BILLS OF QUANTITIES FOR PROPOSED BANK

Method · November 2019


DOI: 10.13140/RG.2.2.16397.87528

CITATIONS READS

0 523

1 author:

Yasiru Tishan
University of Plymouth
47 PUBLICATIONS 1 CITATION

SEE PROFILE

All content following this page was uploaded by Yasiru Tishan on 24 November 2021.

The user has requested enhancement of the downloaded file.


BILLS OF QUANTITIES FOR PROPOSED BANK
AT GALLE

FINAL PROJECT

Diploma in Quantity Surveying 18.2P


National Institute of Business Management

Group Members

G. M. M. Madhushani - CODQS18.2P-007

Nuwanka K. G. T. - CODQS18.2P-002

Chamalka G. E. - CODQS18.2P-013

Silva S. Y. T. - CODQS18.2P-010
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 01 - PRELIMINARIES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

1.1 Following are the preliminary items of work in


connection with this Contract and the bidder is
required to price each such individual item. If no
price has been stated against any item hereunder
the Contractor will not be entitled to claim any
money for such items even though he is obliged
to execute the work or provide services
described therein. Preliminary items priced by
the bidder are deemed to include the cost of
unpriced items. 1.00 Note

1.2 The bidder shall read, understand and acquaint


himself with the requirements in the Conditions
of Contract and Contract Data, General
Specification of Work, Particular Specification of
Work, Instruction to Bidders , Bidding Data and
Preamble Notes. It is the bidders responsibility to
see that his price include for complying with all
the above requirements whether specifically
referred to in this Bill of Quantities or otherwise.
1.00 Note

1.3 The bidder is required to visit the site of the


proposed work, as it is his responsibility to
ascertain the conditions governing access to the
site, the external working space, storage area
etc., 1.00 Note

1.4 Cost and expenses in connection with any other


preliminary items which are not listed below, but
are necessary for the due completion of works,
are deemed to be included in the rates or prices
quoted by the Contractor and accepted by the
Employer 1.00 Note

Insurance and Securities


1.5 Allow lump sum for providing a Performance
Security confirming to requirements under Sub
Clauses 34.1 & 34.2 in the Instructions to
Bidders. 1.00 Item 125,000.00 125,000.00

1.6 Allow lump sum for providing an Advance


Payment Guarantee referred to in Sub Clause
35.1 and conforming to Form of Advance
Payment Security included in the Bidding
Document. 1.00 Item 500,000.00 500,000.00

1.7 Allow lump sum for obtaining and maintaining


an Insurance Policy conforming to Clause 13 in
the Condition of Contract. Insurance Policy shall
be obtained from an Insurance company
approved by the Employer.

1
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 01 - PRELIMINARIES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

1.8 The Contractor is required to obtain a draft of the


Insurance Policy and submit same to Engineer
for approval. 1.00 Item 250,000.00 250,000.00

Engineer's Facilities
1.9 Allow lump sum for constructing, maintaining
and dismantling and removal on completion of
the Works, a temporary building for Engineer’s
office in conformity with the plans provided for
Engineer’s requirements, including necessary
furniture and fittings, furnishing and sanitary
facilities. 1.00 Item 80,000.00 80,000.00

1.10 Allow lump sum for providing telephone and


facsimile, facilities, electricity and water services
for the Engineer’s site office for their use in
connection with the Works. 1.00 Item 75,000.00 75,000.00

1.11 Allow lump sum for maintenance, rental,


consumption charges etc. for telephone and
facsimile facilities, electricity and water services
for the Engineer’s site office for their use in
connection with the Works. 1.00 Item 75,000.00 75,000.00

1.12 Allow for payment for extra working hours (


additional working hours from standard working
hours worked by the consultant) and transport
facilities for extra working hours. 1.00 Item

Contractor's Facilities
1.13 Allow lump sum for constructing, maintaining,
dismantling and removal on completion of the
Works, a temporary site office of adequate size
including staff rest room and toilets and other
facilities for the Contractor’s site management
staff in accordance with the plans prepared by
the Contractor and concurred by the Engineer. 1.00 Item 200,000.00 200,000.00

1.14 Allow lump sum for constructing , maintaining,


dismantling and removal on completion of the
Works, buildings to be used as workshops and
stores for perishable materials. Buildings shall be
constructed in accordance with the drawings
prepared by the Contractor and concurred by the
Engineer. The lump sum shall also include for
altering modifying, or dismantling and reerecting
within the site all temporary buildings/
structures if required. 1.00 Item 250,000.00 250,000.00

2
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 01 - PRELIMINARIES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

1.15 Allow lump sum for constructing, maintaining,


dismantling and removed on completion of the
Works, temporary buildings in accordance with
the plans prepared by the Contractor and
concurred by the Engineer to accommodate the
following: 1.00

1. Worker’s rest room, canteen facilities, kitchen


2. Toilet and wash areas 1.00
3. Sick / First – Aid room
4. Facilities to workmen shall conform to the
latest public health and industrial regulations. 1.00
The price shall include for;
i. construction, maintenance and dismantling, on
completion. 1.00

ii. engaging the services of an adequately trained


person to attend to first-aid medical duties.
iii. Employing workmen to clean and maintain
wet areas including toilets, wash areas, kitchen
etc., supplying adequate drinking water, water
for washing purposes, soap detergent etc
throughout the period of construction. 1.00 Item 300,000.00 300,000.00

1.16 Allow lump sum for providing and maintaining


telephone and facsimiles facilities electricity and
water services for the Contractor’s site office for
their use in connection with the works.
1.00 Item 45,000.00 45,000.00

1.17 Allow for altering modifying, dismantling and re-


erecting for shifting within the site all temporary
buildings structures required to be erected by
the Contractor. 1.00 Item 75,000.00 75,000.00

Construction Management and Supervision


1.18 Allow lump sum for employing suitably qualified
and experienced technical personnel for
construction management services at site. Refer
Clause 4.2 in Instructions to Bidders. 1.00 Item 150,000.00 150,000.00

1.19 Allow lump sum for employing technical


Supervisory staff on full time basis. Refer sub
Clause 4.2 in Instructions to Bidders. 1.00 Item 100,000.00 100,000.00

3
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 01 - PRELIMINARIES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Setting out
1.20 Allow lump sum for employing a licensed land
surveyor to define the building site work etc,
check levels and carry out such other surveys as
may be necessary to establish accurately the
placing of forms and pouring of concrete and all
other setting out in both vertical and horizontal
plane. All survey marks and pegs shall be clearly
identifiable with accurate records kept on site by
the Contractor that must be related to "Bench
Marks".
In this regard the Contractor must maintain
accurate survey instruments on the site at all
times for any checking of levels that the Engineer
or his representative may desire to check.

The Contractor shall obtain a statement when the


work has substantially begun, signed by a
Licensed Land Surveyor certifying the correct
setting out of the work in accordance with the
drawings and such other additional statements
to suit the various stages of construction of the
Works. 1.00 Item 25,000.00 25,000.00

1.21 Allow lump sum for setting out of Works in


accordance with drawings and other written
information given by the Engineer. The checking
of any setting out or of any line or level by the
Engineer shall not in any way relieve the
Contractor of his responsibility for the accuracy
thereof. 1.00 Item 20,000.00 20,000.00

1.22 Allow lump sum for provision of progress


reports including photographic records and
other schedules included in the ICTAD
publication – Guidelines for Effective
Construction Management. (ICTAD/CM/01),
relevant to contract administration as directed
by the Engineer including but not limited to
followings.

i. Number of workmen in different categories and


the number of Foremen.
ii. Particulars of materials and goods brought to
the site.
iii. Particulars of machinery & equipment
brought to or taken out of site.
iv. Rain fall records.
v. Accident or damage to property
vi. Any other relevant records as required by the
Engineer 1.00 Item 40,000.00 40,000.00

4
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 01 - PRELIMINARIES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

1.23 Allow lump sum for all cost in connection with


submitting material safety data, preparing
samples for testing, making arrangements for
testing of Materials, Goods etc., as stipulated in
the specification, obtaining test reports and
submitting the same to the Engineer (This item
intends to cover all expenses incurred by the
Contractor in connection with sampling and
testing of materials, goods etc., required by the
specifications, other than those provided for in
the Bills of Quantities) 1.00 Item 40,000.00 40,000.00

1.24 Allow lump sum for provision of 3 hard copies


and 1 soft copy of as – built drawings of all work
including services, for Engineer’s approval prior
to handing over of works. 1.00 Item 175,000.00 175,000.00

1.25 Allow for preparing and submitting to Engineer


in sufficient number of copies the Programme of
Work together with the method statement
referred to in Clause No.27 of Conditions of
Contract. The Programme shall be updated or
revised as required by the Engineer. 1.00 Item 40,000.00 40,000.00

1.26 Allow lump sum for providing and maintaining a


first aid box and regular supply of medicine,
linen etc. 1.00 Item 25,000.00 25,000.00

1.27 Allow for providing all necessary safety


measures to workmen 1.00 Item 75,000.00 75,000.00

1.28 Allow lump sum for maintaining the site in a


clean and orderly manner at all times and during
the entire contract period. Materials, casings, etc.,
shall be stacked on the site with access-ways
kept clear. Burning of rubbish and debris on site
is prohibited and will not be allowed under any
circumstances. 1.00 Item 150,000.00 150,000.00

1.29 Allow lump sum for demobilization, removal of


all rubbish & debris and clearing up site on
completion, leaving all in good order and
handing over. 1.00 Item 200,000.00 200,000.00

1.30 Allow lump sum for employing an adequate


number of security personnel and security
systems on full time basis throughout the period
of construction, and provide for necessary
security lighting and a warning system.
1.00 Item 270,000.00 270,000.00

5
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 01 - PRELIMINARIES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

1.31 Allow lump sum for providing and maintaining


necessary fencing, hoarding, screens and gates
for safeguarding the Works, Materials and Plant,
as directed by the Engineer. 1.00 Item 80,000.00 80,000.00

1.32 Allow lump sum for providing and maintaining


guard rail in perimeter of every floors and
openings after finishing structural work, within
600 mm clear space from the external edge until
completing the handrails and balcony rails as
directed by the Engineer. 1.00 Item

1.33 Allow for making adequate provisions to control


dust escaping to surrounding areas, from
construction work and demolition work such as
erecting and maintaining dust screens etc. Noise
from construction work and demolition work
shall be reduced to the minimum acceptable
limits The Contractor shall be responsible and
shall pay all claims and damages payable to
affected parties, arising from complaints or
action by such parties or by relevant state
authorities, in connection with the above.

No work in any trade shall be carried out in a


manner so as to cause any nuisance to adjacent
owners or the public.
Mechanical plant and equipment which emits
excessive noise, smoke, fumes, obnoxious gases
etc., will not be allowed to be used on the Site,
without the prior approval of the Engineer. 1.00 Item 125,000.00 125,000.00

Services and Facilities

Allow for access to site. It shall be the


Contractor's responsibility to visit the site and
ascertain for himself the means of access in
relation to the location. It would be his
responsibility to ensure satisfactory maintenance
of the access road for movement of plant and
traffic. Any damages to public roads, pavements
etc., should be made good at the Contractor's
expense. 1.00 Item 175,000.00 175,000.00

1.34 Allow lump sum for supply of water for the


Works and paying all charges and other expenses
in connection with the supply from water mains
or any other alternative method of water supply,
storage and reticulation. It is the sole
responsibility of the Contractor to ensure a
steady, uninterrupted adequate supply of water
required for main contract and nominated Sub
Contract Works. 1.00 Item 300,000.00 300,000.00

6
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 01 - PRELIMINARIES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

1.35 Allow for supplying temporary electricity for the


Works including connection, distribution system
for the work, internal arrangements and all
payment to the authorities for consumption (dry
hire).
It is the responsibility of the Contractor to ensure
steady and uninterrupted power supply to
Works. The Contractor shall not be entitled to
claim and the Employer shall not pay cost
incurred by the Contractor for using electric
power generators or for using other alternative
power supply methods in case there happened to
be disruptions to normal power supply due to
any reason. 1.00 Item 300,000.00 300,000.00

1.36 Allow lump sum for providing and maintaining


hoisting equipment and other construction
machinery for the use of the Works on site.
1.00 Item 250,000.00 250,000.00

1.37 Allow lump sum for providing small machinery


or equipment for the use of the Works on site.
1.00 Item 200,000.00 200,000.00

1.38 Allow for complying with Engineer's orders in


connection with maintenance or repair of
Contractor's machinery and equipment or
removal of such machinery and equipment from
the site as when he deems it necessary. 1.00 Item 100,000.00 100,000.00

1.39 Allow lump sum for erecting and maintaining


scaffolding and /or self climbing platforms. Such
scaffolding etc. shall be removed on completion
and all Works disturbed shall be made good.
1.00 Item 175,000.00 175,000.00

Miscellaneous

1.40 Allow a sum for Stainless steel BOC logo with


acrylic sticker leaving a stainless steel border
right round with LED backlit in front wall Item 100,000.00 100,000.00

1.41 Allow lump sum for providing and maintaining a


name board to the specifications and / or as
directed by the Engineer. 1.00 Item 35,000.00 35,000.00

7
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 01 - PRELIMINARIES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

1.42 Allow for protection of public and private


services. The Contractor shall protect, uphold
and maintain all water and drain pipes, ducts,
sewers, service mains, overhead cables, etc.,
unless earmarked for demolition, during the
execution of the Works. The Contractor is to
make good any damage due to any cause within
his control at his own expenses or pay any cost
and charges in connection therewith. In case
where the services are to be temporarily
terminated or diverted the Contractor is to give
the necessary notice to the appropriate Authority
and arrange for the works to be carried out and
pay all costs and charges in connection
1.00 Item 125,000.00 125,000.00
therewith.

1.43 Allow for care of adjoining properties. Care shall


be taken to ensure that the rights of all adjoining
and adjacent owners, tenants and the public are
fully respected. Immediately upon receipt of any
form of complaint from adjoining property
owners or any Authorities, the Contractor shall
notify the Engineer. The Engineer shall be
informed of the corrective measures he intends
to employ. The Contractor will be held solely
responsible for any damage caused to the
adjoining and adjacent properties due to
carrying out works under this Contract and must
make good and or compensate the affected party
or parties as mutually agreed or as directed by
the appropriate Authorities. Item 150,000.00 150,000.00

1.44 Allow lump sum for excavation for trial pits /


trial trenches as specified or as directed by the
Engineer as for locating services etc. and
reinstating the ground and making good
disturbed work to the satisfaction of the
Engineer. 1.00 Item 100,000.00 100,000.00

1.45 Allow for complying with the requirements of the


General Conditions of Contract and Contract
Data. 1.00 Item 80,000.00 80,000.00

TOTAL FOR BILL NO.01 PRELIMINARIES


CARRIED TO GRAND SUMMARY Rs. 5,580,000.00

8
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 02 - SUBSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

2A EXCAVATION & EARTH WORK

2A.1 Site preparation


2A.1.1 Site preparation including clearing site vegetation,
removing bushes, shrubs & top soil to a depth not
exceeding 6" and removing all debris away from
site. 914.47 m2 220.00 201,183.40

2A.2 Excavation
(a) Manual Excavation for column, wall, staircase
foundations in any material (except rock
requiring blasting) up to 1.5m depth, part return
fill in and ram and surplus deposited within site
as directed.

2A.2.1 For wall foundations and foundation in entrance


steps 29.00 m3 1,630.00 47,270.00

(b) Manual Excavation for column, wall, staircase


foundations in any material (except rock
requiring blasting) depth exceeding 3.0m but not
exceeding 4.50m part return fill in and ram
and surplus deposited within site as directed.

2A.2.2 For column foundations 152.98 m3 2,140.00 327,377.20

2A.3 Earth Filling


2A.3.1 Approved Earth spreading, leveling watering
and compaction manually using standard cast
iron stamper or equivalent and filling in 150 mm
thick layers under floors 313.39 m3 2,650.00 830,483.50

2A.4 Quarry Dust Filling


2A.4.1 Graded Quarry dust 4.5mm or sand downwards
supplying, spreading, levelling, watering in
225mm thick layers and compaction using
machine Rammer.(loose volume). Rate include
hire charges of the machine rammer. 68.84 m3 5,610.00 386,192.40

2A.5 Dewatering
2A.5.1 Allow for Dewatering from foundation trenches &
column pits Item Sum 255,000.00

2A.6 Anti-termite Treatment


2A.6.1 Anti-termite treatment for the new construction
with applying Biflexthrine 10Tc (Biflex ) or
approved equivalent as per manufacturer's
standards of application including horizontal &
vertical barriers with 10 years warranty on
application (Measured on plinth area).
406.35 m2 440.00 178,794.00

9
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 02 - SUBSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

2A.7 Damp Proof Membrane


2A.7.1 Gauge 1000 polythene damp proof membrane
with 150mm laps laid under floors. 349.09 m2 110.00 38,399.90

TOTAL FOR EXCAVATION & EARTH WORK


CARRIED TO SUMMARY Rs. 2,264,700.40

2B CONCRETE WORK

2B.1 Mass Concrete


2B.1.1 Cement concrete 1:3:6 (1") laid to a thickness
of 50mm under column base including placing in
position, compacting and curing.
50.99 m2 970.00 49,460.30

2B.2 Reinforced Concrete


2B.2.1 Cement concrete 1:3:6 (1") laid to thickness of
75mm in wall foundations and under 300thk
Ground floor slab including placing in position,
compacting and curing. 39.47 m2 1,175.00 46,377.25

2B.2.2 Volume Batched Grade 20 concrete in column


foundations prepared at site using mixer and
vibrator for reinforced and unreinforced concrete
floors laid on ground 7.65 m3 21,930.00 167,764.50

2B.2.3 Volume Batched Grade 20 concrete in column


foundations prepared at site using mixer and
vibrator for reinforced and unreinforced concrete
floors laid on ground with 30% plum (150x225)
or quarry dust filling with 5% cement
55.34 m3 21,930.00 1,213,606.20

2B.2.4 Volume Batched Grade 25 concrete prepared


at site using mixer and vibrator

2B.2.4.1 In Column Base 18.59 m3 21,930.00 407,678.70

2B.2.4.2 In Column shaft up to DPC 5.12 m3 21,930.00 112,281.60

2B.2.4.3 In Ground Beams 21.38 m3 21,930.00 468,863.40

2B.2.4.4 In Plinth Beam in entrance steps 0.20 m3 21,930.00 4,386.00

2B.2.4.5 In 100thk Ground floor slab 31.25 m3 21,930.00 685,312.50

10
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 02 - SUBSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

2B.2.4.6 In 300thk Ground floor slab 10.98 m3 21,930.00 240,791.40

2B.2.4.7 In Entrance steps 1.09 m3 21,930.00 23,903.70

2B.2.4.8 Supply & laying pre cast cylinders

2B.2.4.9 600mm high 1200 dia. 18.00 Nos 6,120.00 110,160.00

2B.2.4.10 600mm high 1500 dia. 30.00 Nos 9,180.00 275,400.00

2B.2.4.11 600mm high 1800 dia. 27.00 Nos 15,300.00 413,100.00

2B.3 Formwork
Note :
Formwork shall be properly designed as
described in Specification and should be
sufficiently strong and stiff and should have an
even surface and grout tight and unless
otherwise stated should provide Basic Finish
as described in the Specification.

2B.3.1 Shuttering for sides of plinth beams, ground


beams on top of foundation including
dismantling in 15mm thick plywood

2B.3.1.1 In Ground Beams 19.68 m2 970.00 19,089.60

2B.3.1.2 In Plinth Beam in entrance steps 1.76 m2 970.00 1,707.20

2B.3.1.3 In Entrance steps 11.33 m2 970.00 10,990.10

2B.3.2 Shuttering for columns including dismantling in


15mm thick Plywood board & side supports with
props.

2B.3.2.1 In Column shaft up to DPC 63.51 m2 1,020.00 64,780.20

11
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 02 - SUBSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

2B.4 Reinforcement
Allow for preparing Bar Bending Schedules,
details working drawings to the entire work
based on detail drawings prepared by the
Structural Engineer and issued to the
Contractor by the Engineer. The Contractor
shall obtain written approval of the
Engineer for the Bar Bending Schedules
prior to fabricating and fixing in position.
Note :
Following are the minimum weights/m which
have been used for the computation of
quantities of reinforcement.
32mm - 6.282 Kg/m
25mm - 3.854 Kg/m
20mm - 2.467 Kg/m
16mm - 1.579 Kg/m
12mm - 0.888 Kg/m
10mm - 0.617 Kg/m
8mm - 0.395 Kg/m
6mm - 0.222 Kg/m

2B.4.1 Mild steel reinforcement to slabs, beams, lintels,


columns, footings etc.. bent to shape, laid in
position and tied with 16 B.W.G. Aneal binding
wire (Lap should be measured when full bar is
used or else as per the drawings ).

2B.4.1.1 In Column Base 496.00 Kg 215.00 106,640.00

2B.4.1.2 In Column shaft up to DPC 573.40 Kg 215.00 123,281.00

2B.4.1.3 In Ground Beams 4,916.77 Kg 215.00 1,057,105.55

2B.4.1.4 In Plinth Beams 18.47 Kg 215.00 3,971.05

2B.4.1.5 In 300thk ground floor slab 631.03 Kg 215.00 135,671.45

2B.4.1.6 R6 -200 mesh in 100thk ground floor slab 312.49 m2 215.00 67,185.35

2B.4.1.7 In Entrance steps 141.70 Kg 215.00 30,465.50

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY Rs. 5,839,972.55

12
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 02 - SUBSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

2C MASONRY WORK

2C.1 Random rubble masonry


2C.1.1 Random rubble (225x150mm) masonry in
cement sand mortar 1:5

2C.1.2 In wall foundations, entrance steps foundation


and ramp foundation 42.96 m3 7,650.00 328,644.00

2C.2 Rubble slat cladding


2C.2.1 Rubble slats (point rubble) 900mm high dressing
to walls as per drawings including necessary
backing 28.00 m2 3,160.00 88,480.00

2C.3 Damp Proof Course


2C.3.1 20mm thick D.P.C. in cement sand 1:3 finished
with 2 coats of D.P.C. tar and blinded with sand. 28.16 m2 665.00 18,726.40

2C.4 Plinth Plastering


2C.4.1 16mm thick plastering to plinth wall in cement
sand 1:3 including finishing with cement slurry
floating. 77.12 m2 970.00 74,806.40

TOTAL FOR MASONRY WORK CARRIED TO


SUMMARY Rs. 510,656.80

13
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 02 - SUBSTRUCTURE

SUMMARY

2A EXCAVATION & EARTH WORK Rs. 2,264,700.40

2B CONCRETE WORK Rs. 5,839,972.55

2C MASONRY WORK Rs. 510,656.80

TOTAL FOR BILL NO. 02 - SUBSTRUCTURE CARRIED


Rs. 8,615,329.75
TO GRAND SUMMARY

14
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

3A CONCRETE WORK

3A.1 Reinforced Concrete


Volume Batched Grade 25 concrete prepared at
site using mixer and vibrator

In Ground Floor
3A.1.1 In Columns 6.63 m3 23,460.00 155,539.80

3A.1.2 In 150mm thk. Slab at first floor level 13.91 m3 23,460.00 326,328.60

3A.1.3 In 300mm thk. Slab at first floor level 15.55 m3 23,460.00 364,803.00

3A.1.4 In Beams at first floor slab 10.24 m3 23,460.00 240,230.40

3A.1.5 In Staircase 2.19 m3 23,460.00 51,377.40

3A.1.6 RCC Flower Trough 4.87 m3 23,460.00 114,250.20

3A.1.7 RCC Roof Gutter at first floor slab level 5.69 m3 23,460.00 133,487.40

3A.1.8 RCW1 40.91 m3 23,460.00 959,748.60

3A.1.9 TB1 at roof angle 1.67 m3 23,460.00 39,178.20

In First Floor
3A.1.10 In Columns 3.45 m3 24,635.00 84,990.75

3A.1.11 In 150mm thk. Roof Terrace slab 14.39 m3 24,635.00 354,497.65

3A.1.12 In Beams at Roof Terrace slab 3.98 m3 24,635.00 98,047.30

3A.1.13 In Staircase 1.88 m3 24,635.00 46,313.80

3A.1.14 100mm thk RCC Sun shade 0.71 m3 24,635.00 17,490.85

In Roof Terrace
3A.1.15 In Columns 2.37 m3 25,865.00 61,300.05

3A.1.16 In 150mm thk. Water tank Cover slab 3.17 m3 25,865.00 81,992.05

3A.1.17 In Beam at Water tank Cover slab 1.20 m3 25,865.00 31,038.00

Lintels
Lintels type L2 size 225x 75mm reinforced with 2
nos of 10mm dia. tor steel bars including necessary
formwork

15
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

3A.1.20 In ground floor 10.35 m 2,755.00 28,514.25

3A.1.21 In 1st floor 6.90 m 2,890.00 19,941.00

3A.1.22 In roof terrace 1.20 m 3,060.00 3,672.00

Lintels type L3 size 225x 100mm reinforced with 2


nos of 10mm dia. tor steel bars including necessary
formwork

3A.1.23 In ground floor 3.15 m 3,265.00 10,284.75

3A.1.24 In 1st floor 3.00 m 3,425.00 10,275.00

3A.1.25 In roof terrace 3.30 m 3,570.00 11,781.00

Lintels type L4 size 225x 150mm reinforced with 4


nos of 10mm dia. tor steel bars and 6mm mild steel
stirrups @ 6" c/c including necessary formwork

3A.1.26 In ground floor 3.70 m 3,670.00 13,579.00

Lintels type L5 size 225x 230mm reinforced with 4


nos of 10mm dia. tor steel bars and 6mm mild steel
stirrups @ 6" c/c including necessary formwork

3A.1.27 In ground floor 2.70 m 4,080.00 11,016.00

3A.1.28 In 1st floor 4.95 m 4,285.00 21,210.75

3A.2 Formwork
Note :
Formwork shall be properly designed as
described in Specification and should be
sufficiently strong and stiff and should have an
even surface and grout tight and unless
otherwise stated should provide Basic Finish
as described in the Specification.

Shuttering for columns including dismantling in


15mm thick Plywood board & side supports with
props.

In Ground Floor
3A.2.1 In Columns 95.32 m2 970.00 92,460.40

3A.2.2 In 150mm thk. Slab at first floor level 102.97 m2 970.00 99,880.90

16
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

3A.2.3 In 300mm thk. Slab at first floor level 56.45 m2 970.00 54,756.50

3A.2.4 In Beams at first floor slab 91.83 m2 970.00 89,075.10

3A.2.5 In Staircase 28.05 m2 970.00 27,208.50

3A.2.6 RCC Flower Trough 42.36 m2 1,120.00 47,443.20

3A.2.7 RCC Roof Gutter at first floor slab level 47.22 m2 1,120.00 52,886.40

3A.2.8 RCW1 136.35 m2 970.00 132,259.50

3A.2.9 TB1 at roof angle 14.48 m2 970.00 14,045.60

In First Floor
3A.2.10 In Columns 57.35 m2 1,020.00 58,497.00

3A.2.11 In 150mm thk. Roof Terrace slab 103.44 m2 1,020.00 105,508.80

3A.2.12 In Beams at Roof Terrace slab 34.63 m2 1,020.00 35,322.60

3A.2.13 In Staircase 23.11 m2 1,020.00 23,572.20

3A.2.14 100mm thk. RCC Sun shade 31.54 m2 1,020.00 32,170.80

In Roof Terrace
3A.2.15 In Columns 42.26 m2 1,070.00 45,218.20

3A.2.16 In 150mm thk. Water tank Cover slab 25.55 m2 1,070.00 27,338.50

3A.2.17 In Beam at Water tank Cover slab 10.95 m2 1,070.00 11,716.50

3A.3 Reinforcement

(a) Allow for preparing Bar Bending Schedules,


details working drawings to the entire work
based on detail drawings prepared by the
Structural Engineer and issued to the
Contractor by the Engineer. The Contractor
shall obtain written approval of the Engineer
for the Bar Bending Schedules prior to
fabricating and fixing in position.
Note :
(b) Following are the minimum weights/m which
have been used for the computation of
quantities of reinforcement.

17
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT


32mm - 6.282 Kg/m
25mm - 3.854 Kg/m
20mm - 2.467 Kg/m
16mm - 1.579 Kg/m
12mm - 0.888 Kg/m
10mm - 0.617 Kg/m
8mm - 0.395 Kg/m
6mm - 0.222 Kg/m

Mild steel reinforcement to slabs, beams, lintels,


columns, footings etc.. bent to shape, laid in
position and tied with 16 B.W.G. Aneal binding
wire (Lap should be measured when full bar is
used or else as per the drawings)

In Ground Floor
3A.3.1 In Columns 775.13 Kg 215.00 166,652.95

3A.3.2 In 150mm thk. Slab at first floor level 1,112.80 Kg 215.00 239,252.00

3A.3.3 In 300mm thk. Slab at first floor level 1,244.00 Kg 215.00 267,460.00

3A.3.4 In Beams at first floor slab 1,945.60 Kg 215.00 418,304.00

3A.3.5 In Staircase 218.09 Kg 215.00 46,889.35

3A.3.6 RCC Flower Trough 389.60 Kg 215.00 83,764.00

3A.3.7 RCC Roof Gutter at first floor slab level 387.61 Kg 215.00 83,336.15

3A.3.8 RCW1 1,968.58 Kg 215.00 423,244.70

3A.3.9 TB1 at roof angle 249.79 Kg 215.00 53,704.85

In First Floor
3A.3.10 In Columns 539.31 Kg 225.00 121,344.75

3A.3.11 In 150mm thk. Roof Terrace slab 1,151.20 Kg 225.00 259,020.00

3A.3.12 In Beams at Roof Terrace slab 756.20 Kg 225.00 170,145.00

3A.3.13 In Staircase 111.55 Kg 225.00 25,098.75

3A.3.14 100mm thk RCC Sun shade 483.48 Kg 225.00 108,783.00

In Roof Terrace
3A.3.15 In Columns 235.53 Kg 235.00 55,349.55

3A.3.16 In 150mm thk. Water tank Cover slab 265.91 Kg 235.00 62,488.85

3A.3.17 In Beam at Water tank Cover slab 430.92 Kg 235.00 101,266.20

18
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Sundries
Vanity Top

Vanity top in grade 25 reinforced concrete with void


to receive one vanity basin including necessary
reinforcement, formwork and preparing exposed faces
to receive granite slab or edge stip with 100mm thk
brick work (granite slab and strip measured
separately)

In Ground Floor
3A.3.20 Vanity size 890x500x75mm 1.00 Nos 20,400.00 20,400.00

In First Floor
3A.3.21 Vanity size 1148x636x75mm 2.00 Nos 21,420.00 42,840.00

TOTAL FOR CONCRETE WORK CARRIED TO


SUMMARY Rs. 6,989,592.60

3B MASONRY WORK

3B.1 Burnt clay bricks built in 1: 5 cement sand mortar


as follows

In Ground Floor
3B.1.1 225mm thick walls 313.15 m2 5,355.00 1,676,918.25

3B.1.2 115mm thick walls 17.12 m2 3,570.00 61,118.40

In First Floor
3B.1.3 225mm thick walls 197.54 m2 5,610.00 1,108,199.40

3B.1.4 112.50mm thick walls 58.35 m2 3,750.00 218,812.50

3B.1.5 100mm thick walls 5.30 m2 3,470.00 18,391.00

In Roof Terrace
3B.1.6 225mm thick walls 86.62 m2 5,895.00 510,624.90

3B.1.7 100mm thick walls 21.81 m2 3,640.00 79,388.40

TOTAL FOR MASONRY WORK CARRIED TO


SUMMARY Rs. 3,673,452.85

19
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

3C WATER PROOFING

Note :
The contractor shall submit a warranty to the Employer
against dampness or moisture penetrating through
treated surface. The warranty shall be valid for a period
of 10 years commencing from the date of issue of
completion certificate regarding the proposed.

The following information shall be furnished with the


Bid;
(a) Brand name/make
(b) Description
(d) Bidder shall of waterthe
furnish proofing system
product specifications of
waterproofing systems which he intends using at
different locations for approval of the Engineer.

Waterproofing to floor slabs and walls -toilets,


3C.1
terrace etc.
Preparation of concrete surface to received water
proofing treatment shall be strictly in accordance with
manufactures' Instruction.
When water proofing treatment is used on masonry
walls the surface shall be plastered with cement sand 1;3
mortar and wood floated to an unblemished even finish.

Water Proofing the inner surface and wet areas


rate shall include for cleaning the substrate and all
other work as per manufacturer's specifications
with 10 years warranty on application and shall
include for ponding test for a 300mm water height
kept for a period of 48 hours for horizontal
surfaces.

In Ground Floor
3C.1.1 In Toilet floors and walls 15.86 m2 2,040.00 32,354.40

3C.1.2 In RCC Roof Gutter & Flower trough 104.24 m2 2,040.00 212,649.60

3C.1.3 On first floor slab surface 31.73 m2 2,040.00 64,729.20

In First Floor
3C.1.4 In Toilet floors and walls 53.58 m2 2,140.00 114,661.20

In Roof Terrace
3C.1.5 In Roof terrace floor 93.53 m2 2,245.00 209,974.85

3C.1.6 In Water tank slab soffit 23.20 m2 2,245.00 52,084.00

TOTAL FOR WATER PROOFING CARRIED TO


SUMMARY Rs. 686,453.25

20
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

3D METAL WORK AND GLAZING

Refer Doors and windows schedule


NOTE:
The bidder shall qualify the Bid by furnishing the
particulars in connection with the item of Work
identified below and price accordingly. This is
subject to Employer’s approval. Type and thickness of
the glass panes in windows and doors shall be as
specified in Schedules issued by the Architect Refer
detail drawings and schedules for accurate sizes of
units, iron mongery etc. All doors and windows shall
be fabricated from extrusions as specified, including
frames, mullions, transoms, top rail and guides rails
and reinforcing sections where necessary to suit
marine condition. Where indicated in drawings
aluminium panels shall be made of composite sheets of
approved thickness texture and colour Glazing shall be
as stated in the drawings with double glazed in Saint
Gobient or approved equivalent.

The Bidder shall submit along with the Bid all technical
Information and detail of aluminium installation to be
used by the bidder technical information and detail of
aluminium Components which is proposed to be used by
the bidder. The Contractor shall submit detail shop
drawings as required by the Engineer for his approval
prior to commencement of fabrication of units. Rate
shall include all necessary Ironmongery items, locks and
fasteners (Hafele SS or approved equivalent) as per the
drawings to suit marine condition.
The aluminum windows, doors aluminum framed
partition etc. shall be, fabricated and installed by
specially trained tradesmen under the direction and
supervision of a competent Engineer. All metal
components to performed by complying with marine
conditions.

21
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Powder coating
All aluminium extrusion used in fabrication of doors and
widows shall be powder coated to required colour
to a minimum thickness of 80 mm micrones and shall
conform to the following standards.

1. Dry Film Thickness Test- BS 3900


2. Resistance To Abrasion- BS 3900 E14
3. Indentation Test- BS EN 180:2815
4. Resistance To Mortar Test- ASTM 3260
The following information shall be furnished with the
bid.
Brand and model of all key hardware and ironmongery
items
Origin, manufacturer and thickness of all glazing
elements
Origin, manufacturer and details of the aluminium
sections to be used

Refer General Specifications and Particular


Specifications for full description of materials and
workmanship.

3D.1 DOORS

Door Type D1 overall size 1200 X 2900mm


Frameless Glazed (12mm thick) Double Sash Door
size 1200x 2100mm Door with 1200x 800
Frameless Tempered Fixed Glass on top

3D.1.1 Ground Floor (1Nos) 3.48 m2 25,500.00 88,740.00

Door Type D2 overall size 3590 X 2900mm


Frameless Glazed (12mm thick) Double Door sash
size 1500 x 2100 with 1045x 2100 Frameless Glass
Panel on Both Sides and 1500x 800 Frameless
Glass on top

3D.1.2 Ground Floor (1Nos) 10.41 m2 27,540.00 286,691.40

Door Type D3 overall size 900 X 2100mm Grey


Powder Coated Aluminum Framed Single Sash
Composite Panel Door

3D.1.3 Ground Floor (1Nos) 1.89 m2 18,360.00 34,700.40

Door Type D4 overall size 1400 X 2100mm -


Supply by Client

3D.1.4 Ground Floor (2Nos) 2.00 Nos 5,100.00 10,200.00

22
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Door Type D5 overall size 1200 X 2100mm Grey


Powder Coated Aluminum Framed Double Sash
Composite Panel Door

3D.1.5 Ground Floor (1Nos) 2.52 m2 18,360.00 46,267.20

Door Type D6 overall size 1050 X 2100mm Grey


Powder Coated Aluminum Framed Single Sash
Composite Panel Door

3D.1.6 Ground Floor (1Nos) 2.21 m2 18,360.00 40,575.60

Door Type D7 overall size 750 X 2100mm Grey


Powder Coated Aluminum Framed Single Sash
Composite Panel Door

3D.1.7 Ground Floor (4Nos) 6.30 m2 18,360.00 115,668.00

3D.1.8 First Floor (2Nos) 3.15 m2 18,360.00 57,834.00

3D.1.9 First Floor (1Nos) 1.58 m2 18,360.00 29,008.80

Door Type G1 overall size 3700 X 3550mm


Galvanized Iron Grill Door

3D.1.10 Ground Floor (1Nos) 13.14 m2 14,380.00 188,953.20

Door Type RSD overall opening size 1200 X


2100mm Secured Roller Shutter Door (Manual
Operated)

3D.1.11 Ground Floor (1Nos) 2.52 m2 11,220.00 28,274.40

3D.2 WINDOWS

Window Type W1 overall size 600 X 1200mm Grey


Powder Coated Aluminum Framed Glazed (6mm
thick) Window

3D.2.1 Ground Floor (1Nos) 0.72 m2 18,360.00 13,219.20

Window Type W2 overall size 2250 X 1450mm


Grey Powder Coated Aluminum Framed Glazed
(6mm thick) Window

3D.2.2 Ground Floor (1Nos) 3.26 m2 18,360.00 59,853.60

3D.2.3 First Floor (1Nos) 3.26 m2 18,360.00 59,853.60

23
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Window Type W3 overall size 1050 X 1700mm


Grey Powder Coated Aluminum Framed Glazed
(6mm thick) Sliding Window

3D.2.4 Ground Floor (1Nos) 1.79 m2 18,360.00 32,864.40

3D.2.5 First Floor (2Nos) 3.57 m2 18,360.00 65,545.20

3D.2.6 First Floor (2Nos) 3.57 m2 18,360.00 65,545.20

Window Type W4 overall size 1800 X 1100mm


Grey Powder Coated Aluminum Framed Glazed
(6mm thick) Sliding Window

3D.2.7 First Floor (1Nos) 1.98 m2 18,360.00 36,352.80

Window Type W5.1 overall size 4785 X 1100mm


Grey Powder Coated Aluminum Framed Glazed
(6mm Thick) Sliding Window

3D.2.8 First Floor (1Nos) 5.26 m2 19,380.00 101,938.80

Window Type W5.2 overall size 3795 X 1100mm


Grey Powder Coated Aluminum Framed Glazed
(6mm thick) Sliding Window

3D.2.9 First Floor (1Nos) 4.17 m2 19,380.00 80,814.60

Window Type W6 overall size 4250 X 1700mm


Grey Powder Coated Aluminum Framed Glazed
(6mm thick) Sliding Window

3D.2.10 First Floor (1Nos) 7.23 m2 19,380.00 140,117.40

Window Type F1 overall size 600 X 900mm Grey


Powder Coated Aluminum Framed Frosted Glazed
(6mm thick) Fan Light

3D.2.11 Ground Floor (3Nos) 1.62 m2 18,360.00 29,743.20

3D.2.12 First Floor (2Nos) 1.08 m2 18,360.00 19,828.80

FG1 overall size 2530 X 2900mm 12mm Thick


Frameless Tempered Glass Partition

3D.2.13 Ground Floor (1Nos) 7.34 m2 28,560.00 209,630.40

24
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

FG2 overall size 3165 X 2900mm 12mm Thick


Frameless Tempered Glass Partition

3D.2.14 Ground Floor (1Nos) 9.19 m2 28,560.00 262,466.40

FG3.1 overall size 7055 X 2450mm Grey Powder


Coated Aluminum Framed Tempered Glass (12mm
thick) Partition

3D.2.15 Ground Floor (1Nos) 17.28 m2 28,560.00 493,516.80

FG3.2 overall size 6630 X 2450mm Grey Powder


Coated Aluminum Framed Tempered Glass (12mm
thick) Partition

3D.2.16 Ground Floor (1Nos) 16.24 m2 28,560.00 463,814.40

3D.3 PARTITIONS

Partition Type P1 overall size 7150 X 2100mm


Grey Powder Coated Aluminum Partition
(Including Door) With Horizontal Center Bar at
900 mm high and Glass (8mm thick) on Top &
Bottom with Sandblasting

3D.3.1 Ground Floor (1Nos) 15.02 m2 11,730.00 176,184.60

Partition Type P2 overall size 3770 X 2100mm


Grey Powder Coated Aluminum Partition
(Including Door) With Horizontal Center Bar at
900 mm high and Glass (8mm thick) on Top &
Bottom with Sandblasting

3D.3.2 Ground Floor (1Nos) 7.92 m2 11,730.00 92,901.60

Partition Type P3 overall size 3810 X 2100mm


Grey Powder Coated Aluminum Partition with
Horizontal Center Bar at 900 mm high and Glass
(8mm thick) on Top & Bottom with Sandblasting

3D.3.3 Ground Floor (1Nos) 8.00 m2 11,730.00 93,840.00

Partition Type P4 overall size 4925 X 2974mm


Grey and Yellow Painted Double Sided Gypsum
Board Backdrop Partition with Stainless Steel BOC
Logo and LED Lighting

3D.3.4 Ground Floor (1Nos) 14.64 m2 11,730.00 171,727.20

25
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Partition Type P4a overall size 4260 X 2100mm


Grey Powder Coated Aluminum Partition
(Including Door) With Horizontal Center Bar at
900 mm high and Glass (8mm thick) on Top &
Bottom with Sandblasting

3D.3.5 Ground Floor (1Nos) 8.95 m2 11,730.00 104,983.50

Partition Type P5 overall size 4725 X 2100mm


Grey Powder Coated Aluminum Partition
(Including Door) With Horizontal Center Bar at
900 mm high and Glass (8mm thick) on Top &
Bottom with Sandblasting

3D.3.6 Ground Floor (1Nos) 9.93 m2 11,730.00 116,478.90

Partition Type P6 overall size 3235 X 2100mm


Grey Powder Coated Aluminum Partition
(Including Door) With Horizontal Center Bar at
900 mm high and Glass (8mm thick) on Top &
Bottom with Sandblasting

3D.3.7 Ground Floor (1Nos) 6.80 m2 11,730.00 79,764.00

Partition Type P7 overall size 8975 X 3000mm


Painted Finish Double Side (10mm thick) Gypsum
Board Partition with GI Structure

3D.3.8 Ground Floor (1Nos) 38.36 m2 10,710.00 410,835.60

Partition Type P7a overall size 3765 X 3000mm


Painted Finish Double Side (10mm thick) Gypsum
Board Partition with GI Structure

3D.3.9 Ground Floor (1Nos) 11.30 m2 10,710.00 121,023.00

Partition Type P8 overall size 1500 X 3000mm


Grey Powder Coated Aluminum Louvre Door with
Horizontal Center Bar at 900 mm high and Double
Sided Gypsum Board Partition on GI Structure

3D.3.10 Ground Floor (1Nos) 4.50 m2 11,730.00 52,785.00

Partition Type P9 overall size 3640 X 3000mm


Grey Powder Coated Aluminum Partition
(Including Door) with Horizontal Center Bar at 900
mm high and Glass (8mm Thick) on Top & Bottom

3D.3.11 Ground Floor (1Nos) 10.92 m2 11,730.00 128,091.60

26
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Partition Type P10 overall size 2435 X 3000mm


Painted Finish Double Side (10mm thick) Gypsum
Board Partition with GI Structure

3D.3.12 Ground Floor (1Nos) 7.31 m2 10,710.00 78,290.10

Partition Type P11 overall size 3768 X 2925mm


Painted Finish Double Side (10mm thick) Gypsum
Board Partition with GI Structure

3D.3.13 First Floor (1Nos) 11.02 m2 10,710.00 118,024.20

Partition Type P12 overall size 1070 X 2925mm


Grey Powder Coated Aluminum Composite Panel
Door with Horizontal Center Bar at 900 mm high
and Double Side (10mm thick) Gypsum Board
Partition on GI Structure

3D.3.14 First Floor (1Nos) 3.13 m2 11,730.00 36,714.90

Partition Type P13 8595 X 2925mm Grey Powder


Coated Aluminum Composite Panel Door with
Horizontal Center Bar at 900 mm high and Double
Side (10mm thick) Gypsum Board Partition on GI
Structure

3D.3.15 First Floor (1Nos) 25.14 m2 11,730.00 294,892.20

Partition Type P14 5250 X 2925mm Grey Powder


Coated Aluminum Partition (Including Door) With
Horizontal Center Bar at 900 mm high and Glass
(8mm Thick) on Top & Double Sided Gypsum
Bottom

3D.3.16 First Floor (1Nos) 15.36 m2 11,730.00 180,172.80

Partition Type P15 3260 X 2925mm Painted Finish


Double Side (10mm thick) Gypsum Board Partition
with GI Structure

3D.3.17 First Floor (1Nos) 9.54 m2 10,710.00 102,173.40

Partition Type P16 1200 X 2925mm Grey Powder


Coated Aluminum Louvre Door With Horizontal
Center Bar at 900 mm High and Double Side
(10mm thick) Gypsum Board Partition on GI
Structure

3D.3.18 First Floor (1Nos) 3.51 m2 14,790.00 51,912.90

27
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Toilet Partition
Toilet Partition overall size 1945 X 2100mm with
doors shall be of single colour 12mm tk water
proofed HPL compact with chamfered edge . Each
will be supported by 3 nylon hinges affixed to the
pilaster completed with nylon coat hook & nylon
door knob.

3D.3.19 First Floor (1Nos) 4.08 m2 19,380.00 79,070.40

Toilet Partition overall size 2020 X 2100mm with


doors shall be of single colour 12mm tk water
proofed HPL compact with chamfered edge . Each
will be supported by 3 nylon hinges affixed to the
pilaster completed with nylon coat hook & nylon
door knob.

3D.3.20 First Floor (1Nos) 4.24 m2 19,380.00 82,171.20

3D.4 Hand Rail

Staircase handrail 25mm dia. G.I. upright, 50mm


dia G.I. pipe handrail with 10mm dia M.S. rods.
Rates are including anti corrosive paint & spray
paint finish as per instructions of Consultants.

3D.4.1 In Ground floor 7.55 m 6,630.00 50,056.50

3D.4.2 In First floor 7.67 m 6,935.00 53,191.45

TOTAL FOR METAL WORK AND GLAZING


CARRIED TO SUMMARY Rs. 5,737,302.85

3E ROOF WORK

Note:
All fabrication work notching drilling for bolts etc.
Delivery & unloading handling hoisting fixing in position
& grinding off all exposed welds flush & smooth.

Steel roof frame work should be applied with


corrosion inhibitor painting.

3E.1 0.47mm ZN/AL roof covering with steel frame


work as per the detail drawing 210.37 m2 7,140.00 1,502,041.80

3E.2 Supply and lay 5mm heat insulation with


aluminum sheet on both side all as specified. 210.37 m2 610.00 128,325.70

28
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

3E.3 C15015 high tensile pre galvanized lipped channel


purlins 179.92 m 2,905.00 522,667.60

3E.4
2.80m width ZN/AL flashing as per detail drawing 31.00 m 2,245.00 69,595.00

3E.5 2.25m width ZN/AL flashing to cover RCC roof


gutter as per detail drawing 14.00 m 3,060.00 42,840.00

3E.6 Truss T1 - 2/70x70x6 double angle & 1/50x50x6


single angle in span of 15.68m 2.00 Nos 255,000.00 510,000.00

3E.7 PU - C15015 high tensile pre galvanized lipped


channel purlins @1200mm C/C with 1 Raw of 12
∅mm GI tie rods as per the detail drawings 182.70 m 3,365.00 614,785.50

3E.8 Zinc-alum down pipes with necessary specials


brackets etc. complete. 21.00 m 2,245.00 47,145.00

TOTAL FOR ROOF WORK CARRIED TO


SUMMARY Rs. 3,437,400.60

3F FLOOR, WALL AND CEILING FINISHES

3F.1 Floor Finishes

Note
Isolated areas, staircase areas, narrow widths such
as returns, reveals jambs and alike are not
measured separately.All tile edges shall be jointed
with miter joints.
Homogeneous ceramic tiling laid to pattern as per
drawing on 0-20mm thick 1:3 cement sand mix
bedding and joints pointed to match tiling and
consultants approval.
(a) Rocell tiles or equalent as per consultants approval

(b) Tile Cost Rs.3282.00 per sq.m

Off white 600x600mm gloss tiles (rocell 7/107 or


equalent) laid to given pattern

3F.1.1 In Ground floor 240.79 m2 6,630.00 1,596,437.70

Gray 600X300mm semi rough tiles laid to given


pattern

29
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

3F.1.2 In Ground floor 27.16 m2 6,630.00 180,070.80

Gray / off white textured 600x600mm semi gloss


tiles laid to given pattern

3F.1.3 In Ground floor 51.25 m2 7,140.00 365,925.00

3F.1.4 In First floor 84.18 m2 7,140.00 601,045.20

3F.1.5 In Roof Terrace floor 10.30 m2 7,140.00 73,542.00

300x300 dark colour matt tile for toilet floors to


match with the wall tile - non skid

3F.1.6 In Ground floor 14.18 m2 6,630.00 94,013.40

3F.1.7 In First floor 11.18 m2 6,630.00 74,123.40

600x600mm semi rough floor tiles on approved


water proofing

3F.1.8 In Roof Terrace floor 76.80 m2 7,140.00 548,352.00

Cement Rendering 12mm thick in cement and


sand 1:3 in R.C.C. floors finished smooth with
cement slurry in approved color and texture

3F.1.9 In Ground floor 11.73 m2 1,630.00 19,119.90

3F.1.10 On water proofed Slab 33.32 m2 1,630.00 54,311.60

Pebble wash concrete finish

3F.1.11 In ground floor 13.04 m2 1,835.00 23,928.40

300x300mm hand cut miris gal paving

3F.1.12 In Ground floor 5.21 m2 9,180.00 47,827.80

100mm high Ceramic tile skirting

3F.1.13 In Ground floor 140.45 m 1,430.00 200,843.50

30
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

3F.2 Wall Finishes

Note:
Isolated areas, staircase area, narrow widths such as
returns, reveals jambs and alike are not are not
measured separately. Rate are including isolated
columns plastering.

Internal

Plastering 16mm thick to walls in cement and sand


1:5 finished smooth with skim coat.

3F.2.1 To walls in Ground floor 565.99 m2 970.00 549,010.30

3F.2.2 In First floor 205.43 m2 1,020.00 209,538.60

3F.2.3 In Roof Terrace 71.04 m2 1,020.00 72,460.80

In sides and soffits of slabs and staircase

3F.2.4 In Ground floor 110.90 m2 1,120.00 124,208.00

3F.2.5 To walls in Rooof Terrace floor 96.89 m2 1,070.00 103,672.30

3F.2.6 In soffit of slab in Rooof Terrace floor 19.95 m2 1,225.00 24,438.75

External

Plastering 16mm thick to walls in cement and sand


1:5 finished semi-rough.

3F.2.7 To walls in Ground floor 336.24 m2 970.00 326,152.80

3F.2.8 To walls in First floor 127.05 m2 1,020.00 129,591.00

3F.2.9 To walls in Rooof Terrace floor 153.50 m2 1,070.00 164,245.00

Cut cement finish on walls. Colour shade tester to


be approved by Consultant

3F.2.10 To walls in Ground floor 54.73 m2 3,160.00 172,946.80

3F.2.11 1:3 cement protective plastering

3F.2.12 To RCC Roof Gutter 31.50 m2 1,120.00 35,280.00

31
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

Ceiling
Supply and fixing 2'x2' non perforated white
metalic silicate ceiling

3F.2.11 In Ground floor 221.27 m2 3,825.00 846,357.75

Granite tilng
Polished Granite size 300 x 300 x 20mm thick
absolutely black for vanity top, laid on 50mm thick
cement sand 1:3 screed level off using cement
slurry and 1mm joints to be absolutely in line and
flush and grout. (Prime Cost of tile Rs.1800.00 per
sq.m)

3F.2.12 Vanity Top in Ground Floor (1Nos) 2.48 m2 7,650.00 18,972.00

3F.2.13 Vanity Tops in First Floor (2Nos) 4.56 m2 7,955.00 36,274.80

TOTAL FOR FLOOR, WALL AND CEILING


FINISHES CARRIED TO SUMMARY Rs. 6,692,689.60

3G PAINTING

Note:
Isolated areas, staircase area, narrow widths such as
returns, reveals jambs and alike are not are not
measured separately.

INTERNAL
Painting walls with one coat of alkali resistant
wall primer including preparing surface to CIC
paint - marble falls (off white) colour (code no.
86/042) or equalent

3G.1 To walls in Ground floor 567.00 m2 665.00 377,055.00

3G.2 On soffits of slabs and staircase in Ground floor 116.45 m2 765.00 89,084.25

3G.3 To walls in First floor 158.47 m2 695.00 110,136.65

3G.4 On soffits of slabs and staircase in First floor 96.89 m2 805.00 77,996.45

3G.5 To walls in Roof Terrace floor 71.04 m2 715.00 50,793.60

Painting walls with one coat of alkali resistant


wall primer including preparing surface
toBrilliant white painted or equalent

32
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

On soffits of slabs and staircase in Roof Terrace


3G.6
floor 19.33 m2 715.00 13,820.95

Wall Tilling
300 x 600mm gloss with textured finish , supplying
and fixing to walls on a 1:3 cement sand mortar
layer, and pointed with tile grout to match the tile.

3G.7 To walls in Ground floor 36.65 m2 1,120.00 41,048.00

3G.8 To walls in First floor 42.40 m2 1,180.00 50,032.00

EXTERNAL

Painting walls with one coat of alkali resistant


wall primer including preparing surface to CIC
paint - Royal Gold yellow colour (code no. 23YY
62/816) or equalent

3G.9 To walls in Ground floor 21.37 m2 970.00 20,728.90

3G.10 To walls in First floor 127.05 m2 1,020.00 129,591.00

Painting walls with one coat of alkali resistant


wall primer & 5 coat system of weather shield
paint CIC or equalent including preparing surface.

3G.11 To walls in Ground floor 212.37 m2 1,375.00 292,008.75

3G.12 To walls in First floor 132.22 m2 1,430.00 189,074.60

3G.13 To walls in Roof Terrace floor 175.27 m2 1,070.00 187,538.90

TOTAL FOR PAINTING CARRIED TO SUMMARY


Rs. 1,628,909.05

33
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 03 - SUPERSTRUCTURE

SUMMARY

3A CONCRETE WORK Rs. 6,989,592.60

3B MASONRY WORK Rs. 3,673,452.85

3C WATER PROOFING Rs. 686,453.25

3D METAL WORK AND GLAZING Rs. 5,737,302.85

3E ROOF WORK Rs. 3,437,400.60

3F FLOOR, WALL AND CEILING FINISHES Rs. 6,692,689.60

3G PAINTING Rs. 1,628,909.05

TOTAL FOR BILL NO. 03 - SUPERSTRUCTURE CARRIED


TO GRAND SUMMARY Rs. 28,845,800.80

34
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 04 - SERVICES

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

4A VRV TYPE AIR CONDITIONING SYSTEM

4A.1 Allow for cost of supply VRV System - Ground


Floor including transport, installation fees and
profits etc. for all items specified. The price shall
include for all accessories required for complete
installation and for all temporary works such as
scaffolding etc. Prior to pricing the bidder
should visit the site, acquaint himself with the
specification and drawings. Provisional Sum 3,500,000.00

4B CCTV SYSTEM

4B.1 Allow for Supply and install conducting, junction


boxes, trunking and cable tray only for complete
CCTV system as per project specifications and
drawings Provisional Sum 800,000.00

4C FIRE PROTECTION , DETECTION & FIGHTING SYSTEM

4C.1 Allow for fire protection, detection & fighting


system including necessary for the satisfactory
completion of the system Provisional Sum 1,000,000.00

4D ELECTRICAL & ELV WORK

4D.1 Allow for necessary items as per the detailed


drawings and/or specifications for the satisfactory
completion of the system. The tenderer is
requested to specify all the items quoted under this
item with related cost, quoted under this item.
Provisional Sum 6,000,000.00

4E PLUMBING WORK / SANITARY INSTALLATIONS

4E.1 Allow for all the plumbing and sanitory works


necessary as per the detailed drawings and/or
specifications for the satisfactory completion of the
system. The tenderer is requested to specify all the
items quoted under this item with related cost,
quoted under this item. Provisional Sum 2,500,000.00

TOTAL FOR SERVICES CARRIED TO SUMMARY


Rs. 13,800,000.00

35
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

BILL NO. 05 - LANDSCAPING

ITEM DESCRIPTION QNTY UNIT RATE AMOUNT

The quoted Rates include all Materials Labour Chargers and Transport

Paving
5A.1 100x100mm Pre cast cobble stone pavings with grass
patches laid to patterns on and including prepared base
to Architects Approval. Shall include for a Preperation
and the ground for required levels and compacting with
an including base layer of quary dust as per the
satisfaction of the consultant. 417.29 m2 330.00 137,705.70

Root balled Trees


5A.2 Root balled trees are plalnted in 3' -0" x 3'-0" x3' -0"
pits, filled with mixed soil and fixing of wooden tree
supports

5A.3 Root balled Ehala (height of 12ft.-15ft.) all as per


drawings. 1.00 Nos 15,300.00 15,300.00

5A.4 Root balled Araliya (White height of 10ft-12ft) all as per


drawings 1.00 Nos 8,975.00 8,975.00

Shurubs
5A.5 Flowering shurbs hedge consisting of Finger Palm
(Rhapis excelsa) 50.00 Nos 510.00 25,500.00

5A.6 Flowering shurbs hedge consisting of Snake plant


(Sansevieria trifasciata) 15.00 Nos 305.00 4,575.00

5A.7 Flowering crepers White trumpet vine (Thunbergia


grandiflora) 40.00 Nos 765.00 30,600.00

5A.8 Flowering shurbs hedge consisting of Bim pol (Molineria


trichocarpa) 20.00 Nos 410.00 8,200.00

Kerbs
5A.9 Precast concrete kerbs (125 x255 x 915mm) laid on and
including mass concrete bedding as per detail 72.45 m 1,530.00 110,848.50

Fence
5A.10 Chain link 4m height fence to cover the part of the
Boundring wall (as per drawing). Complete of 50mm dia
Heavy duty G.I.Pipe embedded concrete pocket in the
2400mm center and horizontal with 25mm dia G.I.Pipe
at the top and bottom and 04 rods of draw wire concrete
with PVC coated guage-6 chain link Fence top of all the
G.I Columns should have a Fiber Glass on other material
caps accepted as the consultants. 47.88 m 7,650.00 366,282.00

TOTAL FOR BILL NO. 05 - LANDSCAPING CARRIED TO


GRAND SUMMARY Rs. 707,986.20

36
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.

GRAND SUMMARY

BILL NO. 01 - PRELIMINARIES Rs. 5,580,000.00

BILL NO. 02 - SUBSTRUCTURE Rs. 8,615,329.75

BILL NO. 03 - SUPERSTRUCTURE Rs. 28,845,800.80

BILL NO. 04 - SERVICES Rs. 13,800,000.00

BILL NO. 05 - LANDSCAPING Rs. 707,986.20

TOTAL 01 Rs. 57,549,116.75

Add - Contingencies 10% Rs. 5,754,911.68


Rs. 63,304,028.43
Add - VAT 8% Rs. 5,064,322.27

GRAND TOTAL Rs. 68,368,350.70

37
Proposed Bank At Galle. 1
ABSTRACT SHEET

Description Quantity Unit Sheet No.


1) Removal of top soil 914.47 m² 1

2) Excavation for Col. Fdn. 152.98 m³ 1

3) C20 mass conc. In col. Fdn. 7.65 m³ 1

4) Quarry dust filling with 5% cement in col. Fdn. 68.84 m³ 1

5) Cylinders - CY1 - 1200 dia -300mm high 18.00 Nr 1

Cylinders - CY2 - 1500 dia -350mm high 30.00 Nr 1

Cylinders - CY3 - 1800 dia -400mm high 27.00 Nr 1

6) 50mm screed concrete in Col. Fdn. 50.99 m² 1

7) Conc. In Col. Base 18.59 m³ 1

8) Reinforcement in Col. Base - T10 496.00 Kg 1

9) Conc. In Col. Shaft up to DPC 1.52 m³ 1


3.60 m³ 2
5.12 m³

10) Formwork in Col. Shaft up to DPC 63.51 m² 2

11) Reinforcement in Col. Shaft up to DPC


T12 bars in Col. Shaft up to DPC 300.50 Kg 2
T16 bars in Col. Shaft up to DPC 179.69 Kg 2
R6 bars in Col. Shaft up to DPC 93.21 Kg 3
573.40 Kg

12)Quarry dust filling with 5% in col. Fdn. 55.34 m³ 3

13)Concrete in Ground Beams 18.91 m³ 4


2.47 m³ 5
21.38 m³

14)Form work in Ground beams 19.68 m² 5

15) Reinft. in Ground beams 4,916.77 Kg 5

16) Excavation for wall fdn. 27.99 m³ 5

17) 75mm thk. Mass conc. 1:3:6 (20) 37.31 m³ 5

18)Random Rubble Masonry in wall fdn. 42.16 m³ 5

19)Exc. For foundation in entrance steps 1.00 m³ 5


Proposed Bank At Galle. 2
ABSTRACT SHEET

Description Quantity Unit Sheet No.

20) 75mm thk. Mass conc. 1:3:6 (20) under entrance steps
fdn. 1.34 m² 5

21) Random Rubble Masonry in entrance steps fdn. 0.80 m³ 5

22)Conc. In Plinth beam of entrance steps 0.20 m³ 6

23)Formwork in Plinth beam of entrance 1.76 m² 6

24) Reinft. In Plinth beam of entrance steps


T12 bars in in Plinth beam of entrance 14.31 Kg 6
R6 bars in Plinth beam of entrance 4.16 Kg 6

25) Dry earth filling under floors 175.49 m³ 6


130.29 m³ 6
7.62 m³ 7
313.39 m³

26) 1000 gauge polythene 277.85 m² 7


71.24 m² 7
349.09 m²

27) Concrete GF slab -100thk 26.34 m³ 7


4.91 m³ 8
31.25 m³

28) Concrete GF slab -300thk 10.98 m³ 8

29) R6-200 mesh 194.99 m² 8


117.51 m² 8
312.49 m² 8

30) 75mm screed under 300thk GF slab 39.47 m² 8

31) T10 bars in 300mm thk GF slab 631.03 Kg 9

32) Plinth Plaster 77.12 m² 9

33) concrete in entrance steps 1.09 m³ 9

34) Formwork in entrance steps 11.33 m² 9

35) Reinft. in entrance steps 141.70 Kg 9

36) Concrete in columns 6.63 m³ 9

37) Formwork in columns 95.32 m² 9


Proposed Bank At Galle. 3
ABSTRACT SHEET

Description Quantity Unit Sheet No.


38) reinft. in columns
T12 Bars in columns 262.14 Kg 9
T16 Bars in columns 336.64 Kg 9
R6 stirrups in columns 176.35 Kg 10
775.13 Kg

39) Concrete in 150mm thk slab at 1st floor level 13.91 m³ 10

40) Formwork in 150mm thk slab at 1st floor level 102.97 m² 10

41) Reinft. in 1st floor slab 1,112.80 Kg 10

42) Concrete in RCC flower trough 4.87 m³ 10

43) formwork in RCC flower trough 42.36 m² 10

44) Reinft. in RCC flower trough 389.60 Kg 10

45)Concrete in 300mm thk 1st floor slab 15.55 m³ 10

46)Formwork in 300mm thk 1st floor slab 56.45 m² 10

47) Reinft. in 300mm thk 1st floor slab 1,244.00 Kg 10

48)concrete in 1st floor slab beams 10.24 m³ 10

49) formwork in sides of 1st floor slab 13.50 m² 10


78.33 m² 10
91.83 m²

50) Reinft. in 1st floor slab beams 1,945.60 Kg 10

51) concrete in RCC roof gutters 5.69 m³ 11

52) formwork in RCC roof gutters 47.22 m² 11

53) Reinft. In RCC roof gutter


T10 bars in RCC roof gutters 376.10 Kg 12
T16 bars in RCC roof gutters 11.51 Kg 12
387.61 Kg 12

54) concrete in RCW1 up to 1st floor level 40.91 m³ 12

55) formwork in RCW1 up to 1st floor level 136.35 m² 12

56) T10 bars in RCW1 1,968.58 Kg 12

57) Concrete in TB1 @ roof angle 1.67 m³ 12


Proposed Bank At Galle. 4
ABSTRACT SHEET

Description Quantity Unit Sheet No.

58) Formwork in TB1 @ roof angle 14.48 m² 12

59) Reinft. in TB1 @ roof angle 249.79 Kg 12

60) concrete in staircase 2.19 m³ 12

61) formwork in staircase 28.05 m² 13

62) Reinft. In Staircase


T10 bars in staircase 121.89 Kg 13
T12 bars in staircase 83.74 Kg 13
T16 bars in staircase 7.90 Kg 13
T8 bars in staircase 4.56 Kg 13
218.09 Kg

63) Lintels
Lintel type L2 - 225 x 75 with 2T10 10.35 m 13

Lintel type L3 - 225 x 100 with 2T10 3.15 m 13

Lintel type L4 - 225 x 150 with 4T10, R6 3.70 m 13

Lintel type L5 - 230 x 230 with 4T10, R6 2.70 m 13

64) 225thk. Brick work 385.07 m² 14


ddt. Doors and windows (71.92) m² 14
313.15 m²

65) 112.50mm thk. Brick work 17.12 m² 14

66) Floor Finishes

off white 600x600 gloss tiles (rocell 7/107) laid to given


pattern - banking areas [1] 240.79 m² 14

gray 600X300 semi rough tiles laid to given pattern [2] in


self service area and entrance 27.16 m² 14

gray / off white textured 600x600 semi gloss tiles laid to


given pattern [3] 51.25 m² 15

300x300 dark color matt tile to match with the wall tile -
non skid - toilets [4] 14.18 m² 15

pebble wash concrete finish [5] 13.04 m² 15

300x300 hand cut miris gal paving [6] 5.21 m² 15


Proposed Bank At Galle. 5
ABSTRACT SHEET

Description Quantity Unit Sheet No.


cement rendering (in approved color and texture) [7] 11.73 m² 15

100mm high ceramic skirting 140.45 m 16

67) Wall Finishes


Internal

CIC paint - marble falls (off white) paint & smooth plastering
384.67 m² 16
248.86 m² 17
18.95 m² 17
ddt - Doors and windows (44.84) m² 17
ddt - Doors and windows (41.65) m² 18
565.99 m²

300X600mm gloss white with textured finish wall tiles in


toilet 43.63 m² 18
ddt - Doors and windows (6.98) m² 18
36.65

20mm thk granite tiling on vanity top 2.48 m² 18

External
CIC paint - Royal gold yellow color 21.37 m² 18

cut cement finish 54.73 m² 18

watershed paint 250.33 m² 18


9.81 m² 19
260.15

Rough plastering 21.37 m² 18


54.73 m² 18
250.33 m² 18
9.81 m² 19
336.24 m²

(68) Ceiling finishes


2'x2' non perforated white metallic ceiling 221.27 m² 19

smooth plastered and painted in approved color - slab soffit


and staircase soffit 110.90 m² 19

(69) water proofing


approved type water proofing on the floor and 300mm
along walls in toilet 15.86 m² 19

water proofing to rcc gutter and flower trough 104.24 m² 19


Proposed Bank At Galle. 6
ABSTRACT SHEET

Description Quantity Unit Sheet No.


water proofing on slab 31.73 m² 19

(70)hand rail - staircase hand rail 25∅ G.I. upright, 50∅ G.I.
pipe handrail with 10∅ M.S. rods 7.55 m 19

(71) vanity - RCC vanity 890x500mm size with 100thk brick


work 1.00 Nr 19

Plastering to RCC gutter 31.50 m² 19

First floor to Roof top level


(72) Concrete in RCC columns 3.45 m³ 20

(73) Formwork in Columns 57.35 m² 20

74) Reinft. in Col. shaft


T12 bars in columns 171.92 Kg 20
T16 bars in columns 305.69 Kg 20
R6 stirrups in columns 61.70 Kg 20
539.31 Kg 20

(75) Concrete in 150mm thk roof slab 14.39 m³ 20

(76) formwork in 150mm thk roof slab 103.44 m² 20

(77) Reinft. in roof slab 1,151.20 Kg 20

(78) Concrete in beams at roof slab 3.98 m³ 21

(79) Formwork in beams at roof slab 34.63 m² 21

(80) Reinft. in RCC flower trough 756.20 Kg 21

(81) Concrete in 100mm thk sun shade 0.71 m³ 21

(82) Formwork in 100mm thk sun shade 31.54 m² 21

(83) Reinforcement in sun shade


T16 bars 218.53 Kg 21
T10 bars 264.95 Kg 21
483.48 Kg

84) concrete in staircase 1.88 m³ 22

85) formwork in staircase 23.11 m² 22

86) Reinft. In Staircase 94.65 Kg 22


T12 4.44 Kg 22
T16 7.90 Kg 22
Proposed Bank At Galle. 7
ABSTRACT SHEET

Description Quantity Unit Sheet No.


T8 4.56 Kg 22
111.55 Kg

lintel type L2 - 225x75 with 2T10 6.90 m 22

lintel type L3 - 225x100 with 2T10 3.00 m 22

lintel type L5 - 225x75 with 2T10 4.95 m 22

91) 225mm thk.brick work 224.43 m² 23


(26.89) m² 23
197.54 m² 23

92) 112.5mm thk brick work 58.35 m² 23

93)110mm thk brick work 8.45 m² 23


ddt - Doors and windows (3.15) m² 23
5.30 m² 23

94) Floor Finishes

gray / off white textured 600x600 semi gloss tiles laid to


given pattern [3] 71.34 m² 23
in staircase steps & landing 12.84 m² 23
84.18 m² 23

300x300 dark color matt tile to match with the wall tile -
non skid - toilets [4] 11.18 m² 23

95) Wall Finishes


Internal

CIC paint - marble falls (off white) paint & smooth plastering
158.47 m² 24

300X600mm gloss white with textured finish wall tiles in


toilet 42.40 m² 24

20mm thk granite tiling on vanity top 4.56 m² 24

smooth plastering 158.47 m² 24


42.40 m² 24
4.56 m² 24
205.43 m²

External
CIC paint - Royal gold yellow color 127.05 m² 24

Rough plastering 127.05 m² 24


Proposed Bank At Galle. 8
ABSTRACT SHEET

Description Quantity Unit Sheet No.

(96) Ceiling finishes


2'x2' non perforated white metallic ceiling 221.26 m² 24

(97) water proofing


approved type water proofing on the floor and 2100mm
along walls in toilet 11.18 m² 25
42.40 m² 25
53.58 m²

(98)hand rail - staircase hand rail 25∅ G.I. upright, 50∅ G.I.
pipe handrail with 10∅ M.S. rods 7.30 m 25

(99) vanity - RCC vanity 890x500mm size with 100thk brick


work 2.00 Nr 25

ROOF TOP TO WATER TANK FLOOR

100) concrete in columns 2.37 m³ 25

101) Formwork in column shafts 40.25 m² 25

102) Reinforcement in columns


T12 167.48 Kg 25
R6 58.98 Kg 25
226.46 Kg 25

103) Conc. in 150mm thk covering 3.17 m³ 25

104) Formwork in 150mm thk 24.33 m² 25

105) Reinft. in 150mm thk covering slab 253.60 Kg 25

106) Conc. in beams at Covering slab 1.20 m³ 26

107) Formwork beams at Covering 10.43 m² 26

108) Reinft. beams at Covering slab 228.00 Kg 26

109) Lintel
lintel type L2 - 225x75 with 2T10 1.20 m 26

lintel type L3 - 225x100 with 2T10 3.30 m 26

110) 225mm thk brick work 95.54 m² 26


ddt - Doors and windows (8.92) m² 26
86.62 m²

111) 110mm thk brick work 21.81 m² 26


Proposed Bank At Galle. 9
ABSTRACT SHEET

Description Quantity Unit Sheet No.

112) Floor Finishes

gray / off white textured 600x600 semi gloss tiles laid to


given pattern - other areas 10.03 m² 26

gray / off white textured 600x600 semi rough floor tiles on


approved waterproofing 76.80 m² 26

113) Wall finishes - internal

CIC paint - marble falls (off white) paint & smooth plastering
71.04 m² 26

smooth plastering 71.04 m² 26

External
CIC paint - Royal gold yellow color 153.50 m² 27

Rough plastering 153.50 m² 27

(114) Ceiling finishes


brilliant white painted slab soffit and staircase soffit 19.33 m² 27

(115) water proofing


approved type water proofing on the floor and 300mm
along walls in toilet 93.53 m² 27

ROOF WORK

116) ZN/AL roof covering / heat insulation 210.37 m² 27

117) 0.7m width ZN/AL flashing as per architectural


drawing 179.92 m 27

118) 2.8m width ZN/AL flashing as per architectural drawing


31.00 m 27

119) 2.25m width ZN/AL flashing as per architectural


drawing 14.00 m 27

120) Truss T1 - 2/70x70x6 double angle & 1/50x50x6 single


angle 2.00 Nr 27
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: A
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

1. Removal of top soil 24. Reinft. in Plinth beam of entrance steps

2. Excavation for Col. Fdn. 25. Dry earth filling under floor

3. C20 mass conc. In col. Fdn. 26. 1000g polythene

4. Quarry dust filling 27.Concrete GF slab -100thk

5. Cylinders 28.Concrete GF slab - 300thk

6. 50mm screed concrete in Col. Fdn. 29. R6- 200 mesh

7. Conc. In Col. Base 30. 75mm thk. screed under 300thk GF slab

8. Reinft. in Col. Base 31. 300mm thk GF slab r/f - T10

9. Conc. In Col. Shaft up to DPC


32. Plinth plaster
10. Formwork in Col. Shaft up to DPC
33. Conc. in entrnce steps
11. Reinft. in Col. Shaft up to DPC
34. Formwork in entrance steps
12. Quarry Dust fill in col. Fdn.
35. Reinft. in entrance steps
13. Conc. In Ground Beams

14. Formwork in Ground Beams


GROUND FLOOR TO FIRST FLOOR
15. Reinforcement in Ground Beams
36. Conc. in Col. shaft up to GF to FF
16. Exc. for wall fdn.
37. Formwork in Col. shaft up to GF to FF
17. 75mm thk. Mass conc. 1:3:6 (20) under
wall fdn.
38. Reinft. in Col. shaft up to GF to FF
18. Random Rubble Masonry in wall fdn.

39. Conc. in 150mm thk slab at FF level


19. Exc. For foundation in entrance steps

40. Formwork in 150mm thk slab at FF level

20. 75mm thk. Mass conc. 1:3:6 (20) under


entrance steps fdn.
41. Reinft. in 150mm thk slab at FF level
21. Random Rubble Masonry in entrance
steps fdn.
42. Conc. in RCC flower trough
22. Conc. In Plinth beam of entrance steps

23. Formwork in Plinth beam of entrance


steps
Quantity Take off Sheet
Job Ref:Job Ref: Proposed Bank At Galle. Sheet No: B
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

43. Formwork in RCC flower trough 64.225mm thk.brick work

44. Reinft. in RCC flower trough 65.112.5mm thk brick work

45. Conc. in 300mm thk slab at FF level 66. Floor Finishes

46. Formwork in 300mm thk slab at FF level 67. Wall finishes

47. Reinft. in 300mm thk slab at FF level 68. Ceiling finishes

48. Conc. in Beams at FF slab level 69.Waterproofing

49. Formwork in Beams at FF slab level 70. Handrail

50. Reinft. in Beams at FF slab level 71. RCC Vanity

51. Conc. RCC roof gutter FIRST FLOOR TO ROOF TOP LEVEL

52. Formwork RCC roof gutter 72. Conc. in Col. shaft up to FF to Roof top

53. Reinft. RCC roof gutter 73. Formwork in Col. shaft up to FF to Roof top

54. Conc. in RCW1 74. Reinft. in Col. shaft up to FF to Roof top

55. Formwork in RCW1 75. Conc. in 150mm thk slab at Roof top level

56. Reinft. in RCW1 76. Formwork in 150mm thk slab at Roof top
level

57. Conc. in TB1 @ roof angle 77. Reinft. in 150mm thk slab at Roof top level

58. Formwork in TB1 @ roof angle 78. Conc. in beams at Roof top slab level

59. Reinft. in TB1 @ roof angle 79. Formwork beams at Roof top slab level

60. Conc. in staircase 80. Reinft. beams at Roof top slab level

61. Formwork in staircase 81. Conc. in sun shade

62. Reinft. in staircase 82. Formwork in sun shade

63. Lintols 83. Reinft. in sun shade


Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: C
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

84. Conc. In RCC link to support roof at FC1 104. Formwork in 150mm thk covering slab
columns

85. Formwork in RCC link to support roof at 105. Reinft. in 150mm thk covering slab
FC1 columns

86. Reinft. in RCC link to support roof at FC1 106. Conc. in beams at Covering slab
columns

87. Conc. in staircase 107. Formwork beams at Covering slab

88. Formwork in staircase 108. Reinft. beams at Covering slab

89. Reinft. in staircase 109. Lintols

90. Lintols 110. 225mm thk.brick work

91. 225mm thk.brick work 111. 110mm thk brick work

92. 112.5mm thk brick work 112. Floor Finishes

93.110mm thk brick work 113. Wall finishes

94. Floor Finishes 114. Ceiling finishes

95. Wall finishes 115. Waterproofing

96. Ceiling finishes ROOF WORK

97.Waterproofing 116. ZN/AL roof covering / heat insulation

98. Hand rail 117. 0.7m width ZN/AL flashing as per


architectural drawing

99. RCC Vanity 118. 2.8m width ZN/AL flashing as per


architectural drawing

ROOF TOP TO WATER TANK FLOOR 119. 2.25m width ZN/AL flashing as per
architectural drawing

100. Conc. in Col. shaft 120. Truss T1 - 2/70x70x6 double angle &
1/50x50x6 single a

101. Formwork in Col. shaft

102. Reinforcement in Col. shaft

103. Conc. in 150mm thk covering slab


Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 1
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

48.13 1) Removal of top soil 6/22/7/ 0.65 6) 50mm screed concrete in Col. Fdn.
19.00 914.47 m2 0.65 7.97 CY1
10/22/7/ 0.80
0.80 20.11 CY2
9/22/7/ 0.90
6/22/7/ 0.65 2) Excavation for Col. Fdn. 0.90 22.91 CY3
0.65 50.99 m2
3.00 23.90 CY1
10/22/7/ 0.80
0.80 6/22/7/ 0.65 7) Conc. In Col. Base
3.00 60.34 CY2 0.65
9/22/7/ 0.90 0.30 2.39 CY1
0.90 10/22/7/ 0.80
3.00 68.73 CY3 0.80
152.98 m3 0.35 7.04 CY2
9/22/7/ 0.90
0.90
0.40 9.16 CY3
6/22/7/ 0.65 3) C20 mass conc. In col. Fdn. 18.59 m3
0.65
0.15 1.20 CY1
10/22/7/ 0.80 CY1
0.80 2.00 1200/150 = 8
0.15 3.02 CY2
9/22/7/ 0.90 CY2
0.90 1.50 1500/150 = 10
0.15 3.44 CY3
7.65 m3 CY3
1800/150 = 12

6/22/7/ 0.65 4) Quarry dust filling with 5% cement 8) Reinforcement in Col. Base - T10
0.65 in col. Fdn. 6/2/8/ 1.20 115.20 CY1
1.35 10.76 CY1 10/2/10/ 1.50 300.00 CY2
10/22/7/ 0.80 9/2/12/ 1.80 388.80 CY3
0.80 804.00 m
1.35 27.15 CY2
9/22/7/ 0.90 804 X 0.617 = 496.07Kg
0.90
1.35 30.93 CY3
68.84 m3 9) Conc. In Col. Shaft up to DPC
2/ 0.28
CY1
0.28 1500
CY1 = 1500/ 600 = 2.5 ≈ 3nos 2.05 0.32 C1,CY1 ddt. Screed (50)
0.28 ddt. Base Height (300)
CY2 = 1500/ 450 = 3.33 ≈ 3nos 0.28 add. height up to G.F 900
2.00 0.16 C1,CY2
CY3 = 1500/ 450 = 3.33 ≈ 3nos 3/ 0.28 CY2
0.28 1500
5) 2.00 0.47 C2,CY2 ddt. Screed (50)
6/ 3.00 18.00 Nr Cylinders - CY1 - 1200 dia -300mm high 0.28 ddt. Base Height (350)
0.50 add. height up to G.F 900
2.05 0.29 C3,CY1
10/ 3.00 30.00 Nr Cylinders - CY1 - 1500 dia -350mm high 0.28 CY3
1500
0.50
ddt. Screed (50)
2.00 0.28 C3,CY2
ddt. Base Height (400)
9/ 3.00 27.00 Nr Cylinders - CY1 - 1800 dia -400mm high 1.52 m3 add. height up to G.F 900
1950

Conc. In Col. Shaft up to DPC Cont..


Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 2
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

3/ 0.28 9) Conc. In Col. Shaft up to DPC CY2 - bar length


0.50 1500
1.95 0.82 C3,CY3 ddt - screed 50
0.35 ddt - col. Base 300
0.35 (350)
2.00 0.25 C4,CY2 1150
3/ 0.35 add 1500/2 750
0.35 height up to ground level 900
1.95 0.72 C4,CY3 2800
22/7/ 0.18
0.18 CY3 - bar length
2.00 0.20 C5,CY2 1500
3/ 0.30 ddt - screed 50
0.30 ddt - col. Base 300
2.05 0.55 SC1,CY1 (350)
3/ 0.30 1150
0.30 add 1800/2 900
2.00 0.54 SC1,CY2 height up to ground level 900
3/ 0.30 2950
0.30
1.95 0.53 SC1,CY3
3.60 m3 T12 bars in Col. Shaft up to DPC
2/4/ 2.65 21.20 C1,CY1
3/4/ 2.80 22.40 C1,CY2
2/ 1.10 10) Formwork in Col. Shaft up to DPC 8/ 2.80 22.40 C4,CY2
2.05 4.51 C1,CY1 3/8/ 2.95 70.80 C4,CY3
1.10 3/8/ 2.65 63.60 SC1,CY1
2.00 2.20 C1,CY2 3/8/ 2.80 67.20 SC1,CY2
3/ 1.10 3/8/ 2.95 70.80 SC1,CY3
2.00 6.60 C2,CY2 338.40 m
1.55
2.05 3.18 C3,CY1 338.40m x 0.888 = 300.50kg
1.55
2.00 3.10 C3,CY2
3/ 1.55 T16 bars in Col. Shaft up to DPC
1.95 9.07 C3,CY3 4/ 2.80 11.20 C2,CY2
1.40 6/ 2.65 15.90 C3,CY1
2.00 2.80 C4,CY2 6/ 2.80 16.80 C3,CY2
3/ 1.40 3/6/ 2.95 53.10 C3,CY3
1.95 8.19 C4,CY3 6/ 2.80 16.80 C5,CY2
2/22/7/ 0.18 113.80 m
2.00 2.26 C5,CY2
3/ 1.20 113.80m x 1.579 = 179.69kg
2.05 7.38 SC1,CY1
3/ 1.20
2.00 7.20 SC1,CY2 Stirrups lengths
3/ 1.20
1.95 7.02 SC1,CY3 C1
63.51 m2

11) Reinforcement in Col. Shaft up to DPC


CY1 - bar length
1500
ddt - screed 50
ddt - col. Base 300
(350) 275 - (40 x 2) = 195
1150 4 x 195 + 24d = 780 + 24 x 6
add 1200/2 600 = 924
height up to ground level 900
2650
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 3
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description
C2
C5

275 - (40 x 2) = 195


4 x 195 + 24d = 780 + 24 x 6 r = 175, cover = 40
= 924 R = r - cover - ½ of bar dia.
R= 175 - 40 - 8
R= 127
C3
Stirrup lenngth = 2πR + hook - bend
2 x 3.14 x 127 + (2 x 10d) - (2x 2d)
797.56 + (2 x 10 x 6) - (2 x 2 x 6)
797.56 + 120 + 24
941.56

275 - (40 x 2) = 195


500 - (40 x 2) = 420 SC1
2(195 + 420) + 24d = 1230 + 24 x 6
= 1374

C4

Stirrup 1
300 - (40 x 2) = 220
4 x 220 + 24d = 880 + 24 x 6
= 1024

Stirrup 1 Stirrup 2
350 - (40 x 2) = 270 = 150 2 + 150 2
4 x 270 + 24d = 1080 + 24 x 6 = √22500 + √22500
= 1224 = √45000
= 212.13
Stirrup 2
= 175 2 + 175 2 212.13 - (40 x 2) = 132.13
= √30625 + √30625 4 x 132.13 + 24d = 525.52 + 24 x 6
= √61250 = 669.52
= 247.49

247.49 - (40 x 2) = 167.49 CY1


4 x 167.49 + 24d = 669.96 + 24 x 6 2050 / 150 = 13.66 + 1
= 813.96 ≈ 14 + 1
=15

CY2
2000 / 150 = 13.33 + 1
≈ 13 + 1
=14
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 4
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

CY3 13)Concrete in Ground Beams


1950 / 150 = 13 + 1 23.68 GB1
=14 0.30
0.45 3.20
4.50 GB2
R6 bars in Col. Shaft up to DPC 0.30
2/15/ 0.92 27.60 C1,CY1 0.45 0.61
14/ 0.92 12.88 C1,CY2 2.89 GB2
3/14/ 0.92 38.64 C2,CY2 0.30
15/ 1.37 20.55 C3,CY1 0.45 0.39
14/ 1.37 19.18 C3,CY2 4.43 GB3
3/14/ 1.37 57.54 C3,CY3 0.30
14/ 1.22 17.08 C4,CY2 - stirrup 1 0.45 0.60
3/14/ 0.81 34.02 C4,CY2 - stirrup 2 2.89 GB4
14/ 1.22 17.08 C4,CY3 - stirrup 1 0.30
14/ 0.81 11.34 C4,CY3 - stirrup 2 0.45 0.39
14/ 0.94 13.16 C5,CY2 1.66 GB5
15/ 1.02 14.28 SC1,CY1 - stirrup 1 0.30
15/ 0.81 11.34 SC1,CY1 - stirrup 2 0.45 0.22
14/ 1.02 14.28 SC1,CY2 - stirrup 1 4.43 GB6
3/14/ 0.81 34.02 SC1,CY2 - stirrup 2 0.30
3/14/ 1.02 42.84 SC1,CY3 - stirrup 1 0.45 0.60
3/14/ 0.81 34.02 SC1,CY3 - stirrup 2 4.05 GB7
419.85 m 0.30
0.45 0.55
419.85m x 0.222 = 93.21kg 2.89 GB8
0.30
0.45 0.39
CY1 28.13 GB9
1500
0.30
ddt. Screed (50)
ddt. Base Height (300) 0.45 3.80
1150 5.48 GB10
0.30
0.45 0.74
CY2
1500 13.83 GB11
ddt. Screed (50) 0.30
ddt. Base Height (350) 0.45 1.87
1100 13.31 GB12
0.30
CY3 0.45 1.80
1500 12.45 GB13
ddt. Screed (50)
ddt. Base Height (400)
0.30
1050 0.45 1.68
2.18 GB14
0.30
6/22/7/ 0.65 12)Quarry dust filling with 5% cement 0.45 0.29
0.65 in col. Fdn. 9.68 GB15
1.15 9.16 CY1 0.30
10/22/7/ 0.80 0.45 1.31
0.80 3.56 GB16
1.10 22.13 CY2 0.30
9/22/7/ 0.90 0.45 0.48
0.90 18.91 m3
1.05 24.06 CY3 Concrete in Ground Beams Contd..
55.34 m3
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 5
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description
15) Reinft. in Ground beams
13)Concrete in Ground Beams Reinft. in Ground beams -230kg/m3
1.73 GB17 (18.91m3 + 2.47m3) x 230kg
0.30 21.38m3 x 230kg = 4,916.77kg
0.45 0.23
12.30 GB18
0.30 Wall Fndn.
0.45 1.66
4.28 Ground beam for new 115thk wall 2/ 28125 56250
0.30
0.45 0.58 14372
2.47 m3 12302 26674
82924

14)Form work in Ground beams


2/ 23.68 GB1
0.45 21.31 82.92 16) Excavation for wall fdn.
2/ 4.50 GB2 0.45
0.45 4.05 0.75 27.99 m3
2/ 2.89 GB2
0.45 2.60
2/ 4.43 GB3 82.92 17) 75mm thk. Mass conc. 1:3:6 (20)
0.45 3.99 0.45 37.31 m3 under wall fdn.
2/ 2.89 GB4
0.45 2.60
2/ 1.66 GB5 82.92 18)Random Rubble Masonry in wall fdn.
0.45 1.49 0.45
2/ 4.43 GB6 1.13 42.16 m3 750
0.45 3.99 450
2/ 4.05 GB7 screed (75)
0.45 3.65 1125
2/ 2.89 GB8
0.45 2.60
2/ 28.13 GB9 862
0.45 25.32 1613
2/ 5.48 GB10 412
0.45 4.93 928
2/ 13.83 GB11 3815
0.45 12.45
2/ 13.31 GB12
0.45 11.98 3.82 19)Exc. For foundation in entrance steps
2/ 12.45 GB13 0.35
0.45 11.21 0.75 1.00 m3
2/ 2.18 GB14
0.45 1.96
2/ 9.68 GB15 3.82 20) 75mm thk. Mass conc. 1:3:6 (20)
0.45 8.71 0.35 1.34 m2 under entrance steps fdn.
2/ 3.56 GB16
0.45 3.20
2/ 1.73 GB17 3.82 21) Random Rubble Masonry in entrance
0.45 1.56 0.35 steps fdn.
2/ 12.30 GB18 0.60 0.80 m3
0.45 11.07 750
2/ 4.28 Ground beam for new 115thk wall (75)
0.45 3.85 (78)
19.68 m2 597
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 6
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

3.82 22)Conc. In Plinth beam of entrance steps 7.70 D


0.23 3.61 25)Dry earth filling under floors
0.23 0.20 m3 0.90 25.02
1 / 15.19 E
2
1.98
2/ 3.82 23)Formwork in Plinth beam of entrance 0.90 13.53
0.23 1.76 m2 steps 3.89 F
3.76
24) Reinft. In Plinth beam of entrance steps 0.90 13.16
2.31 G
1.03
0.90 2.14
3.10 H
1.01
0.75 2.35
2.85 I
T12 bar length 1.08
3815 0.75 2.31
ddt. Cover 40 x2 (80) 2.13 J
2/225 450 1.10
ddt. Cover 40 x2 x2 (160) 0.90 2.11
4025 2.54 K
0.96
0.90 2.19
R6 stirrups 2.21 L
1.78
225 - (40 x 2) = 145 0.75 2.95
4 x 145 + 24d = 580 + 24 x 6 1.78 M
= 724 1.40
0.75 1.87
3815/150 = 25.43 + 1 ≈ 25 + 1 = 26 1.98 N
1.61
0.90 2.87
4/ 4.03 16.12 m T12 bars in Plinth beam of entrance 1.93 P
steps 1.25
16.12 x 0.888 = 14.31Kg 0.90 2.17
3.96 Q
3.09
26/ 0.72 18.72 m R6 in Plinth beam of entrance 0.90 11.01
steps 4.51 R
18.72 x 0.222 = 4.16Kg 4.43
0.90 17.98
4.43 S
25) Dry earth filling under floors 3.75
5.25 A 0.90 14.95
4.34 2.30 T-under entrance stairs
0.90 20.51 3.50
15.85 B 1.29 10.38
9.17 4.45 V-under entrance ramp
0.90 130.81 1.10
7.44 C 0.67 3.28
3.61 130.29 m3 Dry earth filling under floors contnd.
0.90 24.17
175.49 m3 Dry earth filling under floors contnd.
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 7
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

26)1000 gauge polythene


4.45 25)Dry earth filling under floors 3.96 Q
1.35 3.09 12.24
0.12 0.72 4.51 R
3.55 4.43 19.98
1.10 4.43 S
0.67 2.62 3.75 16.61
3.55 2.30 T- under entrance stairs
1.35 3.50 8.05
0.12 0.58 4.45 V- under entrance ramp
4.12 1.10 4.90
1.10 3.55
0.67 3.04 1.10 3.91
4.12 4.12
1.35 1.35 5.56
0.12 0.67 71.24 m2
7.62 m3

27) Concrete GF slab -100thk


26) 1000 gauge polythene 5.25 A
5.25 A 4.34
4.34 22.79 0.10 2.28
15.85 B 15.85 B
9.17 145.34 9.17
7.44 C 0.10 14.53
3.61 26.86 7.44 C
7.70 D 3.61
3.61 27.80 0.10 2.69
15.19 E 7.70 D
1.98 15.04 3.61
3.89 F 0.10 2.78
3.76 14.63 15.19 E
2.31 G 1.98
1.03 2.38 0.10 1.50
3.10 H 3.89 F
1.01 3.13 3.76
2.85 I 0.10 1.46
1.08 3.08 2.31 G
2.13 J 1.03
1.10 2.34 0.10 0.24
2.54 K 3.10 H
0.96 2.44 1.01
2.21 L 0.10 0.31
1.78 3.93 2.85 I
1.78 M 1.08
1.40 2.49 0.10 0.31
1.98 N 2.13 J
1.61 3.19 1.10
1.93 P 0.10 0.23
1.25 2.41 26.34 m3 Concrete GF slab -100thk contd…
277.85 m2 1000 gauge polythene contd...
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 8
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

27) Concrete GF slab -100thk 29) R6-200 mesh


2.54 K 7.70 D
0.96 3.61 27.80
0.10 0.24 15.19 E
2.21 L 1.98 15.04
1.78 3.89 F
0.10 0.39 3.76 14.63
1.78 M 2.31 G
1.40 1.03 2.38
0.10 0.25 3.10 H
1.98 N 1.01 3.13
1.61 2.85 I
0.10 0.32 1.08 3.08
1.93 P 2.13 J
1.25 1.10 2.34
0.10 0.24 2.54 K
3.96 Q 0.96 2.44
3.09 2.21 L
0.10 1.22 1.78 3.93
2.30 T- under entrance stairs 1.78 M
3.50 1.40 2.49
0.10 0.81 1.98 N
4.45 V- under entrance ramp 1.61 3.19
1.10 1.93 P
0.10 0.49 1.25 2.41
3.55 3.96 Q
1.10 3.09 12.24
0.10 0.39 2.30 T-undewr entrance stairs
4.12 3.50 8.05
1.35 4.45 v-under entrance ramp
0.10 0.56 1.10 4.90
4.91 m3 3.55
1.10 3.91
4.12
1.35 5.56
28) Concrete GF slab -300thk 117.51 m2
4.51 R
4.43
0.30 5.99
4.43 S 8.91 30) 75mm screed under 300thk GF slab
3.75 4.43 39.47 m2
0.30 4.98
10.98 m3 4725
2/150 300
ddt. Cover 2/40 (80)
29) R6-200 mesh add. 2/ 300 600
5.25 A ddt. Cover 2/40 (80)
4.34 22.79 5465
15.85 B
9.17 145.34 8909/200 = 44.55 + 1 ≈ 45 + 1 = 46
7.44 C
3.61 26.86
194.99 m2 R6-200 mesh contd..
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 9
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

4860 SUPERSTRUCTURE
2/150 300
ddt. Cover 2/40 (80) Ground floor to First floor
add. 2/ 300 600
ddt. Cover 2/40 (80) C1 - 225 X 225 - 4000 High - 06 NOS.
5600 C2 - 225 X 225 - 4000 High - 04 NOS.
C3 - 225 X 450 - 4000 High - 05 NOS.
4725/200 = 23.62 + 1 ≈ 24 + 1 = 25 C4 - 300 X 300 - 4000 High - 06 NOS.
C5 - 300Ø - 4000 high -1 NOS.
4050
2/150 300 36) Concrete in columns
ddt. Cover 2/40 (80) 6/ 0.23 C1
add. 2/ 300 600 0.23
ddt. Cover 2/40 (80) 4.00 1.27
4790 4/ 0.23 C2
0.23
4.00 0.85
5/ 0.23 C3
31) T10 bars in 300mm thk GF slab 0.45
2/46/ 5.47 503.24 4.00 2.07
2/25/ 5.60 280.00 6/ 0.30 C4
2/25/ 4.79 239.50 0.30
1,022.74 m 1022.74mx 0.617 = 631.03Kg 4.00 2.16
1/3.14/ 0.15 C5
0.15
4.00 0.28
900 6.63 m3
25
925
37) Formwork in columns
82.92 32) Plinth Plaster 6/ 0.90 C1
0.93 77.12 m2 4.00 21.60
4/ 0.90 C2
4.00 14.40
5/ 1.35 C3
3.82 33) concrete in entrance steps 4.00 27.00
1.72 6/ 1.20 C4
0.10 0.66 4.00 28.80
5/½ 3.82 1/2/3.14 0.14 C5
0.30 4.00 3.52
0.15 0.43 95.32 m2
1.09 m3
38) reinft. in columns
T12 Bars in columns
3.82 34) Formwork in entrance steps 6/4/ 4.10 98.40 C1
0.98 3.74 6/8/ 4.10 196.80 C4
3.82 295.20 m 295.2 x 0.888=262.14kg
1.77 6.76
2/ 1.72
0.24 0.83
11.33 m2 T16 Bars in columns
4/4/ 4.10 65.60 C2
5/6/ 4.10 123.00 C3
35) Reinft. in entrance steps -130kg/m3 1/6/ 4.10 24.60 C5
1.09m3 x 130kg = 141.70 kg 213.20 m 213.20 x 1.579=336.64kg
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 10
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

4000/150 = 26.67 + 1 ≈ 27 +1 = 28 9.60 42) Concrete in RCC flower trough


0.20
R6 stirrups in columns 0.70 1.34
6/28/ 0.92 154.56 C1 9.60
4/28/ 0.92 80.64 C2 0.20
5/28/ 1.37 191.80 C3 0.85 1.63
6/28/ 1.22 204.96 C4 2/ 4.50
6/28/ 0.81 136.08 0.10
1/28/ 0.94 26.32 C5 0.70 0.63
794.36 m 794.36 x 0.222= 176.35kg 2/ 4.50
0.20
0.70 1.26
4.87 m3
39) Concrete in 150mm thk slab at 1st floor
level
9.60 slab - grid 5-6
4.50 2/ 9.60 43) formwork in RCC flower trough
0.15 6.48 0.70 13.44
9.88 grid 1 - 3, C-1 2/ 9.60
3.23 0.85 16.32
0.15 4.79 2/ 4.50
4.95 grid 3 - 4, C-D 0.70 6.30
1.69 2/ 4.50
0.15 1.25 0.70 6.30
3.73 grid 3 - 4, C 42.36 m2
2.48
0.15 1.39
13.91 m3 44) Reinft. in RCC flower trough- 80kg/m3
4.87m3 x 80kg = 389.60kg

40) Formwork in 150mm thk slab at 1st


9.60 floor level 10.47 45)Concrete in 300mm thk 1st floor slab
4.50 43.20 4.95
9.88 2/1225 2450 0.30 15.55 m3
3.23 31.91 2/2000 4000
4.95 2/2156 4312
1.69 8.37 2/2184 4368 10.47 46)Formwork in 300mm thk 1st floor slab
3.73 2/1613 3226 4.95 51.83
2.48 9.25 2/1558 3116 15.42 10.47
40.48 2/880 1760 0.30 4.63 4.95
0.15 6.07 2/1425 2850 56.45 m3 15.42
27.77 2/4725 9450
0.15 4.17 2/1175 2350
102.97 m2 2/1300 2600 47) Reinft. in 300mm thk 1st floor
m3 40482 slab- 80kg/m3
15.55m3 x 80kg = 1244kg
2/4500 9000
2/9386 18772
27772

41) Reinft. in 1st floor slab - 80kg/m3


13.91m3 x 80kg = 1112.80kg
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 11
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

4.50 48)concrete in 1st floor slab beams 49) formwork in sides of 1st floor slab
0.20 2/ 9.60 beams
0.60 0.54 B3 0.60 11.52 B8
4.50 2/ 4.50
0.30 0.60 5.40 B8a
0.30 0.41 B4 2/ 13.92
4.50 0.45 12.53 B9
0.20 2/ 15.70
0.60 0.54 B7a 0.45 14.13 B1
9.60 2/ 19.28
0.20 0.45 17.35 B7
0.60 1.15 B8 2/ 3.68
4.50 0.25 1.84 B10
0.20 2/ 7.72
0.60 0.54 B8a 0.25 3.86 B5
13.92 2/ 4.13
0.23 0.25 2.07 B6
0.45 1.44 B9 2/ 1.20
15.70 0.25 0.60 B12
0.23 2/ 3.00
0.45 1.62 B1 0.25 1.50 B2
19.28 2/ 3.00
0.23 0.25 1.50 B1a
0.45 2.00 B7 2/ 12.07
3.68 0.25 6.04 B13
0.23 78.33 m2
0.25 0.21 B10
7.72
0.23 50) Reinft. in 1st floor slab beams
0.25 0.44 B5 190kg/m3
4.13 10.24m3 x 190kg = 1945.60kg
0.23
0.25 0.24 B6
1.20
0.23
0.25 0.07 B12
3.00
0.23
0.25 0.17 B2
3.00
0.23
0.25 0.17 B1a
12.07
0.23
0.25 0.69 B13
10.24 m3

49) formwork in sides of 1st floor slab


2/ 4.50 beams
0.60 5.40 B3
2/ 4.50
0.30 2.70 B4
2/ 4.50
0.60 5.40 B7a
13.50 m2
formwork in sides of 1st floor slab beams contnd..
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 12
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

14.37 51) concrete in RCC roof gutters 8.91 55) formwork in RCW1 up to 1st
0.23 4.30 38.31 floor level
0.45 1.49 8.61
14.37 4.30 37.02
0.35 3/ 4.73
0.25 1.26 4.30 61.02
14.37 136.35 m2
0.30
0.55 2.37
14.37
0.10 2/22/ 5.64 248.16 56) T10 bars in RCW1
0.40 0.57 2/2/22/ 5.03 442.64
5.69 m3 2/2/22/ 9.97 877.36
2/24/ 5.20 249.60
2/2/22/ 5.20 457.60
2/2/44/ 5.20 915.20
2/ 14.37 52) formwork in RCC roof gutters 3,190.56 m 3190.56 x 0.617= 1968.58kg
0.45 12.93
14.37
0.65 9.34
14.37 2/ 15.74 57) Concrete in TB1 @ roof angle
0.95 13.65 0.23
14.37 0.23 1.67 m3
0.70 10.06
2/ 0.95
0.65 1.24
47.22 m2 2/2/ 15.74 58) Formwork in TB1 @ roof angle
0.23 14.48 m2
53) Reinft. In RCC roof gutter

59) Reinft. in TB1 @ roof angle - 150kg/m3

1.67m3 x 150kg = 249.79kg

60) concrete in staircase


3.51 flight 1
1.13
21/ 17.37 364.77 T10 bars in RCC roof gutters 0.15 0.59
72/ 1.60 115.20 12/½/ 0.25
96/ 1.35 129.60 0.15
609.57 m 609.57 x 0.617= 376.10kg 1.13 0.25
2.25 landing
1.13
3/ 2.43 7.29 m T16 bars in RCC roof gutters 0.15 0.38
2.25 LB1
7.29 x 1.579= 11.51kg 0.23
0.30 0.16
3.34 flight 2
8.91 54) concrete in RCW1 up to 1st floor level 1.13
0.30 0.15 0.57
4.30 11.49 11/½/ 0.25
8.61 0.15
0.30 1.13 0.23
4.30 11.11 2.19 m3
3/ 4.73
0.30
4.30 18.31
40.91 m3
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 13
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description
63) Litols
3.51 61) formwork in staircase Lintol type L2 - 225 x 75 with 2T10
1.13 3.97 flight 1 1.35 1.35 D3
2/ 3.51 4/ 1.20 4.80 D7
0.30 2.11 1.05 1.05 W1
1.13 3/ 1.05 3.15 F1
2.00 2.26 10.35 m
1.13
3.00 3.39
2/ 2.25 landing
0.15 0.68 Lintol type L3 - 225 x 100 with 2T10
2.25 1.65 1.65 D5
1.13 2.54 1.50 1.50 D6
2/ 0.25 LB1 3.15 m
0.30 0.15
2.25
0.68 1.53
3.34 flight 2 Lintol type L4 - 225 x 150 with 4T10, R6
1.13 3.77 2/ 1.85 3.70 m D4
2/ 3.34
0.30 2.00
2.00
1.13 2.26 Lintol type L5 - 230 x 230 with 4T10, R6
3.00 2.70 2.70 m W2
1.13 3.39
28.05 m2
225 bk.wk
62) Reinft. In Staircase
4000mm high walls
T10 bars in staircase
31/ 1.30 40.30 flight 1 grid I 15709
12/ 1.35 16.20 flight 2 1228
12/ 5.10 61.20 2004
33/ 1.30 42.90 grid H 3225
12/ 3.08 36.96 grid F 3225
197.56 m grid E 2000
grid C 4238
197.56 x 0.617= 121.89kg grid B 2100
grid A 2000
1225
T12 bars in staircase 4725
11/ 0.85 9.35 flight 1 15675
11/ 1.55 17.05 4500
11/ 3.60 39.60 grid 1 1300
5/ 4.66 23.30 1175
2/ 2.50 5.00 LB1 1425
94.30 m 880
1558
94.30 x 0.888 = 83.74kg 1613
413
3935
2/ 2.50 5.00 m T16 bars in staircase grid 2 1425
880
5.00 x 1.579= 7.90kg 1558
1613
413
11/ 1.05 11.55 m T8 bars in staircase grid 5 13862
grid 6 2963
11.55 x 0.395 = 4.56kg ddt - T joints 12/½/225 (1350)
95517
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 14
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

2995mm high walls


4725 1200
grid 3 1300 add 2/½/225 225
1300 1000
5950

95.52 64) 225thk. Brick work


4.00 382.08 4725 2435
1.30 add 2/½/225 225
2.30 2.99 ddt. (1000)
385.07 m2 4950

1000 1300

-ditto - do-
ddt. Doors and windows 1000 950
3.70 G1 1225
3.55 13.14 2000
0.60 W1 4225
1.20 0.72
0.75 D7
2.10 1.58 1000 880
0.60 F1 1558
0.90 0.54 2438
2.25 W2
1.45 3.26
1.20 D5 off white 600x600 gloss tiles (rocell
2.10 2.52 7/107) laid to given patern - banking
1.05 D6 areas [1]
2.10 2.21 15.71
0.90 D3 13.61 213.81
2.10 1.89 5.95
3.59 D2 1.20 7.14
3.00 10.77 4.95
7.61 FG3.1 2.44 12.08
2.45 18.64 1.30
6.07 FG3.2 1.00 1.30
2.45 14.87 4.23
1.05 W3 0.95 4.02
1.70 1.79 2.44
71.92 m2 1.00 2.44
240.79 m2

4.28 65) 112.50mm thk. Brick work


4.00 17.12 m2 4275 5343

1200 3590
66) Floor Finishes

5.34 gray 600X300 semi rough tiles laid to


15709 9894 4.28 22.86 given pattern [2] in self service area
3720 1.20 and entrance
13614 3.59 4.31
27.16 m2
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 15
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

Staircase Entrance steps

1300 1000 1450 3590


1175 1225
2475 2000
4225 3590 900

2475 / 2 = 1237.50 Ramp area

1200 1920
safe deposite vault

4350 3750 3.59 pebble wash concrete finish [5]


1.45 5.21
cash vault 3.59
0.90 3.23 entrance steps
4360 4472 2/ 1.92
1.20 4.61 ramp area
13.04 m2
4.23 gray / off white textured 600x600 semi
2.48 10.49 gloss tiles laid to given pattern [3]
1.24 Entrance
4.00 4.96 staircase steps & landing
4.35 1450 3590
3.75 16.31 safe deposite vault
4.47 3.59 300x300 handcut miris gal paving [6]
4.36 19.49 cash vault 1.45 5.21 m2
51.25 m2

Sec. Toilet Generator room

2875 1075 3000 3910

Disable toilet 3.91 cement rendering (in approved colour


3.00 11.73 m2 and texture) [7]
1175 1075

Common toilet 100mm high skirting

1175 1333 banking area

Sec. Room 15700


15675
1550 1800 4725
2/1225 2450
Common toilet 2/2000 4000
ddt ½/ 225 (112.5)
1225 1800 1000
225
300x300 dark colour matt tile to match 1000
2.88 with the wall tile - non skid - toilets [4] 1225
1.08 3.11 Sec. Toilet ddt ½/ 225 (112.5)
2.08 4725
1.78 3.70 Disable toilet add ½/ 225 112.5
1.78 50612.50
1.33 2.37 common toilet
1.80
1.55 2.79 Sec. room
1.80
1.23 2.21 Janitor's room
14.18 m2
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 16
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description
banking area
1300 67) Wall Finishes
add ½/ 225 112.5
9894 Wall finishes - internal
3720
950 CIC paint - marble falls (off white)
1425 colour
2/880 1760 10.66 grid I
2/1558 3116 3.15 33.58
880 4.78
1558 3.15 15.06 &
1613 4.36
413 4.00 17.44 smooth plastering
3935 3.00
30676.5 4.00 12.00
3.00 grid H
self service area and entrance 4.00 12.00
4275 1.55
5243 4.00 6.20
2850 1.23
12368 4.00 4.92
4.58 grid G
staircase 4.00 18.32
2/4225 8450 4.35
2475 4.00 17.40
4000 1.55 grid F
2/3750 7500 4.00 6.20
2/4360 8720 1.23
2/4472 8944 4.00 4.92
40089 1.00
3.15 3.15
Security room 4.58 grid D
4.00 18.32
2/ 1800 3600 4.80
2/ 1550 3100 3.15 15.12
6700 2.23 grid C
3.15 7.02
4.23
100mm high ceramic skirting 4.00 16.92
50.61 50.61 banking area 3.10 grid B
30.68 30.68 4.00 12.40
12.37 12.37 self service area and entrance 1.00 grid A
40.09 40.09 staircase 4.00 4.00
6.70 6.70 Security room 23.79
140.45 m 3.10 73.75
2/ 4.28
4.00 34.24
0.95 grid 1
4.00 3.80
1.80
4.00 7.20
3.71
4.00 14.84
3.64 grid 2
3.15 11.47
2/ 1.80
4.00 14.40
384.67 m²
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 17
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

CIC paint - marble falls (off white) CIC paint - marble falls (off white)
colour colour
2/ 1.80 1.20 D5
4.00 14.40 grid 2 0.23 0.28 &
1.30 2/ 0.23
3.10 4.03 grid 3 2.10 0.97 smooth plastering
2.44 & 4/ 0.75 D7
3.15 7.69 0.23 0.69
1.80 smooth plastering 4/2/ 0.23
4.00 7.20 2.10 3.86
3.91 1.05 D6
4.00 15.64 0.23 0.24
3.75 2/ 0.23
4.00 15.00 2.10 0.97
4.19 2/ 1.40 D4
4.00 16.76 0.23 0.64
3.75 grid 4 4/2/ 0.23
4.00 15.00 2.10 3.86
4.47 3.70 G1
4.00 17.88 0.23 0.85
8.92 2/ 0.23
3.15 28.10 3.55 1.63
13.60 grid 5 1.20 RSD
3.15 42.84 0.23 0.28
5.48 2/ 0.23
3.15 17.26 2.10 0.97
2.85 grid 6 2/ 0.60 W1
3.15 8.98 0.23 0.28
5.03 common toilet 2/ 0.23
1.90 9.56 1.20 0.55
7.71 disable toilet 3/ 0.60 F1
1.90 14.65 0.23 0.41
3.59 D2 3/2/ 0.23
0.23 0.83 0.56 0.77
2/ 0.23 2/ 2.25 W2
3.00 1.38 0.23 1.04
0.90 D3 2/ 0.23
0.23 0.21 1.45 0.67
2/ 0.23 18.95 m²
2.10 0.97
0.23 FG1
3.00 0.69
2/ 7.61 FG3.1 ditto - ddt
0.23 3.50 4/ 0.75 Doors and windows
2/ 0.23 2.10 6.30 D7
2.45 1.13 1.20
2/ 6.07 FG3.2 2.10 2.52 D5
0.23 2.79 7.61
2/ 0.23 2.45 18.64 FG3.1
2.45 1.13 6.07
2/ 1.05 W3 2.45 14.87 FG3.2
0.23 0.48 1.05
2/ 0.23 1.70 1.79 W3
1.70 0.78 0.60
248.86 m² 1.20 0.72 W1
44.84 m²
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 18
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description
Wall finishes - internal
ditto - ddt
3.70 Doors and windows 4.79 CIC paint - Royal gold yellow color
3.55 13.14 G1 4.00 19.16
1.05 3.59 &
2.10 2.21 D6 0.23 0.83
2/2/ 1.40 2/ 0.23 rough plastering
2.10 11.76 D4 3.00 1.38
2/ 0.90 21.37 m²
2.10 3.78 D3
3.59
3.00 10.77 D2
41.65 m² 4.50 cut cement finish
1.00 4.50
4.73 &
300X600mm gloss white with textured 4.90 23.18
5.03 finish wall tiles in toilet 3.31 rough plastering
2.10 10.56 common toilet 0.93 3.08
7.71 6.44
2.10 16.19 disable toilet 1.00 6.44
6.23 2.63
2.10 13.08 sec. toilet 0.93 2.45
2/ 0.60 3.08
0.23 0.28 F1 4.90 15.09
2/2/ 0.23 54.73 m²
0.56 0.52
1.05
0.23 0.24 D6 23.63 weathershild paint
0.23 4.00 94.52 grid A
2.10 0.48 23.90 &
2/ 0.75 4.00 95.60 grid I
0.23 0.35 D7 12.52 rough plastering
2/2/ 0.23 4.00 50.08 grid 1
2.10 1.93 1.20
43.63 m² 0.23 0.28 D5
2/ 0.23
2.10 0.97 D5
ditto - ddt 2/ 0.75
2/ 0.75 Doors and windows 0.23 0.35 D7
2.10 3.15 D7 2/2/ 0.23
3/ 0.60 2.10 1.93 D7
0.90 1.62 F1 3.70
1.05 0.23 0.85 RSD
2.10 2.21 D6 2/ 0.23
6.98 m² 3.55 1.63
2/ 0.60 W1
0.23 0.28
0.89 20mm thk granite tiling on vanity top 2/ 0.23
0.53 0.47 1.20 0.55
0.89 3/2/ 0.60 F1
0.30 0.27 0.23 0.83
2/ 0.10 3/2/ 0.23
0.45 0.09 0.56 0.77
4/ 0.52 2/ 2.25 W2
0.73 1.52 0.23 1.04
0.89 2/ 0.23
0.15 0.13 1.45 0.67
2.48 m² 250.33 m²
cont..
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 19
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description
(69) water proofing
2/ 7.61 weathershild paint approved type water proofing on
0.23 3.50 FG3.1 the floor and 300mm along walls
2/ 0.23 & in toilet
2.45 1.13
2/ 6.07 FG3.2 1.78 common toilet
0.23 2.79 rough plastering 1.33 2.37
2/ 0.23 2/ 1.78
2.45 1.13 0.30 1.07
2/ 1.05 W3 2/ 1.33
0.23 0.48 0.30 0.80
2/ 0.23 1.78 disable toilet
1.70 0.78 2.08 3.70
9.81 m² 2/ 1.78
0.30 1.07
2/ 2.08
(68) Ceiling finishes 0.33 1.37
2.88 security toilet
2'x2' non perforated white 1.08 3.11
15.41 metalic ceiling 2/ 2.88
13.12 202.18 banking room 0.30 1.73
3.83 common room 2/ 1.08
3.68 14.09 0.30 0.65
2.13 passage along jenitors room 15.86 m²
1.20 2.56
2.44
1.00 2.44 14.00 water proofing to rcc gutter and
221.27 m² 2.25 31.50 flower trough
2/ 16.12
1.00 32.24
smooth plastered and painted in 16.12
approved color - slab soffit and 0.10 1.61
staircase soffit 2/ 18.52
1.00 37.04
5.25 self service area 18.52
4.28 22.47 0.10 1.85
4.51 cash valt 104.24 m²
4.47 20.16
4.51 safe deposite
3.75 16.91 8.22 water proofing on slab
3.91 generator room 3.86 31.73 m²
3.00 11.73
1.80 janitor's room
1.23 2.21 (70)hand rail - staircase hand rail
1.80 security room 7.55 7.55m 25∅ G.I. upright, 50∅ G.I. pipe
1.55 2.79 handrail with 10∅ M.S. rods
1.78 common toilet
1.33 2.37
2.08 disable toilet 1.00 1 nr (71) vanity - RCC vanity 890x500mm size
1.78 3.70 with 100thk brick work
2.88 security toilet
1.08 3.11
4.13 staircase soffit 14.00 Plastering to RCC gutter
2.25 9.29 2.25 31.50 m²
4.50 entrance area
3.59 16.16
110.90 m²
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 20
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description
(74)
First floor to Roof top level T12 bars in columns
9/4/ 3.30 118.80 C1
C1 - 225x225 - 3025 high - 9 NOS 2/4/ 3.00 24.00
C1 - 225x225 - 2700 high - 2 NOS 2/4/ 1.70 13.60 FC1
FC1 - 225x225 - 1400 high - 2 NOS 4/ 3.30 13.20
C2 - 225x225 - 3025 high - 1 NOS 2/4/ 3.00 24.00
C2 - 225x225 - 2700 high - 2 NOS 193.60 m
C3 - 225x450 - 3025 high - 3 NOS
C3 - 225x450 - 2700 high - 2 NOS 193.60m x 0.888 = 171.92kg
C4 - 300x300 - 4000 high - 2 NOS

9/ 0.23 (72) Concrete in RCC columns T16 bars in columns


0.23 3/4/ 3.30 39.60 C3
3.03 1.44 C1 2/4/ 3.00 24.00
2/ 0.23 63.60 m
0.23
2.70 0.29 193.60m x 1.579 = 305.69kg
2/ 0.23 FC1
0.23
1.40 0.15 R6 stirrups in columns
0.23 C2 9/20/ 0.72 129.60 C1
0.23 2/18/ 0.72 25.92
3.03 0.16 2/9/ 0.72 12.96 FC1
2/ 0.23 20/ 0.72 14.40 C2
0.23 2/18/ 0.72 25.92
2.70 0.29 3/20/ 0.72 43.20 C3
3/ 0.23 C3 2/18/ 0.72 25.92
0.23 277.92 m
3.03 0.48
2/ 0.23 277.92m x 0.222 = 61.70kg
0.23
2.70 0.29
0.30 C4
0.30 10.57 (75) Concrete in 150mm thk roof
4.00 0.36 8.18 slab
3.45 m³ 0.15 12.97
3.83
2.48
0.15 1.42
9/ 0.90 (73) Formwork in Columns 14.39 m³
3.03 24.54 C1
2/ 0.90
2.70 4.86
2/ 0.90 10.57 (76) formwork in 150mm thk roof
1.40 2.52 FC1 8.18 86.46 slab
0.90 3.83
3.03 2.73 C2 2.48 9.50
2/ 0.90 2/ 10.57
2.70 4.86 C2 0.15 3.17
3/ 0.90 2/ 14.37
3.03 8.18 C3 0.15 4.31
2/ 0.90 103.44 m²
2.70 4.86 C3
1.20
4.00 4.80 C4 (77) Reinft. in roof slab- 80kg/m³
57.35 m² 14.39m³ x 80kg = 1,151.20kg
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 21
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

(78) Concrete in beams at roof slab 8,800


7.95 level 1,800
0.23 4/1,300 5,200
0.25 0.46 BR1 15,800
7.95
0.23
0.25 0.46 BR2
7.95 15.80 (81) Concrete in 100mm thk sun
0.23 0.45 shade
0.25 0.46 BR3 0.10 0.71 m³
3.60
0.23
0.25 0.21 BR4 2/ 15.80 (82) Formwork in 100mm thk sun
14.37 0.45 14.22 shade
0.23 3/ 15.80
0.25 0.83 BR5 0.10 4.74
10.03 4/2/ 0.45
0.23 1.30 4.68
0.25 0.58 BR6 15.80
14.70 0.50 7.90
0.23 31.54 m²
0.25 0.85 BR7
2.70
0.23 (83) Reinforcement in sun shade
0.25 0.16 BR8
3.98 m³ 4/2/ 17.30 138.40 m T16 bars in sun shade

2/ 7.95 (79) Formwork in beams at roof slab 138.40m x 1.579 = 218.53kg


0.25 3.98 BR1
2/ 7.95
0.25 3.98 BR2 2/105/ 0.75 157.50 T10 bars in sun shade
2/ 7.95 2/105/ 0.62 130.20
0.25 3.98 BR3 2/3/ 17.30 103.80
2/ 3.60 4/3/ 1.30 15.60
0.25 1.80 BR4 4/9/ 0.62 22.32
2/ 14.37 429.42 m
0.25 7.19 BR5
2/ 10.03 429.42m x 0.617 = 264.95kg
0.25 5.02 BR6
2/ 14.70
0.25 7.35 BR7 2/ 5.23 Concrete in link to support roof at
2/ 2.70 0.23 FC1 column
0.25 1.35 BR8 0.40 0.96 m³
34.63 m²

2/ formwork in link to support roof at


(80) Reinft. in RCC flower trough- 190kg/m³ FC1 column
3.98m³ x 190kg = 756.20kg
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 22
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

84) concrete in staircase 153.40 x 0.617= 94.65kg


3.51 flight 3
1.13
0.15 0.59 T12 bars in staircase
0.25 2/ 2.50 5.00 m
12/½/
0.15
1.13 0.25 5.00x 0.888= 4.44kg
2.25 landing
1.13
0.15 0.38 2/ 2.50 5.00 m T16 bars in staircase
2.25 LB1
0.23 5.00 x 1.579= 7.90kg
0.30 0.16
2.06 flight 4
1.13 11/ 1.05 11.55 m T8 bars in staircase
0.15 0.35
7/½/ 0.25 11.55 x 0.395 = 4.56kg
0.15
1.13 0.15
1.88 m3

lintol type L2 - 225x75 with 2T10


3.51 85) formwork in staircase 4/ 1.20 4.80 D7
1.13 3.97 flight 3 2/ 1.05 2.10 F1
2/ 3.51 6.90 m
0.30 2.11
1.13
2.00 2.26
1.13 lintol type L3 - 225x100 with 2T10
3.00 3.39 2/ 1.50 3.00 m W3
2/ 2.25 landing
0.15 0.68
2.25 lintol type L5 - 225x75 with 2T10
1.13 2.54 2.70 2.70 D7
2/ 0.25 LB1 2.25 2.25 F1
0.30 0.15 4.95 m
2.25
0.68 1.53
2.06 flight 4
1.13 2.33 225 thk brick wall length - 2700 height
2/ 2.06 grid 5 13.94
0.30 1.24
1.09
1.13 1.23 225 thk brick wall length - 836 height
1.50 grid I 15.71
1.13 1.70 grid A 15.66
23.11 m2 31.37

86) Reinft. In Staircase

T10 bars in staircase


12/ 2.30 27.60 flight 3
12/ 3.56 42.72 flight 4
12/ 3.24 38.88
34/ 1.30 44.20
153.40 m
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 23
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

225 thk brick wall length - 3025 height 93)110mm thk brick work

grid I 4735 2/750 1500


1228 2/644 1288
2004 2788
grid H1 2363 2.79
grid G 3225 3.03 8.45 m2
grid C 4238
grid A 2000
1225
4725 2/ 0.75 ditto - ddt doors and windows
grid 1 & 4 2/ 2475 4950 2.10 3.15 D7
2/5475 10950
2/2184 4368
2/2090 4180 94) Floor Finishes
grid 3 1712
1497
ddt T-joints 4/½/225 (450) 10.10 gray / off white textured 600x600
52,950 4.50 45.45 semi gloss tiles laid to given
5.25 pattern - other areas
13.94 91) 225mm thk.brick work 3.23 16.96
2.70 37.64 3.60
31.37 2.48 8.93
0.84 26.35 71.34 m2
52.95
3.03 160.44
224.43 m2
1.13 ditto -
3.10 3.50 in staircase steps & landing
2/ 0.60 ditto - ddt doors and windows 4.15
0.90 1.08 F1 2.25 9.34
2.25 12.84 m2
1.45 3.26 W2
2/ 1.05
1.70 3.57 W3 300x300 dark colour matt tile to
1.80 3.00 match with the wall tile - non skid
1.10 1.98 W4 1.51 4.53 in toilets
4.89 2.15
1.10 5.38 W5.1 0.64 1.38 gents toilet
3.99 3.00
1.10 4.39 W5.2 1.30 3.90
4.25 2.15
1.70 7.23 W6 0.64 1.38 ladies toilet
26.89 m2 11.18 m2

92) 112.5mm thk brick work


15.71
1.86 29.22 grid I
15.66
1.86 29.13 grid A
58.35 m2
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 24
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

95) Wall finishes - internal Wall finishes - external

CIC paint - marble falls (off white) CIC paint - Royal Gold yellow
colour (code no. 86/042) 8.18 colour (code no. 23YY 62/816)
4.51 grid I 3.03 24.79 grid A
3.03 13.67 8.19
3.23 grid G 3.03 24.82 grid I
3.03 9.79 12.52
2/ 4.13 grid C 3.03 37.94 grid 1
3.03 25.03 13.04
7.73 grid A 3.03 39.51 grid 4
3.03 23.42 127.05
2.25 grid 1
3.03 6.82
5.25
3.03 15.91 96) Ceiling finishes
1.35 grid 2
3.03 4.09 9.00 Smooth plastered and painted in
1.61 grid 3 4.50 40.50 approved colour - slab soffit and
3.03 4.88 4.47 staircase soffit
12.58 grid 4 4.35 19.44
3.03 38.12 4.35
10.30 ladies toilet 3.75 16.31
0.83 8.55 3.90
9.89 gents toilet 3.00 11.70
0.83 8.21 1.80
158.47 m2 1.23 2.21
1.80
1.55 2.79
1.78
wall tiles - 300x600 gloss white with 1.33 2.37
10.30 textured finish - toilets 2.00
2.10 21.63 1.78 3.56
9.89 4.13
2.10 20.77 2.25 9.29
42.40 m2 108.18 m2

2/ 1.15 20mm thk Granite Tile on vanity


0.64 1.47 15.41 2'x2' non perforated white metalic
2/ 1.15 13.12 202.18 ceiling
0.30 0.69 3.83
2/2/ 0.10 3.68 14.09
0.45 0.18 2.13
2/2/ 0.64 1.20 2.56
0.73 1.87 2.43
2/ 1.15 1.00 2.43
0.15 0.35 221.26 m2
4.56 m2
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 25
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

97) waterproofing 101) Formwork in column shafts


waterproofing in floor 3/ 0.90 C1
3.00 gents toilet 5.48 14.80
1.51 4.53 0.90
2.15 2.85 2.57
0.64 1.38 6/ 0.90 FC1
3.00 ladies toilet 2.85 15.39
1.30 3.90 0.90 C2
2.15 5.48 4.93
0.64 1.38 0.90 C3
11.18 m2 2.85 2.57
40.25 m2
waterproofing in wall
10.30 gents toilet 102) Reinforcement in columns
2.10 21.63 T12 bars in columns
9.89 ladies toilet 9/4/ 5.50 66.00 C1
2.10 20.77 4/ 3.10 12.40
42.40 m2 6/4/ 3.15 75.60 FC1
4/ 5.50 22.00 C2
4/ 3.15 12.60 C3
98) Hand rail 188.60 m
Staircase handrail 25 dia. G.I.
7.30 7.30 upright, 50 dia G.I. pipe handrail 188.60m x 0.888 = 167.48kg
with 10 dia M.S. rods
R6 stirrups in columns
3/37/ 0.72 129.60 C1
99) RCC Vanity 19/ 0.72 13.68
2.00 2 nos RC slab Vanity size 1148x636 with 6/19/ 0.72 82.08 FC1
100thk brick work 37/ 0.72 26.64 C2
19/ 0.72 13.68 C3
ROOF TOP TO WATER TANK FLOOR 265.68 m

C1 - 225x225 - 5475 high - 3 NOS 265.68m x 0.222 = 58.98kg


C1 - 225x225 - 2850 high - 1 NOS
FC1 - 225x225 - 2850high - 6 NOS
C2 - 225x225 - 5475 high - 1 NOS 8.18 103) Conc. in 150mm thk covering
C3 - 225x450 - 2850 high - 1 NOS 2.58
0.15 3.17 m3
100) concrete in columns
3/ 0.23 C1
0.23 8.18 104) Formwork in 150mm thk
5.48 0.87 2.58 21.10 covering slab
0.23 21.52
0.23 0.15 3.23
2.85 0.15 24.33 m2
6/ 0.23 FC1
0.23
2.85 0.90 105) Reinft. in 150mm thk covering
0.23 C2 slab
0.23 reinforcement - 80kg/m³
5.48 0.29
0.23 C3 3.17 x 80= 253.60kg
0.23
2.85 0.15
2.37 m3
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 26
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description

106) Conc. in beams at Covering slab ddt. Doors and windows


2/ 2.48 B1RB
0.23 225mm thk brick work
0.25 0.29 0.75
7.95 B2RB 2.10 1.58
0.23 2.25
0.25 0.46 1.45 3.26
7.95 B3RB 2/ 1.20
0.23 1.70 4.08
0.25 0.46 8.92 m2
1.20 m3

2.75 111) 110mm thk brick work


107) Formwork beams at Covering 3.18 8.75
slab 3.03
2/2/ 2.48 3.18 9.64
0.25 2.48 1.08
2/ 7.95 3.18 3.43
0.25 3.98 21.81 m2
2/ 7.95
0.25 3.98
10.43 m2 112) Floor Finishes

2.83 gray / off white textured 600x600


108) Reinft. beams at Covering slab 2.75 7.78 semi gloss tiles laid to given
reinforcement - 190kg/m³ 2.50 pattern - other areas
0.90 2.25
1.20 x 190= 228.00kg 10.03 m2

109) Lintel 9.60 gray / off white textured 600x600


lintol type L2 - 225x75 with 2T10 7.73 76.80 semi rough floor tiles on approved
1.20 1.20 m D7 waterproofing

lintol type L3 - 225x100 with 2T10 113) Wall finishes - internal


2/ 1.65 3.30 m W3
CIC paint - marble falls (off white) colour
7.84 (codeC no. 86/042)
grid
8.06 110) 225mm thk brick work 3.18 24.93
3.18 25.63 7.84 grid A
5.04 3.18 24.93
3.18 16.03 2.25 grid 1
5.15 3.18 7.16
2.30 11.85 1.08
2.48 3.18 3.43
3.18 7.89 0.58
2.48 3.18 1.84
2.30 5.70 2.75 grid 4
9.74 3.18 8.75
1.05 10.23 71.04 m2
9.61
1.05 10.09
7.74
1.05 8.13
95.54 m2
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 27
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:

T D S Description T D S Description
113) Wall finishes - external
weathersheild paint / plastering work 119) 2.25m width ZN/AL flashing
8.18 grid A 14.00 14.00m as per architectural drawing
3.18 26.01
5.15
3.18 16.38 120) Truss T1 - 2/70x70x6 double
8.19 grid C 2.00 2 nos angle & 1/50x50x6 single angle
3.18 26.04
3.08 grid 1
3.18 9.79
2.70
3.18 8.59
3.08 grid 4
3.18 9.79
2/ 9.74 guard wall
1.05 20.45
2/ 9.61
1.05 20.18
2/ 7.74
1.05 16.25
153.50 m2

2.83 114) plastering /.brilient white painted


2.75 7.78 slab soffit and staircase soffit
2.50
0.90 2.25
4.13
2.25 9.29
19.33 m2

2.83 115) waterproofing


2.75 7.78
2.50
0.90 2.25
4.13
2.25 9.29
9.60
7.73 74.21
93.53 m2

ROOF WORK

116) ZN/AL roof covering / heat


15.20 insulation
13.84 210.37 m2

117) 0.7m width ZN/AL flashing as


per architectural drawing
13/ 13.84 179.92 m

118) 2.8m width ZN/AL flashing as


31.00 31.00m per architectural drawing
View publication stats