You are on page 1of 30

Quantity Summary of Mechanical Plant and System

During erection/installation for Imported Good (MS-45)


Section Ⅲ.1: Embedded Steel Penstock / Steel Liner

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.1 Embedded Steel Penstock / Steel Liner

III.1.1 Embedded Steel Penstock / Steel Liner works inclu LS

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

__________________ __________________ __________________


Quantity Summary of Mechanical Plant and System
Upon delivery at site, During erection and Commissioning for Stoplogs (MS-52)
Section .II19: Stoplogs at regulating dam: (Schedule No. II.19)

Item Description Unit Previous Cumulative This Period Current Cumulative Remarks

II.19. B Stoplogs at regulating dam

see the attachment for detailed


B.1 Stoplogs ls 50.51% 49.49% 100.00%
calculation

PT PLN(Persero) PT.PLN ENJINIRING CONTRACTOR


UPP JBT 2 Site Office SINOHYDRO-PP

Dinar Pradipto Maulana Fahrurozi Qin Wei


Progress of Stoplogs at Regulating Dam

Unit Price Amount Weight Previous Cumulative This period Current Cumulative Complete percentage
No. Items Unit Qty. Remarks
USD IDR USD IDR
II.19.B Stoplogs at Regulating Dam
1 Design for stoplogs ls 1.00 359,038,782.01 359,038,782.01 8.52% 100.00% 100.00% 8.52% finish
2 Stoplogs
2.1 Upstream stoplog gate slot set 6.00 309,092,141.78 - 1,854,552,850.71 44.02% 57.50% 42.50% 100.00% 44.02% erection 75%+commissioning 100%
2.2 Upstream stoplog gate leaf set 2.00 174,258,151.45 - 348,516,302.90 8.27% 25.00% 75.00% 100.00% 8.27% delivery 100%+erection 100%+commissioning 100%
2.3 Downstream stoplog gate slot set 6.00 135,301,878.46 - 811,811,270.78 19.27% 50.00% 50.00% 100.00% 19.27% erection 100%+commissioning 100%
2.4 Downstream stoplog gate leaf set 2.00 122,705,006.40 - 245,410,012.80 5.82% 25.00% 75.00% 100.00% 5.82% delivery 100%+erection 100%+commissioning 100%
2.5 Downstream stoplog hoist set 1.00 594,010,083.72 - 594,010,083.72 14.10% 25.00% 75.00% 100.00% 14.10% delivery 100%+erection 100%+commissioning 100%
Total(IDR) - 4,213,339,302.92 50.51% 49.49% 100.00%
Quantity Summary of Mechanical Plant and System
Upon delivery at site, During erection and Commissioning for Gates (MS-52)
Section .II19: Irrigation Culvert : (Schedule No. II.19)

Item Description Unit Previous Cumulative This Period Current Cumulative Remarks

II.19. E Irrigation Culvert

6 Gates

6.1 Service gate slot set 100.00% 100.00% all works completed

6.2 Service gate leaf set 100.00% 100.00% all works completed

6.4 Maintenance gate slot set 100.00% 100.00% all works completed

6.5 Maintenance gate leaf set 100.00% 100.00% all works completed

PT PLN(Persero) PT.PLN ENJINIRING CONTRACTOR


UPP JBT 2 Site Office SINOHYDRO-PP

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
Replacement of CT (MS-52)
Section .II19: Replacement of CT: (Schedule No. II.19)

Item Description Unit Previous Cumulative This Period Current Cumulative Remarks

II.19. G Replacement of CT

G Replacement of CT ls 100.00% 100.00%

PT PLN(Persero) PT.PLN ENJINIRING CONTRACTOR


UPP JBT 2 Site Office SINOHYDRO-PP

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation for Imported Good (MS-50)
Section Ⅲ.2: Gates and Maintenance Bulkhead: (Schedule No. III.2)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.2 Gates and Maintenance Bulkhead

Adit tunnel gate flap type including their frame


III.2.1 no.
and other necessary accessories

Draft Tube gate(s) fixed wheel type including


III.2.2 electrical hoist, conductor cable, lifting beam, test no. 0.0000 0.0000 During erection
weight, electrical and power control cables

Draft Tube Maintenance bulkhead vertical slide


type including electrical hoist, conductor cable,
III.2.3 no. 0.0000 0.0000 During erection
lifting beam, test weight, electrical and power
control cables.

Tailrace bulkhead vertical slide type including


III.2.4 electrical hoist, conductor cable, lifting beam, test no.
weight, electrical and power control cables.

Downstream regulating weir gate(s) vertical slide


III.2.5 type including actuating equipment, lifting gear no. 0.0000 0.0000 During erection
and electrical-mechanical drive.

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Imported Good (MS-50)
Section Ⅲ.4: Mechanical Plant and System:(Schedule No. III.4)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.4 Mechanical Plant and System:

Francis Turbine Including Spiral Case, Draft Tube


Liner, Servomotors and Regulating Mechanism,
During E&C 1.17%
III.4.1 Shaft, Headcover, Essential Tools, Embedded no. 0.0023 0.0023 0.0117
Parts, Flywheel, Draft Tube Maintenance
Platform and Other Accessories.

Inlet valve Including Priming Valve, Valve


Actuator, Air/Oil pressure vessel, Oil sump tank,
III.4.2 Oil pump, Control and Indication, Downstream no.
Dismantling Sleeve, Corrosion Protection Work,
and Oil for the first filling.

Turbine Governor System including hydraulic oil


system, Speed and Power Measuring devices,
Digital Controlles, Cabinet with Individual Control
III.4.3 no. 0.0000 0.0000
Modules, Electro-hydraulic Actuator, Hydraulic
Amplifier, Air/Oil pressure vessel, Oil sump tank,
Oil pump, and Other Accessories.

Thrust and Guide Bearing including the bearing,


III.4.4 coupling, lubricating oil system with dirty oil tank, No. 0.0650 0.0650 0.3250 During E&C 32.5%
instrument and wiring

III.4.5 Braking systems Set 0.0900 0.0900 0.4500 During E&C 45.00%

III.4.6 Power house crane LS

III.4.7 Cooling water systems no. 0.0125 0.0125 0.0625 During E&C 6.25%

III.4.8 Treated water supplies no.

III.4.9 Compressed air system Set

III.4.10 Dewatering pumps and drainage systems Set

III.4.11 Fire detection and protection systems LS 0.0333 0.0333 0.1664 During E&C 16.64%

III.4.12 Ventilation and air conditioning systems LS 0.0224 0.0224 0.1120 During E&C 11.2%

III.4.13 Oil separation plant

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Imported Good (MS-50)
Section Ⅲ.5: Generator and Excitation System:(Schedule No. III.5)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.5 Generator and Excitation System
During E&C 12.3%
III.5.1 Generator no. 0.0246 0.0246 0.1230

III.5.2 Excitation system no. 0.0000 0.0000

III.5.3 Neutral earthing equipment no. 0.0000 0.0000

III.5.4 11-13.8 kV segregated bus duct no. 0.0000 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During Erection/Installation for Ex-Works(MS-36)
Section Ⅲ.6: Power Transformers: (Schedule No. III.6)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.6 Power Transformers:

III.6.1 Generator transformer 11/150 kV Set 0.0150 0.0500 During E&C 5%

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

__________________ __________________ __________________


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Ex-works (MS-49)

Section Ⅲ.6: Power transfromers :(Schedule No. III.6)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.6 Power Transformers:

III.6.1 Generator transformer 11/150 kV LS 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Ex-works (MS-49)

Section Ⅲ.7: Auxiliary transformers:(Schedule No. III.7)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.7 Auxiliary Transformers:

III.7.1 Station services transformer 150/20 kV LS 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Ex-works (MS-49)

Section Ⅲ.8: Medium Voltage Switchgear:(Schedule No. III.8)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.8 Medium Voltage Switchgear:

III.8.1 20 kV switchgear LS 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Ex-works (MS-49)

Section Ⅲ.9: Low Voltage Switchgear:(Schedule No. III.9)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.9 Low Voltage Switchgear:

III.9.1 400 V switchgear LS 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Ex-works (MS-49)
Section Ⅲ.10: Power Cable: (Schedule No. III.10)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.10 Power Cables:
III.10.1 20 kV cable & accessories Ls 0.0000

III.10.2 LV cable & accessories Ls 0.1050 0.3500 During E&C 35%

III.10.3 Cable tray LS 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Imported Good (MS-50)
Section Ⅲ.11: Earthing and Lightning Protection Systems

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.11 Earthing and Lightning Protection Systems

III.11.1 Earthing conductor LS 0.0012 0.0012 0.0060 During instalation 0.6%

III.11.2 Earth electrodes LS 0.0000 0.0000

III.11.3 Lightning protection LS 0.0000 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Imported Good (MS-49)
Section Ⅲ.12: DC and AC UPS System:(Schedule No. III.12)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.12 DC and AC UPS Systems

III.12.1 AC panels Ls 0.0000 0.0000

III.12.2 DC panels Ls 0.0000 0.0000

III.12.3 Batteries Ls 0.0000 0.0000

III.12.4 Battery chargers Ls 0.0000 0.0000

III.12.5 UPS Ls 0.0000 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Imported Good (MS-49)
Section Ⅲ.13: Small power and lighting:(Schedule No. III.13)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.13 Small Power and Lighting

III.13.1 Lighting & small power Ls 0.0000 0.0000 Delivery at site 0%,

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Imported Good (MS-49)
Section Ⅲ.14: Standby Diesel Generator:(Schedule No. III.14)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.14 Standby Diesel Generator:

III.14.1 Engine & Generator (power house) Ls 0.0000 0.0000

III.14.2 Ancillary services (power house) Ls 0.0000 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Imported Good (MS-50)
Section Ⅲ.15: Electrical protection:(Schedule No. III.15)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.15 Electrical Protection

III.15.1 Relays Ls 0.1000 0.1000 1.0000 During delivery 100%

III.15.2 Panels and ancillaries Ls 0.0950 0.0950 0.9500 During delivery 95%

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Ex-works (MS-50)

Section Ⅲ.16: 150 kV Substation Equipment: (Schedule No. III.16)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.16 150 kV Substation Equipment

III.16.1 Circuit Breaker no. 0.0000

III.16.2 Isolating switches no. 0.0150 0.0500 During E&C 5%

III.16.3 Surge arrester no. 0.0300 0.1000 During E&C 10%

III.16.4 Current transformers no. 0.0090 0.0300 During E&C 3%

III.16.5 Voltage transformers no. 0.0000

III.16.6 Busbars no. 0.0000

III.16.7 Post insulator no. 0.0000

III.16.8 Substation protections & Metering no. 0.0000

III.16.9 DC and UPS system no. 0.0000

III.16.10 Lighting no. 0.0000

III.16.11 Substation Control panel no. 0.0300 0.1000 During E&C 10%
III.16.12 Substation Fire Protection System no. 0.0000

III.16.13 Subsation monitoring & control no. 0.0000

III.16.14 Steel structure including dead end gantry no. 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Imported Good (MS-50)
Section Ⅲ.17: Control and Supervision Equipment:: (Schedule No. III.17)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.17 Control and Supervision Equipment:

III.17.1 Unit control panels LS 0.0950 0.0950 0.9500 During delivery 95%

III.17.2 Station control panels LS 0.0950 0.0950 0.9500 During delivery 95%

III.17.3 Common control panels  LS 0.0950 0.0950 0.9500 During delivery 95%

III.17.4 Synchronizing equipment LS 0.0000 0.0000

III.17.5 DCIS and control room equipment LS 0.0800 0.0800 0.8000 During delivery 80%

III.17.6 LAN/WAN equipment LS 0.1000 0.1000 1.0000 During delivery 100%

III.17.7 Instrumentation LS 0.1000 0.1000 1.0000 During delivery 100%

III.17.8 Intake control panel LS 0.0750 0.0750 0.7500 During delivery 75%

III.17.9 Extended software support LS 0.0000 0.0000

III.17.10 CCTV and equipment LS 0.0000 0.0000

III.17.11 Control cable LS 0.0000 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office
Dinar Pradipto Maulana Fahrurozi Qin Wei
Quantity Summary of Mechanical Plant and System
During erection/installation for Imported Good (MS-45)
Section Ⅲ.19: 20 kV OVERHEAD POWER SUPPLIES: (Schedule No. III.19)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.19 20 kV OVERHEAD POWER SUPPLIES

20 kV overhead distribution line from powerhouse


III.19.1 to intake, tailrace bulkhead and downstream 0.0000 Delivery at site
regulating dam

20 kV overhead distribution line from powerhouse


III.19.2 no. 0.0000 Delivery at site
to tailrace

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

__________________ __________________ __________________


Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Ex-works and Imported Good(MS-49)
Section Ⅲ.18: Communication Equipment:: (Schedule No. III.18)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.18 Communications Equipment:

III.18.1 Power line carrier communications system LS 0.0000 0.0000

III.18.2 Telephone system LS 0.0000 0.0000

III.18.3 Other communications equipment LS 0.0000 0.0000

III.18.4 Substation communication equipments LS 0.0000 0.0000

III.18.5 ADSS LS 0.0000 0.0000

III.18.6 Other fibre optic cable LS

III.18.7 Other communications cable LS 0.0000 0.0000

III.18.8 Radio equipment LS 0.0000 0.0000

III.18.9 Optical interface LS 0.0000 0.0000

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office
Dinar Pradipto Maulana Fahrurozi Qin Wei
Quantity Summary of Mechanical Plant and System
During erection/installation and Upon delivery at site for Ex-works (MS-50)
Section Ⅲ.19: 20 kV OVERHEAD POWER SUPPLIES: (Schedule No. III.19)

Progress of this period


Item Description Unit Remarks
FOB EX -Work M.F&I Inland Tr. E&C
III.19 20 kV OVERHEAD POWER SUPPLIES
20 kV overhead distribution line from powerhouse
During delivery 30%
III.19.1 to intake, tailrace bulkhead and downstream LS 0.1200 0.3000 0.2500
During E&C 25%
regulating weir

Local supply at at intake area including 20 kV


III.19.2 Set
distribution transformer

PT.PLN ENJINIRING
PT PLN(Persero) CONTRACTOR
UPP KIT JBT2 SINOHYDRO-PP
Site Office

Dinar Pradipto Maulana Fahrurozi Qin Wei


Quantity Summary of Embedded Steel Penstock
Section Ⅲ.1: Embedded Steel Penstock / Steel Liner (Schedule No. III.1)

This Period
Unit EX -
FOB M.F&I Inland Tr. E&C
Item Description Work Remarks
Qty. Qty. Qty. Qty. Qty.
7 8 9 10 11
III.1 Embedded Steel Penstock / Steel Liner
III.1.1 Embedded Steel Penstock / Steel Liner works including bifurcat LS
III.2 Gates and Maintenance Bulkhead
III.2.1 Adit tunnel gate flap type including their frame and other neces No. 0.0000 0.0000
III.2.2 Draft Tube gate(s) fixed wheel type including electrical hoist, c No. 0.0000 0.0000
III.2.3 Draft Tube Maintenance bulkhead vertical slide type including elec No. 0.0000 0.0000
III.2.4 Tailrace bulkhead vertical slide type including electrical hoist, c No. 0.0000 0.0000
III.2.5 Downstream regulating weir gate(s) vertical slide type including No. 0.0000 0.0000

III.3 Raking System (NOT APPLICABLE)


III.3.1 Raking System (NOT APPLICABLE) No.
Including Mobile Car Type Raking Equipment, Conveyor, Stora
III.3.2 Mobile equipment (Pick-up Truck) for trash disposal (NOT APPLICABLE)
No.
III.4 Mechanical Plant and System:
III.4.1 Francis Turbine Including Spiral Case, Draft Tube Liner, Serv no. 0.0000 0.0000
III.4.2 Inlet valve Including Priming Valve, Valve Actuator, Air/Oil pres no. 0.0000 0.0000
III.4.3 Turbine Governor System including hydraulic oil system, Speed a No. 0.0000 0.0000
III.4.4 Thrust and Guide Bearing including the bearing, coupling, lubricat No. 0.0000 0.0000
III.4.5 Braking systems Set
III.4.6 Power house crane LS
III.4.7 Cooling water systems Set 0.0000 0.0000
III.4.8 Treated water supplies Set
III.4.9 Compressed air system Set
III.4.10 Dewatering pumps and drainage systems Set 0.0000 0.0000
III.4.11 Fire detection and protection systems LS
III.4.12 Ventilation and air conditioning systems LS
III.4.13 Oil separation plant Set 0.0000 0.0000
III.4.14 Maintenance equipment and tools LS
III.4.15 Elevator Set
III.4.16 Turbine Model Test LS
III.5 Generator and Excitation System:
III.5.1 Generator Set 0.0000 0.0000
III.5.2 Excitation system Set 0.0000 0.0000
III.5.3 Neutral earthing equipment Set
III.5.4 11-13.8 kV segregated bus duct LS 0.0000 0.0000
III.6 Power Transformers:
III.6.1 Generator transformer 11/150 kV Set.
III.7 Auxiliary Transformers:
III.7.1 Station services transformer 150/20 kV Set
III.7.2 Auxiliary transformers 20/0.4 kV Set
III.8 Medium Voltage Switchgear:
III.8.1 20 kV switchgear LS
III.9 Low Voltage Switchgear:
III.9.1 400 V switchgear LS
III.10 Power Cables
III.10.1 20 kV cable & accessories LS
III.10.2 LV cable & accessories LS
III.10.3 Cable tray LS
III.11 Earthing and Lightning Protection Systems
III.11.1 Earthing conductor LS 0.0000 0.0000
III.11.2 Earth electrodes LS 0.0000 0.0000
III.11.3 Lightning protection LS
III.12 DC and AC UPS Systems
III.12.1 AC panels Set
III.12.2 DC panels Set
III.12.3 Batteries Set
III.12.4 Battery chargers Set
III.12.5 UPS Set
III.13 Small Power and Lighting
III.13.1 Lighting & small power LS
III.14 Standby Diesel Generator:
III.14.1 Engine & Generator (power house) LS 0
III.14.2 Ancillary services (power house) LS 0
III.15 Electrical Protection
III.15.1 Relays LS

1/30
III.15.2 Panels and ancillaries LS
III.16 150 kV Substation Equipment
III.16.1 Circuit breaker LS
III.16.2 Isolating switches LS 0.0000
III.16.3 Surge arrester LS
III.16.4 Current transformers LS
III.16.5 Voltage transformers LS
III.16.6 Busbars LS 0.0000
III.16.7 Post insulator LS
III.16.8 Substation protections & Metering LS
III.16.9 DC and UPS system LS
III.16.10 Lighting LS
III.16.11 Substation Control panel LS 0.0000
III.16.12 Substation Fire Protection System LS
III.16.13 Subsation monitoring & control LS
III.16.14 Steel structure including dead end gantry LS 0.0000
III.17 Control and Supervision Equipment:
III.17.1 Unit control panels Set
III.17.2 Station control panels Set
III.17.3 Common control panels  Set
III.17.4 Synchronizing equipment Set
III.17.5 DCIS and control room equipment LS
III.17.6 LAN/WAN equipment LS
III.17.7 Instrumentation LS
III.17.8 Intake control panel LS
III.17.9 Extended software support LS
III.17.10 CCTV and equipment LS
III.17.11 Control cable LS 0.0000 0.0000
III.18 Communications Equipment:
III.18.1 Power line carrier communications system LS
III.18.2 Telephone system LS
III.18.3 Other communications equipment LS
III.18.4 Substation communication equipments LS
III.18.5 ADSS LS
III.18.6 Other fibre optic cable LS
III.18.7 Other communications cable LS
III.18.8 Radio equipment LS
III.18.9 Optical interface LS
III.19 20 kV OVERHEAD POWER SUPPLIES
III.19.1 20 kV overhead distribution line from powerhouse to intake, tai LS
III.19.2 Local supply at at intake area including 20 kV distribution transf Set
Local supply downstream regulating  weir area including 20 kV distribution transformer
III.19.3 Set
III.19.4 Local supply at tailrace bulkhead area including 20 kV distribution Set
transformer
III.20 Mandatory Spare Parts and Special Tools:
III.20.1.0 Mechanical plant and Hydraulic Steel Structure :
III.20.1.1 Turbine LS
III.20.1.2 Inlet valve LS
III.20.1.3 Turbine governor system LS
III.20.1.4 Bearings LS
III.20.1.6 Braking system LS
III.20.1.7 Powerhouse LS
III.20.1.8 Cooling water system LS
III.20.1.9 Treated Water Supply System LS
III.20.1.10 Compressed air system LS
III.20.1.11 Dewatering and drainage LS
III.20.1.12 Fire detection and protection System LS
III.20.1.13 Ventilation and air conditioning Systems LS
III.20.1.14 Oil separation plant LS
III.20.1.15 Maintenance equipment LS
III.20.1.16 Draft Tube Gate hoist LS
III.20.1.17 Draft tube maintenance bulkhead hoist LS
III.20.1.18 Tailrace bulkhead hoist LS
III.20.1.19 Regulating weir gate actuating equipment LS
III.20.2.0 Generator and Excitation System:
III.20.2.1 Bearings Set
III.20.2.2 Gaskets, seals, O-rings for oil system Set
III.20.2.3 Flow relay assembly Set
III.20.2.4 AVR spares Set
III.20.2.5 Rectifying elements for exciter Set
III.20.2.6 Dial thermometers Set
III.20.2.7 Lamps and fuses %
III.20.2.8 Glass for oil level sight gauge Set
III.20.2.9 Relays, timers, rheostats, contactor, switches, PCB’s Set

2/30
III.20.3.0 Transformers:
III.20.3.1 Bushing HV and LV Set
III.20.3.2 Gaskets Set
III.20.3.3 Oil level gauges Set
III.20.3.4 Bursting plates Set
III.20.3.5 Dial thermometer Set
III.20.3.6 Pressure gauge Set
III.20.3.7 Buchholz relay Set
III.20.3.8 OLTC spare drive and contact parts Set
III.20.3.9 20/0.4kV aux. trans spares Set
III.20.4.0 Switchgear:
III.20.4.1 MV current & voltage transformers Set
III.20.4.2 MV fuses %
III.20.4.3 MV coils Set
III.20.4.4 MV circuit breaker contact assembly Set
III.20.4.5 MV lamps and covers %
III.20.4.6 MV instruments 1 each type Set
III.20.4.7 LV fuses Set
III.20.4.8 LV coils Set
III.20.4.9 LV circuit breaker contact assembly Set
III.20.4.10 LV lamps and covers %
III.20.4.11 LV instrument Set
III.20.5.0 Control, Protection and Communication:
III.20.5.1 Relays Set
III.20.5.2 Fuses %
III.20.5.3 Lamps, resistors and covers %
III.20.5.4 Push buttons Set
III.20.5.5 Control switches Set
III.20.5.6 Panel meters Set
III.20.5.7 Annunciator panel Set
III.20.5.8 Test block Set
III.20.5.9 Synchroscope Set
III.20.5.10 DCS/PLC spares Set
III.20.5.11 Communication equipment spares Set
III.20.6.0 Auxiliary Services:
III.20.6.1 Lighting fixtures Set
III.20.6.2 Bulbs and tubes %
III.20.6.3 Fuses %
III.20.6.4 M.C.B.s Set
III.20.6.5 Circuit breaker contact assembly Set
III.20.6.6 Socket outlets Set
III.20.7.0 Cabling & Earthing:
III.20.7.1 MV cable terminations Set
III.20.7.2 LV cable terminations Set
III.20.7.3 Earthing conductor %
III.20.8.0 Standby Diesel Generator Set:
III.20.8.1 Piston rings, key stone rings and oil scraper rings %
III.20.8.2 Pistons and piston pins %
III.20.8.3 Cylinder liners %
III.20.8.4 Piston pin bearing metal %
III.20.8.5 Engine bearing metals set
III.20.8.6 Crank shaft bearing metals set
III.20.8.7 Other bearing metals %
III.20.8.8 Oil feed pumps set
III.20.8.9 Reamer bolts and nuts set
III.20.8.10 Complete set of nozzle holders set
III.20.8.11 Nozzles set
III.20.8.12 Inlet valves set
III.20.8.13 Exhaust valves set
III.20.8.14 Complete set of fuel oil injection tubes set
III.20.8.15 Springs of each type used %
III.20.8.16 Gaskets of each type used %
III.20.8.17 Filter elements for fuel and lubrication set
III.20.8.18 Indicating lamps and fuses of each type used %
Total (Schedule III)
Approved By:

Maulana Fahrurozi
Co. Project Manager for Construction
PLN Enjiniring

3/30