1 REMOVAL OF PIPES 0
MATERIAL 0
LABOUR 0 nos
Equipments 0 hrs
2 MAKING WATER DIVERSIONS
MATERIAL 0
LABOUR 0 nos
Equipments 0 hrs
Excavation 20 4 2.8 224 cum
Pipe placing 0 hrs
3 BED PREPARATION
MATERIAL 2 17 2.25 0.2 15.3
LABOUR 2 1 nos
Equipments 2 hrs
0 hrs
0 hrs
4 SOLLING
MATERIAL 2 17 1.65 0.4 22.44 cum
LABOUR 1 nos
Equipments 3 hrs
5 PCC
MATERIAL 2 17 1.65 0.15 8.415 cum
LABOUR 2 nos
Equipments 2 36 0.15 10.8 sqm
6 Raft
MATERIAL 2 15 1.35 0.45 18.225 Cum
1.8225 mt
1.8225 mt
LABOUR 9.1125
Equipments 2 33 0.45 29.7 sqm
2 nos
4 nos
8 SLAB
MATERIAL 1 15 8.4 0.6 75.6 cum
7.56 mt
LABOUR 7.56 mt
75.6
Equipments 1 48 0.6 28.8
1000 nos
4
10 bituminous pad
11 Drain spouts
RATE AMOUNT
700 0
1200 0 Crane
600
700 0
1000 0 JCB
45 10080 4.977778 40.1785714286
1200 0 Crane
4250 27540
68000 44064 steel
300 1944
7000 4536 bending
600 26784 shuttering
15000
900 1800
2500
4300
113.7566
2,393,705.50
2,872,446.60
2,958,620.00
Material Labour
Concrete Steel
655,031.25 1,041,624.00 93,653.75
2,028,673.00
for 1 pier
raft 0.911
steel 0.911
1.822
wall 2.643
2.643
5.286
Equipment
238,364.00