MECHANICAL WORK
……………………………………………………………………………………………………………………………………
Total Tender Price In Words: Ringgit Malaysia (RM)
……………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………
………
……………………………………………………. …………………………………………………….
(Signature of tenderer) (Signature of tenderer)
Name : …………………………………………… Name : ……………………………………………
Designation : …………………………………….. Designation : ……………………………………..
For and on behalf of For and on behalf of
……………………………………………………. …………………………………………………….
……………………………………………………. …………………………………………………….
1.1 The Tenderer shall set out below and fully describe in the space
provided (inserting the relevant clause number or reference) and price
work or obligations or anything in the Condtions of Sub-Contract or the
specifications not included by him in rates elsewhere and or which he
considers a separate charge is required for this portion of Works, i.e Air
Condtioning and Ventilation System.
BQ-PLUMBING PRELIM/2
BILL OF QUANTITIES
Carried Forward
BROUGHT FORWARD
1.2 MOBILISATION
1.2.1 Mobilize and demobilize all necessary personnel, plant and equipment to 2,500.00 2,500.00
Set 1
the Site for completion of the Sub-Contracts Works
1.3.1 Provide Performance Bond (Cost incurred in the provision of bond for 500.00 500.00
Set 1
this portion of Works)
1.5.1 Provide maintain and remove on completion (for this portion of Works)
the connection to temporary water and electricity supplies provided by L.S L.S 500.00 500.00
the Main Contractor.
BQ-PLUMBING PRELIM/3
BILL OF QUANTITIES
1.8 Painting, directional sign indications and all warnings sign boards to 300.00 300.00
L.S L.S
Bomba's requirement.
1.10 Spare Parts and Tools as per Specifications. L.S L.S 500.00 500.00
1.11 Service and maintenance during 24 months Defect Liability Period L.S L.S 1500.00 1500.00
1.12 Testing and Commisioning as per Specification and/or drawings 500.00 500.00
L.S L.S
1.13 OTHERS
Other works not include in this section and/or Bills but necessary for the
satisfactory completion of the installation works (please specify):-
a. ……………………………………………………………………………….
b. ……………………………………………………………………………….
c. ……………………………………………………………………………….
BQ-PLUMBING PRELIM/4
BILL OF QUANTITIES
BQ-PLUMBING PRELIM/5
BILL OF QUANTITIES
B.1.1.1 A. SUCTION TANK- FRP Cold Water Storage Tank size 7,000mm x
2,000mm x 2,000mm (H) capacity 5,280 lgal @ 24,000 Liters c/w
overflow pipe, warning pipe, scour pipe, balancing pipe, header pipes
and valves, access internal and external cat ladder, valves, tank cover, lot 1 27,000.00 27,000.00
vent pipe, mosquito net, water level indicator, painting, tank labeling, etc.
to S.O. approval
a) 50mm dia Stainless Steel pipe buried under ground tap-off from main
reticulation pipe c/w tap-off point, excavation and backfilled to storage m 20 364.00 7,280.00
tank
b) 65mm dia Stainless Steel pipe buried under ground from suction tank,
m 15 526.00 7,890.00
excavation and backfilled supply for roof tank
BQ-PLUMBING PS/6
BILL OF QUANTITIES
B.1.3.3 Water meter set c/w stainless steel pipe stand, stop cocks, check valves, set 8 300.00 2,400.00
lockable valves and accessories.
B.1.4.2 Control panel c/w conduits, cabling, control wiring, automatic switches & lot 1 3,500.00 3,500.00
controls, inclusive stainless steel level electrodes in water tank
BQ-PLUMBING PS/7
BILL OF QUANTITIES
B.1.4.4 Pilot Opeated Valve ( Size 65mm Dia ) at TANK 1 (MASJID) c/w all Set 2 2,500.00 5,000.00
necessary accessories
B.1.4.4 Pilot Opeated Valve ( Size 65mm Dia ) at TANK 2 (KUARTERS) c/w all Set 2 0.00 0.00
necessary accessories
B.1.5.0 Other works not included this section and/or Bills but necessary for the
satisfactory completion of the installation works (please specify) :-
a) ___________________
b) ___________________
c) ___________________
d) ___________________
BQ-PLUMBING PS/8
BILL OF QUANTITIES
B.2.1.1
EXCAVATE COMMENCING FROM PLATFORM LEVEL (FINISHED
GROUND FLOOR LEVEL) GET OUT, PART RETURN, FILL IN AND
RAM, DEPOSIT AND SPREAD IN MAKING UP LEVEL, REMAINDERS
LOAD CART AWAY OFF SITE:-
a) Trench, not exceeding 1.50m deep, average 600m deep for 40mm m 60 5.50 330.00
diameter pipe.
B.2.2.2
APPROVED VITRIFIED CLAY PIPE TO BS 65, FITTINGS JOINTED
WITH MANUFACTURER'S APPROVED SOLVENT CEMENT AND
FIXED TO HORIZONTAL AND VERTICAL SURFACES WITH
APPROVED FIXING WITH AND INCLUDING SWEEP BENDS,
BRANCHES, BRACKETS, HANGERS, SOCKETS, CONNECTORS,
GASKETS, STAPS AND ALL OTHER ACCESSORIES ALL IN
ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTION.
Inspection chamber shall be constructed to the sizes shown on the Lot 31 1,500.00 46,500.00
drawings as well for the thicknesses and the sizes of the manholes
unless otherwise shown or specified in the Drawings. This will included
neccessary excavation, formwork, etc.
Furnish and install Gully Trap up to and including connection to the Lot 35 210.00 7,350.00
manholes as shown on the drawings. Provided all pipings, fittings and all
other associated equipments neccessary to complete the work.
B.1.2.7
Other works not included this section and/or Bills but necessary for the
satisfactory completion of the installation works (please specify) :-
a) All connection VCP pipe and inspection chamber to C&S external m 30 95.00 2,850.00
sewerage pipe
b) ………………………………………………………………….
c) ………………………………………………………………….
d) ………………………………………………………………….
BQ-PLUMBING PS/10
BILL OF QUANTITIES
BQ-PLUMBING PS/11