a) soil/soft rock 70
a) soil/soft rock 70
Pipe Culvert
a) soil/soft rock 70
Drain
Earthwork in excavation (with
machinery) in soil in foundation
including all lifs and leads including
dewatering if required, as per drawing
1 Cum
and technical specification, complete
in all respect & good industrial
practice, to the satisfaction of
engineer incharge.
a) soil/soft rock 70
Total
Scope Matrix
2 Labour Accommodation √
3 Concrete √
4 TMT √
5 Binding Wire √
8 Concrete Pump √
9 Vibrator Machine √
11 Shuttering Oil √
13 Labour Fooding √
14 Labour Transporting √
22 Hessain Cloth √
24 Hume Pipe √
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
Drain
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a) soil/soft rock 70
a)
b)
5
6
Grand
Total
Perticular Unit Quty
soil/soft rock
Hard Rock
Dewatering
Backfill
Rate Remarks
150
500
900 22500
1800 171000
2200 0
3300 0
3300 0
9000 146250
100
1200
339750