Professional Documents
Culture Documents
LANDSCAPE
SUMMARY
1 DIV. 1 - GENERAL REQUIREMENTS _
2 DIV. 2 - LANDSCAPE - SOFTSCAPE & HARDSCAPE 0.00
3 DIV. 3 - CONCRETE WORK 0.00
5 DIV. 5 - METALS WORK 0.00
9 DIV. 9 - FINISHES 0.00
10 DIV. 10 - SPECIALITIES 0.00
15 DIV. 15 - MECHANICAL WORK 0.00
16 DIV. 16 - ELECTRICAL WORK 0.00
SUMMARY - TOTAL AMOUNT SAR 0.00
SUMMARY
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - General Requirements
The contractor shall verify all the quantities along with drawings
SI No ITEM DESCRIPTION UNIT QTY UNIT PRICE SAR TOTAL AMOUNT
SAR
1.0 DIVISION 1 - GENERAL REQUIREMENTS:
These preliminaries are applicable to the whole of the work. If the Bidder
1.0.1 wishes to price any of the items. contained herein, that each item, clause, or
sub-clause must be individually priced
The bidder shall not enter any lump sums, more than one or all items, clauses
and sub-clauses. Covering, Where any item, clause or sub-clause of the, INCLUDED
1.0.2 preliminaries has not been priced, it will be, deemed that the value of such
item, clause or, sub-clause is included in the rates for measured, items
elsewhere in the Bill of Quantities.
1.0.3 The Contractor shall produce detailed shop drawing, which is subject for
Client/Consultant approval prior, to execution and implementation.
CONDITIONS OF CONTRACT:
The contractor is to include for complying in all , respects with the condition
1.0.4 of contract and shall , price here for obligations for which has not , allowed INCLUDED
elsewhere, & wishes to price separately , and /or for items not listed in this
schedule.
SPECIFICATIONS:
The contractor shall price the items listed below, which are described in the
1.10 specifications. In addition, the contractor shall list below, describe , and price
any obligations contained in the , specifications or in any other document for
which, has not allowed elsewhere and which wishes to, price separately, such INCLUDED
as:
1.1.2 As- Built Drawings
1.1.3 Maintenance manuals
1.1.4 TESTING AND COMMISSIONING
1.2 PRICING:
The contractor shall satisfy himself as to the meaning , of every item in the
1.2.1 Bill of Quantities, rates and, price inserted by him will be deemed to cover
all, his obligations under the contract.
The contractor shall price all items for all sections, which he considers have a
1.2.2 value. If any items, are to be of no values or that value has been, spread
through out the rates of the other items. INCLUDED
The contractor shall investigate and verify the , existence and location of any
1.2.3 existing underground , or over head services which may affect the works.
USE AND PROTECTION OF SITE: The contractor shall take all steps necessary
1.2.4 to protect the site as directed by the owner/local Authorities.
WATER: The contractor shall arrange for and pay all charges in connection
1.5 with adequate supply of water for the works suitable for all purposes. INCLUDED
RECORDS: Upon completion of all work, the contractor shall submit Three (3)
sets of As built drawings and Electronic File (CD format) to the owner. These
drawings shall include all deviations from the contract drawings including
1.6 dimensions, quantities, materials & products. INCLUDED
TEMPORARY SITE OFFICE: The contractor shall provide a site office 160 m²
with complete office equipments (Telephone, Fax, Computers, Internet &
1.8 etc.), furnitures and facilities for the use of Client or his representative INCLUDED
2.1.1 Excavation for palms 2x2x2m , trees 1.5x1.5x1.5m, shrubs , grass and ground 11,600 0.00 0.00
covers 40cm depth , and disposal of excavated materials offsite M3
2.1.2 Supply and installation of drainage gravel for plams and trees M3 580 0.00 0.00
2.1.3 Supply and laying of geotextile filter membrane for palm trees M2 21,000 0.00 0.00
2.1.4 Supply and backfilling Planting soil medium M 3
8,800 0.00 0.00
2.1.5 Supply and filling redsand planting medium for palms M3 2,200 0.00 0.00
2.2 SOFTSCAPE
2.6.8 Terminalia Mantaly 2-2.5m ht, 1.5-2" caliper Nos 107 0.00 0.00
2.6.9 Cassia Javanica 2-2.5m ht, 1.5-2" caliper Nos 63 0.00 0.00
2.6.12 Azaradichta indica 2-2.5m ht, 1.5-2" caliper Nos 94 0.00 0.00
2.6.13 Ficus religiosa 2-2.5m ht, 1.5-2" caliper Nos 56 0.00 0.00
2.6.14 Cassia glauca 2-2.5m ht, 1.5-2" caliper Nos 56 0.00 0.00
2.6.15 Albizzia lebbeck 2-2.5m ht, 1.5-2" caliper Nos 40 0.00 0.00
2.6.16 Conocarpus in pots 1m ht Nos 11 0.00 0.00
2.6.17 Fig tree 2-2.5m ht Nos 22 0.00 0.00
2.6.18 Citrus tree 1.5-2m ht Nos 32 0.00 0.00
DIV_02 LANDSCAPE
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Landscaping
The contractor shall verify all the quantities along with drawings
SI No ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL
SAR AMOUNT SAR
2.7 Shrubs & Succelents
2.9.3 Supply and install Lawn C2000 and preparation of base for lawn area as per M2 3,620 0.00 0.00
standard installation method.
Sub Total for Planting 0.00
2.10 HARDSCAPE
2.11 Paving and Outdoor furniture
Supply and install Interlock paver -asper drawing and details ,( submit
2.12 samples for approval) on 50 mm thk Sand cement mortars & 150 mm
aggregate base course, external paving, side walk and sitting area , as per
drawing.
2.12.1 Paving for lake area-2, hotel and majilis m2 2,184 0.00 0.00
2.12.2 Paving for Hotel sitting and plaza m2 440 0.00 0.00
2.12.3 Pedestrian pathway-paver finish m2 628 0.00 0.00
2.12.4 Bicycle and JoggingTrail - fine gravel finish m2 2,550 0.00 0.00
2.12.5 Bicycle and JoggingTrail - stone edging Lm 2,504 0.00 0.00
2.12.6 Hotel Villas wooden deck m2 252 0.00 0.00
2.12.7 Random boulders nos 200 0.00 0.00
2.12.8 Wooden bench 200x60cm nos 52 0.00 0.00
2.12.9 Trash bin nos 58 0.00 0.00
2.12.10 Bike rack for 6 bicycles nos 5 0.00 0.00
2.13 Stone boulders (Sports zone area)
2.13.1 Lake total area m2 1,427 0.00 0.00
2.13.2 Lake total perimeter incl. islands Lm 503 0.00 0.00
DIV_02 LANDSCAPE
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Landscaping
The contractor shall verify all the quantities along with drawings
SI No ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL
SAR AMOUNT SAR
2.13.3 Lake area - 5 layers boulders Lm 2,281 0.00 0.00
2.13.4 Island steps random size nos 2 0.00 0.00
2.13.5 Bouders in the lake nos 35 0.00 0.00
2.14 Water treatment area
2.14.1 Lake total area m2 1,203 0.00 0.00
2.14.2 Lake total perimeter incl. islands Lm 357 0.00 0.00
2.14.3 Lake area - 5 layers boulders Lm 1,789 0.00 0.00
2.14.4 Island steps random size nos 6 0.00 0.00
2.14.5 Lake planter with bench Lm 296 0.00 0.00
2.14.6 Wooden bench in the stone boulder Lm 233 0.00 0.00
2.14.7 Lake perimeter - 1 layer Lm 192 0.00 0.00
2.14.8 Bouders in the lake nos 30 0.00 0.00
2.15 Main garden
2.15.1 Lake total area m2 1,246 0.00 0.00
2.15.2 Lake total perimeter incl. islands Lm 465 0.00 0.00
2.15.3 Lake area - 5 layers boulders Lm 2,325 0.00 0.00
2.15.4 Island steps random size nos 5 0.00 0.00
2.15.5 Bouders in the lake nos 60 0.00 0.00
2.16 Cascading river - flowing
2.16.1 River total area m2 202 0.00 0.00
2.16.2 River total perimeter Lm 100 0.00 0.00
2.16.3 River - 2 layers boulders Lm 400 0.00 0.00
2.17 Garden -1
2.17.1 Garden total perimeter - 1 layer boulder Lm 161 0.00 0.00
2.17.2 Playground stone edging Lm 79 0.00 0.00
2.17.3 Playground area-wash sand finish m2 295 0.00 0.00
2.18 Garden -2
2.18.1 Garden total perimeter - 1 layer boulder Lm 147 0.00 0.00
2.18.2 Planter stone edging Lm 126 0.00 0.00
2.19 Garden -3
2.19.1 Garden total perimeter - 1 layer boulder Lm 126 0.00 0.00
2.19.2 Planter stone edging Lm 112 0.00 0.00
2.20 Garden -4
2.20.1 Garden total perimeter - 1 layer boulder Lm 153 0.00 0.00
2.20.2 Planter stone edging (Majilis stone boulder terrace) Lm 150 0.00 0.00
2.20.3 Total perimeter - number of layer to be decided Lm 147 0.00 0.00
2.20.4 Hotel Villas stone boulder terrace 0.00
2.20.5 Total perimeter - number of layer to be decided Lm 306 0.00 0.00
2.20.6 Stone boulder for roundabout - outside Lm 306 0.00 0.00
2.20.7 Stone boulder for roundabout - inside Lm 20 0.00 0.00
2.20.8 Rip-rap for drainage canal m2 1,857 0.00 0.00
2.20.9 Rip-rap in lake area and rain channel m2 2,795 0.00 0.00
2.20.10 Gravel mulch m2 1,922 0.00 0.00
2.20.11 Fine gravel for open sitting and garden m2 1,792 0.00 0.00
2.20.12 Wooden mulch-proposal 0.00
2.20.13 Decorative jars-proposal 0.00
DIV_02 LANDSCAPE
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Landscaping
The contractor shall verify all the quantities along with drawings
SI No ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL
SAR AMOUNT SAR
2.21 Stepping stone in Hotel villa
2.23 Garden-1
2.23.1 Gazebo with deck for viewing-Total area -71m2 nos 1 0.00 0.00
2.23.2 Pergola-square shape-Total floor area - 6.40mx6.30m nos 2 0.00 0.00
2.23.3 Open sitting area 1 - stone boulder, Total perimeter- 30Lm, Total floor area - nos 1 0.00 0.00
68m2
2.23.4 Open sitting area 2- stone boulder, Total perimeter- 13Lm, Total floor area - nos 1 0.00 0.00
13m2
2.24 Hotel Villas area
2.24.1 Open sitting area - stone boulder, Total perimeter for 2 sitting-60Lm, Total nos 2 0.00 0.00
floor area for 2 sitting area-136m²
2.24.2 Gazebo-octagonal shape 6x6m, Total floor area with 4 steps - 59m2 nos 1 0.00 0.00
2.24.3 Men gazebo-square shape,Total floor area - 19m² nos 1 0.00 0.00
2.24.4 Ladies gazebo-square shape, Total floor area - 19m² nos 1 0.00 0.00
2.25 Existing elevated terrace
2.25.1 Gazebo-octagonal shape 6x6m, Total floor area with 4 steps- 59m² nos 1 0.00 0.00
2.26 Football court
2.26.1 Stone boulder sitting on wadi slope,for watching football game Lm 208 0.00 0.00
2.26.2 hotel-gazebo bridge - 5x2.14m nos 1 0.00 0.00
2.26.3 near lake 1 area bridge - 2.25x2.14m nos 1 0.00 0.00
2.26.4 cascading river bridge - 3.25x2.14m nos 1 0.00 0.00
DIV_02 LANDSCAPE
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Concrete
The contractor shall verify all the quantities along with drawings
UNIT PRICE TOTAL
SI No ITEM DESCRIPTION UNIT QTY
SAR AMOUNT SAR
3.0 DIVISION 3 - CONCRETE WORK
ALL required concrete work for Construction of miscellaneous facilities
3.1
as per drawings, which not completed like:
Concrete culvertNo.1- ,in sports area total length 20.00 m and width
3.3 starting point 7.00 m and in center 3.50 m including all , blinding , No's 1.0 0.00 0.00
Waterprrfing and all material complete and ready to use
Concrete culvert No.2 ,in main watertreatment area total length 20.00
3.4 m and width starting point 4.50 m and in center 2.50 m including all , No's 1.0 0.00 0.00
blinding , Waterprrfing and all material complete and ready to use
Concrete culvert No.3 ,in main sports area total length 15.00 m and
3.5 width starting point 4.00 m and in center 2.50 m including all , blinding , No's 1.0 0.00 0.00
Waterprrfing and all material complete and ready to use
Concrete culvert No.4 ,in main garden area total length 14.00 m and
3.6 width starting point 2.50 m and in center 2.00 m including all , blinding , No's 1.0 0.00 0.00
Waterprrfing and all material complete and ready to use
Concrete culvert No.5 ,in main garden area total length 19.00 m and
3.7 width starting point 2.00 m and in center 2.00 m including all , blinding , No's 1.0 0.00 0.00
Waterprrfing and all material complete and ready to use
DIV_03 CONCRETE
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Metals
The contractor shall verify all the quantities along with drawings
TOTAL AMOUNT
SI No ITEM DESCRIPTION UNIT QTY UNIT PRICE SAR SAR
5.0 DIVISION 5 - METALS
SUPPLY AND INSTALL METAL FENCE FOR FOOTBAL COURT
5.1 INCLEDE ALL CIVIL WORKS ARE INCLUDED IN THE SCOPE OF
WORKS.
Steel fence 120.00 lm with height of 3.00m . And one gate size
5.1.1 2.40X2.60 m with lock set, Steel tube support ,size 100X100 Lm 120 0.00 0.00
thickness 4 mm and mesh size 200 mmX 200 mm
SI No 0.00
DIV_05 METALS
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Finishes
The contractor shall verify all the quantities along with drawings
TOTAL
SI No ITEM DESCRIPTION UNIT QTY UNIT PRICE SAR
AMOUNT SAR
9.0 DIVISION 9- FINISHES
Sand and Soil combination process, supply, and installation by company Name
- 5S Is A Saudi Company Specialized In Solutions For Sand And Soil
9.1 Stabilization, A Subsidiary Of Saba Trading And Contracting Company-TEL:
+966546492775-EMAIL:sales@5s-tech.org
9.2 New Sand and Soil combination process for Street/Parking area
9.2.1 Hotel Villas street m2 16812 0.00 0.00
9.2.2 Resort main entrance parking area m2 1068 0.00 0.00
9.2.3 Driveway to majilis m2 587 0.00 0.00
9.2.4 Water treatment parking area m2 368 0.00 0.00
9.2.5 Sportszone street m2 1,569 0.00 0.00
Sand and Soil combination process round about street in elevated
9.2.6 m2 104 0.00 0.00
terrace
9.3 Floorings around swimming pool
supply and install porceline flooring around pool area including base
9.4
floor concrete
9.4.1 Porceleine flooring around poor area(wooden texture) Size 1200X200 100.0 m2 0.00 0.00
DIV_09 FINISHES
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Specialties
The contractor shall verify all the quantities along with drawings
UNIT PRICE TOTAL
SI No ITEM DESCRIPTION UNIT QTY
SAR AMOUNT SAR
10.0 DIVISION 10 - SPECIALITIES
Water fall ( shellal ): Design, Supply and install water feature such as
fountains, water falls, ponds, and all necessary materials and labor to
10.1
complete the work. , Including all necessary electrical and mechanical
work as per prespective.
water wall Beside guest pavilion in two area lengths size - length 27.70m
+11.65 width 1.57x1.10 m height+ 11.70 length, width 1.57X1.10 m height
10.1.1 . This include all electrical and mechanical works to conplete the works, Lot 1.0 0.00 0.00
submit design proposal
water wall Beside swimming pool area size lengths 4.90 length This
10.1.2 include all electrical and mechanical works to conplete the works, submit Lot 2.0 0.00 0.00
design proposal
DIV_10 SPECIALTIES
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Mechanical
The contractor shall verify all the quantities along with drawings
TOTAL
SI No ITEM DESCRIPTION UNIT QTY UNIT PRICE SAR
AMOUNT SAR
15.0 DIVISION 15 - MECHANICAL
Supply, install, testing and commissioning Electrical solenoid valve Glass
filled Nylon body, with filter sentry self cleaning Diaphragm, with pressure
rated up to 220 PSI, with adjustable Pressure Regulator, Single Station
15.1 Decoder, connected with Gate valve and Y-filter for Drip zones, DBRY wire
connectors, and all required fitting and accessories and to be inside
rectangular valve box
15.9.1 Quick Coupling Valves, ¾" female inlet, 2 slots, 1 piece body, yellow lid Nr 19 0.00 0.00
Quick Coupling Key, ¾" single lug inlet, combination ¾" male / ½" female
15.9.2 Nr 2 0.00 0.00
outlet
15.9.3 Quick Coupling Swivels, ¾" female inlet x ¾" male hose outlet Nr 2 0.00 0.00
15.9.4 3/4" FTHD Brass Gate valve Nr 19 0.00 0.00
15.9.5 Circular valve box for 3/4" Quick coupling valve Nr 19 0.00 0.00
DIV_15 MECHANICAL
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Mechanical
The contractor shall verify all the quantities along with drawings
TOTAL
SI No ITEM DESCRIPTION UNIT QTY UNIT PRICE SAR
AMOUNT SAR
15.9.6 Air valve 2" Nr 5 0.00 0.00
15.9.7 2" FTHD Brass Gate valve Nr 5 0.00 0.00
15.9.8 Circular valve box for 2" Air valve 2" Nr 5 0.00 0.00
15.9.9 isolation main line valve 110 mm ,Flanged type Nr 1 0.00 0.00
15.9.10 isolation main line valve 160 mm ,Flanged type Nr 3 0.00 0.00
15.9.11 Circular Valve Box for isolation main line valve Nr 4 0.00 0.00
15.10 HDPE PIPE MAIN LINE AND LATERAL LINE
15.10.1 ML - PIPE, HDPE 63MM 16 BAR L.M 700 0.00 0.00
15.10.2 ML - PIPE, HDPE 75MM 16 BAR L.M 600 0.00 0.00
15.10.3 ML - PIPE, HDPE 90MM 16 BAR L.M 700 0.00 0.00
15.10.4 ML - PIPE, HDPE 110MM 16 BAR L.M 900 0.00 0.00
15.10.5 ML - PIPE, HDPE 160MM 16 BAR L.M 400 0.00 0.00
15.10.6 LATERAL PIPE, HDPE PE100 SDR17 PN10 , ∅75 L.M 200 0.00 0.00
15.10.7 LATERAL PIPE, HDPE PE100 SDR17 PN10 , ∅63 L.M 600 0.00 0.00
15.10.8 LATERAL PIPE, HDPE PE100 SDR17 PN10 , ∅50 L.M 2,900 0.00 0.00
15.10.9 LATERAL PIPE, HDPE PE100 SDR17 PN10 , ∅32 L.M 11,600 0.00 0.00
15.10.10 LATERAL PIPE, HDPE PE100 SDR17 PN10 , ∅20 L.M 1,500 0.00 0.00
UPVC PIPE FOR SLEEVES - In case of intersect with road should be
15.11
incasement the pipe by concrete.
15.11.1 PIPE SLEEVE PVC CLASS-4-250mm L.M 66 0.00 0.00
15.11.2 PIPE SLEEVE PVC CLASS-4-200mm L.M 108 0.00 0.00
15.11.3 PIPE SLEEVE PVC CLASS-4-160mm L.M 198 0.00 0.00
15.11.4 PIPE SLEEVE PVC CLASS-4-110mm L.M 528 0.00 0.00
15.11.5 PIPE SLEEVE PVC CLASS-4-63mm L.M 420 0.00 0.00
15.12 PUMP ROOM
DIV_15 MECHANICAL
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Electrical
The contractor shall verify all the quantities along with drawings
SI No ITEM DESCRIPTION Unit Quantity Unit Price SAR Total Amount
S.R
16.2.1 Installations of 110cm hight Bollard lights (BL) with necessory base NOS 280 0.00 0.00
concrete foundation, cable joints and terminations. (for walk way area)
16.2.4 Installations of Wall mounted lights (WL) with necessory cable joints and NOS 32 0.00 0.00
terminations. (for Gazebo shade area)
16.2.5 Installations of Inground Uplights (TUL) with necessory base concrete NOS 244 0.00 0.00
foundation, cable joints and terminations. (For Palm trees)
16.2.6 Installations of Pole mounted lights (PML) with necessory base concrete NOS 75 0.00 0.00
foundation, cable joints and terminations. (for Drive way area lighting)
DIV_16 ELECTRICAL
Owner: Daman Projects Real Estate Co.
Consultant: ARCHITECTURAL GROUP CONSULTING ENG.
HAWADA– DIRIYAH
Bill of Quantities - Electrical
The contractor shall verify all the quantities along with drawings
SI No ITEM DESCRIPTION Unit Quantity Unit Price SAR Total Amount
S.R
Installations of 6mtr hight lighting pole with double flood lights (FLD) with
16.2.7 necessory base concrete foundation, cable joints and terminations. (for NOS 24 0.00 0.00
Play area lighting)
16.3.1 Supply of 110cm hight Bollard lights (BL) 220V, 15watts LED, 2700/3000K, NOS 280 0.00 0.00
E27 Lamp. Model: D15.15.555.FCI, FUMAGALLI, Italy. (for walk way area)
16.3.2 Supply of surface mounted Mini Spot lights (MSL) 220V, 22Watts, LED, NOS 253 0.00 0.00
3000K, Model: Panda Mini, AVOLUX Turky. (for trees lighting)
16.3.3 Supply of surface mounted Micro Spot lights (SLM) 220V, 5Watts, LED, NOS 86 0.00 0.00
3000K, Model: Panda Micro, AVOLUX, Turki. (for shrubs lighting)
16.3.4 Supply of Wall mounted lights (WL) 100-240V, 15Watts, LED, 3000K, NOS 32 0.00 0.00
Model: TAMASHI 71303, FARO, Italy. (for Gazebo shade area)
16.3.5 Supply of Inground Uplights (TUL) 220V, 9Watts, LED, 3000K, Model: Flora NOS 244 0.00 0.00
Mini, AVOLUX, Turki. (For Palm trees)
Supply of 4mtr high, Pole mounted lights (PML) 100-240V, 6x10Watts
16.3.6 LED, 3000K, Model: ECOVIVI 400, EV4.367.A10, FUMAGALLI. (for Drive NOS 75 0.00 0.00
way area lighting)
16.3.7 Supply of 6mtr high HDG Steel lighting pole with double flood lights (FLD) NOS 24 0.00 0.00
220V, 2x100Watts, LED, 4000K, LEDVANCE. (for Play area lighting)
16.4.2 Supply, Installation, Testing & Commissioning of Main distribution Panel NO 1 0.00 0.00
board (MDB).
16.4.3 Supply, Installation, Testing & Commissioning of Sub Main distribution NO 1 0.00 0.00
Panel board (SMDB).
16.4.4 Supply, Installation, Testing & Commissioning of Football court Lighting NO 1 0.00 0.00
control Panel (FLCP)
16.4.5 Main Power supply from SEC Energy meter to consumer LV Main Item 1 0.00 0.00
Distribution Board (MDB)
Total Amount 0.00
DIV_16 ELECTRICAL