Item Description Unit Qty Rate Amount (RM)

ELEMENT NO. 1 - WORK BELOW LOWEST FLOOR

Excavation Commencing From Formation Levels, Get Out

A Excavate for ground and apron slab m3 60 -


B Pit for pilecap not exceeding 2.00m deep m3 16 -
C Trench for ground beam not exceeding 2.00m deep m2 17 -

Bed Of Hardcore As Described Spread, Levelled, Well


Rammed
D To receive apron slab m3 6 -

50mm Thick Grade 20 Lean Conrete Blinding Screed


E Pilecap m3 1 -
F Ground beam m3 2 -
G Ground slab m3 13 -
H Apron slab m3 2 -

Reinforced Grade 30 Concrete As Described


I Pilecap m3 8 -
J Ground beams m3 18 -
K Ground slab; not exceeding 150mm thick m3 35 -
L Apron slab; not exceeding 150mm thick m3 4 -
M Extra over apron slab for thickening; average 225mm wide x
125mm thick
m 63 -

High Tensile Rod Reinforcement As Described:-


Pilecap
N 16mm diameter kg 447 -
O 12mm diameter kg 246 -
P 10mm diameter; as loops kg 224 -

Column Starter Bar


Q 16mm diameter kg 115 -
R 12mm diameter kg 229 -

Carried Forward -
Item Description Unit Qty Rate Amount (RM)

Brought Forward -

Ground Beam
A 20mm diameter kg 204 -
B 16mm diameter kg 257 -
C 12mm diameter kg 705 -

Apron Slab
D 10mm diameter kg 404 -
E 12mm diameter, as dowel bar kg 260 -

Mild Steel Round Bar Reinforcement As Described:-


Column Starter Bar
F 6mm diameter, as links kg 78 -

Ground Beam
G 6mm diameter, as links kg 454 -

Steel Mesh Fabric Reinforcement; Well Lapped At Joint

Ground Slab
H BRC A7; 3.02 kg/m2 m2 300 -
I BRC A8; 3.95 kg/m2 m2 230 -
J BRC A9; 4.99 kg/m2 m2 78 -

Sawn Formwork As Described To:-


K Sides of Pilecap m2 47 -
L Sides of Ground Beam m2 217 -

SURFACE TREATMENT
Ground Treatment Against Subterranean Termites
M Spray 'TERMITE-SYN' or other equal and approved Item -

DAMP PROOFING
Polythene Sheet; Joint Sealed With Approved Pressure
Sensitive Tape
N 0.30mm thick flat covering under ground slab; in one layer
m2 300 -

Element 1 - Work Below Lowest Floor Finish Carried to Summary -


Item Description Unit Qty Rate Amount (RM)
ELEMENT NO. 2 - FRAME

Reinforced Grade 30 Concrete As Described


A Column m3 8 -
B Floor beam m3 11 -
C Roof beam m3 11 -
D Upper roof beam m3 2 -

High Tensile Rod Reinforcement As Described:-


Column
E 12mm diameter kg 1,348 -

Floor Beam
F 20mm diameter kg 51 -
G 16mm diameter kg 33 -
H 12mm diameter kg 862

Roof Beam
I 20mm diameter kg 197 -
J 12mm diameter kg 640 -

Upper Roof Beam


K 12mm diameter kg 149 -

Beam In Slab
L 12mm diameter kg 22 -

Mild Steel Round Bar Reinforcement As Described:-


Column
M 6mm diameter, as links / stirrups kg 78 -

Floor Beam
N 6mm diameter, as links kg 301 -

Roof Beam
O 6mm diameter, as links kg 232 -

Upper Roof Beam


P 6mm diameter, as links kg 32 -

Beam In Slab
Q 6mm diameter, as links kg 6 -

Sawn Formwork As Described To:-


R Sides of column m2 164 -
S Sides and soffit of floor beam m2 168 -
T Sides and soffit of roor beam m2 187 -
U Sides and soffit of upper roof beam m2 28 -

To Supply Material, Labour, Tools And Equipment For Fabricate and


Installation for Steel Column and Roof Beam
V 125mm x 125mm 5mm x 18.33 kg/m SHS column kg 440 -
W 200mm x 150mm 5mm x 26.185 kg/m RHS beam kg 1,194 -
X 200mm x 150mm 5mm x 22.3 kg/m RHS beam kg 528 -
Y 12mm thick base plate kg 50 -
Z 20mm diameter HT bolts Grade 8.8 x 300mm embedded depth kg 32 -
including nuts and washers
AA Allow for all connection plate, capping plate and the like Item 1 -

Element 2 - Frame Carried to Summary -