SUMMARY
1.00 SUBSTRUCTURE
3.00 WALLING
4.00 DOORS
5.00 WINDOWS
6.00 FINISHINGS
8.00 PLUMBING
9.00 ROOFING
TOTAL TO SUMMARY
Page 2 of 12
Page 3 Copy of BoQs for Staff House at Namungo H.C 223.xls
1.15 BRC mesh ref.No. A 98 laid with spacers in floor slab SM 164
Sawn Formwork as described to:
1.17
Allow for keeping excavation free from surface water Item 1
To collection
Page 3 of 12
Page 4 Copy of BoQs for Staff House at Namungo H.C 223.xls
1.20
15mm Cement and sand (1:3) render : wood float finish SM 59
To collection
Collection:
Page No. 1
Page No. 2
Page 4 of 12
Page 5 Copy of BoQs for Staff House at Namungo H.C 223.xls
ELEMENT NO. 2
Page 5 of 12
Page 6 Copy of BoQs for Staff House at Namungo H.C 223.xls
ELEMENT NO. 3
3.00 WALLING
Concrete Work
Page 6 of 12
Page 7 Copy of BoQs for Staff House at Namungo H.C 223.xls
ELEMENT NO. 4
4.00 DOORS
Metal Work
4.05 Apply three coats gloss oil paint on all metal doors
surfaces SM 44
Timber doors
4.09
Apply one coat of udercoat and three coats of gloss oil
paint on all timber doors surfaces icluding door frames SM 38
Page 7 of 12
Page 8 Copy of BoQs for Staff House at Namungo H.C 223.xls
5.00 WINDOWS
5.02 Ditto but size 600 x 900mm; with one top hung sash
NO 10
5.02 Prepare and apply three coats gloss oil paint to metal
surfaces bothsides SM 47
Glazing
Page 8 of 12
Page 9 Copy of BoQs for Staff House at Namungo H.C 223.xls
ELEMENT NO. 6
6.00 FINISHINGS
FLOOR FINISHES
Tile work
WALL FINISHES
CEILING FINISHES
Page 9 of 12
Page 10 Copy of BoQs for Staff House at Namungo H.C 223.xls
Page 10 of 12
Page 11 Copy of BoQs for Staff House at Namungo H.C 223.xls
ELEMENT NO.8
8.01 Supply and fix 5No showers with metalic shower heads
complete with all valves, fittings, floor traps, supply
pipes and drainage pipes connected to soakpit of size
1.0 x1.2m deep filled with hardcore and covered with a
DPM; connection to existing water grid measured
seperately. Item
Page 11 of 12
Page 12 Copy of BoQs for Staff House at Namungo H.C 223.xls
ELEMENT NO.9
Roof covering
28 gauge pre-painted iron sheets (colour to be given by
the engineer) and fixing accessories from approved
9.06 manufacturer's lapped and fixed on timber purlins SM 238
(measured separately) in accordance with
manufacturer's instructions.
Page 12 of 12