PRELIMINARIES AND GENERAL ITEMS

1 Site instruction book


Site instructions must be in writing in an adequate triplicate
carbon site book of A4 size which must be kept in the office on
site and provided by the Contractor on site Item 150.00

2 Labour record
At the end of each month, the Contractor must supply the
Engineer of a written record (in schedule format) of the
amount and description of the Contractor's and Subcontractors
skilled and unskilled labourers, set out for
each day of the month Item 140.00

3 Implement record
At the end of each month, the Contractor must supply the
Project Manager of a written record (in schedule format) of the
amount, type, and capacity of the Contractor's and Subcontractors
implements (including hand tools), which is in operation on site Item 200.00

4 Progress report
At the end of each month, the Contractor must supply the
Project Manager of a written progress report, which state the
progress of the work and indicate how the progress
respond with the program that was compiled for the work. Item 400.00

5 Water for the Works


The contractor is required to ensure adequate supply of water on
site
for all site operations till the project is handed over, The water
must be boreholed with automatic pumping system with 10,000
litre
reserve capacity support. Item 32,000.00

6 Project identification and direction posts


The contractor muct erect a project sign post with each readable
area not exceeding 4 square meters but not less than 3.12 square
meters.The sign post must be made of mild steel plate with
thickness
not exceeding 5mm with edges reinforced with 25mm x 25mm
square pipe and supported at the verical edges with two-75mm
diameter mild steel round posts with ends concreted firmly to the
ground and
positioned as directed by the Engineer. Item 2,500.00
7 Scaffloging
All scaffolds must be of steel and with easy dismantling features
Item 5,000.00
with less mobility hinderances

Preliminaries and General items Page 1 carried to Collection 40,390.00

Page 1
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

PRELIMINARIES AND GENERAL ITEMS CONTD.


8 Site Offices and Store

Construction of Wooden offices and store with total floor area not
exceeding 40m2 for use by the contractor and his site Officials. The
Item 10,000.00
strucucture should be constructed on masonry substructure with
corrugated galvanised roof covering on hardwood trusses.

9 Provision of access routes


Construction of access route to connect site to existing nearby road
for easy acessibility. Route construction include clearing of light
bush with the necessary sub grade preparation and subsequent sub Item 13,000.00
base formation with approved laterite material and consolitated to
form acess route.

10 Temporal Lighting
Extension of electric power to site including subsequent provision
of mercury bulbs at vantage places as directed by the Project Item 6,500.00
Engineer
11 Progress photographs
Provision of progress pictures detailing the progress of work on site
to the project Engineer at monthly intervals showing at least the
Item 300.00
four elevations of the structure including other specific details on
site.

12 Environmental Control
The contractor shall keep the site, structures, etc well watered
during operations to prevent dust and shall provide and erect and
Item 3,000.00
remove on completion of the works all temporary dust screens all
to the satisfaction of the Engineer

13 Materials Testing
The cost of making, storing and testing of concrete test cubes
as required under the conditions of contract and project
specification
to include the cost of providing cube moulds necessary for the
purpose, for testing costs and for submitting reports on them. Item 2,500.00

14 Ecological and Environmental assessment and management Plan Item 2,000.00


15 Temporary Works and Plant Item 3,800.00
16 Telecommunication equipment Item 800.00
20 Insurance of Workmen and agents Item 1,400.00
21 Insurance of plants and Equipment Item 1,000.00
22 Insurance of the works Item 1,500.00

23 Tendering and other performance securities Item 1,500.00

24 HIV and STD sensitization Workshop for worksmen including the


supply of condoms to site workers Item 1,000.00
25 Health and safety clothing and other equipment Item 1,500.00

To Collection 49,800.00

Page 2
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
Preliminaries Contd.

25 Hiring of Watchmen for day and night duties on sites Item 2,000.00

26 Provide for tansportation to site includind preliminary visit and site


familiarisation tours for the purpose of pricing before tendering Item 1,500.00

27 Organisation of sites meetings and refreshment therein Item 4,000.00

28 Participation in joint interim valuation of works Item 2,000.00

29 Health and safety awareness campaigns for worksmen Item 800.00

Include a provional sum of GH¢ 10,000.00 for fueling the


30
Engineer and
other Technical Attendants vehicles. Item 10,000.00

31 Setting out of the works including prelimaries site survey by a


Land Surveyor. Report of such avtivities must be provided in
written
to the Engineer before further excavation works. Item 3,000.00

Completion and Handing over


32 Testing and reporting before handing over Item 2,000.00

33 Site cleaning and Handing over Item 1,680.00

34 Security and warning signs and indicators on site Item 1,200.00

Collections 28,180.00

Page 1 40,390.00

Page 2 49,800.00

Page 3 28,180.00

PRELIMINARIES AND GENERAL ITEMS CARRIED TO GENERAL SUMMARY 118,370.00

Page 3
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
BILL NO 2
GROUND FLOOR
SUBSTRUCTURE
Provisional Quantities
Site Clearance
A Clear site of vegetation including trees with average girth 300mm 2,790 M2 7.50 20,925.00

B Excavate oversite average 150mm deep to remove top soil and


vegetable matter and wheel to a distance not exceeding 200 metres

and deposit in spoil heaps where directed 143 M3 30.00 4,290.00

Excavations
C Excavate trench to receive strip foundations not exceeding 1meter
commencing from strip level 145 M3 50.00 7,250.00
D Excavate pit with maximum depth not exceeding
1.5m to receive cloumn bases. 240 M3 50.00 12,000.00

E Timbering earthwork support to vertical and battering faces of


excavated trenches. 684 M 20.00 13,680.00

F Ditto Pits for column bases. 421 M 20.00 8,420.00

G Dewatering the surfaces and trences and pit other than subterranean
water 176 M2 9.00 1,584.00

Concrete Works
H Plain in-situ concrete (Grade 10/20) in 50mm blinding 176 M2 560.00 98,560.00

J Ditto: (Grade 30/40) in Strip foundation 150mm thick 27 M3 560.00 15,120.00

K Ditto : In floor bed 100mm thick 122 M3 560.00 68,320.00

Reinforced vibrated in-situ concrete (Grade30/20) as


described in:

L Column bases 225mm thick 45 M3 615.00 27,675.00

M Starter columns 13 M3 615.00 7,995.00

Mild steel reinforcement bars in cuts bends hooks and


fixed in possition in accordance with specifications:

N 20mm diameter steel bars in column bases 5,231 KG 5.00 26,155.00

P Ditto in starter columns 2,210 KG 5.00 11,050.00

Q 8mm diameter bars in stirrups 1,411 KG 5.00 7,055.00

To Collection 330,079.00

Page 4
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
SUBSTRUCTURE CONTD.

Sawn formwork to:

A Vertical and battering sides of columns 182 M2 30.00 5,460.00

B Edges of bed 150mm high 185 M 15.00 2,775.00

Filling
Backfilling with selected materials arising from excavation
C
compacted
to a density of 95% 230 M3 15.00 3,450.00

D Remove surplus excavated materials from site 155 M3 10.00 1,550.00

E Approved imported hardcore or laterite filling compacted in layers


of 150mm 265 M3 66.00 17,490.00

Blockwork

F 150mm thick solid sandcrete blockwall in cement and sand mortar


(1:6) in foundation 337 M2 70.00 23,590.00

Waterproofing
G 375 Micron embossed or approved brand of black polyethylene
damp proof coarse in walls 100mm above GL 74 M2 40.00 2,960.00

H Ditto : In damproof membrane under and against the surfaces of


oversite concrete beds and stands 732 M2 10.00 7,320.00

Finishing
J 19mm thick cement and sand mortar (1:4) rendering
to blockwall and concrete surfaces 82 M2 30.00 2,460.00

Painting and Decoration

K Seal, prime and sand to smooth finish rendered external surfaces of


block and concrete members. 82 M2 10.00 820.00

L Prepare and apply three coats of DTM paint on sanded blockwall


and concrete surfaces 82 M2 12.00 984.00

To Collection 68,859.00

Page 5
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
SUBTRUCTURE CONTD.

COLLECTIONS

Substructure page 1 330,079.00

Substructure Page 2 68,859.00

SUBSTRUCTURE CARRIED TO GENERAL SUMMARY 398,938.00

Page 6
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

GROUND FLOOR SUPERSTRUCTURE


ELEMENT NO.1

REINFORCED CONCRETE STRUCTURAL FRAMEWORK

Concrete works
Reinforced in-situ vibrated concrete (Grade 20/30) as
described in

A Columns 19 M3 615.00 11,685.00

C Suspended Beams 47 M3 615.00 28,905.00

C Suspended Floor Slabs 115 M3 615.00 70,725.00

D Staircases and Landing Slabs 4 M3 615.00 2,460.00

E Disability escalating ramp 6 M3 615.00 3,690.00

F Ballustrade 7 M3 615.00 4,305.00

G Slopping hand rail on staicases and landing 3 M3 615.00 1,845.00

H Rectangular support column for stair cases and escalating ramps 13 M3 615.00 7,995.00

Reinforcement
Mild steel reinforcement bars in cuts bends hooks and
fixed in possition in accordance with specifications in:

J 20mm diameter in Suspended beams 5,820 KG 5.00 29,100.00

K Ditto: In columns 2,530 KG 5.00 12,650.00

Ditto: Rectangular support column for stair cases and escalating


L 720 KG 5.00 3,600.00
ramps

M 16mm diameter in Staircases 455 KG 5.00 2,275.00

N Ditto: in Balustrade 953 KG 5.00 4,765.00

P Ditto in staicase beams 33 KG 5.00 165.00

Q Ditto in incline disable escalating slabs 671 KG 5.00 3,355.00

R Ditto: Slopping hand rail on staircases and landing ramp 567 KG 5.00 2,835.00

S 8mm diameter as stirrups in columns 865 KG 5.00 4,325.00

To Collection 194,680.00

Page 7
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

A 8mm diameter bar stiirups in suspended beams 2,302 KG 5.00 11,510.00

B Ditto: In stircase and beams in escalating ramps 69 KG 5.00 345.00

C 12mm diameter in Suspended Floor Slabs 10,684 KG 5.00 53,420.00

D Ditto as stirups in columns for stairs and escalating ramp 393 KG 5.00 1,965.00

Sawn formwork as described in the following members:

E Vertical sides of columns 169 M2 27.00 4,563.00

F Sides and soffit of beams 565 M2 27.00 15,255.00

G Soffit of floor slabs 642 M2 27.00 17,334.00

H Edges of floor slabs 192 M 27.00 5,184.00

J Slopping soffit of staicases 12 M2 27.00 324.00

K Strings of staircase cut to profile of risers and treads 6 M2 27.00 162.00

L Edges of disabled escalating slab 21 M 10.00 210.00

M Vertical and horizontal edges of balustrade and guide rails in


staircases and escalating ramps 110 M2 27.00 2,970.00

N Rectangular support column for stair cases and escalating ramps 97 M2 27.00 2,619.00

COLLECTIONS 115,861.00

R.C Structural frame Page 1 194,680.00

R.C Structural frame Page 2 115,861.00

R.C STRUCTURAL FRAMEWORK CARRIED TO GENERAL SUMMARY 310,541.00

Page 8
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ELEMENT 2

WALLING
Solid sandcrete blockwork in cement and sand
(1:5) mortar as described in

A 125mm thick wall panel walls between columns and beams 720 M2 71.00 51,120.00

B 150mm thick wall 15 M2 71.00 1,065.00

Carpentry (Door and Window Frames)


Wrot seasoned Hardwood in:

C 144x 44 rebated Door Frames 157 M 35.00 5,495.00

D 144x 44 Window frames 590 M 35.00 20,650.00

Carpenter's metalwork
E 16mm Diameter Steel Bars in Burglar-proofing cut to length and
fixed in pre-drilled holes in window frames 1,504 KG 10.00 15,040.00

Treatment and Priming


F Priming back of surfaces of hardwood door frames
with wood primer 70 M2 10.00 700.00

G Ditto: Window frame surfaces 250 M2 12.00 3,000.00

WALLING CARRIED TO GENERAL SUMMARY 97,070.00

Page 9
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT 3

FINISHING
PLASTERWORK, FLOOR AND CEILING FINISHES

In-situ Plaster finishes


18mm cement and sand plaster (1:6 ) on blockwalls finished
A
smooth
with a steel trowel (over openings). 1,440 M2 29.00 41,760.00

B Ditto: 20mm thick on Concrete surfaces in beams columns 670 M2 29.00 19,430.00

C Ditto 12.5 mm for horizontal soffit and edges of suspended floor 642 M2 29.00 18,618.00

D Horizontal and slopping soffit of staircases and excalating ramps 68 M2 29.00 1,972.00

E Vertical surfaces of concrete in balustrade and RC guide rails. 125 M2 29.00 3,625.00

Floor and other wall Finishes

F 50mm oversite cement and sand mortar (1:6) placed and


floated to rough finish to receive other finishes (measured
732 M2 40.00 29,280.00
elsewhere).

G 500mm × 500mm Porcelain floor tiles laid on cement and


sand mortar (1:3) backing on floated plaster surfaces separately
measured in all offices. 475 M2 130.00 61,750.00

H Ditto: 200mm x 300mm ceramic wall tiles on internal surfaces of


lavatory walls 97 M2 130.00 12,610.00

J Ditto: 300mm x 300mm on Lavatory floors 23 M2 130.00 2,990.00

Polished in-situ terrazzo paving in grey cement and small local


chippings of colour and size to be selected by the Engineer
on cement and sand (1:3) screeded bed (measured separately)
30mm Level paving cast in bays not exceeding 1.50 Square
metres between and including 3 x 25mm black ebonite dividing
strips set vertically in screed as described in:

K Verandah and corridors 197 M2 145.00 28,565.00

L Top surfaces of escalating ramps and landings 63 M2 145.00 9,135.00

M Thread and risers in staircases 47 M2 145.00 6,815.00

To Collection 236,550.00

Page 10
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
FINISHES CONTD.
Other Ceiling finishes
A Super white Calcium Sulphate hemihydrate based Plaster of Paris
ceiling finish prepared with approved reinforcing fibre with
inclined
corner moulding skirting with horizontal and inclined surface
sanded
and white-painted to smooth finish as described in all offices 475 M2 90.00 42,750.00

Expansion joint Filets


B Expanded polystyrene foam and organically bound render) "or
equivalent ". See drawing and schedule for location and detail
expansion joint treatment including preparation of cement render
and
all other processes required for a complete per product
manufacturer
data and engineering satisfaction Item 5,000.00

Decorative wall facings


C Extra over decorative redish brown clay tile wall facings as
indicated in the front view of building (see Drawing) and executed
per Engineer's advice 5 M2 80.00 400.00

COLLECTIONS 48,150.00

Finishes Page 1 236,550.00

Finishes Page 2 48,150.00

PLASTERWORK, FLOOR AND CEILING FINISHES CARRIED TO GENERAL SUMMARY 284,700.00

Page 11
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT 4
JOINERY
44mm thick (polish-finished) panel door comprising
125mm stiles, top and middle rails 175mm bottom rail and
divided into panels filled with 25mm hardwood chamfered all
round wrought polished redwood architrave penel to door
frames

A Door size 700mm x 2050mm 4 No. 800.00 3,200.00

B Door size 850 x 2050mm 18 No. 800.00 14,400.00

C Door size 1200 x 2050mm overall in double leaf 2 No. 1,300.00 2,600.00

Fillets, glazing beads and grounds


Wrot hardwood

D 19 x 19mm glazing stops in window frames 165 M 3.00 495.00

Ironmongery
Supply and fix the following ironmongery to hardwood with
and including matching screws

E Pair 100mm brass butt hinges 72 NO. 20.00 1,440.00

Mortice lockset set with lever handle furniture


F 24 NO. 220.00 5,280.00
(Italian Made)

G 150mm pair brass barrel bolt to pair -leafed doors measured


elsewhere 2 Pair 30.00 60.00

JOINERY CARRIED TO SUMMARY 27,475.00

Page 12
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT NO.5

PAINTING AND DECORATION


Prepare and apply three coats of Emulsion paint on:

A Rendered blockwork 1,440 M2 11.00 15,840.00

B Horizontal soffit of suspended floor slab 197 M2 11.00 2,167.00

C Soffit and edges of Staircases and escalating ramps 56 M2 11.00 616.00

D Rendered concrete surfaces 670 M2 1.00 670.00

Knot putty to stop,primer and paint three coats of


gloss oil paint on:

E Ditto: Narrow widths not exceeding 0.35m 250 M2 11.00 2,750.00

PAINTING AND DECORATION TO SUMMARY 22,043.00

Page 13
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ELEMENT. 6

METALWORK AND GLAZING


Supply and fix the following anodiesd Aluminium
louvre carriers standard units (Unico)screwed to
hardwood with matching screws as described in:

A 4 Blade 146 Pairs 45.00 6,570.00

B 8 Blade 112 Pairs 70.00 7,840.00

C Approved galvanised steel welded mesh fixed to


hardwood window framesand fanlights and backed with
12mm×50mm wrought hardwood battens (m/s) 72 M2 30.00 2,160.00

D 12mm×50mm wrought hardwood battens fixed to


window frames as backing to welded mesh measured
above 690 M 3.00 2,070.00

E Ditto: Nylon Insect proof gauze netting 125 M2 10.00 1,250.00

6mm×150mm Clear sheet glass louvre blades with


rounded edges and fixed into adjustable louvre
carriers both (measured separately)

F Obscure 600mm 892 Pcs. 7.00 6,244.00

G Plain 600mm as directed in all fanlight openings 568 Pcs. 6.00 3,408.00
6mm thich coloured glass in aluminium framed profile including
H
all
other locking and hinged control acessories in 1.5 m x 2.7 m
door way. This cost includes installation. 1 No. 3,500.00 3,500.00

METALWORK AND GLAZING CARRIED TO SUMMARY 33,042.00

Page 14
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT 7
ELECTRICAL INSTALLATION

ELECTRICAL INSTALLATIONS
Switch Gear
Supply and install the following
A 400 A change Swich gear 1 No 1,500.00 1,500.00

32-Way TPN distribution board 1 No. 1,500.00 1,500.00

Feeder Cable
B 16mm2 armoured cable 120 M 30.00 3,600.00

Wiring of Points
Supply and wire in concealed conduit lighting and
fan and socket and other outlet points using PVC insulated
copper cable as Kabel Metal make or approved equal

Lighting and fan points using 1.5mm2 PVC cable (measured in


C 24 Coils 70.00 1,680.00
coils)

D 13A Socket outlet points usisng 2.5mm2 PVC cable


complement 2.5mm2 yellow/green as earth 22 Coills 150.00 3,300.00

E 30 A Swich Air condition point oulet using 4mm 2 14 Coils 250.00 3,500.00

Supply and install 20mm diameter- 2700mm length PVC conduit


F
pipes
in floor slab and wall chasings as directed by the Engineer 1,500 Pieces 5.00 7,500.00

G Ditto 40mm Pipe to connect feeder supply wires 30 M 10.00 300.00

H 3 X 3 Switch boxes 60 No. 5.00 300.00

J 3X6 Switch boxes 40 No. 7.70 308.00

Luminaries and Accessories


Supply and fix approved brand of ceiling mounted LED energy
K
saving
lighting 24 No 30.00 720.00

L Supply and fix TFL energy saving bulbs in verandah 8 No. 30.00 240.00

M Ditto wall mounted energy lamps 10 No. 30.00 300.00

N Ceiling Rose per Engineers choice 8 No. 10.00 80.00

To Collection 24,828.00

Page 15
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

Fittings
A Supply and install approved brand of Ceiling fans as directed 17 No 400.00 6,800.00

B 3x 6 13A double socket Socket outlet 32 No 30.00 960.00

C 10A 1 Gang switch 20 No 15.00 300.00

Earthing
Supply and install suitable earthing system for the above
D Item 1,000.00
installation

E Ditto lighting arrester complete and installed per Engineer's advice Item 2,000.00

F E.C.G Meter installation and attendance Item 2,000.00

COLLECTIONS 13,060.00

G Electrical Installation Page 1 24,828.00

13,060.00
H Electrical Installation Page 2

ELECTRICAL INSTALLATION CARRIED TO SUMMARY 37,888.00

Page 16
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ELEMENT 8

PLUMBING INSTALLATION

PLUMBING AND ENGINEERING INSTALLATIONS

A Include a Provisional sum of GH¢ 10,000.00 for all pipework and


ancillaries associated with the installation of all sanitary appliances Item 10,000.00

SANITARY APPLIANCES AND FITTINGS

Supply and fix the following sanitary fittings including joining


together (Twyford or Amitageshanks or similar approved)

White vitreous china water closet (WC) suite comprising water


B
closet
pot with an S or P-Trap cistern of 9 litres capacity, valve fitting
with
plastic syphon supports, inlet connection, overflow fitting, plastic
seat
and cover, Twyford or approved type with top flushing button set 6 No. 800.00 4,800.00

C 560 x 425mm Belfast sink with overflow and 32mm


diameter waste with chain including pair of painted
concealed bracket and built into blockwall 4 No. 300.00 1,200.00

D Vitreous China ceramic urinal pot for male lavatory 2 No. 200.00 400.00

E Ditto for bidet in female lavatory 2 No. 150.00 300.00

F Chromium plated toilet roll holder plugged and


screwed to wall 6 No. 40.00 240.00

G Chromium plated towel rail 600mm long plugged and


screwed tile wall surfaces 4 No. 45.00 180.00

Engineering Installations
H Include the provisional Sum of Gh¢5,500.00 for
builder's work in connection with plumbing installation Item 5,500.00

J Allow for Hydrostatic pressure testing (GH¢ 2,500.00) Item 2,500.00

K Allow for supply and installation of 4 No. 2000 litres capacity


polytanks including all associated pipeworks and mount on roof
slab
including all acessories to the satisfaction of the Project Manager Item 4,000.00

PLUMBING AND ENGINEERING CARRIED TO GENERAL SUMMARY 29,120.00

Page 17
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
FIRST FLOOR SUPERSTRUCTURE
ELEMENT NO.1

REINFORCED CONCRETE STRUCTURAL FRAMEWORK

Concrete works
Reinforced in-situ vibrated concrete (Grade 20/30) as
described in

A Columns 19 M3 615.00 11,685.00

B Suspended Beams 47 M3 615.00 28,905.00

C Suspended Floor Slabs 12 M3 615.00 7,380.00

D Staircases and Landing Slabs 4 M3 615.00 2,460.00

E Disability escalating ramp 6 M3 615.00 3,690.00

F Ballustrade 7 M3 615.00 4,305.00

G Slopping hand rail on staicases and landing 3 M3 615.00 1,845.00

H Rectangular support column for stair cases and escalating ramps 13 M3 615.00 7,995.00

Reinforcement
Mild steel reinforcement bars in cuts bends hooks and
fixed in possition in accordance with specifications in:

J 20mm diameter in Suspended beams 5,820 KG 5.00 29,100.00

K Ditto: In columns 2,530 KG 5.00 12,650.00

Ditto: Rectangular support column for stair cases and escalating


L 720 KG 5.00 3,600.00
ramps

M 16mm diameter in Staircases 455 KG 5.00 2,275.00

N Ditto: in Balustrade 953 KG 5.00 4,765.00

P Ditto in staicase beams 33 KG 5.00 165.00

Q Ditto in incline disable escalating slabs 671 KG 5.00 3,355.00

R Ditto: Slopping hand rail on staircases and landing 567 KG 5.00 2,835.00

S 8mm diameter as stirrups in columns 865 KG 5.00 4,325.00

To Collection 131,335.00

Page 18
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

A Ditto: In suspended beams 2,302 KG 5.00 11,510.00

B Ditto: In stircase and escalating beams 69 KG 5.00 345.00

C 12mm diameter in Suspended Floor Slabs on stairs and ramps 1,450 KG 5.00 7,250.00

D Ditto as stirups in support for stairs and escalating 393 KG 5.00 1,965.00

Sawn formwork as described in the following members:

E Vertical sides of columns 169 M2 27.00 4,563.00

F Sides and soffit of beams 565 M2 27.00 15,255.00

G Soffit of floor slabs 80 M2 27.00 2,160.00

H Edges of floor slabs 32 M2 27.00 864.00

J Slopping soffit of staicases 12 M2 27.00 324.00

K Strings of staircase cut to profile of risers and treads 6 M2 27.00 162.00

L Edges of disabled escalating slab 21 M2 27.00 567.00

M Vertical and horizontal edges of balustrade and guide rails in


staircases and escalating ramps 110 M2 27.00 2,970.00

N Rectangular support column for stair cases and escalating ramps 97 M2 27.00 2,619.00

COLLECTIONS 50,554.00

R.C Structural frame Page 1 131,335.00

R.C Structural frame Page 2 50,554.00

R.C STRUCTURAL FRAMEWORK CARRIED TO GENERAL SUMMARY 181,889.00

Page 19
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ELEMENT 2

WALLING
Solid sandcrete blockwork in cement and sand
(1:5) mortar as described in

A 125mm thick wall panel walls between columns and beams 640 M2 72.00 46,080.00

B 125mm thick wall 15 M2 72.00 1,080.00

Carpentry (Door and Window Frames)


Wrot seasoned Hardwood in:
C 144x 44 rebated mm Door Frames 165 M 30.00 4,950.00

D 144x 44 Window frames 622 M 30.00 18,660.00

Carpenter's metalwork
E 16mm Diameter Steel Bars in Burglar -proofing cut to length and
fixed in pre-drilled holes in window frames 1,354 KG 11.00 14,894.00

Treatment and Priming


F Priming back of surfaces of hardwood door frames
with wood primer 75 M2 10.00 750.00

G Ditto: Window frame surfaces 255 M2 10.00 2,550.00

WALLING CARRIED TO GENERAL SUMMARY 88,964.00

Page 20
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ELEMENT NO.3

ROOFING
Structural Roof Members
A 50mm×150mm wall plates 267 M 14.00 3,738.00

B 50mm×150mm Ridge and Hip Pieces 134 M 14.00 1,876.00

C 25mm×225mm Fascia board 148 M 16.00 2,368.00

D 50mm×75mm Purlins 9 M 12.00 108.00

E 50mm×150mm Angle Cleats 45 M 12.00 540.00

F 50mm×50mm Ceiling noggings and hangers 2,210 M 4.00 8,840.00

Truss Members
G 50mm×100mm Rafters 967 M 13.00 12,571.00

H 50mm×150mm Bottom Chords 737 M 12.00 8,844.00

J 50mm×150mm vertical posts 256 M 12.00 3,072.00

K 50mm×150mm Diagonals 840 M 12.00 10,080.00

Treatment and Priming


L Liberal treatment of hardwood roof
carcass members with creosote 1,320 M2 5.00 6,600.00

M Priming back of the surfaces of fascia and verge boards


with wood primer 55 M2 7.00 385.00

Roof Anchorage
N 8mm Diameter roof anchorage rods fixed and rooted in reinforced
beam with ends twisted to bind wall plate firmly in position at
1.5 metres centres along the perimeter of building. 150 KG 10.00 1,500.00

To Collection 60,522.00

Page 21
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ROOF CONTD.

Corrugated aluminium sheet roofing


A 0.5mm Gauge long Span Corrugated Aluminium deep troughed
trapezoidal roof sheeting as manufactured by Messrs Ghana
Aluminium Products, Tema or equal and approved brand (fixed
to manufacturer's specifications and Egineer's as Roof sheeting 827 M2 37.50 31,012.50

B Extra over IDT roofing for matching ridge cap, 600mm


girth 104 M 35.00 3,640.00

C Preformed aluminium valley gutter 30 M 40.00 1,200.00

COLLECTIONS 35,852.50

Roofing Page 1
60,522.00

Roofing Page 2 35,852.50

ROOFING CARRIED TO GENERAL SUMMARY 96,374.50

Page 22
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT 3

FINISHING
PLASTERWORK, FLOOR AND CEILING FINISHES

In-situ Plaster finishes


18mm cement and sand plaster (1:6 ) on blockwalls finished
A
smooth
with a steel trowel (over openings). 1,280 M2 30.00 38,400.00

B Ditto: 20mm thick on Concrete surfaces in beams columns 670 M2 30.00 20,100.00

C Ditto 12.5 mm for horizontal soffit and edges of suspended floor 96 M2 30.00 2,880.00

D Slopping soffit of staircases and excalating ramps 68 M2 30.00 2,040.00

E Surfaces of concrete balustrade, 118 M2 30.00 3,540.00

Floor and other wall Finishes

F 50mm oversite cement and sand mortar (1:6) placed and


floated to rough finish to receive other finishes (measured
732 M2 50.00 36,600.00
elsewhere).

G 500mm×500mm Porcelain floor tiles laid on cement and


sand mortar (1:3) backing on floated plaster surfaces separately
measured in all offices. 488 M2 130.00 63,440.00

H Ditto:200mm x 300mm ceramic wall tiles on internal surfaces of


lavatory walls 116 M2 120.00 13,920.00

J Ditto: 300mm x 300mm on Lavatory floors 32 M2 120.00 3,840.00

Polished in-situ terrazzo paving in grey cement and small local


chippings of colour and size to be selected by the Engineer
on cement and sand (1:3) screeded bed (measured separately)
30mm Level paving cast in bays not exceeding 1.20 Square
metres between and including 3 x 25mm black ebonite dividing
strips set vertically in screed as described in:

K Verandah and corridors 156 M2 139.00 21,684.00

L Top surfaces of escalating ramps and landings 63 M2 139.00 8,757.00

M Thread and risers in staircases 47 M2 139.00 6,533.00

To Collection 221,734.00

Page 23
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
FINISHES CONTD.
Other Ceiling finishes
A Plastic board ceiling fixed with screw to existing ceiling noggings
(measured separately) with reqired and approved corner designs in

offices eaves and verandal as directed by the Project Engineer and

product manufacturer's instructions 652 M2 95.00 61,940.00

Expansion joint Filets


B Expanded polystyrene foam and organically bound render) "or
equivalent ". See drawing and schedule for location and detail
expansion joint treatment including preparation of cement render
and
all other processes required for a complete per product
manufacturer
data and engineering satisfaction Item 4,100.00

Decorative wall facings


C Extra over decorative redish brown clay tile wall facings as

indicated in the front view of building (see Drawing) and executed


per Engineer's advice 14 M2 65.00 910.00

COLLECTIONS 66,950.00

Finishes Page 1 221,734.00

Finishes Page 2 66,950.00

PLASTERWORK, FLOOR AND CEILING FINISHES CARRIED TO GENERAL SUMMARY 288,684.00

Page 24
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT 4
JOINERY
44mm thick (polish-finished) panel door comprising 125mm
stiles
top and middle rails 175mm bottom rail and divided into
panels filled with 25mm hardwood chamfered all round
wrought polished redwood architrave penel to door frames

A Door size 700mm x 2050mm 4 No. 850.00 3,400.00

B Door size 850 x 2050mm 13 No. 850.00 11,050.00

C Door size 1200 x 2050mm overall in double leaf 3 No. 1,250.00 3,750.00

Fillets, glazing beads and grounds


Wrot hardwood as described

D 19 x 19mm glazing stops in window frames 158 M 2.00 316.00

Ironmongery
Supply and fix the following ironmongery to hardwood with
and including matching screws

E Pair 100mm brass butt hinges. 60 NO. 20.00 1,200.00

Mortice lockset set with lever handle furniture


F 20 NO. 200.00 4,000.00
(Italian Made).

G 150mm pair brass barrel bolt to pair -leafed doors measured 3 NO. 35.00 105.00
elsewhere

JOINERY CARRIED TO SUMMARY 23,821.00

Page 25
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT NO.5

PAINTING AND DECORATION


Prepare and apply three coats of Emulsion paint on:
A Rendered blockwork. 1,280 M2 10.00 12,800.00

B Horizontal soffit of suspended floor slab. 197 M2 10.00 1,970.00

C Soffit and edges of Staircases and escalating ramps. 56 M2 10.00 560.00

D Rendered surfaces of columns, beam and Staircase. 670 M2 10.00 6,700.00

Knot putty to stop,primer and paint three coats of


gloss oil paint on:

E Ditto: Narrow widths not exceeding 0.35m. 234 10.00 2,340.00

PAINTING AND DECORATION TO SUMMARY 24,370.00

Page 26
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ELEMENT. 6

METALWORK AND GLAZING


Supply and fix the following anodiesd Aluminium
louvre carriers standard units (Unico)screwed to
hardwood with matching screws as described in:

A 4 Blade 142 Pairs 40.00 5,680.00

B 8 Blade 108 Pairs 70.00 7,560.00

C Approved galvanised steel welded mesh fixed to


hardwood window framesand fanlights and backed with
12mm×50mm wrought hardwood battens (m/s). 112 M2 35.00 3,920.00

D 12mm×50mm wrought hardwood battens fixed to


window frames as backing to welded mesh measured
above. 578 M2 3.00 1,734.00

E Ditto: Nylon Insect proof gauze netting. 112 M2 9.00 1,008.00

6mm×150mmClear sheet glass louvre blades with


rounded edges and fixed into adjustable louvre
carriers both (measured separately)

F Obscure 600mm 892 Pcs. 6.00 5,352.00

G Plain 600mm as directed in all fanlight openings 568 Pcs. 6.00 3,408.00

METALWORK AND GLAZING CARRIED TO SUMMARY 28,662.00

Page 27
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT 7
ELECTRICAL INSTALLATION

ELECTRICAL INSTALLATIONS

Wiring of Points
Supply and wire in concealed conduit lighting and
fan and socket and other outlet points using PVC insulated
copper cable as Kabel Metal make or approved equal

Lighting and fan points using 1.5mm2 PVC cable (measured in


A 24 Coils 50.00 1,200.00
coils).

B 13A Socket outlet points usisng 2.5mm2 PVC cable


complement 2.5mm2 yellow/green as earth. 22 Coills 100.00 2,200.00

C 30 A Swich Air condition point oulet using 4mm 2. 14 Coils 200.00 2,800.00

D Supply and install 20mm diamete- 2700mm length PVC conduit


pipes in floor slab and wall chasings as directed by the Engineer. 1,500 Pieces 5.00 7,500.00

E Ditto 40mm Pipe to connect feeder supply wires. 30 M 12.00 360.00

F 3 X 3 Switch boxes. 60 No. 5.00 300.00

G 3X6 Swish boxes. 40 No. 7.00 280.00

Luminaries and Accessories


Supply and fix approved brand of ceiling mounted LED energy
H
saving
lighting. 24 No 35.00 840.00

J Supply and fix TFL energy saving bulbs in verandah. 8 No. 35.00 280.00

K Ditto wall mounted energy lamps. 10 No. 35.00 350.00

L Ceiling Rose. 8 No. 10.00 80.00

Fittings
M Supply and install approved brand of Ceiling fans as directed. 22 No 390.00 8,580.00

N 3x 6 13A double socket Socket outlet. 28 No 30.00 840.00

P 10A 1 Gang switch. 20 No 15.00 300.00

To Collection 25,910.00

Page 28
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

Supply and install split Haier airconditioners or approved brand in


selected offices as directed by project Engineer 6 No. 5,200.00 31,200.00

COLLECTIONS

Electrical Installation Page 1 25,910.00

Electrical Installation Page 2 31,200.00

ELECTRICAL INSTALLATION CARRIED TO SUMMARY 57,110.00

Page 29
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ELEMENT 8

PLUMBING INSTALLATION

PLUMBING AND ENGINEERING INSTALLATIONS

A include a Provisional sum GH¢8,500.00 for all pipework and


ancillaries associated with the installation of all sanitary
Item 8,500.00
appliances.

SANITARY APPLIANCES AND FITTINGS

Supply and fix the following sanitary fittings including joining


together (Twyford or Amitageshanks or similar approved)

White vitreous china water closet (WC) suite comprising water


B
closet
pot with an S or P-Trap cistern of 9 litres capacity, valve fitting
with
plastic syphon supports, inlet connection, overflow fitting, plastic
seat
and cover, Twyford or approved type. 6 800.00 4,800.00

560 x 425mm Belfast sink with overflow and 32mm diameter


C
waste
with diameter waste with chain including pair of painted concealed
4 350.00 1,400.00
bracket and built into blockwall.

D Chromium plated toilet roll holder plugged and


screwed to wall. 6 50.00 300.00

E Chromium plated towel rail 600mm long plugged and


screwed. 4 50.00 200.00

Engineering Installations
F Include the provisional Sum of Gh¢ 3,000.00 for builder's work
in connection with plumbing installation Item 3,000.00

Allow for Hydrostatic pressure testing and consistency with


G
pipework
in other adjoining floors Item 2,500.00

PLUMBING AND ENGINEERING CARRIED TO


GENERAL SUMMARY 20,700.00

Page 30
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
BILL 3
EXTERNAL WORKS INCLUDING APRONS
SEPTIC TANK, PAVEMENT AND LANDSCAPING

ELEMENT 1
APRONS AND DRAINS

Construction of 185m long U-drain around main


Administrative block

Earthwork
A Excavate foundation trench starting from strip level no exceeding
0.45meters 22 M3 30.00 660.00

B Backfilling around drain walls 3 M3 20.00 60.00

C Remove excess excavated materials from site 12 M3 10.00 120.00

Blockwork
D 102mm thick sancrete bockwork laid in both sides
of trench to form drain 78 M2 72.00 5,616.00

Concrete Works
E 100mm thick in-situ mass concrete (1:2:4) in foundation 12 M2 560.00 6,720.00

F Ditto: In Drain cover slabs 1 M2 560.00 560.00

G Reinforcement as described in 12mm diameter


bars in drain cover slabs and disable tresholds 164 KG 5.00 820.00

Formwork
H Sawn formwork to soffit of drain cover slabs 7 M2 30.00 210.00

J Ditto:Edges of drain cover slab. 54 M 10.00 540.00

Rendering
K 16mm thick cement and sand screed (1:6) inside
the base of drain 33 M2 35.00 1,155.00

L Ditto:Top and vertical sides of drain walls 87 M2 35.00 3,045.00

To Collcetion 19,506.00

Page 31
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

Concrete Aprons Around Building( 90 M2 approximately)

A Filling with previously excavated materials to make


compacted level to receive aprons concrete. 11 M3 25.00 275.00

B 100 mm thick in situ Concrete (1:6) to form aprons. 10 M3 560.00 5,600.00

C Sawn formwork to edges of apron concrete. 155 M2 30.00 4,650.00

To Collection 10,525.00

COLLECTIONS

External Works First Page 19,506.00

Ditto External works Second Page 10,525.00

APRONSAND DRAINS CARRIED TO SUMMARY 30,031.00

Page 32
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

ELEMENT 2

WASTE DISPOSAL SYSTEM


(SEPTIC TANK AND INSPECTION CHAMBERS)

Excavation and Earthwork


A Prepare site for pit excavation. 38 M3 10.00 380.00

B Excavate pit for septic tank with maximum depth not


exceeding 3.0 meters including extra overs. 110 M3 50.00 5,500.00

Backfilling
C Backfill with previously excavated materials. 12 M3 13.00 156.00

D Remove excess excavated material from site. 98 M3 12.00 1,176.00

Concrete works
E Plain in- situ concrete grade C20/30 as base slab
150mm thick. 5 M3 560.00 2,800.00

F Reinforced in-situ vibrated concrete grade C20/30


100mm thick as pit suspended slab. 5 M3 620.00 3,100.00

G Ditto:100mm thick cover slab 450mm×450mm including


steel handles and accompanying formwork 3 No. 250.00 750.00

Reinforcement
H 12mm diameter deformed mild steel bars cut and
arranged in an approved pattern as described in
suspended slab. 420 KG 5.00 2,100.00

To Collection 15,962.00

Page 33
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢

Formwork
A Sawn formwork as descibed in the soffit and sides
of slab. 30 M2 35.00 1,050.00

Blockwork
B 150mm thick solid sandcrete blockwork in cement and
sand mortar (1:6) in pit. 97 M2 70.00 6,790.00

Finishing
C 20mm thick cement and sand screed on vertical faces
of blockwork 120 M2 35.00 4,200.00

Inspection Chambers
D 750mm× 750mm blockwall inspection chamber
with benched concrete base including all necessary
plasterwork and cover slabs 10 No. 250.00 2,500.00

To Collection 14,540.00

COLLECTION

Waste Disposal System Page 1 15,962.00

Waste disposal System Page 2 14,540.00

WASTE DISPOSAL SYSTEM CARRIED TO GENERAL SUMMARY 30,502.00

Page 34
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
GH¢ GH¢
ELEMENT 3

PAVEMENT AND LANDSCAPING

A Carefully survey, demarcate and peg for pavement and ladscaping


works as detailed in working drawings Item 2,000.00

Construction of Ring route around Building

Excavation to spoil materials for Roadway including cutting and


filling as directed by the Engineer. Material surplus considered 17.00 7,701.00
B 453 M3
unsuitable for the works shall be carted from site and disposed off
asi directed.

C Sub-grade preparation consisting of topsoil grading and leveliing


to achieve the required cumber formations with surface with
(95% compaction) to accommodate the placement of the pavement
structure, shoulder and other cross section futures in accordance
Engineer's directives. 350 M3 15.00 5,250.00

D Sub base natural graded latrite filling measured in the final position
after compaction to the specified density (95%) and the quantity
shall
be calculated as the product of the nominal depth as per drawing.
and supplied within a distance of 5 Kilometers 2,600 M3 20.00 52,000.00

Concrete Ancillaries
E Concrete Kerb Type - A including casting and placing as per
specification drawing and direction of the Engineer in charge. 200 M 280.00 56,000.00

F In-situ concrete U-drian conrete including the necessary trench


excavation works with accompanying formwork, spacer blocks and
backfilling proced inclusive 200 M 290.00 58,000.00

G Laying of approved pre-moulded pavement blocks including all


required base grading preparation. 900 M2 71.00 63,900.00

Landscaping

Provide for planting plant approved species and other ornamental


shrubs including tendering till handing over covering an 20,000.00
H Item
approximate area not exceeding 2,000 m 2 in accordance with
working drawings

PAVEMENT AND LANDSCAPING CARRIED TO GENERAL SUMMARY 264,851.00

Page 35
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES

RATE
AMOUNT
ITEM DESCRIPTION QTY UNIT GH
GH¢
¢

GENERAL SUMMARY

BILL NO. 2
(MAIN BUILDING)
GROUND FLOOR
A SUBSTRUCTURE 398,938.00

B SUPERSTRUCTURE

1 Reinforces structural Concrete Works 310,541.00

2 Walling 97,070.00

3 Finishes 284,700.00

4 Joinery 27,475.00

5 Painting and Decoration 22,043.00

6 Metalwork and Glazing 33,042.00

7 Electrical Installation 37,888.00

8 Plumbing Installation 29,120.00

GROUND FLOOR CARRIED TO GRAND BILL 2 SUMMARY 841,879.00

G.S 36
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE
AMOUNT
ITEM DESCRIPTION QTY UNIT GH
GH¢
¢

FIRST FLOOR SUPERSTRUCTURE

1 Reinforces structural Concrete Works 181,889.00

2 Walling 88,964.00

3 Roofing 96,374.50

4 Finishes 288,684.00

5 Joinery 23,821.00

6 Painting and Decoration 24,370.00

7 Metalwork and Glazing 28,662.00

8 Electrical Installation 57,110.00

9 Plumbing Installation 20,700.00

FIRST FLOOR SUPERSTRUCTURE CARRIED TO BILL 2 SUMMARY 810,574.50

G.S 37
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE
AMOUNT
ITEM DESCRIPTION QTY UNIT GH
GH¢
¢

BILL NO. 2 SUMMARY

SUBSTRUCTURE 398,938.00

GROUND FLOOR 841,879.00

FIRST FLOOR 810,574.50

BILL NO. 2 CARRIED TO GRAND SUMMARY 2,051,391.50

BILL NO 3
EXTERNAL WORKS

1 APRONS AND DRAINS 30,031.00

2 WASTE DISPOSAL SYSTEM 30,502.00

3 PAVEMENT AND LANDSCAPING 264,851.00

BILL NO 3 CARRIED TO GRAND SUMMARY 325,384.00

G.S 38
NAME OF CLIENT/EMPLOYER

NAME OF PROJECT

BILL OF QUANTITIES
RATE
AMOUNT
ITEM DESCRIPTION QTY UNIT GH
GH¢
¢

GRAND SUMMARY
BILL NO. 1 (PRELIMINARIES AND GENERAL ITEMS) 118,370.00

BILL NO. 2 (2-STOREY AMINISTRATION BLOCK) 2,051,391.50

BILL NO. 3 (EXTERNAL WORKS) 325,384.00

ESTIMATED COST OF MEASURED WORKS 2,495,145.50


ALLOW 10% FOR CONTINGENCIES 249,514.55

COST OF WORKS CARRIED TO FORM OF TENDER 2,744,660.05

NAME ……………………………………………………………………………………………

DESIGNATION………………………………..……………………………………………………..

SIGNATURE……………………………………….…………………………………………………

DATE AND OFFICIAL STAMP……………………………………………………………………

G.S 39

You might also like