The following proposal has been prepared in response to the invitation extended to
Model Space by Ar. Jessica Z. Cueto, for the rendering of architectural and
documentation services as ARCHITECT-OF-RECORD of STRAIGHTFORWARD SM
BACOOR with a total development area consideration of 87 SQM, with the address
located at SM City Bacoor, Bacoor, Cavite composed mainly of the following:
A. SCOPE OF WORKS
Page 1 of 6
3. Pertinent Docs related to Mall Fit-out – Mall Cut-out Plan, Existing Unit
Plan
4. Ocular Inspection / Site Visit
5. Construction/Fit-out Guidelines (if applicable)
6. Project Brief and Outline (if applicable)
C. DURATION OF WORK
(Day 1 starts upon signing the Acceptance of Proposal and payment of DP
and issuance of Commencement of Work by Client)
D. SCHEDULE OF FEES
Area Cost /
Scope Description Cost of Service
(sqm) sqm
Proposal A: Contract Documentation
Signing and Sealing of Building Permit
Forms & Construction Plans*
Architectural 87 sqm 350 30,450.00
Electrical 87 sqm 250 21,750.00
Electronics 87 sqm 200 17,400.00
Fire Protection 87 sqm 200 17,400.00
Mechanical 87 sqm 200 17,400.00
Max of two (2) Site visits / Ocular
Incl.
inspection
Subtotal 104,400.00
12% VAT 12,528.00
Total with 12% VAT 116,928.00
Discount 18,028.00
Total Service Fee inc. of VAT & Disc. 98,900.00
Page 2 of 6
Mechanical 87 sqm - *5,000.00
Certificate of Completion and
Incl.
Construction Logbook
Site visits / Ocular inspection Incl.
Subtotal 25,000.00
Total Service Fee **25,000.00++
* Fixed cost of Php 5,000.00 pesos if there are no major revisions for the as-built drawings
** Please see Item H.
E. TERMS OF PAYMENT
The terms of payment for the above service are as follows:
F. EXCLUSION
1. Design Development
2. Sign and Seal for Full time Supervision (for Building Permit)
3. Any other Engineering Analysis or other architectural drawings not listed above.
4. Space Branding
5. Contract Documents printing and Building Permit processing.
6. Project Management
7. Procurement Assistance
H. REVISIONS
The ARCHITECT-OF-RECORD will only accommodate Three (3) Minor revisions
for As-built revisions under Proposal B, (please see annex for revision definition) and
anything beyond the said revision shall be an additional cost. Any addition, alteration
or deviation for Proposal B shall only be executed upon written order and will
become an extra cost over. Computation is as follows:
Page 3 of 6
Number of manhours x 2.5 (factor)
In the event of termination/cancellation during the 1st billing, the deposited down
payment stated above shall be returned to the client but will be charged for a
cancellation fee of 20% of the above contract price or shall be based on the actual
output of the architect, whichever is higher, However, in the event that the CLIENT
terminates/cancels the project after the approval of final schematics (presentation
by architects with one revision requested by the client), no amount shall be returned
to the CLIENT and the CLIENT agrees to settle the amount equal to 80% of the above
contract price. All existing output from the team shall be turned over to the client.
The CLIENT Agrees to pay to the Model Space not more than Seven (7) days from
the requested date of the Billing. If the CLIENT fails to pay within the said period,
the CLIENT agrees to pay a fee of 10% of 1% of total contract cost per day as penalty
with a limit not more than 10% of the total amount indicated above.
J. CONSTRUCTION PHASE
CLIENT agrees that Site coordination and implementation of the design to the is
the sole responsibility of the Contractor/PM/CM, should the CLIENT decide to do
PM/CM on their own, the ARCHITECT-OF-RECORD is not required to provide
any shop drawings or documentation to the client beyond the agreed scope of
works.
Page 4 of 6
Responsibility of the designer is solely the preparation of the specification. The
getting of the actual quantity/implementation/sizes on site must be assumed by
the Contractor/PM/CM.
The DESIGNER is not responsible for any variances in the measurements that may
occur during the implementation due to existing site conditions before
construction. However, it is the DESIGNER’s responsibility to revise the design
upon request to fit the site condition with a limit of One (1) revision.
After the turnover of the contract documents, signed by the CLIENT, the designer
is no longer liable in implementation in construction, Contractor/PM/CM shall
implement all designs as per specifications, the burden of the Construction
deadlines is not under the ARCHITECT-OF-RECORD.
K. GENERAL PROVISIONS
This proposal shall act as a CONTRACT AGREEMENT for the above services. This
agreement sets forth the entire understanding between the parties with respect
to its subject matter, and supersedes all prior agreements or conditions.
This proposal can only be modified by the mutual written agreement of the parties.
Nothing in this Agreement is intended to confer on any third party any benefit or
any right to enforce any terms of this Agreement.
This Agreement will be governed in accordance with the Philippine Laws, without
giving effect to conflict of law rules.
Respectfully,
Norvim C. Mallari,
UAP, PIEP, LEED Green Assoc., ACIArb
Principal Architect
August 24, 2023
Page 5 of 6
ACCEPTANCE OF PROPOSAL
The attached price, specifications and conditions for the Architectural services are
satisfactory and are hereby accepted. MODEL SPACE is now authorized to do the
work on STRAIGHTFORWARD SM BACOOR as specified. This document will act as
the contract for the services indicated above.
______________________
Client
Date: _______________
Bank Details:
BDO – MODEL SPACE BUILDERS
ACCOUNT NO. 002478013404
ANNEX A
Constructions Documents (11 sets, 20” X30” signed and sealed blueprints)
• Architectural Drawings – details as provided by Designer
• Mechanical – details as provided by Designer
• Electrical – details as provided by Designer
• Electronics – details as provided by Designer
• Fire Protection – details as provided by Designer
Major Revision – any item that will affect 3 or more of the scope describe above
Example: Extension/Interior Wall
Affects (1) Floor Plan, (2) Reflected Ceiling Plan, (3) Lighting Layout.
Cabinetry/Modules
Affects (1) Shop drawings (2) Connection details (3) Material
Specification
Minor Revision – any item that will affect 1-2 of the scope describe above
Example: Change location of interior Door
Affects (1) Floor Plan only
----------------------nothing follows----------------------