You are on page 1of 35

BILL OF QUANTITIES- PERMANENT BRIDGES (TWO LAUNCHING OPTIONS FOR EACH)

Name of work:- Lot 2: Construction of Access Roads to Project Dam Site, Left Bank Road Network, Dibang Bridges, Dam Site Right Bank Road Network and Temporary Haulage Road to Pathar Camp from ADC Morh Including All Civil
and HM Works of Diversion Tunnel
Quantities Rates COST

180m Span at 66m Span at 66m Span at 180m Span at 180m Span at 66m Span at 66m Span at
S.No. Description of work 180m Span at Dibang Unit Rate
Dibang Ashupani Ashupani Dibang Dibang Ashupani Ashupani

Option 1 Option 2 Option 1 Option 2 Option 1 Option 2 Option 1 Option 2


Launching Nose Length (m) 90 45 45 25
Back Span (m) 100 50 50 30
Intermediate Trestles - 3 - 1
PERMANENT WORKS
1 Geotechnical investigation including Plate Load Tests LS LS LS LS
2 Providing and laying M15 PCC below open footing 29.1 29.1 29.1 29.1 Cum
3 Providing and laying Design Mix Reinforced Cement Concrete in Open Foundations in M40
grade of concrete(Conforming to strength requirement of IS: 1489 (Part-I) 1991) including 420.0 420.0 280.0 280.0 Cum
centering and shuttering, but excluding the cost of reinforcement,
4 Providing and laying machine batched, machine mixed and machine vibrated design mix
reinforced concrete for construction of piers, pier caps, abutments, abutment caps, shear key,
bearing pedestals, dirt wall, reataining wall & wing walls etc., with M40 grades of concrete 691.9 691.9 632.2 632.2 Cum
but excluding the cost of reinforcement .

5 Providing and laying in position machine batched, machine mixed and machine vibrated
design mix reinforced concrete of grade M45 with 43/53 grade Ordinary Portland Cement in
deck slab in superstructure using 20mm & down stone aggregates but excluding the cost of
494.1 494.1 181.2 181.2 Cum
reinforcement.

6 Providing and laying Design Mix Reinforced Cement Concrete of grade M40 with 43/53
grade Ordinary Portland Cement (Conforming to strength requirement of IS: 8112) in cast-in-
situ Approach Slabs, Friction Slabs over the approaches, complete as per drawing excluding
25.6 25.6 25.6 25.6 Cum
the cost of steel reinforcement.

7 Providing and fixing M45 grade reinforced cement concrete with 43/53 grade Ordinary
Portland Cement in cast-in-situ crash barriers over the superstructure, bridge and over the
retaining wall as shown in the drawings. Reinforcement shall be measured and paid 129.6 129.6 47.5 47.5 Cum
separately.

8 Providing and installing to true lines levels Elastomeric bearings of 1200 mm Diameter,
426 mm height, as per Drawings. These bearings will have to be anchored at top as well as 6 6 6 6 nos.
bottom by anchor bolts to act as seismic isolators.
9 Providing, fabricating , transportation, assembling and erection in position of steel members
for Steel Plate Girder Bridge using structural steel plates of Grade E-410 B0,
Normalised/control cooled, conforming to IS-2062 with latest amendments, to the required
profile and shape . This item includes necessary templates, adequate temporary supports,
scaffolding and staging, all cutting, grinding, welding (using automatic submerged arc 1950.0 1800.0 390.0 360.0 MT
welding and gas metal arc (MIG) welding wherever specified) & all labour, tools, plants &
equipments and operations etc required to complete the job as per drawings and
specifications.

10 Providing, testing and tightening of High Strength Friction Grip Bolts (HSFG bolts) of
class/grade 10.9 up to proof loads as per IS:4000 using Automatic Calibrated Torque Wrench
at all locations of splicing and at all heights, wherever specified as per drawings and their
compatible nuts and washers all complete required to execute the job. All HSFG bolts and 117.0 108.0 23.4 21.6 MT
nuts, washers conforming to IS:1367, IS:6610, IS:6623 and IS:4000 shall be used.

11 Providing, testing and fixing of High Strength shear connectors shear studs of size 25 x
125 mm profiled from high strength MS rods (Yield strength=385 MPa, minimum
elongation=18 %, Characteristic tensile strength=495 mpa) and fusion welded of appropriate
15390.0 15390.0 5130.0 5130.0 Each
diameter and height as per approved designs and relevant specifications to connect steel
girders with the reinforced concrete deck slab.

12 Providing & placing in position at all depths and heights Thermo-Mechanically Treated
(TMT) Fe 500 D grade Reinforcement Bars 290.5 290.5 178.7 178.7 MT
180m Span at 66m Span at 66m Span at 180m Span at 180m Span at 66m Span at 66m Span at
S.No. Description of work 180m Span at Dibang Unit Rate
Dibang Ashupani Ashupani Dibang Dibang Ashupani Ashupani

13 Providing and installing multi-cell expansion joints with total allowable movement of 240
mm as per specifications detailed in IRC-SP:69-2005 duly supplemented with manufacturer's
recommendations. Entire installation is to be carried out strictly in the presence of 25.0 25.0 25.0 25.0 RM
manufacturer's representative only at all times.

14 Providing and laying Ready to use Prepacked, Non-shrink, Cementatious Micro Concrete
from approved manufacturer of strength 60 MPa at 28 days with selected cement, aggregate
and other chemicals as per the drawings & manufacturer's specifications and provisions
including all type of steel shuttering, staging ,scaffolding, and necessary tools, plant and
machinery, testing of materials etc. all complete. The rates quoted shall also include the cost 1.4 1.4 1.4 1.4 cum
of formwork but exclude the cost of providing and placing reinforcement which shall be paid
in the relevant item.

15 Steel Railing over Crash barrier (65 NB Medium Class GI Pipe) 360.0 360.0 132.0 132.0 RM
16 RCC railing at Edges (Concrete Quantity) 57.6 57.6 21.1 21.1 cum
17 Wearing course (Bituminous Concrete) 65 mm thick 97.1 97.1 35.6 35.6 cum
18 GI Drainage Spout 200 Dia. @ 3 m c/c 120.0 120.0 44.0 44.0 nos.
19 Rock Anchors for Anchoring Footing - 8 K15 (30 m depth Tentative) 8 8 8 8 Nos.

TEMPORARY WORKS
1 Temporary Works - Launching Nose + Tail Span 600.0 202.5 225.0 105.0 MT
2 Temporary Works - Counterweight 2500 600 400 300 MT
3 Trestle - Open Foundation and Pier (M40) 0.0 443.3 0.0 57.7 cum
4 Trestle - Open Foundation and Pier reinforcement 0.0 76.0 0.0 9.4 MT
5 Excavation & rock bolting HCC HCC HCC HCC HCC
6 Rock Anchors for Anchoring Footing - 8 K15 (30 m depth Tentative) 0 12 0 4 Nos.
TOTAL COST IN LAKHS (INR)
A INDIVIDUAL COSTS
B ASHUPANI DONE FIRST, FOLLOWED BY DIBANG USING SAME LAUNCHING
NOSE FOR BOTH BRIDGES
OPTION 1 OF ASHUPANI FOLLOWED BY OPTION 2 OF DIBANG
C OPTION 1 FOR BOTH - BOTH BRIDGES CONSTRUCTED SIMULTANEOUSLY

D OPTION 2 FOR BOTH - BOTH BRIDGES CONSTRUCTED SIMULTANEOUSLY

Important Observation:

Bridge Name Cost Length


(Rs lacs) Assumed (m)
Dibang 5000.0 180.0
Ashupani 1250.0 66.0
Temporary Bridge - 1 1800.0 200.0
Temporary Bridge - 2 1800.0 200.0
TOTAL 9850.0 646.0

If cost per m is taken as 9850.0 = 15.2 lacs per m length


646.0
AND if during execution, temporary bridges get excluded from scope, payment will be made for 180+ 66 m = 246 m with above rate per m length.

This will be : 3750.9 which will entail a loss of -2499.1 lacs

Hence, it may be prudent to quote based on per m length cost of permanent bridges only. In such a case, no money will be lost
180m Span at 66m Span at 66m Span at 180m Span at 180m Span at 66m Span at 66m Span at
S.No. Description of work 180m Span at Dibang Unit Rate
Dibang Ashupani Ashupani Dibang Dibang Ashupani Ashupani

if temporary bridges are excluded from scope of work.


BILL OF QUANTITIES- TEMPORARY BRIDGES (ASSUMMIN
Name of work:- Lot 2: Construction of Access Roads to Project Dam Site, Left Bank Road Network, Diban
Road to Pathar Camp from ADC Morh Including All Civil and HM Works of Diversion Tunnel

S.No. Description of work

PERMANENT WORKS
1 Geotechnical investigation including Plate Load Tests
2 Providing and laying M15 PCC below open footing/ Pile Cap
2A Pile Foundations - M35 Grade (1000 Dia.)
2A.1 Piling in Soft / Weathered Rock
2A.2 Pile socketing in Hard Rock
2A.3 8 mm Thick Permanent Liner
3 Providing and laying Design Mix Reinforced Cement Concrete in Open Foundations / Pile
Cap in M40 grade of concrete(Conforming to strength requirement of IS: 1489 (Part-I) 1991)
including centering and shuttering, but excluding the cost of reinforcement,

4 Providing and laying machine batched, machine mixed and machine vibrated design mix
reinforced concrete for construction of piers, pier caps, abutments, abutment caps, shear key,
bearing pedestals, dirt wall, reataining wall & wing walls etc., with M40 grades of concrete
but excluding the cost of reinforcement .

5 Providing and laying in position machine batched, machine mixed and machine vibrated
design mix reinforced concrete of grade M45 with 43/53 grade Ordinary Portland Cement in
deck slab in superstructure using 20mm & down stone aggregates but excluding the cost of
reinforcement.

6 Providing and laying Design Mix Reinforced Cement Concrete of grade M40 with 43/53
grade Ordinary Portland Cement (Conforming to strength requirement of IS: 8112) in cast-in-
situ Approach Slabs, Friction Slabs over the approaches, complete as per drawing excluding
the cost of steel reinforcement.

7 Providing and fixing M45 grade reinforced cement concrete with 43/53 grade Ordinary
Portland Cement in cast-in-situ crash barriers over the superstructure, bridge and over the
retaining wall as shown in the drawings. Reinforcement shall be measured and paid
separately.

8 POT-PTFE bearing (SLS Load: 225 T, ULS Load = 400 T)


9 Providing, fabricating , transportation, assembling and erection in position of steel members
for Steel Plate Girder Bridge using structural steel plates of Grade E-410 B0,
Normalised/control cooled, conforming to IS-2062 with latest amendments, to the required
profile and shape . This item includes necessary templates, adequate temporary supports,
scaffolding and staging, all cutting, grinding, welding (using automatic submerged arc
welding and gas metal arc (MIG) welding wherever specified) & all labour, tools, plants &
equipments and operations etc required to complete the job as per drawings and
specifications.
10 Providing, testing and tightening of High Strength Friction Grip Bolts (HSFG bolts) of
class/grade 10.9 up to proof loads as per IS:4000 using Automatic Calibrated Torque Wrench
at all locations of splicing and at all heights, wherever specified as per drawings and their
compatible nuts and washers all complete required to execute the job. All HSFG bolts and
nuts, washers conforming to IS:1367, IS:6610, IS:6623 and IS:4000 shall be used.

11 Providing, testing and fixing of High Strength shear connectors shear studs of size 25 x
125 mm profiled from high strength MS rods (Yield strength=385 MPa, minimum
elongation=18 %, Characteristic tensile strength=495 mpa) and fusion welded of appropriate
diameter and height as per approved designs and relevant specifications to connect steel
girders with the reinforced concrete deck slab.

12 Providing & placing in position at all depths and heights Thermo-Mechanically Treated
(TMT) Fe 500 D grade Reinforcement Bars
13 Providing and installing strip seal with total allowable movement of 80 mm as per
specifications detailed in IRC-SP:69-2005 duly supplemented with manufacturer's
recommendations. Entire installation is to be carried out strictly in the presence of
manufacturer's representative only at all times.

14 Providing and laying Ready to use Prepacked, Non-shrink, Cementatious Micro Concrete
from approved manufacturer of strength 60 MPa at 28 days with selected cement, aggregate
and other chemicals as per the drawings & manufacturer's specifications and provisions
including all type of steel shuttering, staging ,scaffolding, and necessary tools, plant and
machinery, testing of materials etc. all complete. The rates quoted shall also include the cost
of formwork but exclude the cost of providing and placing reinforcement which shall be paid
in the relevant item.

15 Steel Railing over Crash barrier (65 NB Medium Class GI Pipe)


16 RCC railing at Edges (Concrete Quantity)
17 Wearing course (Bituminous Concrete) 65 mm thick
18 GI Drainage Spout 200 Dia. @ 3 m c/c
19 Rock Anchors for Anchoring Footing - 8 K15 (30 m depth Tentative)

TEMPORARY WORKS & EXCAVATION WORKS


TOTAL COST IN LAKHS (INR)
A INDIVIDUAL COSTS
DGES (ASSUMMING 10 m PIER HEIGHTS & 50 t/sqm SBC)
Bank Road Network, Dibang Bridges, Dam Site Right Bank Road Network and Temporary Haulage
iversion Tunnel
Quantities Rates COST

200m Temporary 200m Temporary 200m Temporary 200m Temporary


Unit Rate
Bridge - 1 Bridge - 2 Bridge - 1 Bridge - 2

LS LS
35.4 35.4 Cum

204.0 204.0 RM
72.0 72.0 RM
204.0 204.0 RM

405.8 405.8 Cum

930.9 930.9 Cum

610.0 610.0 Cum

25.6 25.6 Cum

144.0 144.0 Cum

40 40 nos.

664.0 664.0 MT
46.5 46.5 MT

16000.0 16000.0 Each

383.6 383.6 MT

75.0 75.0 RM

2.6 2.6 cum

400.0 400.0 RM
64.0 64.0 cum
107.9 107.9 cum
133 133 nos.
8 8 Nos.

By HCC By HCC By HCC By HCC


1A Open Foundation
1A.1 Abutment Open Foundation = L(m) B(m) H(m)
= 7 14 1
= 98 cum
Number = 2 Nos
Total Concrete Quantity = 196.0 cum
M15 PCC below foundation = 20.4 cum

1A.2 Pile Cap at Intermediate Piers = L(m) B(m) H(m)


= 7.6 4.6 1.5
= 52.44 cum
Number = 4 Nos
Total Concrete Quantity = 209.8 cum
M15 PCC below foundation = 15.0 cum

1B Pile Foundation 1000 Dia.

Soft rock/ weathered rock from bed level: 10 m


Deducting for pile cap & PCC: 1.5 m

Total Pile depth in soft rock= 8.5 m


Socketing in hard rock = 3m

Nos. of Piles : 6 per pier


Nos. of Piers: 4

Total Piling in Soft rock : 204 m


Total Piling in Hard rock : 72 m

Permanent Liner 8 mm Thk..: 204 m

2 Pier/Abutment
2.1 Abutment = L(m) B(m) H(m)
= 12 1.8 10
= 216.0 cum
Number = 2 Nos
Total Concrete Quantity = 432.0 cum

2.2 Pier = Dia (m) H(m)


= 1.8 10
= 25.4 cum
= 4 Nos
= 101.8 cum

3 Piercap/Abutment Cap
3.1 Abutment Cap = L(m) B(m) H(m)
= 12 3.8 0.5
= 12 1 0.5
= 12 1.8 0.5
= 39.6 cum
Number = 2 Nos
Total Concrete Quantity = 79.2 cum

3.2 Pier Cap = L(m) B(m) H(m)


= 5 5.1 0.8
= 5 5.1 0.7
= 5 1.8 1.5
= 51.8 cum
= 2 Nos
= 103.5 cum

5 Retaining/Wing Wall = L(m) B(m) H(m)


Left = 3.5 1 5
Right = 3.5 1 5
Number = 2
Total Concrete Quantity = 70.0 cum

6 Bearing Pedestal = L(m) B(m) H(m)


= 0.8 0.8 0.25
= 0.16 cum
Number = 40 Nos
Total Concrete Quantity (M40) = 6.4 cum
Micro Concrete (M60) = 2.6 cum

7 Stopper = L(m) B(m) H(m)


= 2 0.8 1.5
= 2.4 cum
Number = 45 Nos
Total Concrete Quantity = 108.0 cum

8 Dirt Wall = L(m) B(m) H(m)


= 12 0.5 2.5
= 15 cum
Number = 2 Nos
Total Concrete Quantity = 30.0 cum

9 Deck Slab = L(m) B(m) H(m)


= 200 12.2 0.25
= 610 cum
Total Concrete Quantity = 610.0 cum

10 Approach Slab = L(m) B(m) H(m)


= 3.5 12.2 0.3
= 12.8 cum
Number = 2 Nos
Total Concrete Quantity = 25.6 cum

11 Crash Barrier = L(m) Area(m2)


= 200 0.36
= 72.0 cum
Number = 2 Nos
Total Concrete Quantity = 144.0 cum
Steel Railing over crash barrier = 400.0 RM

12 Number of Bearings = 40 Nos

13 Steel Superstructure

No of spans = 5
No of girders = 4
Cross section area = 0.0808 m2 for 20 m
= 0.0952 m for 2
20 m
Steel Quantity = 553 MT
= 664 MT (with stiffeners etc.)

14 Shear Connectors

Number of girders = 20 Nos


Length of girder = 40 m
Spacing of shear stud = 150 mm c/c
Number of shear stud at each section = 3 Nos
Total Number of shear studs = 16000 Nos

15 HSFG Bolts = 46 MT
(7% of girder weight)

16 RCC Railing at Edges = L(m) Area(m2)


= 200 0.16
= 32.0 cum
Number = 2 Nos
Total Concrete Quantity = 64.0 cum

18 GI Drainage Spout = L(m)


= 200
C/c distance of spout = 3 m c/c
= 133 Nos

19 Wearing Course = L(m) B(m) H(m)


= 200 8.3 0.065
= 107.9 cum
Total Concrete Quantity = 107.9 cum

20 Reinforcement
Piles @ 75 kg/cum 23.4 T
Foundation @ 125 kg/cum 50.7 T
Pier Cap, Stopper, Pedestal & Dirt Wall@ 110 kg/cu 36.0 T
Abutment @ 150 kg/cum 64.8 T
Wing wall & Return wall @ 120 kg/cum 8.4 T
Pier @ 250 kg/cum 25.4 T
Approach Slab @ 60 kg/cum 1.5 T
Railing & Crash barrier @ 100 kg/cum 20.8 T
Deck Slab @ 250 kg/cum 152.5 T
TOTAL: 383.6 T
1 Open Foundation = L(m) B(m) H(m)
= 7 20 1.5
= 210 cum
Number = 2 Nos
Total Concrete Quantity = 420.0 cum
M15 PCC below foundation = 29.1 cum

2 Pier/Abutment = L(m) B(m) H(m)


Left = 17.2 1.8 10.25
Right = 17.2 1.8 3.85
Total Concrete Quantity = 436.5 cum

3 Piercap/Abutment Cap = L(m) B(m) H(m)


= 17.2 3.8 0.5
= 17.2 1 0.5
= 17.2 1.8 0.5
= 56.8 cum
Number = 2 Nos
Total Concrete Quantity = 113.5 cum

5 Retaining/Wing Wall = L(m) B(m) H(m)


Left = 3.5 1 5
Right = 3.5 1 5
Number = 2
Total Concrete Quantity = 70.0 cum

6 Bearing Pedestal = L(m) B(m) H(m)


= 1.5 1.5 0.25
= 0.5625 cum
Number = 6 Nos
Total Concrete Quantity (M40) = 3.4 cum
Micro Concrete (M60) = 1.4 cum

7 Stopper = L(m) B(m) H(m)


= 1.2 0.8 1.5
= 1.44 cum
Number = 18 Nos
Total Concrete Quantity = 25.9 cum

8 Dirt Wall = L(m) B(m) H(m)


= 17 0.5 2.5
= 21.25 cum
Number = 2 Nos
Total Concrete Quantity = 42.5 cum

9 Deck Slab = L(m) B(m) H(m)


= 180 12.2 0.225
= 494.1 cum
Total Concrete Quantity = 494.1 cum

10 Wearing Course = L(m) B(m) H(m)


= 180 8.3 0.065
= 97.11 cum
Total Concrete Quantity = 97.1 cum

11 Approach Slab = L(m) B(m) H(m)


= 3.5 12.2 0.3
= 12.8 cum
Number = 2 Nos
Total Concrete Quantity = 25.6 cum

12 Crash Barrier = L(m) Area(m2)


= 180 0.36
= 64.8 cum
Number = 2 Nos
Total Concrete Quantity = 129.6 cum
Steel Railing over crash barrier = 360.0 RM

13 Number of Bearings = 6 Nos

14 Structural Steel = 1950 MT

15 Shear Stud
Number of cross girders = 72 Nos
Length of cross girder = 14.25 m
Spacing of shear stud = 200 mm c/c
Number of shear stud at each section = 3 Nos
Total Number of shear studs = 15390 Nos

16 HSFG Bolts = 117 MT


(6% of truss weight)

17 RCC Railing at Edges = L(m) Area(m2)


= 180 0.16
= 28.8 cum
Number = 2 Nos
Total Concrete Quantity = 57.6 cum

18 GI Drainage Spout = L(m)


= 180
C/c distance of spout = 3 m c/c
= 120 Nos

17 Reinforcement
Foundation @ 125 kg/cum 52.5 T
Pier Cap, Stopper, Pedestal & Dirt Wall@ 110 kg/cum 20.4 T
Abutment @ 150 kg/cum 65.5 T
Wing wall & Return wall @ 120 kg/cum 8.4 T
Approach Slab @ 60 kg/cum 1.5 T
Railing & Crash barrier @ 100 kg/cum 18.7 T
Deck Slab @ 250 kg/cum 123.5 T
TOTAL: 290.5 T

18 Launching Nose + Tail Span


Length = 100 m
Steel Tonnage @ 6 t/m = 600 MT

19 Counter Weight @ 25 t/m = 2500 MT


1 Open Foundation = L(m) B(m) H(m)
= 7 20 1.5
= 210 cum
Number = 2 Nos
Total Concrete Quantity = 420.0 cum
M15 PCC below foundation = 29.1 cum

2 Pier/Abutment = L(m) B(m) H(m)


Left = 17.2 1.8 10.25
Right = 17.2 1.8 3.85
Total Concrete Quantity = 436.5 cum

3 Piercap/Abutment Cap = L(m) B(m) H(m)


= 17.2 3.8 0.5
= 17.2 1 0.5
= 17.2 1.8 0.5
= 56.8 cum
Number = 2 Nos
Total Concrete Quantity = 113.5 cum

5 Retaining/Wing Wall = L(m) B(m) H(m)


Left = 3.5 1 5
Right = 3.5 1 5
Number = 2
Total Concrete Quantity = 70.0 cum

6 Bearing Pedestal = L(m) B(m) H(m)


= 1.5 1.5 0.25
= 0.5625 cum
Number = 6 Nos
Total Concrete Quantity (M40) = 3.4 cum
Micro Concrete (M60) = 1.4 cum

7 Stopper = L(m) B(m) H(m)


= 1.2 0.8 1.5
= 1.44 cum
Number = 18 Nos
Total Concrete Quantity = 25.9 cum

8 Dirt Wall = L(m) B(m) H(m)


= 17 0.5 2.5
= 21.25 cum
Number = 2 Nos
Total Concrete Quantity = 42.5 cum

9 Deck Slab = L(m) B(m) H(m)


= 180 12.2 0.225
= 494.1 cum
Total Concrete Quantity = 494.1 cum

10 Wearing Course = L(m) B(m) H(m)


= 180 8.3 0.065
= 97.11 cum
Total Concrete Quantity = 97.1 cum

11 Approach Slab = L(m) B(m) H(m)


= 3.5 12.2 0.3
= 12.8 cum
Number = 2 Nos
Total Concrete Quantity = 25.6 cum

12 Crash Barrier = L(m) Area(m2)


= 180 0.36
= 64.8 cum
Number = 2 Nos
Total Concrete Quantity = 129.6 cum
Steel Railing over crash barrier = 360.0 RM

13 Number of Bearings = 6 Nos

14 Structural Steel = 1800 MT

15 Shear Stud
Number of cross girders = 72 Nos
Length of cross girder = 14.25 m
Spacing of shear stud = 200 mm c/c
Number of shear stud at each section = 3 Nos
Total Number of shear studs = 15390 Nos

16 HSFG Bolts = 108 MT


(6% of truss weight)

17 RCC Railing at Edges = L(m) Area(m2)


= 180 0.16
= 28.8 cum
Number = 2 Nos
Total Concrete Quantity = 57.6 cum

18 GI Drainage Spout = L(m)


= 180
C/c distance of spout = 3 m c/c
= 120 Nos

17 Reinforcement
Foundation @ 125 kg/cum 52.5 T
Pier Cap, Stopper, Pedestal & Dirt Wall @ 110 kg/cum 20.4 T
Abutment @ 150 kg/cum 65.5 T
Wing wall & Return wall @ 120 kg/cum 8.4 T
Approach Slab @ 60 kg/cum 1.5 T
Railing & Crash barrier @ 100 kg/cum 18.7 T
Deck Slab @ 250 kg/cum 123.5 T
TOTAL: 290.5 T

18 Launching Nose
Length = 45 m
Steel Tonnage @ 4.5 t/m = 202.5 MT

19 Counter Weight
Length = 50 m
Steel Tonnage @ 12 t/m = 600 MT

20 Trestle
Open Foundation = 278.4 cum
Foundation @ 125 kg/cum = 34.8 T

Pier = 164.9 cum


Pier @ 250 kg/cum = 41.2 T
1 Open Foundation = L(m) B(m) H(m)
= 7 20 1
= 140 cum
Number = 2 Nos
Total Concrete Quantity = 280.0 cum
M15 PCC below foundation = 29.1 cum

2 Pier/Abutment = L(m) B(m) H(m)


Left = 17.2 1.8 6
Right = 17.2 1.8 7
Total Concrete Quantity = 402.5 cum

3 Piercap/Abutment Cap = L(m) B(m) H(m)


= 17.2 3.8 0.5
= 17.2 1 0.5
= 17.2 1.8 0.5
= 56.8 cum
Number = 2 Nos
Total Concrete Quantity = 113.5 cum

5 Retaining/Wing Wall = L(m) B(m) H(m)


Left = 3.5 1 5
Right = 3.5 1 5
Number = 2
Total Concrete Quantity = 70.0 cum

6 Bearing Pedestal = L(m) B(m) H(m)


= 1.5 1.5 0.25
= 0.5625 cum
Number = 6 Nos
Total Concrete Quantity (M40) = 3.4 cum
Micro Concrete (M60) = 1.4 cum

7 Stopper = L(m) B(m) H(m)


= 1.2 0.8 1
= 0.96 cum
Number = 18 Nos
Total Concrete Quantity = 17.3 cum

8 Dirt Wall = L(m) B(m) H(m)


= 17 0.5 1.5
= 12.75 cum
Number = 2 Nos
Total Concrete Quantity = 25.5 cum

9 Deck Slab = L(m) B(m) H(m)


= 66 12.2 0.225
= 181.17 cum
Total Concrete Quantity = 181.2 cum

10 Wearing Course = L(m) B(m) H(m)


= 66 8.3 0.065
= 35.607 cum
Total Concrete Quantity = 35.6 cum

11 Approach Slab = L(m) B(m) H(m)


= 3.5 12.2 0.3
= 12.8 cum
Number = 2 Nos
Total Concrete Quantity = 25.6 cum

12 Crash Barrier = L(m) Area(m2)


= 66 0.36
= 23.8 cum
Number = 2 Nos
Total Concrete Quantity = 47.5 cum
Steel Railing over crash barrier = 132.0 RM

13 Number of Bearings = 6 Nos

14 Structural Steel = 390 MT

15 Shear Stud
Number of cross girders = 24 Nos
Length of cross girder = 14.25 m
Spacing of shear stud = 200 mm c/c
Number of shear stud at each section = 3 Nos
Total Number of shear studs = 5130 Nos

16 HSFG Bolts = 23.4 MT


(6% of truss weight)

17 RCC Railing at Edges = L(m) Area(m2)


= 66 0.16
= 10.6 cum
Number = 2 Nos
Total Concrete Quantity = 21.1 cum

18 GI Drainage Spout = L(m)


= 66
C/c distance of spout = 3 m c/c
= 44 Nos

17 Reinforcement
Foundation @ 125 kg/cum 35.0 T
Pier Cap, Stopper, Pedestal & Dirt Wall@ 110 kg/cum 17.6 T
Abutment @ 150 kg/cum 60.4 T
Wing wall & Return wall @ 120 kg/cum 8.4 T
Approach Slab @ 60 kg/cum 1.5 T
Railing & Crash barrier @ 100 kg/cum 10.5 T
Deck Slab @ 250 kg/cum 45.3 T
TOTAL: 178.7 T

18 Launching Nose + Tail Span


Length = 50 m
Steel Tonnage @ 4.5 t/m = 225 MT

19 Counter Weight @ 8 t/m = 400 MT


1 Open Foundation = L(m) B(m) H(m)
= 7 20 1
= 140 cum
Number = 2 Nos
Total Concrete Quantity = 280.0 cum
M15 PCC below foundation = 29.1 cum

2 Pier/Abutment = L(m) B(m) H(m)


Left = 17.2 1.8 6
Right = 17.2 1.8 7
Total Concrete Quantity = 402.5 cum

3 Piercap/Abutment Cap = L(m) B(m) H(m)


= 17.2 3.8 0.5
= 17.2 1 0.5
= 17.2 1.8 0.5
= 56.8 cum
Number = 2 Nos
Total Concrete Quantity = 113.5 cum

5 Retaining/Wing Wall = L(m) B(m) H(m)


Left = 3.5 1 5
Right = 3.5 1 5
Number = 2
Total Concrete Quantity = 70.0 cum

6 Bearing Pedestal = L(m) B(m) H(m)


= 1.5 1.5 0.25
= 0.5625 cum
Number = 6 Nos
Total Concrete Quantity (M40) = 3.4 cum
Micro Concrete (M60) = 1.4 cum

7 Stopper = L(m) B(m) H(m)


= 1.2 0.8 1
= 0.96 cum
Number = 18 Nos
Total Concrete Quantity = 17.3 cum

8 Dirt Wall = L(m) B(m) H(m)


= 17 0.5 1.5
= 12.75 cum
Number = 2 Nos
Total Concrete Quantity = 25.5 cum

9 Deck Slab = L(m) B(m) H(m)


= 66 12.2 0.225
= 181.17 cum
Total Concrete Quantity = 181.2 cum

10 Wearing Course = L(m) B(m) H(m)


= 66 8.3 0.065
= 35.607 cum
Total Concrete Quantity = 35.6 cum

11 Approach Slab = L(m) B(m) H(m)


= 3.5 12.2 0.3
= 12.8 cum
Number = 2 Nos
Total Concrete Quantity = 25.6 cum

12 Crash Barrier = L(m) Area(m2)


= 66 0.36
= 23.8 cum
Number = 2 Nos
Total Concrete Quantity = 47.5 cum
Steel Railing over crash barrier = 132.0 RM

13 Number of Bearings = 6 Nos

14 Structural Steel = 360 MT

15 Shear Stud
Number of cross girders = 24 Nos
Length of cross girder = 14.25 m
Spacing of shear stud = 200 mm c/c
Number of shear stud at each section = 3 Nos
Total Number of shear studs = 5130 Nos

16 HSFG Bolts = 21.6 MT


(6% of truss weight)

17 RCC Railing at Edges = L(m) Area(m2)


= 66 0.16
= 10.6 cum
Number = 2 Nos
Total Concrete Quantity = 21.1 cum

18 GI Drainage Spout = L(m)


= 66
C/c distance of spout = 3 m c/c
= 44 Nos

17 Reinforcement
Foundation @ 125 kg/cum 35.0 T
Pier Cap, Stopper, Pedestal & Dirt Wall@ 110 kg/cum 17.6 T
Abutment @ 150 kg/cum 60.4 T
Wing wall & Return wall @ 120 kg/cum 8.4 T
Approach Slab @ 60 kg/cum 1.5 T
Railing & Crash barrier @ 100 kg/cum 10.5 T
Deck Slab @ 250 kg/cum 45.3 T
TOTAL: 178.7 T

18 Launching Nose + Tail Span


Length = 30 m
Steel Tonnage @ 3.5 t/m = 105 MT

19 Counter Weight @ 10 t/m = 300 MT

20 Trestle
Open Foundation = 40 cum
Foundation @ 125 kg/cum = 5.0 T

Pier = 17.7 cum


Pier @ 250 kg/cum = 4.4 T
Details of Measurement

Name of Work: Comprehensive Development of Corridor (Outer Ring Road) between Mukarba Chowk to
Wazirabad Chowk.
SH: Construction of Additional Bridge over Nala at Bhalswa Sanitry Land Fill Site.

Sl. No. Description of work


1 Soil investigation by boring hole of 47 m depth each by using shell and auger equipment including
standard panitration test, collection of undistrubed soil samples at every identifiable change of strata,
Conducting laboratory tests on soil samples to decide necessary shear strength parameters of soil as well
as compression index and coefficient of consolidation. These tests include natural moisture content, bulk
and dry density, liquid and plastic limits, particle size distribution, and specific gravity, unconfined
compression tests, tri-axial shear tests and consolidation tests on specimen from collected undisturbed soil
samples and particle size distribution, liquid limit, plastic limit etc. on specimen from collected disturbed
soil samples. Conducting chemical analysis of subsoil water samples for evaluation of pH value, sulphate
content, calcium content, chloride content and total dissolved solids in water for each borehole including
preparation & submission soil investigation report, giving complete comprehensive record of field and
laboratory investigations and interpretation in soft and hard copy all complete as per SP002, as per
MORTH Technical Specification - 1102, 2403, 2404, 2405 and as per direction of Engineer-in-Charge.
a) all kind of soil.

2 Nos.

2 Add or deduct for boring each one meter depth beyond 47 m depth or lesser than 47 m depth for soil
investigation including the testing and reporting complete as per direction of Engineer-in-Charge.
10 Metre

3 Boring, providing and installing Bored cast-in-situ Reinforced Cement Concrete Piles of M-35 grade of
1200 mm dia using Puzlona Portland Cement (confirming to strength requirement of IS:8112) excluding
the cost of steel reinforcement but including the cost of boring and temporary liner etc. complete as per
approved drawings and Technical Specifications Sections 1100, 1700 of MORTH and IRC: 78 -2000 or as
directed by Engineer-in-charge.

2 x 15 x 40 = 1200 Metre
Say 1200 Metre

4 Extra for providing Permanent Liner of 6mm thick mild steel plate in place of temporary liner wherever
required for piling works cluding fabrication and setting out in position.
2 x 15 x 10 x 3.80 x 0.047 = 53.58 MT
Say 54 MT
5 Providing and laying Design Mix Reinforced Cement Concrete in Pile Caps, Open Foundations and any
other foundation etc. in M35 grade of concrete using Puzlona Portland Cement (confirming to strength
requirement of IS:8112) including the cost of PCC M15 levelling course, centering and shuttering, but
excluding the cost of reinforcement, with all leads, lifts and depths all complete as per approved drawings
and as directed by Engineer-in-charge.

2 x 17.2 x 9.00 x 2 = 619.20 Cum


Say = 620 Cum
6 Providing and laying machine batched, machine mixed and machine vibrated design mix reinforced
concrete for construction of piers, pier caps, abutments, abutment caps, shear key, bearing pedestals, dirt
wall, Portal frame etc., with M45 grades of concrete using Ordinary Portland Cement (conforming to
strength requirement of IS:8112) as per approved drawings supplied by the Engineer-in-charge including
all types of shuttering, staging, scaffolding, necessary tools, plants, machinery and all related operations
as required to complete the work with all leads, lifts, and depths true to level and position all complete but
excluding the cost of reinforcement .

2 x 15 x 1.20 x 6.00 = 216.00 Cum


2 x 2 x 2 x 6.00 x 0.8 = 38.40 Cum
Total 254.40 Cum
Say = 260 Cum

7 Providing and laying in position machine batched, machine mixed and machine vibrated design mix
reinforced concrete of grade M45 with 43/53 grade Ordinary Portland Cement in deck slab in
superstructure using 20mm & down stone aggregates and approved quality sand complete as per approved
drawings, designs and specifications including the necessary tools, plants and machinery complete but
excluding the cost of reinforcement.

1 x 48 x 15 x 0.225 = 162 Cum


Say 165 Cum

8 Providing and laying Design Mix Reinforced Cement Concrete of grade M35 with 43/53 grade Ordinary
Portland Cement in cast-in-situ Approach Slabs, Friction Slabs over the approaches, complete as per
drawing excluding the cost of steel reinforcement.
2 x 15 x 4.00 x 0.30 = 36 Cum
Say = 40 Cum

9 Providing and fixing M45 grade reinforced cement concrete with 43/53 grade Ordinary Portland Cement
in cast-in-situ crash barriers over the superstructure, bridge and over the retaining wall as shown in the
drawings. Reinforcement shall be measured and paid separately.

3 x 52 x 0.217 = 22.57 Cum


Say = 25 Cum

10 Providing and installing 4mm thick fiber impregnated bituminous bridge deck waterproofing membrane
of approved make including necessary primer and adhesive heating and rolling, overlapping and sealing
joints etc. complete as per specifications and as per the Direction of Engineering-in-Charge.

2 x 48 x 15.5 = 1488 Sqm


Say 1500 Sqm

11 Providing and installing to true lines levels MSM Spherical bearings of specified load capacity as detailed
here under and as per section 2000 of MORTH Specifications. Item includes preparation of designs and
drawings and its approval from the Engineer-in-charge, manufacturing, testing, transportation to site,
storage with all handling, leads & lifts etc. and placing the permanent bearings in position, grouting holes
and filling the underside of base plates using prepacked, free flowing high strength, non-shrinkage grout
such as CONBEXTRA HF of M/s FOSROC or approved equivalent, as per manufacturer's specifications.
(Bearings shall be provided with a warranty of trouble free maintenance of 15 years).

MSM Spherical Slide Guide Bearing (L)- 1700 KN 5 Nos


MSM Spherical Fixed Bearing - 1700 KN 5 Nos
12 Providing, fabricating , transportation, assembling and erection in position of steel members for Steel
Plate Girder Bridge using structural steel plates of Grade E 410 A, Normalised/control cooled, conforming
to IS-2062 with latest amendments, to the required profile and shape as per the drawings and
specifications. This item includes preparation of fabrication shop drawings and their approval, necessary
templates, adequate temporary supports, scaffolding and staging, all cutting, grinding, welding (using
automatic submerged arc welding and gas metal arc (MIG) welding wherever specified) & all labour,
tools, plants & equipments and operations etc required to complete the job as per drawings and
specifications. Every precaution to be taken to prevent rusting of sections. This item also includes all tests
on materials and welded fabricated parts as per specifications and directions of Engineer-in-Charge.
Temporary bolts and nuts (Grade 4.6) to be used during assembling shall be removed before site erection.
All site erection bolts shall be HSFG type only. Item to include costs of steel shot blasting on external
surface using abrasive charge conforming to SA 2.5 (ISO 8501-1988), application of primer and various
coats of internal and external painting in fabrication shop and final painting on site including all touch up
works after erection as per technical specifications. Priming & Painting shall be done as per technical
specifications mentioned in relevant portion of the document.

1 x 48 x 15 x 0.375 = 270 MT
Say = 270 MT

13 Providing, fabricating , transportation, assembling and erection in position of steel members using
structural steel plates, rolled of Grade E 250 A, Normalised/control cooled conforming to IS-2062 with
latest amendments, to the required profile and shape as called for as per the drawings and specifications.
This item includes preparation of fabrication shop drawings and their approval, necessary templates,
adequate temporary supports, scaffolding and staging, all cutting, grinding, surface treatment, painting,
welding (using automatic submerged arc welding and gas metal arc (MIG) welding wherever specified)
including hexagonal black bolts & all labour, tools, plants & equipments and operations etc required to
complete the job as per drawings and specifications. This item excludes the shear studs profiled from the
high strength MS rods (Yield strength=385 MPa) and fusion welded to top flange of the girder (which is
to be measured and paid separately under relevant item). Every precaution to be taken to prevent rusting
of sections. This item also includes all tests on materials and welded fabricated parts as per specifications
and directions of Engineer-in-Charge. Temporary bolts and nuts (Grade 4.6) to be used during assembling
shall be removed before site erection. All site erection bolts shall be HSFG type only. Item to include
costs of steel shot blasting on external surface using abrasive charge conforming to SA 2.5 (ISO 8501-
1988) on materials, application of primer and various coats of internal and external painting in fabrication
shop and final painting on site including all touch up works after erection as per technical specifications.

12 MT

14 Providing, testing and tightening of High Strength Friction Grip Bolts (HSFG bolts) of class/grade 8.8 up
to proof loads as per IS:4000 using Automatic Calibrated Torque Wrench at all locations of splicing and
at all heights, wherever specified as per drawings and their compatible nuts and washers all complete
required to execute the job. All HSFG bolts and nuts, washers conforming to IS:1367, IS:6610, IS:6623
and IS:4000 shall be used. The measurement shall be made for complete assembly of bolt, nut and
compatible washers used in permanent works.

270 @ 2 % = 5400 Kg

15 Providing, testing and fixing of High Strength shear connectors shear studs of size 22 x 125 mm profiled
from high strength MS rods (Yield strength=385 MPa, minimum elongation=18 %, Characteristic tensile
strength=495 mpa) and fusion welded to top flange of the Plate girders of appropriate diameter and height
as per approved designs and relevant specifications to connect steel girders with the reinforced concrete
deck slab. The measurement shall be made in Nos. and nothing extra shall be paid for welding to connect
studs with steel plate girders.

270 @ 2 % = 5400 Nos.


16 Proiding & placing in position at all depths and heights Thermo-Mechanically Treated (TMT) Fe 500 D
grade Reinforcement Bars including cutting, straightening, bending, binding with mild steel annealed
binding wire of 18 SWG i/c, testing of materials complete as per approved drawings, specifications and as
per directions of the Engineer-in-charge.

Pile: 1200 m @ 150 kg/m = 180000


Pile Cap: 620 cum @ 150 kg/cum = 93000
Deck: 165 cum @ 180 kg/cum = 29700
Approach Slab: 40 cum @ 150 kg/cum = 6000
Crash Barrier: 25 cum @ 150 kg/cum = 3750
Total = 312450 Kg
312450 / 1000 = 312.45 MT
Say = 320 MT

18 Excavation for road work in Soil with hydraulic excavator of 0.9 cum bucket capacity including disposal
by mechanical means, including loading, transporting, unloading to approved municipal dumping ground
or as approved by Engineer-in-charge.

Aapproaches: 2100 x 0.6 = 1260 Cum


Say 1300 Cum

19 Construction of embankment with earth obtained from borrow pits with all lifts and leads, transporting to
site, spreading, grading to required slope, watering and compacting to meet requirement of table 300-2 of
MORTH with CBR >5 (Also including filling in the approaches between reinforced earth (RE) wall
panels and return walls as per approved drawings and specifications).

New: 2100 x 0.6 = 1260


Old: 1100 x 2.5 = 2750
Total 4010 Cum
Say 4000 Cum

20 Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after
excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller
including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with
lead upto 50 metres.

960 Sqm

21 Providing, laying, spreading and compacting 300 mm thick Granular Sub Base (GSB) Course in two
layers of 150mm thick each, with grade 1 and grade 2 maerials of CBR not less than 20% and 30%
respectively, including premixing the material with water at OMC in Mechanical mixing plant, carriage of
material at site, spreading in uniform layers with motor grader on a prepared base, compacting with
power/vibrating road roller of 8 to 10 tonne capacity to achieve the desired density including all
materials, labours and machinery etc. complete for all leads and lifts as per specifications and directions
of Engineer-in-charge.

a) Layer of 150mm thick lower granular cub-base course with CBR not less than 20% using Grading I (as
per table 400-1 of MoRTH Specifications 2001) close graded materials
New: 2100 x 0.165 = 346.5
Old: 1100 x 0.165 = 181.5
Total 528 Cum
Say 530 Cum
b) Layer of 150mm thick upper granular cub-base course with CBR not less than 30% using Grading II
(as per table 400-2 of MoRTH Specifications 2001) coarse graded material granular sub-base materials as
per Iten 4.1 of MoRTH
New: 2100 x 0.165 = 346.5
Old: 1100 x 0.165 = 181.5
Total 528 Cum
Say 530 Cum

22 Providing, laying, spreading and compacting Wet Mix Macadam (WMM) base course comprising of
graded stone aggregates and granular material conforming to MORTH Specification (Table 400-11)
including pre-mixing the material with water at OMC in mechanical mixing plant, carriage of mixed
materials by tippers to site, laying and spreading in uniform layers in base-course on a well prepared sub-
base/base course compacting with power vibratory roller of 8 to 10 tonne capacity to achieve the desired
density at OMC including all material, labours, machinery etc. complete for all leads and lifts and as per
the directions of Engineer-in-Charge.

New: 2100 x 0.25 = 525


Old: 1100 x 0.15 = 165
Total 690 Cum
Say 700 Cum

23 Providing and applying Primer Coat with bitumen emulsion on prepared surface of granular base
including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means

New: 2100
Old: 1100
Total 3200 sqm

24 Providing and applying Tack Coat with bituminous emulsionusing emulsion pressure distributor at the
rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

New: 3 x 2100 = 6300


Old: 3 x 1100 = 3300
Total 9600 sqm

25 Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed
with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver
finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth
wheeled/vibratory rollers as per specifications to achieve the desired compaction and density, complete as
per specifications and directions of Engineer-in-Charge.
50 to 100 mm average compacted thickness with bitumen of grade CRMB-60 @3.5% (percentage by
weight of total mix) prepared in Computarised Batch Type Hot Mix Plant of 100-120 TPH capacity.

New: 2100 x 0.080 = 168


Old: 1100 x 0.080 = 88
Total 256 Cum
Say 260 Cum
26 Providing and laying Dense Bituminous Macadam on prepared surface with specified graded crushed
stone aggregates including hot mixing of stone aggregates, filler and bitumen in computerised batch type
hot mix plant of 100 - 120 TPH capacity, transporting the mixed material by tippers to site and laying the
mixed material with paver finisher fitted with electronic sensing device to the required level and grade
and rolling by road rollers, as per MORTH specifications, to achieve the desired density and compaction,
but excluding the cost of primer/tack coat.
(a) 50 to 100 mm average compacted thickness with bitumen of grade CRMB-60 @ 5% (percentage by
weight of Total mix) and lime filler @ 2% (percentage by weight of Aggregate).

New: 2100 x 0.075 = 168


Bridge: 900 x 0.05 = 45
Old: 1100 x 0.075 = 88
Bridge: 1800 x 0.05 = 90
Total 391 Cum
Say 400 Cum

27 Providing and laying Bituminous Concrete on prepared surface with specified graded crushed stone
aggregates for wearing course including hot mixing of stone aggregates, filler and bitumen in
computerised batch type hot mix plant of 100-120 TPH capacity, transporting the mixed material by
tippers to site and laying the mixed material with paver finisher fitted with electronic sensing device to the
required level and grade and rolling by road rollers, as per MORTH specifications, to achieve the desired
density and compaction, but excluding the cost of tack coat.
(a) 40/50mm compacted thickness with bitumen of grade CRMB-60 @ 5.5% (percentage by weight of
Total mix) and lime filler @ 2% (percentage by weight of Aggregate).

New: 2100 x 0.04 = 84


Bridge: 900 x 0.04 = 36
Old: 1100 x 0.04 = 44
Bridge: 1800 x 0.04 = 72
Total 236 Cum
Say 240 Cum

28 Providing and applying 2.5 mm thick Road Marking Strips (retro-reflective) of specified shade/colour for
Lane Marking using hot thermoplastic material by fully/ semi-automatic paint applicator machine fitted
with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by
experienced operator on road surface including cost of material , labour, T&P, cleaning the road surface
of all dirt, scales, oil, grease and foreign material etc complete as per direction of the Engineer in charge
and applicable specifications. The raw material used for marking shall conform to BS 3262-1989 part I
and MORT&H specification under section 800 clause 803. Item to include all incidentals required to
complete the job and cost of testing of materials.

New: 220 Sqm


Old: 360 Sqm
Total 580 Sqm

29 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
a) Two or more coats on new work

1200 Sqm

30 Providing and laying Design Mix Plain Cement Concrete of specified grades using 43/53 grade Ordinary
Portland Cement at all locations with all leads, lifts and depths including necessary form work, wherever
required, as per direction of Engineer in Charge.

a) M 10 grade cement concrete 20 Cum

b) M 35 grade cement concrete 25 Cum


31 Making bell mouth opening/ entrance of size 100x50x50 cm for drainage pipe under footpath, including
providing cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal
size) for shape of bell mouth, including plastering providing and fixing precast R.C.C./ S.F.R.C. slab
including plastering with cement mortar 1:3 (1 cement : 3 fine sand) of 6 mm thickness on exposed
surface of the slab & bell mouth including centring, shuttering & neat cement punning inside the bell
mouth etc. all complete.

8 Nos.

32 Providing and fixing in position Drainage Spouts for drainage of superstructures complete as per approved
drawings and MORTH Technical Specification 2705 and as directed by Engineer-in-charge including all
incidental works, labour, materials, staging/scaffolding etc. to complete the job. The spouts shall be
connected with suitably located runner/downtake pipelines (to be paid separately under relevant item) to
discharge the surface run-off to drains or any similar arrangement provided at ground level.

16 Nos.

33 Providing and fixing Glow studs of size 100x20 mm made of heavy duty body shall be moulded ASA
(Acrylic styrene Acryloretrite ) or HIP (High impact polystyrene) or ABS having electronically welded
micro- prismatic lens with abrasion resistant coating as approved by Engineer in charge. The glow stud
shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective
surface shall be 35 (+/-5) degress to base .The reflective panels on both sides with at least 12 cm of
reflective area up each side. The luminance intensity should be as per the specification and shall be tested
as described in ASTM I: 809 as recommended in BS: 873 part 4 : 1973. The studs shall be fixed to the
Road surface using the adhesive conforming to IS, as per procedure recommended by the manufacturer
complete and as per direction of Engineer-in-charge.

New: 48 Nos.
Old: 82 Nos.
Total 130 Nos.

34 Providing and laying cement concrete of grade M 15 in kerb channel, coping constructiion of energy
dissipation basin at toe of chutes and similar work as per direction of Engineer-in-charge.
New: 60 Sqm
Old: 60 Sqm
Total 120 Sqm

35 Providing and laying non pressure R.C.C Pipes with collars jointed with stiff mixture of cement mortar in
the proportion of 1:2 (1 Cement : 2 fine sand) including testing of joints etc. complete.
NP2 pipes(light duty)-250 mm dia .

New: 20 Metre
Old: 30 Metre
Total 50 Metre

36 Providing and laying at or near ground level factory made Kerb Stone of M-25 grade cement concrete in
position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand)
including making joints with or without grooves (thickness of joints except at sharp curve shall not to
more than 5mm), including making drainage opening wherever required complete etc. as per direction of
Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb
stone shall be approved by Engineer-in-charge).

New: 16 cum
Old: 8 cum
Total 24 cum
37 Providing and laying factory made chamfered edge with CC Paver Block of required strength , thickness,
size/ shape made by table vibratory method using PU mould, laid in required colour and pattern over
50mm thick bed of compacted fine sand, compacting and proper embedding through vibratory compaction
by using plate vibrator, filling joints with jamuna sand and cutting of paver blocks as per size and pattern
finishing and sweeping extra sand complete as per manufacturers specifications and direction of
Engineer-in-Charge. (Item includes Cost of testing of all materials involved in the execution of item as
per approved QAP and Specifications in internal / external laboratory including providing the samples and
transporting to the testing laboratory.)
a) 60mm thick paver block of M-30 grade cement concrete with approved colour, design and pattern.

New: 160 Sqm


Old: 120 Sqm
Total 280 Sqm

38 Add or deduct for using extra/less quantity of ordinary portland cement as per the design requirement
under specific condition and as per direction of engineer-in-charge.
10 MT

39 Providing and laying stone pitching laid over prepared filter media including grouting with M 15 grade
cement concrete, all complete as per drawings and Section 2504 of MORTH technical specifications and
as per the instructions of Engineer-in-Charge.

2 x 18.00 x 6.00 x 0.225 = 48.6 Cum


2 x 20.00 x 6.00 x 0.225 = 54 Cum
Total 102.6 Cum
Say 105 Cum

40 Providing and laying Filter Material underneath stone pitching in slopes complete as per drawings and
Section 2504 of MORTH technical specifications and as per the instructions of Engineer-in-Charge.

2 x 18.00 x 6.00 x 0.2 = 43.2 Cum


2 x 20.00 x 6.00 x 0.2 = 48 Cum
Total 91.2 Cum
Say 95 Cum

41 Providing & making Gabion structure with Mechnically Woven Double Twisted Hexagonal Shaped Wire
mesh Gabion Boxes as per IS 16014:2012, MORTH Clause 2500, of required size, Mesh Type 10x12
(D=100 mm with tolerance of ± 2%) Zinc + PVC coated, Mesh wire diameter 2.7/3.7mm, mechanically
edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per
meter of mesh perpendicular to twist, tying with lacking wire of diameter 2.2/3.2mm (ID/OD), supplied
@ 3% by weight of Gabion boxes, billed with boulders with least dimension of 200 mm, as per drawing,
all complete as per directions of Engineer-in-Charge.

2 x 2 x 12.00 x 4.00 x 2.00 = 384 Cum


Say 390 Cum

42 Steel work in built up tubular/ Square Steel section of Grade E 250 A including cutting, hoisting, fixing in
position, welded, bolted and J-hooks foundation bolts with nuts & washer, steel shot blasting on external
surface using abrasive charge conforming to SA 2.5 (ISO 8501-1988), zinc rich epoxy primer and painting
with MIO epoxy paint and Ecrylic polysiloxane paint including special shaped washers etc. complete.
Priming & Painting shall be done as per technical specification mentioned in the relevent clause of the
agreement complete as per engineer-in-charge, seamless type tubes.

12000 kg
43 Providing and fixing metallic screen on crash barrier or steel railing on ground consisting of hard drawn
steel wire fabric 75x25 mm mesh of weight not less then 7.75 kg/sqm welded to MS angle iron frame
including painting with synthetic enamel paint of approved brand and manufacturer of required colour to
give an even shape - two or more coats - over a coat of approved steel primer as per the direction of
Engineer-in-Charge. The work shall be done as per Technical Specifications 300, 1500, 1700 and 1900 of
MORTH Specification and as per approved drawings. (Payment for necessary excavation and foundation
concrete, if required, shall be made separately).

1860 Kg
Basic
Sl.N B.Quantiti Cost
Description of items Unit Rates Remarks
o. es (Rs.)
(Rs.)
58 Err:509
Err:509

(A) Material
Consideration the Signage board of size 1.2m x 0.9m = 1.08 sqm
ACP sheet
Size of Panel to be used for making front side of signage
= 1.2m x 0.9m = 1.08 sqm
Size of Panel to be used for making back side of signage
= 1.2m x 0.9m = 1.08 sqm
Total area of ACP Panel = 2x1.08 = 2.16 sqm
Add Wastage @ 5%= 2.16 x 5% = 0.11 sqm
Total area of ACP Panel required = 2.16 + 0.11= 2.27sqm
Cost of ACP Sheet sqm 2.27 1143.16 2594.97 MR
VHB Tape 25mm wide
Total length of VHB Tape (Both sides) = ((0.9+1.2)x2 + 1.50) x 2 = 11.40 m

Add wastage @ 5% = 11.40x5% = 0.57 m


Total qty of VHB tape= (11.40 + 0.57 )= 11.97 m
Cost of VHB Tape metre 11.97 54.55 652.96 MR
White Micro Prismatic Type- XI Retro Reflective Sheeting for
base
Area taken for 1.08 sqm Add wastage @ 5%=0.05
1.08 + 0. 05 = 1.13 sqm sqm 1.13 1840.64 2079.92 MR
Transparent Coloured Electrocut Overlay Sheeting
1.08 + 0. 05 = 1.13 sqm sqm 1.13 727.70 822.30 MR

MS tube 50 x 50 x 3.6 mm

2 x (1.2 + 0.90) = 4.20 m


Diagonal (internal) = 1.36 m
Total 4.20 + 1.36 = 5.56 m
Weight of MS tube including 5% wastage DSR
= 1.05x5.56 @ 4.98 kg per metre = 29.07Kg.
2016
kg 29.07 42.00 1220.94
code
4009
Labour for fabrication of frame
(Based on DAR 2016 Vol-I. Item- 10.16.1)
i. Black smith Ist class (1.50/125.0 x 29.07 = 0.35 day) day 0.35 652.00 228.20 L-01
ii. Bandhani (0.75/125.0 x 29.07 = 0.17 day) day 0.17 592.00 100.64 L-04
iii. Beldar (5.50/125.0 x 29.07 = 1.28 day) day 1.28 538.00 688.64 L-05

Epoxy painting over MS tube LS 50.00

Aluminium C-channel and screwing


Aluminium channel (65x12x2mm)
2x(1.20+0.90) = 4.20 metre
DSR
2016
Weight of channel (i/c 5% wastage) = 1.05x4.20x0.46 kg/m = kg 2.03 200.00 406.00
code
7306

Self tapping SS screws LS 50.00

Charges for elctro-cutting of reflective sheet, overlay film, pressure


pasting of the film with ACP panel, fixing the panel with MS frame with sqm 1.08 1500.00 1620.00 M/R
VHB tape etc. all complete.

Packaging transportation of fabricated board from workshop to the


LS 200.00
site including loading and unloading etc.

Sub Total 10714.57

Add 1% Water charges 107.15

Sub Total 10821.72


Add 15% CP and OH 1623.26

Sub Total 12444.98

Add 1% for Labour Cess 124.45

Cost per Square Metre 12569.43

AE/F-122 AEE/F-113 AE/F-120 EE/F-12