INDUSTRIAL SECTOR
o Design of cement factory:
Clinker silos, cement silos, fly ash silos, conveying
structures, mill feeding system, pre-crushing machine
foundation, hot gas generator, truck loading etc.
o All type of foundation and superstructure for the bitumen
production factory for Bashundhara Group (BG)
o Expansion of Bashundhara tissue factory
CONTACT ME o Expansion of Shahjalal newsprint factory of BG
o 10 storied garments factory for Riviera group
+8801771965563 o 4 storied dying factory for Perseus group (steel
building)
khairul4008@gmail.com o 10 storied garments factory for knit horizon
soilandstructure.bd@gmail.com

BRIDGE AND JETTY


House # 431, Road # 6
o Design of jetty at bitumen plant for Bashundhara group
Mirpur DOHS, Dhaka -1216
o Design of jetty at MCML cement plant at Mongla.
o Retrofitting of existing jetty at Modongonj for BG
PROFILE o Design of pc girder bridge at Mukhtarpur.
I have completed my graduation from BUET in o Working at Kachpur, Meghna and Gumoti bridges
2001. I have been working in the field of structural o Design of six bridges at YAS Island in Abu Dhabi
and geotechnical engineering in different companies o Design of approach flyover bridges at Abu Dhabi airport
in Bangladesh and abroad. Now I have started my
own company named Soil and Structure. My total
BUILDING STRCUTURE
educational and work experiences is given below-
o Review the design and preparing construction design of
Professional Experience: the JAFZA convention centre, hotel and office building in
 Graduation in 2001 from BUET. Dubai. Project comprises two 35 storied office building
 Bashundhara Group in 2002 to 2004 including five basements, 10 storied hotel building and 6
 Grameenphone Ltd. 2004 to 2008 storied convention centre.
 Al Habtoor Engineering in UAE in 2008 to 2012
o Design review and construction design preparation of the
 Obayashi – HBK JV in Qatar in 2012 to 2016
Al Bustan tower in Abu Dhabi. Project comprises five 14
 Obayashi in KMG bridge project in 2016 to 2017
Buildings including five basements.
 Bashundhara Group in 2017 to 2019 end
 Soil and Structure in 2020 o Review the design and preparing construction design of
the Meshireb downtown, phase-3 project in Doha,
Design Expertise: Qatar. Project comprises of 14 building including five
 Road, embankment, pavement, bridge, culvert, basements. The highest building is a 22 storied hotel
temporary structures for construction. building.
 Jetty, sheet pile wall, cofferdam.
 MSE wall, retaining structures, slope stability,
GEOTECHNICAL WORKS
o Design of slope stability and mechanically stabilized earth
soil nailing, soil anchoring etc.
 Ground Improvements including PVD, SCP,
(MSE) wall at Kanchpur bridge on behalf of Obayashi
Deep Cement Mixing (DCM), Vibro Floatation corporation.
(VF), Stone Column, Concrete Column, uses o Design of cofferdam, temporary jetty, retaining walls,
of geotextile diaphragm wall and temporary bridge staging platform at
 Residential, commercial industrial buildings Matabari road project, Bakkhali bridge project, Muktarpur
 All type of steel and RC structures like bridge project on behalf of Mir Akhtar Hossain Ltd.
transmission tower, conveying structure, steel
silos. RC silos etc.