BANI DINAR MOSQUE

Al Madinah, Kingdom of Saudi Arabia

BILL OF QUANTITIES
SUMMARY OF PRICES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
TOTAL PRICE
DIV. # D E S C R I P T I O N
( SR )

DIVISION 1 GENERAL REQUIREMENTS

DIVISION 2 SITEWORK

DIVISION 3 CONCRETE WORKS

DIVISION 4 MASONRY WORKS

DIVISION 5 METALS

DIVISION 6 WOODS AND PLASTICS

DIVISION 7 THERMAL AND MOISTURE PROTECTION

DIVISION 8 DOORS AND WINDOWS

DIVISION 9 FINISHES

DIVISION 10 SPECIALTIES

DIVISION 14 CONVEYING SYSTEM

DIVISION 15 MECHANICAL (FIRE SUPP. + PLUMBING + HVAC)


- FIRE SUPPRESSION
- PLUMBING
- HVAC

DIVISION 16 ELECTRICAL (ELV + MCC PANEL)


- ELECTRICAL & ELV
- ELECTRICAL MCC PANEL #REF!

TOTAL COST (SR) #REF!

Page 1 of 49 Summary of Prices


BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 1 - GENERAL REQUIREMENTS
1.1 CONSTRUCTION FACILITIES & TEMPORARY
CONTROLS

1.1.1 Temporary Facilities for the Engineer shall be


provided and maintained by the Contractor such
as adequate Field Office with Conference Room,
Pantry, Sample Storage, Complete Facilities for
Communication + Internet Connection, Sanitary
Facilities and Power Services, Pantry Equipment,
Office Equipment Laptop & Desktop including
licensed software and printer, Office Furniture,
Security Services and Safety Protection.
Temporary fence shall be provided and other
requirements as described in the Contract
Documents And Specifications.
LS 1 -
2 portable cabin offices, suitable for 6 persons fo
a
each cabin with pantry & toilet
b 1 portable cabin meeting room (with toilet)
Complete office furnitures & cabinets (Simple
c
white by IKEA)
Suitable Office equipments including licenced
d.
softwares for Engineers
1 Computer desktop = 5 nos
2 Laptop = 5 nos
3 A3 & A4 Printers Laser Jet = 1 nos
4 A3 & A4 Copying Machine = 1 nos

1.1.2 Provide and maintain two (2) new vehicle sedan LS 1


for the Engineer including regular maintenance,
gasoline and oil for the entire duration of the
Project.

1.1.3 Independent Testing Laboratory for quality LS 1


control of materials such as, not limited to, soil &
fill materials, concrete, steel works, plate load
testing, pile load testing (i.e. Static load test,
tension pile test, Sonic integrity test ,Sonic core
integrity test, Dynamic pile test, & others as
required by the engineer), as well as other
materials that require quality testing shall be
provided. The Laboratory it self shall not
necessarily preside on site, as it could be in the
work station of the Independent Testing
Company, but it must attend and perform all
required field tests with full capacity.

1.1.4 Preparation and submission of As-Built Drawings LS 1


on USB memory stick and printed on A0 Hard
Copy (3 sets) stamped and other necessary
documents for submission as required in the
Project Close-Out.

Page 2 of 49 Division 1
General Requirements
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 1 - GENERAL REQUIREMENTS
Sub-Total for Division 1 - General Requirements -
1.1.5 Supply and Install a temporary site fence for all
site sides in proper way and approved by
engineer.
Price including removing and clearing at the end LS 1
of the works or upon request of Engineer or
Client

1.1.6 Supply and fix a metal sign board with dimension


not less than (3000mm x 5000 mm) including all
necessary information related to the project,
project perspective, Client, Consultant, main
contractor and other contractors. price includes
concrete foundation, steel framing & lights, LS 1
maintenance including Municipality requirements
and permissions.

1.1.7 Performance Bond: Allow for obligations in


connection with provisions of bonds and LS 1
guarantees.

1.1.8 Project Insurance: Submit to engineer the


required project insurance in accordance to the LS 1
contract documents.

1.1.9 Security of the project by appointing a suitable


number of guards to be responsible for security LS 1 -
of site and materials for the entire duration of the
Project.

1.1.10 Supply and provide electrical temporary supply


(two (2) suitable generators with one standby
generator) for offices and construction operation
of contractor and other contractors including fuel, LS 1
oil, maintenance, operating, cost and monthly
expenses during the entire construction period.

1.1.11 Supply and provide adequate water supply for


offices and construction operations including all
expenses cost during the entire construction LS 1
period.

1.1.12 Maintain site cleaning, clearing, construction


materials wastage & garbage disposal including LS 1 -
site pest control through out the duration of
construction.

1.1.13 Full implementation of site safety construction for


LS 1 -
the entire duration of the project.

Page 3 of 49 Division 1
General Requirements
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 1 - GENERAL REQUIREMENTS

Sub-Total for Division 1 - General Requirements -


COLLECTION

Total page 1 -

Total page 2 -

Page 4 of 49 Division 1
General Requirements
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 1 - GENERAL REQUIREMENTS

Total for Division 1 - General Requirements -

Page 5 of 49 Division 1
General Requirements
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 2 - SITEWORK
2.1 EARTHWORKS
Complete all excavation, backfilling and site
grading according to the drawings,
specifications and engineering satisfactions.

Excavation works to reach the desired levels.


Considering the following items of works:
a. Storage of excavated soil materials that are
proven to be applicable for backfilling
b. Haul out & disposal of excess & unsuitable
2.1.1 excavated soil materials LS 1
c. Allow sufficient, not less than 1m, setback in
the excavation for working and movement space

2.1.2 Backfilling of crushed stone layer to building


foundation including plate load testing, backfilling
around the building perimeter from foundation
level until the ground level of suitable imported
materials, this fill shall be placed in layers, each
layer should not exceed 20cm. in thickness and
LS 1
compacted to 95% of Standard Proctor Maximum
Dry Density Test. Sand in two layers, to be
soaked in water per lift and last layer
compacted.The excavated soil materials may be
used as backfill material after geotechnical
consultant approval.

2.4 TERMITE CONTROL


Soil treatment application for termite control
to subgrade foundation,ground slab and
periphery of the building according to the
drawings, specifications and engineering
satisfactions.

2.4.1 Termite treatment underneath the mat m2


foundation, grade slab and around building 660
perimeter ( 2 meters width).

2.5 SITE CLEARING & DEMOLITION


Site clearing and demolition of the existing
structures.

2.5.1 Site clearing and demolition of the existing


LS 1
structures as directed by Engineers.

2.5.2 Siite verification and protection of existing utilities.


LS 1

2.6 SOFT LANDSCAPING (NOT INCLUDED IN CONTRACT)

Page 6 of 49 Division 2
Siteworks
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )

Complete soft landscaping works including


excavation, backfill of gravel drainage layer,
geotextile sheet layer, planting medium
including pit moss and fertilizers, planting of
palms & lawn as shown in the drawings.
(Submit shop drawing for Architect's
approval)

2.7 HARDSCAPING WORKS (NOT INCLUDED IN CONTRACT)

Complete hardscaping works including


excavation, backfill, concrete works as
shown in the drawings. (Submit shop drawing
for Architect's approval)

Sub-Total for Division 2 - Site Work


COLLECTION

Total page 1

Page 7 of 49 Division 2
Siteworks
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )

Total for Division 2 - Site Work -

Page 8 of 49 Division 2
Siteworks
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia

Page 1 of 49 Division 3
Concrete Works
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 4 - MASONRY WORKS
4.1 UNIT MASONRY:
Supply and installation of Lightweight
Volcanic Blocks with a maximum density 750
kg/m3 and a regular standard nominal size ,
bedded and jointed on ordinary portland
cement and sand mortar (1:3), salt free
including 1.52mm (16 gauge) sheet metal
anchoring straps abutting to structural
concretes at every 3 layers, 4mm dia. ladder
mesh horizontal reinforcement at every 3
layer with fire rated insulation and sealant in
between masonry and slab soffit, Including
precast reinforced lintels to openings.

Internal Walls
4.1.1 100mm thk. CMU Internal Wall m2 60

4.1.2 150mm thk. CMU Wall (court yard parapet) m2 15

4.1.3 200 0mm thk. CMU Internal Wall m2 400

External Walls
4.1.4 200mm thk. CMU External Wall with pre- m2 390
insulated insulation

4.1.5 200mm and 100mm thk. CMU External Wall with m2 610
50mm rigid insulation in between.

4.1.6 200mm thk. CMU wall for external stair m2 14

4.1.7 150mm thk. CMU wall for ledge around dome m2 60


including recessed blocks

4.1.8 100mm thk. CMU wall for walkway and ramp m2 32

4.1.9 Allowance for providing the protruding bricks Ls 1


around the windows and doors as required

Sub-Total for Division 4 - Masonry Works -


COLLECTION

Total page 1 -

Page 2 of 49 Division 4
Masonry Works
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 4 - MASONRY WORKS

Total for Division 4 - Masonry Works -

Page 3 of 49 Division 4
Masonry Works
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 5 - METAL WORKS
5.1 METAL FABRICATIONS:
Furnish and install fabricated metals according to the
drawings, specification and engineering satisfaction.

5.1.1 Supply and installation of stair steel handrail 50mmØ including Ls 1


steel balusters, bracket support with epoxy paint primer and
painted per project specification (Submit shop drawing for
Architect's approval)

Location: Stair, Basement to 2nd floor

5.1.2 Supply and installation of stair steel handrails, treads & risers Ls 1
with balusters and epoxy paint primer and painted per project
specifications (Submit shop drawing for Architect's approval)

Location: Stair at Minaret from Grd to Mosque roof level

5.1.3 Supply and installation of spiral stair steel handrails, treads & Ls 1
risers with balusters and epoxy paint primer and painted per
project specifications (Submit shop drawing for Architect's
approval)

Location: Stair at Minaret from level 109.10 to 120.10

5.1.4 Supply and installation of stair steel handrail 50mmØ including Ls 1


steel balusters, bracket support with epoxy paint primer and
painted per project specification (Submit shop drawing for
Architect's approval)

Location: Stair at Handicap Ramp

5.1.5 Supply and installation of 16mm diameter stainless steel Nos 10


ladder @ 300mm o.c Width = 300mm (Submit shop drawing
for Architect's approval)
Location: Minaret at Stair transition

5.1.6 Supply and installation of Aluminium ladder to water tanks Ls 1


including support H=3000 mm, Width = 300mm (Submit shop
drawing for Architect's approval)

Location: Domestic, Irrigation & Fire Water Tank

5.1.7 Supply and installation of Aluminum ladder for roof access Ls 1


including support approx. H=4000 mm, Width = 300mm
(Submit shop drawing for Architect's approval)

Location: Roof deck

5.1.8 Supply and installation of Aluminum ladder for roof access Ls 1


including support approx. H=3000 mm, Width = 300mm
(Submit shop drawing for Architect's approval)

Location: Roof deck

Page 4 of 49 Division 5
Metal Works
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
5.1.9 Supply and installation of Aluminum screen and handrails Ls 1
including support (Submit shop drawing for Architect's
approval)

Location: Minaret at level 120.10

5.1.10 Supply and installation of Aluminum screen and handrails Ls 1


including support (Submit shop drawing for Architect's
approval)

Location: Court yard at Ground floor level

5.1.11 Supply and installation of Conical spire consisting of insulated Ls 1


metal panels, metal rafter & furring chanels painted and prime
coated. Items to include brass crescent decor approx H=2000
(Submit shop drawing for Architect's approval)
Location: Court yard at Ground floor level

5.1.12 Supply and installation of Crescent decor including support Ls 1


appox H=2000 (Submit shop drawing for Architect's approval)

Location: Top of Dome

Sub-Total for Division 5 - Metal Works -


Collection

Total Page - 01 -

Page 5 of 49 Division 5
Metal Works
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )

Total for Division 5 - Metal Works -

Page 6 of 49 Division 5
Metal Works
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 6 - WOODS & PLASTICS
6.1 WOOD WORKS
Furnish and installtion of woodworks according
to the drawings, specification and engineering
satisfaction.
6.1.1 Weatherproof treated teak wood with natural Nos 16
varnish coating finish including frames. Items to
include fixation and all required support. (Submit
design and shop drawings for Architect approval)

Location: External, H=2500 x W=1500 for W2&W4

6.1.2 Weatherproof treated teak wood with natural Nos 16


varnish coating finish including frames. Items to
include fixation and all required support. (Submit
design and shop drawings for Architect approval)

Location: External, H=800 x W=800 for W3&W5

6.1.2 Weatherproof treated teak wood with of white Nos 12


painted finish including frames. Items to include
fixation and all required support. (Submit design
and shop drawings for Architect approval)

Location: External, H=800 x W=800 for W1

6.1.3 Crown decor around the parapet wall, Fiber Lm 114


reinforced Plastic H=380 x Thk= 150, spray painted
Items to include fixation and all required support.
(Submit design and shop drawings for Architect
approval)
Location: External, around parapet wall of Main
Mosque and Prayer building

Page 7 of 49 Division 6
Woods and Plastics
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )

Sub-Total for Division 6 - Woods & Plastics

Collection

Total Page - 01

Page 8 of 49 Division 6
Woods and Plastics
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )

Total for Division 6 - Woods & Plastics -

Page 9 of 49 Division 6
Woods and Plastics
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
7.1 VAPOR BARRIER:
Furnish and install 200 microns polyethylene
sheet vapor barrier underneath the following
sub-structure elements:

7.1.1 Underneath Ground Slab on Grade m2 580 - -

7.1.2 Underneath the Minaret Mat Foundations m2 16 - -

7.2 BITUMINOUS DAMP PROOFING:


Furnish and install two (2) coats of bituminous
paint to concrete surface in contact with earth
for the following sub structure elements:
7.2.1 R.C Shear walls @ Basement Floor. m2 240
7.2.2 R.C Footings @ Basement Floor. m2
128
7,2,5 R.C Footings @ Ground Floor. m2
75 - -

7.2.2 Columns necks @ Basement and Ground Floor. m2 54 - -

7.3 MEMBRANE WATERPROOFING


Supply and install PVC sheets membrane (single
layer) fully welded by automated hot air machine
(or by other means approved by engineer) to
horizontal areas over raft concrete blinding
including protection layer of non woven geo-textile
sheet.
1 Mosque Dome m2 130
Supply and install PVC sheets membrane (single
layer) welded by automated hot air machine to
vertical areas over external faces of retaining wall,
including protection layer of non woven geo-textile
sheet and protection board.
2 RC Walls at Basement m2 240

7.3 MEMBRANE WATERPROOFING :


Waterproofing membrane, 4mm thick single layer
torch applied to horizontal areas and 200mm
upstands to walls, including protection layer & non
woven geo-textile sheet and 50mm thick
sand/cement screed.
Basement
7.3.1 Main Toilet m2 140

7.4 PROTECTED ROOF MEMBRANE SYSTEM :

Page 10 of 49 Division 7
Thermal and Moisture
Protection
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
Supply & installation of complete waterproofing
system to roof deck: Lightweight concrete screed
slope to drain, PVC sheets membrane (single
layer), 2.0mm thick welded by automated hot air
machine to vertical areas over roof, including
protection layer of non woven geo-textile sheet and
protection board.having an average thickness of
80mm thick with maximum 1% slope, one (1) layer
of extruded polystyrene thermal insulation 50mm
thick with rebated edges, one (1) layer of non-
woven geo-textile sheet separation layer, cant strip
fillet (45 degrees angle) along walls , all upstands /
parapet walls, upper ends of PVC sheets shall be
mechanically fastened by extruded aluminum
counter flashing with sealant protection and
waterproofing dressing around service pipes, water
outlets and drains as shown on the drawings.
Consider the following item of works:
a. Filter fabric
b. Drainage layer
c. Root barrier

7.4.1 Roof Deck Main Mosque, Court yard hallways and m2 520
Prayer room building

Sub Total for Division 7-Thermal & Moisture Protection -

7.5 EPOXY COATINGS:


Application of two (2) coats epoxy resin based,
non-toxic high build solvent-free with glass fiber
reinforcement in between coats on horizontal and
vertical surfaces.
Basement
7.5.1 Pump Room - Flooring & Walls m2 35

7.7 Cementitious Waterproofing Type:


Application of two (2) coats cementitious type
waterproofing membrane (Submit samples for
Architect's approval)

Basement

7.7.1 Domestic, Irrigation and Fire water Tank ( Floor, m2 440


Walls & Roof underside)

7.7.2 Open space (Floor, Walls & Roof) m2 720

7.7.3 Tench Drain m2 7

Page 11 of 49 Division 7
Thermal and Moisture
Protection
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 7 - THERMAL AND MOISTURE PROTECTION

Sub Total for Division 7-Thermal & Moisture Protection -


COLLECTION

Total page 1

Total page 2 -

Page 12 of 49 Division 7
Thermal and Moisture
Protection
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 7 - THERMAL AND MOISTURE PROTECTION

Total for Division 7-Thermal & Moisture Protection -

Page 13 of 49 Division 7
Thermal and Moisture
Protection
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 8 - DOORS & WINDOWS
8.1 DOOR SETS:
The descriptions of the item as follow, furnish
and install of doors complete including wood
door architrave and paint finish with
accessories and best quality hardwares
according to the specifications and
engineering satisfactions.

Refer to schedule of doors and windows

8.1.1 DOOR NO.: 1 Set 3


SIZE: 2000 X 2500 mm

8.1.2 DOOR NO.: 2 Set 11


SIZE: 1300 X 2200 mm

8.1.3 DOOR NO.: 3 Set 10


SIZE: 1200 X 2200 mm

8.1.4 DOOR NO.: 4 Set 1


SIZE: 1050 X 2200 mm

8.1.5 DOOR NO.: 5 Set 2


SIZE: 1050 X 2200 mm

8.1.6 DOOR NO.: 6 Set 2


SIZE: 1050 X 2200 mm

8.1.6 DOOR NO.: 7 Set 1


SIZE: 1000 X 2200 mm

8.2 WINDOW SETS:

The descriptions of the item as follow, furnish


and install of windows complete with approved
accessories , sealants and quality hardwares
according to the specifications and
engineering satisfactions.
Refer to schedule of doors and windows

8.2.1 WINDOW NO.: W1 Set 12


SIZE: H=1700 x W=1200 mm

8.2.2 WINDOW NO.: W2 Set 8

SIZE: H=2500 x W=1500 mm

8.2.3 WINDOW NO.: W3 Set 8

Page 14 of 49 Division 8
Doors and Windows
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 8 - DOORS & WINDOWS
SIZE: H=800 x W=800 mm

8.2.4 WINDOW NO.: W4 & 4a Set 8


SIZE: H=2500 x W=1500 mm

8.2.5 WINDOW NO.: W5 & W5a Set 8


SIZE: H=800 x W=800 mm

Sub-Total for Division 8 - Doors & Windows


Collection

Total Page - 01

Page 15 of 49 Division 8
Doors and Windows
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 8 - DOORS & WINDOWS

Total for Division 8 - Doors & Windows -

Page 16 of 49 Division 8
Doors and Windows
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 9 - FINISHES
9.1 INTERNAL FINISHES:
Furnish and install the required internal
finishes according to the drawings,
specifications and engineering satisfactions.

Floor Finishes:

9.1.1 Tread-Jerusalem stone, W=1325xW=300 Thk.=30 nos. 48


Riser-Jerusalem stone, W=1325xW=166 Thk.=20 nos. 48
Floor-Jerusalem stone, W=600xW=600 Thk.=20 m2. 4

9.1.2 600x600 Porcelain tiles, matte finish m2. 200

9.1.3 200x200 Ceramic tiles, non-skid m2. 105

9.1.4 Epoxy Paint m2. 260

9.1.5 250x250x20 Terrazzo tiles m2. 500

9.1.6 Heavy duty carpet m2. 500

Wall Finishes:

9.1.7 Cement plaster, skimmed coated and painted m2. 950

9.1.8 Washable paint finish to walls and columns m2. 360

9.1.9 200x200 Ceramic tiles, glazed m2. 206

Wall Skirting Finishes:

9.1.10 Hard wood H=100mm x 10mm thk. lm 190

9.1.11 Ceramic Tiles H=100mm x 20mm thk. lm 30

Sub- Total for Division 9 - Finishes


Interior Ceiling Finishes:
9.1.12 12mm thick fibrous gypsum ceiling with painted m2 266
finish on metal furrings and hangers.Item to
include ceiling soffit at dome opening

9.1.13 12mm thick fibrous humid resistant gypsum ceiling m2 120


with painted finish on metal furrings and hangers.

9.1.14 600x600x12mm thick Acoustical fiber board m2 200


suspended ceiling on metal furrings and hangers.

9.1.15 Allowance for providing cornice at Main Mosque Ls 1


ceiling. (Submit drawing for approval)

9.1.16 Allowance for providing curtain cove Ls 1

9.1.17 Applied paint finish on slab underside


Page 17 of 49 Division 9
Finishes
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 9 - FINISHES

9.2 EXTERNAL FINISHES

Wall Finishes:

9.2.1 Cement plaster, skimmed coated and painted m2 2,200 -

9.2.2 600x600x20mm thk. Granite stone with hound Lm 130 -


finish skirting

9.2.3 Groove on plaster 25mm width x 25mm depth Lm 690

Floor Finishes:

9.2.4 300X300x30 thk. Terrazzo tiles at External stair m2 100


includung tread and risrs with aluminum stair
nosing.Item to include walkway at womens
entrance

Smooth concrete finish with epoxy painted to m2 25


handicap ramp pavement.

Sub- Total for Division 9 - Finishes


Collection

Total Page - 01

Total Page - 02

Page 18 of 49 Division 9
Finishes
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 9 - FINISHES

Total for Division 9 - Finishes -

Page 19 of 49 Division 9
Finishes
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 10 - SPECIALTIES

10.1.2 COUNTERTOP
Furnish and install lavatory countertop
according to the drawings, specifications and
engineering satisfactions (Subject to
Architect's approval).

10.1.2 20mm thk. Cut-to-size natural marble countertop


polished finish including back splash & fascia

Size : L=2150 W= 600mm No. 1


Size : L=2030 W= 600mm No. 1
Size : L=2550 W= 600mm No. 1
Size : L=3360 W= 600mm No. 1
Size : L=950 W= 600mm No. 1
Location: Toilet

10.2 FACIAL MIRROR


Furnish & install of facial mirror all complete
including aluminum bracket support
according to the drawings, specifications and
engineering satisfactions.

10.2.1 Supply & installation of facial mirror all complete


including aluminum bracket support according to
the drawings, specifications and engineering
satisfactions.
Size : H= 1000mm,W=600mm No. 12
Location: Toilet

Page 20 of 49 Division 10
Specialties
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 10 - SPECIALTIES

Sub-Total for Division 10 - Specialties


Collection

Total Page - 01

Page 21 of 49 Division 10
Specialties
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 10 - SPECIALTIES

Total for Division 10 - Specialties -

Page 22 of 49 Division 10
Specialties
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 14 - CONVEYING SYSTEM
11.2 ESCALATOR:
Supply and install the required escalator
according to the drawings, specifications and
engineering satisfactions.

11.2.1 Supply and installation of escalator including


testing and commissioning by Schindler,
Mitsubishi or approved equal Item to include all
required wiring and control for automatic and
manual operation of the system.(Submit
catalogues for Architect's
Maximum Capacity: approval.
Standard

Type: Exterior, Modern Lot 2


Speed = .5m/s
Width= 1520mm (approx)
Length = 9650mm (approx)
Vertical Height = 4000mm (approx)

Sub-Total for Division 14 - Conveying System


Collection

Total Page - 01

Page 23 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 14 - CONVEYING SYSTEM

Total for Division 14 - Conveying System -

Page 24 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 21 - FIRE SUPPRESSION)

21-1 WET-PIPE SPRINKLER SYSTEMS

21-1-1 FIRE DEPARTMENT CONNECTIONS – 2


WAYFIRE DEPT. INLET CONNECTION WITH
CHECK VALVE (Black Steel Sch. 40
Seamless). Item to include support, fittings
and required accessories, testing and
commissioning.

A 150mm dia Black Steel Pipe Lm 1

21-1-2 SPRINKLER PIPING AND FHC CONNECTION


(Black Steel Sch. 40 Seamless, screw joint for
50mm below and victaulic joint for 63mm above).
Item to include pipe support, bracing, fittings, pipe
sleeves, testing and commissioning.

A 25mm dia. Black Steel Pipe Lm 125


B 32mm dia Black Steel Pipe Lm 40
C 38mm dia Black Steel Pipe Lm 18
D 50mm dia Black Steel Pipe Lm 46
F 75mm dia. Black Steel Pipe Lm 14
G 100mm dia Black Steel Pipe Lm 12
H 150mm dia Black Steel Pipe Lm 8

21-3 FIRE SUPPRESSION HOSES AND NOZZLES

A FHC Box (Valve in FHC to be pressure regulating item 2


type), full glass, wall mounted UL listed complete
with hose, nozzles and portable fire extinguisher

21-4 FIRE EXTINGUISHERS

A 4.5 Kg Dry Powder Extinguisher item 11


B 5 Kg C02 Extinguisher item 2

21-7 WET PIPE SPRINKLER SYSTEMS

B Concealed Pendent Sprinklers No. 48

C Horizontal Sidewall Sprinklers No. 16

21-5 Supply and installation Alarm Check Valve Set 1


assembly complete with all necessary accessories

Page 25 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 21 - FIRE SUPPRESSION)
150mm Test pipe header assembly consisting of Set 1
Gate valve with supervisory switch, sight glass
and flow switch

Sub-Total for Division 15 - Section 21 (Fire Suppression)

21-9 Supply and install Supervisory Gate Valve


including all necessary connection, support and
labeling as specified

A 50mm dia Gate Valve No. 48


B 75mm dia Gate Valve No. 3
C 100mm dia Gate Valve No. 1
D 75mm dia Flow switch No. 3
E 100mm dia Flow switch No. 1

21-12 EQUIPMENT:

Supply and install factory assembled and tested


electrical fire pump set assembly (one duty /one
standby) UL listed and FM approved, complete
with all necessary accessories, fitting, valve,
manifold, gauge, connection, concrete pad,
vibration isolator, frame and control panel as
specified (Aurora, Perless, ITT make for detail
check specs)

A Electric driven Pumpset 500 GPM item 1

B Diesel driven Pumpset 500 GPM item 1

C Jockey Pump 50 GPM item 1

D Supply and installation Alarm Check Valve Set 1


assembly complete with all necessary accessories

Page 26 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 21 - FIRE SUPPRESSION)

Sub-Total for Division 15 - Section 21 (Fire Suppression)


Collection

Total Page - 01

Total Page - 02

Page 27 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 21 - FIRE SUPPRESSION)

Total for Division 15 - Section 21 (Fire Suppression) -

Page 28 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 22 - PLUMBING SERVICES INSTALLATIONS)

22-1 Sanitary fixtures


Supplying, installing, connecting, test and commissioning
of fixtures, traps, angle valves, faucet complete with all
necessary accessories

A Lavatories (counter type, counter measured elsewhere) No 12

B Water Closet Tank type, integral P trap with seat cover No 1

C Water Closet Squat/Arabic, tank type with P-trap No 10

D Kitchen Sink Double No 1

E Ablution Faucet No 10

F Perineal Spray No 11

G Lockable Hose bibb set (15mm diameter incl. Isolation No 2


valve)

22-2 COLD AND HOT WATER INSTALLATION AS PER


SPECS)

22-2-A.1 Supplying, install & Test Cold water piping from schedule
80 CPVC including Pipe hanger, support, pipe sleeves,
fittings. (For Domestic Water)

A 75 mm CPVC Sch 80 Lm 24
B 63 mm CPVC Sch 80 Lm 5
C 50 mm CPVC Sch 80 Lm 4
D 38 mm CPVC Sch 80 Lm 10
E 32 mm CPVC Sch 80 Lm 16
F 25 mm CPVC Sch 80 Lm 8
G 20 mm CPVC Sch 80 Lm 40
H 13 mm CPVC Sch 80 Lm 90

Sub-Total for Division 15 - Section 22 (Plumbing Service Installations)

22-2-B Schedule 40 G.I steel pipeworks with all fittings, valves Ls 1


and accessories etc. from water meter to pump room..

22-2-C Supply and Install Main water meter including gate valves,
required fittings and accessories. Item to include concrete
valve box with cover and appropriate markings.

63 mm Ls 1

22-2-D Allowance for tapping to Baladiyah network. Ls 1

Page 29 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 22 - PLUMBING SERVICES INSTALLATIONS)

22-3-A Valves & Accessories


Supplying, installing, connecting, testing and
commissioning of Valve and support (Gatel valve, brass,
screw type up to 50mm, Gate valve, C.I-flange type for
63mm above]

A 75 mm diameter No 1
B 63 mm diameter No 1
C 50 mm diameter No 3
D 38 mm diameter No 3
E 32 mm diameter No 6
F 25mm diameter No 3
G 50mm dia. Float valve

22-3-C Supplying, installing, connecting, testing and


commissioning of check valve or non return valve as
shown on specifications and drawings c/w all necessary
coupling, Adapters and accessories.

A 50 mm diameter No 2
B 32 mm diameter No 3

C Supply and Install Electric water heater complete with all Set 3
accessories, valves, fittings, gauges, etc.

D Supply and Install Hot water tempering device complete Nos. 3


with all accessories, valves, fittings, gauges, etc.

22-4 Allowance for providing 100MM tank inlet connection Ls 1


from stand up pipe to water tanks

Sub-Total for Division 15 - Section 22 (Plumbing Service Installations)


22-5 Water Supply Pumps
A Domestic Water Triplex Pumps, Package type, multi- Sets 1
booster set complete with Valves & accessories required
for complete operation of the system. Item to include
short length of pipe work, fittings, supports, collar plate
within the pump room area. 2W+1S by Grunfos or
approved equal.
B Irrigation Water Duplex Pumps, Package type, multi- Sets 1
booster set complete with Valves & accessories required
for complete operation of the system. Item to include
short length of pipe work, fittings, supports, collar plate
within the pump room area. 1W+1S by Grunfos or
approved equal.

Page 30 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 22 - PLUMBING SERVICES INSTALLATIONS)
22-6 Sewer, Waste, Vent and Drainage pipe
Supplying, installing, connecting, testing and
commissioning PVC pipe for Soil, waste, vent and
storm/condensate drain pipework including all necessary
fittings, supports, fixing accessories. Item to include
Trenching, Bedding and Backfilling for buried pipes

A 25 mm (1") diameter-Blue pipe Lm 55

B 50 mm (3") diameter-Blue pipe Lm 16

C 50 mm (2") diameter Lm 160

D 75 mm (3") diameter Lm 180

E 110 mm (4") diameter. Lm 60

F 160 mm (6") diameter. Lm 70

G 200 mm (6") diameter. Lm 12

22-8 Drainage accessories;

Supplying, installing, connecting, testing and


commissioning, chrome plated floor Clean out and floor
drain complete including cover as per project specification.

A Floor Cleanout 110 mm No. 6

B Floor Cleanout 150 mm No. 1

C Stainless steel trench grating cover W=400 L=7500 Ls 1


(in 5 removable panels at 1500m)

D Area Drain, CI with removable bucket from J.R.Smith or No. 5


approved equal

E Soak-away drain box with removable grating cover as per No. 1


detail

F Allowance for Minaret drain Ls 1

G Vent cowl including vent penetration thru roof and required No. 3
flashing

H Supplying, installing, 75mm Downspout nozzles including No. 17


splash block at grade level as required.

I Supplying, installing, connecting, testing and No. 17


commissioning of 75mm Dia.dome roof drain cast iron.
Jay R. Smith or approved equal.

J Supply and Install Package unit drain 50mm Dia. No. 2

K Supply and Install 100mm Overflow and drain pipe Lm 16

L Supply and Install 100mm Drain valve No. 3

Page 31 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 22 - PLUMBING SERVICES INSTALLATIONS)
M Supply and Install Stainless steel access manhole frame No. 3
and cover, 600x800

N Sewage manhole frame and cover C.I 600x600 No. 1

O Floor Drain 50mm Stainless Steel No. 12

P Allowance for providing Pipe sleevs & penetration to wall Ls 1


and slab

Sub-Total for Division 15 - Section 22 (Plumbing Service Installations)


Collection

Total Page - 01

Total Page - 02

Total Page - 03

Page 32 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 22 - PLUMBING SERVICES INSTALLATIONS)

Total for Division 15 - Section 22 (Plumbing Service Installations)

Page 33 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 23 - HVAC SYSTEMS)

23.1 Supply and Installation of Split unit including Thermostat


and control accessories
23.1.1 FCU-01/ACCU-01 Set 4
23.1.2 FCU-02/ACCU-02 Set 8

23.2 Exhaust register 600x600 No. 11

23.2.1 Exhaust register 300x300 No. 10

23.2.1 Allow for the supply and installation of Ls 1


door grilles

23.3 Refrigerant Copper piping with Closed Nitrile Lm 130


Rubber Insulation.

23.4 Copper Piping with Insulation Lm 45

23.5 Branch Kits Lot 1

23.5.1 Refnet Connection for Refrigerant Piping Lot 1

23.6 Ventilating fans as detailed in drawing

23.6.1 EF-01 (1100 cfm) No. 1

23.6.2 EF-02 (1200 cfm) No. 1

23.7 Supply Linear Bar Grilles including


volume damper, insulated plenum box and all
accessories for complete installation.

23.7.1 4-slot x 200mm Width, Length=10 M No. 2


23.7.2 4-slot x 200mm Width, Length=3 M No. 2

23.8 Return Linear Bar Grilles including volume


damper
all accessories for complete installation.
23.8.1 4-slot x 200mm Width, Length=13 M No. 1

Air Curtain AC-01 L=1200 No. 3

Sub-Total for Division 15 - (Section 23 - HVAC Systems)

Supply, Installation and commisioning of


Packaged Air-conditionung Unit complete with
all necessary accessories and concrete pad for
complete operation of the system.

23.9 PACU-01 20 tons cap. No. 1

Page 34 of 49 Division 15
(Section 23 - HVAC Systems)
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 23 - HVAC SYSTEMS)
23.1 Duct insulation, fire retardant fiber glass Lm
with aluminium foil vapor barrier

850x600 Lm 18
600x500 Lm 8
600x300 Lm 8

23.20 Duct Flexible Connections No. 30

23.21 Allowance for providing Elbows.Reducers and Ls 1


Bends

Sub-Total for Division 15 - (Section 23 - HVAC Systems)


Collection

Total Page - 01

Total Page - 02

Page 35 of 49 Division 15
(Section 23 - HVAC Systems)
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 15 (SECTION 23 - HVAC SYSTEMS)

Total for Division 15 - Section 22 (Plumbing Service Installations) -

Page 36 of 49 Division 15
(Section 23 - HVAC Systems)
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 16 - ELECTRICAL WORKS

16.1 DISTRIBUTION PANEL BOARDS

Furnishing, supplying, installing, connecting,


and testing of distribution panels,termination
of incoming feeder and branch circuit to all
incoming and outgoing feeders, all necessary
accessories and ancillary works and materials
required to complete the installation as per
drawings and specifications.

16.1.1 ref. MDB No. 1


16.1.2 ref. PP-1 No. 1
16.1.3 ref. PP-2 No. 1

16.2 LIGHTING FIXTURES

Installation of ligting fixtures and wiring


devices as shown on layout and described on
legend complete with lamps and control gear,
supply and installation of outlet points
including wires, conduits, conduits fittings,
junction boxes and related accessories.

ref. 40 Watts Panel LED Nos. 69


ref. 40 Watts Tube LED Nos. 52
ref. 2000 Watts Chandelier Nos. 1
ref. 1000 Watts Chandelier Nos. 3
ref. 20 Watts Wall light Nos. 23
ref. 20 Watts Wall light flush Mtd. Nos. 3
ref. 60 Watts Spot light Nos. 10

16.3 WIRING DEVICE AND FINAL SUB-CIRCUIT

installation of wiring devices and supply and


installation of outlet points complete with
wires, conduits fittings, junction boxes and all
related accessories.

16.3.1 to Socket Outlet, 220V Duplex Nos. 29


16.3.2 to Socket Outlet, 220V Weatherproof Nos. 14
16.3.3 to Electric Water Heater Nos. 3
16.3.4 to Exhaust Fan Nos. 2
16.3.5 to Smoke Detector Nos. 24
16.3.6 to Heat Detector Nos. 1
16.3.7 to Manual Pull Satation Nos. 3
16.3.8 to Horn Nos. 3
16.3.9 to Strobe Light Nos. 2

DISCONNECT SWITCHES/DP SWITCHES AND


16.4
CONTROL PANELS

Page 37 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 16 - ELECTRICAL WORKS
Supply & installation of disconnect/DP
switches and control panels as required
complete including wires, conduits, junction
boxes, flexible connections and all related
accessories up to equipment terminals to the
following equipment for power, control /
interlock circuits.

16.4.1 to FCU1/ACCU1 No. 1


16.4.2 to FCU2/ACCU2 No. 1
16.4.3 to FCU3/ACCU3 No. 1
16.4.4 to FCU4/ACCU4 No. 1
16.4.5 to FCU5/ACCU5 No. 1
16.4.6 to FCU6/ACCU6 No. 1
16.4.7 to FCU7/ACCU7 No. 1
16.4.8 to FCU8/ACCU8 No. 1
16.4.9 to FCU9/ACCU9 No. 1
16.4.10 to FC10/ACCU10 No. 1

Sub-Total for Division 16 - Electrical Works

16.5 GROUNDING PROTECTION SYSTEM

Supply and installation of grounding


protection system complete including ground
16.5.1 conductors, ground electrodes, inspection Lot 1
pits, exothermic weld and all related
accessories as shown on drawings.

16.6 SOUND SYSTEM

Supply and installation of sound system


complete as shown on drawings including
cables, conduits, conduit fittings, junction Lot 1
boxes, installation of wiring devices and all
related accessories.
(wiring devices supplied by others)

16.6.1 Public speaker Nos. 18


16.6.2 Voice Control Nos. 3
16.6.3 Microphone Nos. 2

16.7 FIRE ALARM SYSTEM

Page 38 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 16 - ELECTRICAL WORKS
Supply and installation of fire alarm system
complete as shown on drawings including
cables, conduits, conduit fittings, junction Lot 1
boxes, installation of wiring devices and all
related accessories.
(wiring devices supplied by others)

Sub-Total for Division 16 - Electrical Works

Collection

Total Page - 01

Total Page - 02

Page 39 of 49 Division 11
Conveying System
BILL OF QUANTITIES
PROJECT NO : BANI DINAR MOSQUE
Al Madinah, Kingdom of Saudi Arabia
U/RATE TOTAL PRICE
ITEM # D E S C R I P T I O N UNIT QTY.
( SR ) ( SR )
DIVISION 16 - ELECTRICAL WORKS

Sub-Total for Division 16 - Electrical Works

Page 40 of 49 Division 11
Conveying System