SOR Type: Safety Progress Quality Process & Procedure
MEP REPORT
1.Provide Proper water proofing above substation
2.Provide wall mounted rain water outlet and free discharge 3.Conduct water leakage test at toilet and wash basins in toilet and kitchen area 4.Conduct slope test inside the toilet and wash basin 5.Provide threshold as per civil engineer for wet areas 6.Complete the riser duct insulation work 7.Need to complete toilet light, exhaust work 8.Must be conduct water proofing test inside the toilet above tile for slope and leakage test 9.Fix shower washer properly in toilet 10. Water supply gate valve should be in accessible location 11. Junction box in toilet need to fix 12. GT-05 Make properly for the flow of waste water 13. All external and internal water and holding tank cover must be GRP type ,To avoid inrush of water to inside 14. Provide Proper support for the ducts in GF entrance area ,for joins 15. Kitchen sockets must be below the counter-as per DEWA 16. Confirm LPG detector in free air area , no closed area 17. All service room door opening should be outwards 18. All opening telecom room above false ceiling must be closed with fire sealant 19. Submit the material submittal for fire sealant 20. 32A isolator need to provide in telecom room as per ETISALAT 21. Provide earth bar in Telecom room 22. At Kitchen one Floor Trap and cleanout missed ,required clarification 23. Provide 45 bend for grease trap instead of using 90 degree 24. In kitchen, Tel DB schedule name tag should be adjusted as per schedule 25. Sound level must be checked for AC machines in the dining area and it should be below 30 db 26. Complete the insulation of ducts inside the Dining area toilet 27. Provide Proper support for PPR Pipes in Dining toilet 28. PPR Isolation valves must be provided in GF dining area as per Shop drawing 29. Suggest to provide Threshold in dining area toilet to avoid entering water to dining area 30. Bare cables not acceptable inside the false ceiling it should be through flexible and pvc conduits 31. All external water supply must be provided with insulation 32. Provide Name tag for all the ducts and pipes inside false ceiling for maintenance purpose 33. Must be conduct leakage test for PPR and drainage Pipes 34. Electrical wires segregation should be provided( DB wise) in GF high level and risers - final approval subjected to DEWA, for any comment from DEWA contractor need to rectify with full responsibility 35. Consider Bip taps on bus parking area for cleaning purpose (not in drawing ) First floor / Typical Floor/Roof 36. Provide Proper tap insulation for all control cables of ac with copper pipe 37. Complete Riser Duct insulation work 38. Toilet Lighting exhaust work is not completed 39. All copper pipe should be covered with insulation or through flexible conduit 40. No bare insulated wires acceptable inside typical floor garbage room, provide flexible 41. Fix properly the junction box inside the false ceiling 42. Clean all the ducts before closing the false ceiling 43. Rectify Brocken insulation 44. Complete duct insulation in shaft 45. Provide Protection for copper pipe 46. Proper Water proofing test must be conducted for wash basin in toilet 47. Fix shower washer properly in toilet cubicle 48. All PPR Gate valve should be in accessible location and same should be shown in the as built drawing 49. WC bib tap is loose, need to rectify 50. Lights and Exhaust need to provide in toilet 51. Consider Mirror light wiring /conduit 52. Fire hose reel face plate should be inline with wall 53. All electrical junction box in toilet need to fix 54. Typical floor SMDB to DB electrical wire pulling should be through separate conduit inside the tray or trunking , at site provided through single trunking – final approval subjected to DEWA, for any comment from DEWA contractor need to rectify with full responsibility 55. Properly fix the grill inside the room 56. Properly close all the MEP services opening with approved fire sealant 57. Provide Proper support for PPR Pipe terminals in toilet area 58. Provide Provision for Drinking water cooler in typical floor as per tender drawing 59. Use flexible conduit for loose wires inside the false ceiling 60. Don’t make 180 degre. bend for PEX Pipes inside toilet false ceiling 61. Typical floor toilet vent pipe need to connect with soil Pipe 62. Follow PEX color code inside the toilet 63. For AC control wire joins should take NOC from supplier 64. For any Power cable joining should be as per DEWA requirement 65. Cables segregation need to be done on roof for different DB outgoings 66. At roof copper pipe should be insulated as per spec and neatly arranged with tray 67. All the water supply pipes on the roof should be insulated as per spec 68. LPG Tank clearance from parapet should be as per DCD and approved drawing 69. Solar calorifier external cladding need to rectify 70. All metal parts should be earthed on the roof Issued By: ANT Received By : Action Required By: (Contractor) Signature : Section 2- Contractor‘s Reply:
Replied by: Signature:
DATE : Section 3 – SNAG Closure (For Engineer Use): Approve Approved with comment Reject
THIS THIS IS AN OFFICIAL REMINDER TO CONTRACTOR TO CLOSE THE TECHNICAL ISSUES AND CONSULTANT SHALL NOT BE RESPONSIBLE FOR THE NON COMPLIENCE AFTER EFECTS