You are on page 1of 29

62.5 680 62.

5 451
125

125
325

325
125 125
SECTION 1 SECTION 2
1 SPAN 1 2 SPAN 2 3

2.350 2.350
1 SPAN 1 2 SPAN 2 3

2.350 2.350
1 SPAN 1 2 SPAN 2 3

Live
1.18 1.04

Dead+
Own W 17.02 17.11

2.350 2.350
A B C
2350 2350
A B C

2Y10-B

2Y10-A

2Y10-C

A B C
7-SA-300 7-SA-300

B B B B B B
SA1

SA1

SA1
C C C C C C

SECTION A-A SECTION B-B SECTION C-C


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Continuous Beam: CONTINOUS BEAM (Code of Practice : Eurocode 2 - 2004)


12/27/2021 3:50:32 PM C01

Input Tables
fck (MPa) 30
fy (MPa) 460
fyv (MPa) 460
% Redistribution 10
Downward/Optimized redistr. D
Cover to centre top steel (mm) 20
Cover to centre bot.steel (mm) 20
Dead Load Factor 1.35
Live Load Factor 1.5
Density of concrete (kN/m3) 25
% Live load permanent 25
Ø (Creep coefficient) 2
Ecs (Free shrinkage strain) 300E-6
cot (Θ) - Eurocode Shear 2.5

Sec Bw D Bf-top Hf-top Bf-bot Hf-bot Y-offset Web Flange


No. (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset

1 125 450 742.5 125 308.75


2 125 450 513.5 125 194.25

Span Section Sec No Sec No


No Length(m) Left Right

1 2.35 1 1
2 2.35 1 1

Sup Code Column Below Code Column above Code


No. C,F F,P F,P
D(mm) B(mm) H(m) D(mm) B(mm) H(m)
1 200 300 1.5 F 200 300 3.6 F
2 200 300 1.5 F 200 300 3.6 F
3 200 300 1.5 F 200 300 3.6 F

Case Span Wleft Wright a b P a M a Load


D,L (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m) Description

D 1 13.68 13.68
L 1 1.18 1.18
D 2 13.77 13.77
L 2 1.04 1.04

Span M left M right


(kNm) (kNm)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Deflection, Shear, Moment and Steel diagrams. Spans 1,2

Elastic Deflections (Alternate spans loaded) Def max = .0557mm @ 3.63m


.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

4.60
.01000

.02000

.03000

.04000

.05000

Long-term Deflections (All spans loaded - using entered reinforcement) Def max = .2977mm @ 3.63m
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

4.60
.050

.100

.150

.200

.250

.300

SHEAR: X-X V max = -34.37kN @ 2.35m


30.0
20.0
10.0
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

4.60
-10.0
-20.0
-30.0

MOMENTS: X-X M max = -14.38kNm @ 2.35m


-15.0

-10.0

-5.00
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

4.60

5.00

Shear Steel: X-X Asv max = .1191mm²/mm @ 0.00m


.120

.100

.080

.060

.040

.020
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

4.60

Bending Steel: X-X As max = -84.96mm2 @ 2.35m


-80.0
-60.0
-40.0
-20.0
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

4.60

20.0
40.0
BILL OF QUANTITIES

Total reinforcement length = (Length + Column – 2 Cover + 2 Bends) x no. of bar


Bends = 5.5d (for high tensile steel), Anchorage = 15d (for high tensile steel), diameter bar, d = 10 mm =
0.01m, diameter link = 8mm = 0.008m, cover = 20mm = 0.02m, Beam length = 4.7m

Top Reinforcement for span A-B & B-C:

= [4.7 m + 0.125 – 2(0.02) + 2(5.5x0.01)] x 3 = 14.69 m

Bottom Reinforcement for span A-B & B-C:

= [4.7 m + 0.125 – 2(0.02) + 2(5.5x0.01)] x 3 = 14.69 m

Stirrups:

Beam size = (125x450)

Total length = 2[(H - 2 Cover) + (B - 2 Cover)] + 2 Anchorage

= 2[(0.45-2(0.02)) + (0.125-2(0.02))] + 2[15(0.008)]

= 1.23m

No. of stirrup = 14

= 1.23 x 14 = 17.22 m

Item
Description Quantity Unit Rate RM
No.
Reinforcement
For span A-B:
1 Y 10, 14.69m (3.14 x 0.0052 x 14.69 x 7850) 9.05 kg 4.00 36.20
2 Y 10, 14.69m (3.14 x 0.0052 x 14.69 x 7850) 9.05 kg 4.00 36.20
3 Y 8, 17.22m (3.14 x 0.0042 x 17.22 x 7850) 6.79 kg 4.10 27.84
For span B-C:
4 Y 10, 14.69m (3.14 x 0.0052 x 14.69 x 7850) 9.05 kg 4.00 36.20
5 Y 10, 14.69m (3.14 x 0.0052 x 14.69 x 7850) 9.05 kg 4.00 36.20
6 Y 8, 17.22m (3.14 x 0.0042 x 17.22 x 7850) 6.79 kg 4.10 27.84
(Density of steel bar, assume = 7850 kg/m3)
Total Bill RM 200.48

You might also like