327 cum 13.49


3.2.4_ Concrete for 1st floor beam A350-7-CW-2329, 2330 cum 27.75

3.2.5_ Concrete for 2nd floor beam A350-7-CW-2332 cum 27.28

3.2.6_ Concrete for beam at elv +10.780m A350-7-CW-2334,2335 cum 25.81

3.2.7_ Concrete for roof beam A350-7-CW-2334,2335 cum 12.63

3.2.8_ Concrete for ground floor slab A350-7-CW-2329 cum 39.04

3.2.9_ Concrete for 1st floor slab A350-7-CW-2331 cum 45.03

3.2.10_ Concrete for 2nd floor slab A350-7-CW-2333 cum 45.03

3.2.11_ Concrete for slab at elv +10.780m A350-7-CW-2336, 2337 cum 2.71
3.2.12_ Concrete for roof slope slab A350-7-CW-2336, 2337 cum 51.01

3.2.13_ Concrete for ground floor column A350-7-CW-2328 cum 28.65

3.2.14_ Concrete for 1st floor column A350-7-CW-2328 cum 25.57

3.2.15_ Concrete for 2nd floor and roof column A350-7-CW-2328 cum 24.24

Subject: Detail BOQ of Civil Works


Page - 260/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3.2.16_ Concrete for gutter A350-7-CW-2306 cum 12.96

3.2.17_ Concrete for lintel A350-7-CW-2338 cum 5.61


3.2.18_Concrete for sunshade A350-7-CW-2338 cum 5.15

3.2.19_ Concrete for staircase A350-7-CW-2312 cum 3.88


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
4.1.1_ Formwork for footing A350-7-CW-2322-2326 sqm 239.71

4.1.2_ Formwork for pedestal column A350-7-CW-2328 sqm 28.80

4.1.3_ Formwork for ground floor beam A350-7-CW-2327 sqm 75.86


4.1.4_ Formwork for 1st floor beam A350-7-CW-2329, 2330 sqm 216.52

4.1.5_ Formwork for 2nd floor beam A350-7-CW-2332 sqm 212.77

4.1.6_ Formwork for beam elv +10.780 A350-7-CW-2334,2335 sqm 206.44

4.1.7_ Formwork for roof beam A350-7-CW-2334,2335 sqm 101.06

4.1.8_ Formwork for 1st floor slab A350-7-CW-2331 sqm 367.55

4.1.9_ Formwork for 2nd floor slab A350-7-CW-2333 sqm 367.55

4.1.10_ Formwork for slab elv +10.780 A350-7-CW-2336, 2337 sqm 22.61

4.1.11_ Formwork for roof slope slab A350-7-CW-2336, 2337 sqm 425.08

4.3.12_ Formwork for ground floor column A350-7-CW-2328 sqm 286.46


4.3.13_ Formwork for 1st floor column A350-7-CW-2328 sqm 255.74

4.3.14_ Formwork for 2nd floor and roof column A350-7-CW-2328 sqm 245.92

4.3.15_ Formwork for gutter slab A350-7-CW-2306 sqm 107.97

4.3.16_ Formwork for lintel A350-7-CW-2338 sqm 91.30

4.1.17_Formwork sunshade A350-7-CW-2338 sqm 51.50

Subject: Detail BOQ of Civil Works


Page - 261/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4.3.18_ Formwork for staircase A350-7-CW-2312 sqm 34.60
Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for Reinforced
Cement Concrete, produced and marked in accordance with BDS ISO
6935-2: 2006 (or standard subsequently released from BSTI) , the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least 1.25
and minimum elongation after fracture and minimum total elongation
at maximum force is 16% and 8% respectively including straightening
5.1
and cleaning rust, if any, bending and binding in position with supply of
G.I. wires, splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

5.1.1_ Reinforcement for footing A350-7-CW-2322-2326 kg 19,773.28

5.1.2_ Reinforcement for pedestal column A350-7-CW-2328 kg 1,381.04

5.1.3_ Reinforcement for ground floor beam A350-7-CW-2327 kg 5,504.84

5.1.4_ Reinforcement 1st floor beam +3.850 A350-7-CW-2329, 2330 kg 8,518.66

5.1.5_ Reinforcement 2nd floor beam +7.300 A350-7-CW-2332 kg 8,518.66

5.1.6_ Reinforcement for beam +10.780 A350-7-CW-2334,2335 kg 7,640.82

5.1.7_ Reinforcement for roof beam A350-7-CW-2334,2335 kg 4,044.94


5.1.8_ Reinforcement for ground floor slab A350-7-CW-2329 kg 3,455.91

5.1.9_ Reinforcement for 1st floor slab A350-7-CW-2331 kg 7,476.62

5.1.10_ Reinforcement for 2nd floor slab A350-7-CW-2333 kg 7,476.62

5.1.11_ Reinforcement for slab +10.780 A350-7-CW-2336, 2337 kg 465.31

5.1.12_ Reinforcement for roof slope slab A350-7-CW-2336, 2337 kg 7,093.36

5.1.13_ Reinforcement for gutter slab A350-7-CW-2306 kg 1,822.28

5.1.14_ Reinforcement for column A350-7-CW-2328 kg 21,910.07

5.3.15_ Reinforcement for lintel A350-7-CW-2338 kg 1,211.10

Subject: Detail BOQ of Civil Works


Page - 262/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
5.1.16_ Reinforcement for sunshade A350-7-CW-2338 kg 1,030.07

Subject: Detail BOQ of Civil Works


Page - 263/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
5.3.17_ Reinforcement for staircase A350-7-CW-2339 kg 909.61
Sub - Total 5
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and
6.1 soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

6.1.1_ Ground floor wall include balcony wall A350-7-CW-2305-2308 cum 111.47

6.1.2_ 1st floor wall include balcony wall A350-7-CW-2305-2308 cum 92.38

6.1.3_ 2nd floor wall include balcony wall A350-7-CW-2305-2308 cum 96.60
Exposed brick work for interior wall
Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made 10 holes first class bricks (Mirpur
Ceramics or equivalent) in cement sand (F.M.1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding,
6.2 raking out joints, cleaning and soaking the bricks for at least 24 hours
before use and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges ect. all complete
and acceplete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.
6.2.1_ Ground floor A350-7-CW-2305-2308 sqm 92.36
6.2.2_ 1st floor A350-7-CW-2305-2308 sqm 86.73
6.2.3_ 2nd floor A350-7-CW-2305-2308 sqm 90.55

Subject: Detail BOQ of Civil Works


Page - 264/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
and soaking bricks at least 24 hours before use and washing of sand,
6.3 necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length). (Cement: CEM-I)

6.3.1_ Staircase A350-7-CW-2312 cum 1.05

6.3.2_ Entry steps A350-7-CW-2307 cum 0.94


125mm thick normal brick work
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including necessary
scaffolding, raking out joints, cleaning and soaking bricks at least 24
6.4
hours before use and washing of sand curing at least 7 days in all floor
including cost of water, electricity and other charges etc. (Cement:
CEM-I)

6.4.1_ Gutter A350-7-CW-2305-2308 sqm 51.20


6.4.2_ Drain wall A350-7-CW-2305-2308 sqm 90.64
Sub - Total 6
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
sunshades, cornices, railings, drop wall, louvers, fins and finishing the
7.1 corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to gutter A350-7-CW-2306 sqm 210.37

7.1.2_ Plaster to beam A350-7-CW-2327-2335 sqm 577.15

7.1.3_ Plaster to ceiling and below surface of roof slab A350-7-CW-2307 sqm 425.08

7.1.4_ Plaster to column A350-7-CW-2328 sqm 788.13

7.1.5_ Plaster to drain A350-7-CW-2301 sqm 90.64

7.1.6_ Plaster to staircase A350-7-CW-2312 sqm 30.14

Subject: Detail BOQ of Civil Works


Page - 265/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
7.2 Waterproofing

7.2.1_ Three layers waterproofing by sika for gutter slab A350-7-CW-2305-2308 sqm 107.97
Sub - Total 7
8 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.1 (1:4) base and raking out the joints with white cement including cutting
and laying the tiles in proper way and finishing with care

8.1.1_ Ground floor A350-7-CW-2307-2311 sqm 256.61

8.1.2_ 1st floor A350-7-CW-2307-2311 sqm 259.52

8.1.3_ 2nd floor A350-7-CW-2307-2311 sqm 249.57


Homogenious tile 300 x 300mm
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.2 (1:4) base and raking out the joints with white cement including cutting
and laying the tiles in proper way and finishing with care

8.2.1_ Toilet floor A350-7-CW-2309-2311 sqm 204.54


Ceramic tile 300x500mm light colour
Suppling, fitting and fixing glazed wall tile, irrespective of color &/or
design, with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base
8.3 and ranking out the joints with respective joint filler & binder including
cutting, laying and hire charge of machine and finishing with care etc.
including water, electricity and other charges

8.3.1_ Toilet wall A350-7-CW-2309-2311 sqm 314.37


Mirpur ceramic 75x225 mm, dark colour for outer surface of ground
8.4 A350-7-CW-2307-2311 sqm 84.60
floor beam
Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
8.5
respective joint filler & binder including cutting, laying and finishing
with care etc

8.5.1_ For staircase A350-7-CW-2312 sqm 32.90

8.5.2_ For entry steps A350-7-CW-2307 sqm 5.72

Subject: Detail BOQ of Civil Works


Page - 266/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Roof tile
8.6 Supplying, fitting and fixing country made (Mirpur Ceramic/equivalent) A350-7-CW-2303 sqm 425.08
roof tile, with adhesive motar
Sub - Total 8
9 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
9.1 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 250x62mm) & shutter as per design, drawing, accepted by
the Engineer

9.1.1_ Double leaf door DO-01(2100x1200x38mm) including


A350-7-CW-2313-2317 cum 3.23
varnishing and frence polishing
9.1.2_ Single leaf door DO-02(2100x1000x38mm) including varnishing
A350-7-CW-2313-2317 cum 0.64
and frence polishing
9.2 Solid uPVC Toilet door (frame 150x62mm)
9.2.1_ Single leaf door DO-03 (2130x760x38mm) A350-7-CW-2313-2317 each 7.00
9.2.2_ Single leaf door DO-04 (2130x600x38mm) A350-7-CW-2313-2317 each 39.00
5mm thick glass Thai Aluminium frame sliding window as per design,
9.3 drawing, accepted by the Engineer
9.3.1_ Double shutter window WD-01 (1200x1800mm) including grill
with 12mm square bar, angle flat bar etc. and epoxy paint A350-7-CW-2313-2317 sqm 19.44

9.3.2_ Double shutter window WD-02 (1200x1400mm)including grill


with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2313-2317 sqm 47.04
complete & accepted by the Engineer.

5mm thick glass Thai Aluminium frame curtain window as per design,
9.4 drawing, accepted by the Engineer

9.4.1_ Single shutter curtain window CW-01 (600x600mm) including


grill with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2313-2317 sqm 3.60
complete & accepted by the Engineer.
9.4.2_ Single shutter curtain window CW-02 (1000x600mm) including
grill with 12mm square bar, angle flat bar etc. and epoxy paint A350-7-CW-2313-2317 sqm 1.80

9.4.3_ Single shutter curtain window CW-03 (1850x600mm) including


grill with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2313-2317 sqm 3.33
complete & accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 267/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
9.4.4_ Single shutter curtain window (3045x6200mm) including grill
with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2313-2317 sqm 18.88
complete & accepted by the Engineer.
Window (1640x6250mm) Louver type Galvanized steel (steel frame
9.5 30x630x2 mm) Galvanized steel leaf 2mm thick. A350-7-CW-2318 sqm 10.25
Sub - Total 9
10 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm thick
board laminated by mechanical hot press with a milk white PVC
10.1 membrane with Aluminum T- bar frame in natural anodized finish at
600*600 mm in grid suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc.

10.1.1_ Aluminium ceiling of ground floor A350-7-CW-2307 sqm 328.93

10.1.2_ Aluminium ceiling of 1st floor A350-7-CW-2307 sqm 322.44

10.1.3_ Aluminium ceiling of 2nd floor A350-7-CW-2307 sqm 336.09


Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
10.2 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

10.2.1_ Painting to gutter wall A350-7-CW-2306 sqm 102.40

10.2.2_ Painting to beam A350-7-CW-2327-2335 sqm 384.77

10.2.3_ Painting to column A350-7-CW-2328 sqm 778.75


Sub - Total 10
11 Structural Steel
11.1 Balloon gutter guard F114 A350-7-CW-2306 each 4.00
11.2 Stainless steel handrail with wooden top rail for staircase A350-7-CW-2312 m 13.10

11.3 Stainless steel handrail for balcony wall A350-7-CW-2301 m 116.70


Sub - Total 11

Subject: Detail BOQ of Civil Works


Page - 268/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
12 Water Supply/ Waste water System
A350-7-DW-3-2305, A350-7-DW-2-2304
Supply and installation of foreign made food grade stainless steel
(SS304) thickness 1.8mm water tank including supply of hardware,
12.1 consumables, fittings etc. all complete approved and accepted by the
Engineer

12.1.1_2000 liter capacity each 3.00

12.2 Valve each 53.00

12.3 uPVC pipe (min. Thickness 3.0 mm)

12.3.1_ uPVC ɸ110 m 44.00

12.3.2_ uPVC ɸ76 m 87.00

12.3.3_ uPVC ɸ40 m 52.00

12.3.5_VENT PIPE uPVC ɸ 76 m 16.00

12.4 PPR pipe (min. Thickness 4.5 mm)


12.4.1_PPR pipe ɸ 27 m 133.00

12.4.2_PPR pipe ɸ 20 m 37.00

12.5 Tee

12.5.1_110 Tee each 29.00

12.5.2_110/ 76 Tee each 9.00

12.5.3_110/ 40Tee each 5.00

12.5.4_76/40 Tee each 1.00

11.5.5_76/76 Tee each 56.00

11.5.6_40/27 Tee each 4.00

12.5.7_27/ 27Tee each 3.00

12.5.8_27/ 20Tee each 69.00

12.5.9_20/ 20Tee each 7.00

12.5.10_40X40 Tee each 21.00

12.5.11_40X27 Tee each 1.00

Subject: Detail BOQ of Civil Works


Page - 269/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
12.6 Reducer

12.6.1_110-40 Reducer each 4.00

12.6.2_76-40 Reducer each 2.00

12.6.3_40-27 Reducer each 4.00

12.6.4_27-20 Reducer each 13.00

12.7 Elbow

12.7.1_90 degree elbow(PPR pipe ɸ 20) each 44.00

12.7.2_90 degree elbow(uPVC ɸ110) each 4.00

12.7.3_90 degree elbow(uPVC ɸ76) each 25.00

12.7.4_90 degree elbow(uPVC ɸ40) each 46.00

12.7.5_90 degree elbow(uPVC ɸ27) each 38.00

12.7.6_45 degree elbow(uPVC ɸ110) each 48.00


Septic tank
Construction of septic tank of different sizes (medium and large sizes)
with walls of brick work in cement mortar (1:6) having a lining of
minimum 125 mm R.C.C cast against the walls as per approved type
plan over a brick flat soling flat soiling and 150 mm thick reinforced
cement concrete flooring (1:2:4) with 125 mm thick walls in partition
and 12 mm thick cement plaster (1:4) with N.C.F. to insides of walls on
floor and all around outside walls by 18” height at top including
12.8 supplying fitting and fixing of two R.C.C. Tees and providing 450 mm
dia water sealed heavy type C.I. manhole cover with locking/unlocking
arrangement and 100 mm thick R.C.C (1:2:4) top slab, including
centering, shuttering, fabricating, casting and curing etc. all complete as
per standard drawing, specification accepted by the Engineer. (Rate in
including cost of reinforcement and its fabrication, binding and
placing.)

12.8.1_ for 50 person each 1.00

Subject: Detail BOQ of Civil Works


Page - 270/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Soak well
Construction of soak well of different sizes (medium and large sizes)
with 250mm thick soild brick work and 250mm honey comb brick work
with cement mortar (1:6) as per design over R.C.C. (1:2:4) well curb
with 1% reinforcement up to the depth as per drawing with 450 mmm
dia water sealed heavy type. C.I. manhole cover with locking
arrangement, filling the well up to the reqired depth with graded khoa
12.9 and sand including suppling and fabicating M.S. Rod, casting, curing
including necessary earth work in excavation, side filling and bailing
out water including cost of all materials etc. all complete as per
standard drawing, design approved and accepted by the Engineer. (Rate
in including cost of reinforcement and its fabrication, binding,and
placing, form work etc.)

12.9.1_ 30 users each 1.00


Construction of masonry inspection pit with 250 mm thick brick work
in cement mortar (1:4) including necessary earth work, side filling and
one layer brick flat soling, 75 mm thick (1:3:6) base concrete for
12.10
making invert channel and 12 mm thick (1:2) cement plaster with neat
finishing etc.all complete up to a depth of 700 mm approved and
accepted by the Engineer.
12.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average 525
each 3.00
mm for single 150 mm dia R.C.C.pipes and 400 mm uPVC pipe
Sub - Total 12
13 Sanitary Accessories (Cotto or Equivalent)
A350-7-CW-2309,2310,2311, A350-7-DW-2-2304
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c plastic
13.1 seat cover, cistern system, preparing the base with cement concrete and each 24.00
with wire mesh or roads if necessary, including making holes and
fitting, fixing, finishing etc.
13.2 Bowl uniral each 23.00
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx. size
656×510×845, 26kg by weight including fitting, fixing the same in
position with heavy type C.I. Brackets. 30 mm dia PVC waste water
13.3 pipe with brass coupling (not exceeding 750 mm in length). 12mm each 18.00
plastic lead (connection) pipe with brass coupling, basin waste with
chain plug including making holes in walls and floors and fitting with
wooden blocks, screws, finishing etc,

13.4 Bathroom strainer each 50.00

Subject: Detail BOQ of Civil Works


Page - 271/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
13.5 unframe super quality mirror with hard board at the back with all each 18.00
necessary fitting including making holes in walls and mending good the
damages with cement morta (1:4) etc.

13.6 Shower each 16.00

13.7 Flush faucet for toilet bowl (Cotto or equivalent) each 24.00

13.8 Wash basin faucet (Cotto or equivalent) each 18.00


Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
13.9 150*150*126 mm size including making holes in walls and mending each 24.00
good the damages with cement mortar (1:4) etc.
Porcelain soap tray
Supplying, fitting, and fixing standard size soap tray including making
13.10 holes in walls and mending good the damages with cement mortar (1:4) each 16.00
etc.
Supplying, fitting and fixing best quality faucets ect. (Cotto or
13.11 equivalent). Complete approved and accepted by the Engineer
13.11.1_12mm CP bib cock each 24.00
Supply, fitting and fixing best quality CP pillar cock ect. (Cotto or
13.12 equivalent). Complete approved and accepted by the Engineer
13.12.1_ 12 mm CP medium quality pillar cock each 24.00
13.12.2_12 mm CP stop cock each 24.00
13.12.3_12 mm CP angle stop cock each 24.00
Sub - Total 13

Subject: Detail BOQ of Civil Works


Page - 272/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
14 Electrical Work
Ref: A350-7-LA-2301
Electrical equipment
14.1 Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215 mm.dia
Steel Sheet Carrier, with Powder coated Paint/Oxidized /Chromium each 110.00
finished, suitable glass covers of min. height 92mm
2- Wall mounted bracket LED light
Providing & fixing the Special type fancy bracket LED light consisting
of white colour conical fiber sheet shade of minimum dia 150mm,
minimum total height of fitting 250mm, golden or oxidized or each 86.00
chromium plated/ brass bracket with carrier, brass holder, earth
terminal, necessary wiring with 2× 0.4 sq.mm stranded PVC insulated
flexible FR cable etc.

3- Ceiling fan 56" including fitting and fixing


Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS rod each 41.00
4- Exhaust fan 12"
Providing and fixing of following axial flow A.C capacitor type wall
mounted exhaust fan complete with blade, steel frame standard wall each 12.00
louver shutter, PVC insulated connecting wire etc.
5- Combined switch and regulator board
Supply and installation of electronics fans regulators compriasing of
standard component having noise suppression circuit and total loss in
the regulator not exceeding 0.4 watt suitable for 220 10% volt AC each 17.00
single phase 50 Hz manufactured by Micro Electronics Ltd. or
equivalent foreign made

6- Sub distribution board, IP42 include the terminal block each 3.00
7- Distribution board, IP42 Enclosures each 1.00
8- Socket (3-pin6A ) each 49.00
9- Socket (3-pin15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps.
Combined switch socket outlet (concealed type) manufactured and
tested in accordance with relevant IEC standards and manufactured and
tested in accordance with relevant IEC standards and approved by BSTI
mounted on required size 18 SWG galvanized plain sheet board of each 22.00
76.2mm. (3”) depth all electrical contacts shall be of brass/copper
(Dynamic/MEP/ SK/Metro/Super Star or equivalent, local made).)

Subject: Detail BOQ of Civil Works


Page - 273/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
10- LED tube light set (3 x 10W)
Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.37) consisting of power
coated 22 SWG sheet steel frame of min. length 600mm & breath
600mm, symmetrical mirror reflector of anodized aluminum, superior each 25.00
quality electronic ballast with one year guarantee, holder, necessary
wiring with 2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire,
earth terminal etc.

11- LED tube light set (3 x 20W)


Providing & fixing the 3 x 2’× 20 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.19) consisting of power
coated enameled22 SWG sheet steel frame of min. length 1213mm &
breath 600mm, louver of steel sheet/aluminum, superior quality each 35.00
electronic ballast with one year guarantee, holder, necessary wiring with
2 x 0.4 sq.mm PVC insulated (stranded) flexible FR wire, earth terminal
etc.

12- One way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 74.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

13- Two way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 18.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

14- Three way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 4.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

Subject: Detail BOQ of Civil Works


Page - 274/405
Item: Dormitory for support staff
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
15- Four way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 9.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

16- Room air cooler- split type 24000btu / hr


Supply, Installation, Testing & commissioning of split type Air-cooler
comprising condensing and evaporating units having following cooling
capacity based on indoor temperature 27°-30° C DB / 19.5°-22°C WB
and outdoor temperature 35°-40° DB at high fan speed condition each 22.00
suitable for installation & operation in tropicalized country like
Bangladesh & as per detailed specifications & standard as mentioned
below: Wall mounted

14.2 Protection (RCCB)


1- RCCB 2px6,6KA each 5.00
2- RCCB 2px10,6KA each 11.00

3- RCCB 2px16,6KA each 14.00

4- RCCB 4px30.6KA each 1.00

5- RCCB 4px40,6KA each 6.00

6- RCCB 4px100,6KA each 1.00


Electrical wire and cable (include conduit pipes,junction box with
14.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 5,140.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 1,828.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 2,404.00
core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 100.00
core 1c x 4 mm²
5- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Multi - core
m 170.00
5c x 10 mm²
Sub - Total 14
TOTAL

Subject: Detail BOQ of Civil Works


Page - 275/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 276/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 277/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 278/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 279/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 280/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 281/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 282/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 283/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 284/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 285/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 286/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 287/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 288/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 289/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 290/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 291/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 292/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 293/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 294/405
Item: Dormitory for support staff
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 295/405
Item: Dormitory for support staff
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Fire-Fighting Pump House
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350-7-CW-2101 sqm 50.00
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth and
1.2 A350-7-CW-2101, 2105 cum 320.06
maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion of A350-7-CW-2101 sqm 50.00
the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in 150mm
layers with earth available within 90 m of the building site minimum dry
density of 95% with optimum moisture content (Modified proctor test)
1.4 A350-7-CW-2101, 2105 cum 84.65
including carrying, watering, levelling, dressing and compacting to a
specified percentage each layer upto finished level etc. all complete and
accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city or
1.5 A350-7-CW-2101, 2105 cum 235.41
town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 275/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to vertical,
providing bentonite slurry and maintaining water level in the hole,
washing the hole for at least 30 minutes, clean the bore-hole and make
the bore-hole ready for placing steel cage and concreting including hire
of drilling rig set, tripod stand, tremie pipe, cost of fuel, lubricant,
mobilization, demobilization, maintenance, spares, stand-byes,
insurance coverage, water, electricity and other charges all compete
2.1 approved and accepted by the Engineer. Before commencing boring
operation, Contractor shall submit method of statement of cast-in-situ
pile work including sequence of boring and casting, disposal of spoils,
test result of materials to the Engineer for approval. However, Engineer'
approval shall not relieve the Contractor of his responsibilities and
obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350 - 7- CW - 2405, 2407 m 352.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage & binding
ms pipes in position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
2.2 maintaining the tremie pipe immersed in concrete by at least 1 meter A350 - 7- CW - 2405, 2407 cum 99.48
throughout the period of concreting, maintaining required slump, etc.
mixing the aggregates in diginal batching plant, casting in bore holes,
acertaining the strength by trial mix design all complete including all
cost of water, electricity, plant & machinery, bentonite, admixture
testing of materials and concrete etc and other charges as per design,
drawing etc all complete approved and accepted by the Engineer.
Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 276/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding
450 MPa and whatever is the yield strength within allowable limit as per
BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after fracture
2.3 and minimum total elongation at maximum force is 16% and 8% A350 - 7- CW - 2405, 2407 kg 4,954.18
respectively including welding of lapping and spirals as per design,
drawing, straightening and cleaning rust, if any, bending and binding in
position with supply of G.I. wires, splices or laps what so ever etc. all
complete accepted by the Engineer (Measurement shall be recorded only
on Standard Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length in
each pile for ultrasonic pulse velocity meter test. The Pvc pipes should
have threaded cap at top and bottom, and jointed by socket & glue to
connect each others. 14 SWG steel wires shall be used for binding with
2.4 rebar cage having minimum one binding with rebar cages in each 3m A350 - 7- CW - 2405, 2407 m 1,056.00
interval or apply other approved devices for fastenening firmly with
rebar cage, cleaning pipes upto full length immediately after concreting,
protecting the pipes from any damage etc. all complete accepted by the
Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making platform A350 - 7- CW - 2405, 2407 cum 4.52
where necessary, carrying, all sorts of handling, stacking the same
properly after cleaning, leveling and dressing the situ and clearing the
bed etc.

Subject: Detail BOQ of Civil Works


Page - 277/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full length
for each pile (3 holes/pile) by a qulifified and approved expert,
preparing, cleaning the holes and providing all relevant materials,
equipment, result in standard forms and compiling test report with A350 - 7- CW - 2405, 2407 each 8.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

2.6
ii) Double PIT (pile integrity test)
Conducting low strain dynamic testing of pile as per ASTM D5882- The
standard method of testing by a qulifified and approved PIT expert,
preparing pile heads and providing all relevant materials, equipment,
result in standard forms and compiling test report with recommendations A350 - 7- CW - 2405, 2407 7.00
on the test etc. complete in all respect approve and accepted by the
Engineer.

Conducting static load test as per ASTM D1143 or equivalent standard


for the cast-in-situ/pre-cast pile providing required scaffolding, bracing,
jacks, pressure test gauge, loading unloading, Kentledge and other plants
and equipment including staging, mobilization, demobilization, hire
charge, gunny bags, sand and filling sacs/gunny bags for loading, record
readings and preparation of results in standard forms and other
incidental charges per standard practice and procedures including
2.8 A350 - 7- CW - 2405, 2407
submission of load test report, furnishing all graph and chart etc.
complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method statement
for conducting load test to the Engineer for approval. However,
Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test test 1.00


Sub - Total 2

Subject: Detail BOQ of Civil Works


Page - 278/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
3.1 polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For tank bottom beam A350-7-CW-2106 cum 6.34


3.1.2_ For tank bottom slab A350-7-CW-2106 cum 6.66
3.1.3_ For drain and appron A350-7-CW-2101 cum 3.47
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for tank bottom beam A350-7-CW-2106 cum 29.59

3.2.2_ Concrete for ground floor beam A350-7-CW-2108, 2109 cum 6.86

3.2.3_ Concrete for beam elv +4.380 A350-7-CW-2108, 2109 cum 3.35

3.2.4_ Concrete for roof beam A350-7-CW-2110 cum 2.46

3.2.5_ Concrete for tank bottom slab A350-7-CW-2106 cum 38.63

3.2.6_ Concrete for tank top slab A350-7-CW-2106 cum 21.60

3.2.7_ Concrete for roof slab A350-7-CW-2111 cum 7.07

3.2.8_ Concrete for tank wall A350-7-CW-2107 cum 22.16

Subject: Detail BOQ of Civil Works


Page - 279/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3.2.9_ Concrete for column A350-7-CW-2108 cum 3.33

3.2.10_ Concrete for gutter A350-7-CW-2104 cum 1.59

3.2.11_ Concrete for lintel A350-7-CW-2105 cum 0.81

3.2.12_ Concrete for Sunshade A350-7-CW-2105 cum 1.92


Sub - Total 2
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.

4.1.1_ Formwork for tank bottom beam A350-7-CW-2106 sqm 59.82

4.1.2_ Formwork for ground floor beam A350-7-CW-2108, 2109 sqm 44.12

4.1.3_ Formwork for beam elv +4.380 A350-7-CW-2108, 2109 sqm 22.40

4.1.4_ Formwork for roof beam A350-7-CW-2110 sqm 21.10

4.1.5_ Formwork for tank top slab A350-7-CW-2106 sqm 16.20

4.1.6_ Formwork for roof slab A350-7-CW-2111 sqm 58.89

4.1.7_ Formwork for tank wall A350-7-CW-2107 sqm 163.20

4.1.8_ Formwork for column A350-7-CW-2108 sqm 33.54

4.1.9_ Formwork for gutter A350-7-CW-2104 sqm 17.26

4.1.10_ Formwork for lintel A350-7-CW-2105 sqm 10.79

4.1.11_ Formwork for Sunshade A350-7-CW-2105 sqm 0.96


Sub - Total 3

Subject: Detail BOQ of Civil Works


Page - 280/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for Reinforced
Cement Concrete, produced and marked in accordance with BDS ISO
6935-2: 2006 (or standard subsequently released from BSTI) , the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least 1.25
and minimum elongation after fracture and minimum total elongation at
maximum force is 16% and 8% respectively including straightening and
5.1
cleaning rust, if any, bending and binding in position with supply of G.I.
wires, splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

5.1.1_ Reinforcement for tank bottom beam A350-7-CW-2106 kg 13,016.34

5.1.2_ Reinforcement for ground floor beam A350-7-CW-2108, 2109 kg 2,415.24

5.1.3_ Reinforcement for beam +4.380 A350-7-CW-2108, 2109 kg 935.05

5.1.4_Reinforcement for roof beam A350-7-CW-2110 kg 490.89

5.1.5_ Reinforcement for tank bottom slab A350-7-CW-2106 kg 4,286.13

5.1.6_ Reinforcement for tank top slab A350-7-CW-2106 kg 1,717.82

5.1.7_ Reinforcement for roof slab A350-7-CW-2111 kg 1,730.20

5.1.8_ Reinforcement for tank wall slab A350-7-CW-2107 kg 3,020.73

5.1.9_ Reinforcement for column A350-7-CW-2108 kg 1,003.48

5.1.10_ Reinforcement for gutter A350-7-CW-2104 kg 288.00

5.1.11_ Reinforcement for lintel A350-7-CW-2105 kg 123.98

5.1.12_ Reinforcement for Sunshade A350-7-CW-2105 kg 460.80

Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 281/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and soaking
6.1 bricks at least for 24 hours before use and washing and screening of
sand, necessary scaffolding, curing at least for 7 days and pointing with
cement sand (F.M.1.2) mortar (1:2) including cost of water, electricity
and other charges ect. all complete and accepted by the Engineer.
(Cement: CEM-I) in ground floor.

6.1.1_ Ground floor A350-7-CW-2102, 2103 cum 23.78


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including necessary
6.2 scaffolding, raking out joints, cleaning and soaking bricks at least 24
hours before use and washing of sand curing at least 7 days in all floor
including cost of water, electricity and other charges etc. (Cement:
CEM-I)

6.2.1_Gutter wall A350-7-CW-2102-2104 sqm 13.28

6.2.2_Drain wall A350-7-CW-2101- 2103 sqm 64.82


Sub - Total 5
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
7.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to column A350-7-CW-2108 sqm 18.48


7.1.2_ Plaster to beam A350-7-CW-2106-2109 sqm 11.60

7.1.3_ Plaster to gutter wall A350-7-CW-2104 sqm 29.88

7.1.4_ Plaster to below surface of roof slab A350-7-CW-2111 sqm 58.89

Subject: Detail BOQ of Civil Works


Page - 282/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
7.1.5_ Plaster to drain A350-7-CW-2101 sqm 64.82
7.2 Waterproofing
7.2.1_ Two layers baranlastic waterproofing for tank A350-7-CW-2106,2107 sqm 187.40

7.2.2_ Cement mortar with sika latex grade 100 for tank A350-7-CW-2106,2107 sqm 187.40

7.2.3_ Three layers epoxy painting for tank A350-7-CW-2106,2107 sqm 187.40
Sub - Total 6
8 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.1 (1:4) base and raking out the joints with white cement including cutting A350-7-CW-2101-2103 sqm 38.36
and laying the tiles in proper way and finishing with care

8.2 Mirpur ceramic 75x225 mm, dark colour for outside ground floor beam A350-7-CW-2102, 2103 sqm 15.12

Roof tile
8.3 Supplying, fitting and fixing country made (Mirpur Ceramic / A350-7-CW-2102, 2103 sqm 60.27
equivalent) roof tile, with adhesive motar
Sub - Total 7
9 Door & Window
Wooden (matured and seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
9.1 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 250x62mm) & shutter as per design, drawing, accepted by
the Engineer

9.1.1_ Single leaf door DO-01 (2100x1000x38mm) including varnishing


and frence polishing A350-7-CW-2102, 2104 cum 0.36
5mm thick glass Thai Aluminium frame sliding window as per design,
9.2 drawing, accepted by the Engineer
8.2.1_ Double shutter window WD-01 (1200x1200mm) including grill
with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2102, 2104 sqm 6.72
complete & accepted by the Engineer
Sub - Total 8

Subject: Detail BOQ of Civil Works


Page - 283/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
10 Finishing Work
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
10.1 brand applied on primer or sealer elapsing specified time for
drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.
10.1.1_Painting to gutter A350-7-CW-2104 sqm 16.60
10.1.2_ Painting to beam A350-7-CW-2106-2109 sqm 11.60

10.1.3_ Painting to column A350-7-CW-2108 sqm 18.48


Sub - Total 9
11 Steel Structure
All steel structure, Beams, Columns, Purlins, fittings & fixtures shall be
hot rolled pre-fabricated and hot deep galvanized (EN ISO 14713:1999
10.1 C5, Galvanized coating conforms to ASTM A653/A653 M/EN 1461 for
zinc coated steel minimum 600 gm/m2)

10.1.1_ Stainless Steel L-50x5 mm A350-7-CW-2107, 2111 kg 10.21

10.1.2_ Stainless Steel Plate, thk=1,5mm A350-7-CW-2107, 2111 kg 7.44

10.1.3_ Stainless Steel Plate, thk=4mm A350-7-CW-2107, 2111 kg 7.94

10.1.4_ Stainless Steel Ladder A350-7-CW-2106, 2111 kg 7.92


Sub - Total 10

Subject: Detail BOQ of Civil Works


Page - 284/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
11 Water Pumping
Mobilization
Preparation for installation of tube-well and transportation of complete
boring equipments, labour and materials to the work site and remove the
materials after completion of the works. Installation of drilling rig and
11.1 accessaries, making arrangements for electricity, water, labour shed, site
office and stores, digging mud pit etc, leveling, dressing and clearing of
the site as per original condition and a testing for discharge using
minimum 1000 liter water tub etc. .

11.1.1_ For tube-wells beyond 200 meter depth per set 1.00
Boring
Execution 350mm dia of boring through all sorts of strata by reverse
circulation or any other approved method. Boring for 350mm dia
11.2 vertical hole up to designed depth and collection of soil samples at every
3 meter interval or as required and at every change in soil stratum
including sinking and with drawing necessary casing pipe and all
necessary arrangements complete

11.2.1_ From 200m to 250m m 200.00


150mm dia water grade uPVC housing pipe having wall thickness 6.6
11.3 m 200.00
mm to 7.6mm
Sub - Total 11
12 Electrical Work
Electric equipment
12.1
Providing and fixing electric equipment to position
Ref: A350-7-LA-2101
1- Wall mounted LED tube light
Providing & fixing the 1×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
each 4.00
breadth 60mm, superior quality electronic ballast with one year
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC insulated
(stranded) flexible FR wire, earth terminal etc.

2- Distribution board, IP54 Enclosures each 1.00

3- Socket (3-pin 6A) each 4.00

Subject: Detail BOQ of Civil Works


Page - 285/405
Item: Fire-Fighting Pump House
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4- Four way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 1.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

12.2 Protection (MCB & MCCB)


1- MCB 2px6,6KA each 1.00

2- MCB 2px16,6KA each 1.00


3- MCB 3px10,6KA each 1.00

4-MCB 3PX16,6KA each 1.00

4- MCB 4px63,6KA each 1.00


Electrical wire and cable (include conduit pipes , junction box with
12.3
terminal blockand concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 72.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 60.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 60.00
core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Multi - core
m 100.00
5c x 4 mm²
Sub - Total 12
TOTAL

Subject: Detail BOQ of Civil Works


Page - 286/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 287/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 288/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 289/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 290/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 291/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 292/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 293/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 294/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 295/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 296/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 297/405
Item: Fire-Fighting Pump House
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 298/405
Item: Fire-Fighting Pump House
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Canteen and club
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
layout with chalk powder, providing necessary tools and plants,
1 protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.

Layout and marking for earth work in excavation in foundation


1.1 A350-7-CW-2501 sqm 147.00
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 A350-7-CW-2501/2513 - 2517 cum 234.98
and maximum 10m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-2501 sqm 147.00
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content (Modified
1.4 proctor test) including carrying, watering, levelling, dressing and A350-7-CW-2501/2513 - 2517 cum 124.36
compacting to a specified percentage each layer upto finished level etc.
all complete and accepted by the Engineer.

1.5 Sand filling to elv +1.00 with compaction k=0.95 A350-7-CW-2501/2513 - 2517 cum 43.97

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city or
1.6 A350-7-CW-2501/2513 - 2517 cum 110.62
town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 287/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire of drilling rig set, tripod stand, tremie pipe, cost of fuel,
lubricant, mobilization, demobilization, maintenance, spares, stand-
byes, insurance coverage, water, electricity and other charges all
2.1 compete approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement of cast-
in-situ pile work including sequence of boring and casting, disposal of
spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350-7-CW-2512 Rm 792.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage & binding
ms pipes in position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1 meter
2.2 throughout the period of concreting, maintaining required slump, etc. A350-7-CW-2512 cum 223.82
mixing the aggregates in diginal batching plant, casting in bore holes,
acertaining the strength by trial mix design all complete including all
cost of water, electricity, plant & machinery, bentonite, admixture
testing of materials and concrete etc and other charges as per design,
drawing etc all complete approved and accepted by the Engineer.
Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 288/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding
450 MPa and whatever is the yield strength within allowable limit as
per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield
2.3 strength fy, shall be at least 1.25 and minimum elongation after A350-7-CW-2512 kg 13,543.27
fracture and minimum total elongation at maximum force is 16% and
8% respectively including welding of lapping and spirals as per
design, drawing all complete accepted by the Enginer (Measurement
shall be recorded only on Standard Mass per Unit length of Bars, while,
dia of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length in
each pile for ultrasonic pulse velocity meter test. The Pvc pipes should
have threaded cap at top and bottom, and jointed by socket & glue to
connect each others. 14 SWG steel wires shall be used for binding with
2.4 rebar cage having minimum one binding with rebar cages in each 3m A350-7-CW-2512 m 2,376.00
interval or apply other approved devices for fastenening firmly with
rebar cage, cleaning pipes upto full length immediately after
concreting, protecting the pipes from any damage etc. all complete
accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making platform A350-7-CW-2512 cum 10.17
where necessary, carrying, all sorts of handling, stacking the same
properly after cleaning, leveling and dressing the situ and clearing the
bed etc.

i) Ultrasonic pulse velocity meter test


Conducting ultrasonic pulse velocity meter test in 3 pipes of full length
for each pile (3 holes/pile) by a qulifified and approved expert,
preparing, cleaning the holes and providing all relevant materials,
2.6 equipment, result in standard forms and compiling test report with A350-7-CW-2512 each 19.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 289/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
ii) Double PIT (pile integrity test)
Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT expert,
preparing pile heads and providing all relevant materials, equipment,
result in standard forms and compiling test report with A350-7-CW-2512 each 16.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent standard


for the cast-in-situ/pre-cast pile providing required scaffolding, bracing,
jacks, pressure test gauge, loading unloading, Kentledge and other
plants and equipment including staging, mobilization, demobilization,
hire charge, gunny bags, sand and filling sacs/gunny bags for loading,
record readings and preparation of results in standard forms and other
incidental charges per standard practice and procedures including
2.7 A350-7-CW-2512
submission of load test report, furnishing all graph and chart etc.
complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test /test 1.00


Sub - Total 2

Subject: Detail BOQ of Civil Works


Page - 290/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
3.1 by mixer, casting in forms in/c supplying & laying of single layer
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-2513 ÷ 2517 cum 8.20


3.1.2_ For bracing beam A350-7-CW-2513 ÷ 2517 cum 2.05
3.1.3_ For ground floor slab A350-7-CW-2513 ÷ 2517 cum 13.33
3.1.4_ For drain wall A350-7-CW-2513 ÷ 2517 cum 3.79
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-2513 ÷ 2517 cum 68.30

3.2.2_ Concrete for Pedestal column A350-7-CW-2513 ÷ 2517 cum 0.75

3.2.3_ Concrete for Bracing beam A350-7-CW-2513 ÷ 2517 cum 7.39

3.2.4_ Concrete for 1st floor beam +4.150 A350-7-CW-2518/2519 cum 9.61

3.2.5_ Concrete for beam at +8.180 A350-7-CW-2520/2521 cum 11.23

3.2.6_ Concrete for Roof beam A350-7-CW-2524 cum 4.35

3.2.7_ Concrete for Ground floor slab A350-7-CW-2518 cum 17.64

3.2.8_ Concrete for 1st floor slab +4.150 A350-7-CW-2501/2518 cum 1.10

3.2.9_ Concrete for slab at +8.180 A350-7-CW-2501/2518 cum 1.61

Subject: Detail BOQ of Civil Works


Page - 291/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.2.10_ Concrete for Roof floor slab A350-7-CW-2524 cum 16.71

3.2.11_ Concrete for gutter A350-7-CW-2522 cum 3.15

3.2.12_ Concrete for Ground floor column A350-7-CW-2516 cum 8.10

3.2.13_ Concrete for 1st floor column A350-7-CW-2516 cum 7.92

3.2.14_ Concrete fo column at +8.180 A350-7-CW-2516 cum 0.55

3.2.15_ Concrete for lintel A350-7-CW-2507 cum 1.73

3.2.16_ Concrete for sunshade A350-7-CW-2507 cum 1.64

3.2.17_ Concrete for staircase A350-7-CW-2523 cum 1.92


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.

4.1.1_ Formwork for footing A350-7-CW-2513 ÷ 2517 sqm 78.01

4.1.2_ Formwork for pedestal column f A350-7-CW-2513 ÷ 2517 sqm 6.00

4.1.3_ Formwork for Bracing beam A350-7-CW-2513 ÷ 2517 sqm 49.26

4.1.4_ Formwork for 1st floor beam at +4.150 A350-7-CW-2518/2519 sqm 76.63

4.1.5_ Formwok for beam at +8.180 A350-7-CW-2520/2521 sqm 98.36

4.1.6_ Formwork for Roof floor beam A350-7-CW-2524 sqm 30.58

4.1.7_ Formwork for 1st floor slab at +4.150 A350-7-CW-2501/2518 sqm 152.29

4.1.8_ Formwork for slab at +8.180 A350-7-CW-2501/2518 sqm 13.41

4.1.9_ Formwork for Roof floor slab A350-7-CW-2524 sqm 147.99

4.1.10_ Formwork for Gutter A350-7-CW-2522 sqm 26.22

4.1.11_ Formwork for ground floor column A350-7-CW-2516 sqm 72.00

Subject: Detail BOQ of Civil Works


Page - 292/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.12_ Formwork for 1st floor column A350-7-CW-2516 sqm 70.38

Subject: Detail BOQ of Civil Works


Page - 293/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4.1.13_ Formwork for column at +8.180 A350-7-CW-2516 sqm 3.24

4.1.14_ Formwork for Lintel A350-7-CW-2507 sqm 29.07

4.1.15_ Formwork for sunshade A350-7-CW-2507 sqm 16.35

4.1.16_ Formwork for staircase A350-7-CW-2523 sqm 12.96


Sub - Total 4
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for Reinforced
Cement Concrete, produced and marked in accordance with BDS ISO
6935-2: 2006 (or standard subsequently released from BSTI) , the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least 1.25
and minimum elongation after fracture and minimum total elongation
at maximum force is 16% and 8% respectively including straightening
5.1 and cleaning rust, if any, bending and binding in position with supply of
G.I. wires, splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

5.1.1_ Rebar for footing A350-7-CW-2513 ÷ 2517 kg 5,313.41

5.1.2_ Rebar for pedestal column and column A350-7-CW-2516 kg 3,550.52

5.1.3_ Rebar for bracing beam A350-7-CW-2513/2517 kg 2,715.95

5.1.4_ Rebar for 1st floor beam A350-7-CW-2516/2517 kg 3,332.38

5.1.5_ Rebar for beam at +8.180 A350-7-CW-2520/2521 kg 2,694.06

5.1.6_ Rebar for roof floor beam A350-7-CW-2524 kg 1,329.50

5.1.7_ Rebar for ground floor slab A350-7-CW-2518 kg 1,226.24

5.1.8_ Rebar for 1st floor slab A350-7-CW-2518 kg 2,368.29

5.1.9_ Rebar for slab at +8.180 A350-7-CW-2520 471.37

5.1.10_ Rebar for roof floor slab A350-7-CW-2524 kg 2,815.23

5.1.11_ Rebar for gutter A350-7-CW-2520/2522 kg 690.40

Subject: Detail BOQ of Civil Works


Page - 294/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5.1.12_ Rebar for lintel A350-7-CW-2522 kg 368.46

5.1.13_ Rebar for sunshade A350-7-CW-2522 kg 293.45

5.1.14_ Rebar for staircase A350-7-CW-2523 kg 334.29


Sub - Total 5
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramic or Equivalent) Rock-face, textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and
6.1 soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

6.1.1_ Ground floor A350-7-CW-2507 cum 42.46

6.1.2_ 1st floor A350-7-CW-2507 cum 44.80

Exposed brick work for interior wall


Exposed 125mm thick pointing extra ordinary ornamental brick work
with automatic machine made 10 holes first class bricks (Mirpur
Ceramics or equivalent) in cement sand (F.M.1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding,
6.2
raking out joints, cleaning and soaking the bricks for at least 24 hours
before use and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges ect. all complete
and acceplete and accepted by the Engineer. (Cement: CEM-I) in
ground floor.

6.2.1_ Ground floor A350-7-CW-2507 sqm 78.57


6.2.2_ 1st floor A350-7-CW-2507 sqm 77.30

Subject: Detail BOQ of Civil Works


Page - 295/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word

Normal brick work 250mm to 375mm thick


Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
6.3
and soaking bricks at least 24 hours before use and washing of sand,
necessary scaffolding, curing at least 7 days etc. all complete
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length) (Cement: CEM-I)

6.3.1_ Staircase A350-7-CW-2505 cum 0.49


6.3.2_ Entry steps A350-7-CW-2505 cum 3.39
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including necessary
6.4 scaffolding, raking out joints, cleaning and soaking bricks at least 24
hours before use and washing of sand curing at least 7 days in all floor
including cost of water, electricity and other charges etc. (Cement:
CEM-I)
6.4.1_ Gutter wall A350-7-CW-2502/2520 sqm 48.32
6.4.2_ Drain wall A350-7-CW-2501 sqm 70.71
Sub - Total 6
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
7.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to gutter wall A350-7-CW-2502/2520 sqm 122.86

7.1.4_ Plaster to beam A350-7-CW-2518 ÷ 2524 sqm 205.57

7.1.6_ Plaster to column A350-7-CW-2518 ÷ 2524 sqm 109.22

7.1.2_ Plaster to lower surface of roof slab A350-7-CW-2524 sqm 161.40

7.1.3_ Plaster to drain A350-7-CW-2501 sqm 70.71

7.1.3_ Plaster to staircase A350-7-CW-2505 sqm 10.36

7.2 Waterproofing

Subject: Detail BOQ of Civil Works


Page - 296/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7.2.1_ Three layer waterproofing by sika grout for gutter slab A350-7-CW-2502/2503 sqm 235.94
Sub - Total 7
8 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.1 (1:4) base and raking out the joints with white cement including cutting
and laying the tiles in proper way and finishing with care

8.1.1_ Ground floor A350-7-CW-2501/2503 sqm 140.16


8.1.2_ 1st floor A350-7-CW-2501/2503 sqm 95.91
Homogenious tile 300 x 300mm
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.2 (1:4) base and raking out the joints with white cement including cutting
and laying the tiles in proper way and finishing with care
8.2.1_ Toilet floor A350-7-CW-2501/2503 sqm 19.72
Ceramic tile 300x500mm light colour
Suppling, fitting and fixing glazed wall tile, irrespective of color &/or
design, with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base
8.3 and ranking out the joints with respective joint filler & binder including
cutting, laying and hire charge of machine and finishing with care etc.
including water, electricity and other charges

8.3.1_ Toilet wall A350-7-CW-2501/2503 sqm 87.34


Mirpur ceramic 75x225 mm, dark colour for outer surface of ground
8.4 A350-7-CW-2501/2503 sqm 26.92
floor beam
Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick cement
8.5 sand (F.M. 1.2) mortar (1:4) base and ranking out the joints with
respective joint filler & binder including cutting, laying and finishing
with care etc

8.5.1_ For staircase A350-7-CW-2505 sqm 12.97

8.5.2_ For entry steps A350-7-CW-2505 sqm 18.08


Roof tile
8.6 Supplying, fitting and fixing country made (Mirpur Ceramic/equivalent) A350-7-CW-2524 sqm 147.99
roof tile, with adhesive motar
Sub - Total 8

Subject: Detail BOQ of Civil Works


Page - 297/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
9.1 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 250x62mm) & shutter as per design, drawing, accepted by
the Engineer

9.1.1_ Quadruple leaf door DO-01(2400x2100x38mm) including


varnishing and frence polishing A350-7-CW-2507/2508 cum 0.29
9.1.2_ Double leaf door DO-02(2100x1200x38mm) including
varnishing and frence polishing A350-7-CW-2507/2508 cum 0.36
9.1.3_ Single leaf door DO-03(2100x1000x38mm) including varnishing
and frence polishing A350-7-CW-2507/2508 cum 0.32
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
9.2 coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 125x62mm) & shutter as per design, drawing, accepted by
the Engineer

9.2.1_ Single leaf door DO-04(2100x1000x38mm) including varnishing


and frence polishing A350-7-CW-2507/2508 cum 0.24

9.3 Solid uPVC Toilet door (frame 150x62mm)

9.3.1_ Single leaf door DO-05 (2130x760x38mm) A350-7-CW-2507/2508 each 1.00

9.3.2_ Single leaf door DO-06 (2130x600x38mm) A350-7-CW-2507/2508 each 4.00


5mm thick glass Thai Aluminium frame sliding window as per design,
9.4 drawing, accepted by the Engineer
9.4.1_ Double shutter window WD-01 (1200x2000mm) including grill
with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2313-2317 sqm 31.20
complete & accepted by the Engineer.
5mm thick glass Thai Aluminium frame curtain window as per design,
9.5 drawing, accepted by the Engineer
9.5.1_ Single shutter curtain window CW-01 (1500x600mm) including
grill with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2313-2317 sqm 2.70
complete & accepted by the Engineer.
9.5.2_ Single shutter curtain window CW-02 (600x600mm) including
grill with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2313-2317 sqm 1.08
complete & accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 298/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9.5.3_ Single shutter curtain window CW-03 (3000x900mm) including
grill with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-2313-2317 sqm 2.70
complete & accepted by the Engineer.
Sub - Total 9
10 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm thick
board laminated by mechanical hot press with a milk white PVC
10.1 membrane with Aluminum T- bar frame in natural anodized finish at
600*600 mm in grid suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc.

10.1.1_ Aluminium ceiling of ground floor A350-7-CW-2501/2503 sqm 112.75

10.1.2_ Aluminium ceiling of 1st floor A350-7-CW-2501/2503 sqm 95.91


Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
10.2 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

10.2.1_ Painting to gutter wall A350-7-CW-2502/2520 sqm 122.86

10.2.2_ Painting to beam A350-7-CW-2502/2520 sqm 205.57

10.2.3_ Painting to column A350-7-CW-2502/2520 sqm 109.22


Sub - Total 10
11 Structural Steel
11.1 Balloon gutter guard F114 A350-7-CW-2501/2503 each 2.00

11.2 Stainless steel handrail with wooden top rail for staircase A350-7-CW-2505 m 6.11
Sub - Total 11

Subject: Detail BOQ of Civil Works


Page - 299/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
12 Furniture
Supply table and chair for canteen
Stainless steel leg and frame, wooden face
Wooden table with stainless steel leg and frame (3400x1000 mm) with
12.1 approved wood, frame etc. all complete accepted by the Engineer. A350-7-CW-2501 each 4.00

Wooden table with stainless steel leg and frame (1000x1000 mm) with
12.2 approved wood, frame etc. all complete accepted by the Engineer. A350-7-CW-2501 each 7.00

Wooden chair with stainless steel leg and frame with approved wood,
12.3 frame etc. all complete accepted by the Engineer. A350-7-CW-2501 each 46.00

Sub - Total 12
13 Water Supply/ Waste water System
A350-7-DW-3-2505, A350-7-DW-2-2505
Supply and installation of foreign made food grade stainless steel
(SS304) thickness 1.8mm water tank including supply of hardware,
13.1 consumables, fittings etc. all complete approved and accepted by the
Engineer

13.1.1_2000 liter capacity each 2.00

13.2 Valve each 14.00

13.3 uPVC pipe (min. Thickness 3.0 mm)

13.3.1_ uPVC ɸ110 m 30.00

13.3.2_ uPVC ɸ76 m 60.00


13.3.3_ uPVC ɸ40 m 30.00

13.3.4_VENT PIPE uPVC ɸ 76 m 12.00

13.4 PPR pipe (min. Thickness 4.5 mm)

13.4.1_PPR pipe ɸ 27 m 35.00

13.4.2_PPR pipe ɸ 20 m 10.00

13.5 Tee

13.5.1_ 110 Tee each 3.00

13.5.2_ 76/40 Tee each 8.00

13.5.3 40/27 Tee each 8.00

Subject: Detail BOQ of Civil Works


Page - 300/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
13.5.4_ 27/ 27Tee each 12.00

13.6 Elbow
13.6.1_90 degree elbow(uPVC ɸ110) each 2.00

13.6.2_90 degree elbow(uPVC ɸ76) each 2.00

13.6.3_90 degree elbow(uPVC ɸ40) each 2.00

13.6.4_90 degree elbow(uPVC ɸ27) each 3.00


Septic tank
Construction of septic tank of different sizes (medium and large sizes)
with walls of brick work in cement mortar (1:6) having a lining of
minimum 125 mm R.C.C cast against the walls as per approved type
plan over a brick flat soling flat soiling and 150 mm thick reinforced
cement concrete flooring (1:2:4) with 125 mm thick walls in partition
and 12 mm thick cement plaster (1:4) with N.C.F. to insides of walls on
floor and all around outside walls by 18” height at top including
13.7 supplying fitting and fixing of two R.C.C. Tees and providing 450 mm
dia water sealed heavy type C.I. manhole cover with locking/unlocking
arrangement and 100 mm thick R.C.C (1:2:4) top slab, including
centering, shuttering, fabricating, casting and curing etc. all complete as
per standard drawing, specification accepted by the Engineer. (Rate in
including cost of reinforcement and its fabrication, binding and
placing.)

13.7.1_ for 30 person each 1.00

Subject: Detail BOQ of Civil Works


Page - 301/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Soak well
Construction of soak well of different sizes (medium and large sizes)
with 250mm thick soild brick work and 250mm honey comb brick work
with cement mortar (1:6) as per design over R.C.C. (1:2:4) well curb
with 1% reinforcement up to the depth as per drawing with 450 mmm
dia water sealed heavy type. C.I. manhole cover with locking
arrangement, filling the well up to the reqired depth with graded khoa
and sand including suppling and fabicating M.S. Rod, casting, curing
13.8
including necessary earth work in excavation, side filling and bailing
out water including cost of all materials etc. all complete as per
standard drawing, design approved and accepted by the Engineer. (Rate
in including cost of reinforcement and its fabrication, binding,and
placing, form work etc.)

13.8.1_ 30 users each 1.00


Construction of masonry inspection pit with 250 mm thick brick work
in cement mortar (1:4) including necessary earth work, side filling and
one layer brick flat soling, 75 mm thick (1:3:6) base concrete for
13.9 making invert channel and 12 mm thick (1:2) cement plaster with neat
finishing etc.all complete up to a depth of 700 mm approved and
accepted by the Engineer.

13.9.1_ Clear 450x450 mm and depth 450 to 600 mm, average 525 mm
for single 150 mm dia R.C.C.pipes and 400 mm uPVC pipe each 3.00
Sub - Total 13
14 Sanitary Accessories (Cotto or Equipment)
A350-7-CW-2506,2507, A350-7-DW-2-2505
Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c plastic
14.1 seat cover, cistern system, preparing the base with cement concrete and each 3.00
with wire mesh or roads if necessary, including making holes and
fitting, fixing, finishing etc.
14.2 Bowl uniral each 3.00
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx. size
656×510×845, 26kg by weight including fitting, fixing the same in
position with heavy type C.I. Brackets. 30 mm dia PVC waste water
14.3 pipe with brass coupling (not exceeding 750 mm in length). 12mm each 3.00
plastic lead (connection) pipe with brass coupling, basin waste with
chain plug including making holes in walls and floors and fitting with
wooden blocks, screws, finishing etc,

Subject: Detail BOQ of Civil Works


Page - 302/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
14.4 Bathroom strainer each 6.00
14.5 Kitchen Sink each 1.00
Mirror (450 x 600 x 5) mm
Supplying, fitting and fixing of 450x600mm size and 5mm thick
14.6 unframe super quality mirror with hard board at the back with all each 3.00
necessary fitting including making holes in walls and mending good the
damages with cement morta (1:4) etc.

14.7 Flush faucet for toilet bowl (Cotto or equivalent) each 3.00

14.8 Wash basin faucet (Cotto or equivalent) each 4.00


Paper holder
Supplying, fitting, and fixing standard toilet paper holder of
14.90 150*150*126 mm size including making holes in walls and mending each 3.00
good the damages with cement mortar (1:4) etc.
Porcelain soap tray
Supplying, fitting, and fixing standard size soap tray including making
14.10 holes in walls and mending good the damages with cement mortar (1:4) each 3.00
etc.
Supplying, fitting and fixing best quality faucets ect. (Cotto or
14.11 equivalent). Complete approved and accepted by the Engineer
14.12.1_12mm CP bib cock each 3.00
Supply, fitting and fixing best quality CP pillar cock ect. (Cotto or
14.12 equivalent). Complete approved and accepted by the Engineer
14.13.1_12 mm CP medium quality pillar cock each 3.00
14.13.2_12 mm CP stop cock each 3.00
14.13.3_12 mm CP angle stop cock each 3.00
Sub - Total 14
15 Electrical Work
Ref: A350-7-LA-2501
Electrical equipment
15.1 Providing and fixing electric equipment to position
1- LED Ceiling light
Providing & fixing the fancy Saucer Light consisting of 215 mm.dia
Steel Sheet Carrier, with Powder coated Paint/Oxidized /Chromium each 27.00
finished, suitable glass covers of min. height 92mm

Subject: Detail BOQ of Civil Works


Page - 303/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2- Wall mounted bracket LED light
Providing & fixing the Special type fancy bracket LED light consisting
of white colour conical fiber sheet shade of minimum dia 150mm,
minimum total height of fitting 250mm, golden or oxidized or each 5.00
chromium plated/ brass bracket with carrier, brass holder, earth
terminal, necessary wiring with 2× 0.4 sq.mm stranded uPVC insulated
flexible FR cable etc.

3- Ceiling fan 56" including fitting and fixing


Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS rod each 9.00
4- Exhaust fan 12"
Providing and fixing of following axial flow A.C capacitor type wall
mounted exhaust fan complete with blade, steel frame standard wall each 3.00
louver shutter, uPVC insulated connecting wire etc.
5- Combined switch and regulator board
Supply and installation of electronics fans regulators compriasing of
standard component having noise suppression circuit and total loss in
the regulator not exceeding 0.4 watt suitable for 220 10% volt AC each 9.00
single phase 50 Hz manufactured by Micro Electronics Ltd. or
equivalent foreign made

6- Sub distribution board, IP42, include the terminal block each 1.00
7- Distribution board, IP42 Enclosures each 1.00
8- Socket (3-pin 6A) each 13.00
9- LED Tube light set (3 x 10W)
Providing & fixing the 3 x 2’× 10 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.37) consisting of power
coated 22 SWG sheet steel frame of min. length 600mm & breath
600mm, symmetrical mirror reflector of anodized aluminum, superior each 21.00
quality electronic ballast with one year guarantee, holder, necessary
wiring with 2 x 0.4 sq.mm uPVC insulated (stranded) flexible FR wire,
earth terminal etc.

Subject: Detail BOQ of Civil Works


Page - 304/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
10- LED Tube light set (3 x 20W)
Providing & fixing the 3 x 2’× 20 watt Louver type LED tube light
fitting (False ceiling mounted concealed type) with V- grid louver of
following manufacturers (as per picture No. 12.19) consisting of power
coated enameled22 SWG sheet steel frame of min. length 1213mm &
breath 600mm, louver of steel sheet/aluminum, superior quality each 6.00
electronic ballast with one year guarantee, holder, necessary wiring with
2 x 0.4 sq.mm uPVC insulated (stranded) flexible FR wire, earth
terminal etc.

11- One way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 9.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

12- Three way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 5.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

13- Four way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required size each 3.00
18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

15.2 Protection (MCB & MCCB)


1- MCB 2px10, 6KA each 8.00

2- MCB 2px20, 6KA each 3.00

3- MCB 4PX20, 6KA each 2.00

4- MCB 4px40,6KA each 1.00


Electrical wire and cable (include conduit pipes, junction box with
15.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 1,320.00
core 1c x0.75 mm²

Subject: Detail BOQ of Civil Works


Page - 305/405
Item: Canteen Club
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 1,660.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 560.00
core 1c x 2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 120.00
core 1c x 4 mm²
5- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 40.00
core 5c x 6 mm²
Sub - Total 15
TOTAL

Subject: Detail BOQ of Civil Works


Page - 306/405
Item: Canteen Club
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Mosque
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
1 Site Clearance
1.1 Demolishing and removing of one floor existing club 18.0m x 7.5m lot 1.00

1.2 Demolishing and removing of one floor existing canteen 20.5m x 5.5m lot 1.00
Sub - Total 1
Earth work in excavation in all kinds of soil for foundation trenches layout,
providing center lines, local bench-mark pillars, levelling, ramming and preparing the
base, fixing bamboo spikes and marking layout with chalk powder, providing
2
necessary tools and plants, protecting and maintaining the trench dry etc., stacking,
clearing the excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation accepted by the
2.1 A350-7-CW-2601 sqm 516.80
Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth and maximum
2.2 A350-7-CW-2601, 2617-2619 cum 468.70
10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical work and
2.3 during contract period and demobilization after Completion of the Works under A350-7-CW-2601 sqm 516.80
contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in 150mm layers with
earth available within 90 m of the building site minimum dry density of 95% with
2.4 optimum moisture content (Modified proctor test) including carrying, watering, A350-7-CW-2601, 2617-2619 cum 442.42
levelling, dressing and compacting to a specified percentage each layer upto finished
level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site by truck or
any other means to a place within 30 km radius of the city or town area including
2.5 A350-7-CW-2601, 2617-2619 cum 150.93
loading, unloading at both ends, leveling and dressing the carried earth etc. complete
accepted by the Engineer.
Sub - Total 2

Subject: Detail BOQ of Civil Works


Page - 305/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
3 Pile Work
Boring/drilling for cast in situ pile up to the required depth and diameter with
minimum 6m long temporary steel casing, true to vertical, providing bentonite slurry
and maintaining water level in the hole, washing the hole for at least 30 minutes,
clean the bore-hole and make the bore-hole ready for placing steel cage and
concreting including hire of drilling rig set, tripod stand, tremie pipe, cost of fuel,
lubricant, mobilization, demobilization, maintenance, spares, stand-byes, insurance
coverage, water, electricity and other charges all compete approved and accepted by
3.1
the Engineer. Before commencing boring operation, Contractor shall submit method
of statement of cast-in-situ pile work including sequence of boring and casting,
disposal of spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his responsibilities and
obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350-7-CW-2616 m 1,210.00
Cast in situ pile with RCC works of required slump by adding water reducing
admixture with 25 Mpa relates to mix ratio (1:1.5:3) on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM & cement conforming to BDS EN-197-
1- CEM -1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand [Sylhet sand or
coarse sand of equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips, screening
through proper sieves, making, placing re-bar cage & binding ms pipes in position,
placing and removing tri-pod as per requirement, pouring the concrete in bore-hole
with the help of a tremie pipe, maintaining the tremie pipe immersed in concrete by
3.2 at least 1 meter throughout the period of concreting, maintaining required slump, etc. A350-7-CW-2616 cum 341.95
mixing the aggregates in diginal batching plant, casting in bore holes, acertaining the
strength by trial mix design all complete including all cost of water, electricity, plant
& machinery, bentonite, admixture testing of materials and concrete etc and other
charges as per design, drawing etc all complete approved and accepted by the
Engineer. Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 306/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400 (RB 400 /RB
400W: complying BDS ISO 6935-2:2006) ribbed or deformed bar produced and
marked according to Bangladesh standard, with minimum yield strength, fy (ReH)=
400 MPa but fy not exceeding 450 MPa and whatever is the yield strength within
allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after fracture and
3.3 minimum total elongation at maximum force is 16% and 8% respectively including A350-7-CW-2616 kg 20,733.19
welding of lapping and spirals as per design, drawing, straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires, splices or laps
what so ever etc. all complete accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia of bars exceeds
its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall thickness 4mm )
Lira, National polymer as approved upto total length in each pile for ultrasonic pulse
velocity meter test. The Pvc pipes should have threaded cap at top and bottom, and
jointed by socket & glue to connect each others. 14 SWG steel wires shall be used for
3.4 binding with rebar cage having minimum one binding with rebar cages in each 3m A350-7-CW-2616 m 3,630.00
interval or apply other approved devices for fastenening firmly with rebar cage,
cleaning pipes upto full length immediately after concreting, protecting the pipes
from any damage etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and removing the
dismantled materials such as concrete to a safe distance including scraps and cleaning
concrete from steel/M.S. rods, straightening and bending of pile bars, preparation and
3.5 A350-7-CW-2616 cum 15.54
making platform where necessary, carrying, all sorts of handling, stacking the same
properly after cleaning, leveling and dressing the situ and clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 307/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full length for each pile
(3 holes/pile) by a qulifified and approved expert, preparing, cleaning the holes and
providing all relevant materials, equipment, result in standard forms and compiling A350-7-CW-2616 each 53.00
test report with recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.
3.6 ii) Double PIT (pile integrity test)
Conducting low strain dynamic testing of pile as per ASTM D5882- The standard
method of testing by a qulifified and approved PIT expert, preparing pile heads and
providing all relevant materials, equipment, result in standard forms and compiling A350-7-CW-2616 each
test report with recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent standard for the cast-
in-situ/pre-cast pile providing required scaffolding, bracing, jacks, pressure test
gauge, loading unloading, Kentledge and other plants and equipment including
staging, mobilization, demobilization, hire charge, gunny bags, sand and filling
sacs/gunny bags for loading, record readings and preparation of results in standard
3.7 forms and other incidental charges per standard practice and procedures including A350-7-CW-2616
submission of load test report, furnishing all graph and chart etc. complete in all
respects approved and accepted by the Engineer (Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method statement for
conducting load test to the Engineer for approval. However, Engineer’s approval
shall not relieve the Contractor of his responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test /test 1.00


Sub - Total 3
4 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced by mixer,
casting in forms in/c supplying & laying of single layer polythene sheet weighing
4.1
6.5 kg/Sqm with allowances for lapping complete in all respect and accepted by the
Engineer.

4.1.1_ For footing A350-7-CW-2617-2619 cum 10.10

4.1.2_ For ground floor beam A350-7-CW-2620 cum 4.29

4.1.3_ For ground floor slab A350-7-CW-2601,2623 cum 28.36

Subject: Detail BOQ of Civil Works


Page - 308/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4.1.4_ For drain and appron A350-7-CW-2602 cum 5.03
Reinforced cement concrete works with minimum cement concrete relates to mix
ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and satisfying a specified compressive
strength f’c= 25 Mpa at 28 days on standard cylinders as per standard practice of
code ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1, 52.5N
(52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips conforming to
ASTM C-33; preparing the concrete mix in the Digital Batching plant, ascertaing the
4.2 strength by trail mix design, casting in forms, compacting by vibrator machine and
curing at least for 28 days, removing centering-shuttering after specified time
approved; including all cost of water, electricity, admixture, additional testing
charges of materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

4.2.1_ Concrete for footing A350-7-CW-2617-2619 cum 107.86

4.2.2_ Concrete for pedestal column A350-7-CW-2618, 2619 cum 2.10

4.2.3_ Concrete for bracing beam A350-7-CW-2620, 2621 cum 15.44


4.2.4_ Concrete for 1st floor beam (+6.000) A350-7-CW-2624-2627 cum 26.74

4.2.5_ Concrete for beam at elv +8.500 A350-7-CW-2624-2627 cum 2.30

4.2.6_ Concrete for beam at elv +12.000 A350-7-CW-2624-2627 cum 0.48

4.2.7_ Concrete for beam at elv +16.000 A350-7-CW-2624-2627 cum 0.36

4.2.8_ Concrete for beam at elv +20.000 A350-7-CW-2624-2627 cum 0.14

4.2.9_ Concrete for ground floor slab A350-7-CW-2623 cum 28.36

4.2.10_ Concrete for 1st floor slab (+6.000) A350-7-CW-2628,2629 cum 29.29

4.2.11_ Concrete for slab at elv +8.500 A350-7-CW-2629 cum 5.69

4.2.12_ Concrete for slab at elv +12.000 A350-7-CW-2629 cum 0.25

4.2.14_ Concrete for slab at elv +20.000 A350-7-CW-2629 cum 0.66

4.2.14_ Concrete for ground floor column A350-7-CW-2622 cum 29.04

4.2.15_ Concrete for column from +6.000 to +12.000 A350-7-CW-2622 cum 10.62

Subject: Detail BOQ of Civil Works


Page - 309/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
4.2.16_ Concrete for column from +12.000 to +20.000 A350-7-CW-2622 cum 2.00

4.2.17_ Concrete for gutter A350-7-CW-2610 cum 5.93

4.2.18_ Concrete for staircase A350-7-CW-2609, 2630 cum 1.65


Sub - Total 4
5 Form Work
Steel formwork include making, placing shutter in position and maintaining true to
plumb, making shutter in position and maintaining true to plumb, making shutter
5.1
water-tight properly, placing reinforcement in position. all complete approved and
accepted by the Engineer.
5.1.1_ Formwork for footing A350-7-CW-2617-2619 sqm 197.44
5.1.2_ Formwork for pedestal column A350-7-CW-2618, 2619 sqm 16.80

5.1.3_ Formwork for bracing beam A350-7-CW-2620, 2621 sqm 103.62

5.1.4_ Formwork for beam at elv +6.000 A350-7-CW-2624-2627 sqm 220.13

5.1.5_ Formwork for beam at elv +8.500 A350-7-CW-2624-2627 sqm 25.11

5.1.6_ Formwork for beam at elv +12.000 A350-7-CW-2624-2627 sqm 5.59

5.1.7_ Formwork for beam at elv +16.000 A350-7-CW-2624-2627 sqm 4.23

5.1.8_ Formwork for beam at elv +20.000 A350-7-CW-2624-2627 sqm 2.70

5.1.9_ Formwork for 1st floor slab concrete (+6.000) A350-7-CW-2628,2629 sqm 303.24

5.1.10_ Formwork for slab at elv +8.500 A350-7-CW-2629 sqm 60.05

5.1.11_ Formwork for slab at elv +12.000 A350-7-CW-2629 sqm 3.64

5.1.12_ Formwork for slab at elv +20.000 A350-7-CW-2629 sqm 5.67

5.1.13_ Formwork for ground floor column A350-7-CW-2622 sqm 255.20

5.1.15_ Formwork for column from +6.000 to +12.000 A350-7-CW-2622 sqm 92.40

5.1.15_ Formwork for column from +12.000 to +20.000 A350-7-CW-2622 sqm 30.40

5.1.16_ Formwork for gutter A350-7-CW-2610 sqm 59.25

5.1.17_ Formwork for staircase A350-7-CW-2609, 2630 sqm 19.29

Subject: Detail BOQ of Civil Works


Page - 310/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Sub - Total 5

Subject: Detail BOQ of Civil Works


Page - 311/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
6 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or deformed bar
reinforcement Grade 400 (RB 400 / 400W) for Reinforced Cement Concrete,
produced and marked in accordance with BDS ISO 6935-2: 2006 (or standard
subsequently released from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after fracture and
6.1 minimum total elongation at maximum force is 16% and 8% respectively including
straightening and cleaning rust, if any, bending and binding in position with supply
of G.I. wires, splices or laps what so ever etc. complete in all respects and accepted
by the Engineer (Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

6.1.1_ Reinforcement for footing A350-7-CW-2617-2619 kg 5,504.57

6.1.2_ Reinforcement for pedestal column A350-7-CW-2618, 2619 kg 2,247.65

6.1.3_ Reinforcement for ground floor beam A350-7-CW-2620, 2621 kg 6,214.66

6.1.4_ Reinforcement for 1st floor beam (+6.000) A350-7-CW-2624-2627 kg 7,225.57

6.1.5_ Reinforcement for beam at elv +8.500 A350-7-CW-2624-2627 kg 734.97

6.1.6_ Reinforcement for beam at elv +12.000 A350-7-CW-2624-2627 kg 244.81

6.1.7_ Reinforcement for beam at elv +16.000 A350-7-CW-2624-2627 kg 244.81

6.1.8_ Reinforcement for beam at elv +20.000 A350-7-CW-2624-2627 kg 145.39

6.1.9_ Reinforcement for ground floor slab A350-7-CW-2623 kg 2,405.28

6.1.10_ Reinforcement for 1st floor slab (+6.000) A350-7-CW-2628,2629 kg 6,215.34


6.1.11_ Reinforcement for slab at elv +8.500 A350-7-CW-2629 kg 387.49

6.1.12_ Reinforcement for slab at elv +12.000 A350-7-CW-2629 kg 32.76

6.1.13_ Reinforcement for slab at elv +20.000 A350-7-CW-2629 kg 38.84

4.1.14_ Reinforcement for column A350-7-CW-2622 kg 8,193.90

6.1.15_ Reinforcement for gutter A350-7-CW-2622 kg 1,274.40

6.1.16_ Reinforcement for staircase A350-7-CW-2630 kg 569.74


Sub - Total 5

Subject: Detail BOQ of Civil Works


Page - 312/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
7 Masonry Work
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with first class bricks in
cement sand (F.M. 1.2) mortar (1:6), in superstructure including raking out joints,
filling the interstices with mortar, cleaning and soaking bricks at least 24 hours
7.1 before use and washing of sand, necessary scaffolding, curing at least 7 days etc. all
complete (measurement to given as 250mm width for one brick length and 375mm
for one brick and a half brick length). (Cement: CEM-I)

7.1.1_ For exterior wall A350-7-CW-2606, 2607 cum 121.95

7.1.2_ For staircase A350-7-CW-2608,2609 cum 2.70

7.1.3_ For entry steps A350-7-CW-2609 cum 6.95


125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2) mortar (1:6), and
making bond with connected wall including necessary scaffolding, raking out joints,
7.2 cleaning and soaking bricks at least 24 hours before use and washing of sand curing
at least 7 days in all floor including cost of water, electricity and other charges etc.
(Cement: CEM-I)

7.2.1_ For interior wall A350-7-CW-2606, 2607 sqm 73.62

7.2.2_ Drain wall A350-7-CW-2602 sqm 55.16


Sub - Total 7

Subject: Detail BOQ of Civil Works


Page - 313/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
8 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to
ceiling R.C.C, columns, beams, surface of stair case, sunshades, cornices, railings,
8.1 drop wall, louvers, fins and finishing the corners and edges including washing of
sand cleaning the surface, scaffolding and curing a least for 7 days, cost of water,
electricity and other charges etc. (Cement: CEM-I)

8.1.1_ Plastering to ceiling A350-7-CW-(2601-2604) sqm 128.10

8.1.2_ Plaster to column A350-7-CW-2622 sqm 378.00

8.1.3_ Plaster to beam A350-7-CW-2624-2627 sqm 257.76

8.1.4_ Plaster to wall A350-7-CW-2606, 2607 sqm 1,122.81

8.1.5_ Plastering for staircase A350-7-CW-2608,2609 sqm 30.83

8.1.6_ Plastering to entry steps A350-7-CW-2609 sqm 0.13

8.1.7_ Plaster to drain wall A350-7-CW-2602 sqm 194.62


Sub - Total 8
9 Tiles & Stone Work
Ceramic tile 600x600 light colour for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar (1:4) base and
9.1 raking out the joints with white cement including cutting and laying the tiles in A350-7-CW-2601 sqm 283.38
proper way and finishing with care

Homogenious tile 300 x 300mm


Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar (1:4) base and
9.2 raking out the joints with white cement including cutting and laying the tiles in A350-7-CW-2608 sqm 11.91
proper way and finishing with care

Ceramic tile 300x500mm light colour for toilet wall


Suppling, fitting and fixing glazed wall tile, irrespective of color &/or design, with on
20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and ranking out the joints with
9.3 respective joint filler & binder including cutting, laying and hire charge of machine A350-7-CW-2608 sqm 44.40
and finishing with care etc. including water, electricity and other charges

Subject: Detail BOQ of Civil Works


Page - 314/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick cement sand (F.M. 1.2)
9.4 mortar (1:4) base and ranking out the joints with respective joint filler & binder
including cutting, laying and finishing with care etc

9.4.1_ For staircase A350-7-CW-2608,2609 sqm 48.57

9.4.2_ For entry steps A350-7-CW-2609 sqm 10.41


Sub - Total 9
10 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured natural
10.1 seasoned wood of required size including painting two coats of coal tar to the surface
in contact with all, fitting and fixing in position. Frame (size 250x62mm) & shutter
as per design, drawing, accepted by the Engineer.
10.1.1_ Double leaf door DO-01 (2850x3975x38mm) including varnishing and
frence polishing A350-7-CW-2611, 2612 cum 0.51
10.1.2_ Single leaf door DO-02 (2100x1000x38mm) including varnishing and frence
polishing A350-7-CW-2611, 2612 cum 0.48
10.2 Solid uPVC Toilet door (frame 150x62mm)
10.2.1_ Single leaf door DO-03 (2130x760x38mm) with 12mm square bar, angle, flat
bar, epoxy paint etc. A350-7-CW-2611, 2612 each 1.00

5mm thick glass with Thai Aluminium frame curtain window as per design, drawing,
10.3 accepted by the Engineer

10.3.1_ Double leaf window WD-01 (2100x1400mm) including grill with 12mm
square bar as per drawing, design, specification etc. all complete & accepted by the A350-7-CW-2611, 2612 sqm 5.32
Engineer.
5mm thick glass with Thai Aluminium frame curtain window as per design, drawing,
10.4
accepted by the Engineer
10.4.1_ Curtain window CW-01 (1800x2700mm) including grill with 12mm square
bar as per drawing, design, specification etc. all complete & accepted by the A350-7-CW-2611, 2612 sqm 30.83
Engineer.
10.4.2_ Curtain window CW-02 (1800x3300mm) including grill with 12mm square
bar as per drawing, design, specification etc. all complete & accepted by the A350-7-CW-2611, 2612 sqm 5.48
Engineer.

Subject: Detail BOQ of Civil Works


Page - 315/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure

10.4.3_ Curtain window CW-03 (600x600mm) including grill with 12mm square bar
A350-7-CW-2611, 2612 sqm 0.36
as per drawing, design, specification etc. all complete & accepted by the Engineer.

Sub - Total 10
11 Finishing Work
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from authorized local
agent of the manufacturere in a sealed container, applying to wall and ceiling in two
coats over lime putty of specified brand applied on primer or sealer elapsing specified
11.1 time for drying/recoating including cleaning drying, making free from dirt, grease,
wax, removing all chalked and scaled materials, fungus, mending good the surface
defects, sand papering the surface and necessary scaffolding, spreading by brush/
roller/ spray etc.

11.1.1_ Painting to ceiling A350-7-CW-(2601-2604) sqm 368.95

11.1.2_ Painting to column A350-7-CW-2622 sqm 378.00

11.1.3_ Painting to beam A350-7-CW-2624-2627 sqm 257.76

11.1.4_ Painting to wall A350-7-CW-2606, 2607 sqm 1,122.81

11.1.5_ Painting to staircase A350-7-CW-2608,2609 sqm 30.83


11.1.6_ Painting to entry steps A350-7-CW-2609 sqm 0.13
Sub - Total 11
12 Water Supply System / Waste Sewerage System
A350-7-DW-3-2602, A350-7-DW-2-2602
Supply and installation of foreign made food grade stainless steel (SS304) thickness
12.1 min 1.8 mm water tank including supply of hardware, consumables, fittings etc. all
complete approved and accepted by the Engineer
12.1.1_2000 liter capacity each 1.00

12.2 Valve each 28.00

12.3 uPVC pipe (min. thickness 3.0 mm)

12.3.1_ uPVC ɸ120 m 21.50

12.3.2_ uPVC ɸ76 m 16.00

12.3.3_ uPVC ɸ40 m 7.00

Subject: Detail BOQ of Civil Works


Page - 316/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
12.3.4_ VENT PIPE uPVC ɸ 76 m 8.00

12.3.5_ VENT PIPE uPVC ɸ 60 (Waste water) m 8.00

12.4 PPR pipe (min. thickness 4.5)

12.4.1_ PPR pipe ɸ 27 m 2.00

12.4.2_ PPR pipe ɸ 20 m 51.00

12.5 Tee

12.5.1_ 120 Tee each 10.00

12.5.2_ 120/76 Tee each 3.00

12.5.3_ 120/40 Tee each 2.00

12.5.4_ 76/76 Tee each 18.00

12.5.5_ 76/40 Tee each 1.00

12.5.6_ 27/ 27Tee each 3.00

12.5.7_ 27/ 20Tee each 3.00

12.5.8_ 40/40 Tee each 6.00


12.5.9_ 20/ 20Tee each 21.00

12.6 Reducer

12.6.1_ 27-20 Reducer each 6.00

12.6.2_ 76-40 Reducer each 5.00

12.7 Elbow

12.7.1_ 90 degree elbow (PPR pipe ɸ 27) each 3.00

12.7.2_ 90 degree elbow (PPR pipe ɸ 20) each 35.00

12.7.3_ 90 degree elbow (uPVC ɸ120) each 13.00

12.7.4_ 90 degree elbow (uPVC ɸ76) each 9.00

12.7.5_ 90 degree elbow (uPVC ɸ40) each 8.00

12.7.6_ 45 degree elbow (uPVC ɸ120) each 20.00

Subject: Detail BOQ of Civil Works


Page - 317/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
Septic tank
Construction of septic tank of different sizes (medium and large sizes) with walls of
brick work in cement mortar (1:6) having a lining of minimum 125 mm R.C.C cast
against the walls as per approved type plan over a brick flat soling flat soiling and
150 mm thick reinforced cement concrete flooring (1:2:4) with 125 mm thick walls in
partition and 12 mm thick cement plaster (1:4) with N.C.F. to insides of walls on
floor and all around outside walls by 18” height at top including supplying fitting and
12.8 fixing of two R.C.C. Tees and providing 450 mm dia water sealed heavy type C.I.
manhole cover with locking/unlocking arrangement and 100 mm thick R.C.C (1:2:4)
top slab, including centering, shuttering, fabricating, casting and curing etc. all
complete as per standard drawing, specification accepted by the Engineer. (Rate in
including cost of reinforcement and its fabrication, binding and placing.)

12.8.1_ for 50 person each 1.00


Soak well
Construction of soak well of different sizes (medium and large sizes) with 250mm
thick soild brick work and 250mm honey comb brick work with cement mortar (1:6)
as per design over R.C.C. (1:2:4) well curb with 1% reinforcement up to the depth as
per drawing with 450 mmm dia water sealed heavy type. C.I. manhole cover with
locking arrangement, filling the well up to the reqired depth with graded khoa and
12.9 sand including suppling and fabicating M.S. Rod, casting, curing including necessary
earth work in excavation, side filling and bailing out water including cost of all
materials etc. all complete as per standard drawing, design approved and accepted by
the Engineer. (Rate in including cost of reinforcement and its fabrication, binding,and
placing, form work etc.)

12.9.1_ 50 users each 1.00


Construction of masonry inspection pit with 250 mm thick brick work in cement
mortar (1:4) including necessary earth work, side filling and one layer brick flat
12.10 soling, 75 mm thick (1:3:6) base concrete for making invert channel and 12 mm thick
(1:2) cement plaster with neat finishing etc.all complete up to a depth of 700 mm
approved and accepted by the Engineer.
12.10.1_ Clear 450x450 mm and depth 450 to 600 mm, average 525 mm for single
each 1.00
150 mm dia R.C.C.pipes and 400 mm uPVC pipe
Sub - Total 12

Subject: Detail BOQ of Civil Works


Page - 318/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
13 Sanitary Accessories
A350-7-CW-(2601-2613), A350-7-DW-2-2602

Toilet bowl
Supplying, fitting, and fixing European type of toilet bowl. in/c plastic seat cover,
13.1 each 3.00
cistern system, preparing the base with cement concrete and with wire mesh or roads
if necessary, including making holes and fitting, fixing, finishing etc.

13.2 Urinal each 3.00


13.3 Bathroom strainer each 14.00
13.4 Shower each 1.00
Hand wash Basin
Supplying glazed vitreous W/H Wash Basin in/c pedestal approx. size 656×510×845,
26kg by weight including fitting, fixing the same in position with heavy type C.I.
13.5 Brackets. 30 mm dia PVC waste water pipe with brass coupling (not exceeding 750 each 2.00
mm in length). 13mm plastic lead (connection) pipe with brass coupling, basin waste
with chain plug including making holes in walls and floors and fitting with wooden
blocks, screws, finishing etc,

Mirror (450 x 600 x 5) mm


Supplying, fitting and fixing of 450x600mm size and 5mm thick unframe super
13.6 quality mirror with hard board at the back with all necessary fitting including making each 2.00
holes in walls and mending good the damages with cement morta (1:4) etc.

13.7 Glass shelf each 1.00

13.8 Flush faucet for toilet bowl (Cotto or equivalent) each 3.00

13.9 Wash basin faucet (Cotto or equivalent) each 2.00


Paper holder
Supplying, fitting, and fixing standard toilet paper holder of 150*150*136 mm size
13.10 each 20.00
including making holes in walls and mending good the damages with cement mortar
(1:4) etc.
Porcelain soap tray
13.11 Supplying, fitting, and fixing standard size soap tray including making holes in walls each 2.00
and mending good the damages with cement mortar (1:4) etc.
Supplying, fitting and fixing best quality faucets ect. (Cotto or equivalent). Complete
13.13
approved and accepted by the Engineer
13.13.1_13mm CP bib cock each 3.00
Supply, fitting and fixing best quality CP pillar cock ect. (Cotto or equivalent).
13.13
Complete approved and accepted by the Engineer

Subject: Detail BOQ of Civil Works


Page - 319/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
13.13.1_13 mm CP medium quality pillar cock each 3.00

13.13.2_13 mm CP stop cock each 24.00

13.13.3_13 mm CP angle stop cock each 24.00


Sub - Total 13
14 Electrical Work
Electrical equipment
14.1 Providing and fixing electric equipment to position
Ref: A350-7-LA-2601
1- Wall mounted LED tube light
Providing & fixing the 1×4’×20-watt LED tube light consisting of powder coated 22
SWG sheet steel frame of min. length 1226mm & breadth 60mm, superior quality
each 20.00
electronic ballast with one year guarantee, holder, necessary wiring with 2× 0.4 sq
mm PVC insulated (stranded) flexible FR wire, earth terminal etc.

2- Wall mounted bracket LED light


Providing & fixing the Special type fancy bracket light consisting of white colour
conical fiber sheet shade of minimum dia 150mm, minimum total height of fitting
250mm, golden or oxidized or chromium plated/ brass bracket with carrier, brass each 25.00
holder, earth terminal, necessary wiring with 2× 0.4 sq.mm stranded PVC insulated
flexible FR cable etc.

3- Ceiling fan 56" including fitting and fixing


Providing & fixing U type fan clamp of 15.87mm. (5/8”) dia MS rod each 25.00
4- Combined switch and regulator board
Supply and installation of electronics fans regulators compriasing of standard
component having noise suppression circuit and total loss in the regulator not each 5.00
exceeding 0.4 watt suitable for 220 10% volt AC single phase 50 Hz manufactured
by Micro Electronics Ltd. or equivalent foreign made

Subject: Detail BOQ of Civil Works


Page - 320/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
5- Distribution board, IP42 Enclosures each 1.00
6- Socket (3-pin 6A) each 9.00
7- Socket (3-pin 15A)
Providing & fixing 250 volts, single phase, 3-pin, 13/15/16amps. Combined switch
socket outlet (concealed type) manufactured and tested in accordance with relevant
IEC standards and manufactured and tested in accordance with relevant IEC
standards and approved by BSTI mounted on required size 18 SWG galvanized plain each 4.00
sheet board of 76.2mm. (3”) depth all electrical contacts shall be of brass/copper
(Dynamic/MEP/ SK/Metro/Super Star or equivalent, local made).)

8- One way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type following switch/
switch socket manufactured and tested in accordance with relevant IEC/
each 2.00
VDE/NEMA/JIS standards mounted on required size 18 SWG galvanized plain sheet
board of 76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

9- Two way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type following switch/
switch socket manufactured and tested in accordance with relevant IEC/
VDE/NEMA/JIS standards mounted on required size 18 SWG galvanized plain sheet each 6.00
board of 76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

10- Three way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type following switch/
switch socket manufactured and tested in accordance with relevant IEC/
VDE/NEMA/JIS standards mounted on required size 18 SWG galvanized plain sheet each 3.00
board of 76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

11- Four way switch


Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type following switch/
switch socket manufactured and tested in accordance with relevant IEC/
VDE/NEMA/JIS standards mounted on required size 18 SWG galvanized plain sheet each 1.00
board of 76.2 mm (3”) depth. All electrical contacts shall be brass/ copper

Subject: Detail BOQ of Civil Works


Page - 321/405
Item: Mosque
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure
12- Room air cooler- split type
Supply, Installation, Testing & commissioning of split type Air-cooler comprising
condensing and evaporating units having following cooling capacity based on indoor
temperature 27°-30° C DB / 19.5°-22°C WB and outdoor temperature 35°-40° DB at each 4.00
high fan speed condition suitable for installation & operation in tropicalized country
like Bangladesh & as per detailed specifications & standard as mentioned below:
Wall mounted

14.2 Protection (MCB & MCCB)

1- MCB 2px10, 6KA each 4.00

2- MCB 2px16, 6KA each 6.00

5- MCB 4px40, 6KA each 1.00


Electrical wire and cable (include conduit pipes, junction box with terminal block and
14.3
concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single - core 1c x0.75
m 1,600.00
mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single - core 1c x1.5
m 900.00
mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single - core 1c x 2.5
m 100.00
mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single - core 1c x 4 mm² m 700.00
Sub - Total 14
TOTAL

Subject: Detail BOQ of Civil Works


Page - 322/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 323/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 324/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 325/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 326/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 327/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 328/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 329/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 330/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 331/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 332/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 333/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 334/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 335/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 336/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 337/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 338/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 339/405
Item: Mosque
Amounts
In Word

Subject: Detail BOQ of Civil Works


Page - 340/405
Item: Mosque
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Unloader Substation
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Unit Rates Amounts


Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation
trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes
and marking layout with chalk powder, providing necessary tools
1 and plants, protecting and maintaining the trench dry etc., stacking,
clearing the excavated earth at a safe distance out of the area
enclosed by the layout etc.

Layout and marking for earth work in excavation in foundation


1.1 accepted by the Engineer. A350 - 7 - CW - 2701 sqm 50.00

Earth work in excavation in foundation trenches up to 1.5 m depth


1.2 and maximum 10 m lead: in soft clayey soil/loose sand/silt A350 - 7 - CW - 2701, 2706 cum 51.60

Mobilization and cleaning site before commencing actual


1.3 physical work and during contract period and demobilization after A350 - 7 - CW - 2701 sqm 50.00
Completion of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 A350 - 7 - CW - 2701, 2706 cum 45.49
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of
1.5 the city or town area including loading, unloading at both ends, A350 - 7 - CW - 2701, 2706 cum 6.11
leveling and dressing the carried earth etc. complete accepted by the
Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works Page - 322/405


Unloader Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of
2.1 single layer polythene sheet weighing 6.5 kg/Sqm with allowances
for lapping complete in all respect and accepted by the Engineer.

2.1.1_ For footing A350 - 7 - CW - 2706 cum 1.54


2.1.2_ For trench A350 - 7 - CW - 2701, 2708 cum 2.00

2.1.3_ For ground floor beam A350 - 7 - CW - 2706 cum 1.75

2.1.4_ For ground floor slab A350 - 7 - CW - 2708 cum 4.87


Reinforced cement concrete works with minimum cement
concrete relates to mix ratio 1:1.5:3 having minimum f’ cr = 30
Mpa, and satisfying a specified compressive strength f’c= 25 Mpa at
28 days on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1
CEM1, 52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality
Sylhet sand or coarse sand of equivalent F.M 2.2 and 20 mm down
well graded crushed stone chips conforming to ASTM C-33;
preparing the concrete mix in the Digital Batching plant, ascertaing
2.2 the strength by trail mix design, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing
centering-shuttering after specified time approved; including all cost
of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

2.2.1_ Concrete for footing A350 - 7 - CW - 2706 cum 2.69

2.2.2_ Concrete for pedestal column A350 - 7 - CW - 2706 cum 1.75

2.2.3_ Concrete for trench A350 - 7 - CW - 2701, 2708 cum 2.00

2.2.4_ Concrete for ground floor beam A350 - 7 - CW - 2706 cum 6.30

2.2.5_ Concrete for beam +5.35m A350 - 7 - CW - 2707 cum 3.50


2.2.6_ Concrete for roof beam A350 - 7 - CW - 2709 cum 1.65

Subject: Detail BOQ of Civil Works Page - 323/405


Unloader Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
2.2.7_ Concrete for ground floor slab A350 - 7 - CW - 2708 cum 8.55

2.2.8_ Concrete for roof slab A350 - 7 - CW - 2710 cum 9.65

2.2.9_ Concrete for gutter slab A350 - 7 - CW - 2703 cum 1.88

2.2.10_ Concrete for column A350 - 7 - CW - 2706 cum 5.12

2.2.11_ Concrete for lintel A350 - 7 - CW-2701, 2705 cum 0.27

2.2.12_ Concrete for sunshade A350 - 7 - CW-2701, 2705 cum 0.13


Sub - Total 2
3 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
3.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
3.1.1_ Formwork for footing A350 - 7 - CW - 2706 sqm 4.48

3.1.2_ Formwork for pedestal column A350 - 7 - CW - 2706 sqm 13.80

3.1.3_ Formwork for trench A350 - 7 - CW - 2701, 2708 sqm 13.30

3.1.4_ Formwork for ground floor beam A350 - 7 - CW - 2706 sqm 42.00

3.1.5_ Formwork for beam +5.35m A350 - 7 - CW - 2707 sqm 26.25


3.1.6_ Formwork for roof beam A350 - 7 - CW - 2709 sqm 19.84

3.1.7_ Formwork for roof slab A350 - 7 - CW - 2710 sqm 64.36

3.1.8_ Formwork for gutter slab A350 - 7 - CW - 2703 sqm 18.00

3.1.9_ Formwork for column A350 - 7 - CW - 2706, 2707 sqm 47.21

3.1.10_ Formwork for lintel A350 - 7 - CW-2701, 2705 sqm 4.40

3.1.11_ Formwork for sunshade A350 - 7 - CW-2701, 2705 sqm 3.52


Sub - Total 3

Subject: Detail BOQ of Civil Works Page - 324/405


Unloader Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released
from BSTI) , the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16%
4.1 and 8% respectively including straightening and cleaning rust, if
any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

4.1.1_ Reinforcement for footing A350 - 7 - CW - 2706 kg 125.00

4.1.2_ Reinforcement for pedestal column A350 - 7 - CW - 2706 kg 569.09

4.1.3_ Reinforcement for trench A350 - 7 - CW - 2701, 2708 kg 240.63

4.1.4_ Reinforcement for ground floor beam A350 - 7 - CW - 2708 kg 976.39


4.1.5_ Reinforcement for Beam +5.35m A350 - 7 - CW - 2707 kg 875.13

4.1.6_ Reinforcement for roof beam A350 - 7 - CW - 2709 kg 586.04

4.1.7_ Reinforcement for ground floor slab A350 - 7 - CW - 2708 kg 328.79

4.1.8_ Reinforcement for roof slab A350 - 7 - CW - 2710 kg 391.04

4.1.9_ Reinforcement for gutter A350 - 7 - CW - 2703 kg 114.56

4.1.10_ Reinforcement for column A350 - 7 - CW - 2706, 2710 kg 1,649.55

4.1.11_ Reinforcement for lintel A350 - 7 - CW-2701, 2705 kg 49.76

4.1.12_ Reinforcement for sunshade A350 - 7 - CW-2701, 2705 kg 15.84


Sub - Total 4

Subject: Detail BOQ of Civil Works Page - 325/405


Unloader Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
5 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and
depth and depth joints, filling the interstices with mortar, cleaning
and soaking bricks at least for 24 hours before use and washing and
5.1
screening of sand, necessary scaffolding, curing at least for 7 days
and pointing with cement sand (F.M.1.2) mortar (1:2) including cost
of water, electricity and other charges ect. all complete and accepted
by the Engineer. (Cement: CEM-I) in ground floor.

5.1.1_ Ground floor A350 - 7 - CW - 2701, 2705 cum 253.67


Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with
first class bricks in cement sand (F.M. 1.2) mortar (1:6), in
superstructure including raking out joints, filling the interstices with
mortar, cleaning and soaking bricks at least 24 hours before use and
5.2 washing of sand, necessary scaffolding, curing at least 7 days etc. all
complete (measurement to given as 250mm width for one brick
length and 375mm for one brick and a half brick length) (Cement:
CEM-I)

5.2.1_ Entry steps A350 - 7 - CW - 2703 cum 0.66

125mm thick normal brick work in superstructure


125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
5.3 necessary scaffolding, raking out joints, cleaning and soaking bricks
at least 24 hours before use and washing of sand curing at least 7
days in all floor including cost of water, electricity and other
charges etc. (Cement: CEM-I)
5.3.1_ Gutter wall A350 - 7 - CW - 2703 sqm 12.00
Sub - Total 5

Subject: Detail BOQ of Civil Works Page - 326/405


Unloader Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
6 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with
fresh cement to ceiling R.C.C, columns, beams, surface of stair case,
sunshades, cornices, railings, drop wall, louvers, fins and finishing
6.1 the corners and edges including washing of sand cleaning the
surface, scaffolding and curing a least for 7 days, cost of water,
electricity and other charges etc. (Cement: CEM-I)

6.1.1_ Plaster to gutter A350 - 7 - CW - 2701, 2703, 2709 sqm 64.85

6.1.2_ Plaster to column A350 - 7 - CW - 2701, 2703, 2709 sqm 43.20

6.1.3_ Plaster to beam A350 - 7 - CW - 2701, 2703, 2709 sqm 50.00

6.1.4_ Plaster to below surface of roof slab A350 - 7 - CW - 2701, 2703, 2709 sqm 64.39

6.1.5_ Plaster to entry steps A350 - 7 - CW - 2701, 2703, 2709 sqm 2.67
6.2 Waterproofing

6.2.1_ Three layer waterproofing by sika grout for gutter slab A350 - 7 - CW - 2701, 2703, 2709 sqm 56.40
Sub - Total 6
7 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
7.1 (1:4) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care

7.1.1_ Ground floor A350 - 7 - CW - 2701, 2703 sqm 37.22


Granite stone thick. 20mm
Suppling, fitting and fixing granit stone, with on 20 mm thick
7.2 cement sand (F.M. 1.2) mortar (1:4) base and ranking out the joints
with respective joint filler & binder including cutting, laying and
finishing with care etc
7.2.1_ Entry steps A350 - 7 - CW - 2703 sqm 2.67
7.3 Ceramic 75x225, dark colour for outside of ground floor beam A350 - 7 - CW - 2702 sqm 18.00
Roof tile
7.4 Supplying, fitting and fixing country made (Mirpur Ceramic / A350 - 7 - CW - 2709 sqm 64.39
equivalent) roof tile, with adhesive motar
Sub - Total 7

Subject: Detail BOQ of Civil Works Page - 327/405


Unloader Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
8 Door & Window
8.1 Door
8.1.1_ Single leaf stainless steel door DO-01 (1000x2100mm) A350-7-CW-2704 sqm 2.10

8.1.2_ Stainless steel collapsible gate DO-02 (3000x3000mm) A350-7-CW-2704 sqm 9.00
5mm thick glass Thai Aluminium frame sliding window as per
8.2
design, drawing, accepted by the Engineer
8.2.1_ Double shutter window WD-01 (1200x1400mm) including
grill with 12mm square bar as per drawing, design, specification A350-7-CW-2704 sqm 3.36
etc. all complete & accepted by the Engineer.
8.3 Ventilation A350-7-CW-2705 sqm 5.28
Sub - Total 8
Structural Steel
9
9.1 Galvanized grating F40x3 mm for trench cover A350 - 7 - CW - 2703 sqm 27.77
Sub - Total 9
10 Electrical Work
Ref: A350-7-LA-2701
Electrical equipment
10.1
Providing and fixing electric equipment to position
1- Wall mounted LED tube light
Providing & fixing the 1×4’×20- LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
breadth 60mm, superior quality electronic ballast with one year each 4.00
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC
insulated (stranded) flexible FR wire, earth terminal etc.

2- Exhaust fan 12"


Providing and fixing of following axial flow A.C capacitor type
wall mounted exhaust fan complete with blade, steel frame standard each 2.00
wall louver shutter, PVC insulated connecting wire etc.

4- Distribution board, IP54 Enclosures each 1.00

5- Socket (3-pin6A ) each 3.00

Subject: Detail BOQ of Civil Works Page - 328/405


Unloader Substation
Unit Rates Amounts
Item No Description of Work Drawing Reference Unit Quantity
In Figure In Word In Figure In Word
6- Two way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in
accordance with relevant IEC/ VDE/NEMA/JIS standards mounted each 2.00
on required size 18 SWG galvanized plain sheet board of 76.2 mm
(3”) depth. All electrical contacts shall be brass/ copper

10.2 Protection (MCB & MCCB)


1- MCB 2px6, 6KA each 1.00
2- MCB 2px10, 6KA each 1.00
3- MCB 2px16,6KA each 1.00
Electrical wire and cable (include conduit pipes, junction box with
10.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 80.00
core 1c x0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 20.00
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 60.00
core 1c x 2.5 mm²
Sub - Total 10
TOTAL

Subject: Detail BOQ of Civil Works Page - 329/405


Unloader Substation
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Purification plant & desalination
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation
trenches layout, providing center lines, local bench-mark pillars,
levelling, ramming and preparing the base, fixing bamboo spikes and
marking layout with chalk powder, providing necessary tools and
1 plants, protecting and maintaining the trench dry etc., stacking,
clearing the excavated earth at a safe distance out of the area
enclosed by the layout etc.

Layout and marking for earth work in excavation in foundation


1.1 A350-7-CW-2805 sqm 100.00
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 and maximum 10 m lead: in soft clayey soil/loose sand/silt A350-7-CW-2805 cum 338.55

Mobilization and cleaning site before commencing actual physical


work and during contract period and demobilization after
1.3 Completion of the Works under contract accepted by Engineer. A350-7-CW-2805 sqm 100.00

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 A350-7-CW-2805-2809 cum 128.03
(Modified proctor test) including carrying, watering, levelling,
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

1.5 Sand filling to elv +1.00 with compaction k=0.95 A350-7-CW-2805-2809 cum 73.20
Clearing and disposing of excavated earth from the construction
site by truck or any other means to a place within 30 km radius of the
1.6 city or town area including loading, unloading at both ends, leveling A350-7-CW-2805-2809 cum 210.52
and dressing the carried earth etc. complete accepted by the
Engineer.
Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 330/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole
and make the bore-hole ready for placing steel cage and concreting
including hire of drilling rig set, tripod stand, tremie pipe, cost of
fuel, lubricant, mobilization, demobilization, maintenance, spares,
stand-byes, insurance coverage, water, electricity and other charges
2.1 all compete approved and accepted by the Engineer. Before
commencing boring operation, Contractor shall submit method of
statement of cast-in-situ pile work including sequence of boring and
casting, disposal of spoils, test result of materials to the Engineer for
approval. However, Engineer' approval shall not relieve the
Contractor of his responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 22 m A350-7-CW-2805 Rm 176.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM
-1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand [Sylhet
sand or coarse sand of equivalent F.M.2.2], 20 mm down well graded
crushed stone chips conforming to ASTM C-33, including breaking
crushed stone chips, screening through proper sieves, making,
placing re-bar cage & binding ms pipes in position, placing and
removing tri-pod as per requirement, pouring the concrete in bore-
hole with the help of a tremie pipe, maintaining the tremie pipe
immersed in concrete by at least 1 meter throughout the period of
2.2 A350-7-CW-2805 cum 49.76
concreting, maintaining required slump, etc. mixing the aggregates in
diginal batching plant, casting in bore holes, acertaining the strength
by trial mix design all complete including all cost of water,
electricity, plant & machinery, bentonite, admixture testing of
materials and concrete etc and other charges as per design, drawing
etc all complete approved and accepted by the Engineer. Concrete
should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 331/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy
not exceeding 450 MPa and whatever is the yield strength within
allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile
strength fu to yield strength fy, shall be at least 1.25 and minimum
elongation after fracture and minimum total elongation at maximum
2.3 force is 16% and 8% respectively including welding of lapping and A350-7-CW-2805 kg 2,914.72
spirals as per design, drawing, straightening and cleaning rust, if
any, bending and binding in position with supply of G.I. wires,
splices or laps what so ever etc. all complete accepted by the
Engineer (Measurement shall be recorded only on Standard Mass per
Unit length of Bars, while, dia of bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total
length in each pile for ultrasonic pulse velocity meter test. The Pvc
pipes should have threaded cap at top and bottom, and jointed by
socket & glue to connect each others. 14 SWG steel wires shall be
2.4 used for binding with rebar cage having minimum one binding with A350-7-CW-2805 m 528.00
rebar cages in each 3m interval or apply other approved devices for
fastenening firmly with rebar cage, cleaning pipes upto full length
immediately after concreting, protecting the pipes from any damage
etc. all complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making A350-7-CW-2805 cum 1.47
platform where necessary, carrying, all sorts of handling, stacking
the same properly after cleaning, leveling and dressing the situ and
clearing the bed etc.

Subject: Detail BOQ of Civil Works


Page - 332/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full
length for each pile (3 holes/pile) by a qulifified and approved
2.6 expert, preparing, cleaning the holes and providing all relevant A350-7-CW-2805 each 4.00
materials, equipment, result in standard forms and compiling test
report with recommendations on the test etc. complete in all respect
approve and accepted by the Engineer.

ii) Double PIT (pile integrity test)


Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT
expert, preparing pile heads and providing all relevant materials,
equipment, result in standard forms and compiling test report with A350-7-CW-2805 each 3.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent


standard for the cast-in-situ/pre-cast pile providing required
scaffolding, bracing, jacks, pressure test gauge, loading unloading,
Kentledge and other plants and equipment including staging,
mobilization, demobilization, hire charge, gunny bags, sand and
filling sacs/gunny bags for loading, record readings and preparation
of results in standard forms and other incidental charges per standard
practice and procedures including submission of load test report,
2.7 furnishing all graph and chart etc. complete in all respects approved A350-7-CW-2805
and accepted by the Engineer (Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 80 tonne load for 1 No. test / test 1.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips;
produced by mixer, casting in forms in/c supplying & laying of
3.1 single layer polythene sheet weighing 6.5 kg/Sqm with allowances
for lapping complete in all respect and accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 333/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.1.1_ For footing desalonation tank A350-7-CW-2807-2809 cum 2.05

3.1.2_ For footing A350-7-CW-2805-2807 cum 2.97


3.1.2_ For drain wall A350-7-CW-2805-2807 cum 4.35
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days
on standard cylinders as per standard practice of code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1 CEM1,
52.5N (52.5 Mpa) / ASTM-C 150 Type – I, best quality Sylhet sand
or coarse sand of equivalent F.M 2.2 and 20 mm down well graded
crushed stone chips conforming to ASTM C-33; preparing the
concrete mix in the Digital Batching plant, ascertaing the strength by
3.2 trail mix design, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after
specified time approved; including all cost of water, electricity,
admixture, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the Engineer.

3.2.1_ Concrete for footing tank A350-7-CW-2807-2809 cum 9.00

3.2.2_ Concrete for bottom slab tank A350-7-CW-2807-2809 cum 11.60

3.2.3_ Concrete for wall tank A350-7-CW-2807-2809 cum 47.08

3.2.4_ Concrete for top slab tank A350-7-CW-2116-2115 cum 6.48

3.2.5_ Concrete for Footing A350-7-CW-2805-2807 cum 5.75

3.2.6_ Concrete for pedestal column A350-7-CW-2805-2807 cum 2.63

3.2.7_ Concrete for ground floor beam at +0.550 A350-7-CW-2807-2809 cum 14.02

3.2.8_ Concrete for beam at +5.400 A350-7-CW-2810 cum 7.31

3.2.9_ Concrete for roof beam A350-7-CW-2811. 2812 cum 4.52


3.2.10_ Concrete for ground floor slab A350-7-CW-2807 cum 10.14

3.2.11_ Concrete for slab at +5.400 A350-7-CW-2811, 2812 cum 6.68

3.2.12_ Concrete for roof slab A350-7-CW-2811, 2812 cum 17.26

Subject: Detail BOQ of Civil Works


Page - 334/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.2.13_ Concrete for ramp slope A350-7-CW-2802 cum 1.56

3.2.14_ Concrete for column A350-7-CW-2810-2812 cum 8.75


3.2.15_ Concrete for lintel A350-7-CW-2810-2812 cum 0.54

3.2.16_ Concrete for sunshade A350-7-CW-2810-2812 cum 0.63


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and
4.1 maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position. all complete approved and
accepted by the Engineer.
4.1.1_ Formwork for footing tank A350-7-CW-2807-2809 sqm 12.00

4.1.2_ Formwork for bottom slab tank A350-7-CW-2807-2809 sqm 58.29

4.1.3_ Formwork for wall tank A350-7-CW-2807-2809 sqm 316.29


4.1.4_ Formwork for top slab tank A350-7-CW-2807-2809 sqm 37.44

4.1.5_ Formwork for Footing A350-7-CW-2805-2807 sqm 26.24

4.1.6_ Formwork for pedestal column A350-7-CW-2805-2807 sqm 8.75

4.1.7_ Formwork for ground floor beam at +0.550 A350-7-CW-2807-2809 sqm 69.60

4.1.8_ Formwork for beam at +5.400 A350-7-CW-2810 sqm 74.75

4.1.9_ Formwork for roof beam A350-7-CW-2811. 2812 sqm 47.46

4.1.10_ Formwork for slab at +5.400 A350-7-CW-2811, 2812 sqm 60.77

4.1.11_ Formwork for roof slab A350-7-CW-2811, 2812 sqm 148.78

4.1.12_ Formwork for column A350-7-CW-2810-2812 sqm 48.50


4.1.13_ Formwork for lintel A350-7-CW-2810-2812 sqm 14.18

4.1.14_ Formwork for sunshade A350-7-CW-2810-2812 sqm 18.56


Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 335/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.1 respectively including straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires, splices or
laps what so ever etc. complete in all respects and accepted by the
Engineer (Measurement shall be recorded only on Standard Mass per
Unit length of Bars, while, dia of bars exceeds its standard)

5.1.1_ Reinforcement for footing tank A350-7-CW-2807-2809 kg 1,378.83

5.1.2_ Reinforcement for bottom slab tank A350-7-CW-2807-2809 kg 1,295.50

5.1.3_ Reinforcement for wall tank A350-7-CW-2807-2809 kg 3,127.06

5.1.4_ Reinforcement for top slab tank A350-7-CW-2116-2115 kg 1,128.23

5.1.5_ Reinforcement for Footing A350-7-CW-2805-2807 kg 447.62

5.1.6_ Reinforcement for pedestal column A350-7-CW-2805-2807 kg 1,338.22


5.1.7_ Reinforcement for ground floor beam at +0.550 A350-7-CW-2807-2809 kg 2,901.54

5.1.8_ Reinforcement for beam at +5.400 A350-7-CW-2810 kg 1,851.08

5.1.9_ Reinforcement for roof beam A350-7-CW-2811. 2812 kg 1,127.41

5.1.10_ Reinforcement for ground floor slab and ramp A350-7-CW-2807 kg 890.25

5.1.11_ Reinforcement for slab at +5.400 A350-7-CW-2811, 2812 kg 865.08

5.1.12_ Reinforcement for roof slab A350-7-CW-2811, 2812 kg 2,030.37

5.1.13_ Reinforcement for column A350-7-CW-2810-2812 kg 2,325.77

5.1.14_ Reinforcement for lintel A350-7-CW-2810-2812 kg 153.13


5.1.15_ Reinforcement for sunshade A350-7-CW-2810-2812 kg 103.72
Sub - Total 5

Subject: Detail BOQ of Civil Works


Page - 336/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and
6.1 depth and depth joints, filling the interstices with mortar, cleaning
and soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days
and pointing with cement sand (F.M.1.2) mortar (1:2) including cost
of water, electricity and other charges ect. all complete and accepted
by the Engineer. (Cement: CEM-I) in ground floor.
6.1.1_ Ground floor A350-7-CW-2801-2803 cum 40.22
Normal brick work 250mm to 375mm thick
Brick work of width one brick or one and a half brick length with
first class bricks in cement sand (F.M. 1.2) mortar (1:6), in
superstructure including raking out joints, filling the interstices with
6.2 mortar, cleaning and soaking bricks at least 24 hours before use and
washing of sand, necessary scaffolding, curing at least 7 days etc. all
complete (measurement to given as 250mm width for one brick
length and 375mm for one brick and a half brick length). (Cement:
CEM-I)
6.2.1_ For ramp slope A350-7-CW-2802 cum 0.33
125mm thick normal brick work in superstructure
125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including
necessary scaffolding, raking out joints, cleaning and soaking bricks
6.3 at least 24 hours before use and washing of sand curing at least 7
days in all floor including cost of water, electricity and other charges
etc. (Cement: CEM-I)

6.3.1_Gutter wall A350-7-CW-2801-2803 sqm 21.71

6.3.2_Drain wall A350-7-CW-2801-2803 sqm 40.60


Sub - Total 6

Subject: Detail BOQ of Civil Works


Page - 337/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
7 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
sunshades, cornices, railings, drop wall, louvers, fins and finishing
7.1 the corners and edges including washing of sand cleaning the
surface, scaffolding and curing a least for 7 days, cost of water,
electricity and other charges etc. (Cement: CEM-I)

7.1.1_ Plaster to column A350-7-CW-2801-2803 sqm 49.50

7.1.2_ Plaster to beam A350-7-CW-2801-2803 sqm 58.50

7.1.3_ Plaster to gutter wall A350-7-CW-2801-2803 sqm 61.88

7.1.4_ Plaster to below surface of roof slab A350-7-CW-2801-2803 sqm 131.56

7.1.5_ for ramp slope A350-7-CW-2801-2803 sqm 8.94


7.1.6_ Plaster to drain A350-7-CW-2801-2803 sqm 131.66

7.2 Waterproofing

7.2.1_ Three layers waterproofing by sika for gutter slab A350-7-CW-2801-2803 sqm 48.65
Sub - Total 7
8 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
8.1 (1:4) base and raking out the joints with white cement including A350-7-CW-2801-2803 sqm 87.75
cutting and laying the tiles in proper way and finishing with care

Mirpur ceramic 75x225 mm, dark colour for outside ground floor
8.2 beam A350-7-CW-2801-2803 sqm 56.21
Roof tile
8.3 Supplying, fitting and fixing country made (Mirpur Ceramic / A350-7-CW-2801-2803 sqm 60.17
equivalent) roof tile, with adhesive motar

Sub - Total 8

Subject: Detail BOQ of Civil Works


Page - 338/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9 Door & Window
9.1 Stainless steel collapsible gate DO-01 (4000x3000mm) A350-7-CW-2801-2803 sqm 12.00
5mm thick glass Thai Aluminium frame sliding window as per
9.2 design, drawing, accepted by the Engineer
9.2.1_ Double shutter window WD-01 (1400x1200mm) including
grill with 12mm square bar as per drawing, design, specification etc. A350-7-CW-2801-2803 sqm 13.44
all complete & accepted by the Engineer.

9.3 Ventilation A350-7-CW-2801-2803 sqm 25.20


Sub - Total 9
10 Finishing Work
Aluminium ceiling sheet
Supplying, fitting and fixing aluminium board ceiling of 9 mm thick
board laminated by mechanical hot press with a milk white PVC
membrane with Aluminum T- bar frame in natural anodized finish at
10.1 600*600 mm in grid suspended from ceiling by 12 SWG double ply
wire fixed to the ceiling by rowel plug, screws, hooks, nails etc.

10.1.1_ Aluminium ceiling of ground floor A350-7-CW-2801-2803 sqm 87.75


Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
10.2 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

10.2.1_Painting to gutter A350-7-CW-2801-2803 sqm 82.84

10.2.2_ Painting to beam A350-7-CW-2801-2803 sqm 58.50


10.2.3_ Painting to column A350-7-CW-2801-2803 sqm 49.50
Sub - Total 10

Subject: Detail BOQ of Civil Works


Page - 339/405
Item: Purification plant desalination
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
11 Electrical Work
Ref: A350-7-LA-2801
Electrical equipment
11.1
Providing and fixing electrical equipment to position
1- Wall mounted LED tube light
Providing & fixing the 1×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
breadth 60mm, superior quality electronic ballast with one year each 8.00
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC
insulated (stranded) flexible FR wire, earth terminal etc.

2- Distribution board, IP54 Enclosures each 1.00

3- Socket (3-pin 6A) each 8.00


11.2 Protection(MCB & MCCB)

1- MCB 2px6, 6KA each 1.00

2- MCP 2px16, 6KA each 1.00

3- MCB 3PX10,6KA each 2.00

4- MCP 4px63,6KA each 1.00


Electrical wire and cable (include conduit pipes junction box with
11.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 120
core 1c x 0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 80
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 100
core 1c x2.5 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 50
core 4c x 4 mm²
Sub - Total 11
TOTAL

Subject: Detail BOQ of Civil Works


Page - 340/405
Item: Purification plant desalination
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chittagong
Item: Running Water Deep Drill Well
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350-7-CW-29a01 sqm 36.00
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 A350-7-CW-29a01, 29a04 cum 86.40
and maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-29a01 sqm 25.00
of the Works under contract accepted by Engineer.
Earth filling in foundation trenches/Back filling and plinth in
150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, dressing A350-7-CW-29a01, 29a04 cum 24.52
and compacting to a specified percentage each layer upto finished level
etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city
1.5 A350-7-CW-29a01, 29a04 cum 61.88
or town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 341/405
Item: Running Water Deep Drill Well
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
by mixer, casting in forms in/c supplying & laying of single layer
2.1 polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

2.1.1_ For tank bottom beam A350-7-CW-29a04 cum 1.79

2.1.2_ For tank bottom slab A350-7-CW-29a04 cum 3.14

2.1.3_ For drain and appron A350-7-CW-29a02 cum 1.64


Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
2.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

2.2.1_ Concrete for tank bottom beam A350-7-CW-29a04 cum 6.91

2.2.2_ Concrete for ground floor beam A350-7-CW-29a04, 29a05 cum 1.92

2.2.3_ Concrete for beam elv +4.380 A350-7-CW-29a04, 29a05 cum 1.60

2.2.4_ Concrete for roof beam A350-7-CW-29a07 cum 0.94

2.2.5_ Concrete for tank bottom slab A350-7-CW-29a04 cum 7.50

2.2.6_ Concrete for tank top slab A350-7-CW-29a04 cum 5.00

2.2.7_ Concrete for roof slab A350-7-CW-29a07 cum 2.50

2.2.8_ Concrete for gutter A350-7-CW-29a02 cum 0.60

Subject: Detail BOQ of Civil Works


Page - 342/405
Item: Running Water Deep Drill Well
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2.2.9_ Concrete for column A350-7-CW-29a06 cum 5.00

2.2.10_ Concrete for tank wall A350-7-CW-29a04 cum 8.55

2.2.11_ Concrete for lintel A350-7-CW-29a06 cum 0.17

2.2.12_Concrete for sunshade A350-7-CW-29a06 cum 0.08


Sub - Total 2
3 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
3.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.

3.1.1_ Formwork for tank bottom beam A350-7-CW-29a04 sqm 23.04

3.1.2_ Formwork for ground floor beam A350-7-CW-29a04, 29a05 sqm 15.36

3.1.3_ Formwork for beam elv +4.380 A350-7-CW-29a04, 29a05 sqm 16.80

3.1.4_ Formwork for roof beam A350-7-CW-29a07 sqm 9.87

3.1.5_ Formwork for tank top slab A350-7-CW-29a04 sqm 25.00

3.1.6_ Formwork for roof slab A350-7-CW-29a07 sqm 28.00

3.1.7_ Formwork for gutter A350-7-CW-29a02 sqm 6.00

3.1.8_ Formwork for column A350-7-CW-29a06 sqm 44.91

3.1.9_ Formwork for tank wall A350-7-CW-29a04 sqm 34.20

3.1.10_ Formwork for lintel A350-7-CW-29a06 sqm 2.75

3.1.11_Formwork for sunshade A350-7-CW-29a06 sqm 1.93


Sub - Total 3

Subject: Detail BOQ of Civil Works


Page - 343/405
Item: Running Water Deep Drill Well
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
4 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance with
BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
4.1
respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit length
of Bars, while, dia of bars exceeds its standard)

4.1.1_ Reinforcement for tank bottom beam A350-7-CW-29a04 kg 1,679.22


4.1.2_ Reinforcement for ground floor beam A350-7-CW-29a04, 29a05 kg 230.40
4.1.3_ Reinforcement for beam +4.380 A350-7-CW-29a04, 29a05 kg 192.00

4.1.4_Reinforcement for roof beam A350-7-CW-29a07 kg 112.80

4.1.5_ Reinforcement for tank bottom slab A350-7-CW-29a04 kg 900.00

4.1.6_ Reinforcement for tank top slab A350-7-CW-29a04 kg 998.52

4.1.7_ Reinforcement for roof slab A350-7-CW-29a07 kg 300.00

4.1.8_ Reinforcement for tank wall A350-7-CW-29a02 kg 72.00

4.1.9_ Reinforcement for column A350-7-CW-29a06 kg 600.14

4.1.10_ Reinforcement for gutter A350-7-CW-29a04 kg 1,557.87

4.1.11_ Reinforcement for lintel A350-7-CW-29a06 kg 20.33

4.1.12_ Reinforcement for sunshade A350-7-CW-29a06 kg 9.90


Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 344/405
Item: Running Water Deep Drill Well
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5 Masonry Work
Brick work for exterior wall
250 mm Brick works with 9.5" x 4.5" x 2.75" size 10 hole machine
made (Mirpur Ceramics or equivalent) Rock-face or textured klinker
facing bricks having uniform colour carefully laid in cement sand
(F.M.1.2) mortar (1:4) in superstructure with uniform width and depth
and depth joints, filling the interstices with mortar, cleaning and
5.1 soaking bricks at least for 24 hours before use and washing and
screening of sand, necessary scaffolding, curing at least for 7 days and
pointing with cement sand (F.M.1.2) mortar (1:2) including cost of
water, electricity and other charges ect. all complete and accepted by
the Engineer. (Cement: CEM-I) in ground floor.

5.1.1_ Ground floor A350-7-CW-29a01, 29a02 cum 9.47

125mm thick normal brick work in superstructure


125mm brick work with first class bricks in cement sand (F.M. 1.2)
mortar (1:6), and making bond with connected wall including necessary
5.3
scaffolding, raking out joints, cleaning and soaking bricks at least 24
hours before use and washing of sand curing at least 7 days in all floor
including cost of water, electricity and other charges etc. (CEM 1)

5.2.1_ Gutter wall A350-7-CW-29a01, 29a02 sqm 7.68

5.2.2_ Drain wall A350-7-CW-29a01, 29a02 sqm 15.26


Sub - Total 5
6 Plastering & Waterproofing Work
Plaster ceiling R.C.C, columns, beams, staircase etc
Minimum 6mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh
cement to ceiling R.C.C, columns, beams, surface of stair case,
6.1 sunshades, cornices, railings, drop wall, louvers, fins and finishing the
corners and edges including washing of sand cleaning the surface,
scaffolding and curing a least for 7 days, cost of water, electricity and
other charges etc. (Cement CEM 1)

6.1.1_ Plaster to gutter wall A350-7-CW-29a01, 29a02 sqm 22.56

6.1.2_ Plaster to tank top slab A350-7-CW-29a04 sqm 25.00

6.1.3_ Plaster to drain A350-7-CW-29a01, 29a02 sqm 15.26

Subject: Detail BOQ of Civil Works


Page - 345/405
Item: Running Water Deep Drill Well
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
6.2 Waterproofing

6.2.1_ Th layers Waterproofing by sika for gutter slab A350-7-CW-29a01, 29a02 sqm 2.40
6.2.3_ Motal cement with sika latex grade 100 for tank A350-7-CW-29a01, 29a02 sqm 187.70

6.2.4_ Three layers epoxy painting for tank A350-7-CW-29a01, 29a02 sqm 187.70
Sub - Total 6
7 Tiles & Stone Work
Homogenious mirror polish tile 600x600 mm for floor
Suppling, fitting and fixing tiles with cement sand (F.M. 1.2) mortar
7.1 (1:4) base and raking out the joints with white cement including cutting A350-7-CW-29a01- 29a03 sqm 25.00
and laying the tiles in proper way and finishing with care

7.2 Mirpur ceramic 75x225 mm, dark colour for outside ground floor beam A350-7-CW-29a01- 29a03 sqm 8.40

Roof tile
7.3 Supplying, fitting and fixing country made (Mirpur Ceramic / A350-7-CW-29a01- 29a03 sqm 60.27
equivalent) roof tile, with adhesive motar
Sub - Total 7
8 Door & Window
Wooden (matured & seasoned Mehaghani) entry door and frame
Supplying and making solid wooden door for all floors with matured
natural seasoned wood of required size including painting two coats of
8.1
coal tar to the surface in contact with all, fitting and fixing in position.
Frame (size 250x62mm) & shutter as per design, drawing, accepted by
the Engineer.
8.1.1_ Single leaf door DO-01 (2100x1000X38mm) including
A350-7-CW-29a03 cum 0.16
varnishing and frence polishing
5mm thick glass Thai Aluminium frame sliding window as per design,
8.2
drawing, accepted by the Engineer
8.2.1_ Double shutter window WD-01 (1200x1200mm)including grill
with 12mm square bar as per drawing, design, specification etc. all A350-7-CW-29a03 sqm 2.88
complete & accepted by the Engineer.
Sub - Total 8

Subject: Detail BOQ of Civil Works


Page - 346/405
Item: Running Water Deep Drill Well
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
9 Finishing Work
Emulsion Paint
Plastic emulsion of approved best quality and colour delivered from
authorized local agent of the manufacturere in a sealed container,
applying to wall and ceiling in two coats over lime putty of specified
brand applied on primer or sealer elapsing specified time for
9.1 drying/recoating including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects, sand papering the surface and
necessary scaffolding, spreading by brush/ roller/ spray etc.

9.1.1_Painting to gutter wall A350-7-CW-29a01, 29a02 sqm 7.68


Sub - Total 9
10 Steel Structure
All steel structure, Beams, Columns, Purlins, fittings & fixtures shall be
hot rolled pre-fabricated and hot deep galvanized (EN ISO 14713:1999
10.1
C5, Galvanized coating conforms to ASTM A653/A653 M/EN 1461
for zinc coated steel minimum 600 gm/m2)
10.1.1_ Stainless Steel L-50x5 mm A350-7-CW-29a01-29a03 kg 9.78

10.1.2_ Stainless Steel cover, thk=1,5mm A350-7-CW-29a01-29a03 kg 12.01


10.1.3_ Stainless Steel Plate, thk=4mm A350-7-CW-29a01-29a03 kg 0.71

10.1.4_ Stainless Steel Ladder A350-7-CW-29a01-29a03 kg 10.21


Sub - Total 10
11 Water Pumping
Mobilization
Preparation for installation of tube-well and transportation of complete
boring equipments, labour and materials to the work site and remove
the materials after completion of the works. Installation of drilling rig
11.1 and accessaries, making arrangements for electricity, water, labour
shed, site office and stores, digging mud pit etc, leveling, dressing and
clearing of the site as per original condition and a testing for discharge
using minimum 1000 liter water tub etc. .

11.1.1_ For tube-wells beyond 200 meter depth A350-7-CW-29a01-29a03 per set 1.00

Subject: Detail BOQ of Civil Works


Page - 347/405
Item: Running Water Deep Drill Well
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Boring
Execution 350mm dia of boring through all sorts of strata by reverse
circulation or any other approved method. Boring for 350mm dia
11.2 vertical hole up to designed depth and collection of soil samples at
every 3 meter interval or as required and at every change in soil stratum
including sinking and with drawing necessary casing pipe and all
necessary arrangements complete

11.2.1_ From 200m to 250m A350-7-CW-29a01-29a03 m 300.00


150mm dia water grade uPVC housing pipe having wall thickness 6.6
11.3 A350-7-CW-29a01-29a03 m 300.00
mm to 7.6mm
Complete installation of 75 mm dia uPVC tube well fixtures such as
expanded top pipes, tube well pipes, strainer, blind pipe, pipe cap etc.
fitting and fixing with best quality uPVC solution, iron screws and
11.4 A350-7-CW-29a01-29a03 rm 300.00
uPVc tape and placing in position with proper size MS cetralizer @ 3
meter c/c in strainer portion including blind pipe etc. complete as per
practice and accepted by the Engineer

Complete development of the of the well by suitable air compressor and


pump of suitable capacity by alternate surging & pumping untill
satisfactory yeild, sand free water and turbidity condition is reached
11.5 using necessary quality of calgon and conducting step draw down test A350-7-CW-29a01-29a03 each 1.00
before and after the development as per specification and accepted by
the Engineer (Development shouild be started within 24 hours of
completion of shrouding) Wells up to 300 m depth

Filling of the bore hole around the tube well from top the shrouding up
to the bottom of sanitary seal by withdrawn of selected soil or clay or
11.6 A350-7-CW-29a01-29a03 rm 300.00
other harmful substances and filled by coarse sand

Sub - Total 11
12 Electrical Work
Electrical equipment
12.1
Providing and fixing electric equipment to position
1- Wall mounted LED tube light
Providing & fixing the 1×4’×20-watt LED tube light consisting of
powder coated 22 SWG sheet steel frame of min. length 1226mm &
breadth 60mm, superior quality electronic ballast with one year each 2.00
guarantee, holder, necessary wiring with 2× 0.4 sq mm PVC insulated
(stranded) flexible FR wire, earth terminal etc.

Subject: Detail BOQ of Civil Works


Page - 348/405
Item: Running Water Deep Drill Well
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2- Two way switch
Providing & fixing 250 volt. 5/6 amps. (minimum) concealed type
following switch/ switch socket manufactured and tested in accordance
with relevant IEC/ VDE/NEMA/JIS standards mounted on required each 1.00
size 18 SWG galvanized plain sheet board of 76.2 mm (3”) depth. All
electrical contacts shall be brass/ copper

3- Distribution board IP54 Enclosure each 3.00


12.2 Protection(MCB & MCCB)
1- MCB 2px6, 6KA each 3.00
2- MCP 3px10,6KA each 9.00
3- MCP 4px32,6KA each 3.00
Electrical wire and cable (include conduit pipes, junction box with
12.3
terminal block and concealed)
1- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 30
core 1c x 0.75 mm²
2- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 20
core 1c x1.5 mm²
3- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 60
core 4c x 4 mm²
4- (NYY) / XLPE insulated & PVC sheathed, 0.6/1KV, Cu, Single -
m 65
core 4c x 6 mm²
Sub - Total 12
TOTAL

Subject: Detail BOQ of Civil Works


Page - 349/405
Item: Running Water Deep Drill Well
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Link tower
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1 layout with chalk powder, providing necessary tools and plants,
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Layout and marking for earth work in excavation in foundation
1.1 A350-7-CW-3006/3007 sqm 76.74
accepted by the Engineer.
Earth work in excavation in foundation trenches up to 1.5 m depth
1.2 A350-7-CW-3006/3007 cum 88.88
and maximum 10 m lead: in soft clayey soil/loose sand/silt
Mobilization and cleaning site before commencing actual physical
1.3 work and during contract period and demobilization after Completion A350-7-CW-3006/3007 sqm 76.74
of the Works under contract accepted by Engineer.

Earth filling in foundation trenches/Back filling and plinth in


150mm layers with earth available within 90 m of the building site
minimum dry density of 95% with optimum moisture content
1.4 (Modified proctor test) including carrying, watering, levelling, A350-7-CW-3006/3007 cum 60.37
dressing and compacting to a specified percentage each layer upto
finished level etc. all complete and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city
1.5 A350-7-CW-3006/3007 cum 28.51
or town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

Sub - Total 1

Subject: Detail BOQ of Civil Works


Page - 350/405
Item: Link tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
2 Pile Work
Boring/drilling for cast in situ pile up to the required depth and
diameter with minimum 6m long temporary steel casing, true to
vertical, providing bentonite slurry and maintaining water level in the
hole, washing the hole for at least 30 minutes, clean the bore-hole and
make the bore-hole ready for placing steel cage and concreting
including hire of drilling rig set, tripod stand, tremie pipe, cost of fuel,
lubricant, mobilization, demobilization, maintenance, spares, stand-
byes, insurance coverage, water, electricity and other charges all
2.1 compete approved and accepted by the Engineer. Before commencing
boring operation, Contractor shall submit method of statement of cast-
in-situ pile work including sequence of boring and casting, disposal of
spoils, test result of materials to the Engineer for approval. However,
Engineer' approval shall not relieve the Contractor of his
responsibilities and obligations under contract.

a) 600 mm dia
b) Depth up to 38 m A350-7-CW-3006 m 456.00
Cast in situ pile with RCC works of required slump by adding water
reducing admixture with 25 Mpa relates to mix ratio (1:1.5:3) on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM
& cement conforming to BDS EN-197-1- CEM -1,52.5 N / ASTM-C
150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of
equivalent F.M.2.2], 20 mm down well graded crushed stone chips
conforming to ASTM C-33, including breaking crushed stone chips,
screening through proper sieves, making, placing re-bar cage & binding
ms pipes in position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe,
maintaining the tremie pipe immersed in concrete by at least 1 meter
2.2 throughout the period of concreting, maintaining required slump, etc. A350-7-CW-3006 cum 128.87
mixing the aggregates in diginal batching plant, casting in bore holes,
acertaining the strength by trial mix design all complete including all
cost of water, electricity, plant & machinery, bentonite, admixture
testing of materials and concrete etc and other charges as per design,
drawing etc all complete approved and accepted by the Engineer.
Concrete should prepared by Digital batching plant, strength may be
acertained by trail mix design.

Subject: Detail BOQ of Civil Works


Page - 351/405
Item: Link tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement Work
Supplying, fabrication and fixing to details as per design: Grade 400
(RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or
deformed bar produced and marked according to Bangladesh standard,
with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding
450 MPa and whatever is the yield strength within allowable limit as
per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1.25 and minimum elongation after
2.3 fracture and minimum total elongation at maximum force is 16% and A350-7-CW-3006 kg 13,722.96
8% respectively including welding of lapping and spirals as per
design, drawing, straightening and cleaning rust, if any, bending and
binding in position with supply of G.I. wires, splices or laps what so
ever etc. all complete accepted by the Engineer (Measurement shall be
recorded only on Standard Mass per Unit length of Bars, while, dia of
bars exceeds its standard)

Pvc pipe D40 for ultrasonic test


Supplying, fitting and fixing 3 nos. of Pvc pipes of 40mm Ø (wall
thickness 4mm ) Lira, National polymer as approved upto total length
in each pile for ultrasonic pulse velocity meter test. The Pvc pipes
should have threaded cap at top and bottom, and jointed by socket &
glue to connect each others. 14 SWG steel wires shall be used for
2.4 binding with rebar cage having minimum one binding with rebar cages A350-7-CW-3006 m 1,368.00
in each 3m interval or apply other approved devices for fastenening
firmly with rebar cage, cleaning pipes upto full length immediately
after concreting, protecting the pipes from any damage etc. all
complete accepted by the Engineer.

Pile head concrete breaking & removing


Labour for breaking head of hardened cast in situ bored pile and
removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods,
2.5 straightening and bending of pile bars, preparation and making A350-7-CW-3006 cum 3.05
platform where necessary, carrying, all sorts of handling, stacking the
same properly after cleaning, leveling and dressing the situ and clearing
the bed etc.

Subject: Detail BOQ of Civil Works


Page - 352/405
Item: Link tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
i) Ultrasonic pulse velocity meter test
Conducting ultrasonic pulse velocity meter test in 3 pipes of full length
for each pile (3 holes/pile) by a qulifified and approved expert,
preparing, cleaning the holes and providing all relevant materials,
equipment, result in standard forms and compiling test report with A350-7-CW-3006 each 6.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.
2.6
ii) Double PIT (pile integrity test)
Conducting low strain dynamic testing of pile as per ASTM D5882-
The standard method of testing by a qulifified and approved PIT expert,
preparing pile heads and providing all relevant materials, equipment,
result in standard forms and compiling test report with A350-7-CW-3006 each 5.00
recommendations on the test etc. complete in all respect approve and
accepted by the Engineer.

Conducting static load test as per ASTM D1143 or equivalent standard


for the cast-in-situ/pre-cast pile providing required scaffolding, bracing,
jacks, pressure test gauge, loading unloading, Kentledge and other
plants and equipment including staging, mobilization, demobilization,
hire charge, gunny bags, sand and filling sacs/gunny bags for loading,
record readings and preparation of results in standard forms and other
incidental charges per standard practice and procedures including
2.7 A350-7-CW-3006
submission of load test report, furnishing all graph and chart etc.
complete in all respects approved and accepted by the Engineer
(Minimum two cyclic loading).
Before commencing load test, Contractor shall submit method
statement for conducting load test to the Engineer for approval.
However, Engineer’s approval shall not relieve the Contractor of his
responsibilities and obligations under Contract.

a) For 250 tonne load for 1 No. test /test 1.00


Sub - Total 2
3 Concrete Work
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
3.1 by mixer, casting in forms in/c supplying & laying of single layer
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

3.1.1_ For footing A350-7-CW-3006/3007 cum 2.82

3.1.2_ For ground floor beam A350-7-CW-3006/3007 cum 0.82

Subject: Detail BOQ of Civil Works


Page - 353/405
Item: Link tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
3.1.3_ For ground slab A350-7-CW-3006/3007 cum 3.60
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.2.1_ Concrete for footing A350-7-CW-3006/3007 cum 18.06


3.2.2_ Concrete for pedestal column A350-7-CW-3006/3007 cum 3.22

3.2.3_ Concrete for ground floor beam A350-7-CW-3006/3007 cum 3.00

3.2.4_ Concrete for ground floor slab A350-7-CW-3006/3007 cum 10.80

3.2.5_ Concrete for column A350-7-CW-3006/3007 cum 3.76


Sub - Total 3
4 Form Work
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
4.1 true to plumb, making shutter water-tight properly, placing
reinforcement in position. all complete approved and accepted by the
Engineer.
4.1.1_ Formwork for footing A350-7-CW-3006/3007 sqm 29.53
4.1.2_ Formwork for pedestal column A350-7-CW-3006/3007 sqm 13.98

4.1.3_ Formwork for ground floor beam A350-7-CW-3006/3007 sqm 15.02

4.1.4_ Formwork for column A350-7-CW-3006/3007 sqm 17.68


Sub - Total 4

Subject: Detail BOQ of Civil Works


Page - 354/405
Item: Link tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
5 Reinforcement Work
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance with
BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.1 respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit length
of Bars, while, dia of bars exceeds its standard)

5.1.1_ Rebar for footing A350-7-CW-3006/3007 kg 1,198.84


5.1.2_ Rebar for pedestal column and column A350-7-CW-3006/3007 kg 950.79
5.1.3_ Rebar for ground floor beam A350-7-CW-3006/3007 kg 480.81
5.1.4_ Rebar for ground floor slab A350-7-CW-3006/3007 kg 859.76
Sub - Total 5
6 Structural Steel
All steel structure, Beams, Columns, Angles, C- Channels, fittings &
fixtures shall be hot rolled pre-fabricated and hot deep galvanized (EN
6.1 ISO 14713:1999 C5, Galvanized coating conforms to ASTM
A653/A653 M/EN 1461 for zinc coated steel minimum 600 gm/m2)

6.1.1_ Galvanized Steel column A350-7-CW-3008/3010 kg 13,185.52


6.1.2_ Galvanized Steel beams A350-7-CW-3008/3010 kg 13,310.64
6.1.3_ Galvanized Steel bracing A350-7-CW-3008/3010 kg 2,863.24
6.1.4_ Galvanized Steel Plate A350-7-CW-3008/3010 kg 3,211.29
6.2 Galvanized Steel platforms
6.2.1_ Galvanized grating platforms (F40x3mm) A350-7-CW-3009/3011 sqm 180.00
6.2.2_ Galvanized Steel handrail A350-7-CW-3009/3011 kg 1,558.86
6.3 Galvanized Bolts for steel structure
6.3.1_ Galvanized anchor Bolt M24, L700 mm A350-7-CW-3009/3011 each 32.00
6.3.2_ Galvanized Bolt M20, L70 mm A350-7-CW-3009/3011 kg 157.97
6.3.3_ Galvanized Bolt M20, L50 mm A350-7-CW-3009/3011 kg 22.78
6.3.4_ Galvanized Bolt M16, L50 mm A350-7-CW-3009/3011 kg 20.00

Subject: Detail BOQ of Civil Works


Page - 355/405
Item: Link tower
Item Unit Rates Amounts
Description of Work Drawing Reference Unit Quantity
No In Figure In Word In Figure In Word
Sub - Total 6
TOTAL

Subject: Detail BOQ of Civil Works


Page - 356/405
Item: Link tower
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Water Supply System
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
A350-7-WS-3-0002-0004
1 Earth work
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling, ramming
and preparing the base, fixing bamboo spikes and marking layout with chalk
1.1 powder, providing necessary tools and plants, protecting and maintaining cum 359.66
the trench dry etc., stacking, clearing the excavated earth at a safe distance
out of the area enclosed by the layout etc.

Back filling in 150mm layers with black sand having minimum dry density
of 95% with optimum moisture content (Modified proctor test) including
1.2 carrying, watering, levelling, dressing and compacting to a specified cum 89.18
percentage each layer upto finished level etc. all complete and accepted by
the Engineer.
Back filling in 150mm layers with undisturbed soil having minimum dry
density of 95% with optimum moisture content (Modified proctor test)
1.3 including carrying, watering, levelling, dressing and compacting to a cum 240.51
specified percentage each layer upto finished level etc. all complete and
accepted by the Engineer.

2 Compaction to achieve k = 0.95 & accepted by the Engineer. cum 29.97


3 Transporting the excess as per instruction & accepted by the Engineer. cum 30.71

4 Water Supply Equipment

4.1 - Control panel set 3.00

4.2 - Automatic pump (Q=15m3/h, H=30m) set 6.00

4.3 - Compressed-Air VRSSEL (V=200L) 4PAR set 4.00


4.4 - Water pressure meter (6PAR) psc 4.00

4.5 - Valve electromagnetic DM60 psc 3.00

Subject: Detail BOQ of Civil Works


Page - 356/405
Item: Water Supply System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
4.6 - Valve DN60 psc 20.00

4.7 - Valve DN42 psc 14.00


4.8 - Check valve DN60 psc 9.00

4.9 - Pump strainer DN60 psc 6.00

4.10 - Valve electromagnetic DM76 psc 1.00

4.11 - Valve DN76 psc 16.00

4.12 - Check valve DN76 psc 15.00

4.13 - Flexible coupling DN60 psc 6.00

4.14 - Diaphragm valve DN60 psc 1.00

4.15 - PPR Pipe DN76 m 868.00

4.16 - PPR Pipe DN60 m 241.34


4.17 - PPR Pipe DN42 m 89.53

4.18 - Submersible pump (Q=15m3/h, H=60m, 3.5kW) set 1.00

4.19 - Other Accessories LS 1.00


TOTAL

Subject: Detail BOQ of Civil Works


Page - 357/405
Item: Water Supply System
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Rain Water Drainage System
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
A350-7-WS-1-0002-0006
1 Earth work
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1.1 layout with chalk powder, providing necessary tools and plants, cum 6,044.48
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the
layout etc.
Earth Back filling and plinth in 150mm layers with earth available
within 90 m of the building site minimum dry density of 95% with
optimum moisture content (Modified proctor test) including carrying,
1.2 watering, levelling, dressing and compacting to a specified percentage cum 948.88
each layer upto finished level etc. all complete and accepted by the
Engineer.

1.3 Compaction k= 0.98 etc. all complete accepted by the Engineer cum 3,129.50

Clearing and disposing of excavated earth from the construction


site by truck or any other means to a place within 30 km radius of the
1.4 cum 5,095.49
city or town area including loading, unloading at both ends, leveling
and dressing the carried earth etc. complete accepted by the Engineer.

RCC Pipe drainage including rebar (Ref. Drg A350 - 7 - WS - 1 -


2
0001 to 0006
2.1 - Pipe ф300 m 1,340.65
2.2 - Pipe ф400 m 140.00

2.3 - Pipe ф500 m 534.40

2.4 - PVC Pipe ф114 m 756.50

Subject: Detail BOQ of Civil Works


Page - 358/405
Item: Rain Water Drainage System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
3 Support for RCC Pipe
Steel formwork include making, placing shutter in position and
maintaining true to plumb, making shutter in position and maintaining
3.1 true to plumb, making shutter water-tight properly, placing sqm 65.68
reinforcement in position. all complete approved and accepted by the
Engineer.
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
3.2 Batching plant, ascertaing the strength by trail mix design, casting in cum 3.40
forms, compacting by vibrator machine and curing at least for 28
days, removing centering-shuttering after specified time approved;
including all cost of water, electricity, admixture, additional testing
charges of materials and cylinders required by Engineer, other charges
etc. all complete approved and accepted by the Engineer.

Reinforcement (60 grade deformed rebar)


Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) including straightening and cleaning rust, if any, bending and
3.3 binding in position with supply of G.I. wires, splices or laps what so kg 427.54
ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

Subject: Detail BOQ of Civil Works


Page - 359/405
Item: Rain Water Drainage System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
PVC sheet
supplying & laying of single layer polythene sheet weighing 6.5
3.4 sqm 38.94
kg/Sqm with allowances for lapping complete in all respect and
accepted by the Engineer.
4 Manhole
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
4.1 by mixer, casting in forms in/c supplying & laying of single layer cum 19.18
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

Steel formwork include making, placing shutter in position and


maintaining true to plumb, making shutter in position and maintaining
4.2 true to plumb, making shutter water-tight properly, placing sqm 224.19
reinforcement in position. all complete approved and accepted by the
Engineer.
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
4.3 Batching plant, ascertaing the strength by trail mix design, casting in cum 147.38
forms, compacting by vibrator machine and curing at least for 28
days, removing centering-shuttering after specified time approved;
including all cost of water, electricity, admixture, additional testing
charges of materials and cylinders required by Engineer, other charges
etc. all complete approved and accepted by the Engineer.

Subject: Detail BOQ of Civil Works


Page - 360/405
Item: Rain Water Drainage System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
Reinforcement (60 grade deformed rebar)
Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) including straightening and cleaning rust, if any, bending and
4.4 binding in position with supply of G.I. wires, splices or laps what so kg 6,033.79
ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

4.5 - Shape angle L50x50 kg 1,541.74

4.6 - Steel cover kg 28.26

4.7 - Steel mesh kg 9.34

4.8 - Epoxy Painting sqm 86.69


5 Ditch
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
5.1 by mixer, casting in forms in/c supplying & laying of single layer cum 11.00
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

Steel formwork include making, placing shutter in position and


maintaining true to plumb, making shutter in position and maintaining
5.2 true to plumb, making shutter water-tight properly, placing sqm 240.00
reinforcement in position. all complete approved and accepted by the
Engineer.

Subject: Detail BOQ of Civil Works


Page - 361/405
Item: Rain Water Drainage System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
5.3 Batching plant, ascertaing the strength by trail mix design, casting in cum 40.76
forms, compacting by vibrator machine and curing at least for 28
days, removing centering-shuttering after specified time approved;
including all cost of water, electricity, admixture, additional testing
charges of materials and cylinders required by Engineer, other charges
etc. all complete approved and accepted by the Engineer.

Reinforcement (60 grade deformed rebar)


Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for
Reinforced Cement Concrete, produced and marked in accordance
with BDS ISO 6935-2: 2006 (or standard subsequently released from
BSTI) , the ratio of ultimate tensile strength fu to yield strength fy,
shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8%
5.4 kg 1,817.02
respectively including straightening and cleaning rust, if any, bending
and binding in position with supply of G.I. wires, splices or laps what
so ever etc. complete in all respects and accepted by the Engineer
(Measurement shall be recorded only on Standard Mass per Unit
length of Bars, while, dia of bars exceeds its standard)

5.5 - Galvanized steel L50x50 mm kg 1,263.85

5.6 - Epoxy Painting sqm 70.84

6 Drainage equipment

6.1 - Strainer ball pcs 74.00

6.2 - Socket, Ø150 pcs 300.00

6.3 - Elbow, Ø150 pcs 40.00


6.4 - Tee 90, Ø150 pcs 15.00

Subject: Detail BOQ of Civil Works


Page - 362/405
Item: Rain Water Drainage System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
TOTAL

Subject: Detail BOQ of Civil Works


Page - 363/405
Item: Rain Water Drainage System
DETAIL BOQ of Civil Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Waste Water Sewerage System
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
A350-7-WS-2-0002-0003
1 Earth work
Earth work in excavation in all kinds of soil for foundation trenches
layout, providing center lines, local bench-mark pillars, levelling,
ramming and preparing the base, fixing bamboo spikes and marking
1.1 layout with chalk powder, providing necessary tools and plants, cum 914.50
protecting and maintaining the trench dry etc., stacking, clearing the
excavated earth at a safe distance out of the area enclosed by the layout
etc.
Sand filling in 150mm layers with black sand having minimum dry
density of 95% with optimum moisture content (Modified proctor test)
including carrying, watering, levelling, dressing and compacting to a
1.2 specified percentage each layer upto finished level etc. all complete and cum 88.46
accepted by the Engineer.

Earth filling in 150mm layers with undisturbed soil having minimum


dry density of 95% with optimum moisture content (Modified proctor
1.3 test) including carrying, watering, levelling, dressing and compacting to cum 757.13
a specified percentage each layer upto finished level etc. all complete
and accepted by the Engineer.

Clearing and disposing of excavated earth from the construction site


by truck or any other means to a place within 30 km radius of the city or
1.4 cum 157.36
town area including loading, unloading at both ends, leveling and
dressing the carried earth etc. complete accepted by the Engineer.

1.5 Compaction to achieve k = 0.95 & accepted by the Engineer. cum 819.02

Subject: Detail BOQ of Civil Works


Page - 363/405
Item: Waste Water Sewerage System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
2.0 Batching plant, ascertaing the strength by trail mix design, casting in cum 68.90
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

3.0 Pipe sewage


3.1 - PVC Pipe ф200 m 642.50

3.2 - PVC Pipe ф110 m 218.80


4.0 Manhole
Mass concrete
Grade 9 Mpa, 20mm down well graded crushed stone chips; produced
4.1 by mixer, casting in forms in/c supplying & laying of single layer cum 7.99
polythene sheet weighing 6.5 kg/Sqm with allowances for lapping
complete in all respect and accepted by the Engineer.

Steel formwork
Include making, placing shutter in position and maintaining true to
4.2 plumb, making shutter in position and maintaining true to plumb, sqm 29.04
making shutter water-tight properly, placing reinforcement in position.
all complete approved and accepted by the Engineer.
Brick work
Brick work of width one brick or one and a half brick length with first
class bricks in cement sand (F.M. 1.2) mortar (1:6), in superstructure
including raking out joints, filling the interstices with mortar, cleaning
and soaking bricks at least 24 hours before use and washing of sand,
4.3 necessary scaffolding, curing at least 7 days etc. all complete cum 24.74
(measurement to given as 250mm width for one brick length and
375mm for one brick and a half brick length). (Cement: CEM-I)

Subject: Detail BOQ of Civil Works


Page - 364/405
Item: Waste Water Sewerage System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
Reinforced cement concrete works with minimum cement concrete
relates to mix ratio 1:1.5:3 having minimum f’ cr = 30 Mpa, and
satisfying a specified compressive strength f’c= 25 Mpa at 28 days on
standard cylinders as per standard practice of code ACI/BNBC/ASTM
& Cement conforming to BDS EN-197-1 CEM1, 52.5N (52.5 Mpa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of
equivalent F.M 2.2 and 20 mm down well graded crushed stone chips
conforming to ASTM C-33; preparing the concrete mix in the Digital
4.4 Batching plant, ascertaing the strength by trail mix design, casting in cum 4.43
forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
all cost of water, electricity, admixture, additional testing charges of
materials and cylinders required by Engineer, other charges etc. all
complete approved and accepted by the Engineer.

Reinforcement (60 grade deformed rebar)


Supplying, fabrication and fixing to details as per design: Ribbed or
deformed bar reinforcement Grade 400 (RB 400 / 400W) for Reinforced
Cement Concrete, produced and marked in accordance with BDS ISO
6935-2: 2006 (or standard subsequently released from BSTI) , the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least 1.25
and minimum elongation after fracture and minimum total elongation
4.5 at maximum force is 16% and 8% respectively including straightening kg 307.14
and cleaning rust, if any, bending and binding in position with supply of
G.I. wires, splices or laps what so ever etc. complete in all respects and
accepted by the Engineer (Measurement shall be recorded only on
Standard Mass per Unit length of Bars, while, dia of bars exceeds its
standard)

4.6 - Galvanized steel L50x50x5 mm kg 316.04

4.7 - Epoxy Painting sqm 17.71


TOTAL

Subject: Detail BOQ of Civil Works


Page - 365/405
Item: Waste Water Sewerage System
DETAIL BOQ of Electrical & Automation System
Project: Modern Food Storage Facilities_ MFSP
Location: Chittagong
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Electrical & Automation System

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
1 Substation Equipment
Automatic Voltage Regulator - AVR 2000KVA, 11KV, Standard: NEMA & ANSI C57.15 with type
1.1 set 1.00
tested certificate
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-2-0002
Automatic Voltage Regulator - AVR 2500KVA, 11KV, Standard: NEMA & ANSI C57.15 with type
1.2 set 2.00
tested certificate.
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-2-0002
H.T. Switch Gear (SF6) gas insulated, 11KV, 50HZ, sheet steel clad powder coated (14 SWG -2mm)
1.3 set 1.00
, IEC Standard with type tested certificate
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-2-0002
Include:
1- 630A, 11KV,breaking current 21KA(3sec) making current 50KA,50HZ,TP SF6 gas insulated
Switch Gear with motor operated mechanism,With closing solenoid shunt releases, auxiliary
contacts 5NO+5NC and limit switch 1NO + 1NC for indication " closing spring charged "
mechanical on/off/trip indicator -5 each
2- Busbar copper 11KV, 50HZ, 3PH, 400A, 100KA, hard drawn copper busbars-1 each
3- MAN/MC Interface master control-1 each
4- Measuring devices cell (A&V) -1 each output C.B
Transformer 2000KVA, 11/0.415KV, Dry type, 3 phase, air cooled, Standard:IEC with type tested
1.4 set 1.00
certificate
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-2-0002, A350-7-EA-7-0001
Transformer 2500KVA, 11/0.415KV, Dry type, 3 phase, air cooled, Standard:IEC with type tested
1.5 set 2.00
certificate.
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-2-0002, A350-7-EA-7-0001
Main Distribution Board LVDB70 1671 KVA, enclosure IP42, 415/230 V, 85 KA, 50HZ
1.6 set 1.00
Sheet steel clad powder coated (16 SWG - 1.6mm) with type tested certificate.
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-7-0001
Include:
1- ATS (ACB 3P x 3000A, with 2 set motor operated mechanism With closing solenoid shunt
releases, 2 auxiliary contacts 5NO+5NC and limit switch (1NO + 1NC) for indication) - 1 each

Subject: Detail Abstract of Cost


Page - 366/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
2- ACB 3P x 3000A, with motor operated mechanism With closing solenoid shunt releases, 2
auxiliary contacts 5NO+5NC and limit switch (1NO + 1NC) for indication - 1 each
3- ACB 3P x 2500A- 1 each
4- MCCB 3P x 1250A- 2 each
5- MCCB 3P x 250A- 2 each
6- MCCB 3P x40- 1 each
7- MCCB 3P x 6A- 1 each
8- BUSCOUPLER copper 400V, 50HZ, 3PH, 3000A, 85KA-1 each
9- Busbar copper 400V, 50HZ, 3PH, 3000A, 85KA, hard drawn copper busbars-1 each
10- MAN/MC Interface master control- 1 each
11- Measuring devices cell (A&V) - 1 each output C.B
Main Distributor Board LVDB71 2082 KVA, enclosure IP42, 415/230 V, 85 KA, 50HZ
1.7 set 1.00
sheet steel clad powder coated (16 SWG-1.6mm) with type tested certificate
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-7-0001
Include:
1- ATS (ACB 3P x 3000A, with 2 set motor operated mechanism With closing solenoid shunt
releases, 2 auxiliary contacts 5NO+5NC and limit switch (1NO + 1NC) for indication) - 1 each
2- ACB 3P x 4000A-with motor operated mechanism With closing solenoid shunt releases, auxiliary
contacts 5NO+5NC and limit switch (1NO + 1NC) for indication -1 each
3- ACB 3P x 2500A- 1 each
4- MCCB 3P x 1250A- 1 each
5- MCCB 3P x 800A- 1 each
6- MCCB 3P x 630A- 2 each
7- MCCB 3P x 400A- 1 each
8- MCB 3P x 250A- 1each
9- MCB 4P x 40A- 1 each
10- Busbar copper 400V, 50HZ, 3PH, 3000A, 85KA-1 each
11- MAN/MC Interface master control-1 each
12- Measuring devices cell (A&V) -1 each output C.B
Main Distributor Board LVDB72 1985 KVA, enclosure IP42, 415/230 V, 85 KA, 50HZ
1.8 1.00
sheet steel clad powder coated (16 SWG-1.6mm) with type tested certificate.
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-7-0001
Include:
1- ACB 3P x 4000A-with motor operated mechanism With closing solenoid shunt releases, auxiliary
contacts 5NO+5NC and limit switch (1NO + 1NC) for indication -1 each
2- ACB 3P x 2500A- 1 each
3- MCCB 3P x 1250A- 1 each
4- MCCB 3P x 1000A- 2 each
5- MCCB 3P x 800A- 1 each
6- Busbar copper 400V, 50HZ, 3PH, 3000A, 85KA-1 each
7- MAN/MC Interface master control-1 each

Subject: Detail Abstract of Cost


Page - 367/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
8- Measuring devices cell (A&V) -1 each output C.B
Capacitor Panel 1000 KVAR (Include Capacitor Bank), One for each LVDB with type tested
1.9 set 3.00
certificate
Ref: A350-7-EA-1-0003, A350-7-EA-2-0001, A350-7-EA-7-0001
Sub-Total 1
Master control panel and Power supply from substation to control room, Motors and other
2
accessories
2.1 Sub-Structure for Cable from Sub-Station to Control Room
2.1.1 - Earthwork
1- Excavation Cum 91.90
2- Sand filling Cum 65.58
3- Earth back filling Cum 14.55
4- Clearing and disposing of excavated earth Cum 11.78
2.1.2 - Manhole
1- Mass Concrete Cum 2.46
2- Shuttering sqm 60.56
3- Concrete Cum 6.87
4- Reinforcement kg 979.50
5- Steel Ladder kg 13.32
2.1.3 Duct bank
1- Solid brick Cum 1.75
2- Pipe HDPE Ø160 m 85.50
2.2 Power and Motor cables. Include: Laying, termination, cable gland etc (all cable shall be RM cable)
Ref: A350-7-EA-2-0001, A350-7-EA-2-0003, A350-7-EA-2-0004, A350-7-EA-7-0001, A350-7-EA-1-
0002
1- XLPE Insulation, SWA, PVC Sheathed, Cu, Multi-core, 11KVA 3CX185 mm²(need high voltage
m 400.00
test)
2- XLPE 0.6/1KV, Cu, Multi-core 3CX1.5 mm² m 6,500.00
3- XLPE 0.6/1KV, Cu, Multi-core 3CX2.5 mm² m 500.00
4- XLPE 0.6/1KV, Cu, Multi-core 3CX4 mm² m 200.00
5- XLPE 0.6/1KV, Cu, Multi-core 3CX10 mm² m 250.00
6- XLPE 0.6/1KV, Cu, Multi-core 3CX16 mm² m 300.00
7- XLPE 0.6/1KV, Cu, Multi-core 3CX25 mm² m 1,100.00
8- XLPE 0.6/1KV, Cu, Multi-core 4CX2.5 mm² m 5,500.00
9- XLPE 0.6/1KV, Cu, Multi-core 4CX4 mm² m 1,500.00
10- XLPE 0.6/1KV, Cu, Multi-core 4CX6 mm² m 2,100.00
11- XLPE 0.6/1KV, Cu, Multi-core 4CX10 mm² m 3,700.00
12- XLPE 0.6/1KV, Cu, Multi-core 4CX16 mm² m 800.00
13- XLPE 0.6/1KV, Cu, Multi-core 3CX25 +16 mm² m 1,000.00
14- XLPE 0.6/1KV, Cu, Multi-core 3CX35 + 25 mm² m 850.00
15- XLPE 0.6/1KV, Cu, Multi-core 4CX50 mm² m 650.00

Subject: Detail Abstract of Cost


Page - 368/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
16- XLPE 0.6/1KV, Cu, Multi-core 4CX70 mm² m 650.00
17- XLPE 0.6/1KV, Cu, Multi-core 4CX95 + 50 mm² m 300.00
18- XLPE 0.6/1KV, Cu, Multi-core 3CX50+1CX25 mm² m 1,200.00
19- XLPE 0.6/1KV, Cu, Multi-core 3CX70+1CX35 mm² m 1,100.00
20- XLPE 0.6/1KV, Cu, Multi-core 3CX120+1CX70 mm² m 600.00
21- XLPE 0.6/1KV, Cu, Single-core 3CX150+1CX90 mm² m 5,600.00
22- XLPE 0.6/1KV, Cu, Single-core 1CX150 mm² m 2,000.00
23- XLPE 0.6/1KV, Cu, Single-core 1CX240 mm² m 11,000.00
24- XLPE 0.6/1KV, Cu, Single-core 1CX120 mm² m 1,900.00
25- XLPE Insulation, PVC Sheathed, Cu, Multi-core, 11KVA 3CX150 mm² m 60.00

Master control panel MCC70, Enclosure IP54, 415/230 V, 85KA,50HZ (Include: MCCB, Magnetic
2.3 contactor, Relay, Overload, timer, selector switch, signal lamp, wiring, Cable gland,etc) set 1.00
Sheet steel clad powder coated (16 SWG-1.6mm), IEC Standard with type tested certificate.

Ref: A350-7-EA-2-0001, A350-7-EA-1-0003, A350-7-EA-2-0003, A350-7-EA-7-0001,A350-7-EA-5-


0001
Include:
1- MCCB 3P x 1250A, with adjustable thermal overload and adjustable magnetic short circuit
releases -1 each
2- MCCB 3P x 220A, with adjustable thermal overload and adjustable magnetic short circuit releases
-3 each
3- MCCB 3P x 150A, with adjustable thermal overload and adjustable magnetic short circuit releases
-2 each
4- MCB 3P x 125A, with adjustable thermal overload and adjustable magnetic short circuit releases
-1 each
5- MCB 3P x 100A, with adjustable thermal overload and adjustable magnetic short circuit releases
-2 each
6- MCB 3P x 80A, with adjustable thermal overload and adjustable magnetic short circuit releases -4
each
7- MCB 3P x 63A, with adjustable thermal overload and adjustable magnetic short circuit releases -2
each
8- MCB 3P x 32A, with adjustable thermal overload -1 each
9- MCB 3P x 18A, with adjustable thermal overload -1 each
10- MCB 3P x 16A, with adjustable thermal overload -1 each
11- MCB 3P x 6A, with adjustable thermal overload -12 each
12- MCB 3P x 4A, with adjustable thermal overload -2 each
13- MCB 2P x 16A, with adjustable thermal overload -1 each
14- MCB 2P x 6A, with adjustable thermal overload -1 each
15- MCB 2P x 2A, with adjustable thermal overload -14 each
16- Soft starter 30KW, 400V, 50 HZ, 3~PH - 2 each
17- Busbar copper 400V, 50 HZ, 3~PH , 1250A ,85KA, hard drawn copper busbars-1 each

Subject: Detail Abstract of Cost


Page - 369/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
18- MAN/MC Interface master control-1 each
19- Measuring devices cell (A&V) -1 each output C.B

Master control panel MCC71A, Enclosure IP54, 415/230 V, 85 KA, 50HZ ( Include: MCCB,
2.4 Magnetic contactor, Relay, Overload, timer, selector switch, signal lamp, wiring, Cable gland, etc) set 1.00
Sheet steel clad powder coated (16 SWG- 1.6mm), IEC Sandard with type tested certificate.

Ref: A350-7-EA-2-0001, A350-7-EA-1-0003, A350-7-EA-2-0003, A350-7-EA-7-0001,A350-7-EA-5-


0002
Include:
1- MCCB 3P x 630A, with adjustable thermal overload and adjustable magnetic short circuit releases
- 1 each
2- MCCB 3P x 400A, with adjustable thermal overload and adjustable magnetic short circuit releases
- 1 each
3- MCCB 3P x 220A, with adjustable thermal overload and adjustable magnetic short circuit releases
- 1 each
4- MCB 3P x 40A, with adjustable thermal overload - 1 each
5- MCB 3P x 23A, with adjustable thermal overload -2 each
6- MCB 3P x 16A, with adjustable thermal overload -1 each
7- MCB 3P x 14A, with adjustable thermal overload -1 each
8- MCB 3P x 10A, with adjustable thermal overload -2 each
9- MCB 3P x 6A, with adjustable thermal overload -2 each
10- MCB 3P x 4A, with adjustable thermal overload -1 each
11- MCB 3P x 2A, with adjustable thermal overload -3 each
12- MCB 2P x 10A -1 each
13- MCB 2P x 2A -6 each
14- Soft starter 18.5KW, 400V, 50 HZ, 3~PH - 1 each
15- Busbar copper 400 V, 50 HZ, 3~PH, 630A,85KA, hard drawn copper busbars-1 each
16- MAN/MC Interface master control-1 each
17- Measuring devices cell (A&V) -1 each output C.B

Master control panel MCC71B, Enclosure IP54, 415/230 V, 85 KA, 50HZ ( Include: MCCB,
2.5 Magnetic contactor, Relay, Overload, timer, selector switch, signal lamp, wiring, Cable gland, etc) set 1.00
Sheet steel clad powder coated (16 SWG-1.6mm), IEC Standard with type tested certificate.

Ref: A350-7-EA-2-0001, A350-7-EA-1-0003, A350-7-EA-2-0004, A350-7-EA-7-0001,A350-7-EA-5-


0003.
Include:
1- MCCB 3P x 630A, with adjustable thermal overload and adjustable magnetic short circuit releases
- 1 each
2- MCCB 3P x 400A, with adjustable thermal overload and adjustable magnetic short circuit releases
- 1 each

Subject: Detail Abstract of Cost


Page - 370/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
3- MCCB 3P x 80A, with adjustable thermal overload and adjustable magnetic short circuit releases -
2 each
4- MCCB 3P x 63A, with adjustable thermal overload and adjustable magnetic short circuit releases -
2 each
5- MCB 3P x 32A, with adjustable thermal overload - 2 each
6- MCB 3P x 14A, with adjustable thermal overload - 2 each
7- MCB 3P x 6A, with adjustable thermal overload - 2 each
8- MCB 3P x 4A, with adjustable thermal overload - 2 each
9- MCB 3P x 2A, with adjustable thermal overload - 7 each
10- MCB 2P x 10A - 1 each
11- MCB 2P x 2A - 10 each
12- Busbar copper 400 V, 50 HZ, 3~PH, 630A,85KA, hard drawn copper busbars - 1 each
13- MAN/MC Interface master control - 1 each
14- Measuring devices cell (A&V) - 1 each output C.B

Master control panel MCC72, Enclosure IP54, 415/230 V, 85 KA, 50HZ ( Include: MCCB, Magnetic
2.6 contactor, Relay, Overload, timer, selector switch, signal lamp, wiring, Cable gland, etc) set 1.00
Sheet steel clad powder coated (16 SWG-1.6mm), IEC Standard with type tested certificate.

Ref: A350-7-EA-2-0001, A350-7-EA-1-0003, A350-7-EA-2-0004, A350-7-EA-7-0001,A350-7-EA-5-


0004.
Include:
1- MCCB 3P x 1000A, with adjustable thermal overload and adjustable magnetic short circuit
releases -1 each
2- MCCB 3P x 150A, with adjustable thermal overload and adjustable magnetic short circuit releases
-1 each
3- MCCB 3P x 100A, with adjustable thermal overload and adjustable magnetic short circuit releases
-3 each
4- MCCB 3P x 63A, with adjustable thermal overload and adjustable magnetic short circuit releases
-4 each
5- MCB 3P x 50A, with adjustable thermal overload - 3 each
6- MCB 3P x 32A, with adjustable thermal overload - 1 each
7- MCB 3P x 16A, with adjustable thermal overload - 1 each
8- MCB 3P x 10A, with adjustable thermal overload - 11 each
9- MCB 3P x 6A, with adjustable thermal overload - 7 each
10- MCB 3P x 4A, with adjustable thermal overload - 2 each
11- MCB 3P x 2A, with adjustable thermal overload - 14 each
12- MCB 2P x10A-1 each
13- MCB 2P x 2A-15 each
14- Soft starter 30KW, 400V, 50 HZ, 3~PH - 4 each
15- Soft starter 22KW, 400V, 50 HZ, 3~PH - 3 each
16- Busbar copper 400 V, 50 HZ, 3~PH, 1000A,85KA, hard drawn copper busbars-1 each

Subject: Detail Abstract of Cost


Page - 371/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
17- MAN/MC Interface master control - 1 each
18- Measuring devices cell (A&V) -1 each output C.B

Master control panel MCCSS, Enclosure IP54, 415/230 V, 85 KA, 50HZ (Include: MCCB, Magnetic
2.7 contactor, Relay, Overload, timer, selector switch, signal lamp,wiring, Cable gland, etc) set 1.00
Sheet steel clad powder coated (16 SWG-1.6MM), IEC Standard with type tested certificate

Ref: A350-7-EA-2-0001, A350-7-EA-1-0003, A350-7-EA-2-0004, A350-7-EA-7-0001,A350-7-EA-5-


0005
Include:
1- MCCB 3P x400A, with adjustable thermal overload and adjustable magnetic short circuit releases
-1 each
2- MCCB 3P x 100A, with adjustable thermal overload and adjustable magnetic short circuit releases
-9 each
3- Frequency Inverter 45KW, 400V, 50 HZ, 3~PH - 9 each
4- Busbar copper 400 V, 50 HZ, 3~PH, 250A,85KA, hard drawn copper busbars-1 each
5- MAN/MC Interface master control-1 each
6- Measuring devices cell (A&V) -1 each output C.B

Electrical and control panel (HPP), Enclosure IP54, 415/230V, 50HZ for the hydraulic extractor (SE-
2.8 11KW), including operation start/stop switches, indication lamp as well as frequency inverter set 1.00
Sheet steel clad powder coated (16 SWG-1.6MM), IEC standard

2.9 CHILLER
CHILLER Cabinet (CH_S1, CH_S2, CH_S3)
Enclosure IP54, 415/230 V, 85KA, 50HZ,(Include: MCCB, Magnetic cotactor, Relay,Overload,
2.9.1 set 3.00
timer, wiring, Cable gland, etc) Sheet steel clad powder coated (16 SWG-1.6mm) ,IEC Standard with
type tested certificate.
Ref: A350-7-EA-2-0001, A350-7-EA-1-0003, A350-7-EA-2-0004, A350-7-EA-7-0001,A350-7-EA-5-
0006-0008.
Include:
1- MCCB 3P x 1250A, with adjustable thermal overload and adjustable magnetic short circuit
releases -1 each
2- MCCB 3P x 220A, with adjustable thermal overload and adjustable magnetic short circuit releases
-6 each
3- Busbar copper 400 V, 50 HZ, 3~PH , 1250A,85 KA, hard drawn copper busbars-1 each
4- Measuring devices cell (A&V) -1 each
2.9.2 Chiller accessories
Triphase plugs ( Sockets ) to be installed under silo
set 18.00
250A, 3P+PEN, 400V AC, IP55 Waterproof, Atex
Triphase Plugs ( Sockets ) to be installed outside Loading House
set 1.00
32A, 3P+PEN , 400V AC, IP66 Waterproof, Atex

Subject: Detail Abstract of Cost


Page - 372/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
2.10 Other Accessories
- Motor protection switch (DISCONNECTOR SWITCH) IP66 Waterproof, Atex, Installation
2.10.1
outdoor
1- Enclosed non-fusible heavy duty safety switches, 3-pole, 480V AC, 30A set 73.00
2- Enclosed non-fusible heavy duty safety switches, 3-pole, 480V AC, 60A set 12.00
3- Enclosed non-fusible heavy duty safety switches, 3-pole, 480V AC, 100A set 20.00
4- Enclosed non-fusible heavy duty safety switches, 3-pole, 480V AC, 200A set 6.00
5- Enclosed non-fusible heavy duty safety switches, 3-pole, 480V AC, 300A set 3.00
Sub-Total 2
3 Power supply of Ancillaries and outdoor lighting
3.1 Power supply of Ancillaries
Ref: A350-7-EA-2-0001
3.1.1 - Earthwork
1- Excavation cum 1,769.51
2- Sand backfilling cum 272.17
3- Soil backfilling cum 1,162.56
4- Compacted k=0.90 sqm 1,649.32
5- Clearing and disposing of excavated earth cum 334.78
3.1.2 Manhole
- Mass concrete cum 10.36
- Concrete cum 45.37
- Shuttering for concrete sqm 568.35
- Steel L50x50 kg 248.47
3.1.3 Cover of manhole
- Concrete cum 3.76
- Shuttering for concrete sqm 14.93
3.1.4 Foundation of Distribution panel
- Mass concrete cum 6.62
- Concrete cum 23.29
- Shuttering for concrete sqm 170.20
Reinforcement kg 4,916.76
3.1.5 DB 70 -Site lighting and utilities board, Enclose IP54, 415/230V,65 KA 50Hz set 1.00
Ref: A350-7-EA-2-0001
1- MCCB 3P 1000A - 1 each
2- MCCB 3P 500A - 1 each
3- MCCB 3P 175A - 2 each
4- MCCB 3P 100A - 1 each
5- MCCB 3P 63A - 1 each
-6 MCB 3P 40A - 1 each
7- MCB 2P 16A - 1 each
9- Busbar copper 400 V, 50 HZ , 3~PH, 1000A , 65KA, hard drawn copper busbars - 1 each

Subject: Detail Abstract of Cost


Page - 373/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
10- Measuring devices cell (A&V) - 1 each
3.1.6 DB 701 -Site lighting and utilities board, IP54 Waterproof, Atex, Installation outdoor,230V 50Hz set 1.00
Ref: A350-7-EA-2-0001
1- MCCB 3P 100A - 1 each
2- MCB 3P 50A- 1 each
3- MCB 3P 30A- 2 each
4- MCB 3P 20A- 2 each
5- MCB 2P 16A- 1 each
6- Busbar copper 400 V, 50 HZ , 3~PH, 600A , 65KA, hard drawn copper busbars - 1 each
7- Measuring devices cell (A&V) - 1 each
3.1.7 DB 702 -Site lighting and utilities board,IP54 Waterproof, Atex, Installation outdoor,230V 50Hz set 1.00
Ref: A350-7-EA-2-0001
1- MCCB 3P 500A- 1 each
2- MCCB 3P 120A- 1 each
3- MCCB 3P 100A- 1 each
4- MCCB 3P 75A- 1 each
5- MCCB 3P 63A- 2 each
6- MCB 3P 50A- 2 each
7- MCB 3P 40A- 1 each
8- MCB 3P 32A- 1 each
9- MCB 3P 25A- 2 each
10- MCB 3P 20A- 1 each
11- MCB 2P 16A- 1 each
12- Busbar copper 400 V, 50 HZ , 3~PH, 600A , 65KA, hard drawn copper busbars - 1 each
13- Measuring devices cell (A&V) - 1 each
3.1.8 DB 703 -Site lighting and utilities board, IP54 Waterproof, Atex, Installation outdoor,230V 50Hz set 1.00
Ref: A350-7-EA-2-0001
1- MCCB 3P 175A- 1 each
2- MCCB 3P 120A- 1 each
3- MCB 3P 25A- 2 each
4- MCB 3P 20A- 1 each
5- Busbar copper 400 V, 50 HZ , 3~PH, 600A , 65KA, hard drawn copper busbars - 1 each
6- Measuring devices cell (A&V) - 1 each
3.1.9 DB 703.1 -Site lighting and utilities board,IP54 Waterproof, Atex, Installation outdoor,230V 50Hz set 1.00
Ref: A350-7-EA-2-0001
1- MCCB 3P 120A- 1 each
2- MCB 3P 40A- 2 each
3-MCB 3P 25- 1 each

Subject: Detail Abstract of Cost


Page - 374/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
4- MCB 3P 20A- 1 each

Subject: Detail Abstract of Cost


Page - 375/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
5- MCB 2P 16A- 1 each
6- Busbar copper 400 V, 50 HZ , 3~PH, 600A , 65KA, hard drawn copper busbars - 1 each
7- Measuring devices cell (A&V) - 1 each
3.1.10 DB 704 -Site lighting and utilities board,IP54 Waterproof, Atex, Installation outdoor,230V 50Hz set 1.00
Ref: A350-7-EA-2-0001
1- MCCB 3P 100A- 1 each
2- MCB 3P 40A-1 each
2- MCB 3P 25A-1 each
2- MCB 3P 20A- 1 each
3- MCB 2P 25A- 1 each
4- Busbar copper 400 V, 50 HZ , 3~PH, 600A , 65KA, hard drawn copper busbars - 1 each
5- Measuring devices cell (A&V) - 1 each
Power cable supply from lighting panel to the Distibution panel . Include: laying, termination, cable
3.1.11
gland etc (All cable shall be RM cable)
1- 1Cx300 XLPE, PVC Sheathed, 0.6/1kv, Cu m 225.00
2 - 1Cx240 XLPE, PVC Sheathed, 0.6/1kv, Cu m 780.00
3- 1Cx150 XLPE, PVC Sheathed, 0.6/1kv, Cu m 150.00
4- 1Cx120 XLPE, PVC Sheathed, 0.6/1kv, Cu m 520.00
5- 1Cx35 XLPE, PVC Sheathed, 0.6/1kv, Cu m 555.00
6- 4Cx70 +35 XLPE, PVC Sheathed, 0.6/1kv, Cu m 185.00
7- 4Cx50 +25 XLPE, PVC Sheathed, 0.6/1kv, Cu m 185.00
8- 4Cx35+25 XLPE, PVC Sheathed, 0.6/1kv, Cu m 25.00
9- 4Cx25 +16 XLPE, PVC Sheathed, 0.6/1kv, Cu m 450.00
10- 5Cx16 XLPE, PVC Sheathed, 0.6/1kv, Cu m 1,015.00
11- 5Cx10 XLPE, PVC Sheathed, 0.6/1kv, Cu m 65.00
12 -5CX6 XLPE, PVC Sheathed, 0.6/1kv,Cu m 100.00
12- 5Cx4 XLPE, PVC Sheathed, 0.6/1kv, Cu m 135.00
13- 3CX6 XLPE,PVC Sheathed, 0.6/1kv, Cu m 150.00
14-3CX4 XLPE, PVC Sheathed, 0.6/1kv, Cu. 100.00
3.1.12 Other Accessories
- Pipe PVC D60 m 2,106.00
- Pipe PVC D100 m 1,477.00
- Pipe PVC D150 m 180.00
3.2 Outdoor lighting
Ref: A350-7-LA-2
3.2.1 Earthwork
1- Excavation Cum 2,028.04
2- Sand backfilling Cum 439.71
3- Earth backfilling Cum 599.46
4- Compacted k=0.95 sqm 2,240.51

Subject: Detail Abstract of Cost


Page - 376/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
5- Clearing and disposing of excavated earth Cum 988.87
3.2.2 Manhole
1- Mass concrete Cum 0.18
2- Reinforced cement concrete Cum 0.08
3- Form work for reinforced cement concrete sqm 4.32
4- Brick work Cum 0.11
5- Shape steel L50X50 kg 8.57
6- Cover of manhole
+ Reinforced concrete Cum 0.04
+ Form work for concrete sqm 0.22
+ Reinforcement kg 11.41
3.2.3 Lamp Post
1- Lamp Post Foundation
+ Mass concrete Cum 13.10
+ Reinforced cement oncrete Cum 47.14
+ Formwork sqm 267.54
2- Lamp Post, H8m, D250mm-90mm, thick. 3mm, Galvanized each 50.00
3.2.4 Steel work
1- Galvanized Plate 540x540x10 mm kg 1,899.92
2- Galvanized Bracing plate 200x145x10 mm kg 573.68
3- Galvanized Steel L50x50x5 mm kg 0.39
4- PVC Pipe D27 m 4,916.96
5- Galvanized Anchor bolt M24x800 mm each 252.00
5- Galvanized Bolt M6x30 kg 364.00
6- Galvanized Bolt M12x30 kg 91.00
3.2.5 Electrical accessaries
Ref: A350-7-LA-2
1- Paragon Lamp 220V each 86.00
2- MCB 2P x 16A each 132.00
3- MCB 4P x 20A each 12.00
4- MCCB 4P x 50A each 1.00
5- XLPE/PVC insulated & PVC sheathed, 0.6/1KV, Cu, multi - core 3 x 2.5 RM m 4,916.96
6- Distribution board (LO), IP54, 415/230 V, 50HZ each 1.00
7- Junction Box, Include terminal block, IP54 each 91.00
8- 5 KW on grid solar energy system for outdoor and bucket elevator tower top lighting system,
set 1.00
including all accessories with complete solar panels, inverter, cable, etc.
3.2.6 DB 71 -Site lighting and utilities board, Enclose IP54, 415/230V 50Hz set 1.00
Ref: A350-7-EA-2-0001, A350-7-EA-7-0002, A350-7-EA-14-0001
1- MCCB 3P 250A- 1 each
2- MCB 2P 32A- 19 each
3- MCB 2P 16A- 19 each

Subject: Detail Abstract of Cost


Page - 377/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
4- MCB 2P 10A- 59 each
5- Busbar copper 400 V, 50 HZ , 3~PH, 250A , 65KA, hard drawn copper busbars - 1 each
6- Measuring devices cell (A&V) - 1 each
Power cable supply from lighting panel to the Distibution panel (DB71). Include: laying,
3.2.7
termination, cable gland etc(All cable shall be RM cable)
- 3Cx6 XLPE, PVC Sheathed, 0.6/1kv, Cu m 1,400.00
- 3Cx4 XLPE, PVC Sheathed, 0.6/1kv, Cu m 3,400.00
- 3Cx2.5 XLPE, PVC Sheathed, 0.6/1kv, Cu m 3,700.00
3.2.8 Other Accessories
1- Lamp fixture 2 X 36 W each 543.00
2- Fluoresecent lamp 36 W each 1,086.00
3- Switch single key each 43.00
4- Socket 1 phase 16 A each 19.00
5- Socket 3 phases 32 A each 19.00
6- Airplane warning light (complete) each 1.00
7- Exit sign each 11.00
8- Directional exit sign each 60.00
9- Emergency light each 26.00
Sub-Total 3
4 Automation System
Ref: A350-4-EA-8-0001, A350-4-EA-8-0002, A350-4-EA-6-0002
Automation wire and Control Cable. Include laying, termination,Cable gland etc (All cable shall be
4.1
RM cable)
1- Control Cable NYY/XLPE, PVC Sheathed, 0.6/1KV, Cu 2G x 1mm2 m
2- Control Cable NYY/XLPE, PVC Sheathed, 0.6/1KV, Cu 3G x 1mm 2
m 10,500.00
3- Control Cable NYY/XLPE, PVC Sheathed, 0.6/1KV, Cu 4G x 1mm2 m 6,373.00
4- Control Cable NYY/XLPE, PVC Sheathed, 0.6/1KV, Cu 6G x 1mm 2
m 2,881.00
5- Control Cable NYY/XLPE, PVC Sheathed, 0.6/1KV, Cu 8G x 1mm2 m 2,362.00
6- Control Cable NYY/XLPE, PVC Sheathed, 0.6/1KV, Cu 10G x 1mm 2
m 6,743.00
7- Control Cable NYY/XLPE, PVC Sheathed, 0.6/1KV, Cu 14G x 1mm2 m 17,500.00
8- Control Cable NYY/XLPE, PVC Sheathed, 0.6/1KV, Cu 3Gx1mm2 ( Shield ) m 500.00
9- PROFIBUS DP cable m 700.00
10- Ethernet cable Cat 6 m 400.00
4.2 Hardware, Software & Trainning lot 1.00
4.2.1 Equipment inside Control Room
Ref: A350-7-EA-3-0001
1- Operator & Engineering station - 4 sets of PC & Monitor
2- Main fiber optic network station- 1 set
3- TFT screen (big size)- 1 set

Subject: Detail Abstract of Cost


Page - 378/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
4- Printer - 2 sets
5- Reporting machine - 1 set
6- PLC panel, Enclosure IP56, 230/24 V, 50HZ , IEC Standard - 1 set
Ref: A350-7-EA-3, A350-7-EA-6-0002,A350-7-EA-8-0001
Include:
- Total DigitalInput signals with MCC’s = 560 Signal +20% SPARE
- Total Digitaloutput signals with MCC’s = 145 Signal +20% SPARE
- Total Analog input signal with the field device = 8 Signal +20% SPARE
- Uninterruptible Power supply, UPS cabinet, IP56, 415/230 V, 50HZ -1 set
- Internet system devices - 1 set
- SCADA system, Full specification of the SCADA and the monitor graphical display in - 1set

Ref: A350-7-EA-6
- CCTV with required accessories, 20set camera, 1set desktop, Complete Package
4.2.2 Equipment outside control room
- Local Romote stations (remote I/O panels), IP66, 230/24 V, 50HZ - 9 set
Ref: A350-4-EA-3, A350-4-EA-6-0001,A350-4-EA-8-0001,A350-4-EA-6-0002,
Include:
1- No. of I/O signals for remote panel 1 Include 58 Signal +20% SPARE
2- No. of I/O signals for remote panel 2 Include 207 Signal +20% SPARE
3- No. of I/O signals for remote panel 3 Include 206 Signal +20% SPARE
4- No. of I/O signals for remote panel 4 Include 142 Signal +20% SPARE
5- No. of I/O signals for remote panel 5 Include 131 Signal +20% SPARE
6- No. of I/O signals for remote panel 6 Include 108 Signal +20% SPARE
7- No. of I/O signals for remote panel 7 Include 134 Signal +20% SPARE
8- No. of I/O signals for remote panel 8 Include 131 Signal +20% SPARE
9- No. of I/O signals for remote panel 9 Include 106 Signal +20% SPARE
Other Accessories
- High Level Switch, LSH, Sensor Specification Ref: LS001 - 4 Set
- High Level Switch, LSH, Sensor Specification Ref: LS002 - 18 Set
- High Level Switch, LSH, Sensor Specification Ref: LS003 - 30 Set
- Medium Level Switch, LSM, Sensor Specification Ref: LS001 - 2 set
- Low Level Switch, LSL, Sensor Specification Ref: LS001 - 22 Set
- Low Level Switch, LSL, Sensor Specification Ref: LS004 - 30 Set

- Sub-jucntion Box, IP66, Water Proof, include all the terminal, cable glamd and the support, size
220X17 mm - 220 set
- Sub-jucntion Box, IP66, Water Proof, include all the terminal, cable glamd and the support, size
150X110 mm - 400 set
- Local Control Box, IP66, Sheet steel clad powder coated (16 SWG), - 235 set
Each box Include:

Subject: Detail Abstract of Cost


Page - 379/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
1- Push button start
2- Push button stop
3- Key Switch 3 position ( Local, Remote, Out of order ) (L, R, O)
4- Pilot light head Green, Machine Available
5- Pilot light head Red, Machine Fault
6- Pilot light head yellow, Machine Running
7- Terminal
8- Stop Emergency
- All steel structure earthing system
Sub-Total 4
Cable Tray and Supporting System
5 All steel structure, fittings & fixtures and sheet shall be hot rolled pre-fabricated and hot deep
galvanized (EN ISO 14713:1999 C5 min 600 gm/sqm
5.1 Sub-Structure
5.1.1 Earth work
1- Excavation m3 31.20
2- Earth back filling m3 25.62
3- Clearing and disposing of excavated earth m3 5.58
5.1.2 Foundation
1- Mass concrete m3 0.87
2- Shuttering m2 8.64
3- Rebar kg 248.77
4- Concrete m3 4.71
5.2 Super-Structure
5.2.1 Galvanized Steel column
1- H300x200x10x12 kg 1,507.39
2- Tab (plate t=8mm) kg 30.17
3- Steel plate 350x250x16 kg 87.92
4- Steel plate 150x200x10 kg 18.84
5- Bolt M16x150 kg 26.40
6- Bolt M20x80 kg 6.59
7- Anchor bolt M20x700 ea 24.00
5.2.2 Galvanized Steel bracing column
1- V75x75x8 kg 132.99
2- Plate 100x429x16 kg 10.78
3- Bolt M14x80 kg 2.67
4- Bolt M20x80 kg 0.41
5.2.3 Galvanized Steel beam
1- H200x150x8x6 kg 1,984.86
2- End beam plate kg 120.58
3- Bolt M20x80 kg 6.59

Subject: Detail Abstract of Cost


Page - 380/405
Item: Electric and Automation System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
5.2.4 Galvanized Steel bracing beam
1- V75x75x8 kg 1,036.15
2- Plate 150x150x8 kg 101.74
3- Bolt M14x80 kg 36.67
5.2.5 Galvanized Grating
- Grating m2 28.17
5.3 Galvanized Cable tray
Ref: A350-7-EA-10
1- Cable tray Type "A" (200 mm) m 1,200.00
2- Cable tray Type "B" (400 mm) m 400.00
3- Cable tray Type "C" (600 mm) m 600.00
4- Cable tray Type "D" (100 mm) m 1,700.00
Sub-Total 5
6 Earthing System
Ref: A350-7-EA-11
1. Boring, 3.5m depth set 65.00
2. GI pipe D25.4 mm, 2m. set 65.00
3.Copper grounding rod, length 3 m, ɸ16 set 65.00
4.Cable, copper- 70mm2 m 800.00
5. Cable, coper- 100mm2 m 2,300.00
Sub-Total 6
TOTAL

Subject: Detail Abstract of Cost


Page - 381/405
Item: Electric and Automation System
DETAIL BOQ of Mechanical Works
Project: Modern Food Storage Facilities_ MFSP
Location: Chattagram
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Equipment System

Item Unit Rates Amounts


Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
Supply, installation and commissioning of equipment
All steel structure, fittings & fixtures and sheet shall be hot rolled pre-
1
fabricated and hot deep galvanized (EN ISO 14713:1999 C5, ASTM A
653/ A653M/EN ISO 1461, min 600 gm/sqm
1.1 Reception System
1.1.1 - Weight bridge WB701 Galvanized 60 T set 1.00
1.1.2 - Ship Unloader SU701 & SU702 Painted 300 T/H set 2.00
1.1.3 - Belt conveyor BC701 with 1 inlets 1 outlet length 361 m (D = 4,4 m) Galvanized 600 T/H set 1.00
1.1.4 - Filter F701 with fan FA701 on belt conveyor BC701 Galvanized For BC701 600T/H set 1.00
1.1.5 - Belt conveyor BC702 with 1 inlets 1 outlet length 218 m (D = 2,7 m) Galvanized 600 T/H set 1.00
1.1.6 - Filter F702 with fan FA702 on belt conveyor BC702 Galvanized For BC702 600T/H set 1.00
1.1.7 - Belt conveyor BC703 with 1 inlets 1 outlet length 59 m (D = 8 m) Galvanized 600 T/H set 1.00
1.1.8 - Filter F703 with fan FA703 on belt conveyor BC703 Galvanized For BC703 600T/H set 1.00
1.1.9 - Belt conveyor BC704 with 1 inlets 1 outlet length 43.2 m (D = 6 m) Galvanized 600 T/H set 1.00
1.1.10 - Filter F704 with fan FA704 on belt conveyor BC704 Galvanized For BC704 600T/H set 1.00
1.1.11 - Filter F705 with fan FA705 on bin H701 Galvanized For H701 3.75T set 1.00
1.1.12 - Manual slide gate SG-MG701 & SG-MG702 beneath bin H701 Galvanized 300 T/H set 2.00
1.1.13 - Pneumatic slide gate PV-MG701 & PV-MG702 beneath bin H701 Galvanized 300 T/H set 2.00
1.1.14 - DRUM MAGNETIC MG701 & MG702 with frame and hoppers SS304L 300 T/H set 2.00
- Pneumatic slide gate PV-E7021 & PV-E7011 at outlet magnetics
1.1.15 Galvanized 600 T/H set 2.00
MG701&702
1.2 Pre-Cleaning System
1.2.1 - Pneumatic slide gate PV-E7012 on bucket elevator E701 Galvanized 600 T/H set 1.00
1.2.2 - Bucket elevator E701 with vent height 42,1 m Galvanized 600 T/H set 1.00
1.2.4 - Filter F706 with fan FA706 on bucket elevator E701 Galvanized For E701 600T/H set 1.00
- Pneumatic slide gate PV-E7022 & PV-E7025 on bucket elevator
1.2.5 Galvanized 600 T/H set 2.00
E702
1.2.6 - Bucket elevator E702 with vent height 55,1 m Galvanized 600 T/H set 1.00
1.2.8 - Filter F707 with fan FA707 on bucket elevator E702 Galvanized For E702 600T/H set 1.00
- Pneumatic slide gate PV-CC7051 & PV-H7021 at outlet bucket
1.2.9 Galvanized 600 T/H set 2.00
elevator E702
- Pneumatic slide gate PV-H7022 & PV-CC7012 under pneumatic slide
1.2.10 Galvanized 600 T/H set 2.00
PV-H7021

Subject: Detail BOQ of Mechanical Works


Page - 381/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
- Pneumatic slide gate PV-H7023 & PV-H706 under pneumatic slide
1.2.11 Galvanized 600 T/H set 2.00
PV-H7022
1.2.12 - Filter F708 with fan FA708 on bin H702 Galvanized For H702 set 1.00
1.2.13 - Filter F709 with fan FA709 on weight scale WS701 Galvanized For AL701 10m3/h set 1.00
1.2.14 - Airlock AL701 beneath filter F-AL701 Painted 10m3/h set 1.00
1.2.15 - Manual slide gate SG-H704 beneath bin H703 Galvanized 600 T/H set 1.00
1.2.16 - Pneumatic slide gate PV-H7041 beneath bin H703 Galvanized 600 T/H set 1.00
- Pneumatic slide gate PV-WC701 & PV-H7042 under pneumatic slide
1.2.17 Galvanized 600 T/H set 2.00
PV-H7041
- Pneumatic slide gate PV-H7043 & PV-E7023 under pneumatic slide
1.2.18 Galvanized 600 T/H set 2.00
PV-H7042
1.2.19 - Manual slide gate SG-DS701 & SG-DS702 beneath bin H704 Galvanized 300 T/H set 2.00
1.2.20 - Pneumatic slide gate PV-DS701 & PV-DS702 beneath bin H704 Galvanized 300 T/H set 2.00
- DRUM SIEVE DS701 & DS702 with 2 outlets (coarse wastes good
1.2.21 Painted 300 T/H set 2.00
product)
- Pneumatic slide gate PV-E7024 & PV-E7031 at outlet drum sieve
1.2.22 Galvanized 600 T/H set 2.00
DS701&702
- Manual air valve AV-H7021 & AV-H7022 between bin H703 and
Galvanized 9600m3/h set 2.00
weight scale WS701
1.3 Silage cells (Silo Loading System)
- Temperature monitoring system TT-S701 to TT-S709 for Steel Silo
1.3.1 set 9.00
12700T
1.2.3 - Chiller for Steel Silo CH701 to CH716 Painted 12 T/H set 16.00
1.3.1 - Steel Silo (Metalic Cell) S701 to S709 Galvanized 12,700 T set 9.00
Include:
+ 32 Ring Commercial Silo
+ Inside Wall Ladder
+ Outside Ladder w/Safety Cage & Platforms
+ Flush-Floor Aeration System
+ Roof Stair
+ Handrail
+ Grain Monitoring System
+ High Level Bindicator
+ Nitrogen fumigation with all devices and network
+ Silo Base Sealing
1.3.1 - Pneumatic slide gate PV-E7032 on bucket elevator E703 Galvanized 600 T/H set 1.00
1.3.2 - Bucket elevator E703 with vent height 55,1 m Galvanized 600 T/H set 1.00
- Filter F710 with fan FA710 on bucket elevator E703 Galvanized For E703 600T/H set 1.00
- Pneumatic slide gate PV-CC7013 & PV-CC7052 at outlet bucket
Galvanized 600 T/H set 2.00
elevator E703
- Chain conveyor CC701 with 2 outlets - length 24 m Galvanized 600 T/H set 1.00
- Filter F711 with fan FA711 on chain conveyor CC701 Galvanized For CC701 600T/H set 1.00
- Pneumatic slide gate PV-S701 & PV-CC702 beneath CC701 Galvanized 600 T/H set 2.00
- Chain conveyor CC702 with 2 outlets - length 58 m Galvanized 600 T/H set 1.00
- Filter F712 with fan FA712 on chain conveyor CC702 Galvanized For CC702 600T/H set 1.00
- Pneumatic slide gate PV-S702 & PV-S703 beneath CC702 Galvanized 600 T/H set 2.00

Subject: Detail BOQ of Mechanical Works


Page - 382/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
- Chain conveyor CC705 with 2 outlets - length 38 m Galvanized 600 T/H set 1.00
- Filter F715 with fan FA715 on chain conveyor CC705 Galvanized For CC705 600T/H set 1.00

Subject: Detail BOQ of Mechanical Works


Page - 383/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
- Pneumatic slide gate PV-CC706 & PV-CC710 beneath CC705 Galvanized 600 T/H set 2.00
- Chain conveyor CC706 with 2 outlets - length 24 m Galvanized 600 T/H set 1.00
- Filter F716 with fan FA716 on chain conveyor CC706 Galvanized For CC706 600T/H set 1.00
- Pneumatic slide gate PV-S704 & PV-CC707 beneath CC706 Galvanized 600 T/H set 2.00
- Chain conveyor CC707 with 2 outlets - length 58 m Galvanized 600 T/H set 1.00
- Filter F717 with fan FA717 on chain conveyor CC707 Galvanized For CC707 600T/H set 1.00
- Pneumatic slide gate PV-S705 & PV-S706 beneath CC707 Galvanized 600 T/H set 2.00
- Chain conveyor CC710 - length 29 m Galvanized 600 T/H set 1.00
- Filter F720 with fan FA720 on chain conveyor CC710 Galvanized For CC710 600T/H set 1.00
- Chain conveyor CC711 with 2 outlets - length 24 m Galvanized 600 T/H set 1.00
- Filter F721 with fan FA721 on chain conveyor CC711 Galvanized For CC711 600T/H set 1.00
- Pneumatic slide gate PV-S707 & PV-CC712 beneath CC711 Galvanized 600 T/H set 2.00
- Chain conveyor CC712 with 2 outlets - length 58 m Galvanized 600 T/H set 1.00
- Filter F722 with fan FA722 on chain conveyor CC712 Galvanized For CC712 600T/H set 1.00
- Pneumatic slide gate PV-S708 & PV-S709 beneath CC712 Galvanized 600 T/H set 2.00
1.4 Reclaiming system (Silo unloading system)
- Manual slide gate SG-CC703A1 beneath S703 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC7031 beneath S703 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC703A2 to SG-CC703A9 beneath S703 Galvanized 100 T/H set 8.00
- Manual slide gate SG-CC703B1 beneath S702 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC7032 beneath S702 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC703B2 to SG-CC703B9 beneath S702 Galvanized 100 T/H set 8.00
- Chain conveyor CC703 - length 54,14 m Galvanized 300 T/H set 1.00
- Filter F713 with fan FA713 on chain conveyor CC703 Galvanized For CC703 300T/H set 1.00
- Manual slide gate SG-CC704A1 beneath S701 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC704 beneath S701 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC704A2 to SG-CC704A9 beneath S701 Galvanized 100 T/H set 8.00
- Chain conveyor CC704 - length 39,4 m Galvanized 300 T/H set 1.00
- Filter F714 with fan FA714 on chain conveyor CC704 Galvanized For CC704 300T/H set 1.00
- Pneumatic slide gate PV-E7043 & PV-E7026 at outlet chain conveyor
Galvanized 300 T/H set 2.00
CC704
- Manual slide gate SG-CC708A1 beneath S706 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC7081 beneath S706 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC708A2 to SG-CC708A9 beneath S706 Galvanized 100 T/H set 8.00
- Manual slide gate SG-CC708B1 beneath S705 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC7082 beneath S705 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC708B2 to SG-CC708B9 beneath S705 Galvanized 100 T/H set 8.00
- Chain conveyor CC708 - length 54,14 m Galvanized 300 T/H set 1.00
- Filter F718 with fan FA718 on chain conveyor CC708 Galvanized For CC708 300T/H set 1.00
- Manual slide gate SG-CC709A1 beneath S704 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC709 beneath S704 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC709A2 to SG-CC709A9 beneath S704 Galvanized 100 T/H set 8.00

Subject: Detail BOQ of Mechanical Works


Page - 384/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
- Chain conveyor CC709 with 2 outlets - length 42,29 m Galvanized 300 T/H set 1.00
- Filter F719 with fan FA719 on chain conveyor CC709 Galvanized For CC709 300T/H set 1.00
- Pneumatic slide gate PV-CC716 & PV-CC717 beneath CC709 Galvanized 300 T/H set 2.00
- Chain conveyor CC717 - length 28,5 m Galvanized 300 T/H set 1.00
Filter F727 with fan FA727 on chain conveyor CC717 Galvanized For CC717 300T/H set 1.00
- Pneumatic slide gate PV-E7042 & PV-E7028 at outlet chain conveyor
Galvanized 300 T/H set 2.00
CC717
- Manual slide gate SG-CC713A1 beneath S709 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC7131 beneath S709 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC713A2 to SG-CC713A9 beneath S709 Galvanized 100 T/H set 8.00
- Manual slide gate SG-CC713B1 beneath S708 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC7132 beneath S708 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC713B2 to SG-CC713B9 beneath S708 Galvanized 100 T/H set 8.00
- Chain conveyor CC713 - length 54,14 m Galvanized 300 T/H set 1.00
- Filter F723 with fan FA723 on chain conveyor CC713 Galvanized For CC713 300T/H set 1.00
- Manual slide gate SG-CC714A1 beneath S707 Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-CC714 beneath S707 Galvanized 300 T/H set 1.00
- Manual slide gate SG-CC714A2 to SG-CC714A9 beneath S707 Galvanized 100 T/H set 8.00
- Chain conveyor CC714 - length 40,4 m Galvanized 300 T/H set 1.00
- Filter F724 with fan FA724 on chain conveyor CC714 Galvanized For CC714 300T/H set 1.00
- Chain conveyor CC715 - length 31,44 m Galvanized 300 T/H set 1.00
- Filter F725 with fan FA725 on chain conveyor CC715 Galvanized For CC715 300T/H set 1.00
- Chain conveyor CC716 - length 30,44 m Galvanized 300 T/H set 1.00
- Filter F726 with fan FA726 on chain conveyor CC716 Galvanized For CC716 300T/H set 1.00
- Pneumatic slide gate PV-E7041 & PV-E7027 at outlet chain conveyor
Galvanized 300 T/H set 1.00
CC716
1.5 Process
1.5.1 - Sweeping screw SS701 to SS709 Painted 300 T/H set 9.00
1.1.2 - Weighing Scale WS701 Painted 600 T/H set 1.00
1.1.2 - Weighing Scale WS702 Painted 300 T/H set 1.00
1.1.2 - Weighing Scale WS703 Painted 100 T/H set 1.00
1.4.2 - Bagging Machine BS701 to BS702 Painted 25 T/H set 2.00
1.4.2 - Bagging Machine BS703 to BS706 Painted 50 T/H set 4.00
- Pneumatic slide gate PV-E7044 on bucket elevator E704 Galvanized 300 T/H set 1.00
- Bucket elevator E704 with vent height 41,65 m Galvanized 300 T/H set 1.00
- Filter F728 with fan FA728 on bucket elevator E704 Galvanized For E704 300T/H set 1.00
- Pneumatic slide gate PV-PC701 & PV-CC7181 at outlet bucket
Galvanized 300 T/H set 1.00
elevator E704
- PRE CLEANER PC701 with 3 outlets (coarse wastes - light wastes -
Painted 300 T/H set 1.00
good product) + filter F742 with fan FA742
- Pneumatic slide gate PV-E7029 & PV-CC7182 at outlet pre cleaner
Galvanized 300 T/H set 1.00
PC701
- Chain conveyor CC718 - length 43,7 m Galvanized 300 T/H set 1.00
- Filter F729 with fan FA729 on chain conveyor CC718 Galvanized For CC718 300T/H set 1.00
- Pneumatic slide gate PV-CC721A beneath H708 Galvanized 200 T/H set 1.00

Subject: Detail BOQ of Mechanical Works


Page - 385/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
- Chain conveyor CC721A - length 45,8 m Galvanized 200 T/H set 1.00
- Filter F731A with fan FA731A on chain conveyor CC721A Galvanized For CC721A 200T/H set 1.00
- Chain conveyor CC721B - length 45,8 m Galvanized 200 T/H set 1.00
- Filter F731B with fan FA731B on chain conveyor CC721B Galvanized For CC721B 200T/H set 1.00
- Chain conveyor CC723 with 4 outlets - length 44,27 m Galvanized 200 T/H set 1.00
- Filter F732 with fan FA732 on chain conveyor CC723 Galvanized For CC723 200T/H set 1.00
- Pneumatic slide gate PV-H710 to PV-H713 beneath CC723 Galvanized 200 T/H set 4.00
- Manual slide gate SG-BS703 to SG-BS706 beneath bin H710 to H713 Galvanized 50 T/H set 4.00
- Pneumatic slide gate PV-BS703 to PV-BS706 beneath bin H710 to
Galvanized 50 T/H set 4.00
H713
- Pneumatic slide gate PV-CC719A beneath H708 Galvanized 100 T/H set 1.00
- Chain conveyor CC719A - length 45,8 m Galvanized 100 T/H set 1.00
- Filter F733A with fan FA733A on chain conveyor CC719A Galvanized For CC719A 100T/H set 1.00
- Chain conveyor CC719B - length 45,8 m Galvanized 100 T/H set 1.00
- Filter F733B with fan FA733B on chain conveyor CC719B Galvanized For CC719B 100T/H set 1.00
- Chain conveyor CC720 with 3 outlets - length 54,86 m Galvanized 100 T/H set 1.00
- Filter F734 with fan FA734 on chain conveyor CC720 Galvanized For CC720 100T/H set 1.00
- Pneumatic slide gate PV-H709A to PV-H709C beneath CC720 Galvanized 100 T/H set 3.00
- Manual slide gate SG-BS701 to SG-BS702 beneath bin H709B to
Galvanized 25 T/H set 2.00
H709C
- Pneumatic slide gate PV-BS701 to PV-BS702 beneath bin H709B to
Galvanized 25 T/H set 2.00
H709C
- Manual slide gate SG-WS703 beneath bin H709A Galvanized 100 T/H set 1.00
- Pneumatic slide gate PV-WS703 beneath bin H709A Galvanized 100 T/H set 1.00
- Filter F735 with fan FA735 on weight scale WS703 Galvanized For AL703 10m3/h set 1.00
- Airlock AL703 beneath filter F-AL703 SS304L 10 m3/h set 1.00
- Manual air valve AV-H709A1 & AV-H709A2 between bin H714 and
Galvanized 1920m3/h set 2.00
weight scale WS703
- Filter F736 with fan FA736 on bin H706 Galvanized For H706 set 1.00
- Filter F737 with fan FA737 on weight scale WS702 Galvanized For AL702 10m3/h set 1.00
- Airlock AL702 beneath filter F-AL702 SS304L 10 m3/h set 1.00
- Manual air valve AV-H7061 & AV-H7062 between bin H707 and
Galvanized 4800m3/h set 2.00
weight scale WS702
- Manual slide gate SG-CC724 beneath bin H707 Galvanized 300 T/H set 1.00
- Pneumatic slide gate PV-CC7241 beneath bin H707 Galvanized 300 T/H set 1.00
- Pneumatic slide gate PV-WC702 & PV-CC7242 under pneumatic
Galvanized 300 T/H set 1.00
slide PV-CC7241
- Digital Platform Scale MS701 to MS706 Galvanized 0-500kgs set 6.00
1.6 Waste circuit
- Screw Conveyor SC701 - length 6 m Galvanized 10 T/H set 1.00
- Hydraulic screw extractor Painted 10 T/H set 1.00
- Pneumatic slide gate PV-SE701 beneath bin H705 Galvanized 10 T/H set 1.00
- Screw Conveyor SC702 - length 10 m Galvanized 10 T/H set 1.00

Subject: Detail BOQ of Mechanical Works


Page - 386/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
1.7 Expedition (Delevery)
- Chain conveyor CC722A - length 14,64 m Galvanized 100 T/H set 1.00
- Filter F738A with fan FA738A on chain conveyor CC722A Galvanized For CC722A 100T/H set 1.00
- Chain conveyor CC722B with 4 outlets - length 12,7 m Galvanized 100 T/H set 1.00
- Filter F738B with fan FA738B on chain conveyor CC722B Galvanized For CC722B 100T/H set 1.00
- Pneumatic slide gate PV-BW7011 to PV-BW7013 beneath CC722B Galvanized 100 T/H set 3.00
- Chain conveyor CC724 - length 43,7 m Galvanized 300 T/H set 1.00
- Filter F739 with fan FA739 on belt conveyor CC724 Galvanized For CC724 300T/H set 1.00
- Belt conveyor BC706 with 1 inlets 1 outlet length 56 m Galvanized 300 T/H set 1.00
- Filter F740 with fan FA740 on belt conveyor BC706 Galvanized For BC706 300T/H set 1.00
- Belt conveyor BC707 with 1 inlets 1 outlet length 245 m (D = 5 m) Galvanized 300 T/H set 1.00
- Filter F741 with fan FA741 on belt conveyor BC707 Galvanized For BC707 300T/H set 1.00
- Bulk ship loader BL701 Galvanized 300 T/H set 1.00
- Belt Conveyor BC712 - length 3.5m Galvanized 25 T/h set 1.00
- Belt Conveyor BC713 - length 3.5m Galvanized 25 T/h set 1.00
- Belt Conveyor BC714 - length 40.5m Galvanized 50 T/h set 1.00
- Belt Conveyor BC715A - length 2m Galvanized 50 T/h set 1.00
- Belt Conveyor BC715B - length 2m Galvanized 50 T/h set 1.00
- Belt Conveyor BC715C - length 2m Galvanized 50 T/h set 1.00
- Belt Conveyor BC715D - length 2m Galvanized 50 T/h set 1.00
- Belt Conveyor BC708 - length 4.2m Galvanized 50 T/h set 1.00
- Belt Conveyor BC709 - length 4.2m Galvanized 50 T/h set 1.00
- Belt Conveyor BC710 - length 4.2m Galvanized 50 T/h set 1.00
- Belt Conveyor BC711 - length 4.2m Galvanized 50 T/h set 1.00
1.8 Laboratory Equipment
- Wheat Pearler set 1.00
- Laboratory Aspirator for foreign materials set 1.00
- Multi-sieve semi-automatic cleaner / separator set 1.00
- Automatic grain analyzer set 1.00
- Falling number analyzer set 1.00
- Aflatoxin analyzer set 1.00
- Radioactivity tester set 1.00
- Electronic precision balance 1000kg set 1.00
- Set of manual probes set 1.00
- Set of aluminum scoop set 1.00
- Set of sieves set 1.00
- Furniture and accessaries set 1.00
1.9 Workshop equipment and Tool
- Hot vulcanizing machine for 1000mm wide fabric ply belts, 22
degrees bias, 6 Bar, plate size 1118x1194 mm.
1.7.1 set 1.00
Maximum belt width 1000mm, Fabric ply, EP1600 Max.
Total weight 877Kg

Subject: Detail BOQ of Mechanical Works


Page - 387/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
- Cooling system, portable, stainless steel.
1.7.2 Holds 20 litres and will cool down the splice to 50 Degrees Celsius in set 1.00
less than 15 minutes.
- Compressor, lightweight for pressurizing the airbag and cooling
1.7.3 system. Maximum 8 Kg/cm2 pressure. set 1.00
Weight 20 Kg
- Mark I belt clamps for belt up to 1200mm width
Maximum belt width: 1200mm
1.7.4 Force per clamp: 1.5 Tonnes set 1.00
Total clamp fore: 3 Tonnes (3-1 safety factor)
1 set=4 bars & 4 clamps
1.7.5 - Fabric Splicing Toolkit set 1.00
- Heavy Duty Lathe Machine, size: 12' - 0''. Complete with all standard
1.7.6 set 1.00
accessories.
- Heavy Duty Lathe Machine, size: 6' - 0''. Complete with all standard
1.7.7 set 1.00
accessories.
- Heavy Duty Drill Machine, size: 40mm. Complete with all standard
1.7.8 set 1.00
accessories.
1.7.9 - Shaping Machine, size: 24''. Complete with all standard accessories. set 1.00
- Mechanical Sheraring Machine, size: 24''
1.7.10 set 1.00
Complete with all standard accessories.
1.7.11 - AC Arc Welding Machine, size: BX1-400 (400 A) each 1.00
1.7.12 - DC Arc Welding Machine, size: 200 A each 1.00
1.7.13 - Welding Cable, 35 mm2, Copper feet 100.00
1.7.14 - Welding Cable, 70 mm2, Copper feet 100.00
1.7.15 - Welding Holder, 300 A each 1.00
1.7.16 - Bench Grinder, 200mm each 1.00
- Power Hack Saw, size: 14'' Blade. Complete with all standard
1.7.17 set 1.00
accessories.
1.7.18 - Power Disc Cutter, 14'' Blade each 1.00
1.7.19 - Manual chain block with manual trolley
+ Manual chain block with manual trolley, 1ton & 10m lifting height Galvanized 1 ton, 10m lifting height set 5.00

+ Manual chain block with manual trolley Galvanized 3 ton, 10m lifting height set 5.00

+ Manual chain block with manual trolley Galvanized 5 ton, 10m lifting height set 2.00

- Monorail Hoist
Capacity: 4 tons
1.7.20 Lifting height: 65m Galvanized set 1.00
Monorail: 6m
Control: Radio remote 100m

Subject: Detail BOQ of Mechanical Works


Page - 388/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
- Electric winch
1.7.21 Capacity 3 tons with 90m wire length with pulley set & frame for Galvanized set 1.00
anchoring
- Grip hoist.
1.7.22 Galvanized set 1.00
Capacity 3 tons with 50m wire length
Sub-Total 1
Others Equipment
2
Supply, installation and commissioning of other equipment.
Steel buffer Bin:
2.1
Steel E360C, ASTM A284, grade C, D. All painted in factory
2.2.1 - Painted steel Bin H701 3.75 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.2 - Painted steel Bin H702 20 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.3 - Painted steel Bin H703 4.5 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14

Subject: Detail BOQ of Mechanical Works


Page - 389/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
b) Painted Steel plate
2.2.4 - Painted steel Bin H704 7T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.5 - Painted steel Bin H706 10 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.6 - Painted steel Bin H707 3.75 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.7 - Painted steel Bin H708 3.75 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin

Subject: Detail BOQ of Mechanical Works


Page - 390/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.8 - Painted steel Bin H709B 25 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.9 - Painted steel Bin H709C 25 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.10 - Painted steel Bin H709A/H710/H711/H712/H713 50 T set 5.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.11 - Painted steel Bin H714 0.5 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100

Subject: Detail BOQ of Mechanical Works


Page - 391/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
2.2.12 - Painted steel Dust Bin DB701 41 T set 1.00
1 - Painted Steel plate
2 - Painted Bin Support Structure
3 - Galvanized Bolts M22 L100
4 - Manhole
a) Galvanized Bolts M14
b) Painted Steel plate
5 - Painted Top buffer bin
6 - Painted Stiffenner around Bin
7 - Inspection Hhole
a) Galvanized Bolts M14
b) Painted Steel plate
Galvanized Spouting:
2.3 Galvanized coating conforms to EN ISO 14713:1999 C5, ASTM
A653/A653 M/EN 1461 for zinc coated steel minimum 600 gm/m2
Supply galvanized steel pipe with hopper, flange, elbow Liner (all
UHMW PE1000) and all accessaries
2.3.1 Square Steel Pipe 500x500mm
a) Galvanized Steel Pipe kg 4,144.80
2.3.2 Square Steel Pipe 450x450mm
a) Galvanized Steel Pipe kg 42.39
2.3.3 Square Steel Pipe 400x400mm
a) Galvanized Steel Pipe kg 1,846.32
2.3.4 Square Steel Pipe 350x350mm
a) Galvanized Steel Pipe kg 230.79
2.3.5 Square Steel Pipe 300x300mm
a) Galvanized Steel Pipe kg 56.52
2.3.6 Circular Steel Pipe D406mm
a) Galvanized Steel Pipe kg 180.13
2.3.7 Circular Steel Pipe D324mm
a) Galvanized Steel Pipe kg 167.71
Slide/ Toboggan-
2.4
Stainless steel with all accessories and supports, Thickness 6mm steel

Straight steel slide


2.4.1 each 4.00
0.6m width, 3m height, 5.11m length

Subject: Detail BOQ of Mechanical Works


Page - 392/405
Item: Equipment System
Item Unit Rates Amounts
Description of Work Coating Capacity Unit Q'ty
No In Figure In Word In Figure
Circular steel slide
2.4.2 each 4.00
0.6m width, 0.5m height, 1m length
Sub-Total 2
3 Others Cost
3.1 Local Transportation
a) Containner 20 feet each 110.00
b) Containner 40 feet each
3.2 Installation Cost
a) Labor cost lot 1.00
b) Supervision cost lot 1.00
Sub-Total 3
TOTAL

Subject: Detail BOQ of Mechanical Works


Page - 393/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 394/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 395/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 396/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 397/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 398/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 399/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 400/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 401/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 402/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 403/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 404/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 405/405
Item: Equipment System
Amounts
In Word

Subject: Detail BOQ of Mechanical Works


Page - 406/405
Item: Equipment System
DETAIL BOQ of Compressed Air System
Project: Modern Food Storage Facilities_ MFSP
Location: Chittagong
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Compressed Air System

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
A350-7-UT-1-0002-0013
1 Air Compressor
1.1 Air Compressor machine (100 Kw) 1000 m3/h set 2.00
1.2 Air Fillter and Air Dryer machine 1300 m3/h set 1.00
1.3 Compressed Air Vessel 3-4 m3 set 1.00
2 Galvanized Steel Pipe
2.1 Galvanized steel pipe D50mm m 160.00
2.2 Galvanized steel pipe D40mm m 725.00
2.3 Galvanized steel pipe D25mm m 966.00
2.4 Galvanized steel pipe D15mm m 272.00
3 Ball Valve
3.1 Valve D50mm each 4.00
3.2 Valve D40mm each 4.00
3.3 Valve D25mm each 10.00
3.4 Valve D15mm each 394.00
4 Connector
4.1 Connector D50mm each 25.00
4.2 Connector D40mm each 110.00
4.3 Connector D25mm each 105.00
4.4 Connector D20mm each 270.00
4.5 Connector D15mm each 25.00
5 Elbow
5.1 Elbow D50mm each 15.00
5.2 Elbow D40mm each 30.00
5.3 Elbow D25mm each 70.00
5.4 Elbow D20mm each 80.00
5.5 Elbow D15mm each 40.00

Subject: Detail BOQ of Compressed Air System


Page - 393/405
Item: Compressed Air System
Item Unit Rates Amounts
Description of Work Unit Quantity
No In Figure In Word In Figure In Word
6 TEE
6.1 TEE D50mm each 10.00
6.2 TEE D40mm each 40.00
6.3 TEE D25mm each 70.00
6.4 TEE D20mm each 100.00
6.5 TEE D15mm each 50.00
7 Reducer
7.1 Reducer D50 / 40mm each 20.00
7.2 Reducer D40 / 25mm each 40.00
7.3 Reducer D25 / 20mm each 70.00
7.4 Reducer D20 / 15mm each 100.00
Compressor room: Brick made room inside the Bagging house or
7.5 Bulk truck receiving house ( depending on compressor supplied) each 1.00

Sub-Total material
Labor cost for installation lot 1.00

Subject: Detail BOQ of Compressed Air System


Page - 394/405
Item: Compressed Air System
DETAIL BOQ of Fire - Fighting System
Project: Modern Food Storage Facilities_ MFSP
Location: Chittagong
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Fire-Fighting System
Unit Rates Amounts
Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
A350-7-UT-4-0002-0018
1 Auto-fire Alarm System
1.1 Fire bell each 40.00
1.2 Fire button each 40.00
1.3 Smoke sensor each 280.00
1.4 Temperature sensor each 150.00
1.5 Exit lamp each 73.00
1.6 Emergency lamp each 78.00
1.7 Cable 2c x1,5 mm m 6,217.00
1.8 Cable 4c x1,5 mm m 5,936.00
1.9 PVC pipe D20 m 1,850.00
Sub-Total 1
2 Water Fire-Fighting system
2.1 Diesel Fire - Pump set 1.00
Include:
- Diezen Fire - Pump (Q=65m3/h; H=110m) - 02 each
- Jockey Fire - Pump (Q=7m3/h; H=110m) - 01 set
- Gate Valve - Suction Line - 02 No
- Non Return Valve - 02 No
- Gate Valve - Discharge Header - 01 No
- Gate Valve - Jockey - 01 No
- Diesel Controller - 01 set
- Jockey Controller - 01 set
- Non Return Valve - Jockey Pump - 01 No
- Pressure Sensing Line - 03 Line
- Ball Valve - 03 No
- Drain Pipe - 02 Line
- Soft hose coupling ∅100_ 01 set
- Y-Strainer_ 02 sets
2.2 Fire control panel 18 zones set 1.00
2.3 Fire - Hydrant 2 head ∅65 each 1.00

Subject: Detail BOQ of Fire - Fighting System


Item: Fire-Fighting System Page - 395/405
Unit Rates Amounts
Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
2.4 Outside water plug 2 head ∅65 each 3.00

Subject: Detail BOQ of Fire - Fighting System


Item: Fire-Fighting System Page - 396/405
Unit Rates Amounts
Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
2.5 Ouside Fire hose cabinet each 3.00
2.6 Fire hose cabinet each 14.00
2.7 Inlet valve each 26.00
2.8 Galvanized iron pipe ∅140 m 12.00
2.9 Galvanized iron pipe ∅114 m 1,376.00
2.10 Galvanized iron pipe ∅60 m 120.00
2.11 ABC type Fire Extinguisher 5kg each 64.00
2.12 Co2 type Fire Extinguisher 5kg each 64.00
2.13 Ceiling mouted automatic ABC type Fire Extinguisher 6kg each 40.00
2.14 Tee 90, ∅140 each 2.00
2.15 Tee 90, ∅114 each 9.00
2.16 Tee 90, ∅60 each 6.00
2.17 Wye, ∅140 - ∅114 each 1.00
2.18 Wye, ∅114 each 1.00
2.19 Reduced tee, ∅140 - ∅114 each 2.00
2.2 Reduced tee, ∅114 - ∅60 each 14.00
2.21 Ellbow 90, ∅140 each 2.00
2.22 Ellbow 90, ∅114 each 18.00
2.23 Ellbow 90, ∅60 each 41.00
2.24 Ellbow 45, ∅114 each 1.00
Sub-Total 2
TOTAL

Subject: Detail BOQ of Fire - Fighting System


Item: Fire-Fighting System Page - 397/405
DETAIL BOQ of Lightning Protection System
Project: Modern Food Storage Facilities_ MFSP
Location: Chittagong
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Lightening Protection System

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
A350-7-UT-5-0002-0004
1 Arrester ese (Rp-173 m) pcs 1.00
2 Arrester ese (Rp-134 m) pcs 1.00
3 Galvanized iron pipe ∅60 m 15.60
4 Wire rope ∅10 m 45.00
5 Turnbuckle pcs 9.00
6 Cable lighting arrester m 121.50
7 Copper grounding rod pcs 15.00
8 Pipe PVC ∅34 m 72.50
9 Resitor box pcs 2.00
10 Bolt M12x50 pcs 6.00
11 Terminal pcs 6.00
12 Cadweld pcs 15.00
13 Plate M150x150x10 kg 5.30
14 Plate M400x400x10 kg 37.68
15 Bolt M10x50 pcs 12.00
16 Welding to roof beam or steel column m 5.06
17 Clamp pipe ∅34 pcs 121.00
18 Bolt M5x25 pcs 242.00
TOTAL

Subject: Detail BOQ of Lightning Protection System


Page - 397/405
Subject: Lightening Protection System
DETAIL BOQ of Communication System
Project: Modern Food Storage Facilities_ MFSP
Location: Chittagong
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Communication System

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
A350-7-UT-2-0002-0009
1 Earthwork
1.1 Excavation m3 846.99
1.2 Sand filling m3 203.77
1.3 Soil backfilling m3 643.22
1.4 Compacted k=0.95 m2 2,823.30
1.5 Clearing and disposing of excavated earth m3 203.77
2 Communication Accessaries
2.1 - PVC Ø49 m 2,823.30
2.2 - Telephone & fax cables: IPF (TYPE RJ11) m 1,544.65
2.3 - Network cables : UTP 4p, CAT 5e (TYPE RJ65) m 1,278.65
2.4 - Socket telephone & fax psc 51.00
2.5 - Socket data psc 116.00
2.6 - Switch 24 port set 11.00
2.7 - PABX set 3.00
2.8 - Satellite television set 4.00
2.9 - MDF 100 pairs (krone type PABX) set 1.00
2.10 - Rack cabinet (19'' - 27U) 8 patch panel 24 port set 1.00
TOTAL

Subject: Detail BOQ of Communication System


Page - 398/405
Subject: Communication System
DETAIL BOQ of Environmental and Social Management
Project: Modern Food Storage Facilities_ MFSP
Location: Chattogram
Item: Environmental and Social Management
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Unit Rates Amounts


Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
1 Environmental Safeguard-Overall Environmental Management
Establishment of temporary labor camp (preferably male shed-15ft X 30 ft and
female shed 12 ft x 15 ft) with standard living arrangement (adequate ventilation,
lighting, furniture, cleaning, bathing, washing, water storage facilities, kitchen,
1.1 dining space, space for prayer, separate labor shed/rest room and toilets for No. 1
female etc.), drinking water facilities, cooking arrangement, mosquito net, waste
bins, disposal of waste water facilities and other facilities as per requirement

Dust suppression measures by water spraying throughout the construction


period in and around the project site, uncovered aggregates and loose materials
1.2 such as stockpiles of the sand, excavated earth, construction wastes etc. and LS −
overall construction works as per requirement

Masonry pucca platform (at least 100 sq. ft size ) providing brick soling and net
1.3 cement finishing for keeping fuel and lubricants for machineries for prevention of No 2
spillage and leakage of the polluting materials in the soil and open places

Worksite wastes disposal facility during the construction period (collection,


transportation, and dumping of the wastes at designated dumping site preferably
1.4 Nos. 10
at City Corp. dumping site: 10 nos. bins and 400 liter size (5 nos. for the organic
wastes and 5 nos. for the inorganic wastes disposal facility)
Providing safety gear packages like hand gloves, spectacles for eye protection,
1.5 helmets, ear plug, masks, visible jacket, safety shoes for at least 150 workers and Set 160
10 visitors
Two first aid box with necessary accessories and medicines (contractor will
provide necessary medicines, saline, sufficient gauge, bandage, antiseptic cream,
1.6 anticipative lotion etc. as per requirement during entire construction period) Set 2

Prevention of the spillage and leakage of the polluting materials as per


1.7 LS −
direction of Engineer in Charge (EC)

Subject: Detail BOQ


Page - 399/405
Environmental and Social Management
Unit Rates Amounts
Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
Construction of temporary earthen drain and its maintenance to drain out
1.8 the surface water during rains, to avoid water stagnant in the whole construction LS −
site as per direction of EC
Sub-Total 1
Providing and Maintaining Adequate Potable Water Supply and Sanitation
2
Facilities at Work Site
Adequate supply of potable water, through installation of Deep Tube Well
(250-300m depth/as per aquifer depth where potable water is avilable and 150
mm dia pipe boring), with at least 6m Strainer, Submergible pump at 25m depth,
2.1 with 3 HP delivery pump for all purposes, by pipe setting (as and where Nos. 2
required). Arrangement of water reservoirs; 1.5 cum plastic overhead tank at site,
surface water reservoirs for construction (at least 3m x 5m size masonry tank on
ground with 1.0 m depth).

Worksite sanitation facilities: 6 nos. of the toilets including separate toilet for
2.2 women (at least 5ft x 8ft size, preferably CC floor with tin-shed roofing) at two Nos. 6
separate corners of the boundary wall as per direction of EC
Sub-Total 2
3 Environmental and Social Enhancement Measures
Cautionary signs-10 nos. (Plane sheet size 2 ft * 3 ft, Background color of the
plane sheet- White, Font-aerial & bold with black color text, Font size at least 50
3.1 Nos. 10
or bigger size to make it visible from at least 200m distance) as per direction of
EC
Traffic control measures and accident control (safety sign board, traffic
regulation equipment if any, placement of well dressed flagmans etc. as and
3.2 when required) for the project activities as per requirement during construction LS −
period as per direction of EC
Provision of the site and campsite cleanliness, fogging (during dengue season-
once in every week and rest months once in a month) by engaging City Corp.
3.3 people, use of bleaching powder and replacing the curing water at each three days LS −
interval to minimize dengue fever for the workers, staffs to be involved in the
construction activities
Maintenance and cleaning of the equipment, machinery and vehicles to be
3.4 used in the construction activities as per direction of EC LS −
Arrangement of stockpile sites through proper fencing around for storing
construction materials (sand, stone, re-bar/rod, bricks, shuttering materials etc.)
3.5 workforce camp in a suitable and separate place with proper entry restriction and LS −
time to time rehabilitation of the stockpile site as per direction of EC

Subject: Detail BOQ


Page - 400/405
Environmental and Social Management
Unit Rates Amounts
Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
Overall work environment and safety-maintaining safety at construction site,
through hanging red tape (at very protective sites) and yellow tape (at moderately
3.6 protected places) around the construction work places to ensure safety for the LS −
workers especially for safe movement facilities as per direction of EC

Engagement of a Site Safety Officer/Environmental Compliance Officer- B.


Sc. Engineer (Civil) from a govt. Engineering University should have minimum 2
years working experience in overall Environmental, Social, and Health and
3.7 Safety Management in the infrastructure project combined with Civil, Electrical LS −
and Mechanical Erection Work during construction period (considering two years
duration)

Public consultation and information discloser-prior to start site works, local


residents and establishments, local authorities and other stakeholders who are
likely to be affected by the project shall be informs on the construction schedule
3.8 and activities, potential environmental and social impacts and mitigation Nos. 1
measures through public consultation in the affected area (100 person-day)

Awareness building program for the contractor and the workers on overall
Environmental and Social Management including minimization of the labor
3.9 influx impacts and efficient workforce management and efficient use of PPE and Nos. 3
natural resources like water, electricity, gas, diesel etc. (100 person-day)
Awareness building program for the host community by engaging local NGO
for minimizing risks associated with labor influx in host community (conducting
3.10 workshops, distribution of leaflet, poster, campaign etc.) (100 Nos. 3
person-day)
Provision of the contraceptive barrier methods (condoms) for the workers and
3.11 site staffs to be involved in the project activities as per requirement LS −
Provision of the vaccination program (Hepatitis A and B, rabies, tetanus,
diphtheria, polio, typhoid, influenza, pneumonia etc.) for the workers and site
staffs to be involved in the project activities by engaging local NGO for
3.12 LS −
minimizing risks associated with vector borne, water borne and infectious
diseases as per requirement

Provision of recreation facilities-indoor and out door sports like badminton,


3.13 volleyball, Keram, criecket, football twice in a year LS −
Installation of the waste bins following design at various strategic points -infront
3.14 of the buildings, entrances, silo premises etc. as per direction of EC (location Nos. 35
will be finalized prior to the installation of waste bins)
Sub-Total 3

Subject: Detail BOQ


Page - 401/405
Environmental and Social Management
Unit Rates Amounts
Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
4 Environmental Monitoring-Analytical during Construction Period
Air quality (SPM, PM2.5, PM10, CO2, SOx and NOx) measurement. It can be
measured from the recognized environmental survey company/ public institute/
university four times considering two years work duration (twice in each year at Per
4.1 dry season and monsoon) during construction phase (24 hours continuous measurement 4
monitoring with the help of appropriate instruments and analyzers)

Noise and vibration level measurement. It can be measured from the recognized
environmental survey company/ public institute/ university four times Per
4.2 4
considering two years work duration (twice in each year) during construction measurement
phase for overall construction activities.
Drinking water quality parameters -ground water/supply water to be used as
drinking water (pH, Color-true or apparent, turbidity, total hardness, Cl, TDS,
Mn, As, Fe, TC, FC) measurement. It can be measured from the recognized Per
4.3 environmental survey company/ public institute/ university four times measurement 4
considering two years work duration (twice in each year) during construction
phase.

Waste water quality parameters- waste water to be generated from the


construction activities - (pH, TDS, DO, COD, BOD5, Color-true or apparent,
turbidity, total hardness, Cl, TDS, Mn, As, Fe, TC, FC) measurement. It can be Per
4.4 measured from the recognized environmental survey company/ public institute/ measurement 2
university two times considering two years work duration (once in a year) during
construction phase

Sub-Total 4
COVID-19 Occupational Health and Safety Response and Preventive
5
Measures
Personal protective equipment- Three layers washable cloth/fabric face masks
(1000 nos.), disposable medical face masks (1000 nos.), face shield (100 nos.),
5.1 LS −
disposable gloves (latex/nitrile) (500 pairs), washable appron (100 nos.) during
entire construction period
Hand washing and shoes disinfecting facilities- providing adequate hand
sanitizer, soap, paper towels, tissues and installation and operation of hand
5.2 washing station (3 nos.) and shoe disinfecting station (2 nos.), foot pedal LS −
dispenser (1 no.) during construction period

Subject: Detail BOQ


Page - 402/405
Environmental and Social Management
Unit Rates Amounts
Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
5.3 Physical distancing-Barricade tape, fences etc. during construction phase LS −

Cleaners, disinfectants and equipment- Bleach, alcohol (ethanol &


5.4 isopropanol), Cleaning equipment (Mechanical sprayer-2 nos., hand sprayer-4 LS −
nos., mops, bucket, brushes, cloths-4 set) during construction phase

COVID-19 case management-Non-contact infrared thermometers (2 nos.),


5.5 COVID-19 tests, quarantine/isolation facilities, hospitalization & treatment, LS −
emergency medical transport etc. as per requirement
Site medical facilities- Engagement of a M.B.B.S Doctor from a Govt. Medical
College specializing in Medicine for monthly physical check-up of the workers
5.6 and site personne etc. (considering two years work duration) during construction LS −
phase
Awareness building program for the workers and adjacent community people-
formal and informal workshops, campaign, distribution of leaflets, posters,
5.7 Nos. 3
signage etc.

Sub-Total 5
6 Social Safeguard (Social Management Plan - SMP)
6.1 Awareness raising program on Grievance Redress Mechanism: Awareness
raising program on Grievance Redress Mechanism for stakeholders and workers
at the worksite (100 participants in a day) and instruction to GRC members for No 3
dealing with GRM
6.2 Implementation of GRM for workers: Implementation cost of GRC decisions
which is not covered by the Insurance (Maximum Tk 15,000/Case) No. 10

6.3 Training on Gender Based Violence / Sexual Exploitation and Abuse :


Training to the workforce at the worksite on Gender Based Violence /Sexual No 3
Exploitation and Abuse/Sexual Harasment (100 participants in a day)

6.4 Awareness raising training program for communicable disease: Awareness


raising program particularly for communicable disease such as HIV/AIDS and No 3
Hepatitis A&B (100 participants in a day)
6.5 Awareness raising refreshers training program: Refresher's training program
particularly for communicable disease such as HIV/AIDS and Hepatitis A&B No 3
(100 participants in a day (100 participants in a day)

Subject: Detail BOQ


Page - 403/405
Environmental and Social Management
Unit Rates Amounts
Item No Description of Work Unit Quantity
In Figure In Word In Figure In Word
6.6 Training program on overall Labor Management: Conduct training program
on overall Labor Management for the stakeholders and workers (100 participants No 3
in a day
6.7 Citizen engagement: Community and stakeholders meetings for assesment of
people living in the adjacent areas of steel silos are aware and satisfied with the
presence and benefits of steel silos (100 participants in a day) No 3

6.8 Gender Sensitization on GBV/SEA/SH: Refreshers training of all the workforce


on Gender Based Violence /Sexual Exploitation and Abuse/Sexual Harasment at No 3
workplace
Sub-Total 6
TOTAL

Subject: Detail BOQ


Page - 404/405
Environmental and Social Management
DETAIL BOQ
Project: Modern Food Storage Facilities_ MFSP
Location: Chittagong
Item: Landscaping
Owner: Directorate General of Food, Bangladesh
Consultant: Gerico France

Item Unit Rates Amounts


Description of Work Unit Quantity
No In Figure In Word In Figure In Word
1 Earthwork
1.1 Sand filling, 400mm thick cum 6,670.00
1.2 Soil filling, 100mm thick cum 1,667.50
Sub-Total 1
2 Planting of greenery
2.1 Trees
2.1.1_ Coconut tree, 1.0-1.5m height each 195.00
2.1.2_ Ashoka tree 1.0-1.5m height each 23.00
2.1.3_ Areca nut tree, 1.0-1.5m height each 85.00
2.1.4_ Jackfruit tree, 1.0-1.5m height each 131.00
2.1.5_ Delonix regia tree (krishnochura), 1.0-1.5m height each 5.00
2.1.6_ Cycas revoluta Thunb, 1.0-1.5m height each 3.00
2.1.7_ Croton, 0.6-1.2m height each 18.00
2.1.8_ Borassus flabellifer (Palm tree), 1.0-1.5m height each 136.00
2.1.9_ Peacock flower, 1.0-1.5m height each 39.00
Planting & Maintenance Cost for Trees each 635.00
2.2 Flower & Grass
2.2.1_ Rose, height<0.5m sqm 31.00
2.2.2_ Sunflower, height<0.6m sqm 90.60
2.2.3_ Cosmos, height<0.4m sqm 62.60
2.2.4_ Bougainvillea, height<0.8m sqm 55.60
2.2.5_ Cow grass sqm 16,361.20
2.2.6_ Periwinkle, height<0.4m sqm 74.00
Planting & Maintenance Cost for Flower & Grass sqm 16,675.00
Sub-Total 2
TOTAL

Subject: Detail BOQ


Page - 405/405
Item: Landscaping