You are on page 1of 37

Bill of Quantities

Proposed Open Shed + Boundary wall+Black wall Partition


Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Bill No. Description Page No. Amount

SUMMARY

Bill No. 1 General Requirements-Preliminaries 1/1 - 1/6 172,050.00

Bill No. 2 Site Work 2/1 - 2/3 23,800.00

Bill No. 3 Concrete Work 3/1 - 3/3 135,150.00

Bill No. 4 Metal Works 4/1 - 4/3 261,200.00

Bill No. 5 Special Construction 5/1 - 5/3 185,725.00

Bill No. 6 Finishes 6/1 - 6/3 114,560.00

Bill No. 7 Electrical Works 7/1 - 7/3 294,950.00

Bill No. 8 Fire Fighting & Alarm System 8/1 - 8/3 64,020.00

Carried to Form of Tender 1,251,455.00

Summary
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 01 : GENERAL REQUIREMENTS

The work under this Contract comprises the provision of all


material, plant & labour of whatever kind necessary and
the proper performance of every operation required for the
complete and proper construction, completion,
commissioning & maintenance including all Architectural,
Structural, Mechanical, Electrical services and External
works. The exact Scope of Work is indicated in the Tender
Drawings.

General

The Tenderer shall insert a lump sum or rate to each


individual item, Clause or sub clause in this bill which he
considers has a financial implication or is of financial
value. Where the Contractor considers that an item, clause
or sub clause has no financial value he shall insert 'NIL'.
No lump sum shall be inserted covering more than one,
item, clause or sub clause.

The value of services and obligations involved in all the


items, clauses and sub clauses in this bill shall not be
included in rates or prices in other bills of quantities, but
shall be priced in their totality in this bill.

Detailed Drawings for construction/ shop drawings


A item 1.00 10,000.00 10,000.00
(Architecture)
0
B Allow for Authority Approval charges item 1.00 Included
0
C CAR insurance and Third Party Insurance item 1.00 15,000.00 15,000.00
0
D Scaffolding , ladders , tools , site safety kits item 1.00 17,800.00 17,800.00
0
E As Built drawings after construction item 1.00 5,000.00 5,000.00
0
F Temporary hoarding Lm 45.00 150.00 6,750.00

G Site Management item 1.00 Included

Preambles
The Contractor shall describe and price any obligations
H contained in the Preambles for which he has not allowed item 1.00 Included
elsewhere.

Provide Warranties required as per the specifications, Bills


J of Quantities and Annexure for Architectural/ Civil & MEP item 1.00 Included
works.

Carried to Collection 54,550.00


Bill No-1 / 1

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

Contractor's Administrative
Arrangements

The Contractor shall provide and maintain all necessary


administrative arrangements, Sufficient Staff and
0 Equipment on site shall comply with acts, orders, laws and
regulations as per Authorities regulations for the duration
of the Contract.
A Site Administration item 1.00 27,000.00 27,000.00
0
B Supervision item 1.00 36,000.00 36,000.00
0
C Security item 1.00 4,500.00 4,500.00
0
D Safety, Health and Welfare of work People item 1.00 6,500.00 6,500.00
0
E Transport of Work People item 1.00 9,000.00 9,000.00
0
F Facilities for Sub/ Nominated-Contractors item 1.00 Included
0
G Co-ordination with Sub/Nominated-Contractors item 1.00 Included
0
0 Construction Plant
The Contractor shall provide and maintain all necessary
0 construction Plant including Sub/ Nominated Contractors
which shall include.
H Small Plant and Tools item 1.00 Included
0
0 Scaffolding
J Establishment item 1.00 Included
0
K Maintenance for the duration of the contract days 1.00 Included
0
L Removal and making good the site item 1.00 Included
0
0 Cranes and Lifting plant
M Establishment item 1.00 Included
0
N Maintenance for the duration of the contract days 1.00 Included
0
P Removal and making good the site item 1.00 Included
0
0 Plant required for specific trades
Q Establishment item 1.00 Included
0
R Maintenance for the duration of the contract days 1.00 Included
0
S Removal and making good the site item 1.00 Included
0
T Equipment Transport to Site item 1.00 Included

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount


Carried to Collection 83,000.00
Bill No-1 / 2

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

0 Engineer's Representative Facilities


The contractor shall provide and maintain the following
0
Engineer's facilities.
Office Space with required facilities such as Services,
A Equipment, Office Accessories as specified in Tender item 1.00 Included
Document.
0
Site Progress Photographs and include in Monthly
B item 1.00 Included
Progress Report.
0
One Sign Boards as shown on drawings and site signs as
C item 1.00 5,000.00 5,000.00
per DM Regulations.
0
0 Contractor's Facilities
The contractor shall provide and maintain the following
0
Contractor's facilities.
Site Offices, Laboratories with required facilities as
0
specified in Tender Document.
D Establishment item 1.00 Included
0
E Maintenance for the duration of the contract days 1.00 Included
0
F Removal and making good the site item 1.00 Included
0
Temporary Services such as Water, Electricity and
G item 1.00 Included
Drainage for the all activities at the site.
0
0 Temporary Works
The Contractor shall provide for all necessary Temporary
0
works; including
H Temporary Access Roads & Pathways. item 1.00 Included
0
Temporary Fencing to the perimeter of the site, including,
0 Lighting, Security barriers, gates etc. as per the Authority
Regulations.
J Establishment item 1.00 Included
0
K Maintenance for the duration of the contract days 1.00 Included
0
L Removal and making good the site item 1.00 Included
0
Provide & maintain Traffic diversions, Warning Sign lamps,
M Barricades, temporary traffic signal, and road closure as item 1.00 Included
required.

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

Carried to Collection 5,000.00


Bill No-1 / 3

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

0 Sundry Items
The Contractor shall provide for all necessary sundry
0
items; including
A Test Materials as specified item 1.00 Included
0
#N/A Test sections of the works as specified item 1.00 Included
0
#N/A Commissioning of the Works as specified item 1.00 Included
0
Protection of executing and finished Works from Weather
D and Damages under all circumstances and removing the item 1.00 7,500.00 7,500.00
same.
0

House Keeping of Site, Roads, Footpaths and Adjacent


areas affected by the works, Clear Debris and Other
Rubbish during the progress of work and at completion all
E item 1.00 Included
as per Authorities' Rules, Construction of Waste
Management plan & in accordance with Engineer's
Approval.

F Any Extreme Physical Restraint at the Site. item 1.00 Included


0
Documentation of Closeout such as As-Built Drawings,
Warranties, O&M Manuals, Testing & Commission Report,
G , Statutory Building Completion Certificate and NOCs Two item 1.00 12,000.00 12,000.00
Sets as per the Specification and providing training in
Completion.
0
Keep the Site clear of rubbish; house keeping; removal of
H protective casings and coverings, and clean the works at item 1.00 10,000.00 10,000.00
completion to the satisfaction of the Engineer.
0
Comply with Traffic Regulations as per the Local traffic
J item 1.00 Included
and construction site requirements.
0
K Possession of the site item 1.00 Included
0
L Fulfil all statuary obligations item 1.00 Included
0
All and any off-site inspection as per the Engineer's
M item 1.00 Included
instruction.

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount


Carried to Collection 29,500.00
Bill No-1 / 4

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

Additional Items:
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up of the lump sum tender price for this section of
the works.

Should the tenderer fail to insert any items here, it will be


deemed that his lump sum price for the tender includes all
items necessary to make the various systems outlined in
the specifications and drawings, and no subsequent claim
for any additional item will be entertained.
1
2
3

Carried to Collection -
Bill No-1 / 5

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 01 : GENERAL REQUIREMENTS

COLLECTION

Bill No-1 / 1 54,550.00

Bill No-1 / 2 83,000.00

Bill No-1 / 3 5,000.00

Bill No-1 / 4 29,500.00

Bill No-1 / 5 -

Carried to Summary 172,050.00


Bill No-1 / 6

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 2 : SITE WORK

Works mentioned below are to be carried out at site with


required preparation as recommended in the Soil
Investigation Report, Engineer's specification and
Authority regulations.

Preparation of site to receive the permanent works. m2 1,200.00 10.00 12,000.00

Excavation for plastering around the shed m3 40.00 25.00 1,000.00

Removal of excavated material from site to designated


m3 40.00 25.00 1,000.00
areas as assigned by the Engineer.

Backfilling for excavated areas/ to making up levels in


layers with required watering and compaction with the
m3 392.00 25.00 9,800.00
excavated earth/ imported fill material in order to achieve
required finished floor level of as shown in the Drawings.

Carried to Collection 23,800.00


Bill No-2/ 1

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 2 : SITE WORK

Additional Items:
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up of the lump sum tender price for this section of
the works.

Should the tenderer fail to insert any items here, it will be


deemed that his lump sum price for the tender includes all
items necessary to make the various systems outlined in
the specifications and drawings, and no subsequent claim
for any additional item will be entertained.
1
2
3

Carried to Collection -
Bill No-2/ 2

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 2 : SITE WORK

COLLECTION

Bill No-2 / 1 23,800.00

Bill No-2 / 2 -

Carried to Summary 23,800.00


Bill No-2/ 3

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 3 : CONCRETE WORK

Supply & Placing of Green Concrete as per Details


Drawings, Specifications, DM Authorities Regulation & the
Engineer's Approval.

10cm thick Concrete, with BRC A-142 Mesh Double Layer


as per drawing & specification.

A Floor Slabs m3 120.00 1,100.00 132,000.00

B 20mm Smooth Cement/ Sand Plaster around the floor slab m2 70.00 45.00 3,150.00

Carried to Collection 135,150.00


Bill No-3/ 1

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 3 : CONCRETE WORK

Additional Items:
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up of the lump sum tender price for this section of
the works.

Should the tenderer fail to insert any items here, it will be


deemed that his lump sum price for the tender includes all
items necessary to make the various systems outlined in
the specifications and drawings, and no subsequent claim
for any additional item will be entertained.

Carried to Collection -
Bill No-3/ 2

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 3 : CONCRETE WORK

COLLECTION

Bill No-3 / 1 135,150.00

Bill No-3 / 2 -

Carried to Summary 135,150.00


Bill No-3/ 3

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 4 : METAL WORK

Fixing of Metal Works complete as per detail in Drawings,


Specifications & to the Engineer's approval.

Supply of Sandwich Panel for Roof, insulated panel with


1 complete required accessories for fixing as Roof Panel m2 960.00 160.00 153,600.00
consists of 0.75mm thick to match the existing panel

Making Good, Cleaning of Rust and Repainting of


2 Existing Metal Columns, Rafters, Perlins, Bolts and m2 240.00 240.00 57,600.00
Bracing Rods and all accessories

Allow for additional Steel members if required.(Provisional


3 item 1.00 50,000.00 50,000.00
Sum)

Carried to Collection 261,200.00

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount


Bill No-4/ 1

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 4 : METAL WORK

Additional Items:
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up of the lump sum tender price for this section of
the works.

Should the tenderer fail to insert any items here, it will be


deemed that his lump sum price for the tender includes all
items necessary to make the various systems outlined in
the specifications and drawings, and no subsequent claim
for any additional item will be entertained.

Carried to Collection -
Bill No-4/ 2

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 4 : METAL WORK

COLLECTION

Bill No-4 / 1 261,200.00

Bill No-4 / 2 -

Carried to Summary 261,200.00


Bill No-4/ 3

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 5 : SPECIAL CONSTRUCTION

Supply, apply and install the following complete as per


detail drawings, specification and Engineer's Approval.

Compound boundary wall comprising of wall and


1 foundation complete including excavation, backfilling, m 72.00 1,200.00 86,400.00
painting as shown and detailed in the drawings

Excavation, Removal of excavated material, Backfilling for


excavated areas/ to making up levels in layers with
2 required compaction with the excavated earth/ imported m3 90.00 50.00 4,500.00
fill material in order to achieve required finished floor level
of as shown in the Drawings.

3 Reinforced Poured Concrete for foundation m3 14.00 1,300.00 18,200.00

4 Smooth Cement/ Sand Plaster m2 135.00 50.00 6,750.00

External epoxy paint system (Jotun epoxy textile or


equivalent) done by 1 coat of 2-companent epoxy primer
+1 spray applied matt unpressed small texture, 2-
5 m2 135.00 45.00 6,075.00
component epoxy underpaint +2 spray applied 2-
componet matt polyurethane topcoats to provide water,
UV , chlorides and Carbon dioxide resistance

6 Proposed Double Swing Steel Gate (4200x2100) no's 1.00 7,800.00 7,800.00

Allowance for rectification and repainting of existing steel


7 no's 2.00 3,000.00 6,000.00
frame and mesh gate

Allowance for Removal and reinitiation of existing


8 item 1.00 50,000.00 50,000.00
landscape works (Provisional Sum)

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount


Carried to Collection 185,725.00
Bill No-5/ 1

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 5 : SPECIAL CONSTRUCTION

Additional Items:
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up of the lump sum tender price for this section of
the works.

Should the tenderer fail to insert any items here, it will be


deemed that his lump sum price for the tender includes all
items necessary to make the various systems outlined in
the specifications and drawings, and no subsequent claim
for any additional item will be entertained.

Carried to Collection -
Bill No-5/ 2

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 5 : SPECIAL CONSTRUCTION

COLLECTION

Bill No-5 / 1 185,725.00

Bill No-5 / 2

Carried to Summary 185,725.00

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount


Bill No-5/ 3

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount


BILL NO. 6 : FINISHES

Supply, Apply & Laying Finishes in this Section complete


as per Drawings, Specifications & to the Engineer's
approval.

Remove 300mm thick from existing soil, Compaction for


m2 912.00
1 the excavated earth by loader.

2 100mm thick black sand to receive Interlock m2 912.00 115.00 104,880.00

3 200mm thick Road base m2 912.00

Supply and installation of 100x200x80mm heavy duty


Precast concrete Interlock tiles with slope and levels as m2 912.00
4 indicated on drawings

Precast concrete curb stone for interlocking pavement


edges liner colour to match paving colours with all required
LM 88.00 110.00 9,680.00
preparations & materials for bedding & grouting as per
5 details & specifications

Carried to Collection 114,560.00

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount


Bill No-6/ 1

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 6 : FINISHES

Additional Items:
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up of the lump sum tender price for this section of
the works.

Should the tenderer fail to insert any items here, it will be


deemed that his lump sum price for the tender includes all
items necessary to make the various systems outlined in
the specifications and drawings, and no subsequent claim
for any additional item will be entertained.

Carried to Collection -
Bill No-6/ 2

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 6 : FINISHES

COLLECTION

Bill No-6 / 1 114,560.00

Bill No-6/ 2 -

Carried to Summary 114,560.00


Bill No-6/ 3

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 7: ELECTRICAL WORKS

All Works should be as per DEWA Rules, Regulations &


Requirements.
Supply & Installation of the complete Electrical Services
strictly in in accordance with the specification and as
indicated on drawings and all builder's work as, but not
limited to the following items.

Supply and Installation of SMDB TCL: 12kW including all


1 Nos 1.00 27,500.00 27,500.00
necessary accessories and fittings

Supply and Installation of DB-P&L TCL: 10kW including all


2 Nos 1.00 13,200.00 13,200.00
necessary accessories and fittings

4 Supply and Installation of check meters for DBs Nos 1.00 5,500.00 5,500.00

Supply and Installation of 4Cx10mm2 XLPE/SWA/PVC


5 LM 70.00 120.00 8,400.00
+1Cx10mm2 ECC

Supply and Installation of Light fittings (Make: Philips LED


6 Smart Bright Highbay Light, BY239P, IP65, 200W, Nos 32.00 2,200.00 70,400.00
26000LM, 6500K, Cool Daylight or Equivalent)

Supply of conduits and cables for Light fitting final wiring


7 LM 260.00 165.00 42,900.00
including all necessary support and accessories

Supply and Installation of 13A twin sockets (Make : MK


8 Nos 10.00 330.00 3,300.00
Masterseal type or equivalent)

Supply of conduits and cables for Sockets final wiring


9 LM 330.00 165.00 54,450.00
including all necessary support and accessories

Supply and Installation of self contained Emergency lights


Addressable, Non Maintained, 4 Watt LED Recessed
10 Nos 12.00 1,650.00 19,800.00
Mounted Emergency Light with built in battery back up for
3 hours

Supply of conduits and FP200 cables for Emergency


11 Lighting final wiring including all necessary support and LM 200.00 165.00 33,000.00
accessories

12 Allow for 100x100 Cable tray LM 50.00 330.00 16,500.00

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

Carried to Collection 294,950.00


Bill No-7/ 1

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 7: ELECTRICAL WORKS

Additional Items:
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up of the lump sum tender price for this section of
the works.

Should the tenderer fail to insert any items here, it will be


deemed that his lump sum price for the tender includes all
items necessary to make the various systems outlined in
the specifications and drawings, and no subsequent claim
for any additional item will be entertained.

Carried to Collection -
Bill No-7/ 2

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 7: ELECTRICAL WORKS

COLLECTION

Bill No-7 / 1 294,950.00

Bill No-7 / 2 -

Carried to Summary 294,950.00


Bill No-7/ 3

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 8 : FIRE FIGHTING & ALARM SYSTEM

Supply, Installation, Testing Commissioning & Maintaining


in in accordance with the drawings & Specification for
complete Fire Alarm System including cabling, conduiting
and power connection for, and Civil Defence requirements
but not necessarily limited to the following.

Supply and Installation of Flame Detectors including


1 cables and conduits. (if hazardous materials are stored in
warehouse)(Not Applicable)

Supply and Installation of Manual Call points including


1 Nos 2.00 825.00 1,650.00
cables and conduits.

Supply and Installation of FA sounder including cables and


2 Nos 2.00 1,100.00 2,200.00
conduits.

3 Supply and Installation of FACP for the fire fighting system Nos 1.00 18,700.00 18,700.00

4 Interface with existing FACP Panel Nos 1.00 13,200.00 13,200.00

Supply and install fire hose reel with cabinet, as specified


and detailed on the drawings Fire Hose reel cabinet
complete with all necessary automatic hose reel with
5 Nos 1.00 4,950.00 4,950.00
nozzle, pressure reducing gauge/valve & lock shield valve,
gate valve, pipework connection and accessories as per
ADCD requirements

Supply and installation of Fire Extinguishers for the


6 Nos 3.00 1,320.00 3,960.00
warehouse

Allow for Testing and commission of Fire Fighting and Fire


7 Item 1.00 3,300.00 3,300.00
Alarm System

Carried to Collection 47,960.00


Bill No-8/ 1

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 8 : FIRE FIGHTING & ALARM SYSTEM

Additional Items:
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up of the lump sum tender price for this section of
the works.

Should the tenderer fail to insert any items here, it will be


deemed that his lump sum price for the tender includes all
items necessary to make the various systems outlined in
the specifications and drawings, and no subsequent claim
for any additional item will be entertained.
1 Emergency Light Nos 12.00 880.00 10,560.00
2 Control Panel for EL Nos 1.00 5,500.00 5,500.00
3

Carried to Collection 16,060.00


Bill No-8/ 2

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount

BILL NO. 8 : FIRE FIGHTING & ALARM SYSTEM

COLLECTION

Bill No-8 / 1 47,960.00

Bill No-8 / 2 16,060.00

Carried to Summary 64,020.00

BOQ
Bill of Quantities
Proposed Open Shed + Boundary wall+Black wall Partition
Client: Biotechnology
Plot No. #MO-0506 Jebel Ali Freezone

Item Description Unit Quantity Rate Amount


Bill No-8/ 3

BOQ