SUMMARY

ITEM DESCRIPTION AMOUNT (AED)

1 Bill 1 - General Requirements -

2 Bill 2 - Civil Works -

3 Provisional Sum -

GRAND TOTAL >>> -

Note 1: The reflected Quantities inside the BOQ are Indicative as it remain the sole
responsibility of the Bidder to verify and ensure quantities.

Note 2: The Consultant (Morganti) Opinion for the scope of Works as descibed are subject
to alteration and/or omission at the discretion and responsibility of the Client.

Prepared & Submitted The name of the Bidder Signature


By :

Approved By: Morganti Group International Signature


ProjeRefurbishment of Presidential Palace in UAE
Employer: The Private Department of the President of the United Arab Emirates
Palace: Khalidiyya Palace
Building: Left Majlis

UNIT
ITEM DESCRIPTION UNIT QTY AMOUNT AED
RATE
Bill 1 - General Requirements

A1 Staff & Supervision item 1 30,000.00


A2 Plant & Equipment item 1 10,000.00
Maintenance
Mobilise /De-mobilisation 15,000.00
Scaffolding 4,500.00
Mobile crane 8,000.00
Transportation 8,000.00
A3 Administration/ Accommodation item 1
Employer/ Engineers Facilities
A4 Miscellaneous item 1
(Insurances, bonds, drawings, protection,
A5 Authority approval / coordination 15,000.00

Contractor to Verify Site Measurements

All Quantities, items and measurements shown on the BOQ


shall be verified by the Contractor on the site and he will be
A6 included
held responsible for the accuracy of all quantities &
measurements.

The Contractor shall be responsible for checking the BOQ and


Quantities, etc, supplied by the Engineer. In the event of any
discrepancy being found between BOQ & contractor's survey
etc, or if the Contractor considers that additional informations
A7 included
are required, then in either case the Contractor shall report
such discrepancy to the Engineer for instruction, or apply in
writing for such additional requirements in advance for further
amendment.

Additional Items

The Tenderer shall state here and price for any additional items
shown on the Survey, deemed to be required for the proper
execution of the works under this Section, but not stated
A8 Noted
herein. Any such item not included herein which is required for
the proper execution of the works shall be deemed to be
included.

Bill 1 - General requirements

Carried to Grand Summary (AED) -


ProjectRefurbishment of Presidential Palace in UAE
Employer: The Private Department of the President of the United Arab Emirates
Palace: Khalidiyya Palace
Building: Left Majlis

UNIT
ITEM DESCRIPTION UNIT QTY AMOUNT AED
RATE
Bill 01 External Elevation *

1.. Plastering
Including all required metal accessories such as but not limited
to GI mesh, GI angel bid, …etc. as per specs and manufacturer
recommendation

Supply and application of cement plaster for external walls and


1.1.. ceilings (wherever required) made of cement and sand mix with item 1.00 13,500.00
a ratio of 1:4 with an average thickness of 20 mm on 3 layers.

2 Paint Works
Including all required scaffoldings and application tools using
only qualified and certified applicators from paint
Manufacturer/supplier.

Repairing old external surfaces coated with external emulsion


2.1 M2 220.00 32.00
paint. Rate includes removing old paint & Repairing cracks.

Preparing and applying textured external emulsion paint for


new and repaired plaster and fair faced concrete surfaces of
walls and ceilings as per selected colors. Rates shall include
2.2 acrylic primer. Two coats of light or medium textured paint, M2 220.00 32.00
containing copolymer emulsion and coarse rock. hard
aggregates of mica or quartz with allowance for third coat to
the engineer's satisfaction.

Preparing and applying epoxy paints for metallic surfaces of


grills, doors, gates, pipes and metallic shades (wherever
2.3 required) as per selected color. rates shall include rust item 1.00
preventing epoxy primer. One coat of high build epoxy. One
coat of polyurethane gloss white finish.

3 Miscellaneous Works

Deep cleaning for roof tiles and drainage system attached with
3.1 item 1.00
it

Replacing damaged roof water proofing with 4 mm membrain


overlapped and tourched including all required slope screed,
3.2 M2 157.00 150.00
termination groves, flashing, cement tiles and epoxy grouting
as per approval.

Bill 02 Main Entrance

1 Flooring
Including all sealer application from 6 sides prior to installation,
any required rear side support mesh
ProjectRefurbishment of Presidential Palace in UAE
Employer: The Private Department of the President of the United Arab Emirates
Palace: Khalidiyya Palace
Building: Left Majlis

UNIT
ITEM DESCRIPTION UNIT QTY AMOUNT AED
RATE
Cont..
Breaking, dismantling and removing of floor and first row of wall
1.1 marble tiles, treads, risers ,skirting and side wall cladding. Rate M2 4.00 35.00
includes removing debris.

Surface preparation including leveling and additional bedding


1.2 M2 4.00 40.00
required prior to Granite installation.

Supply and installation of Granite tiles in water jet cut pattern


with Zero Grout Joint 2cm thick for Flooring as per approved
1.3 M2 4.00 650.00
samples and design. Rates includes wax polishing. Tiles size as
per engineers approval. PC rate 500 AED.

Supply and installation of granite threshold 3cm thick and width


as per wall thickness under main doors. Rates includes
providing chamfered or rounded edges, embedding 2cm under
1.4 M 2.00 275.00
floor level in cement based water resistant adhesive, grouting
with epoxy grout. polishing and restoring of adjacent tiles all in
accordance with Employer's approval

Supply and installation of granite stair treads 3cm thick and


width as per drawings. Rates includes pointing, chamfering one
1.5 edge embedding in cement based water resistant adhesive, LM 19.00 150.00
grouting with epoxy grout. Polishing and cutting at least two
non-slippery grooves all in accordance with Engineers approval

Supply and installation of granite stair riser 2cm thick and


height as per drawings. Rates includes pointing, embedding in
1.6 LM 27.00 150.00
cement based water resistant adhesive and polishing all in
accordance with Engineers approval

3 Main door

3.1 Removal of existing Main entrance doors Nos. 1.00

Supply and installation of Double leaf door at Main entrances,


size to be as per site measurements, rate shall include all
3.2 required ironmongery (lever handles, Cylinder, Drop seal, Nos. 1.00
Hinges SS grade 360 … etc.) as per approved design and
sample

Bill 03 Majlis

1 Paint
Including all required scaffoldings and application tools with
only qualified and certified applicator from paint supplier
Manufacturer/supplier.
ProjectRefurbishment of Presidential Palace in UAE
Employer: The Private Department of the President of the United Arab Emirates
Palace: Khalidiyya Palace
Building: Left Majlis

UNIT
ITEM DESCRIPTION UNIT QTY AMOUNT AED
RATE

Repairing old internal surfaces coated with internal emulsion


1.1 M2 150.00 16.00
paint. Rate includes removing old paint & Repairing cracks.

Cont..

Preparing and applying internal paint as per selected color for


new and repaired plaster, Fair-faced concrete and gypsum
boards surfaces of walls and ceilings, including beams and
1.2 M2 150.00 20.00
soffits of staircases. Rate shall include PVA primer, Two coats of
stucco, Two coats of acrylic copolymer based emulsion with
allowance for third coat to the engineer's satisfaction

Preparing and applying Decorative internal paint as per


selected color for new and repaired plaster, Fair-faced concrete
and gypsum boards surfaces of walls and ceilings, including
1.3 beams and soffits of staircases. Rate shall include PVA primer, item 1.00 20.00
Two coats of stucco, Two coats of acrylic copolymer based
emulsion with allowance for third coat to the engineer's
satisfaction

Supply & fix Gold Papers/premier on existing GRG Cornice and


1.4 LM 42.00
ceiling design

2 Carpet

Removal of existing loose carpet and cart away / store in the


2.1 M2 140.00 15.00
designated area after packing properly.

Supply and fix new carpet as per approved sample, Hand made
2.2 M2 140.00 650.00
carpet HT 550 with Borders and Pattern.

3 Curtains

Removing, and cart away old curtains after packing properly


3.1 M2 75.00 15.00
 for any type.

Supplying and installing curtains high standard fabrics and


matching trimmings, (European make) and rails
as per selected colors and fabrics.
3.2 M2 75.00 190.00
Rate include holders, hanger, Brackets, railing system, pelmet,
veil curtain, backing and trimmings complete with all
accessories as per sample of fabrics selected.

4 Furniture

Removal of existing furniture. Rate includes carefully remove,


4.1 Nos. 34.00
handled and transported and stored in the designated area

4.2 Supply and installation of Sofas (three seaters) Nos. 7.00

4.3 Supply and installation of Single arm chairs Nos. 6.00


ProjectRefurbishment of Presidential Palace in UAE
Employer: The Private Department of the President of the United Arab Emirates
Palace: Khalidiyya Palace
Building: Left Majlis

UNIT
ITEM DESCRIPTION UNIT QTY AMOUNT AED
RATE

4.4 Supply and installation of Coffee tables Nos. 14.00

4.5 Supply and installation of Tables Nos. 7.00


Cont..
ProjectRefurbishment of Presidential Palace in UAE
Employer: The Private Department of the President of the United Arab Emirates
Palace: Khalidiyya Palace
Building: Left Majlis

UNIT
ITEM DESCRIPTION UNIT QTY AMOUNT AED
RATE
Bill 04 Wash and Toilet

1 Flooring & walls


Including all sealer application from 6 sides prior to installation,
any required rear side support mesh

Breaking, dismantling and removing of damaged and stained


1.1 floor and first row wall marble tiles. Rate includes removing M2 24.00 30.00
debris.

Surface preparation including leveling and additional bedding


1.2 M2 24.00 35.00
required prior to Marble installation.

Replacing damaged and stained marble tiles using exactly the


1.3 M2 24.00 250.00
same existing material.

Polishing all marble floor, wall and counter after replacing


1.4 M2 80.00 45.00
damaged and stained tiles

2 Joinery

2.1 Repairing and readjusting Vanity Shutters under wash counter item 1.00

Replacing wooden Architrave around mirrors with Marble


2.2 M2 4.00
Architrave

3 Paint
Including all required scaffoldings and application tools with
only qualified and certified applicator from paint supplier
Manufacturer/supplier.

Repairing old internal surfaces coated with internal emulsion


3.1 M2 17.00 16.00
paint. Rate includes removing old paint & Repairing cracks.

Preparing and applying internal paint as per selected color for


new and repaired plaster, Fair-faced concrete and gypsum
boards surfaces of ceilings including Decorative internal paint/
3.2 Gold Papers/premier on existing GRG Cornice as per selected M2 17.00 25.00
color. Rate shall include PVA primer, Two coats of stucco, Two
coats of acrylic copolymer based emulsion with allowance for
third coat to the engineer's satisfaction

Bill 1 - Civil
ProjectRefurbishment of Presidential Palace in UAE
Employer: The Private Department of the President of the United Arab Emirates
Palace: Khalidiyya Palace
Building: Left Majlis

UNIT
ITEM DESCRIPTION UNIT QTY AMOUNT AED
RATE
Carried to Grand Summary (AED) -
Projec
Refurbishment of Presidential Palace in UAE
Employer: The Private Department of the President of the United Arab Emirates
Palace: Khalidiyya Palace
Building: Left Majlis

UNIT
ITEM DESCRIPTION UNIT QTY AMOUNT AED
RATE
Provisional Sum

Contractor to produce As-built Dwgs. (2 hard copies & 1 soft


PS001
copy, Latest CAD version)

Architectural
Structural
Electrical
Mechanical
Plumbing PS 1.00 20,000.00 20,000.00
Fire fighting & Fire alarm
False Ceiling
Floor finish
HVAC
External works

Note:

Contractor's applicable builders works, attendance, overhead


& profits are deemed included in the Provisional Sum
described item and associated estimated Value in the BOQ.

Provisional sum

Carried to Grand Summary (AED) 20,000.00