You are on page 1of 100

BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads including
dewatering if required, as per drawing
1 Cum
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in


levelling course etc. under foundation
including compacting, centring and if
need dewatering also, with all
2 shuttering materials, as per drawing Cum 600
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

Laying RCC any grade in


(Foundation,Sub-Structure and Super-
Structure )including compacting,
centring and if need dewatering also,
with all shuttering materials,including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
3 of weepholes ,fixing of fibreboard, Cum 1550
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport, as
per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all
shuttering materials,including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
of weepholes ,fixing of fibreboard,
4 Cum 1800

Staging/de staging complete, Line &


Level inclusive of
Shuttering,supporting & Staging
material and labour with transport, as
per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC (any grade) in super
structure (Only LVUP slab,MNB solid
slab and box type slab,dirt
wall,Abutment wall, bracket,seismes
arrestor,pedestal )including
compacting, centring and if need
dewatering also, with all shuttering
materials, complete as per drawing
and Technical Specification,good
5 Cum 2300
practice, to the satisfaction of
engineer incharge , etc. including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
Specification,good practice, to the
satisfaction of engineer incharge ,
6 Cum 2300
etc. including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire
7 as per drawing, Technical Specification MT 6500
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ


crash barrier, with cutting, bending
and fixing reinforcement and all
shuttering materials,including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
of weepholes ,fixing of fibreboard,
8 Rmt. 1200
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport, as
per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.

BOQ For Structure Work

S.no Description Unit Qty. Rate Amount


Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging
9 Cum. 1500
complete, Line & Level exclusive of
Shuttering,supporting & Staging
material as per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500
satisfaction of engineer incharge.

cutting, threading, stressing and


grouting of HT strand as per technical
11 MT 8000
specification and also to the
satisfaction of engineer incharge

S.no Description Unit Qty. Rate Amount

Rate are for CUP/PUP/Box


Culvert/Slab Culvert

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads including
dewatering if required, as per drawing
1 Cum
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in


levelling course etc. under foundation
including compacting, centring and if
need dewatering also, with all
2 shuttering materials, as per drawing Cum 600
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

Laying RCC any grade in


(Foundation,Sub-Structure and Super-
Structure )including compacting,
centring and if need dewatering also,
with all shuttering materials,including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
3 of weepholes ,fixing of fibreboard, Cum 1550
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport, as
per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire
4 as per drawing, Technical Specification MT 6500
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.
Laying RCC any grade in cast in situ
crash barrier, with cutting, bending
and fixing reinforcement and all
shuttering materials,including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
of weepholes ,fixing of fibreboard,
5 Rmt. 1200
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport, as
per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.

S.no Description Unit Qty. Rate Amount

Pipe Culvert

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads including
dewatering if required, as per drawing
1 Cum
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in


levelling course etc. under foundation
including compacting, centring and if
need dewatering also, with all
2 shuttering materials, as per drawing Cum 600
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

Laying of RCC/CC (any grade for all


sizes of pipe )in head
wall,cradle,encasing including
shuttering
materials,vibrating,compacting,
3 Cum 1200
finishing,curing, deshuttering, as per
drawing and technical specification,
complete in all respect & good
industrial practice, to the satisfaction
of engineer incharge.

BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Dismantling of PCC Head wall &


4 shifting, including labour and Cum
machinery

Laying of RCC NP4 Hume Pipe with


collar joint in cement mortar 1:4 and
5
finish inside joint in line and level,
curing. inclusive of crane/hydra.

a) 600mm dia Rmt 500

b) 900mm dia Rmt 550

c) 1200mm dia Rmt 600

Labour charges for laying of granular


6 material below pipe including leveling Cum 100
and compaction

S.no Description Unit Qty. Rate Amount

Drain
Earthwork in excavation (with
machinery) in soil in foundation
including all lifs and leads including
dewatering if required, as per drawing
1 Cum
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Labour rate for PCC leveling


course,RCC bed,wall,slab for
construction of drain (2000mm width)
including fixing of grating,50mm inlet
pipe at different location with steel
reinforcement and shuttering materials
complete in line and level finishing
2
work with curing ,shuttering /de
shuttering, as per drawing and
technical specification, complete in all
respect & good industrial practice, to
the satisfaction of engineer incharge.:-
(Concrete and Steel to be provided by
MMR PROJECTS).

a) 600mm to 1000mm RMT 900

Total
Scope Matrix

SI No. Description Scope

MMRP Sub Contractor

1 Machinery for Excavation/Erection √

2 Labour Accommodation √

3 Concrete √

4 TMT √

5 Binding Wire √

6 Shuttering & Scaffolding,Staging √

7 Shuttering & Scaffolding,Staging for Girder √

8 Concrete Pump √

9 Vibrator Machine √

10 Cutting & Bending Machine √

11 Shuttering Oil √

12 Electricity & Water √

13 Labour Fooding √

14 Labour Transporting √

15 Tools & Tackles √

16 Weep hole /drainage sprout material √

17 Filter media material √

18 Tar Coal Paint material √

19 POT/PTFE / Neoprene/ Tar paper Bearing √


materials

20 Water Storage tank at site √

21 Trailor/Hywa for shifting of free use √


materials

22 Hessain Cloth √

23 PPE /Safety Board/Diversion Board √

24 Hume Pipe √

25 Cement, Sand ,Granual materials √


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery) in soil


in foundation including all lifs and leads
including dewatering if required, as per drawing
1 Cum
and technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need dewatering
2 also, with all shuttering materials, as per Cum 40.0 600 24000
drawing and technical specification, complete
in all respect & good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need dewatering
also, with all shuttering materials,including
compacting, vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete, Line &
Cum 617.0 1550 956350
Level inclusive of Shuttering,supporting &
Staging material and labour with transport, as
per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub structure (wall,


Abutment, retaining wall ) including
compacting, centring and if need dewatering
4
also, with all shuttering materials,including
compacting, vibrating, curing ,centring, and
Cum 70.0 1800 126000
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,

Laying RCC (any grade) in super structure (Only


LVUP slab,MNB solid slab and box type slab,dirt
wall,Abutment wall, bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with all
shuttering materials, complete as per drawing
5
and Technical Specification,good practice, to
the satisfaction of engineer incharge , etc.
Cum 418.0 2300 961400
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport
Laying RCC (any grade) in Abutment & Pier Cap
including compacting, centring and if need
dewatering also, with all shuttering materials,
complete as per drawing and Technical
Specification,good practice, to the satisfaction
6 of engineer incharge , etc. including Cum 2300 0
compacting, vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if required ,
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting & Staging
material and labour with transport.

Cutting, Bending, Binding & Fixing of HYSD/TMT


reinforcement in position in foundation,
substructure and superstructure including
7
binding wire as per drawing, Technical
Specification Section 1600. Including
MT 143.0 6500 929500
transportation from yard (trailor will be
provided by MMR PROJECTS free of cost),
including cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8 weepholes ,fixing of fibreboard, Staging/de Rmt. 148.0 1200 177600
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport, as per drawing and
technical specification, complete in all respect
& good industrial practice, to the satisfaction of
engineer incharge.

Laying RCC any grade in pre-cast girder (RCC &


PSC) including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard, Staging/de
9 Cum. 1500
staging complete, Line & Level exclusive of
Shuttering,supporting & Staging material as per
drawing and technical specification, complete
in all respect & good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per technical


10 specification and also to the satisfaction of Nos. 2500
engineer incharge.

cutting, threading, stressing and grouting of HT


11 strand as per technical specification and also to MT 18.0 8000 144000
the satisfaction of engineer incharge

Grand Total 3318850


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads including
1 dewatering if required, as per drawing Cum
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in


levelling course etc. under foundation
including compacting, centring and if
2
need dewatering also, with all shuttering
materials, as per drawing and technical
Cum 47.1 600 28248
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in


(Foundation,Sub-Structure and Super-
Structure )including compacting,
centring and if need dewatering also,
with all shuttering materials,including
compacting, vibrating, curing ,centring,
and shuttering/de shuttering/Finishing if
3
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete,
Cum 635.8 1550 985428
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per
drawing and technical specification,
complete in all respect & good
industrial practice, to the satisfaction of
engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all shuttering
4 materials,including compacting, Cum 483.2 1800 869670
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,

Laying RCC (any grade) in super


structure (Only LVUP slab,MNB solid slab
and box type slab,dirt wall,Abutment
wall, bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 664.5 2300 1528350
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport
Laying RCC (any grade) in Abutment &
Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical
Specification,good practice, to the
6
satisfaction of engineer incharge , etc.
including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 178.0 6500 1157260
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ


crash barrier, with cutting, bending and
fixing reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
8 fibreboard, Staging/de staging complete, Rmt. 207.0 1200 248400
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per
drawing and technical specification,
complete in all respect & good
industrial practice, to the satisfaction of
engineer incharge.

Laying RCC any grade in pre-cast girder


(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and


11
grouting of HT strand as per technical
specification and also to the satisfaction
MT 8000 0
of engineer incharge

Grand Total 4817356


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads including
1 dewatering if required, as per drawing Cum
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in


levelling course etc. under foundation
including compacting, centring and if
2
need dewatering also, with all shuttering
materials, as per drawing and technical
Cum 40.0 600 24000
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in


(Foundation,Sub-Structure and Super-
Structure )including compacting,
centring and if need dewatering also,
with all shuttering materials,including
compacting, vibrating, curing ,centring,
and shuttering/de shuttering/Finishing if
3
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete,
Cum 133.8 1550 207390
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per
drawing and technical specification,
complete in all respect & good
industrial practice, to the satisfaction of
engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all shuttering
4 materials,including compacting, Cum 299.4 1800 538920
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,
Laying RCC (any grade) in super
structure (Only LVUP slab,MNB solid slab
and box type slab,dirt wall,Abutment
wall, bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 215.4 2300 495420
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical
Specification,good practice, to the
6
satisfaction of engineer incharge , etc.
including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 46.6 6500 302835
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ


crash barrier, with cutting, bending and
fixing reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
8 fibreboard, Staging/de staging complete, Rmt. 72.5 1200 87000
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per
drawing and technical specification,
complete in all respect & good
industrial practice, to the satisfaction of
engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and


11
grouting of HT strand as per technical
specification and also to the satisfaction
MT 8000 0
of engineer incharge

Grand Total 1655565


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery) in soil in


foundation including all lifs and leads including
dewatering if required, as per drawing and technical
1 Cum
specification, complete in all respect & good
industrial practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling course


etc. under foundation including compacting,
centring and if need dewatering also, with all
2 shuttering materials, as per drawing and technical Cum 40.0 600 24000
specification, complete in all respect & good
industrial practice, to the satisfaction of engineer
incharge.

Laying RCC any grade in (Foundation,Sub-Structure


and Super-Structure )including compacting, centring
and if need dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
3
shuttering/Finishing if required ,fixing of weepholes
,fixing of fibreboard, Staging/de staging complete,
Cum 197.8 1550 306590
Line & Level inclusive of Shuttering,supporting &
Staging material and labour with transport, as per
drawing and technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure (wall,


Abutment, retaining wall ) including compacting,
centring and if need dewatering also, with all
4 shuttering materials,including compacting, Cum 219.2 1800 394632
vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of weepholes
,fixing of fibreboard,

Laying RCC (any grade) in super structure (Only


LVUP slab,MNB solid slab and box type slab,dirt
wall,Abutment wall, bracket,seismes
arrestor,pedestal )including compacting, centring
and if need dewatering also, with all shuttering
materials, complete as per drawing and Technical
5 Specification,good practice, to the satisfaction of Cum 270.0 2300 621000
engineer incharge , etc. including compacting,
vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport
Laying RCC (any grade) in Abutment & Pier Cap
including compacting, centring and if need
dewatering also, with all shuttering materials,
complete as per drawing and Technical
Specification,good practice, to the satisfaction of
6 engineer incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport.

Cutting, Bending, Binding & Fixing of HYSD/TMT


reinforcement in position in foundation,
substructure and superstructure including binding
7 wire as per drawing, Technical Specification Section MT 180.4 6500 1172535
1600. Including transportation from yard (trailor will
be provided by MMR PROJECTS free of cost),
including cutting, bending machine.

Laying RCC any grade in cast in situ crash barrier,


with cutting, bending and fixing reinforcement and
all shuttering materials,including compacting,
vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of weepholes
8 ,fixing of fibreboard, Staging/de staging complete, Rmt. 235.6 1200 282720
Line & Level inclusive of Shuttering,supporting &
Staging material and labour with transport, as per
drawing and technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in pre-cast girder (RCC & PSC)


including compacting, vibrating, curing ,centring,
and shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of fibreboard,
9 Staging/de staging complete, Line & Level Cum. 242.2 1500 363300
exclusive of Shuttering,supporting & Staging
material as per drawing and technical specification,
complete in all respect & good industrial practice,
to the satisfaction of engineer incharge.

profiling work for PSC girder as per technical


10 specification and also to the satisfaction of engineer Nos. 2500 0
incharge.

cutting, threading, stressing and grouting of HT


11 strand as per technical specification and also to the MT 8000 0
satisfaction of engineer incharge

Grand Total 3,164,777.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery) in


soil in foundation including all lifs and leads
including dewatering if required, as per
1 Cum
drawing and technical specification, complete
in all respect & good industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need dewatering
2 also, with all shuttering materials, as per Cum 120.0 600 72000
drawing and technical specification, complete
in all respect & good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need dewatering
also, with all shuttering materials,including
compacting, vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete, Line
Cum 1242.0 1550 1925100
& Level inclusive of Shuttering,supporting &
Staging material and labour with transport, as
per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub structure (wall,


Abutment, retaining wall ) including
compacting, centring and if need dewatering
4
also, with all shuttering materials,including
compacting, vibrating, curing ,centring, and
Cum 652.0 1800 1173600
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,

Laying RCC (any grade) in super structure (Only


LVUP slab,MNB solid slab and box type slab,dirt
wall,Abutment wall, bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with all
shuttering materials, complete as per drawing
5
and Technical Specification,good practice, to
the satisfaction of engineer incharge , etc.
Cum 638.0 2300 1467400
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport
Laying RCC (any grade) in Abutment & Pier Cap
including compacting, centring and if need
dewatering also, with all shuttering materials,
complete as per drawing and Technical
Specification,good practice, to the satisfaction
6 of engineer incharge , etc. including Cum 2300 0
compacting, vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if required ,
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting & Staging
material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and superstructure
7
including binding wire as per drawing,
Technical Specification Section 1600. Including
MT 246.3 6500 1600690
transportation from yard (trailor will be
provided by MMR PROJECTS free of cost),
including cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8 weepholes ,fixing of fibreboard, Staging/de Rmt. 280.0 1200 336000
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport, as per drawing and
technical specification, complete in all respect
& good industrial practice, to the satisfaction
of engineer incharge.

Laying RCC any grade in pre-cast girder (RCC &


PSC) including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
9
weepholes ,fixing of fibreboard, Staging/de
staging complete, Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material as per
drawing and technical specification, complete
in all respect & good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per technical


10 specification and also to the satisfaction of Nos. 2500 0
engineer incharge.

cutting, threading, stressing and grouting of HT


11 strand as per technical specification and also to MT 8000 0
the satisfaction of engineer incharge

Grand Total 6,574,790.00


1362
BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery) in soil in


foundation including all lifs and leads including
dewatering if required, as per drawing and
1 Cum
technical specification, complete in all respect &
good industrial practice, to the satisfaction of
engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling course


etc. under foundation including compacting,
centring and if need dewatering also, with all
2 shuttering materials, as per drawing and technical Cum 32.0 600 19200
specification, complete in all respect & good
industrial practice, to the satisfaction of engineer
incharge.

Laying RCC any grade in (Foundation,Sub-Structure


and Super-Structure )including compacting,
centring and if need dewatering also, with all
shuttering materials,including compacting,
vibrating, curing ,centring, and shuttering/de
3
shuttering/Finishing if required ,fixing of weepholes
,fixing of fibreboard, Staging/de staging complete,
Cum 65.0 1550 100750
Line & Level inclusive of Shuttering,supporting &
Staging material and labour with transport, as per
drawing and technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure (wall,


Abutment, retaining wall ) including compacting,
centring and if need dewatering also, with all
4 shuttering materials,including compacting, Cum 6.0 1800 10800
vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of weepholes
,fixing of fibreboard,

Laying RCC (any grade) in super structure (Only


LVUP slab,MNB solid slab and box type slab,dirt
wall,Abutment wall, bracket,seismes
arrestor,pedestal )including compacting, centring
and if need dewatering also, with all shuttering
materials, complete as per drawing and Technical
5 Specification,good practice, to the satisfaction of Cum 15.0 2300 34500
engineer incharge , etc. including compacting,
vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport
Laying RCC (any grade) in Abutment & Pier Cap
including compacting, centring and if need
dewatering also, with all shuttering materials,
complete as per drawing and Technical
Specification,good practice, to the satisfaction of
6 engineer incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport.

Cutting, Bending, Binding & Fixing of HYSD/TMT


reinforcement in position in foundation,
substructure and superstructure including binding
7 wire as per drawing, Technical Specification Section MT 8.4 6500 54730
1600. Including transportation from yard (trailor
will be provided by MMR PROJECTS free of cost),
including cutting, bending machine.

Laying RCC any grade in cast in situ crash barrier,


with cutting, bending and fixing reinforcement and
all shuttering materials,including compacting,
vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of weepholes
8 ,fixing of fibreboard, Staging/de staging complete, Rmt. 75.0 1200 90000
Line & Level inclusive of Shuttering,supporting &
Staging material and labour with transport, as per
drawing and technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in pre-cast girder (RCC & PSC)


including compacting, vibrating, curing ,centring,
and shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of fibreboard,
9 Staging/de staging complete, Line & Level Cum. 1500 0
exclusive of Shuttering,supporting & Staging
material as per drawing and technical specification,
complete in all respect & good industrial practice,
to the satisfaction of engineer incharge.

profiling work for PSC girder as per technical


10 specification and also to the satisfaction of Nos. 2500 0
engineer incharge.

cutting, threading, stressing and grouting of HT


11 strand as per technical specification and also to the MT 8000 0
satisfaction of engineer incharge

Grand Total 309,980.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery) in


soil in foundation including all lifs and leads
including dewatering if required, as per
1 Cum
drawing and technical specification, complete
in all respect & good industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need dewatering
2 also, with all shuttering materials, as per Cum 38.0 600 22800
drawing and technical specification, complete
in all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need dewatering
also, with all shuttering materials,including
compacting, vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete, Line
Cum 411.0 1550 637050
& Level inclusive of Shuttering,supporting &
Staging material and labour with transport, as
per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub structure (wall,


Abutment, retaining wall ) including
compacting, centring and if need dewatering
4
also, with all shuttering materials,including
compacting, vibrating, curing ,centring, and
Cum 8.0 1800 14400
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,

Laying RCC (any grade) in super structure (Only


LVUP slab,MNB solid slab and box type slab,dirt
wall,Abutment wall, bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with all
shuttering materials, complete as per drawing
5
and Technical Specification,good practice, to
the satisfaction of engineer incharge , etc.
Cum 18.0 2300 41400
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport
Laying RCC (any grade) in Abutment & Pier Cap
including compacting, centring and if need
dewatering also, with all shuttering materials,
complete as per drawing and Technical
Specification,good practice, to the satisfaction
6 of engineer incharge , etc. including Cum 2300 0
compacting, vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete, Line
& Level inclusive of Shuttering,supporting &
Staging material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and superstructure
7
including binding wire as per drawing,
Technical Specification Section 1600. Including
MT 9.8 6500 63830
transportation from yard (trailor will be
provided by MMR PROJECTS free of cost),
including cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8 weepholes ,fixing of fibreboard, Staging/de Rmt. 72.0 1200 86400
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport, as per drawing and
technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in pre-cast girder (RCC &


PSC) including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
9
weepholes ,fixing of fibreboard, Staging/de
staging complete, Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material as per
drawing and technical specification, complete
in all respect & good industrial practice, to
the satisfaction of engineer incharge.

profiling work for PSC girder as per technical


10 specification and also to the satisfaction of Nos. 2500 0
engineer incharge.

cutting, threading, stressing and grouting of HT


11 strand as per technical specification and also MT 8000 0
to the satisfaction of engineer incharge

Grand Total 865,880.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads including
dewatering if required, as per drawing
1 Cum
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in


levelling course etc. under foundation
including compacting, centring and if
need dewatering also, with all
2 shuttering materials, as per drawing Cum 30.0 600 18000
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.

Laying RCC any grade in


(Foundation,Sub-Structure and Super-
Structure )including compacting,
centring and if need dewatering also,
with all shuttering materials,including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
3 of weepholes ,fixing of fibreboard, Cum 65.0 1550 100750
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport, as
per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub


structure (wall, Abutment, retaining
wall ) including compacting, centring
and if need dewatering also, with all
4 shuttering materials,including Cum 132.0 1800 237600
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
of weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super
structure (Only LVUP slab,MNB solid
slab and box type slab,dirt
wall,Abutment wall, bracket,seismes
arrestor,pedestal )including
compacting, centring and if need
dewatering also, with all shuttering
materials, complete as per drawing
5
and Technical Specification,good
practice, to the satisfaction of
Cum 356.0 2300 818800
engineer incharge , etc. including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting,
centring and if need dewatering also,
with all shuttering materials,
complete as per drawing and Technical
Specification,good practice, to the
6
satisfaction of engineer incharge ,
etc. including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire
7
as per drawing, Technical
Specification Section 1600. Including
MT 86.0 6500 559195
transportation from yard (trailor will
be provided by MMR PROJECTS free of
cost), including cutting, bending
machine.

Laying RCC any grade in cast in situ


crash barrier, with cutting, bending
and fixing reinforcement and all
shuttering materials,including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
8
of weepholes ,fixing of fibreboard,
Staging/de staging complete, Line &
Rmt. 148.0 1200 177600
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport, as
per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast
girder (RCC & PSC) including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing
of weepholes ,fixing of fibreboard,
9 Staging/de staging complete, Line & Cum. 1500 0
Level exclusive of
Shuttering,supporting & Staging
material as per drawing and technical
specification, complete in all respect
& good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and


11
grouting of HT strand as per technical
specification and also to the
MT 8000 0
satisfaction of engineer incharge

Grand Total 1,911,945.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation including
all lifs and leads including dewatering if
1 required, as per drawing and technical Cum
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 102.0 600 61200
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3 required ,fixing of weepholes ,fixing of Cum 144.0 1550 223200
fibreboard, Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all shuttering
4 materials,including compacting, Cum 17.0 1800 30600
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 1930.0 2300 4439000
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 260.8 6500 1694940
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
8
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete,
Rmt. 392.0 1200 470400
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical
specification and also to the satisfaction
MT 8000 0
of engineer incharge

Grand Total 6,919,340.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation including
all lifs and leads including dewatering if
1 required, as per drawing and technical Cum
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 66.0 600 39600
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3 required ,fixing of weepholes ,fixing of Cum 411.0 1550 637050
fibreboard, Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all shuttering
4 materials,including compacting, Cum 3.0 1800 5400
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 9.0 2300 20700
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 4.0 6500 25935
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
8
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete,
Rmt. 50.0 1200 60000
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical
specification and also to the satisfaction
MT 8000 0
of engineer incharge

Grand Total 788,685.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 31.0 600 18600
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 61.0 1550 94550
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
4
need dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 163.0 1800 293400
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 195.0 2300 448500
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 45.2 6500 293865
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 148.0 1200 177600
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 1,326,515.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation including
all lifs and leads including dewatering if
1 required, as per drawing and technical Cum
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 600 0
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3 required ,fixing of weepholes ,fixing of Cum 40.0 1550 62000
fibreboard, Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all shuttering
4 materials,including compacting, Cum 1045.0 1800 1881000
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,

Laying RCC (any grade) in super structure


(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 2300 0
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport
Laying RCC (any grade) in Abutment &
Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 158.2 6500 1028040
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
8
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete,
Rmt. 1200 0
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC any grade in pre-cast girder


(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical
specification and also to the satisfaction
MT 8000 0
of engineer incharge

Grand Total 2,909,040.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 600 0
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 209.0 1550 323950
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with transport,
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 1725.0 1800 3105000
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 2300 0
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment & Pier


Cap including compacting, centring and if
need dewatering also, with all shuttering
materials, complete as per drawing and
Technical Specification,good practice, to
6
the satisfaction of engineer incharge ,
etc. including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 261.0 6500 1696500
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with transport,
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 4,801,500.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 600 0
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 91.0 1550 141050
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 758.0 1800 1364400
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 2300 0
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 114.0 6500 741000
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 2,105,400.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 600 0
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 50.0 1550 77500
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 1096.0 1800 1972800
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 2300 0
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 165.0 6500 1072500
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 3,122,800.00


S.no Description Unit Qty. Rate Amount

Drain

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads
including dewatering if required,
1 as per drawing and technical Cum
specification, complete in all
respect & good industrial practice,
to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Labour rate for PCC leveling


course,RCC bed,wall,slab for
construction of drain (2000mm
width) including fixing of
grating,50mm inlet pipe at
different location with steel
reinforcement and shuttering
materials complete in line and
2
level finishing work with
curing ,shuttering /de shuttering,
as per drawing and technical
specification, complete in all
respect & good industrial practice,
to the satisfaction of engineer
incharge.:- (Concrete and Steel to
be provided by MMR PROJECTS).

a) 600mm to 1000mm RMT 21682 900 19513800


Grand Total 19,513,800.00
BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 600 0
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 135.0 1550 209250
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
4
need dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 1094.0 1800 1969200
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 2300 0
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 165.0 6500 1072500
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 3,250,950.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads including
dewatering if required, as per
1 Cum
drawing and technical specification,
complete in all respect & good
industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in


levelling course etc. under
foundation including compacting,
centring and if need dewatering
2
also, with all shuttering materials,
as per drawing and technical
Cum 600 0
specification, complete in all
respect & good industrial practice,
to the satisfaction of engineer
incharge.

Laying RCC any grade in


(Foundation,Sub-Structure and
Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3
required ,fixing of weepholes ,fixing
of fibreboard, Staging/de staging
Cum 135.0 1550 209250
complete, Line & Level inclusive of
Shuttering,supporting & Staging
material and labour with transport,
as per drawing and technical
specification, complete in all
respect & good industrial practice,
to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub


structure (wall, Abutment, retaining
wall ) including compacting,
centring and if need dewatering
4
also, with all shuttering
materials,including compacting,
Cum 1800 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing
of fibreboard,
Laying RCC (any grade) in super
structure (Only LVUP slab,MNB solid
slab and box type slab,dirt
wall,Abutment wall, bracket,seismes
arrestor,pedestal )including
compacting, centring and if need
dewatering also, with all shuttering
materials, complete as per drawing
5
and Technical Specification,good
practice, to the satisfaction of
Cum 2500.0 2300 5750000
engineer incharge , etc. including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport

Laying RCC (any grade) in Abutment


& Pier Cap including compacting,
centring and if need dewatering
also, with all shuttering materials,
complete as per drawing and
Technical Specification,good
practice, to the satisfaction of
6 engineer incharge , etc. including Cum 2300 0
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of
Shuttering,supporting & Staging
material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position
in foundation, substructure and
superstructure including binding
7
wire as per drawing, Technical
Specification Section 1600. Including
MT 500.0 6500 3250000
transportation from yard (trailor will
be provided by MMR PROJECTS free
of cost), including cutting, bending
machine.

Laying RCC any grade in cast in situ


crash barrier, with cutting, bending
and fixing reinforcement and all
shuttering materials,including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if
required ,fixing of weepholes ,fixing
8 of fibreboard, Staging/de staging Rmt. 1200 0
complete, Line & Level inclusive of
Shuttering,supporting & Staging
material and labour with transport,
as per drawing and technical
specification, complete in all
respect & good industrial practice,
to the satisfaction of engineer
incharge.
Laying RCC any grade in pre-cast
girder (RCC & PSC) including
compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if
required ,fixing of weepholes ,fixing
9
of fibreboard, Staging/de staging
complete, Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging
material as per drawing and
technical specification, complete in
all respect & good industrial
practice, to the satisfaction of
engineer incharge.

profiling work for PSC girder as per


10
technical specification and also to
the satisfaction of engineer
Nos. 2500 0
incharge.

cutting, threading, stressing and


11
grouting of HT strand as per
technical specification and also to
MT 8000 0
the satisfaction of engineer incharge

Grand Total 9,209,250.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery) in


soil in foundation including all lifs and leads
including dewatering if required, as per
1 Cum
drawing and technical specification, complete
in all respect & good industrial practice, to
the satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need dewatering
2 also, with all shuttering materials, as per Cum 135.0 600 81000
drawing and technical specification, complete
in all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need dewatering
also, with all shuttering materials,including
compacting, vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if required
3 ,fixing of weepholes ,fixing of fibreboard, Cum 27.0 1550 41850
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting & Staging
material and labour with transport, as per
drawing and technical specification, complete
in all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure (wall,


Abutment, retaining wall ) including
compacting, centring and if need dewatering
4 also, with all shuttering materials,including Cum 6.0 1800 10800
compacting, vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if required
,fixing of weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box type
slab,dirt wall,Abutment wall, bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with all
shuttering materials, complete as per drawing
5
and Technical Specification,good practice, to
the satisfaction of engineer incharge , etc.
Cum 4.0 2300 9200
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport

Laying RCC (any grade) in Abutment & Pier


Cap including compacting, centring and if
need dewatering also, with all shuttering
materials, complete as per drawing and
Technical Specification,good practice, to the
6
satisfaction of engineer incharge , etc.
including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and superstructure
7
including binding wire as per drawing,
Technical Specification Section 1600.
MT 3.1 6500 20215
Including transportation from yard (trailor
will be provided by MMR PROJECTS free of
cost), including cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8 weepholes ,fixing of fibreboard, Staging/de Rmt. 1200 0
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport, as per drawing and
technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder (RCC
& PSC) including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard, Staging/de
9 staging complete, Line & Level exclusive of Cum. 1500 0
Shuttering,supporting & Staging material as
per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

profiling work for PSC girder as per technical


10 specification and also to the satisfaction of Nos. 2500 0
engineer incharge.

cutting, threading, stressing and grouting of


11 HT strand as per technical specification and MT 8000 0
also to the satisfaction of engineer incharge

Grand Total 163,065.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation
including all lifs and leads including
1 dewatering if required, as per drawing Cum
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in


levelling course etc. under foundation
including compacting, centring and if
2
need dewatering also, with all
shuttering materials, as per drawing and
Cum 64.0 600 38400
technical specification, complete in all
respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC any grade in


(Foundation,Sub-Structure and Super-
Structure )including compacting,
centring and if need dewatering also,
with all shuttering materials,including
compacting, vibrating, curing ,centring,
and shuttering/de shuttering/Finishing if
3
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging
Cum 31.0 1550 48050
complete, Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per
drawing and technical specification,
complete in all respect & good
industrial practice, to the satisfaction of
engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all
4 shuttering materials,including Cum 2.0 1800 3600
compacting, vibrating, curing ,centring,
and shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,
Laying RCC (any grade) in super
structure (Only LVUP slab,MNB solid slab
and box type slab,dirt wall,Abutment
wall, bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 4.0 2300 9200
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical
Specification,good practice, to the
6
satisfaction of engineer incharge , etc.
including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 101.0 6500 656500
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ


crash barrier, with cutting, bending and
fixing reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
8 fibreboard, Staging/de staging Rmt. 1200 0
complete, Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per
drawing and technical specification,
complete in all respect & good
industrial practice, to the satisfaction of
engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging
complete, Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and


11
grouting of HT strand as per technical
specification and also to the satisfaction
MT 8000 0
of engineer incharge

Grand Total 755,750.00


BOQ For Structure Work

S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 28.0 600 16800
specification, complete in all respect &
good industrial practice, to the satisfaction
of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Staging/de Cum 61.0 1550 94550
staging complete, Line & Level inclusive
of Shuttering,supporting & Staging
material and labour with transport, as per
drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 460.0 1800 828000
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 379.0 2300 871700
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment & Pier


Cap including compacting, centring and if
need dewatering also, with all shuttering
materials, complete as per drawing and
Technical Specification,good practice, to
6
the satisfaction of engineer incharge , etc.
including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 97.9 6500 636350
Section 1600. Including transportation from
yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard, Staging/de
staging complete, Line & Level inclusive
Rmt. 1200 0
of Shuttering,supporting & Staging
material and labour with transport, as per
drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material as
per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 2,447,400.00


S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation including
all lifs and leads including dewatering if
1 required, as per drawing and technical Cum
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 162.0 600 97200
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3 required ,fixing of weepholes ,fixing of Cum 129.0 1550 199950
fibreboard, Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all shuttering
4 materials,including compacting, Cum 7.0 1800 12600
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 24.0 2300 55200
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 12.6 6500 81575
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
8
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete,
Rmt. 1200 0
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical
specification and also to the satisfaction
MT 8000 0
of engineer incharge

Grand Total 446,525.00


S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 63.0 600 37800
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 136.0 1550 210800
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with transport,
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 367.0 1800 660600
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 745.0 2300 1713500
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment & Pier


Cap including compacting, centring and if
need dewatering also, with all shuttering
materials, complete as per drawing and
Technical Specification,good practice, to
6
the satisfaction of engineer incharge ,
etc. including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 201.1 6500 1307020
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with transport,
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 3,929,720.00


S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 600 0
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 135.0 1550 209250
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 1800 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 2300 0
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment & Pier


Cap including compacting, centring and if
need dewatering also, with all shuttering
materials, complete as per drawing and
Technical Specification,good practice, to
the satisfaction of engineer incharge ,
6 etc. including compacting, vibrating, Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with
transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 10.8 6500 69940
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 279,190.00


Rate are for Minor
Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 118.0 600 70800
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 75.0 1550 116250
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 5.0 1800 9000
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 18.0 2300 41400
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 7.2 6500 46540
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 283,990.00


Rate are for Minor
Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with


machinery) in soil in foundation including
all lifs and leads including dewatering if
1 required, as per drawing and technical Cum
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 435.0 600 261000
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3 required ,fixing of weepholes ,fixing of Cum 930.0 1550 1441500
fibreboard, Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all shuttering
4 materials,including compacting, Cum 13.0 1800 23400
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 32.0 2300 73600
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 70.6 6500 459030
Section 1600. Including transportation
from yard (trailor will be provided by
MMR PROJECTS free of cost), including
cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
8
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete,
Rmt. 1200 0
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical
specification and also to the satisfaction
MT 8000 0
of engineer incharge

Grand Total 2,258,530.00


Rate are for Minor
Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 167.0 600 100200
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
3 required ,fixing of weepholes ,fixing of Cum 53.0 1550 82150
fibreboard, Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
need dewatering also, with all shuttering
4 materials,including compacting, Cum 5.0 1800 9000
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also,
with all shuttering materials, complete as
per drawing and Technical
5 Specification,good practice, to the Cum 20.0 2300 46000
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line &
Level inclusive of Shuttering,supporting
& Staging material and labour with
transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 7.1 6500 46085
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
8
required ,fixing of weepholes ,fixing of
fibreboard, Staging/de staging complete,
Rmt. 1200 0
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport, as per drawing
and technical specification, complete in
all respect & good industrial practice, to
the satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 283,435.00


Rate are for Minor
Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 67.0 600 40200
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 78.0 1550 120900
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with transport,
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 791.0 1800 1423800
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 1134.0 2300 2608200
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment & Pier


Cap including compacting, centring and if
need dewatering also, with all shuttering
materials, complete as per drawing and
Technical Specification,good practice, to
6
the satisfaction of engineer incharge ,
etc. including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 308.0 6500 2002065
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with transport,
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 6,195,165.00


S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 43.0 600 25800
specification, complete in all respect &
good industrial practice, to the satisfaction
of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Staging/de Cum 885.0 1550 1371750
staging complete, Line & Level inclusive
of Shuttering,supporting & Staging
material and labour with transport, as per
drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need
4
dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 1800 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 30.0 2300 69000
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment & Pier


Cap including compacting, centring and if
need dewatering also, with all shuttering
materials, complete as per drawing and
Technical Specification,good practice, to
6
the satisfaction of engineer incharge , etc.
including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 150.0 6500 975000
Section 1600. Including transportation from
yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard, Staging/de
staging complete, Line & Level inclusive
Rmt. 1200 0
of Shuttering,supporting & Staging
material and labour with transport, as per
drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material as
per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 2,441,550.00


S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery)


in soil in foundation including all lifs and
leads including dewatering if required, as
1 per drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need
2
dewatering also, with all shuttering
materials, as per drawing and technical
Cum 600 0
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
3 weepholes ,fixing of fibreboard, Cum 400.0 1550 620000
Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall )
including compacting, centring and if
4
need dewatering also, with all shuttering
materials,including compacting, vibrating,
Cum 1800 0
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box
type slab,dirt wall,Abutment wall,
bracket,seismes
arrestor,pedestal )including compacting,
centring and if need dewatering also, with
all shuttering materials, complete as per
5
drawing and Technical Specification,good
practice, to the satisfaction of engineer
Cum 2300 0
incharge , etc. including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment &


Pier Cap including compacting, centring
and if need dewatering also, with all
shuttering materials, complete as per
drawing and Technical Specification,good
practice, to the satisfaction of engineer
6 incharge , etc. including compacting, Cum 2300 0
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required , Staging/de staging complete,
Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and
superstructure including binding wire as
7 per drawing, Technical Specification MT 42.9 6500 278915
Section 1600. Including transportation
from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting,
bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8
weepholes ,fixing of fibreboard,
Staging/de staging complete, Line & Level
Rmt. 1200 0
inclusive of Shuttering,supporting &
Staging material and labour with
transport, as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder
(RCC & PSC) including compacting,
vibrating, curing ,centring, and
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
9
fibreboard, Staging/de staging complete,
Line & Level exclusive of
Cum. 1500 0
Shuttering,supporting & Staging material
as per drawing and technical
specification, complete in all respect &
good industrial practice, to the
satisfaction of engineer incharge.

profiling work for PSC girder as per


10 technical specification and also to the Nos. 2500 0
satisfaction of engineer incharge.

cutting, threading, stressing and grouting


11
of HT strand as per technical specification
and also to the satisfaction of engineer
MT 8000 0
incharge

Grand Total 898,915.00


S.no Description Unit Qty. Rate Amount

Rate are for Minor


Bridge/VUP/LVUP/Flyover/ROB

Earthwork in excavation (with machinery) in


soil in foundation including all lifs and leads
including dewatering if required, as per
1 drawing and technical specification, Cum
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

a) soil/soft rock 70

b) Hard Rock 200

Laying Plain Cement Concrete in levelling


course etc. under foundation including
compacting, centring and if need dewatering
2
also, with all shuttering materials, as per
drawing and technical specification,
Cum 62.0 600 37200
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

Laying RCC any grade in (Foundation,Sub-


Structure and Super-Structure )including
compacting, centring and if need
dewatering also, with all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
3
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard, Staging/de
Cum 280.0 1550 434000
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport, as per drawing and
technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure


(wall, Abutment, retaining wall ) including
compacting, centring and if need dewatering
4
also, with all shuttering materials,including
compacting, vibrating, curing ,centring, and
Cum 764.0 1800 1375200
shuttering/de shuttering/Finishing if
required ,fixing of weepholes ,fixing of
fibreboard,
Laying RCC (any grade) in super structure
(Only LVUP slab,MNB solid slab and box type
slab,dirt wall,Abutment wall,
bracket,seismes arrestor,pedestal )including
compacting, centring and if need dewatering
also, with all shuttering materials, complete
as per drawing and Technical
5 Specification,good practice, to the Cum 1227.0 2300 2822100
satisfaction of engineer incharge , etc.
including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport

Laying RCC (any grade) in Abutment & Pier


Cap including compacting, centring and if
need dewatering also, with all shuttering
materials, complete as per drawing and
Technical Specification,good practice, to the
6
satisfaction of engineer incharge , etc.
including compacting, vibrating,
Cum 2300 0
curing ,centring, and shuttering/de
shuttering/Finishing if required , Staging/de
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material
and labour with transport.

Cutting, Bending, Binding & Fixing of


HYSD/TMT reinforcement in position in
foundation, substructure and superstructure
7
including binding wire as per drawing,
Technical Specification Section 1600.
MT 374.3 6500 2432950
Including transportation from yard (trailor
will be provided by MMR PROJECTS free of
cost), including cutting, bending machine.

Laying RCC any grade in cast in situ crash


barrier, with cutting, bending and fixing
reinforcement and all shuttering
materials,including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
8 weepholes ,fixing of fibreboard, Staging/de Rmt. 1200 0
staging complete, Line & Level inclusive of
Shuttering,supporting & Staging material and
labour with transport, as per drawing and
technical specification, complete in all
respect & good industrial practice, to the
satisfaction of engineer incharge.
Laying RCC any grade in pre-cast girder (RCC
& PSC) including compacting, vibrating,
curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of
weepholes ,fixing of fibreboard, Staging/de
9 staging complete, Line & Level exclusive of Cum. 1500 0
Shuttering,supporting & Staging material as
per drawing and technical specification,
complete in all respect & good industrial
practice, to the satisfaction of engineer
incharge.

profiling work for PSC girder as per technical


10 specification and also to the satisfaction of Nos. 2500 0
engineer incharge.

cutting, threading, stressing and grouting of


11 HT strand as per technical specification and MT 8000 0
also to the satisfaction of engineer incharge

Grand Total 7,101,450.00


S.no
1

a)
b)

5
6

Grand
Total
Perticular Unit Quty

Rate are for Minor Bridge/VUP/LVUP/Flyover/ROB


Earthwork in excavation (with machinery) in soil in
foundation including all lifs and leads including dewatering
if required, as per drawing and technical specification, Cum
complete in all respect & good industrial practice, to the
satisfaction of engineer incharge.

soil/soft rock
Hard Rock

Laying Plain Cement Concrete in levelling course etc. under


foundation including compacting, centring and if need
dewatering also, with all shuttering materials, as per
Cum 25
drawing and technical specification, complete in all respect
& good industrial practice, to the satisfaction of engineer
incharge.

Laying RCC any grade in (Foundation )including compacting,


centring, with all shuttering materials,including
compacting, vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of weepholes ,fixing
of fibreboard, Staging/de staging complete, Line & Level Cum 95
inclusive of Shuttering,supporting & Staging material and
labour with transport, as per drawing and technical
specification, complete in all respect & good industrial
practice, to the satisfaction of engineer incharge.

Laying RCC (any grade) in sub structure (wall, Abutment,


retaining wall ) including compacting, centring and if need
dewatering also, with all shuttering materials,including
Cum
compacting, vibrating, curing ,centring, and shuttering/de
shuttering/Finishing if required ,fixing of weepholes ,fixing
of fibreboard,

Laying RCC (any grade) in super structure (Only LVUP


slab,MNB solid slab and box type slab,dirt wall,Abutment
wall, bracket,seismes arrestor,pedestal )including
compacting, centring and if need dewatering also, with all
shuttering materials, complete as per drawing and
Technical Specification,good practice, to the satisfaction Cum
of engineer incharge , etc. including compacting, vibrating,
curing ,centring, and shuttering/de shuttering/Finishing if
required , Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting & Staging material and
labour with transport
Laying RCC (any grade) in Abutment & Pier Cap including
compacting, centring and if need dewatering also, with all
shuttering materials, complete as per drawing and
Technical Specification,good practice, to the satisfaction
of engineer incharge , etc. including compacting, vibrating, Cum
curing ,centring, and shuttering/de shuttering/Finishing if
required , Staging/de staging complete, Line & Level
inclusive of Shuttering,supporting & Staging material and
labour with transport.

Cutting, Bending, Binding & Fixing of HYSD/TMT


reinforcement in position in foundation, substructure and
superstructure including binding wire as per drawing,
MT 16.25
Technical Specification Section 1600. Including
transportation from yard (trailor will be provided by MMR
PROJECTS free of cost), including cutting, bending machine.

Back fill of excaveted material including compactin in side


CuM
area of Faoundation

Plump Concrete M15 in side area of Faoundation CuM

Dewatering
Backfill
Rate Remarks
150
500

900 22500

1800 171000

2200 0

3300 0
3300 0

9000 146250

100

1200

339750