You are on page 1of 1

Trial Mix Data Sheet

Objective 200±25 mm Slump retention for 3 hours Date 05.07.2020


Client Borak Ready Mix Location Castech Lab
Project Airport extention project Trial No. 226
Mix Design Details
W/C Ratio 0.38 Grade 4000psi Batch Volume(m3) 0.02
Weight for Moisture Water Specific Volume Adjusted
Material Source/ Brand 3 Batch Weight(kg)
1m (kg) Content(%) Absorption Gravity (ltrs) Weight(kg)
Cement Insee PCC 420 420.0 8.40
20mm Borak 755 0.90 0.523 757.8 15.16
12mm Borak 280 0.89 1.175 279.2 5.58
Sand Borak 825 6.93 2.300 863.2 17.26
Stone Dust 0.0 0.00
Water 160 119.8 2.40
Admix. 1 LRPS 3000S 4.2 4.2 0.08
Admix. 2 0.0 0.00
Admix. 3 0.0 0.00
0.0 0.00
Total 2444 2444 48.88
Batched Time 16:35 Admixture Dosage (%) 1.00
Workability
Elapsed
Initial 0.5 Hour 1 Hour 1.5 Hours 2 Hours 2.5 Hours 3 Hours 3.5 Hours 4 Hours
Time
Slump/
220 - 220 - 215 - 210 210 210
Flow(mm)
Temp(˚C)
Density
2.504
(g/cm3)
Air Content
(%)
Strength
Age 1 Day 3 Days 7 Days 14 Days 21 Days 28 Days
Specimen
1 2
No.
Load(kN) 739.7 989.6
Corrected
740 990
Load(kN)
Strength
32.9 44.0
(Mpa)
Remarks
After Converted to Cylinder strength= 5104psi.

Tested By Checked By Approved By


Name Arifur Rahman Dileepa Dissanayake Jia Jipeng
Designation Laboratory Engineer Technical Manager General Manager
Date and Signature 13.07.2020 13.07.2020 13.07.2020