Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

SUBGRADE PREPARATION

1 Preparation of formation level. m2 1.38 1.00 - 2.00 1.38 1.00 - 2.00

2 Prepare, trim and compact formation as specified m2 2.55 1.00 - 5.00 2.55 1.00 - 5.00
including of forming camber to receive sub-base.

3 Trim, level and compact formation surfaces to m2 3.10 2.00 - 5.00 3.10 2.00 - 5.00
required gradients, chamber, falls and cross falls as
described to receive sub-base.

SUB-BASE

4 Provision and placement of 150mm sand with m2 6.01 5.00 - 9.00 6.01 5.00 - 9.00
compaction.

5 200mm thick Sub-base (CBR > 30%). m3 56.84 46.75 - 66.00 56.84 46.75 - 66.00

6 50mm thick compacted sand as per specification. m2 3.98 2.00 - 4.70 3.98 2.00 - 4.70

7 Supply, spread and lay 100 mm thick granular sub- 2 6.10 2.00 - 10.00 6.10 2.00 - 10.00
m
base.

74
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

ROADBASE

8 Supply, lay and compact 300mm thk crusher-run to m2 20.18 19.30 - 25.00 20.18 19.30 - 25.00
top of bund.

9 300mm thick crushed aggregate Roadbase.(CBR > m3 50.72 23.00 - 70.00 50.72 23.00 - 70.00
80%).

10 300mm (compacted) thick crusher run as base course, m2 29.90 19.60 - 40.00 29.90 19.60 - 40.00
spread and levelled to falls and chamber, well
rammed and consolidated as described.

11 Supply, lay and compact crusher - run to 100mm m3 50.71 45.00 - 60.00 50.71 45.00 - 60.00
thickness for construction of Farmroad on the Flood
Protection Bund.

12 Supply, lay and compact quarry - dust to 50mm m3 62.95 50.00 - 70.00 62.95 50.00 - 70.00
thickness for construction of Farmroad on the Flood
Protection Bund.

13 300mm thick well compacted crusher run. m2 23.35 18.00-43.00 23.35 18.00-43.00

14 Supply, spread and lay 300 mm thick compacted m2 16.00 7.50 - 30.00 16.00 7.50 - 30.00
crusher run road base. (to be laid in 2 layers at
150mm thickness per layer).

Macadam
15 50mm thick dense bituminous macadam DBM 40. m2 20.60 18.00 - 26.00 20.60 18.00 - 26.00

75
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

ROAD SHOULDER
16 Earth shoulders shall be deemed to include m2 11.61 8.00 - 12.60 11.61 8.00 - 12.60
vergeEarth shoulder 500m thick compacted laterite
soil as per specification and as shown in the drawing.

SURFACING
17 Bituminous prime coat. m2 1.72 1.10 - 2.50 1.14 1.00 - 1.50 1.43 1.00 - 2.50

18 Bituminous tack coat. m2 1.64 1.10 - 2.50 1.12 1.00 - 1.50 1.38 1.00 - 2.50

19 Supply and apply MC-70 bituminious prime coat m2 2.20 1.20 - 4.00 2.20 1.20 - 4.00
uniformly over the prepared road base. (to be applied
at rate of 0.75 litres/sq.m) .

Alphastic Conrete
20 50mm thick asphaltic concrete binder course ACB 28. m2 23.54 18.00 - 28.00 23.54 18.00 - 28.00

21 50mm thick wearing course. m2 21.45 16.00 - 26.00 21.45 16.00 - 26.00

22 50mm thick asphaltic concrete wearing course ACW m2 23.67 18.00 - 30.00 23.67 18.00 - 30.00
20.

23 Asphaltic concrete wearing course (ACWC) 50mm m2 23.56 18.00 - 28.00 23.56 18.00 - 28.00
thick.

24 65mm thick binder course. m2 25.56 22.00 - 35.00 25.56 22.00 - 35.00

76
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

25 Supply, spread and lay 40 mm thick compacted m2 13.80 14.10 - 26.00 13.80 14.10 - 26.00
asphaltic concrete binder course.

26 Supply, spread and lay 65 mm thick compacted m2 19.60 18.00 - 28.00 19.60 18.00 - 28.00
asphaltic concrete binder course.

CONCRETE PAVEMENT

Joints in Concrete Pavement

EXPANSION JOINTS
Approach Slab
27 b) 250mm Wide x 10mm Thick compressible joint m 282.67 56.00 - 355.30 282.67 56.00 - 355.30
filler.

28 a) 300mm Wide x 25mm Thick compressible joint m 351.01 147.00 - 456.80 351.01 147.00 - 456.80
filler.

DOWEL BAR
Approach Slab
29 25mm Diameter x 1000mm long galvanised mild steel no. 93.84 30.00 - 121.80 93.84 30.00 - 121.80
dowel bar at 300mm centres between abutment and
approach slab complete with and including 30mm
diameter x 10mm thick bituminous compound
around.

77
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

30 32mm Diameter x 820 ~ 900mm long galvanised high no. 161.20 30.00 - 250.00 161.20 30.00 - 250.00
yield bar between pier & T-beam complete with and
including 50mm O.D. x 300~400mm long diameter
tight fitting rubber dowel caps, 75mm diameter x
300~400mm deep holes grouted with epoxy, non-
shrink grout Grade 50, 10mm FLEXCELL or
equivalent.

31 12mm x 20mm Deep saw-cut filled with plastic 99 m 87.13 18.00 - 200.00 87.13 18.00 - 200.00
joint sealant.

KERBS, CHANNEL AND EDGINGS

32 Precast concrete kerb to match existing road kerb m 42.87 20.00 - 65.00 42.87 20.00 - 65.00
including mortar, painting and all necessary works.

33 Precast concrete kerbs, Type A deemed to include m 44.39 35.00 - 57.50 44.39 35.00 - 57.50
beds, backings, reinforcement, joints, and cutting.

34 Supply and lay concrete kerbs Type SM 3 c/w kerb m 24.50 20.00 - 85.00 24.50 20.00 - 85.00
opening where applicable.

78
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

ROAD FURNITURE

Signage

35 Supply, deliver and install traffic signboards. no. 585.25 400.00 - 805.00 585.25 400.00 - 805.00

36 Supply, deliver and install JPS standard river signs. no. 790.82 450.00 - 790.82 450.00 -
1,600.00 1,600.00

Pavement Markings
37 Supply and apply white colour road markings
consisting of thermoplastic material with Class A glass
beads :-

38 Centre line/lane line 1000mm intermittent 100mm m 4.11 3.00 - 5.10 4.11 3.00 - 5.10
wide.

39 Double line in double continuous 100mm wide . m 7.15 3.00 - 10.00 7.15 3.00 - 10.00

40 Continuous edge line/channelising line 150mm wide. m 5.60 3.00 - 7.60 5.60 3.00 - 7.60

41 100mm wide intermittent lane line, Centre line (Type m 2.70 1.60 - 5.00 2.70 1.60 - 5.00
3).

42 150mm wide continous edge/channelising line m 3.05 2.40 - 10.00 3.05 2.40 - 10.00
(Type6).

79
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

43 300mm wide continous/Stopping line (Type7). m 4.70 4.50 - 10.00 4.70 4.50 - 10.00

44 Arrow in straight. no. 212.00 40.00 - 350.00 212.00 40.00 - 350.00

45 Arrow in double head. no. 136.00 60.00 - 396 136.00 60.00 - 396

46 Left turn/right turn arrows. no. 126.00 67.50 - 264.00 126.00 67.50 - 264.00

Pavement Markings for Parking Area


47 Pavement markings shall generally be hot-applied m 4.55 3.00 - 5.00 4.55 3.00 - 5.00
superimposed reflectorised thermoplastic and in
accordance with JKR Arahan Teknik (Jalan) 2D/85.

48 Supply and install the galvanised cast iron post for no. 171.56 120.00 - 250.00 171.56 120.00 - 250.00
new jersey wall guardrail inclusive galvanised steel
bolts complete with washers and nuts.

49 Supply, deliver and install single face guardrails m 222.25 160.00 - 300.00 222.25 160.00 - 300.00
inclusive of galvanise steel posts, washers, nuts,
delineators and accessories; all in accordance with
specifications and drawings.

50 Double mounted corrugated steel beam guardrail m 253.39 220.00 - 250.00 253.39 220.00 - 250.00
with post at 1.95 m spacing inclusive of delineators.
Rate to include bolts, nuts, posts, and other ancillary
work.

51 Guardrail end section, rate to include bolts, nuts, no. 256.65 110.00 - 360.00 256.65 110.00 - 360.00
posts, and other ancillary work.

80
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

MISCELLANEOUS

Construction for Premix Road


52 Construction of road as per construction drawing m2 65.21 43.50 - 100.00 65.21 43.50 - 100.00
with 50mm thk. Sub base, 250mm thk. Well
compacted crusher run road base, 60mm binder
(AC28), 40mm wearing course (ACW20), bituminous
prime coat including (if any) excavation, removal of
surplus materials and grading subgrade.

Maintenance Access Road


53 Construction and completion of access road m2 58.30 25.00 - 150.00 58.30 25.00 - 150.00
consisting of 150mm thick sand sub-base, 250mm
thick compacted crusher run, 25mm thick quary dust.

Testing
CBR for the SUBBASE
54 To carry out CBR test for the SUBBASE in accordance no. 187.00 90.00 - 300.00 187.00 90.00 - 300.00
to BS 1377. Rate shall include sampling, material
testing and reporting. The test results falling below
the specified value will not be paid.

81
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

CBR for the BASE


55 To carryout CBR test for the ROADBASE in accordance no. 181.64 90.00 - 300.00 181.64 90.00 - 300.00
to BS 1377. Rate shall include sampling, material
testing and reporting. The test results falling below
the specified value will not be paid.

Gradation test for the BASE


56 To carry out Gradation test for the ROADBASE in no. 262.19 90.00 - 600.00 262.19 90.00 - 600.00
accordance to BS 1377. Rate shall include sampling,
material testing and reporting. The test results falling
below the specified value will not be paid.

Coring test for the ROAD SURFACE


57 The contractor shall cut core samples of not less 100 no. 331.56 90.00 - 700.00 331.56 90.00 - 700.00
mm nominal diameter at locations selected by S.O.
The core sample shall be used by the S.O to
determine the thickness of the compacted layer of
mix & compacted density of the mix. Test shall be
inaccordance to ASTM Test Method D 1188 or ASTM
Test Method D 2726,whichever is applicable. The test
results falling below the specified value will not be
paid.

82
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

Concrete Imprint
58 200mm thick concrete grade 25 to receive concrete m2 59.78 42.00 - 74.00 59.78 42.00 - 74.00
imprint (measure separately)

59 BRC A11 laid in concrete (measure nett - no allowance m2 31.99 20.70 - 45.00 31.99 20.70 - 45.00
made for laps).

60 Sawn formwork not exceeding 400mm high. m 16.24 11.00 - 25.00 16.24 11.00 - 25.00

61 Concrete imprint with approved colour and pattern as m2 99.82 60.00 - 125.00 99.82 60.00 - 125.00
described laid including imprint blocks, formwork,
prepare and apply 2 coats of approved colourless
stone dressing (oil paint) and dividing strip all as per
S.O's satisfaction.

Pebble Wash
62 25mm thick cement sand rendering (1:6) to receive m2 13.19 9.00 - 18.00 13.19 9.00 - 18.00
pebble wash (measure separately).

63 Selected pebble wash finish complete approved m2 80.00 45.00 - 100.00 80.00 45.00 - 100.00
adhesion or match coloured cement, bedded and
pointed on 20mm thick cement and sand screed (1:3)
and laid in approved pattern to existing RC steps as
per S.O. satisfaction.

83
BAHAGIAN 3.15 : ROADS AND PAVINGS (CLASS Q)
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan,
Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN


Item KETERANGAN KERJA UNIT
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

Trails
64 75mm thick bed of sand or granular material blinding m 6.10 4.00 - 8.00 6.10 4.00 - 8.00
consolidated as described (900mm width).

65 Supply and lay 225 mm dia. semi glaze earthen ware m 54.70 10.00 - 105.00 54.70 10.00 - 105.00
scupper pipe at 4.5 m c/c with grading and connecting
to sump or drain including excavation, backfilling,
jointing, sand bedding.

66 To supply and fix 300mm x 600mm x 25mm thick m 146.60 60.00 - 200.00 146.60 60.00 - 200.00
Shera cellulose fibre cement plank or equivalent c/w
timber groin finishes and 20mm aggregate blinding
consolidated as described (900mm width).

84