SUMMARY OF TENDER SUM

SCHEDULE NO DESCRIPTION PAGE AMOUNT (RM)

1 PRELIMINARIES 8,500.00

2 BUILDING WORKS-POC BLOCK A 872,214.00

3 BUILDING WORKS-POC BLOCK B 874,637.00

4 BUILDING WORKS-POC BLOCK C 180,458.00

5 LINK BRIDGES 4,687.00

TOTAL 1,940,496.00

Tenderer's Signature :....................................... Witnes's Signature:.....................................

Name :................................................................ Name :................................................................

I.C :.................................................................... I.C :....................................................................

Designation :..................................................... Address:....................................................


...............................................................................................
....................................................................

Company Stamp : Date : 14/05/2019

Date : 14/05/2019
..................

..........................

.........................

.................
.......................................................................................
...................
PETRONAS OFFICE COMPLEX, KERTIH

PRELIMINARIES

ITEM DESC UNIT QTY RATE AMOUNT

1 Insurance(workman & contractor all risk) LS LS 3,500.00

2 Mobilazation & Demobilazation LS LS 5,000.00

TOTAL CARRIED TO FINAL SUMMARY : 8,500.00


PETRONAS OFFICE COMPLEX, KERTIH

BILL NO. 2 - BUILDING WORKS - POC BLOCK A

ITEM DESC UNIT QTY RATE AMOUNT

2.6/1 Add 2 ELEMENT NO.6 - WALL AND PARTITION

DRYWALL

Design, supply, fabricate and install approved full


height drywall partitioning faced both sides with
12.5mm thick 'Boral' or approved equivalent
plasterboard with and including metal stud framing
system fix onto existing/new concrete structure floor
and structural slab above complete with non-resilient
sealant at top and bottom and metal angle head and
coping, caulk gap in concrete with 'Boral
Plasterboard Fyreflex' or approved equivalent at
bottom of wall, finished with skim coating to form
seamless finish and additional nogging for services
installation and forming door opening all as per Architect's Drawing No.
RPSD/POC/POC1/ID/DPC/TD/BLOCK C/6500-6502
and manufacturer's specification and details

C 90mm Thick ceiling height partition (Code: PR1) M2 2,109 80.00 168,720.00
(Measured nett - no allowance for area above
ceiling)

2.10/1 ELEMENT NO.10 - CEILING FINISHES

Quantities provided herein are for guidance


only. They shall NOT form part of the Contract.
For description of Materials, Workmanship and
Preambles applicable to this Schedule, refer to
SPECIFICATIONS, PREAMBLES TO ALL TRADES
and GENERAL CONDITIONS & PRELIMINARIES

EXTERNAL CEILING FINISHES

CEMENT BOARD

Approved 3.2mm thick cement board ceiling butt-


jointed complete with perimeter shadow line angle
trim fixed to and including approved concealed
ceiling suspension system fixed from concrete
slab/steel trusses including grouting, taping and
patching flush all joints

A Suspended ceiling M2 352 36.00 12,672.00

B Ditto exceeding 17.00m and not exceeding 18.50 high above immediate floor M2 352 36.00 12,672.00

C Extra for forming access hatch size 600 x 600mm NO 36 70.00 2,520.00

INTERNAL CEILING FINISHES


FIBROUS PLASTERBOARD CEILING

Approved 12mm thick fibrous plaster board ceiling


(Code : FP) butt-jointed complete with perimeter
shadow line angle trim fixed to and including
approved concealed ceiling suspension system fixed
from concrete slab/steel trusses including grouting,
taping and patching flush all joints

E Suspended ceiling M2 1,722 43.00 74,046.00

F Ditto exceeding 6.50m and not exceeding 8.00m high above immediate floor M2 133 43.00 5,719.00

G Extra for forming access hatch size 600 x 600mm NO 88 70.00 6,160.00

2.10/2 Add 2 ELEMENT NO.10 - CEILING FINISHES (CONT'D)

MOISTURE RESISTANT PLASTER BOARD

CEILING

Approved 12mm thick moisture resistant plaster


board ceiling (Code : MPC) butt-jointed complete
with perimeter shadow line angle trim fixed to and
including approved concealed ceiling suspension
system fixed from concrete slab/steel trusses
including grouting, taping and patching flush all joint

A Ceiling set out symmetrically and fixing in position M2 471 43.00 20,253.00

B Extra for forming access hatch size 600 x 600mm NO 24 70.00 1,680.00

GYPSUM BOARD
PETRONAS OFFICE COMPLEX, KERTIH

BILL NO. 2 - BUILDING WORKS - POC BLOCK A

ITEM DESC UNIT QTY RATE AMOUNT

600 x 600 x 9mm Approved gypsum board


(Code:GB) complete with galvanised mild steel T-
suspension system on exposed grid galvanised with
capping suspension system comprising of main
tees, cross tees and wall angles fixed to concrete
soffit or roof trusses all in accordance to the
manufacturer's instruction

C Ceiling set out symmetrically and fixing in position M2 13,204 43.00 567,772.00

D Extra for forming access hatch size 600 x 600mm NO 264 -

ALUMINIUM STRIP CEILING


Approved aluminium strip ceiling including all
necessary accessories and proprietary suspension
system fixed to soffit of slab or concrete/brickwall all
in accordance with manufacturer's instruction
H Ceiling set out symmetrically and fixing in position M2 1335 -

* Brown powder coated Aluminium louvered (Ridded)


panel 100mm x 200mm x 1.3mm thk c/w selected
brown color coated finish to designer approval
Code: Bespoke Lattice Series 08. M2 96

2.10/3 Add 2 ELEMENT NO.10 - CEILING FINISHES (CONT'D)

TIMBER STRIP CEILING

A Approved 120 x 15mm thick 'Solid Timber' or other


equal and approved suspended timber ceiling
complete with all necessary hardwood framing,
fixing accessories and proprietary suspension
system fixed to concrete, timber or steel trusses
Suspended ceiling exceeding 6.50m high and not M2 82 -
8.00m above immediate floor

OTHERS

B Forming opening for M&E services and fittings SUM 1 -


incuding all necessary additional ceiling tees and
runners etc

TOTAL CARRIED TO FINAL SUMMARY : 872,214.00


PETRONAS OFFICE COMPLEX, KERTIH

BILL NO. 3 - BUILDING WORKS - POC BLOCK B

ITEM DESC UNIT QTY RATE AMOUNT

3.4/1 Add 2 ELEMENT NO.4 - WALL AND PARTITION -

Quantities provided herein are for guidance -


only. They shall NOT form part of the Contract. -
For description of Materials, Workmanship and -
Preambles applicable to this Schedule, refer to -
SPECIFICATIONS, PREAMBLES TO ALL TRADES -
and GENERAL CONDITIONS & PRELIMINARIES -

DRYWALL -

Design, supply, fabricate and install approved full -


height drywall partitioning faced both sides with -
12.5mm thick 'Boral' or approved equivalent -
plasterboard with and including metal stud framing -
system fix onto existing/new concrete structure floor -
and structural slab above complete with non-resilient -
sealant at top and bottom and metal angle head and -
coping, caulk gap in concrete with 'Boral -
Plasterboard Fyreflex' or approved equivalent at -
bottom of wall, finished with skim coating to form -
seamless finish and additional nogging for services -

C 90mm Thick ceiling height partition (Code: PR1) M2 1112 80.00 88,960.00
(Measured nett - no allowance for area above -
ceiling) -
-
3.8/1 ELEMENT NO.8 - CEILING FINISHES -

Quantities provided herein are for guidance -


only. They shall NOT form part of the Contract. -
For description of Materials, Workmanship and -
Preambles applicable to this Schedule, refer to -
SPECIFICATIONS, PREAMBLES TO ALL TRADES -
and GENERAL CONDITIONS & PRELIMINARIES -

INTERNAL CEILING FINISHES -

FIBROUS PLASTER BOARD CEILING -

Approved 12mm thick fibrous plaster board ceiling -


(Code : FP) butt-jointed complete with perimeter -
shadow line angle trim fixed to and including -
approved concealed ceiling suspension system fixed -
from concrete slab/steel trusses including grouting, -
taping and patching flush all joints -

A Suspended ceiling M2 4325 43.00 185,975.00

B Ditto exceeding 5.00m and not exceeding 6.50m M2 487 43.00 20,941.00
high above immediate floor -

GYPSUM BOARD CEILING -

600 x 600 x 9mm Approved gypsum board ceiling -


(Code:GB) complete with galvanised mild steel T- -
suspension system on exposed grid galvanised with -
capping suspension system comprising of main -
tees, cross tees and wall angles fixed to concrete -
soffit or roof trusses all in accordance to the -
manufacturer's instruction -

C Ceiling set out symmetrically and fixing in position M2 12312 43.00 529,416.00

D Ditto exceeding 6.50m and not exceeding 8.00m M2 72 43.00 3,096.00


high above immediate floor -
-
3.8/2 Add 2 ELEMENT NO.8 - CEILING FINISHES (CONT'D) -

MOISTURE RESISTANT PLASTER BOARD -

CEILING -

Approved 12mm thick moisture resistant plaster -


board ceiling (Code : MPC) butt-jointed complete -
with perimeter shadow line angle trim fixed to and -
including approved concealed ceiling suspension -
system fixed from concrete slab/steel trusses -
including grouting, taping and patching flush all -
joints -

A Suspended ceiling M2 973 43.00 41,839.00


PETRONAS OFFICE COMPLEX, KERTIH

BILL NO. 3 - BUILDING WORKS - POC BLOCK B

ITEM DESC UNIT QTY RATE AMOUNT


B Extra for forming access hatch size 600 x 600mm NO 63 70.00 4,410.00

OTHERS -

F Forming opening for M&E services and fittings SUM 1 -


incuding all necessary additional ceiling tees and -
runners etc -

TOTAL CARRIED TO FINAL SUMMARY : 874,637.00


PETRONAS OFFICE COMPLEX, KERTIH

BILL NO. 4 - BUILDING WORKS - POC BLOCK C

ITEM DESC UNIT QTY RATE AMOUNT

-
4.7/2 Add 2 ELEMENT NO.7 - WALL AND PARTITION -
(CONT'D) -

DRYWALL -

Design, supply, fabricate and install approved full -


height drywall partitioning faced both sides with -
12.5mm thick 'Boral' or approved equivalent -
plasterboard with and including metal stud framing -
system fix onto new concrete structure floor and -
structural slab above complete with non-resilient -
sealant at top and bottom and metal angle head and -
coping, caulk gap in concrete with 'Boral -
Plasterboard Fyreflex' or approved equivalent at -
bottom of wall, finished with skim coating to form -
seamless finish and additional nogging for services -
installation and forming door opening all as per -
ID's Drawing No. RPSD/POC/P0C1/1D/DPC/TD/ -
BLOCK C/6500, 6501 & 6502 and manufacturer's -
specification and details -

A 90mm Thick ceiling height partition (Code: PR1) M2 365 80.00 29,200.00
(Measured nett - no allowance for area above -
ceiling) -

4.7/3 Add 2 ELEMENT NO.7 - WALL AND PARTITION -


(CONT'D) -

TIMBER LATTICE PARTITION -

Supply and install timber lattice partition complete -


with all necessary accessories to joint and -
interfacing with other trade, all as per ID's Drawing -
RPSD/POC/POC1/ID/DPC/TD/BLOCK C/6703 & 6704 -
-
A Timber lattice partition approximately 7895x3550mm NO 2 -
high overall, constructed with 70x4Omm thick -
hardwood timber intermediate frames with curve -
corners, 70x150mm thick hardwood timber outer -
frames with curve corners and 40mm thick -
hardwood timber vertical frames all to be of selected -
maple veneer finish all round in natural stained -
finish (Elevation C & D) -

B Timber lattice partition approximately NO 2 -


7600x3550mm high overall, constructed with -
70x150mm thick hardwood timber frames with -
curve corners to be of selected maple veneer -
finish all round in natural stained finish -
(Elevation A & B) -

4.11/1 ELEMENT NO.11 - CEILING FINISHES -

Quantities provided herein are for guidance -


only. They shall NOT form part of the Contract. -
For description of Materials, Workmanship and -
Preambles applicable to this Schedule, refer to -
SPECIFICATIONS, PREAMBLES TO ALL TRADES -
and GENERAL CONDITIONS & PRELIMINARIES -

EXTERNAL CEILING FINISHES -

SKIM COAT PLASTERING -

Prepare and apply approved skim coat plastering -


and finished smooth with steel trowel -

A 5mm Plainface to soffit of slab M2 128 9.00 1,152.00

INTERNAL CEILING FINISHES -

SKIM COAT PLASTERING -

Prepare and apply approved skim coat plastering -


and finished smooth with steel trowel -

C 5mm Plainface to soffit of slab exceeding 3.50m and M2 502 9.00 4,518.00
not exceeding 5.00m high above immediate floor -

D Ditto exceeding 5.00m and not exceeding 6.50m M2 964 9.00 8,676.00
high above immediate floor -
PETRONAS OFFICE COMPLEX, KERTIH

BILL NO. 4 - BUILDING WORKS - POC BLOCK C

ITEM DESC UNIT QTY RATE AMOUNT


FIBROUS PLASTER BOARD CEILING -

12mm Thick approved plaster board ceiling (Code : -


FP) butt-jointed complete with perimeter shadow line -
angle trim fixed to and including approved concealed -
ceiling suspension system fixed from concrete -
slab/steel trusses including grouting, taping and -
patching flush all joints -

E Suspended ceiling M2 974 43.00 41,882.00

F Ditto exceeding 3.50m and not exceeding 5.00m M2 102 43.00 4,386.00
high above immediate floor -
-
4.11/2 ELEMENT NO.11 - CEILING FINISHES (CONT'D) -

GYPSUM BOARD CEILING -

600 x 600 x 9mm Approved gypsum board ceiling, -


(Code:GB) complete with galvanised mild steel T- -
suspension system on exposed grid galvanised with -
capping suspension system comprising of main -
tees, cross tees and wall angles fixed to concrete -
soffit or roof trusses all in accordance to the -
manufacturers instruction -

A Ceiling set out symmetrically and fixing in position M2 1271 43.00 54,653.00

B Ditto exceeding 3.50m and not exceeding 5.00m M2 505 43.00 21,715.00
high above immediate floor -

MOISTURE RESISTANT PLASTER. BOARD -


CEILING -

Approved 12mm thick moisture resistant, plaster -


board ceiling (Code : MPC) butt jointed complete -
with perimeter shadow line angle trim fixed to and -
including approved concealed ceiling suspension -
system fixed from concrete slab/steel trusses -
including grouting, taping and patching flush all -
joints -

C Suspended ceiling M2 320 43.00 13,760.00

D Extra for forming access hatch size 600 x 600mm NO 12 43.00 516.00
-
4.11/3 Add 2 ELEMENT NO.11 - CEILING FINISHES (CONTD) -

TIMBER LATTICE CEILING -

A Supply and install timber lattice ceiling M2 59 -


constructed with 70x4Omm thick hardwood -
timber intermediate frames with curve corners, -
70xt5Omm thick hardwood timber outer frames -
with curve corners and 40mm thick hardwood -
timber lattice all to be of selected maple veneer -
finish all round natural stained finish complete -
with approved suspension system fixed to -
concrete soffit and all necessary accessories to -
joint and interfacing with timber lattice partition -
all as per ID's Drawing -
RPSDIPOC/P0C1/1D/DPC/TD/ BLOCK C/6703 & -
E7(14 (Cafeteria) -

TOTAL CARRIED TO FINAL SUMMARY : 180,458.00


PETRONAS OFFICE COMPLEX, KERTIH

BILL NO. 5 - LINK BRIDGE

ITEM DESC UNIT QTY RATE AMOUNT

5/6 Add 2 SOW NO.5 - LINK BRIDGES (CONT'D) -

CEILING FINISHES -

9.5mm Thick approved plaster board ceiling butt- -


jointed complete with perimeter shadow line angle -
trim fixed to and including approved concealed -
ceiling suspension system fixed from steel trusses -
including grouting, taping and patching flush all -
joints -

D Suspended ceiling M2 109 43.00 4,687.00

TOTAL CARRIED TO FINAL SUMMARY : 4,687.00