Notes:-
1. Hacking of pilehead to final cut-off level by others
2. Bulk earthwork by others
Pilecaps, ground and slab, lift pit base & wall, etc.
To Summary Sum -
Page 5B / 1
SECTION 5B - STRUCTURAL WORKS
Pilecaps, ground and slab, lift pit base & wall, etc. (Cont'd)
To Summary Sum -
Page 5B / 2
SECTION 5B - STRUCTURAL WORKS
FRAME
To Summary Sum -
Page 5B / 3
SECTION 5B - STRUCTURAL WORKS
FRAME (Cont'd)
To Summary Sum -
Page 5B / 4
SECTION 5B - STRUCTURAL WORKS
To Summary Sum -
Page 5B / 5
SECTION 5B - STRUCTURAL WORKS
To Summary Sum -
Page 5B / 6
SECTION 5B - STRUCTURAL WORKS
ROOF CONSTRUCTION
To Summary Sum -
Page 5B / 7
SECTION 5B - STRUCTURAL WORKS
STAIRCASE CONSTRUCTION
To Summary Sum -
Page 5B / 8
SECTION 5B - STRUCTURAL WORKS
STRUCTURAL WALL
To Summary Sum -
Page 5B / 9
SECTION 5B - STRUCTURAL WORKS
A Overall size 1.10 x 2.10m lift door opening, in 300mm thk NO 214 -
to lift core wall
B Overall size 1.45 x 2.10m lift door opening, in 12" thk to NO 415 -
lift core wall
Page 5B / 10
SECTION 5B - STRUCTURAL WORKS
SUNDRY WORKS
Pipe Sleeves
To Summary Sum -
Page 5B / 11
SECTION 5B - STRUCTURAL WORKS
SUMMARY
Page 5B / 1 Sum -
Page 5B / 2 Sum -
Page 5B / 3 Sum -
Page 5B / 4 Sum -
Page 5B / 5 Sum -
Page 5B / 6 Sum -
Page 5B / 7 Sum -
Page 5B / 8 Sum -
Page 5B / 9 Sum -
Page 5B / 11 Sum -
Page 5B / 12