Schedule of Work No. 10 - Lift Installation Rationalised Section A Section B


Item Description Unit Qty Rate Qty Amount Qty Amount Qty Amount
3125 12424
LIFT INSTALLATION

Notes:-

Prices to be filled in are installed prices inclusive of


equipment, parts and components, accessories, taxes,
freight, labour, profit, preliminaries, etc., in accordance to the
specifications and drawings.
All installations must comply with FM Global, FM/UL, IEC,
NFPA, authority having jurisdiction, safety requirements,
client's specifications and benchmark to existing
installation/system/services including but not limited to
designs, brands & methods.

i. This Bill is to be read in conjunction with Drawings,


Specifications and Preliminaries.
Preliminaries shall be included in the Schedule of Works
for MBW. Sub-contractor shall obtained a copy from the
Main Contractor and quoted separately to the Main
Contractor.

ii. The words "as described" where used in this Bill shall
mean as described in the above documents.

iii. The quantities in this Bill are for Contractor's guidance


only and shall not form part of the Contract; except for
works where quantities measured as "PROVISIONAL"
are subject to remeasurement based on actual work
executed.

iv. Contractor shall fill in details any item or quantity not


included in this Bill but necessary for the satisfactory
completion, performance and functionality of the works
and/or system. If it is not priced, it shall be deemed
included in the total price.

v. The description in this Bill shall form an integral part of


the Specification. In case of discrepancy, difference or
divergence between the Drawings and the Specification,
Contractor shall report to the Engineer for decision.

vi. Failure to bring to the Engineer's attention any such


discrepancy, difference or divergence before acceptance
of award shall result in the same being resolved at no
additional cost and/or time.

vii. Allow for any remedial works and making good to


damaged existing structures, public services and etc., to
the complete satisfaction of the Engineer and local
authorities.

To Collection RM: - - -

QS047/LIFT
10/2R1

Schedule of Work No. 10 - Lift Installation Rationalised Section A Section B


Item Description Unit Qty Rate Qty Amount Qty Amount Qty Amount

LIFT INSTALLATION
(CONT'D)

Notes:- (Cont'd)

viii. All surplus excavated material shall be removed from site


to Contractor own dumps.

ix. The Contractor shall visit and inspect the site and shall
arquaint himself with the full extent and character of the
works. No claim for Variation, alteration or additional in
payment at any time to be considered or admitted on the
ground of lack of knowlegde of the works, deficiency of
description on accessioned any and default of inspection
on the part of the tenderer.

Supply and install c/w accessories to complete

A Goods lift
i All materials and equipment c/w accessories, inclusive of set 1 1 included
ventilation fan and thermostat/timer
Complete installation cost, including coordination and set 1 353,350.00 1 353,350.00 1 353,350.00
necessary structural works

B Perform all inspections and tests as required by lot 1 1


authority/consultant/client, including the issuing of
Certificates/ Permits and necessary documentation with P.E. included
chop and signature

C Comprehensive maintenance during defects liability period lot 1 1 included

Start-up, testing and commissioning c/w necessary submittals


D lot 1 1 included
for handing over procedure

E Signages & labeling to all systems LS 1 1 included

F Hacking, coring through beam, slab, wall and making LS 1 25,000.00 1 25,000.00 1 25,000.00
good c/w sleeves and accessories

G Fire sealant c/w certificates and accessories for LS 1 10,900.00 1 10,900.00 1 10,900.00
penetration through fire rated materials

To Collection RM: 389,250.00 - 389,250.00

QS047/LIFT
10/3R1

Schedule of Work No. 10 - Lift Installation Rationalised Section A Section B


Item Description Unit Qty Rate Qty Amount Qty Amount Qty Amount

LIFT INSTALLATION
(CONT'D)

Others

Any other items not mentioned above but necessary for the
completion of the works

A ………………………………………………………………… 1

B Insulation door 6 8,000.00 6 48,000.00 - 6 48,000.00

C ………………………………………………………………… 1

D …………………………………………………………………

E …………………………………………………………………

D …………………………………………………………………

To Collection RM: 48,000.00 - 48,000.00

QS047/LIFT
10/4R1

Schedule of Work No. 10 - Lift Installation Rationalised Section A Section B


Item Description Unit Qty Rate Qty Amount Qty Amount Qty Amount

COLLECTION

Page No. 10/1R1 ...……………………………………………….. - - -

Page No. 10/2R1 ...……………………………………………….. 389,250.00 - 389,250.00

Page No. 10/3R1 ...……………………………………………….. 48,000.00 - 48,000.00

To Carrid to End of Section RM: 437,250.00 - 437,250.00

QS047/LIFT
10/1R1

Schedule of Work No. 10 - Lift Installation Rationalised Section A Section B


Item Description Unit Rate Qty Amount Qty Amount Qty Amount

Schedule of Work No. 10 - Summary

Page No. 10/3R1 Lift Installation ………. ………………. ………………… 437,250.00 - 437,250.00

Total Carried to Final Summary RM: 437,250.00 - 437,250.00