FINAL PROJECT
Group Members
G. M. M. Madhushani - CODQS18.2P-007
Nuwanka K. G. T. - CODQS18.2P-002
Chamalka G. E. - CODQS18.2P-013
Silva S. Y. T. - CODQS18.2P-010
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
1
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Engineer's Facilities
1.9 Allow lump sum for constructing, maintaining
and dismantling and removal on completion of
the Works, a temporary building for Engineer’s
office in conformity with the plans provided for
Engineer’s requirements, including necessary
furniture and fittings, furnishing and sanitary
facilities. 1.00 Item 80,000.00 80,000.00
Contractor's Facilities
1.13 Allow lump sum for constructing, maintaining,
dismantling and removal on completion of the
Works, a temporary site office of adequate size
including staff rest room and toilets and other
facilities for the Contractor’s site management
staff in accordance with the plans prepared by
the Contractor and concurred by the Engineer. 1.00 Item 200,000.00 200,000.00
2
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
3
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Setting out
1.20 Allow lump sum for employing a licensed land
surveyor to define the building site work etc,
check levels and carry out such other surveys as
may be necessary to establish accurately the
placing of forms and pouring of concrete and all
other setting out in both vertical and horizontal
plane. All survey marks and pegs shall be clearly
identifiable with accurate records kept on site by
the Contractor that must be related to "Bench
Marks".
In this regard the Contractor must maintain
accurate survey instruments on the site at all
times for any checking of levels that the Engineer
or his representative may desire to check.
4
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
5
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
6
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Miscellaneous
7
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
8
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
2A.2 Excavation
(a) Manual Excavation for column, wall, staircase
foundations in any material (except rock
requiring blasting) up to 1.5m depth, part return
fill in and ram and surplus deposited within site
as directed.
2A.5 Dewatering
2A.5.1 Allow for Dewatering from foundation trenches &
column pits Item Sum 255,000.00
9
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
2B CONCRETE WORK
10
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
2B.3 Formwork
Note :
Formwork shall be properly designed as
described in Specification and should be
sufficiently strong and stiff and should have an
even surface and grout tight and unless
otherwise stated should provide Basic Finish
as described in the Specification.
11
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
2B.4 Reinforcement
Allow for preparing Bar Bending Schedules,
details working drawings to the entire work
based on detail drawings prepared by the
Structural Engineer and issued to the
Contractor by the Engineer. The Contractor
shall obtain written approval of the
Engineer for the Bar Bending Schedules
prior to fabricating and fixing in position.
Note :
Following are the minimum weights/m which
have been used for the computation of
quantities of reinforcement.
32mm - 6.282 Kg/m
25mm - 3.854 Kg/m
20mm - 2.467 Kg/m
16mm - 1.579 Kg/m
12mm - 0.888 Kg/m
10mm - 0.617 Kg/m
8mm - 0.395 Kg/m
6mm - 0.222 Kg/m
2B.4.1.6 R6 -200 mesh in 100thk ground floor slab 312.49 m2 215.00 67,185.35
12
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
2C MASONRY WORK
13
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
SUMMARY
14
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
3A CONCRETE WORK
In Ground Floor
3A.1.1 In Columns 6.63 m3 23,460.00 155,539.80
3A.1.2 In 150mm thk. Slab at first floor level 13.91 m3 23,460.00 326,328.60
3A.1.3 In 300mm thk. Slab at first floor level 15.55 m3 23,460.00 364,803.00
3A.1.7 RCC Roof Gutter at first floor slab level 5.69 m3 23,460.00 133,487.40
In First Floor
3A.1.10 In Columns 3.45 m3 24,635.00 84,990.75
In Roof Terrace
3A.1.15 In Columns 2.37 m3 25,865.00 61,300.05
3A.1.16 In 150mm thk. Water tank Cover slab 3.17 m3 25,865.00 81,992.05
Lintels
Lintels type L2 size 225x 75mm reinforced with 2
nos of 10mm dia. tor steel bars including necessary
formwork
15
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
3A.2 Formwork
Note :
Formwork shall be properly designed as
described in Specification and should be
sufficiently strong and stiff and should have an
even surface and grout tight and unless
otherwise stated should provide Basic Finish
as described in the Specification.
In Ground Floor
3A.2.1 In Columns 95.32 m2 970.00 92,460.40
3A.2.2 In 150mm thk. Slab at first floor level 102.97 m2 970.00 99,880.90
16
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
3A.2.3 In 300mm thk. Slab at first floor level 56.45 m2 970.00 54,756.50
3A.2.7 RCC Roof Gutter at first floor slab level 47.22 m2 1,120.00 52,886.40
In First Floor
3A.2.10 In Columns 57.35 m2 1,020.00 58,497.00
In Roof Terrace
3A.2.15 In Columns 42.26 m2 1,070.00 45,218.20
3A.2.16 In 150mm thk. Water tank Cover slab 25.55 m2 1,070.00 27,338.50
3A.3 Reinforcement
17
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
In Ground Floor
3A.3.1 In Columns 775.13 Kg 215.00 166,652.95
3A.3.2 In 150mm thk. Slab at first floor level 1,112.80 Kg 215.00 239,252.00
3A.3.3 In 300mm thk. Slab at first floor level 1,244.00 Kg 215.00 267,460.00
3A.3.7 RCC Roof Gutter at first floor slab level 387.61 Kg 215.00 83,336.15
In First Floor
3A.3.10 In Columns 539.31 Kg 225.00 121,344.75
In Roof Terrace
3A.3.15 In Columns 235.53 Kg 235.00 55,349.55
3A.3.16 In 150mm thk. Water tank Cover slab 265.91 Kg 235.00 62,488.85
18
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Sundries
Vanity Top
In Ground Floor
3A.3.20 Vanity size 890x500x75mm 1.00 Nos 20,400.00 20,400.00
In First Floor
3A.3.21 Vanity size 1148x636x75mm 2.00 Nos 21,420.00 42,840.00
3B MASONRY WORK
In Ground Floor
3B.1.1 225mm thick walls 313.15 m2 5,355.00 1,676,918.25
In First Floor
3B.1.3 225mm thick walls 197.54 m2 5,610.00 1,108,199.40
In Roof Terrace
3B.1.6 225mm thick walls 86.62 m2 5,895.00 510,624.90
19
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
3C WATER PROOFING
Note :
The contractor shall submit a warranty to the Employer
against dampness or moisture penetrating through
treated surface. The warranty shall be valid for a period
of 10 years commencing from the date of issue of
completion certificate regarding the proposed.
In Ground Floor
3C.1.1 In Toilet floors and walls 15.86 m2 2,040.00 32,354.40
3C.1.2 In RCC Roof Gutter & Flower trough 104.24 m2 2,040.00 212,649.60
In First Floor
3C.1.4 In Toilet floors and walls 53.58 m2 2,140.00 114,661.20
In Roof Terrace
3C.1.5 In Roof terrace floor 93.53 m2 2,245.00 209,974.85
20
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
The Bidder shall submit along with the Bid all technical
Information and detail of aluminium installation to be
used by the bidder technical information and detail of
aluminium Components which is proposed to be used by
the bidder. The Contractor shall submit detail shop
drawings as required by the Engineer for his approval
prior to commencement of fabrication of units. Rate
shall include all necessary Ironmongery items, locks and
fasteners (Hafele SS or approved equivalent) as per the
drawings to suit marine condition.
The aluminum windows, doors aluminum framed
partition etc. shall be, fabricated and installed by
specially trained tradesmen under the direction and
supervision of a competent Engineer. All metal
components to performed by complying with marine
conditions.
21
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Powder coating
All aluminium extrusion used in fabrication of doors and
widows shall be powder coated to required colour
to a minimum thickness of 80 mm micrones and shall
conform to the following standards.
3D.1 DOORS
22
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
3D.2 WINDOWS
23
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
24
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
3D.3 PARTITIONS
25
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
26
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
27
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Toilet Partition
Toilet Partition overall size 1945 X 2100mm with
doors shall be of single colour 12mm tk water
proofed HPL compact with chamfered edge . Each
will be supported by 3 nylon hinges affixed to the
pilaster completed with nylon coat hook & nylon
door knob.
3E ROOF WORK
Note:
All fabrication work notching drilling for bolts etc.
Delivery & unloading handling hoisting fixing in position
& grinding off all exposed welds flush & smooth.
28
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
3E.4
2.80m width ZN/AL flashing as per detail drawing 31.00 m 2,245.00 69,595.00
Note
Isolated areas, staircase areas, narrow widths such
as returns, reveals jambs and alike are not
measured separately.All tile edges shall be jointed
with miter joints.
Homogeneous ceramic tiling laid to pattern as per
drawing on 0-20mm thick 1:3 cement sand mix
bedding and joints pointed to match tiling and
consultants approval.
(a) Rocell tiles or equalent as per consultants approval
29
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
30
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Note:
Isolated areas, staircase area, narrow widths such as
returns, reveals jambs and alike are not are not
measured separately. Rate are including isolated
columns plastering.
Internal
External
31
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Ceiling
Supply and fixing 2'x2' non perforated white
metalic silicate ceiling
Granite tilng
Polished Granite size 300 x 300 x 20mm thick
absolutely black for vanity top, laid on 50mm thick
cement sand 1:3 screed level off using cement
slurry and 1mm joints to be absolutely in line and
flush and grout. (Prime Cost of tile Rs.1800.00 per
sq.m)
3G PAINTING
Note:
Isolated areas, staircase area, narrow widths such as
returns, reveals jambs and alike are not are not
measured separately.
INTERNAL
Painting walls with one coat of alkali resistant
wall primer including preparing surface to CIC
paint - marble falls (off white) colour (code no.
86/042) or equalent
3G.2 On soffits of slabs and staircase in Ground floor 116.45 m2 765.00 89,084.25
3G.4 On soffits of slabs and staircase in First floor 96.89 m2 805.00 77,996.45
32
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
Wall Tilling
300 x 600mm gloss with textured finish , supplying
and fixing to walls on a 1:3 cement sand mortar
layer, and pointed with tile grout to match the tile.
EXTERNAL
33
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
SUMMARY
34
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
4B CCTV SYSTEM
35
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
The quoted Rates include all Materials Labour Chargers and Transport
Paving
5A.1 100x100mm Pre cast cobble stone pavings with grass
patches laid to patterns on and including prepared base
to Architects Approval. Shall include for a Preperation
and the ground for required levels and compacting with
an including base layer of quary dust as per the
satisfaction of the consultant. 417.29 m2 330.00 137,705.70
Shurubs
5A.5 Flowering shurbs hedge consisting of Finger Palm
(Rhapis excelsa) 50.00 Nos 510.00 25,500.00
Kerbs
5A.9 Precast concrete kerbs (125 x255 x 915mm) laid on and
including mass concrete bedding as per detail 72.45 m 1,530.00 110,848.50
Fence
5A.10 Chain link 4m height fence to cover the part of the
Boundring wall (as per drawing). Complete of 50mm dia
Heavy duty G.I.Pipe embedded concrete pocket in the
2400mm center and horizontal with 25mm dia G.I.Pipe
at the top and bottom and 04 rods of draw wire concrete
with PVC coated guage-6 chain link Fence top of all the
G.I Columns should have a Fiber Glass on other material
caps accepted as the consultants. 47.88 m 7,650.00 366,282.00
36
BILLS OF QUANTITIES FOR PROPOSED BANK AT GALLE.
GRAND SUMMARY
37
Proposed Bank At Galle. 1
ABSTRACT SHEET
20) 75mm thk. Mass conc. 1:3:6 (20) under entrance steps
fdn. 1.34 m² 5
63) Lintels
Lintel type L2 - 225 x 75 with 2T10 10.35 m 13
300x300 dark color matt tile to match with the wall tile -
non skid - toilets [4] 14.18 m² 15
CIC paint - marble falls (off white) paint & smooth plastering
384.67 m² 16
248.86 m² 17
18.95 m² 17
ddt - Doors and windows (44.84) m² 17
ddt - Doors and windows (41.65) m² 18
565.99 m²
External
CIC paint - Royal gold yellow color 21.37 m² 18
(70)hand rail - staircase hand rail 25∅ G.I. upright, 50∅ G.I.
pipe handrail with 10∅ M.S. rods 7.55 m 19
300x300 dark color matt tile to match with the wall tile -
non skid - toilets [4] 11.18 m² 23
CIC paint - marble falls (off white) paint & smooth plastering
158.47 m² 24
External
CIC paint - Royal gold yellow color 127.05 m² 24
(98)hand rail - staircase hand rail 25∅ G.I. upright, 50∅ G.I.
pipe handrail with 10∅ M.S. rods 7.30 m 25
109) Lintel
lintel type L2 - 225x75 with 2T10 1.20 m 26
CIC paint - marble falls (off white) paint & smooth plastering
71.04 m² 26
External
CIC paint - Royal gold yellow color 153.50 m² 27
ROOF WORK
T D S Description T D S Description
2. Excavation for Col. Fdn. 25. Dry earth filling under floor
7. Conc. In Col. Base 30. 75mm thk. screed under 300thk GF slab
T D S Description T D S Description
51. Conc. RCC roof gutter FIRST FLOOR TO ROOF TOP LEVEL
52. Formwork RCC roof gutter 72. Conc. in Col. shaft up to FF to Roof top
53. Reinft. RCC roof gutter 73. Formwork in Col. shaft up to FF to Roof top
55. Formwork in RCW1 75. Conc. in 150mm thk slab at Roof top level
56. Reinft. in RCW1 76. Formwork in 150mm thk slab at Roof top
level
57. Conc. in TB1 @ roof angle 77. Reinft. in 150mm thk slab at Roof top level
58. Formwork in TB1 @ roof angle 78. Conc. in beams at Roof top slab level
59. Reinft. in TB1 @ roof angle 79. Formwork beams at Roof top slab level
60. Conc. in staircase 80. Reinft. beams at Roof top slab level
T D S Description T D S Description
84. Conc. In RCC link to support roof at FC1 104. Formwork in 150mm thk covering slab
columns
85. Formwork in RCC link to support roof at 105. Reinft. in 150mm thk covering slab
FC1 columns
86. Reinft. in RCC link to support roof at FC1 106. Conc. in beams at Covering slab
columns
ROOF TOP TO WATER TANK FLOOR 119. 2.25m width ZN/AL flashing as per
architectural drawing
100. Conc. in Col. shaft 120. Truss T1 - 2/70x70x6 double angle &
1/50x50x6 single a
T D S Description T D S Description
48.13 1) Removal of top soil 6/22/7/ 0.65 6) 50mm screed concrete in Col. Fdn.
19.00 914.47 m2 0.65 7.97 CY1
10/22/7/ 0.80
0.80 20.11 CY2
9/22/7/ 0.90
6/22/7/ 0.65 2) Excavation for Col. Fdn. 0.90 22.91 CY3
0.65 50.99 m2
3.00 23.90 CY1
10/22/7/ 0.80
0.80 6/22/7/ 0.65 7) Conc. In Col. Base
3.00 60.34 CY2 0.65
9/22/7/ 0.90 0.30 2.39 CY1
0.90 10/22/7/ 0.80
3.00 68.73 CY3 0.80
152.98 m3 0.35 7.04 CY2
9/22/7/ 0.90
0.90
0.40 9.16 CY3
6/22/7/ 0.65 3) C20 mass conc. In col. Fdn. 18.59 m3
0.65
0.15 1.20 CY1
10/22/7/ 0.80 CY1
0.80 2.00 1200/150 = 8
0.15 3.02 CY2
9/22/7/ 0.90 CY2
0.90 1.50 1500/150 = 10
0.15 3.44 CY3
7.65 m3 CY3
1800/150 = 12
6/22/7/ 0.65 4) Quarry dust filling with 5% cement 8) Reinforcement in Col. Base - T10
0.65 in col. Fdn. 6/2/8/ 1.20 115.20 CY1
1.35 10.76 CY1 10/2/10/ 1.50 300.00 CY2
10/22/7/ 0.80 9/2/12/ 1.80 388.80 CY3
0.80 804.00 m
1.35 27.15 CY2
9/22/7/ 0.90 804 X 0.617 = 496.07Kg
0.90
1.35 30.93 CY3
68.84 m3 9) Conc. In Col. Shaft up to DPC
2/ 0.28
CY1
0.28 1500
CY1 = 1500/ 600 = 2.5 ≈ 3nos 2.05 0.32 C1,CY1 ddt. Screed (50)
0.28 ddt. Base Height (300)
CY2 = 1500/ 450 = 3.33 ≈ 3nos 0.28 add. height up to G.F 900
2.00 0.16 C1,CY2
CY3 = 1500/ 450 = 3.33 ≈ 3nos 3/ 0.28 CY2
0.28 1500
5) 2.00 0.47 C2,CY2 ddt. Screed (50)
6/ 3.00 18.00 Nr Cylinders - CY1 - 1200 dia -300mm high 0.28 ddt. Base Height (350)
0.50 add. height up to G.F 900
2.05 0.29 C3,CY1
10/ 3.00 30.00 Nr Cylinders - CY1 - 1500 dia -350mm high 0.28 CY3
1500
0.50
ddt. Screed (50)
2.00 0.28 C3,CY2
ddt. Base Height (400)
9/ 3.00 27.00 Nr Cylinders - CY1 - 1800 dia -400mm high 1.52 m3 add. height up to G.F 900
1950
T D S Description T D S Description
T D S Description T D S Description
C2
C5
C4
Stirrup 1
300 - (40 x 2) = 220
4 x 220 + 24d = 880 + 24 x 6
= 1024
Stirrup 1 Stirrup 2
350 - (40 x 2) = 270 = 150 2 + 150 2
4 x 270 + 24d = 1080 + 24 x 6 = √22500 + √22500
= 1224 = √45000
= 212.13
Stirrup 2
= 175 2 + 175 2 212.13 - (40 x 2) = 132.13
= √30625 + √30625 4 x 132.13 + 24d = 525.52 + 24 x 6
= √61250 = 669.52
= 247.49
CY2
2000 / 150 = 13.33 + 1
≈ 13 + 1
=14
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 4
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:
T D S Description T D S Description
T D S Description T D S Description
15) Reinft. in Ground beams
13)Concrete in Ground Beams Reinft. in Ground beams -230kg/m3
1.73 GB17 (18.91m3 + 2.47m3) x 230kg
0.30 21.38m3 x 230kg = 4,916.77kg
0.45 0.23
12.30 GB18
0.30 Wall Fndn.
0.45 1.66
4.28 Ground beam for new 115thk wall 2/ 28125 56250
0.30
0.45 0.58 14372
2.47 m3 12302 26674
82924
T D S Description T D S Description
T D S Description T D S Description
T D S Description T D S Description
T D S Description T D S Description
4860 SUPERSTRUCTURE
2/150 300
ddt. Cover 2/40 (80) Ground floor to First floor
add. 2/ 300 600
ddt. Cover 2/40 (80) C1 - 225 X 225 - 4000 High - 06 NOS.
5600 C2 - 225 X 225 - 4000 High - 04 NOS.
C3 - 225 X 450 - 4000 High - 05 NOS.
4725/200 = 23.62 + 1 ≈ 24 + 1 = 25 C4 - 300 X 300 - 4000 High - 06 NOS.
C5 - 300Ø - 4000 high -1 NOS.
4050
2/150 300 36) Concrete in columns
ddt. Cover 2/40 (80) 6/ 0.23 C1
add. 2/ 300 600 0.23
ddt. Cover 2/40 (80) 4.00 1.27
4790 4/ 0.23 C2
0.23
4.00 0.85
5/ 0.23 C3
31) T10 bars in 300mm thk GF slab 0.45
2/46/ 5.47 503.24 4.00 2.07
2/25/ 5.60 280.00 6/ 0.30 C4
2/25/ 4.79 239.50 0.30
1,022.74 m 1022.74mx 0.617 = 631.03Kg 4.00 2.16
1/3.14/ 0.15 C5
0.15
4.00 0.28
900 6.63 m3
25
925
37) Formwork in columns
82.92 32) Plinth Plaster 6/ 0.90 C1
0.93 77.12 m2 4.00 21.60
4/ 0.90 C2
4.00 14.40
5/ 1.35 C3
3.82 33) concrete in entrance steps 4.00 27.00
1.72 6/ 1.20 C4
0.10 0.66 4.00 28.80
5/½ 3.82 1/2/3.14 0.14 C5
0.30 4.00 3.52
0.15 0.43 95.32 m2
1.09 m3
38) reinft. in columns
T12 Bars in columns
3.82 34) Formwork in entrance steps 6/4/ 4.10 98.40 C1
0.98 3.74 6/8/ 4.10 196.80 C4
3.82 295.20 m 295.2 x 0.888=262.14kg
1.77 6.76
2/ 1.72
0.24 0.83
11.33 m2 T16 Bars in columns
4/4/ 4.10 65.60 C2
5/6/ 4.10 123.00 C3
35) Reinft. in entrance steps -130kg/m3 1/6/ 4.10 24.60 C5
1.09m3 x 130kg = 141.70 kg 213.20 m 213.20 x 1.579=336.64kg
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 10
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:
T D S Description T D S Description
T D S Description T D S Description
4.50 48)concrete in 1st floor slab beams 49) formwork in sides of 1st floor slab
0.20 2/ 9.60 beams
0.60 0.54 B3 0.60 11.52 B8
4.50 2/ 4.50
0.30 0.60 5.40 B8a
0.30 0.41 B4 2/ 13.92
4.50 0.45 12.53 B9
0.20 2/ 15.70
0.60 0.54 B7a 0.45 14.13 B1
9.60 2/ 19.28
0.20 0.45 17.35 B7
0.60 1.15 B8 2/ 3.68
4.50 0.25 1.84 B10
0.20 2/ 7.72
0.60 0.54 B8a 0.25 3.86 B5
13.92 2/ 4.13
0.23 0.25 2.07 B6
0.45 1.44 B9 2/ 1.20
15.70 0.25 0.60 B12
0.23 2/ 3.00
0.45 1.62 B1 0.25 1.50 B2
19.28 2/ 3.00
0.23 0.25 1.50 B1a
0.45 2.00 B7 2/ 12.07
3.68 0.25 6.04 B13
0.23 78.33 m2
0.25 0.21 B10
7.72
0.23 50) Reinft. in 1st floor slab beams
0.25 0.44 B5 190kg/m3
4.13 10.24m3 x 190kg = 1945.60kg
0.23
0.25 0.24 B6
1.20
0.23
0.25 0.07 B12
3.00
0.23
0.25 0.17 B2
3.00
0.23
0.25 0.17 B1a
12.07
0.23
0.25 0.69 B13
10.24 m3
T D S Description T D S Description
14.37 51) concrete in RCC roof gutters 8.91 55) formwork in RCW1 up to 1st
0.23 4.30 38.31 floor level
0.45 1.49 8.61
14.37 4.30 37.02
0.35 3/ 4.73
0.25 1.26 4.30 61.02
14.37 136.35 m2
0.30
0.55 2.37
14.37
0.10 2/22/ 5.64 248.16 56) T10 bars in RCW1
0.40 0.57 2/2/22/ 5.03 442.64
5.69 m3 2/2/22/ 9.97 877.36
2/24/ 5.20 249.60
2/2/22/ 5.20 457.60
2/2/44/ 5.20 915.20
2/ 14.37 52) formwork in RCC roof gutters 3,190.56 m 3190.56 x 0.617= 1968.58kg
0.45 12.93
14.37
0.65 9.34
14.37 2/ 15.74 57) Concrete in TB1 @ roof angle
0.95 13.65 0.23
14.37 0.23 1.67 m3
0.70 10.06
2/ 0.95
0.65 1.24
47.22 m2 2/2/ 15.74 58) Formwork in TB1 @ roof angle
0.23 14.48 m2
53) Reinft. In RCC roof gutter
T D S Description T D S Description
63) Litols
3.51 61) formwork in staircase Lintol type L2 - 225 x 75 with 2T10
1.13 3.97 flight 1 1.35 1.35 D3
2/ 3.51 4/ 1.20 4.80 D7
0.30 2.11 1.05 1.05 W1
1.13 3/ 1.05 3.15 F1
2.00 2.26 10.35 m
1.13
3.00 3.39
2/ 2.25 landing
0.15 0.68 Lintol type L3 - 225 x 100 with 2T10
2.25 1.65 1.65 D5
1.13 2.54 1.50 1.50 D6
2/ 0.25 LB1 3.15 m
0.30 0.15
2.25
0.68 1.53
3.34 flight 2 Lintol type L4 - 225 x 150 with 4T10, R6
1.13 3.77 2/ 1.85 3.70 m D4
2/ 3.34
0.30 2.00
2.00
1.13 2.26 Lintol type L5 - 230 x 230 with 4T10, R6
3.00 2.70 2.70 m W2
1.13 3.39
28.05 m2
225 bk.wk
62) Reinft. In Staircase
4000mm high walls
T10 bars in staircase
31/ 1.30 40.30 flight 1 grid I 15709
12/ 1.35 16.20 flight 2 1228
12/ 5.10 61.20 2004
33/ 1.30 42.90 grid H 3225
12/ 3.08 36.96 grid F 3225
197.56 m grid E 2000
grid C 4238
197.56 x 0.617= 121.89kg grid B 2100
grid A 2000
1225
T12 bars in staircase 4725
11/ 0.85 9.35 flight 1 15675
11/ 1.55 17.05 4500
11/ 3.60 39.60 grid 1 1300
5/ 4.66 23.30 1175
2/ 2.50 5.00 LB1 1425
94.30 m 880
1558
94.30 x 0.888 = 83.74kg 1613
413
3935
2/ 2.50 5.00 m T16 bars in staircase grid 2 1425
880
5.00 x 1.579= 7.90kg 1558
1613
413
11/ 1.05 11.55 m T8 bars in staircase grid 5 13862
grid 6 2963
11.55 x 0.395 = 4.56kg ddt - T joints 12/½/225 (1350)
95517
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 14
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:
T D S Description T D S Description
1000 1300
-ditto - do-
ddt. Doors and windows 1000 950
3.70 G1 1225
3.55 13.14 2000
0.60 W1 4225
1.20 0.72
0.75 D7
2.10 1.58 1000 880
0.60 F1 1558
0.90 0.54 2438
2.25 W2
1.45 3.26
1.20 D5 off white 600x600 gloss tiles (rocell
2.10 2.52 7/107) laid to given patern - banking
1.05 D6 areas [1]
2.10 2.21 15.71
0.90 D3 13.61 213.81
2.10 1.89 5.95
3.59 D2 1.20 7.14
3.00 10.77 4.95
7.61 FG3.1 2.44 12.08
2.45 18.64 1.30
6.07 FG3.2 1.00 1.30
2.45 14.87 4.23
1.05 W3 0.95 4.02
1.70 1.79 2.44
71.92 m2 1.00 2.44
240.79 m2
1200 3590
66) Floor Finishes
T D S Description T D S Description
1200 1920
safe deposite vault
T D S Description T D S Description
banking area
1300 67) Wall Finishes
add ½/ 225 112.5
9894 Wall finishes - internal
3720
950 CIC paint - marble falls (off white)
1425 colour
2/880 1760 10.66 grid I
2/1558 3116 3.15 33.58
880 4.78
1558 3.15 15.06 &
1613 4.36
413 4.00 17.44 smooth plastering
3935 3.00
30676.5 4.00 12.00
3.00 grid H
self service area and entrance 4.00 12.00
4275 1.55
5243 4.00 6.20
2850 1.23
12368 4.00 4.92
4.58 grid G
staircase 4.00 18.32
2/4225 8450 4.35
2475 4.00 17.40
4000 1.55 grid F
2/3750 7500 4.00 6.20
2/4360 8720 1.23
2/4472 8944 4.00 4.92
40089 1.00
3.15 3.15
Security room 4.58 grid D
4.00 18.32
2/ 1800 3600 4.80
2/ 1550 3100 3.15 15.12
6700 2.23 grid C
3.15 7.02
4.23
100mm high ceramic skirting 4.00 16.92
50.61 50.61 banking area 3.10 grid B
30.68 30.68 4.00 12.40
12.37 12.37 self service area and entrance 1.00 grid A
40.09 40.09 staircase 4.00 4.00
6.70 6.70 Security room 23.79
140.45 m 3.10 73.75
2/ 4.28
4.00 34.24
0.95 grid 1
4.00 3.80
1.80
4.00 7.20
3.71
4.00 14.84
3.64 grid 2
3.15 11.47
2/ 1.80
4.00 14.40
384.67 m²
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 17
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:
T D S Description T D S Description
CIC paint - marble falls (off white) CIC paint - marble falls (off white)
colour colour
2/ 1.80 1.20 D5
4.00 14.40 grid 2 0.23 0.28 &
1.30 2/ 0.23
3.10 4.03 grid 3 2.10 0.97 smooth plastering
2.44 & 4/ 0.75 D7
3.15 7.69 0.23 0.69
1.80 smooth plastering 4/2/ 0.23
4.00 7.20 2.10 3.86
3.91 1.05 D6
4.00 15.64 0.23 0.24
3.75 2/ 0.23
4.00 15.00 2.10 0.97
4.19 2/ 1.40 D4
4.00 16.76 0.23 0.64
3.75 grid 4 4/2/ 0.23
4.00 15.00 2.10 3.86
4.47 3.70 G1
4.00 17.88 0.23 0.85
8.92 2/ 0.23
3.15 28.10 3.55 1.63
13.60 grid 5 1.20 RSD
3.15 42.84 0.23 0.28
5.48 2/ 0.23
3.15 17.26 2.10 0.97
2.85 grid 6 2/ 0.60 W1
3.15 8.98 0.23 0.28
5.03 common toilet 2/ 0.23
1.90 9.56 1.20 0.55
7.71 disable toilet 3/ 0.60 F1
1.90 14.65 0.23 0.41
3.59 D2 3/2/ 0.23
0.23 0.83 0.56 0.77
2/ 0.23 2/ 2.25 W2
3.00 1.38 0.23 1.04
0.90 D3 2/ 0.23
0.23 0.21 1.45 0.67
2/ 0.23 18.95 m²
2.10 0.97
0.23 FG1
3.00 0.69
2/ 7.61 FG3.1 ditto - ddt
0.23 3.50 4/ 0.75 Doors and windows
2/ 0.23 2.10 6.30 D7
2.45 1.13 1.20
2/ 6.07 FG3.2 2.10 2.52 D5
0.23 2.79 7.61
2/ 0.23 2.45 18.64 FG3.1
2.45 1.13 6.07
2/ 1.05 W3 2.45 14.87 FG3.2
0.23 0.48 1.05
2/ 0.23 1.70 1.79 W3
1.70 0.78 0.60
248.86 m² 1.20 0.72 W1
44.84 m²
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 18
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:
T D S Description T D S Description
Wall finishes - internal
ditto - ddt
3.70 Doors and windows 4.79 CIC paint - Royal gold yellow color
3.55 13.14 G1 4.00 19.16
1.05 3.59 &
2.10 2.21 D6 0.23 0.83
2/2/ 1.40 2/ 0.23 rough plastering
2.10 11.76 D4 3.00 1.38
2/ 0.90 21.37 m²
2.10 3.78 D3
3.59
3.00 10.77 D2
41.65 m² 4.50 cut cement finish
1.00 4.50
4.73 &
300X600mm gloss white with textured 4.90 23.18
5.03 finish wall tiles in toilet 3.31 rough plastering
2.10 10.56 common toilet 0.93 3.08
7.71 6.44
2.10 16.19 disable toilet 1.00 6.44
6.23 2.63
2.10 13.08 sec. toilet 0.93 2.45
2/ 0.60 3.08
0.23 0.28 F1 4.90 15.09
2/2/ 0.23 54.73 m²
0.56 0.52
1.05
0.23 0.24 D6 23.63 weathershild paint
0.23 4.00 94.52 grid A
2.10 0.48 23.90 &
2/ 0.75 4.00 95.60 grid I
0.23 0.35 D7 12.52 rough plastering
2/2/ 0.23 4.00 50.08 grid 1
2.10 1.93 1.20
43.63 m² 0.23 0.28 D5
2/ 0.23
2.10 0.97 D5
ditto - ddt 2/ 0.75
2/ 0.75 Doors and windows 0.23 0.35 D7
2.10 3.15 D7 2/2/ 0.23
3/ 0.60 2.10 1.93 D7
0.90 1.62 F1 3.70
1.05 0.23 0.85 RSD
2.10 2.21 D6 2/ 0.23
6.98 m² 3.55 1.63
2/ 0.60 W1
0.23 0.28
0.89 20mm thk granite tiling on vanity top 2/ 0.23
0.53 0.47 1.20 0.55
0.89 3/2/ 0.60 F1
0.30 0.27 0.23 0.83
2/ 0.10 3/2/ 0.23
0.45 0.09 0.56 0.77
4/ 0.52 2/ 2.25 W2
0.73 1.52 0.23 1.04
0.89 2/ 0.23
0.15 0.13 1.45 0.67
2.48 m² 250.33 m²
cont..
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 19
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:
T D S Description T D S Description
(69) water proofing
2/ 7.61 weathershild paint approved type water proofing on
0.23 3.50 FG3.1 the floor and 300mm along walls
2/ 0.23 & in toilet
2.45 1.13
2/ 6.07 FG3.2 1.78 common toilet
0.23 2.79 rough plastering 1.33 2.37
2/ 0.23 2/ 1.78
2.45 1.13 0.30 1.07
2/ 1.05 W3 2/ 1.33
0.23 0.48 0.30 0.80
2/ 0.23 1.78 disable toilet
1.70 0.78 2.08 3.70
9.81 m² 2/ 1.78
0.30 1.07
2/ 2.08
(68) Ceiling finishes 0.33 1.37
2.88 security toilet
2'x2' non perforated white 1.08 3.11
15.41 metalic ceiling 2/ 2.88
13.12 202.18 banking room 0.30 1.73
3.83 common room 2/ 1.08
3.68 14.09 0.30 0.65
2.13 passage along jenitors room 15.86 m²
1.20 2.56
2.44
1.00 2.44 14.00 water proofing to rcc gutter and
221.27 m² 2.25 31.50 flower trough
2/ 16.12
1.00 32.24
smooth plastered and painted in 16.12
approved color - slab soffit and 0.10 1.61
staircase soffit 2/ 18.52
1.00 37.04
5.25 self service area 18.52
4.28 22.47 0.10 1.85
4.51 cash valt 104.24 m²
4.47 20.16
4.51 safe deposite
3.75 16.91 8.22 water proofing on slab
3.91 generator room 3.86 31.73 m²
3.00 11.73
1.80 janitor's room
1.23 2.21 (70)hand rail - staircase hand rail
1.80 security room 7.55 7.55m 25∅ G.I. upright, 50∅ G.I. pipe
1.55 2.79 handrail with 10∅ M.S. rods
1.78 common toilet
1.33 2.37
2.08 disable toilet 1.00 1 nr (71) vanity - RCC vanity 890x500mm size
1.78 3.70 with 100thk brick work
2.88 security toilet
1.08 3.11
4.13 staircase soffit 14.00 Plastering to RCC gutter
2.25 9.29 2.25 31.50 m²
4.50 entrance area
3.59 16.16
110.90 m²
Quantity Take off Sheet
Job Ref: Proposed Bank At Galle. Sheet No: 20
Drwg Ref: Take off by: Codqs182p- GroupA
Subject: Date:
T D S Description T D S Description
(74)
First floor to Roof top level T12 bars in columns
9/4/ 3.30 118.80 C1
C1 - 225x225 - 3025 high - 9 NOS 2/4/ 3.00 24.00
C1 - 225x225 - 2700 high - 2 NOS 2/4/ 1.70 13.60 FC1
FC1 - 225x225 - 1400 high - 2 NOS 4/ 3.30 13.20
C2 - 225x225 - 3025 high - 1 NOS 2/4/ 3.00 24.00
C2 - 225x225 - 2700 high - 2 NOS 193.60 m
C3 - 225x450 - 3025 high - 3 NOS
C3 - 225x450 - 2700 high - 2 NOS 193.60m x 0.888 = 171.92kg
C4 - 300x300 - 4000 high - 2 NOS
T D S Description T D S Description
T D S Description T D S Description
T D S Description T D S Description
225 thk brick wall length - 3025 height 93)110mm thk brick work
T D S Description T D S Description
CIC paint - marble falls (off white) CIC paint - Royal Gold yellow
colour (code no. 86/042) 8.18 colour (code no. 23YY 62/816)
4.51 grid I 3.03 24.79 grid A
3.03 13.67 8.19
3.23 grid G 3.03 24.82 grid I
3.03 9.79 12.52
2/ 4.13 grid C 3.03 37.94 grid 1
3.03 25.03 13.04
7.73 grid A 3.03 39.51 grid 4
3.03 23.42 127.05
2.25 grid 1
3.03 6.82
5.25
3.03 15.91 96) Ceiling finishes
1.35 grid 2
3.03 4.09 9.00 Smooth plastered and painted in
1.61 grid 3 4.50 40.50 approved colour - slab soffit and
3.03 4.88 4.47 staircase soffit
12.58 grid 4 4.35 19.44
3.03 38.12 4.35
10.30 ladies toilet 3.75 16.31
0.83 8.55 3.90
9.89 gents toilet 3.00 11.70
0.83 8.21 1.80
158.47 m2 1.23 2.21
1.80
1.55 2.79
1.78
wall tiles - 300x600 gloss white with 1.33 2.37
10.30 textured finish - toilets 2.00
2.10 21.63 1.78 3.56
9.89 4.13
2.10 20.77 2.25 9.29
42.40 m2 108.18 m2
T D S Description T D S Description
T D S Description T D S Description
T D S Description T D S Description
113) Wall finishes - external
weathersheild paint / plastering work 119) 2.25m width ZN/AL flashing
8.18 grid A 14.00 14.00m as per architectural drawing
3.18 26.01
5.15
3.18 16.38 120) Truss T1 - 2/70x70x6 double
8.19 grid C 2.00 2 nos angle & 1/50x50x6 single angle
3.18 26.04
3.08 grid 1
3.18 9.79
2.70
3.18 8.59
3.08 grid 4
3.18 9.79
2/ 9.74 guard wall
1.05 20.45
2/ 9.61
1.05 20.18
2/ 7.74
1.05 16.25
153.50 m2
ROOF WORK